|
|
(3 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML12243A392 | | | number = ML12243A392 |
| | issue date = 09/18/2012 | | | issue date = 09/18/2012 |
| | title = 08/29/2012 Meeting Summary with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 (TAC No. ME9233) | | | title = Meeting Summary with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 |
| | author name = Lyon C F | | | author name = Lyon C |
| | author affiliation = NRC/NRR/DORL/LPLIV | | | author affiliation = NRC/NRR/DORL/LPLIV |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000483 | | | docket = 05000483 |
| | license number = NPF-030 | | | license number = NPF-030 |
| | contact person = Lyon C F | | | contact person = Lyon C |
| | case reference number = TAC ME9233 | | | case reference number = TAC ME9233 |
| | document type = Meeting Summary | | | document type = Meeting Summary |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 September 18, 2012 LICENSEE: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 18, 2012 LICENSEE: Union Electric Company FACILITY: Callaway Plant, Unit 1 |
| Union Electric Company FACILITY: | |
| Callaway Plant, Unit 1 | |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF AUGUST 29,2012, PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY TO ADD A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1 E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM (TAC NO. ME9233) On August 29,2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Union Electric Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. | | OF AUGUST 29,2012, PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY TO ADD A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM (TAC NO. ME9233) |
| The purpose of the meeting was to discuss the licensee's planned submittal of an amendment request for Callaway Plant, Unit 1, for a new Technical Specification (TS) to provide operability and surveillance requirements for the Class 1 E electrical equipment air conditioning system. The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML 12227A347. | | On August 29,2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Union Electric Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's planned submittal of an amendment request for Callaway Plant, Unit 1, for a new Technical Specification (TS) to provide operability and surveillance requirements for the Class 1E electrical equipment air conditioning system. |
| The licensee presented information on the background and content of the proposed request (ADAMS Accession No. ML 12241A292). | | The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML12227A347. |
| The licensee described its proposed TS for the Class 1E electrical equipment air conditioning system. The NRC staff queried the licensee about several aspects of the proposed changes and provided comments for consideration by the licensee in developing its submittal. | | The licensee presented information on the background and content of the proposed request (ADAMS Accession No. ML12241A292). The licensee described its proposed TS for the Class 1E electrical equipment air conditioning system. |
| The licensee's staff acknowledged the NRC staff's questions and comments and stated that they would be considered as the licensee continues to prepare its submittal. | | The NRC staff queried the licensee about several aspects of the proposed changes and provided comments for consideration by the licensee in developing its submittal. The licensee's staff acknowledged the NRC staff's questions and comments and stated that they would be considered as the licensee continues to prepare its submittal. Several representatives from other utilities were in attendance or participated by telephone. Industry and NRC staff participating in the meeting recognized the challenges raised by the underlying issues that the new TSs propose to address, but acknowledged that a generic solution has not yet been determined. No regulatory decisions were made at the meeting. |
| Several representatives from other utilities were in attendance or participated by telephone. | | No Public Meeting Feedback forms were received. |
| Industry and NRC staff participating in the meeting recognized the challenges raised by the underlying issues that the new TSs propose to address, but acknowledged that a generic solution has not yet been determined. | | |
| No regulatory decisions were made at the meeting. No Public Meeting Feedback forms were received. | | - 2 Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov. |
| -Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov. Carl F. Lyon, Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor Docket No. | | Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483 |
| List of cc w/encl: Distribution via Listserv LIST OF AUGUST 29.2012. PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY TO ADD A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1 E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM CALLAWAY PLANT, UNIT 1 LICENSEE S. Maglio J. Little R. Andreasen M. Smith B. Yates T. Elwood M. Markley R. Mathew J. Andersen H. Walker K. Scales S.Som M. Hamm G. Armstrong* | | |
| F. Lyon OTHERS L Parker, STARS Alliance T. Weber, Arizona Public Service Company (Palo D. Bice, Entergy S. Wideman, Wolf Creek Nuclear Operating D. Buschbaum, STARS L Conklin, San Onofre Nuclear Generating F. Mowasat, San Onofre Nuclear Generating J. Morris, South Texas Project Nuclear Operating Company* *by telephone Enclosure | | ==Enclosure:== |
| -Please direct any inquiries to me at 301-415-2296, or Docket No.
| | |
| List of cc w/enc/: Distribution via Listserv DISTRIBUTION:
| | List of Attendees cc w/encl: Distribution via Listserv |
| PUBLIC LPL4 Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDeEeeb Resource RidsNrrDorl Resource RidsNrrDorlLpl4 Resource RidsNrrDssSbpb Resource RidsNrrDssScvb Resource RidsNrrDssStsb Resource RidsNrrLAJBurkhardt Resource IRA! Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsNrrPMCallaway Resource RidsOgcRp Resource RidsRgn4MailCenter Resource MHamm, NRR/DSS/STSB KScales, NRR/DE/EEEB RMathew, NRR/DE/EEEB HWalker, NRRlDSS/SCVB SSom, NRR/DE/EEEB GArmstrong, NRRIDSS/SBPB SKennedy, EDO RIV ADAMS Accession Nos. Meeting Notice ML 12227A347, Meeting Summary ML 12243A392, Handouts ML 12241A292
| | |
| *via email OFFICE DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORLlLPL4/PM NAME FLyon JBurkhardt* | | LIST OF ATTENDEES AUGUST 29.2012. PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY TO ADD A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM CALLAWAY PLANT, UNIT 1 LICENSEE S. Maglio J. Little R. Andreasen M. Smith B. Yates T. Elwood M. Markley R. Mathew J. Andersen H. Walker K. Scales S.Som M. Hamm G. Armstrong* |
| MMarkley FLyon DATE 9/13/18 9/13/12 9/14/12 9/18/12 OFFICIAL RECORD}} | | F. Lyon OTHERS L Parker, STARS Alliance T. Weber, Arizona Public Service Company (Palo Verde) |
| | D. Bice, Entergy (ANO) |
| | S. Wideman, Wolf Creek Nuclear Operating Company* |
| | D. Buschbaum, STARS Alliance* |
| | L Conklin, San Onofre Nuclear Generating Station* |
| | F. Mowasat, San Onofre Nuclear Generating Station* |
| | J. Morris, South Texas Project Nuclear Operating Company* |
| | *by telephone Enclosure |
| | |
| | Meeting Notice ML12227A347, Meeting Summary ML12243A392, Handouts ML12241A292 *via email OFFICE DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORLlLPL4/PM NAME FLyon JBurkhardt* MMarkley FLyon DATE 9/13/18 9/13/12 9/14/12 9/18/12}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEARML12227A3472012-08-14014 August 2012 8/29/2012 Notice of Preapplication Meeting with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 Project stage: Meeting ML12241A2922012-08-29029 August 2012 Class 1E AC Meeting Slides August 29, 2012 Project stage: Meeting ML12243A3922012-09-18018 September 2012 Meeting Summary with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 Project stage: Meeting 2012-08-29
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML22259A1192022-10-12012 October 2022 Summary of Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome Gaia Fuel Assemblies in Its Core Reload Quantities for Callaway Plant, Unit No. 1 ML22181A0012022-07-22022 July 2022 Summary of June 29, 2022, Public Meeting - Union Electric Company, Dba Ameren Missouri to Discuss Upcoming License Amendment Request to Revise Technical Specifications to Reflect Revised Spent Fuel Pool Criticality Safety Analysis ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22089A2292022-04-0606 April 2022 February 28, 2022, Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21308A0742021-11-17017 November 2021 Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome'S Gaia Fuel Assemblies in Its Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21243A0042021-09-0707 September 2021 Summary of Teleconference Meeting with Union Electric Company Regarding Proposed License Amendment Request to Revise the Emergency Plan ML21216A2002021-08-11011 August 2021 Summary of Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commission 2020 Annual Assessment of Callaway Plant Docket No. 50-483 ML21168A0022021-07-0101 July 2021 Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome'S Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21103A0032021-04-16016 April 2021 Summary of March 15, 2021, Teleconference Meeting with Union Electric Company Regarding Proposed License Amendment Request to Implement Alternative Source ML20280A5632020-10-21021 October 2020 Summary of Teleconference Meeting with Union Electric Company (Dba Ameren Missouri) for Callaway Plant, Unit 1, on Pre-Application for LARs on TSTF-439, TSTF-505, and Title 10 CFR 50.69 Categorization Program (EPID L-2020-LRM-0072 ML20189A1992020-07-13013 July 2020 Summary of (COVID-19) Presubmittal Public Teleconference W/Union Electric Company Postponement of Steam Generator Eddy Current Testing, by One Refueling Outage, for Callaway Plant, Unit No. 1 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19268A9772019-10-16016 October 2019 Summary of 9/12/2019 Meeting with Union Electric Company Related to Closure of Generic Letter 2004-02 for Callaway Plant, Unit 1 ML18215A3752018-08-21021 August 2018 Summary of Pre-Submittal Meeting with Union Electric Company to Discuss an Alternate Source Term License Amendment Request ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a ML16165A0042016-06-23023 June 2016 Summary of 6/1/2016 Public Meeting with Union Electric Company to Discuss Generic Safety Issue 191 and Callaway Plant Unit 1's Debris Testing Plan ML14281A3652015-02-23023 February 2015 May 2, 2014, Summary of Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML14223A6022014-08-20020 August 2014 Summary of Telephone Conference Call Held on December 18, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) ML14223A5322014-08-20020 August 2014 November 26, 2013, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal A ML14177A5952014-07-0808 July 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plant, Un ML14175B4992014-07-0808 July 2014 Summary of Telephone Conference Calls Held on October 2 and 3, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plan ML14169A6372014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 28, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Pertaining to the Callaway Plant, Unit 1, LRA ML14169A6042014-07-0303 July 2014 April 30, 2014, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML14125A1992014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 9, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application (Tac. No. ME7708) ML14169A4412014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 21, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application (Tac. No. ME7708 ML14121A5532014-06-18018 June 2014 November 25, 2013, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14093B3382014-04-14014 April 2014 01/30/2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14087A2102014-04-0808 April 2014 Summary of 3/25/14 Verbal Relief Telephone Conference, Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval ML14070A0782014-04-0707 April 2014 02/27/2014 & 03/04/2014, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, License Renewal Application RAI Set 31 ML14080A5442014-03-31031 March 2014 February 20, 2014, Summary of Meeting Held Between U.S. Nuclear Regulatory Commission Staff and Union Electric Company Representatives to Discuss the Callaway Plant, Unit 1, License Renewal Application ML14035A5752014-03-25025 March 2014 January 28, 2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant Unit 1, LRA ML13246A3072013-09-0909 September 2013 Memorandum to File - Verbal Authorization of Relief Request PR-07, Testing Frequency for Pumps and Valves, Third 10-year Inservice Testing Interval ML13126A3202013-05-0707 May 2013 Summary of Telephone Conference, Verbal Authorization of Relief Request I3R-14. Proposed Alternative to ASME Code Requirements for Leakage Testing of RPV Head Flange Leakoff Lines, Third 10-Year ISI Interval. ML13067A3162013-04-0101 April 2013 August 23, 2012, Summary of Telephone Conference Call Held Between U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway Plant, Unit 1, License ML13029A0162013-02-12012 February 2013 Summary of Telephone Conference Call Held on January 22, 2013, Between the U.S. Nuclear Regulatory Commission ML13029A6592013-02-12012 February 2013 Summary of Telephone Conference Call Held on December 6, 2012, Between the NRC and Union Electric Company, Concerning Request for Additional Information Pertaining to the Callaway Plant Unit 1, LRA ML13042A1882013-02-11011 February 2013 01/31/2013 Summary of the Public Meeting to Discuss the Results of the Grand Gulf Nuclear Station License Renewal Inspection IR 05000483/20120092013-01-25025 January 2013 1/17/2013 - Summary of Public Meeting to Discuss the Results of the Callaway Nuclear Plant License Renewal Inspection (05000483-12-009) ML12321A1992012-11-29029 November 2012 9/27/12 - Summary of Telephone Conference Call Held Between the NRC and Union Electric Company (Ameren Missouri), Concerning RAIs Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML12321A1882012-11-20020 November 2012 Summary of Preapplication Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1, License Amendment Request to Change Licensing Basis and Analysis of Integrated Head Assembly Consistent with Regulatory Guide 1.61 Revision 1 ML12262A3112012-10-0202 October 2012 Summary of Telephone Conference Call Held on September 14, 2012, Between NRC and Union Electric Company, Concerning the SAMA RAI for the Callaway Plant, Unit 1, LRA ML12243A3922012-09-18018 September 2012 Meeting Summary with Union Electric Company to Discuss Request for New Technical Specification Related to Class 1E Electrical Equipment Air Conditioning System at Callaway Plant, Unit 1 ML12243A3762012-09-18018 September 2012 8/29/2012 Summary of Preapplication Meeting with Union Electric Company to Discuss Request to Revise Technical Specification 3.7.9, Ultimate Heat Sink SR 3.7.9.1 and 3.7.9.2 at Callaway Plant, Unit 1 ML12244A4292012-09-18018 September 2012 Summary of Telephone Conference Call Held on August 29, 2012, Between the U.S. Nuclear Regulatory Commission and Union Electric Company, Concerning the Request for Additional Information Pertaining to the Callaway Plant, Unit 1, License Ren ML1116002282011-06-21021 June 2011 Summary of Meeting with Union Electric Company to Discuss Callaway Plant, Unit 1's Proposed Request to Adopt Risk-informed, Performance-based Alternative Described in National Fire Protection Association Standard (NFPA) 805 ML1115400922011-06-0303 June 2011 Summary of Annual Performance Assessment Meeting with Union Electric Company to Discuss the Callaway Plant Performance for the NRC Inspection Period Ending December 31, 2010 ML1104001662011-02-22022 February 2011 Summary of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1034701472010-12-16016 December 2010 Summary of Meeting with Union Electric Company to Discuss Licensee'S Planned Responses to Staff Requests for Additional Information Related to Callaway Plant'S Request to Revise TS 3.3.2, ESFAS Instrumentation Functions ML1008804162010-03-31031 March 2010 Meeting Summary of Conference Call with Union Electric Company to Discuss Proposed Application for Relocation of Surveillance Frequencies from Callaway Plant Technical Specifications (Risk-Managed TS Initiative 5b) 2024-01-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 September 18, 2012 LICENSEE: Union Electric Company FACILITY: Callaway Plant, Unit 1
SUBJECT:
SUMMARY
OF AUGUST 29,2012, PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY TO ADD A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM (TAC NO. ME9233)
On August 29,2012, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Union Electric Company (the licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's planned submittal of an amendment request for Callaway Plant, Unit 1, for a new Technical Specification (TS) to provide operability and surveillance requirements for the Class 1E electrical equipment air conditioning system.
The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML12227A347.
The licensee presented information on the background and content of the proposed request (ADAMS Accession No. ML12241A292). The licensee described its proposed TS for the Class 1E electrical equipment air conditioning system.
The NRC staff queried the licensee about several aspects of the proposed changes and provided comments for consideration by the licensee in developing its submittal. The licensee's staff acknowledged the NRC staff's questions and comments and stated that they would be considered as the licensee continues to prepare its submittal. Several representatives from other utilities were in attendance or participated by telephone. Industry and NRC staff participating in the meeting recognized the challenges raised by the underlying issues that the new TSs propose to address, but acknowledged that a generic solution has not yet been determined. No regulatory decisions were made at the meeting.
No Public Meeting Feedback forms were received.
- 2 Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov.
Carl F. Lyon, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES AUGUST 29.2012. PRE-APPLICATION MEETING WITH UNION ELECTRIC COMPANY TO ADD A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM CALLAWAY PLANT, UNIT 1 LICENSEE S. Maglio J. Little R. Andreasen M. Smith B. Yates T. Elwood M. Markley R. Mathew J. Andersen H. Walker K. Scales S.Som M. Hamm G. Armstrong*
F. Lyon OTHERS L Parker, STARS Alliance T. Weber, Arizona Public Service Company (Palo Verde)
D. Bice, Entergy (ANO)
S. Wideman, Wolf Creek Nuclear Operating Company*
D. Buschbaum, STARS Alliance*
L Conklin, San Onofre Nuclear Generating Station*
F. Mowasat, San Onofre Nuclear Generating Station*
J. Morris, South Texas Project Nuclear Operating Company*
Meeting Notice ML12227A347, Meeting Summary ML12243A392, Handouts ML12241A292 *via email OFFICE DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORLlLPL4/PM NAME FLyon JBurkhardt* MMarkley FLyon DATE 9/13/18 9/13/12 9/14/12 9/18/12