|
|
(4 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 12/22/2017 | | | issue date = 12/22/2017 |
| | title = Summary of November 14, 2017 Public Teleconference with NextEra Energy Point Beach, LLC, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (CAC Nos. MF9532 and MF9533; EPID L-2017-L | | | title = Summary of November 14, 2017 Public Teleconference with NextEra Energy Point Beach, LLC, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (CAC Nos. MF9532 and MF9533; EPID L-2017-L |
| | author name = Chawla M L | | | author name = Chawla M |
| | author affiliation = NRC/NRR/DORL/LPLIII | | | author affiliation = NRC/NRR/DORL/LPLIII |
| | addressee name = | | | addressee name = |
Line 9: |
Line 9: |
| | docket = 05000266, 05000301 | | | docket = 05000266, 05000301 |
| | license number = DPR-024, DPR-027 | | | license number = DPR-024, DPR-027 |
| | contact person = Chawla M L, NRR/DORL/LPLIII | | | contact person = Chawla M, NRR/DORL/LPLIII |
| | case reference number = CAC MF9532, CAC MF9533, EPID L-2017-LLA-0209 | | | case reference number = CAC MF9532, CAC MF9533, EPID L-2017-LLA-0209 |
| | document type = Meeting Summary | | | document type = Meeting Summary |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:LICENSEE: FACILITY: | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Unit Nos. 1 and 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 NextEra Energy Point Beach, LLC Point Beach Nuclear Plant, Unit Nos. 1 and 2 SUMMARY OF NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS CONTAINMENT DOME TRUSS LICENSE AMENDMENT REQUEST FOR POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF9532 AND MF9533; EPID L-2017-LLA-0209) On November 14, 2017, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Point Beach, LLC (NextEra or licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. By letter dated March 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 17090A511 ), the licensee submitted a license amendment request (LAR) for Point Beach Nuclear Plant, Units 1 and 2. The proposed LAR would document a risk-informed resolution strategy to resolve low risk, legacy design code nonconformances associated with construction trusses in the containment building. On October 30, 2017 (ADAMS Accession No. ML 17303A542), the NRC staff submitted a draft request for additional information (RAI) related to the above submittal. The purpose of this public teleconference was for the NRC staff to discuss the draft RAls in further detail in order to gain a better understanding of the methodology adopted in the subject submittal, prior to conducting a site audit on November 29 and 30, 2017, at the NextEra Headquarters in Jupiter, Florida. The NRC staff asked numerous questions regarding the unique approach, and the licensee provided further insight into the adopted methodology. The meeting notice and agenda, dated November 2, 2017, are available in ADAMS as Accession No. ML 17311A084. A list of the meeting attendees is enclosed. There were no members of the public in attendance via bridgeline and public meeting feedback forms were not requested by anyone. Please direct any inquiries to me at 301-415-8371, or by e-mail to Mahesh.chawla@nrc.gov. Docket Nos. 50-266 and 50-301
| | |
| | ==SUMMARY== |
| | OF NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS CONTAINMENT DOME TRUSS LICENSE AMENDMENT REQUEST FOR POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF9532 AND MF9533; EPID L-2017-LLA-0209) |
| | On November 14, 2017, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Point Beach, LLC (NextEra or licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. |
| | By letter dated March 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17090A511 ), the licensee submitted a license amendment request (LAR) for Point Beach Nuclear Plant, Units 1 and 2. The proposed LAR would document a risk-informed resolution strategy to resolve low risk, legacy design code nonconformances associated with construction trusses in the containment building. |
| | On October 30, 2017 (ADAMS Accession No. ML17303A542), the NRC staff submitted a draft request for additional information (RAI) related to the above submittal. The purpose of this public teleconference was for the NRC staff to discuss the draft RAls in further detail in order to gain a better understanding of the methodology adopted in the subject submittal, prior to conducting a site audit on November 29 and 30, 2017, at the NextEra Headquarters in Jupiter, Florida. The NRC staff asked numerous questions regarding the unique approach, and the licensee provided further insight into the adopted methodology. |
| | The meeting notice and agenda, dated November 2, 2017, are available in ADAMS as Accession No. ML17311A084. A list of the meeting attendees is enclosed. There were no members of the public in attendance via bridgeline and public meeting feedback forms were not requested by anyone. |
| | |
| | Please direct any inquiries to me at 301-415-8371, or by e-mail to Mahesh.chawla@nrc.gov. |
| | Mahesh Chawla, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| List of Attendees cc: Listserv Mahesh Chawla, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LIST OF ATTENDEES NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC REGARDING POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 TO DISCUSS CONTAINMENT DOME TRUSS STRUCTURE LAR Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Division Name Title Division of Operating Mahesh Chawla Project Manager Reactor Licensing (DORL) Division of Engineering (DE) George Thomas Senior Structural Engineer Dan Hoang Structural Engineer Kamal Manoly Senior Technical Advisor Division of Safety Systems Fred Forsaty Reactor Systems Engineer (DSS) Division of Risk Assessment Chinq Nq Reliability and Risk Analyst (ORA) Shilp Vasavada Reliability and Risk Analyst Sara Lyons Reliability and Risk Analyst NRC Reoion 3 Vijay Meghani Reactor Inspector John Bozqa Senior Reactor Inspector Jim Neurauter Senior Reactor Inspector Tom Hartman Senior Resident Inspector at Point Beach Nuclear Plant NextEra Energy Point Beach, LLC Point Beach Nuclear Lori Christensen Licensing Project Manager Plant/NextEra Headquarters Rich LaPlante Civil/Structural Senior Engineer Mike Lev Project Manager Steve Catron Licensing Fleet Manager Gary Kilby Licensing Lead Project Manaoer Jensen-Hughes Consultants Marlene Delaney Senior Engineer Ill/Manager, Design Enoineerinq Kevin Dommer Principal Engineer Ill Braden Schwarz Enoineer IV Todd Radford Senior Engineer/Structural Engineering Manager (Boston) Enclosure
| |
|
| |
|
| ML 17346A912 OFFICE DORL/LPL3/PM DORL/LPL3/LA NRR/DRA/APLB NAME MChawla SRohrer M Reisi Fard (Slyons for) DATE 12/13/17 12/13/17 12/13/17 OFFICE NRR/DSS/SRXB NRR/DORL/LPL3 DORL/LPL3/PM NAME JWhitman DWrona MChawla (RBeaton for) DATE 12/13/17 12/21/17 12/22/17
| | List of Attendees cc: Listserv |
| }} | | |
| | LIST OF ATTENDEES NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC REGARDING POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 TO DISCUSS CONTAINMENT DOME TRUSS STRUCTURE LAR Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Division Name Title Division of Operating Mahesh Chawla Project Manager Reactor Licensing (DORL) |
| | Division of Engineering (DE) George Thomas Senior Structural Engineer Dan Hoang Structural Engineer Kamal Manoly Senior Technical Advisor Division of Safety Systems Fred Forsaty Reactor Systems Engineer (DSS) |
| | Division of Risk Assessment Chinq Nq Reliability and Risk Analyst (ORA) Shilp Vasavada Reliability and Risk Analyst Sara Lyons Reliability and Risk Analyst NRC Reoion 3 Vijay Meghani Reactor Inspector John Bozqa Senior Reactor Inspector Jim Neurauter Senior Reactor Inspector Tom Hartman Senior Resident Inspector at Point Beach Nuclear Plant NextEra Energy Point Beach, LLC Point Beach Nuclear Lori Christensen Licensing Project Manager Plant/NextEra Headquarters Rich LaPlante Civil/Structural Senior Engineer Mike Lev Project Manager Steve Catron Licensing Fleet Manager Gary Kilby Licensing Lead Project Manaoer Jensen-Hughes Consultants Marlene Delaney Senior Engineer Ill/Manager, Design Enoineerinq Kevin Dommer Principal Engineer Ill Braden Schwarz Enoineer IV Todd Radford Senior Engineer/Structural Engineering Manager (Boston) |
| | Enclosure |
| | |
| | ML17346A912 *via email OFFICE DORL/LPL3/PM DORL/LPL3/LA NRR/DRA/APLB NRR/DE/ESEB* |
| | SRohrer M Reisi Fard NAME MChawla BWittick (RPettis for) |
| | (Slyons for) |
| | DATE 12/13/17 12/13/17 12/13/17 12/12/17 OFFICE NRR/DSS/SRXB NRR/DORL/LPL3 DORL/LPL3/PM JWhitman MChawla NAME DWrona (RBeaton for) |
| | DATE 12/13/17 12/21/17 12/22/17}} |
Letter Sequence Meeting |
---|
|
|
MONTHYEARNRC 2017-0017, License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances2017-03-31031 March 2017 License Amendment Request 278, Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances Project stage: Request ML17202G5912017-07-25025 July 2017 Audit Plan and Setup of Online Reference Portal for License Amendment Request - Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances Project stage: Other NRC 2017-0039, Construction Truss License Amendment Request Audit Plan2017-08-10010 August 2017 Construction Truss License Amendment Request Audit Plan Project stage: Request ML17307A0402017-10-30030 October 2017 E-mail Draft Request for Additional Information for Containment Dome Truss LAR - Point Beach Nuclear Plant, Units 1 and 2 (CAC Nos. MF9532 and MF9533; EPID L-2017-LLA-0209) Project stage: Draft RAI ML17319A2272017-11-17017 November 2017 Audit Plan for License Amendment Request to Resolve Non-Conformances Relating to Containment Dome Truss Project stage: Other ML17346A9122017-12-22022 December 2017 Summary of November 14, 2017 Public Teleconference with NextEra Energy Point Beach, LLC, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (CAC Nos. MF9532 and MF9533; EPID L-2017-L Project stage: Meeting ML18025C0432018-01-31031 January 2018 Request for Additional Information Regarding License Amendment Request to Resolve Nonconformances Relating to Containment Dome Truss Project stage: RAI ML18038A7852018-03-0606 March 2018 Summary Report for NRC Audit for Point Beach Nuclear Plant, Units 1 and 2, License Amendment Request to Resolve Nonconformance Relating to Containment Dome Truss Project stage: Other NRC 2018-0014, NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information2018-04-12012 April 2018 NextEra Energy Point Beach, LLC, Construction Truss License Amendment Request 278, Response to Request for Additional Information Project stage: Response to RAI NRC 2018-0001, Transmittal of Construction Truss License Amendment Request Document2018-04-12012 April 2018 Transmittal of Construction Truss License Amendment Request Document Project stage: Request NRC 2018-0030, Construction Truss License Amendment Request 278 Draft Updated Final Safety Analysis Report (UFSAR) Revision2018-05-29029 May 2018 Construction Truss License Amendment Request 278 Draft Updated Final Safety Analysis Report (UFSAR) Revision Project stage: Draft Request ML18179A4032018-06-29029 June 2018 Public Meeting Discussion Points Project stage: Meeting ML18213A3912018-07-12012 July 2018 Public Meeting Project stage: Request ML18214A1532018-08-0101 August 2018 NRR E-mail Capture - Final - Second Round RAIs - Point Beach Nuclear Plant, Units 1 and 2 - License Amendment Request to Resolve Non-conformances Relating to Containment Dome Truss - EPID L-2017-LLA-0209 Project stage: RAI ML18220B0192018-08-13013 August 2018 7/12/2018 Summary of Meeting with NextEra Energy Point Beach, Llc. to Discuss Supplemental Response to the RAI for Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit 1 and 2 (CAC Nos. MF9532 & MF9533; ... Project stage: RAI NRC 2019-0007, License Conditions and Implementation Items Required to Resolve Construction Truss Design Code Nonconformances2019-03-13013 March 2019 License Conditions and Implementation Items Required to Resolve Construction Truss Design Code Nonconformances Project stage: Request ML18345A1102019-03-26026 March 2019 Redacted Version, Issuance of Amendment Nos. 263 and 266 for Risk-Informed Approach to Resolve Construction Truss Design Code Nonconformances Project stage: Approval 2018-03-06
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24248A0152024-09-0505 September 2024 Summary of August 28, 2024, Public Pre-Application Meeting with NextEra Energy Point Beach, LLC Regarding Assessing Seismic Risk ML24227A5082024-08-15015 August 2024 Summary of the July 15, 2024, Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML23199A0262023-07-18018 July 2023 Summary of Public Outreach to Discuss the NRC 2022 End of Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML23118A1762023-05-0404 May 2023 Audit Summary for License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue 191 ML22144A0022022-09-14014 September 2022 Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan ML22181B1182022-06-30030 June 2022 Summary of the June 23, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML22019A2792022-01-20020 January 2022 Summary of Public Webinar with NextEra Energy Point Beach, LLC Regarding Future License Amendment and Exemption Request for Generic Letter 2004-02 Closure for Point Beach Nuclear Plant ML22004A0772022-01-0606 January 2022 Summaries of December 8, 2021 Draft Supplemental Environmental Impact Statement for Subsequent License Renewal Application Public Meetings ML21295A2532021-10-26026 October 2021 Summary of Public Webinar with NextEra Energy Point Beach,Llc Regarding Proposed Future LAR to Adopt TSTF-505, Rev.2, Provide Risk Informed Extended Completion Times-RITSTF Initiative 4B, at Point Beach Plant, Units 1&2 (L-2021-LRM-0086) ML21288A1222021-10-20020 October 2021 SLRA Summary of August 5, 2021, Public Meeting on Proposed Aging Management Activities of Irradiated Concrete and Steel Reactor Vessel Supports ML21214A1512021-08-27027 August 2021 SLRA June 3, 2021, Public Meeting - Proposed Aging Management Activities of Irradiated Concrete and Steel Reactor Vessel Supports ML21214A1652021-08-27027 August 2021 SLRA June 30, 2021, Public Meeting - Proposed Aging Management of Reactor Vessel Internals ML21161A2992021-06-17017 June 2021 Summary of May 18, 2021 Public Webinar with Nextera Energy Point Beach, LLC Regarding Path Forward for Generic Letter 2004-02 Closure ML21166A2192021-06-15015 June 2021 Summary of June 10, 2021, Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Point Beach Nuclear Plant ML21148A1162021-06-0101 June 2021 SLRA Public Meeting Discussion Questions 6-3-21 ML21075A3422021-03-17017 March 2021 Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Memo ML21075A3432021-02-17017 February 2021 Meeting Summary: Public Scoping Meeting for the Environmental Review of the Subsequent License Renewal Application for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (EPID No.: L-2020-SLE-0002) - Summary ML20253A1382020-09-11011 September 2020 8/13/2020 Summary of Public Meeting with NextEra Energy Point Beach, LLC Regarding Proposed License Amendment Request for Point Beach Nuclear Plant, Unit 1, Containment Building Truss License Condition Change Due to COVID-19 ML20233A7902020-08-20020 August 2020 Summary of the July 30, 2020, Public Webinar to Discuss the NRC 2019 End-Of-Cycle Plant Performance Assessment of the Duane Arnold Energy Center and the Point Beach Nuclear Plant ML19344A0162019-12-12012 December 2019 Summary of Pre-Application Public Teleconference with Nextera Energy Point Beach, LLC, for Point Beach Nuclear Plant, Units 1 and 2 ML19246A6242019-09-10010 September 2019 Summary of August 14, 2019, Pre-Application Public Teleconference with NextEra Energy Point Beach, LLC, for Point Beach Nuclear Plant, Unit 2 ML19179A0662019-07-17017 July 2019 Summary of Closed Meeting with Nextera Energy, LLC, to Discuss Security-Related Information for Point Beach Nuclear Plant, Unit 1 and 2, and Duane Arnold Energy Center ML19095B7772019-04-0505 April 2019 Summary of Public Outreach/Open House to Discuss the NRC 2018 End-of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML18220B0192018-08-13013 August 2018 7/12/2018 Summary of Meeting with NextEra Energy Point Beach, Llc. to Discuss Supplemental Response to the RAI for Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit 1 and 2 (CAC Nos. MF9532 & MF9533; ... ML18179A4032018-06-29029 June 2018 Public Meeting Discussion Points ML18136A9052018-05-31031 May 2018 Summary of April 25, 2017, Meeting with Florida Power & Light Company/Nextera Energy Regarding Planned Submittal of Exemption Requests to Support Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML18141A8452018-05-29029 May 2018 Summary of May 1, 2018 Meeting with NextEra Energy Point Beach, LLC, to Discuss License Amendment Request for High Winds Probabilistic Risk Assessment for Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML18121A3142018-05-0101 May 2018 Summary of the April 10, 2018 Public Outreach/Open House for the NRC to Discuss the 2017 End-of-Cycle Plant Performance Assessment of Point Beach Plant, Units 1 and 2 ML17346A9122017-12-22022 December 2017 Summary of November 14, 2017 Public Teleconference with NextEra Energy Point Beach, LLC, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (CAC Nos. MF9532 and MF9533; EPID L-2017-L ML17310B2062017-11-20020 November 2017 Summary of September 20, 2017, Meeting with Florida Power & Light Company and NextEra Energy Regarding Closure of NRC Generic Safety Issue 191/NRC Generic Letter 2004-02 ML17216A1732017-09-0707 September 2017 Notice of Meeting with Florida Power & Light Company and NextEra Energy to Discuss Closing Out Generic Safety Issue-191 and Generic Letter 2004-02 ML17202U7272017-07-19019 July 2017 Summary of July 11, 2017, Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 ML16305A3882016-11-0808 November 2016 Summary of October 18, 2016 Meeting with Nextera Energy Point Beach, Llc, to Discuss Containment Dome Truss License Amendment Request for Point Beach Nuclear Plant, Unit Nos. 1 and 2 (TAC Nos. MF8403 and MF8404) ML16160A1742016-06-0707 June 2016 Summary of Public Meeting with Nextera Energy Point Beach, LLC to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant Units 1 and 2 ML15341A0182015-12-16016 December 2015 Summary of Closed Pre-Application Teleconference with Nextera Energy Point Beach Regarding Steam Generators H* License Amendment Request ML15217A3312015-08-26026 August 2015 July 28, 2015, Summary of Ublic Meeting with NextEra Energy Point Beach, LLC, to Discuss a Proposed Licensing Basis Change for the Turbine-Driven Auxiliary Feedwater Pumps at the Point Beach Nuclear Plant, Units 1 and 2 ML15215A0502015-08-0505 August 2015 Summary of Public Meeting with NextEra Energy Point Beach, LLC, to Discuss Proposed Changes to Containment Dome Truss Design Bases Code for Point Beach Nuclear Plant, Units 1 and 2 ML15121A0572015-05-15015 May 2015 June 9 - 12, 2014 Summary of Audit at Point Beach Nuclear Plant, Unit Nos. 1 and 2, Associated with License Amendment Request to Transition to National Fire Protection Association Standard 805 ML15113B3862015-04-23023 April 2015 April 20, 2015 Summary of Public Outreach/Open House to Discuss the NRC 2014 End-Of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant ML15106A7122015-04-23023 April 2015 Summary of April 6, 2015, Meeting with NextEra Energy Point Beach, LLC, to Discuss License Amendment Request to Transition to NFPA 805 ML14114A1002014-04-23023 April 2014 Summary of Public Meeting to Discuss 2013 Annual Assessment Results for Point Beach Nuclear Plant ML13192A1432013-07-10010 July 2013 6/26/2013 - Summary of Open House to Discuss the 2012 Point Beach Nuclear Plant End-Of-Cycle Performance Assessment ML1212805092012-06-18018 June 2012 May 1, 2012 - Summary of Teleconference with Performance Contracting, Inc., Regarding Large Flume Testing for Point Beach Nuclear Plant ML11173A2332011-06-22022 June 2011 Summary of Public Meeting with NextEra Energy Point Beach, LLC to Discuss the Point Beach Nuclear Plant End-of-Cycle Performance Assessment for 2010 ML1108208272011-04-21021 April 2011 Summary of Pre-application Meeting with NextEra Energy, Inc., and Florida Power & Light Company, on Turkey Point, Units 3 and 4, St. Lucie, Units 1 & 2, Point Beach, Units 1 & 2, Duane Arnold Transition to NFPA-805 ML1014000432010-05-20020 May 2010 Summary of Public Meeting with FPL Energy Point Beach, LLC to Discuss Progress on the Nuclear Excellence Model and Updates on Operational Excellence, Generation Reliability, and Organizational Effectiveness at Point Beach ML1012502352010-05-0505 May 2010 Summary of the April 22, 2010, Public Meeting to Discuss the 2009 Point Beach End-of-Cycle Performance Assessment ML0924305212009-08-31031 August 2009 July 29, 2009,Summary of Public Meeting to Discuss the Progress on Actions Taken in Response to Substantive Cross Cutting Issues and the Results of an Independent Assessment of Corrective Actions for Recent Nuclear Safety Culture Surveys ML0914001932009-05-20020 May 2009 Summary of Public Meeting to Discuss the Progress on Actions Taken in Response to a Nuclear Safety Culture Survey in 2008 - Point Beach Nuclear Plant ML0832308202008-11-20020 November 2008 Teleconference Summary Regarding the 2008 Steam Generator Tube Inspection Results 2024-09-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 December 22, 2017 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC, TO DISCUSS CONTAINMENT DOME TRUSS LICENSE AMENDMENT REQUEST FOR POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 (CAC NOS. MF9532 AND MF9533; EPID L-2017-LLA-0209)
On November 14, 2017, a Category 1 public teleconference was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of NextEra Energy Point Beach, LLC (NextEra or licensee) at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland.
By letter dated March 31, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17090A511 ), the licensee submitted a license amendment request (LAR) for Point Beach Nuclear Plant, Units 1 and 2. The proposed LAR would document a risk-informed resolution strategy to resolve low risk, legacy design code nonconformances associated with construction trusses in the containment building.
On October 30, 2017 (ADAMS Accession No. ML17303A542), the NRC staff submitted a draft request for additional information (RAI) related to the above submittal. The purpose of this public teleconference was for the NRC staff to discuss the draft RAls in further detail in order to gain a better understanding of the methodology adopted in the subject submittal, prior to conducting a site audit on November 29 and 30, 2017, at the NextEra Headquarters in Jupiter, Florida. The NRC staff asked numerous questions regarding the unique approach, and the licensee provided further insight into the adopted methodology.
The meeting notice and agenda, dated November 2, 2017, are available in ADAMS as Accession No. ML17311A084. A list of the meeting attendees is enclosed. There were no members of the public in attendance via bridgeline and public meeting feedback forms were not requested by anyone.
Please direct any inquiries to me at 301-415-8371, or by e-mail to Mahesh.chawla@nrc.gov.
Mahesh Chawla, Project Manager Plant Licensing Branch Ill Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
List of Attendees cc: Listserv
LIST OF ATTENDEES NOVEMBER 14, 2017, PUBLIC TELECONFERENCE WITH NEXTERA ENERGY POINT BEACH, LLC REGARDING POINT BEACH NUCLEAR PLANT, UNIT NOS. 1 AND 2 TO DISCUSS CONTAINMENT DOME TRUSS STRUCTURE LAR Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Division Name Title Division of Operating Mahesh Chawla Project Manager Reactor Licensing (DORL)
Division of Engineering (DE) George Thomas Senior Structural Engineer Dan Hoang Structural Engineer Kamal Manoly Senior Technical Advisor Division of Safety Systems Fred Forsaty Reactor Systems Engineer (DSS)
Division of Risk Assessment Chinq Nq Reliability and Risk Analyst (ORA) Shilp Vasavada Reliability and Risk Analyst Sara Lyons Reliability and Risk Analyst NRC Reoion 3 Vijay Meghani Reactor Inspector John Bozqa Senior Reactor Inspector Jim Neurauter Senior Reactor Inspector Tom Hartman Senior Resident Inspector at Point Beach Nuclear Plant NextEra Energy Point Beach, LLC Point Beach Nuclear Lori Christensen Licensing Project Manager Plant/NextEra Headquarters Rich LaPlante Civil/Structural Senior Engineer Mike Lev Project Manager Steve Catron Licensing Fleet Manager Gary Kilby Licensing Lead Project Manaoer Jensen-Hughes Consultants Marlene Delaney Senior Engineer Ill/Manager, Design Enoineerinq Kevin Dommer Principal Engineer Ill Braden Schwarz Enoineer IV Todd Radford Senior Engineer/Structural Engineering Manager (Boston)
Enclosure
ML17346A912 *via email OFFICE DORL/LPL3/PM DORL/LPL3/LA NRR/DRA/APLB NRR/DE/ESEB*
SRohrer M Reisi Fard NAME MChawla BWittick (RPettis for)
(Slyons for)
DATE 12/13/17 12/13/17 12/13/17 12/12/17 OFFICE NRR/DSS/SRXB NRR/DORL/LPL3 DORL/LPL3/PM JWhitman MChawla NAME DWrona (RBeaton for)
DATE 12/13/17 12/21/17 12/22/17