ML14114A100: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14114A100
| number = ML14114A100
| issue date = 04/23/2014
| issue date = 04/23/2014
| title = 04/08/2014 Summary of Public Meeting to Discuss 2013 Annual Assessment Results for Point Beach Nuclear Plant
| title = Summary of Public Meeting to Discuss 2013 Annual Assessment Results for Point Beach Nuclear Plant
| author name = Cameron J C
| author name = Cameron J
| author affiliation = NRC/RGN-III/DRP/B4
| author affiliation = NRC/RGN-III/DRP/B4
| addressee name =  
| addressee name =  
Line 13: Line 13:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 April 23, 2014 LICENSEE:      NextEra Energy Point Beach, LLC FACILITY:      Point Beach Nuclear Plant
==SUBJECT:==
==SUMMARY==
OF THE APRIL 8, 2014, POINT BEACH PUBLIC MEETING TO DISCUSS THE 2013 ANNUAL ASSESSMENT RESULTS On April 8, 2014, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Two Creeks Township Hall in Two Creeks, Wisconsin, to discuss the 2013 annual assessment results for the Point Beach Nuclear Plant. Enclosed is a list of attendees for the meeting. A copy of the slides used by the NRCs staff during the meeting is located in ADAMS at Accession Number ML14112A425. The licensee staff did not utilize any slides during their presentation.
At the meeting, the NRC provided an overview of the reactor oversight program, the results of the 2013 annual assessment for Point Beach, and the NRCs inspection plans for 2014. The NRCs presentation was followed by statements from the NextEra Point Beach Site Vice-President which included site priorities, information on the results of the NRC Inspection Procedure 95002, as well as information on current plant status. Cynthia Pederson, the Regional Administrator for the NRCs Region III Office, acknowledged the information provided by the Point Beach officials and noted Point Beach performance improvement opportunities. She emphasized the need for performance improvement in 2014 and highlighted the fact that Point Beach was one of nine plants in the nation assessed in the Degraded Cornerstone Column (Column 3) of the NRCs Action Matrix.
After the business part of the meeting ended, NRC and Point Beach representatives listened to comments and addressed several questions from the public.
_/RA/__________________
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-266, 50-301 License No. DPR-24, DPR-27
==Enclosure:==
Meeting Attendance List cc w/encl: Distribution via LISTSERV
POINT BEACH 2013 PERFORMANCE ASSESSMENT MEETING April 8, 2014 MEETING ATTENDANCE LIST NRC Attendees Cynthia Pederson, Regional Administrator Kenneth OBrien, Deputy Director, Division of Reactor Projects Terry Beltz, Project Manager, Office of Nuclear Reactor Regulation Kevin Barclay, Point Beach Acting Senior Resident Inspector Roy Elliott, Point Beach Acting Resident Inspector Prema Chandrathil, Public Affairs Officer Jamnes Cameron, Chief, Branch 4, Division of Reactor Projects Bruce Bartlett, Project Engineer, Branch 4, Division of Reactor Projects NextEra Energy Company Attendees Eric McCartney, Site Vice President Felicia Hennessy, Performance Improvement Manager Lori Christensen, Licensing Project Manager Brenda Scherwinski, Licensing Analyst Mike Millen, Licensing Manager Ron Seizert, Licensing Supervisor Charles Trezise, Special Projects Director Rob Harrsch, Engineering Director Richard Wright, Plant General Manager Rob Webber, Operations Director Jim Petro, Licensing Director Jerry Pruitt, Nuclear Oversight Manager Sara Cassidy, Communications Manager Britt Griffin, Communications Mark Schartz, Point Beach Jeremy Keltner, Point Beach Members of the Public Lee Engelbrecht Tom Poindexter Donna Bartlett Enclosure
April 23, 2014 LICENSEE:          NextEra Energy Point Beach, LLC FACILITY:          Point Beach Nuclear Plant
==SUBJECT:==
==SUMMARY==
OF THE APRIL 8, 2014, POINT BEACH PUBLIC MEETING TO DISCUSS THE 2013 ANNUAL ASSESSMENT RESULTS On April 8, 2014, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Two Creeks Township Hall in Two Creeks, Wisconsin, to discuss the 2013 annual assessment results for the Point Beach Nuclear Plant. Enclosed is a list of attendees for the meeting. A copy of the slides used by the NRCs staff during the meeting is located in ADAMS at Accession Number ML14112A425. The licensee staff did not utilize any slides during their presentation.
At the meeting, the NRC provided an overview of the reactor oversight program, the results of the 2013 annual assessment for Point Beach, and the NRCs inspection plans for 2014. The NRCs presentation was followed by statements from the NextEra Point Beach Site Vice-President which included site priorities, information on the results of the NRC Inspection Procedure 95002, as well as information on current plant status. Cynthia Pederson, the Regional Administrator for the NRCs Region III Office, acknowledged the information provided by the Point Beach officials and noted Point Beach performance improvement opportunities. She emphasized the need for performance improvement in 2014 and highlighted the fact that Point Beach was one of nine plants in the nation assessed in the Degraded Cornerstone Column (Column 3) of the NRCs Action Matrix.
After the business part of the meeting ended, NRC and Point Beach representatives listened to comments and addressed several questions from the public.
_/RA/__________________
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-266, 50-301 License No. DPR-24. DPR-27
==Enclosure:==
Meeting Attendance List cc w/encl: Distribution via LISTSERV DISTRIBUTION:
See next page DOCUMENT NAME: Point Beach EOC Meeting Summary Publicly Available              Non-Publicly Available          Sensitive        Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE        RIII                        RIII NAME          BBartlett                  JCameron DATE          04/22/14                    04/23/14 OFFICIAL RECORD COPY
Memorandum to NextEra Energy from Jamnes Cameron dated April 23, 2014
==SUBJECT:==
==SUMMARY==
OF THE APRIL 8, 2014, POINT BEACH PUBLIC MEETING TO DISCUSS THE 2013 ANNUAL ASSESSMENT RESULTS DISTRIBUTION:
Joseph Nick RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov}}

Latest revision as of 06:42, 5 December 2019

Summary of Public Meeting to Discuss 2013 Annual Assessment Results for Point Beach Nuclear Plant
ML14114A100
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/23/2014
From: Jamnes Cameron
Reactor Projects Region 3 Branch 4
To:
Point Beach
References
Download: ML14114A100 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 April 23, 2014 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 8, 2014, POINT BEACH PUBLIC MEETING TO DISCUSS THE 2013 ANNUAL ASSESSMENT RESULTS On April 8, 2014, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Two Creeks Township Hall in Two Creeks, Wisconsin, to discuss the 2013 annual assessment results for the Point Beach Nuclear Plant. Enclosed is a list of attendees for the meeting. A copy of the slides used by the NRCs staff during the meeting is located in ADAMS at Accession Number ML14112A425. The licensee staff did not utilize any slides during their presentation.

At the meeting, the NRC provided an overview of the reactor oversight program, the results of the 2013 annual assessment for Point Beach, and the NRCs inspection plans for 2014. The NRCs presentation was followed by statements from the NextEra Point Beach Site Vice-President which included site priorities, information on the results of the NRC Inspection Procedure 95002, as well as information on current plant status. Cynthia Pederson, the Regional Administrator for the NRCs Region III Office, acknowledged the information provided by the Point Beach officials and noted Point Beach performance improvement opportunities. She emphasized the need for performance improvement in 2014 and highlighted the fact that Point Beach was one of nine plants in the nation assessed in the Degraded Cornerstone Column (Column 3) of the NRCs Action Matrix.

After the business part of the meeting ended, NRC and Point Beach representatives listened to comments and addressed several questions from the public.

_/RA/__________________

Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-266, 50-301 License No. DPR-24, DPR-27

Enclosure:

Meeting Attendance List cc w/encl: Distribution via LISTSERV

POINT BEACH 2013 PERFORMANCE ASSESSMENT MEETING April 8, 2014 MEETING ATTENDANCE LIST NRC Attendees Cynthia Pederson, Regional Administrator Kenneth OBrien, Deputy Director, Division of Reactor Projects Terry Beltz, Project Manager, Office of Nuclear Reactor Regulation Kevin Barclay, Point Beach Acting Senior Resident Inspector Roy Elliott, Point Beach Acting Resident Inspector Prema Chandrathil, Public Affairs Officer Jamnes Cameron, Chief, Branch 4, Division of Reactor Projects Bruce Bartlett, Project Engineer, Branch 4, Division of Reactor Projects NextEra Energy Company Attendees Eric McCartney, Site Vice President Felicia Hennessy, Performance Improvement Manager Lori Christensen, Licensing Project Manager Brenda Scherwinski, Licensing Analyst Mike Millen, Licensing Manager Ron Seizert, Licensing Supervisor Charles Trezise, Special Projects Director Rob Harrsch, Engineering Director Richard Wright, Plant General Manager Rob Webber, Operations Director Jim Petro, Licensing Director Jerry Pruitt, Nuclear Oversight Manager Sara Cassidy, Communications Manager Britt Griffin, Communications Mark Schartz, Point Beach Jeremy Keltner, Point Beach Members of the Public Lee Engelbrecht Tom Poindexter Donna Bartlett Enclosure

April 23, 2014 LICENSEE: NextEra Energy Point Beach, LLC FACILITY: Point Beach Nuclear Plant

SUBJECT:

SUMMARY

OF THE APRIL 8, 2014, POINT BEACH PUBLIC MEETING TO DISCUSS THE 2013 ANNUAL ASSESSMENT RESULTS On April 8, 2014, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Two Creeks Township Hall in Two Creeks, Wisconsin, to discuss the 2013 annual assessment results for the Point Beach Nuclear Plant. Enclosed is a list of attendees for the meeting. A copy of the slides used by the NRCs staff during the meeting is located in ADAMS at Accession Number ML14112A425. The licensee staff did not utilize any slides during their presentation.

At the meeting, the NRC provided an overview of the reactor oversight program, the results of the 2013 annual assessment for Point Beach, and the NRCs inspection plans for 2014. The NRCs presentation was followed by statements from the NextEra Point Beach Site Vice-President which included site priorities, information on the results of the NRC Inspection Procedure 95002, as well as information on current plant status. Cynthia Pederson, the Regional Administrator for the NRCs Region III Office, acknowledged the information provided by the Point Beach officials and noted Point Beach performance improvement opportunities. She emphasized the need for performance improvement in 2014 and highlighted the fact that Point Beach was one of nine plants in the nation assessed in the Degraded Cornerstone Column (Column 3) of the NRCs Action Matrix.

After the business part of the meeting ended, NRC and Point Beach representatives listened to comments and addressed several questions from the public.

_/RA/__________________

Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket No. 50-266, 50-301 License No. DPR-24. DPR-27

Enclosure:

Meeting Attendance List cc w/encl: Distribution via LISTSERV DISTRIBUTION:

See next page DOCUMENT NAME: Point Beach EOC Meeting Summary Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME BBartlett JCameron DATE 04/22/14 04/23/14 OFFICIAL RECORD COPY

Memorandum to NextEra Energy from Jamnes Cameron dated April 23, 2014

SUBJECT:

SUMMARY

OF THE APRIL 8, 2014, POINT BEACH PUBLIC MEETING TO DISCUSS THE 2013 ANNUAL ASSESSMENT RESULTS DISTRIBUTION:

Joseph Nick RidsNrrDorlLpl3-1 Resource RidsNrrPMPointBeach RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov