ML20246N971: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:.             _
{{#Wiki_filter:.
            .  .4
_
                                                                                        otheial
otheial
    ,-
                                                      MAY 121989.
                  Docket Nos. 50-348, 50-364
                License Nos. NPF-2 and NPF-8
                Alabama Power Company
                ATTN: Mr. W. G. Hairston, III
                          Senior Vice President-Nuclear
                            Operations
                  P. O. Box 2641
                  Birmingham, AL 35291,-0400
                Gentlemen:
                . SUBJECT: NRC INSPECTION REPORT NOS. 50-348/89-08 AND 50-364/89-08
                This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
                W. B. Gloersen and R. B. Shortridge 'on April 10-14, 1989. The inspection
                  included a review of activities authorized for your Farley facility. At the
                  conclusion of the inspection, the findings were discussed with those members of
                your staff identified in the enclosed inspection report.
                Areas' examined during the inspection are identified in the report.      Within
                  these areas, the inspection consisted of selective examinations of procedures
                  and representative records, interviews with personnel, and observation of
                  activities in progress.                                                              1
                Within the scope of the inspection, no violations or deviations were
                  identified.
                The enclosed Inspection Report documents an oral commitment (see Paragraph 2.c)
                made by a licensee representative and discussed in the exit interview. If your
                  understanding of this commitment differs from the report statements, please
                  inform this office promptly.                                                          j
                  In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
                  Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                                                                                                        )j
                  will be placed in the NRC Public Document Room.                                        l
                                                                                                        l
                                                                                                        .
                                                                                                        !
                                                                                                        l
                                                                                                  ,
                      o
.
.
.4
,-
MAY 121989.
Docket Nos. 50-348, 50-364
License Nos. NPF-2 and NPF-8
Alabama Power Company
ATTN: Mr. W. G. Hairston, III
Senior Vice President-Nuclear
Operations
P. O. Box 2641
Birmingham, AL 35291,-0400
Gentlemen:
. SUBJECT: NRC INSPECTION REPORT NOS. 50-348/89-08 AND 50-364/89-08
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. B. Gloersen and R. B. Shortridge 'on April 10-14, 1989.
The inspection
included a review of activities authorized for your Farley facility. At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas' examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
1
Within the scope of the inspection, no violations or deviations were
identified.
The enclosed Inspection Report documents an oral commitment (see Paragraph 2.c)
made by a licensee representative and discussed in the exit interview.
If your
understanding of this commitment differs from the report statements, please
inform this office promptly.
j
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
)
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
j
will be placed in the NRC Public Document Room.
l
l
.
!
l
,
o
.
. hot
f
e. .
e. .
""     .~_
""
                                                                                                  . hot f
.~_


                      _ , - - _ _ - - - - -
_ , - - _ _ - - - - -
                                                                                                                                                                                                    '
..
..
~
              ~     i
i
W.
'
                ./*
W .
          ,,
e w- l . *i
              e w- l . *i
./*
    , _x. .. c .
,,
      .
, _x. .. c .
    .
.
                      ; Alabama _ Power Company-                                                         2
.
        w-
; Alabama _ Power Company-
                    'LShould you have.any questions concerning this'1etter, please contact us.
2
                                                                                                      . Sincerely,
w-
    .
'LShould you have.any questions concerning this'1etter, please contact us.
        f
. Sincerely,
                                                                                                        Douglas M. Collins,' Chief
.
                                                                                                        Emergency Preparedness and
f
                                                                                                            Radiological Protection Branch
Douglas M. Collins,' Chief
                                                                                                        Division'of Radiation Safety
Emergency Preparedness and
                                                                                                            and Safeguards
Radiological Protection Branch
                        Enclosure:
Division'of Radiation Safety
              ,      .NRC Inspection Report
and Safeguards
                        cc w/ encl:
Enclosure:
                        B.'M. Guthrie, Executive Vice President
.NRC Inspection Report
                        D. N. Morey, General Manager -
,
                            Nuclear Plant
cc w/ encl:
                        J. D. Woodard, Vice President -
B.'M. Guthrie, Executive Vice President
                            Nuclear Generation
D. N. Morey, General Manager -
                        J. W. McGowan, Manager-Safety Audit
Nuclear Plant
                            and Engineering Review
J. D. Woodard, Vice President -
                        S. Fulmer, Supervisor-Safety
Nuclear Generation
                            Audit and Engineering Review
J. W. McGowan, Manager-Safety Audit
                        State of Alabama
and Engineering Review
                        bec w/ encl:
S. Fulmer, Supervisor-Safety
                        NRC Resident Inspector
Audit and Engineering Review
                        E. Reeves, Project Manager, NRR
State of Alabama
                        Document-Control Desk
bec w/ encl:
                                                                                                                                                                                                        i
NRC Resident Inspector
                                                                                                                                                                                                      i
E. Reeves, Project Manager, NRR
                                                                                                                                                                                                      !
Document-Control Desk
                        RII.                                   RII         RI                 RII
i
  ':o                   4                                         g                                                                                                                                   i
i
                        WGloersen RShortridge                             JPotter[yECantrell
!
                        5/p /89 5/Ao/89                                     5////89           5/ U/89
RII.
      .,.
RII
                                                                                                                                                                                                      {
RI
C_W____________._____                   . _ _ _ _ _ _ _ _ . _
RII
                                                                    _.__________.______.______._____.___________________.___________________._________________.____________________.._______________j
':o
4
g
WGloersen RShortridge
JPotter[yECantrell
i
5/p /89
5/Ao/89
5////89
5/ U/89
.,.
{
C_W____________._____
. _ _ _ _ _ _ _ _ . _
_.__________.______.______._____.___________________.___________________._________________.____________________.._______________j
}}
}}

Latest revision as of 22:06, 1 December 2024

Forwards Insp Repts 50-348/89-08 & 50-364/89-08 on 890410-14.No Violations or Deviations Noted
ML20246N971
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/12/1989
From: Dan Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hairston W
ALABAMA POWER CO.
Shared Package
ML20246N978 List:
References
NUDOCS 8905220048
Download: ML20246N971 (2)


See also: IR 05000348/1989008

Text

.

_

otheial

.

.4

,-

MAY 121989.

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. W. G. Hairston, III

Senior Vice President-Nuclear

Operations

P. O. Box 2641

Birmingham, AL 35291,-0400

Gentlemen:

. SUBJECT: NRC INSPECTION REPORT NOS. 50-348/89-08 AND 50-364/89-08

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

W. B. Gloersen and R. B. Shortridge 'on April 10-14, 1989.

The inspection

included a review of activities authorized for your Farley facility. At the

conclusion of the inspection, the findings were discussed with those members of

your staff identified in the enclosed inspection report.

Areas' examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

1

Within the scope of the inspection, no violations or deviations were

identified.

The enclosed Inspection Report documents an oral commitment (see Paragraph 2.c)

made by a licensee representative and discussed in the exit interview.

If your

understanding of this commitment differs from the report statements, please

inform this office promptly.

j

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

)

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

j

will be placed in the NRC Public Document Room.

l

l

.

!

l

,

o

.

. hot

f

e. .

""

.~_

_ , - - _ _ - - - - -

..

~

i

'

W .

e w- l . *i

./*

,,

, _x. .. c .

.

.

Alabama _ Power Company-

2

w-

'LShould you have.any questions concerning this'1etter, please contact us.

. Sincerely,

.

f

Douglas M. Collins,' Chief

Emergency Preparedness and

Radiological Protection Branch

Division'of Radiation Safety

and Safeguards

Enclosure:

.NRC Inspection Report

,

cc w/ encl:

B.'M. Guthrie, Executive Vice President

D. N. Morey, General Manager -

Nuclear Plant

J. D. Woodard, Vice President -

Nuclear Generation

J. W. McGowan, Manager-Safety Audit

and Engineering Review

S. Fulmer, Supervisor-Safety

Audit and Engineering Review

State of Alabama

bec w/ encl:

NRC Resident Inspector

E. Reeves, Project Manager, NRR

Document-Control Desk

i

i

!

RII.

RII

RI

RII

':o

4

g

WGloersen RShortridge

JPotter[yECantrell

i

5/p /89

5/Ao/89

5////89

5/ U/89

.,.

{

C_W____________._____

. _ _ _ _ _ _ _ _ . _

_.__________.______.______._____.___________________.___________________._________________.____________________.._______________j