Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARRBG-33517, Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed1990-09-10010 September 1990 Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed RBG-33466, Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range1990-08-30030 August 1990 Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range RBG-33460, Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.211990-08-28028 August 1990 Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.21 RBG-33496, Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment1990-08-28028 August 1990 Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment RBG-33450, Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-9003011990-08-28028 August 1990 Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-900301 RBG-33424, Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 9009291990-08-22022 August 1990 Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 900929 RBG-33372, Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified1990-08-10010 August 1990 Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified RBG-33310, Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages1990-08-0101 August 1990 Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages RBG-33300, Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting1990-07-30030 July 1990 Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting RBG-33294, Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank1990-07-26026 July 1990 Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-161990-07-13013 July 1990 Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16 RBG-33150, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed1990-07-0202 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed RBG-33143, Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 19901990-06-29029 June 1990 Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 1990 RBG-33132, Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs1990-06-28028 June 1990 Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs RBG-33120, Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads1990-06-26026 June 1990 Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads RBG-33114, Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon1990-06-26026 June 1990 Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon RBG-33113, Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License1990-06-26026 June 1990 Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License RBG-33100, Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 19901990-06-22022 June 1990 Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 1990 ML20043G2211990-06-14014 June 1990 Responds to 900509 Request for Addl Info Re 900209 Response to Violations Noted in Insp Rept 50-458/89-41.Procedure Being Developed to Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys ML20043G8191990-06-12012 June 1990 Forwards Rev 5A to Pump Valve Inservice Testing Plan,For Review.Rev Provides Addl Info & Clarification for Requests for Relief Noted in Rev 5 ML20043E6531990-06-0606 June 1990 Forwards Addl Info Re 880930 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09 Requirements Re Preplanned Use of Addl Operating Flexibility ML20043F9801990-06-0606 June 1990 Forwards Response to NRC 890731 Request for Addl Info Re Util 890731 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09.Justifications for Use of Proposed Tech Spec 3.0.4 Will Be Submitted Separately ML20043D5591990-06-0101 June 1990 Provides Status of Actions Re Insp Rept 50-458/89-45 Which Dealt W/Dual Coil Solenoid Operated Valves Used to Control MSIVs ML20043D5421990-06-0101 June 1990 Forwards Addendum to River Bend Station - Unit 1,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. ML20043D5401990-06-0101 June 1990 Provides Update to 900125 & 0315 Responses to Insp Rept 50-458/89-200.Util in Process of Performing Retrofit Review of in-stock Items Purchased Between 850101-900101 ML20043D2371990-05-31031 May 1990 Provides Suppl to 890929 Response to Violations Noted in Insp Rept 50-458/89-31.Safety Tagging Administrative Procedure Being Revised to Make Clearance Program Easier to Understand & Follow ML20043C8011990-05-29029 May 1990 Forwards Rev 12 to Physical Security Plan.Rev Reflects Current Activities of Plant Security Programs.Rev Withheld (Ref 10CFR73.21.) ML20043B4231990-05-21021 May 1990 Forwards Rept Re Investigation Involving Unsatisfactory Performance Test Result by Dhhs Certified Lab Under Contract to Util to Perform Drug Screen Testing Under 10CFR26, Fitness-For-Duty Program. ML20043A4271990-05-14014 May 1990 Forwards Authorization of Util Board of Directors for Tf Plunkett & Wh Odell to Sign Ltrs to NRC Transmitting Amends to OL or Responses to Insp Repts ML20042G7031990-05-0909 May 1990 Responds to NRC 900405 Ltr Re Weaknesses Noted in Insp Rept 50-458/90-06 on 900220-23.Corrective Action:Software in Simulator Changed to Duplicate Software in Control Room & More Training Time on Computers Given to Operators ML20042F9741990-05-0707 May 1990 Responds to Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Electrical Power Removed from Valves,Safety Assessment of Spurious Opening Performed & QA Performed on Energized Valves ML20042G2521990-05-0404 May 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.' ML20042E3781990-04-0606 April 1990 Responds to Violations Noted in Ofc of Investigations Rept 4-88-027,per Enforcement Action 90-043.Corrective Actions: Util Auditing self-screening Contractor Programs to Assure Compliance & Audit Will Be Evaluated for Acceptability ML20042D8351990-03-30030 March 1990 Submits Supplemental Info Re Util Response to Station Blackout Rule & Advises That Results of Plant Evaluations Demonstrate Ability to Cope W/Station Blackout for Proposed 4 H Duration W/O Reliance on Ac Power Sources ML20042E3501990-03-30030 March 1990 Forwards Evaluation of Unsatisfactory Performance by Dhhs Certified Lab Performing Drug Testing ML20012F1571990-03-28028 March 1990 Requests Extension Until 900601 to Submit Changes to Facility Tech Specs Re Leak Detection & Inservice Insp Program,Per Generic Ltr 88-01 ML20012F1551990-03-28028 March 1990 Suppls 890411 Response to Violations Noted in Insp Rept 50-458/86-04.Operations QC Instructed QC Planners & Lead Inspector to Include Hold Point of Electrical Maint Work Request for Category I Electrical Equipment Panels ML20042D7041990-03-21021 March 1990 Forwards Results of Ultrasonic Testing Conducted on N4A-2 Feedwater nozzle-to-safe End Weld During mid-cycle Outage at Plant.Circumferential Indication Identified in Buttered Area on Safe End Side of Weld During Second Refueling Outage ML20012E0001990-03-20020 March 1990 Forwards Marsh & Mclennan 900313 Ltr Containing Summary of Property Insurance Coverage for Facility,Per 10CFR50.54(w)(2) ML20012C7901990-03-16016 March 1990 Forwards Response to Violations Noted in Insp Rept 50-458/89-39.Response Withheld (Ref 10CFR73.21) ML20012C9931990-03-15015 March 1990 Forwards Duke Engineering & Svcs,Inc 900105 Ltr to BC Fichtenkort Re Proposed Crankshaft Insp Variation & Recommends Variation Be Presented to Clearinghouse Members at 900111-12 Meeting ML20012C7881990-03-15015 March 1990 Provides Updated Status for Corrective Actions Being Taken for Discrepancies Identified in Insp Rept 50-458/89-200. Thirty-six Items identified.Twenty-eight Items Completed. Three of Eight Remaining Items Require Evaluation of Stock ML20012C0381990-03-0909 March 1990 Advises That Senior Reactor Operator License 43188-1 & Reactor Operator License 42087-2 for a Middlebrooks & DG Looney,Respectively,Expired on 900105 & 900201 ML20012A4431990-03-0101 March 1990 Requests Addl Clarification to Prepare Response to Generic Ltr 90-01 Re Survey of Time Spent by Key Nuclear Power Plant Managers in Responding to Various Operational Insps & Audits ML20012B3001990-03-0101 March 1990 Forwards Fitness for Duty Program Rept 90-F-02 Re Investigation of Unsatisfactory Performance Test Result by Certified Lab Under Contract to Util to Perform Drug Screen Testing,Per 10CFR26 ML20012A9161990-02-28028 February 1990 Forwards Response to Inspector Followup Item Noted in Insp Rept 50-458/89-42 on 891113-17.Corrective Actions:Rev to Procedure EDP-AA-10 Re Issuance of Training Matrix on Semiannual Basis Will Be Issued to Remove 2-yr Rereading ML20011E8431990-02-0909 February 1990 Responds to Violations Noted in Insp Rept 50-458/89-40. Corrective Actions:All Prestaged Matl Removed from Containment & Radiation Protection Personnel Cautioned on Placement of Matl on 95-ft Elevation of Containment ML20011E6741990-02-0909 February 1990 Responds to Violation Noted in Insp Rept 50-458/89-41 on 891101-15.Corrective Actions:Procedure Which Would Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys Being Developed ML20011E1531990-01-29029 January 1990 Provides Currently Identified Outage & nonoutage-related Activities to Update NRC of Util Licensing Activities in Order of Priority ML20006C0061990-01-25025 January 1990 Forwards Notification of Nuclear Liability Insurance Coverage for Facility 1990-09-10
[Table view] |
Text
gA
/:we r42 %4 .
9 ;j ibr#
GULF STATES UTILITIES COMPANY P o s T O F FIC E B O X 2951 . DEAUMONT, TCXAS77704 APEA CODE 713 838 3843 January 14, 1981 RBG - 9493 File No. G9.5 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Mr. Eisenhut:
River Bend Station - Unit 1 Docket No. 50-458 In your letter of October 1, 1980, entitled "Amendaent to Construction Permit for River Bend Station, Unit 1", you tequested that Gulf States Utilities (GSU) provide the NRC with copies of the loan commitment guarantee notice indicating favorable action by the Rural Electrification Administration to insure the loan to Cajun Electric Power Cooperative (CEPCO). On January 7, 1981, representa-tives of GSU and CEPC0 finalized the joint ownership venture .
Therefore, GSU is now able to provide the NRC with the attached eight copies of the loan guarantee agreement.
Sincerelv, n.
f, v ' gg ss ;~ E. Linn Draper, Jr.
Isin Vice President g Nuclear Technology h.I[ ,
C<> G r I i
lj Attac.hment l
[]
WJR/t'e b g i
1 i
! THIS DOCUMENT CONTAINS l
POOR QUAUTY PAGES f "1 0122a yg3
_ - _ . . . - - - . . . ~
' 8 i
CERTIFICATE I, John E. Randall, President of Cajun Electric Power Cooperative, i Inc. (hereinafter called " Cajun"), do hereby certify that: the attached are ,
true, complete and correct copies of the Rural Electrification Administration loan commitment and guarantee in the amount of $588,220,000.00, and the said loan commitment and guarantee are in full force and effect as of this i
dat e, t IN WITNESS WHEREOF, I have hereunto set my hand and affixed t s('ay of - : 4 ' , 1961. ,
the Cooperative's seal this
/ ;
~ h
. E. RANDALL , President Aa1 I i
I t
I (Seal)
.I i
I r
i i
t I
I L
s P
h I
i h
t I
I i
l I
i e
i
2 Unites $tates Rural Washington
(
, Deoartment Etctnhertion D.C.
,, . of Agnculture Administration 20250 COFCETMENT NOTICE:
FEDERAL FINANCING BANK LOAN WITH RURAL ELECTRIFICATION ADMINISTRATION GUAPE TEE Dat ed : ,
Cajun Electric Power Cooperative, Inc.
New Roads, Louisiana 70760 Pursuant t.o paragraph 2 of the Loan Commitment Agreement (copy of which is attached), dated as of August 14, 1974, as amended, between the Federal Financing Bank (FFB) and the Administrator of the Rural Electrification Administration (REA), this is notice of the commitment of FFB and REA for a loan by FFB to Cajun Electric Power Cooperative, Inc., ,in the amount of $588,223,000 for REA project Louisiana 30 E8 Bayou and for a guarantee thereof by REA, conditional upon:
- 1. The execution by you of a ..ote in the form attached (Note) and delivery thereof, within 45 calendar days f rom the date of this Notice, to REA, as agent for FFB; and
- 2. The execution by REA of a guarantee of the Note (Guarantee) in the form attached. a Within 10 days af ter receipt of the executed Note and a satisf actory estimated schedule of advances, REA vill execute the Guarantee, and as provided, in paragraph 3 of the Loan Commitment Agreement, will certify to FFB receipt of the executed Note and execution of the Guarantee.
Except to the extent REA determines them to be inapplicable to the FFB loan, all provisions of your loan centract with, and mortgage to, REA and the New Orleans Bank for Cooperatives and of the letter transmitting this commitment Notice, including all conditions prerequisite to the advance of funds loaned by REA thereunder, shall, in addition to the provisions of the Loan Commitment Agreement and the Note, be applicable to the REA guarantee of the Note.
Enclosures
I DepartmCnt Ebetnheation D.C.
/ of Agneulture Administration 20250 Mr. John E. Randall, President Cajun Electric Power Cooperative, Inc.
P. O. Box 578 New Roads, Louisiana 70760
Dear Mr. Randall:
In connection with the REA commitment heretofore made to guarantee a loan to Cajun Electric Power Cooperative, Inc., in the amount of $588,223,000, we enclose (a) a Commitment Notice evidencing the commitment of loan funds by the Federal Financing Bank in this amount, and (b) the original and four copies of the Note ref erred to in the Co=mitment Notice. This FFB loan commitment, the terms of which are contained in the Loan Commitment Agreement between REA and FFB dated as of August 14, 1974, will remain valid for 45 days. This agreement has been amended to provide for an aggregate amount and time period sufficient to include this loan.
We are also enclosing instructions, with documents specified therein, relating to the authorication and executien of the Note and security instrument by your organication. If you wish to obtain the FFB loan, your organication should execute and return the enclosed Note to REA within 45 days af ter the date of the Commitment Notice, together with an estimated schedule of advances covering the full amount of the. loan, on REA Form 152 (copy enclosed).
We also enclose a copy of the Loan Co=mitment Agreement which the Borrower becomes entitled to enforce upon REA certification of the Borrower's execu-tion of the Note.
The following provisions shall be applicable to the guarantee of the Note, in addition to those otherwise made applicable by the enclosed Commitment Notice (which, together with this letter, shall constitute a supplement to the locn contract referred to in said Notice):
- 1. (a) The term " Loan," as defined in the loan contract, shall include the FFB loan.
(b) The term " System," as defined in the loan contract, shall include the improvements and facilities financed in whole or part by the FFB loan.
- 2. REA shall be under no obligation to approve advances on account of any portion of the FFB loan unless and until the following conditions have been satisfied:
)
m n
A .T'. .." '
Mr. John E. Randcll, Pr:sident 2 (c) REA has entsr:d into e contrcet of guarantes with Cajun and a lending agency which has agreed, with REA approval, to make Cajun a guaranteed loan of $588,223,000 for partial financing of Cajun's 30 percent undivided ownership interest in the River Bend Nuclear Station Unit 1 (River Bend), and approximately 34 miles of 500 kV transmission line.
(b) Cajun has submitted evidence, in form and substance satis-factory to the Administrator, that the conditions in such contract of guarantee have been satisfied to the extent and in the manner prescribed by the Administrator.
(c) Cajun has submitted evidence, in form and substance satis-factory to the Administrator, that it has duly authorized, executed, delivered, recorded and filed a security .instru-ment, in form and substance satisfactory to the Administrator.
(d) The Administrator has determined that all requirements of the National Environmental Policy Act of 1909 and other environmentally reJ ated statutes, executive orders and regulations with respect to River Bend and relate: trans-mission facilities have been satisfied.
- 3. Notwithstanding anything contained above, REA si 1 :a under no obligation to approve advances on account of any ev.uion of
$561,708,000 of the FFB loan provided for Cajun's participation in River Bend until Cajun has submitted evidence, in form and substance satisfsetory to the Administrator, that:
(a) Cajun and Gulf States Utilicies (GSU), have entered into an agreement, satisfactory to the Administrator, providing for Cajun's participation in the ownership, construction, operation and maintenance of River Bend; (b) Cajun and GSU have entered into an agreement, satisfactory to the Administrator, providing for the sale of a 42 percent ownership interest in Cajun's Big Caiun No. 2, Unit 3, to GSU; (c) All authorizations, approvals, permits and licenses from Federal, State and other governmental authorities and regulatory bodies relating to the purchase, ownership, construction, operation or maintenance of River Bend have to the extent required by the Administrator, been obtained and are valid and binding and will re=ain so; (d) All authorizations, approvals, permits and licenses from Federal, State, and other governmental authorities and regulatory bodies relating to the sale by Cajun and the purchase by GSU of a 42 percent ownership interest in Cajun's Big Cajun No. 2, Unit 3, have to the extent required by the Administrator, been obtained and are
ggn R
.y Mr. John E. Randall, Prssidant 3 valid cnd binding and will re=ain so; (e) Cajun has acquired such right, title and interest in the River Bend facilities and property, including nuclear fuel, as the Administrator may require; (f) All conditions precedent to the. closing on the River Bend Project have been satisfind; '
(g) Gulf States Utilities is able to fund its proportionate share of the cost of construction of River Bend; and (h) Cajun has entered into such related agreements with the Government with respect to Cajun's participation in River Bend as the Administrator may require. l 4 Notwithstanding anything contained above, REA shall be under no obligation to approve advances on account of any portion I of $26,515,000 of the FFB loan provided for transmission f acilities until Cajun has submitted evidence, in form and substance satisf actory to the Administrator, that Cajun and GSU have entered into an arrangement, satisfactory to the Administrator, providing for the establishment of an Inte-grated Transmission System.
- 5. At such time or times af ter the first advance that the Admin-istrator shall designate, Cajun shall submit such evidence as the Administrator may require, in form and substance satisfactory to him, that the instruments ref erred to above re=ain in full force and effect and that in all other aspects the conditions set forth above remain satisfied.
Your execution of the Note in accordance with the enclosed Commitment Notice shall constitute your acceptance of the provisions made applicable hereby to the guarantee of the Note.
Sinc erely, s
. 10 6406 JD 4
4 i
I 1
PROJICT DESIGNATION:
IDUISIANA 30-E8 BAYOU i
i MORTGACI NOTI sade by CAJUN ELECTRIC POWER COOPERATIVE, DiC, to FIDERAI,TINANCING BAJ1K l
l i
Si '* " .- ,
~ ...
r-, .
1**
) -
e
_ .- 1- _ _ _ . . _ _. . _ _ - _. . . _ _ . .._ ._
I
,s 10 6406 b.
I i PROMISSDKY NOTE i Note No. REA . 1 I
p, New Roads, Lcuisiana
, 19 f
l j
- 1. For value received. CAJUN EIECIRIC P01/ER COOPERATIVE , INC . .....-........ .........
"Borrowe "),
...........-......................................................(the Louisiana ...-. ,
a corporation organized and existing under the laws of the State of promises to pay to the Federal Tinancing Bank ("TTB"), at the times, in the manner, and with interest ai; the rate, hereinaf ter provided, such sums as may be advanced to exceed five hundred eighty.eight million ,
from time to time une.sr this note, not i two hundred twenty.three thousand dollats ($ 588,2 23,000 ---...-. ) , pursuant to an agreement (" Loan Commitment Agreement") betueen TTB and the Administrator of the 1974, as hereto.
Rural Electrification Administration ("REA"), dated as of Augus t 14, fore emended, with interest payable from the date of each advance (" Advance") on the unpaid principal balance until paid,
- 2. As to each Advance, the Borrower shall designate in writing at the time of the request therefor, in accordance with the Loan Comitment Agreeeent, the date (the
" Maturity Date") for repayment of such Advance. The Maturity Date of each Advance shall be subject to approval in uriting by REA and shall be not less than tvo (2) years nor more than seven (7) years after the date of the Advance; provided, however, that if the Sorrower desires a long tert maturity, it may designate a Miturisy Date of thirty.four (34) years af ter the end of the calendar year in which such Advance was made.
The Maturity Date of each Advance shall, at the option of the Sorrower by written notice given to TTB not less than 15 days' prior to the Maturity Date, be extended to such new Maturi*y Date as the Bortower, with REA approval, may designate; provided that the period of suci. extension snal'. be not less than two (2) years, but i be later than seven (7) yeers ne extended .".aturity Date of any Adv ance shall not that the Sorrower my designate an extended af ter the date of the Advance, except Futurity Date of thirty.four (34) years af ter the end of the calendar year in which the Advance was made, t
_ _ .- __ . __. _ . _. .. _ , - _ _ _ = . ,
- 3. The interest rate applicable to each Advance shall be ths respectiva rate established by TTB at the time of the Advance on the basis of the determination of the Secretary of the Treasury pursuant to Section 6(b) of the rederal Financing Bank Act of 1973 (12 U.S.C. 2285(b)), except that in the event of extension in accordance with paragraph 2 hereof, the' rate of interest, from and af ter'such extension, shall be the respective rate established by TTB at the time of such extension on the basis of the determination of the Secretary of the Treasury pursuant to said Section 6(b).
During the period ending on the Maturity Date of each Advance, interest on each Advance remaining unpaid sha'11 be payable quarterly on the last day of March, June, September and December of each year (the " Quarterly Payment Dates").
4 The principal of each Adrance having a Maturity Date not later than seven years af ter the date of the Advance shall be payable on the Katurity Date. The principal of each Advance having a Maturity Date later than seven years af ter the date of the Advance (all such Advances made in the same calendar year being herein collectively called an " Amortized Advance") shall be payable in installments on the Quarterly Payment Da es during the period commencing seven (7) years after the date of the Advance and ending on the Maturity Date of st.ch Amortized Advance, subject to the following:
(i) each quarterly payment with respect to the same Amortized Advance, including both interest and principal, shall be equal in amount to every other such ouarterly payment, and (ii) the aggregate amount of all quarterly payments Ln respect of the same Amortized Advance, including both interest and principal, shall be such as will pay the accrued interest and amortite the principal thereof within the period stated in this paragraph.
- 5. Each payment made on this note shall be applied first to the payment of interest J l
and then on account of principal and shall be in such funds as are then legal tender f or the pay =ent of debts due TTB.
l l
2-10-6406
- -_._-__. _ _______ ._ . . - ~ - . - - ._ . - . . - . - - - , .
. _ ~ . . - -. .. . - - -
( No Advance shall be made on account of. this note later than savan (7) yatts 6.
f l
after.the date of this note. -
+
this note, so long as TTB is 7, ' To the extent not _ inconsistent with applicable law, the holder thereof, shall be subject to modifiestion by such amendments, extensions and : renewals as may be agreed upon from time to time by TTB, the Borrower, and REA.
\
I B, . This note is given in consideration of the ' purchase hereof by TTB pursuant to Section 6 of the Tederal Financing Bank Act of 1973 (12 U.S.C. 2285).
- 9. The Borrower may elect to pay all or any part of the unpaid principal balance of an Amortized Advance at any time later than 12 years af ter the end of the year in which the aucunts included in suct Amortized Advance were advanced, on payment of a prepayment premium determined in .ccordance with this paragraph, but so long as there shall be any unpaid principal balance, the Borrower shall be obligated to make the quarterly payments in the amounts determined as herein provided. De prepayment premiu= shall be an amount equal to one hundred per cet (100U of the amount of interest for one year on the unpaid principal balance of the Aciertized Advance, or part thereof, proposed to be prepaid, susitiplied by the ratio which the number of Quarterly Payment Dates between the proposed prepayment date and the Maturity Date of the Amortized Advance bears to the number of Quarterly Payment Dates between the first prepayment data permitted by this paragraph and such Maturity Date, .
- 10. Upon execution of the Guarantee set forth below, the payment by the Borrower of the entire principal nrnount advanced under this note and of the interest on such amount, in accordance with the terms hereof, will be guaranteed by REA, pursuant to the Rural Electrification Act of 1936, as amended, including Public Law 93-32. In consideration of such Guarantee by REA, the Borrower promises to REA to make the pay-ments required by this note. For purposes of tae mortgage of the Borrower's System to REA (the " Mortgage"), REA shall be considered to be, and shall have the rights of, holder of this note, and this note shall be secut'ed to REA by the Mortgage and such se;,plements or scendments thereto as REA may recuire.
3-10-6406
- 11. In case of defeult by ths Barrovir under this cots or the Mortgags, and in consideration of the obligation of REA in that event under the guarantee to continue to make the quarterly payments to TTB as scheduled, the entire unpaid principal balance of this note, and all interest thereon, may be declared by REA, and upon such declaration shall become, due and payable to REA, in the manner and with the effect provided in the Hortgage, IN WITSISS WHERIOT, the Borrower has caused this note tc be signed in its corporate name and its corporate seal to be hereunder af fixed and attested by its of ficers thereunto duly authorizec, all as of the day and year first above written.
CAJUN ELECTRIC POWER COOPERATIVE, INC.
Borrower by (S EAL)
Attest President S ec re ta ry "Ne Varietur" - Tor identification with an Act of Supplement to Supplemental Mortgage passed on the day of , 19,___, at ,
State of Louisiana.
~~
Notary Public (SEAL)
CUAkANTIE The United States of America acting through the Administrator of the Rural Electrification Administration ("REA") hereby guarantees to the Federal Financing Bank ("TTB"), the making of the cuarterly payments of prin:1 pal and interest when and as due on this note in accoriance with the terns thereof, with interest on the 4
I 10-6406
. t ,
e c'k+-
accelerstion thereof undar the terms of prinetsal until paid, irrespective of (!)
receipt by RIA of any sums or property f roo its enforcement of its the note or (ii) remedies for the Borrower's default.
to the Rural Electrification Act of 1936, as This Guarantee is issued pursuant i
includine Public Law 93-32, Sectror 6 of the Federal amended (7 U.S.C. 901, et sgg.), i 1973 (12 U.S.C. 2285), and the Loan commitment Agreement financing Bank Act of between REA and FT3 dated a: of August 14, 1974, as heretofore amended. !
l 151TED STATES OF AF. ERICA )
l 1
By Date Administrator of Rural Electrifica tion Adminis tration l
l 10-6406 i
e
O
,i . .' A LOAN COMMITME;T AGREEMF.NT' ' '
. Agrecmont made as of August 14, 1974 , by and between Federal Financing Bank, an instrumentality and wholly owned Corporat, ion of the United States (FFB), and the Administrator of Rural E1'ectrification Administration (P.EA), an agency of the United States. .
- 1. FFB Purchase .
Pursuant to section 6(a) of the Federal Financing Bank Act of 1973 (12 U.S.C. l t1 2285(a)), FFB hereby agrees to purchase, during the periods provided for in I i
}
paragraph 2 hereof, obligations guaranteed by the Administrator af RF.A pur- i suant to section 306 'of the Rural Electrification Act, as amended (7 U.S.C.
, ,I 901 ej sec.), under the following terms and conditions:
. a. Obligations purchased hereunder shall be it the fort of l
, /
the Note attached hereto, executed by owners of electrification and telephone systems (Borrowers), which have been or, may be financed .,
by~REA, and delivered to RFA as agent for FFB, which Borrowers shall have been designated, and which obligations shall h;tv'e been '
guaranteed, by REA in the canner herein provided.
- b. The aggregate amount of Notes of all Borrowers purchased .
hereunder shall not exceed one billion five hundred c1111on- --
. dollars *(Sl,500,;000;000)'.^ Increases or decreases of such aggre'-
~
gate amount cay be provided for by written agreement of FFB and REA. *
._......a....-.-...'. *
- . ~ . . . . - ' ' . - L .. . . . . . .. . . . .
o - -
, J o o .l u e) . S k lru _2
. s C
- .. .g
- 2. Desienation of Borrowers, i On or' before Deccaber '31,1974, RD., by giving vritten notice (the Notice),
. to each respect [ve Borrower, with copy to FFB, may designate Borrowers whose Notes shall be purchased by FFB hereunder. The effect of the Notice es to each such Borrower shall be, and the No: ice shall so state, that .
- a. FFB is thereby cocsitted .to the Borrower and REA to- '
i purchase, and REA is thereby committed to the Borrower and FFB ]
to guarantee, a Note of the Borrower in the form attached to . .
(
8 the Notice, in accordance with the terms and conditions of this Loan Co==itment Agre ement, a copy of which shall be enclosed .
vith the Notice; and . ;
- b. such co-4 t=ents shall be conditioned upon the return of the duly executed Note to REA, as agent for FFB, within 45 -
~. .
~
days af ter the date of the Notice. nis period may b'e extended by Agree =ent of FFB, REA and the Borrower. ,
a
- 3. REA certification and Guarantee As to each Note to be purchased hereunder, REA, within 10 days, df ter receipt of the Note, duly executed by the Borrower, shall execute the guarantee .
endorsed on the Note and shall certify in writing to FFB the following:
- a. The nana and address of the Borrower and the date and a=ount aE: .he.Nore- .n : N.:..::.:..
~ =. ~
- b. The due execution. af t5e Note by the Borrower
- c. The delivery of the Note to REA, the execution by REA of the guarantee endorsed on the Note, and reten'. ion by RSA of custody thereof as agent for FFB, unless actual possession has been requested by FFB.
e
. g b e a
e me ee es e .e gasse m . .
-8' em .- e en e- ea .e eum.
. 4ee m esses eu.* e
i . <
Upon receipt by, FFB of such certification, which shall be promptly confitted in writing, FFB shall be irrevocably cocmitted to purchase the Note in eccordance vith this agreec,ent. .
. i
- 4. Advances a.- The times and amounts of advances on each Note shall conform to the esticated schedule of advances submitted by the Borrower to, and approved by, REA, whic..a schedule RF.A shall furnish to FFB along with the certification in respect of such Borrower pursuant to para-graph 3; provided, however, that no such schedule shall call for the :
first advance of ibnds earlier than 5 days af tsr FFB receipt of such'. ' . ' . .
certification. ' Changes in the schedule =ay. be. made by the Bo. rover vith RF.A approval on 15 days prior written notice given to FFB by RF.A, provided that no such change shall increase the aggregate amount-
^
of scheduled advances to an a= cunt in excess of the principal amount ,
of the Note and provided further that, if with REA and FFB approval .the' '
annual percentage interest rate is expressed as i fixed nu=ber in the Note, not subject to future deter =ination, no such change shall - e 3
decrease the aggregate acount of scheduled advances eo an amount ,
,- less than the principal a=ount of the Note.
- b. In addition te confor=ance ,to' the esti=ated schedule of advances, ea~ch advance on a~ note shall be ~nade by FFB only upon .
. . :' d receipt of specific written approva.1 by EF.A as to compliance u th conditions of the financing and security instrumenns.
- c. As to each advancer the,Borrever.shal1.designatd in scriting .... 1
^--#'T
.at the ti=e of :the request ' therefor the datb4the' '5!aturitv Date'7 - ,
.: .. f or repay =ent cf. such advance,.: vhich. sb be.=ot. %ss .rhan two . years =: -
Ak
~
D""D "M =U
.mJ c1 ' 'JJ o
3
,. . ,n ,
s nor more than seven years af ter the data of the advance; provided, 1 however, that if the Borrower desires a long ter= caturity, it may ;
E I designate a Maturity Date of thirty-four years af ter the end of the ,
calendar year in which such advance is cade. The Maturity Date i of each advance shall be subject to approval in writing by RF.A.
- d. The Maturity Date of any advance shall, at the option of
, the Borrower by written notice given to FFB not less than 15 days j prior to the Maturity Date, be extended to such new Maturity Date as the Borrower, with REA approval, cay designate; provided that
. the period of such extension shall not be less than two years. -
i h
but the extended Maturity Date of any advance shall not be later j:
than seven years after the date of the advance, except that the Borrower may designate an extended Maturity Date of thirty-four years' af ter the end of . the. calendar year in which the advance was i made. .' ,
~
.- ,{
- 5. , Interest Rate -
I i
- a. The rate of interest payable on each advance shall be the '
i i
respective rate established by FFB at the tine of the advance on '
the basis of.the deter =inatics.cf..the . Secretary. of _the Ircasury. .. ...
pursuant to Section 6(b) of the Federal Financing Bank.Act .of 1973 '
(12 U.S.C. 2285(b)), except that in the event of extension of the l l
. . . - . . " . . _ . . . a . . . .. . . . . . . ... . ....y. ,a...;_ __.. .m_ _ . _ , __. .
, e 1
l
- ~
~,,- - .
.. ,.i. 5 L!
V Maturtry Date of an advance in accordance with paragraph 4d hereof,
.l.i the rate of interest effective from and a'f ter such extension shall
.\
be the respective rate established by FFB at the time of such extension
on the basis of the determination of the Secretary of the
. Treasury pursuant to said Section 6(b).
, b. The foregoing rate of interest shall be inclusive of all aoounts chargeable to the Borrower for loan servicing. ,
Such loan servicirg as may be required under section 306 of the Rural Elec-
!! I trification Act of 1936, as amended, shall be performed by REA on behalf of FFB. REA shall be' reimbursed by FFB' for such loan servicing pursuant to section 10 of the Federal Financing Bank j i
Act of 1973 at the rate of two one-thousandths of one per centum -
~ !.
,(0.00002) per annum of the amounts owed on guaranteed loans at the 5l end of each calendar year. -
4
- 1. .
. l1
- 6. Borrower's Default j;
,. e
- In the event of the Borrower's default on the Note, REA shall, ;
under the guarantee endorsed thereon, continue to make payments pro =ptly , ;
to FFB, without regard to the sufficiency of the security or re=edies
+ ,
i:
i!
. i
_.._._.....m.._ . . . .... .. .
5 yi
$@ML .
~
, .v ,- -
, -6 l
.. ,1., . ,
REA may enforce against the Borrower. Without limitation of the foregoing ',
obligation, REA shall have sole authority in respect of acceleration of i
. . 5 I<
the Guaranteed Note, the exercise of other available renedics and the dis- !
I position of sums or property recovered. .
s *
/ _
FEDE FINANCING EK g l
/
b ,I By. a. A l O& "
I $
"Prbsident~' .
i August 20, 1974- -
l l/ (Date)
, . UNITED c"'ATES OF AMIRIC&, acting through Ow , c.-
, .. Electrificatio.n Administration ~}-
. e o
_ August 20, 1974 4 a
, 3 (Date) . !
i i
l.
1
[
j
.