{{#Wiki_filter:rnonen                                                      DATE OF DOCUutNT:          DATE EECE!YED              N O.:
{{#Wiki_filter:rnonen                                                      DATE OF DOCUutNT:          DATE EECE!YED              N O.:
_
lehn A. m - D Assos18tes                                  7 17 70                  v.20-70                        2293 4
lehn A. m - D Assos18tes                                  7 17 70                  v.20-70                        2293 4
           ~
           ~
Line 41: Line 40:
d bO NGdLdb l
d bO NGdLdb l
l 800P140                    [6 [
l 800P140                    [6 [
      .          ---              _            -                                                          .            .  -.                    - -_- _        . _
-  -
              .
              -                                        ,
;  ..            .
                .        . .
,
                          -
,
:                                                                                                                                          = - , . . . . . =
:                                                                                                                                          = - , . . . . . =
'
JOHN        A. 8 L U M E              &      A S S 0 C I A I E S. E N G I N E E R S            ' #t.". = 5 i                                                                                                                                          =c .u : u
JOHN        A. 8 L U M E              &      A S S 0 C I A I E S. E N G I N E E R S            ' #t.". = 5 i                                                                                                                                          =c .u : u
* e < E *
* e < E *
Line 60: Line 48:
_: r: .        *E
_: r: .        *E
]
]
'
July 17, 1970 i
July 17, 1970 i
,
;
                                                                                                                                                                        '
  !                            Str. Edson G. Case, Director
  !                            Str. Edson G. Case, Director
!                            Division of Reactor Standards U.S. Atomic Energy Commission Washington D.C. 20343
!                            Division of Reactor Standards U.S. Atomic Energy Commission Washington D.C. 20343
]
]
;                            Contract No:                AT(49-5) -3011 i                            Blume Project No: 2085313
;                            Contract No:                AT(49-5) -3011 i                            Blume Project No: 2085313
.;                           


==Subject:==
==Subject:==
Line 81: Line 64:
Ne have revised our 5 fay 15,1970 preliminary report based on discussions with the applicant and members of the DRS and DRL staffs at a meeting on
Ne have revised our 5 fay 15,1970 preliminary report based on discussions with the applicant and members of the DRS and DRL staffs at a meeting on
:.tay 19, 1970, and on Amendments No. 5-7 to the PSAR.
:.tay 19, 1970, and on Amendments No. 5-7 to the PSAR.
As requested by your staf ' ve have deleted any reference to the problems
As requested by your staf ' ve have deleted any reference to the problems of solution activity in thu foundation material. We submitted questions
,
of solution activity in thu foundation material. We submitted questions
;                            to the AEC on April 21, 1970, and understand that this item is to be J
;                            to the AEC on April 21, 1970, and understand that this item is to be J
covered in a separate report.
covered in a separate report.
!
i                                                                                                Very truly yours, i
i                                                                                                Very truly yours,
JOHN A. BLU5tE S ASSOCIATES, ENGINEERS l
'
i JOHN A. BLU5tE S ASSOCIATES, ENGINEERS l
6xnuD                      .ca
6xnuD                      .ca
,
[        Roland L. Sharpe Executive Vice President EGK:aa
[        Roland L. Sharpe Executive Vice President
                                                                                                                                                                          ,
EGK:aa
,
!                            Enclosures 5 4
!                            Enclosures 5 4
l
l 2M i                                                                                                                                      22SJ n - ,      -.-- n      -    --r.-    , ..,--e      m  --- - - - -    w,-  --~->-e    ---,-m,.    ---ne,,wn.-        , ,,-m  --    . - , ,      , -w,  ,m}}
                                                                            -
2M i                                                                                                                                      22SJ
.
n - ,      -.-- n      -    --r.-    , ..,--e      m  --- - - - -    w,-  --~->-e    ---,-m,.    ---ne,,wn.-        , ,,-m  --    . - , ,      , -w,  ,m}}

Latest revision as of 16:13, 18 February 2020

Forwards 700717 Rept, Review of Seismic Design Criteria for Davis-Besse. Preliminary Rept Dtd 700515 Revised,Based on Discussions at 700519 Meeting W/Util & NRC Re Amends 5-7 to PSAR
ML19329C465
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/17/1970
From: Sharpe R
JOHN A. BLUME & ASSOCIATES, ENGINEERS
To: Case E
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19329C466 List:
References
CON-AT(49-5)-3011 NUDOCS 8002140845
Download: ML19329C465 (2)


Text

rnonen DATE OF DOCUutNT: DATE EECE!YED N O.:

lehn A. m - D Assos18tes 7 17 70 v.20-70 2293 4

~

p .18 L Te* W EMO: > EPCA T: O TH Dc

' Roland L. Sharpe I To- G R4G GG. OTH ER.

1 Son G. Case actiou urctssAny O co~cu aaracs O oar = ^~s*saco:

NO ACTION NECE$5AAv 0 cou-asr O av:

C&AS$ e F POST O F F *CE FILE CooE.;

U ,,o~,,. 50-346 oasca.,Tio~a u o. e. v aca ..e,.o > .cnnaco ro oars ; accruto av oarc Ltr furnishin6 c-ts on PSAR Yol's A. Dromerick 7-23-W 1 thru 4 & 2ndta 1 thru 7 ...& trans v/3 cys for ACTION the following:

DITRDLM' ION: 0"7 C'W-c~cwsu a rs.

if - Spae6ulatory filo Report " Review of the 3eismic Design CGC(Rm P 506A)

Criteria for the Davis-Besse H. Price & StafT Nuclear Power 2,tation". h it/ h ede 5"_ 10 NOT REMOVE (5 m ree'd)

P. Hewe ca ,e/ht r-=w

~~!";fy'

- '+-"E"

"'""*"*- This is s ? na!. R epo rt , Cris Tedesco V/0ilIG & 3 era (JRIG M B3 .hME M sent to Ca se on 7-20-70 a retrned f r 016 fe filta>I No Original sig: led copy of Report received fac.<c*ine on 7-22-70.fper Oaeison) 22Q3 fg u.s. Arcuc sucsoy ceuwsic" M AIL CONTROL FORM roau< e.acc.uss sos

  • U. s. G0vt9 Nut NT Pos NT:NG OFFICE. 1968.364.594 f QO 4

Vj <>

0

] /

d bO NGdLdb l

l 800P140 [6 [

= - , . . . . . =

JOHN A. 8 L U M E & A S S 0 C I A I E S. E N G I N E E R S ' #t.". = 5 i =c .u : u

  • e < E *
  • 612 HCWARo STREET -

SAN FPANCISCC C ALiFORNI A 9C05

  • 9151 397-2525 .aussv - '

_: r: . *E

]

July 17, 1970 i

! Str. Edson G. Case, Director

! Division of Reactor Standards U.S. Atomic Energy Commission Washington D.C. 20343

]

Contract No
AT(49-5) -3011 i Blume Project No: 2085313

Subject:

Davis-Besse Nuclear Power Station Toledo Edison Company Docket No. 50-346 l

Dear Str. Case:

In accordance with your request, we have performed a general review of the PSAR Volumes 1-4 and Amendments 1-7 for the Davis-Besse Plant.

i Our review was also based on data gained during several meetings with members of the staffs of DRS and DRL, and during a meeting with the members of the staifs and the applicant on afay 19, 19 70.

i Ne are enclosing herewith five copies of our report, " Review of the Seismic Design Criteria for the Davis-Besse Nuclear Power Station."

Ne have revised our 5 fay 15,1970 preliminary report based on discussions with the applicant and members of the DRS and DRL staffs at a meeting on

.tay 19, 1970, and on Amendments No. 5-7 to the PSAR.

As requested by your staf ' ve have deleted any reference to the problems of solution activity in thu foundation material. We submitted questions

to the AEC on April 21, 1970, and understand that this item is to be J

covered in a separate report.

i Very truly yours, i

JOHN A. BLU5tE S ASSOCIATES, ENGINEERS l

6xnuD .ca

[ Roland L. Sharpe Executive Vice President EGK:aa

! Enclosures 5 4

l 2M i 22SJ n - , -.-- n - --r.- , ..,--e m --- - - - - w,- --~->-e ---,-m,. ---ne,,wn.- , ,,-m -- . - , , , -w, ,m