ML19326A909

From kanterella
Jump to navigation Jump to search
Ack Receipt of Notice of Hearing Re Facility CP Application. Permission Requested to Make Oral Statement at 701208 Hearing in Port Clinton,Oh Re Type of Cooling Tower Planned for Facility.Certificate of Svc Encl
ML19326A909
Person / Time
Site: Davis Besse 
Issue date: 11/03/1970
From: Finkel J
FINKEL & FINKEL
To:
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19326A885 List:
References
NUDOCS 8003050804
Download: ML19326A909 (3)


Text

e.

-s m

fM. f. Uii( ff( N ^ ylt f Ik lS[ f O

l h

) l[ I ujb a

jk _(

hE

[

j I \\ i hNm L

.g i

a x

o u.,,,

s ~ sr=>

s~ A,

r~-

I.f.7.7 a r----- J -

d A J__lk l l _LJClCA_

f l

Masonic Building

  • Phone 244-1675 YlARREN EDWARD FINKEL-A.I.A.

JEAN FENTON FINKEL-A.I.A.

November 3,1970 Secretary of the Commission United States Atomic Energy Commission Washington, D. C.

20545

Dear Sir:

Thank you for your " Notice of Hearing on Application for a Construction Pennit" pertaining to Docket No. 50-346 in the matter of the Davis-Besse Nuclear Power Station.

I request pennission to make an oral statement at this hearing on December 8,1970; more a matter of a question as to the type of cooling tower planned. From all the materials I can garner, it appears to me that the open-air condenser coolino tower planned is a hazardous operation -- and that it, too, will heat up the surrounding waters --

even beyond the estuary into Lake Erie 'itself.

Also I wonder why we are not expending more research time on a fusion reactor rather than fission, so that we could put a temporary moratorium on all the present " hot-fuel" plants now being planned to prevent hot-fuel disposal problems and to allow for a safe environment.

rules finally lanored when the times pinch -- such There are many, safety as power companies are now doing by using high-sulphur coal and we must stand by as small citizens and wait for them to add or replace' broken-YTnat happens when down precipitators -- what happens in the future?

people must have power and to heck with the safety? Atomic Safety.

These are my three questions, and I am most sincere in my worry about this atomic plant having been so f ar constructed that you cannot at this pelritmake them waste their investment -- yet I have been tIying to get l

someone to put a temporary stop to the construction long before they had Than you could have ruled in a calm setting on the so much money spent.

actual safety to our environment; not only for those who live on and enjoy Lake Erie, but for all those persons everywhere who must depend on you alone for. their very life.

g y.

,)

D M */

M/

==:s can Fenton Finkel, A.I.A.

7 NOV 61970 t> R)

O

  • "e*nico4 rus:

3ffsm1m 8003000 [Cf L

No

21

., v

i, U
.TfED STATES OF /dERICA ATOMIC ENERGY C0?dISSION In the Matter of

)

)

TOLEDO EDISON OMGANY, ET AL.

}

Locket No. 50-3h6 (Davis-Besse Nuclear Power

)

Station Unit 1)

)

CERTIFICATE OF SERVICE I hereby certify that copies of (1) Letter from Professor Irvin I. Oster 17, 1970; (2) Letter from A. A. Wells to Mr. Skallerup dated October dated November h, 1970 transmitting copy of letter from Oster and (undated);

Miss Vicki Evans; (3) Letter from Miss Vicki Evt.ns (b) copy of letter from Harold L. Price to Profescor Oster dated November 6,1970; and (5) letter from Miss Jean Fenton Finkel dated November 3,1970 requesting limited appearance, in the captioned catter have been served on the following by deposit in the United States nail, first class or air mail, this 6th day of Novemter 1970:

Walter T. Skallerup, Jr., Esq.

Leslie Henry, Esq.

Chairman, Atomic Safety and Fuller, Seney, Henry & Hodge 800 Owens-Illinois Building Licensing Board h05 Madison Avenue 1155 Crest Lane 6

McLean, Vir6 mia 22101 Toledo, Ohio h3 0h 1

James P. Gleason, Esq., Alternate Gerald Charnoff, Esq.

Shaw, Pittman, Potts, Trowbridge Chairman Atomic Safety end Licensing Eoard and Madden 910 17th Street, N. W.

Donahue, Ehrmantraut & Gleason Washin5 on, D. C. 20006 t

11125 Rockville Pike Rockville,1&ryland 20852 Thomas F. Engelhardt, Esq.

Dr. Walter H. Jordan Paul W. Wallig, Esq.

Oak Rid e National Laboratory Re5ulatory Staff Counsel S

U. S. Atomic Energy Commission P. O. Box X Oak Ridge, Tennessee 37830 Washington, D. C. 20545 Donald H. Hauser, Esq.

Dr. Charles E. Winters The Cleveland Electric 8800 Fernvood Road Illuminating Company Bethesda, Maryland 2003h P. O. Eox 5000, Room 610 Dr. John C. Geyer, Chairman Cleveland, Ohio hh101 Department of Geography and Mr. Glenn J. Cespson, Vice Environmental Engineering President - Fover The Johns Hopkins University The Toledo Edison Company Baltimore, Magland 21218 h20 Madison Avenue 6

Toledo, Ohio h3 01

50-3k6 paEe 2 Honorable Harry R. Johnson Mr. Roger E. Williana President, board of County Atenic Energy Coordinator Conniscioners DeveloInent Department Ottaw County Courthouse 65 South Front Street Port Clinton, Ohio h3kS2 P. O. Eox 1001 Columbus, Ohio 43215 l

dd-?/

'?

Office of the Secretary of the C iscion cc: Mr. Skallerup Mr. Engelhardt Mr. Yore H. Steele H. Smith