ML19329C465
| ML19329C465 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 07/17/1970 |
| From: | Sharpe R JOHN A. BLUME & ASSOCIATES, ENGINEERS |
| To: | Case E US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19329C466 | List: |
| References | |
| CON-AT(49-5)-3011 NUDOCS 8002140845 | |
| Download: ML19329C465 (2) | |
Text
_
rnonen DATE OF DOCUutNT:
DATE EECE!YED N O.:
lehn A. m - D Assos18tes 7 17 70 v.20-70 2293
~
.18 L Te*
W EMO:
> EPCA T:
O TH Dc 4
p
' Roland L. Sharpe I
To-G R4G GG.
OTH ER.
1 Son G. Case actiou urctssAny O
co~cu aaracs O
oar = ^~s*saco:
cou-asr O
NO ACTION NECE$5AAv 0 av:
C&AS$ e F POST O F F *CE FILE CooE.;
U 50-346
,,o~,,.
accruto av oarc oasca.,Tio~a u o. e. v aca..e,.o >
.cnnaco ro oars Ltr furnishin6 c-ts on PSAR Yol's A. Dromerick 7-23-W 1 thru 4 & 2ndta 1 thru 7...& trans v/3 cys for ACTION the following:
0"7 C'W-DITRDLM' ION:
if
- Spae6ulatory filo c~cwsu a rs.
Report
" Review of the 3eismic Design CGC(Rm P 506A)
Criteria for the Davis-Besse H. Price & StafT Nuclear Power 2,tation".
h it/ h ede 5"_
10 NOT REMOVE
~~!";fy' P. Hewe
'+-"E" (5 m ree'd) ca,e/ht r-=w
"'""*"*- This is s ? na!. R epo rt, Cris Tedesco V/0ilIG & 3 era (JRIG M B3.hME M sent to Ca se on 7-20-70 a retrned f r 016 fe filta>I No Original sig: led copy of Report received fac.<c*ine on 7-22-70.fper Oaeison) 22Q3 fg u.s. Arcuc sucsoy ceuwsic" M AIL CONTROL FORM roau acc.uss
< e. sos U. s. G0vt9 Nut NT Po NT:NG OFFICE. 1968.364.594 s
f QO 0
4 Vj <>
]
/
d bO NGdLdb l
l 800P140 [6 [
-,.....
J O H N A. 8 L U M E A S S 0 C I A I E S. E N G I N E E R S
' #t.". = 5 i
=c.u : u
- e < E *
- 612 HCWARo STREET SAN FPANCISCC C ALiFORNI A 9C05
- 9151 397-2525
.aussv
]
_: r:.
- E July 17, 1970 i
Str. Edson G. Case, Director Division of Reactor Standards U.S. Atomic Energy Commission
]
Washington D.C.
20343 Contract No:
AT(49-5) -3011 i
Blume Project No: 2085313
Subject:
Davis-Besse Nuclear Power Station Toledo Edison Company Docket No. 50-346 l
Dear Str. Case:
In accordance with your request, we have performed a general review of the PSAR Volumes 1-4 and Amendments 1-7 for the Davis-Besse Plant.
i Our review was also based on data gained during several meetings with members of the staffs of DRS and DRL, and during a meeting with the members of the staifs and the applicant on afay 19, 19 70.
i Ne are enclosing herewith five copies of our report, " Review of the Seismic Design Criteria for the Davis-Besse Nuclear Power Station."
Ne have revised our 5 fay 15,1970 preliminary report based on discussions with the applicant and members of the DRS and DRL staffs at a meeting on
- .tay 19, 1970, and on Amendments No. 5-7 to the PSAR.
As requested by your staf ' ve have deleted any reference to the problems of solution activity in thu foundation material. We submitted questions to the AEC on April 21, 1970, and understand that this item is to be J
covered in a separate report.
i Very truly yours, i
l JOHN A. BLU5tE S ASSOCIATES, ENGINEERS 6 x n u D
.ca
[
Executive Vice President Roland L. Sharpe EGK:aa Enclosures 5 4
l 2M i
22SJ n
-.-- n
--r.-
..,--e m
w,-
--~->-e
---,-m,.
---ne,,wn.-
,,-m
-w,
,m