ML19332C679
| ML19332C679 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/27/1989 |
| From: | Williams O JRA ASSOCIATES |
| To: | Robinson L NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| FOIA-89-471, RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, OGW-89-193, NUDOCS 8911280413 | |
| Download: ML19332C679 (2) | |
Text
F..;
JIRIAI ASSOCIATES j-Regulatory inf:rmation & Support Syst:ma
., L 1407 M:rco Drive Mitchellville, MD 20716 l
301/249 9672 October 27, 1989 F
OGW-89-193 l
i Ms Linda Robinson, Chief FO!A/LPDR Branch I,REE00M Of INFORMATION Division of Freedom of Infonnation ACi REQUEST and Publication Services
$M -/f. y
=
Office of Administration U.S. Nuclear Regulatory Commission Washington, DC 20555 g h /d,$/-[
SUBJECT:
FREEDOM 0F INFORMATION ACT REQUEST j
[
Dear Ms Robinson:
-Pursuant to the freedom of Information Act (5 USC i 552) and to the Nuclear Regulatory Commission's policies and regulations (10 CFR i 9.3, et seq.),
I request that copies of the following documents be placed in the Public Document Room.
These are references from NUREG - 1177, App. C, page 17, a copy
- of which is attached to this letter:
/
- " Pre-Implementation Audit of the Detailed Control Room Design Review of the Davis-Besse Nuclear Power Station," attachment to memorandum from W.H. Regan, Jr., USNRC, to W.T. Russell, USNRC, dated June 18, 1985.
i t * " Minutes of NRC Meeting with Toledo Edison Concerning the Detailed Control i
Room Design Review of Davis-Besse Nuclear Power Station " attachment to memorandum from W.H. Regan, Jr., USNRC, to J.F. Stolz, USNRC, dated November 8, 1985.
of this request, as provided by 10 CFR 6 9.8 and the NRC'g days of the receipt
[
I would appreciate your prompt response within ten workin s policies.
If you have any questions regarding this request, please feel free to contact me at 301/249 9672.
Thank you.
S rely your l-A.)
Op la G.
liiams 1
8911280413 891027 PDR FOIA WILLIAMB9-471 PDR e
.NUU6 II99-L REEERENCES 1.
" Appendix C'.5.1 - Specific Actions Related To Control Room Deficien-cies," Appendix to Revision 4 to the Davis-Besse Course of Action (C0A), attachment to letter f rom J. Williams, Jr., TED, to H.R. Denton, USNRC, dated November 16, 1985, p 2.
" Pre-implementation Audit of the Detailed Control Room Design Review of the Davis-Besse Nuclear Power Station," attachment to memorandum from W.H. Rega n, Jr., USNRC, to W.T. Russell, USNRC, dated June 18, 1985.
3.
" Minutes of HRC Meeting with Toledo Edison Concerning the Detailed Control Room Design Review of Davis-Besse Nucicar Power Station "
attachment to memorandum from W.H. Regan, Jr., 'USf(RC, to J.F. Stolz, USNRC, dated November 8,1985.
4.
" Supplement 1 to NUREG-0737 Detailed Control Room Design Review Impic-mentation Schedule," attachment to letter from R.P. Crouse. TED, to J.F.
Stolz, USNRC, dated January 31, 1985.
5.
" Response to Suppicment No.1 to NUREG-0737 Requirements for Emergency Response Capability (Generic 1.etter No. 82-33)," attachment to letter f rom R.P. Crouse, TED, to D.G. Eisenhut, USNRC, dated Ap,ril 15, 1983.
6.
NUREG-0737 Supplement 1, " Requirements for Emergency Response Capa-bility," USNRC, Washington, D.C., December 1982, transmitted to reactor licensees via Generic Letter 82-33, December 17, 1982.
7.
NUREG-0700, " Guidelines for Control Room Design Reviews," USNRC, Washington, D.C.,
September 1981.
6 Davis-Besse Tac No. 51154 SAIC/1-263-07-557-16 Contract No. NRC-03-82-096 Davis-Besse Restart SER 17 Appendix C j