ML17278A251: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, STATE/LOCAL GOVERNMENT TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, STATE/LOCAL GOVERNMENT TO NRC
| page count = 4
| page count = 4
| project =
| stage = Request
}}
}}



Latest revision as of 06:08, 10 November 2019

Advises That State of Wa Energy Facility Site Evaluation Council Concurs W/Util 850618 Application for Amend to License NPF-21,revising Tech Spec 3.8.4.2 Re Primary Containment Penetration Conductor Overcurrent Devices
ML17278A251
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/27/1985
From: Eschels C
WASHINGTON, STATE OF
To: Butler W
Office of Nuclear Reactor Regulation
References
TAC-57993, NUDOCS 8507020531
Download: ML17278A251 (4)


Text

REGULA . Y INFORMATION DISTRIBUTI SYSTEM (RIDS) r

.<< ACCESSION NBR:8507020531 DOC ~ DATE ~ 85/06/27, NOTARIZED:'O DOCKET FACIL:50-397 HPPSS Nuclear Projects Unit 2g llashington Public Powe 05000397 AUTH NAME AUTHOR AFFILIATION KSCHKLSgC, Nashingtonr 'State of REC IP ~ NAME RECIPIENT AFFILIATION BUTLERt> ~ RE Licensing Branch 2

SUBJECT:

Advises that, State of llA Ener gy Facility Site Evaluation Council concurs w/util 850618 application for amend to License NPF-21irevising Tech Spec 3,8 ',2',e.primary.

containment penetration conductor over current devices; DISTRIBUTION CODE: A001D COPIES RECEI)ED:LTR, "ENCL OR Submittali General Distribution SIZE'ITLE:

NOTES: 05000397 OL~ 12/20/83 RECIP IENT COPIES'TTR REC IP IENT COPIES ID CODE/NAME ENCL ID CODE/NAME LTTR ENCL NRR LB2 BC 01 INTERNAL; ACRS 09 6 ADM/LFMB 1 El D/HDS2 1 NRR/DE/MTEB 1 1 NRR/DL DIR 1 NRR/DL/ORAB 1 NRR/DL/TSRG 1 MKTB 1 NRR/DSI/RAB 1 REG F IL 04 1 RGN5 1 EXTERNAL: 24X KGLG BRUSKEgS LPDR 03 NRC PDR 02 1 1 NSIC 05 0

TOTAL NUMBER OF COPIES REQUIRED'TTR 28 ENCl

v s sl y

g+g serg O~

Curtis Pschels Chairman STATE OF WASHINCTON ENERCY FACILITY SITE EVALUATION COUNCIL Mail Stop PY.71 o Olympia, Washington 98504 o (206) 4594490 o (SCAN) 5854490 3une 27, 1985 Q5qcng9g Director of Nuclear Reactor Regulations Attention: Mr. W. R. Butler, Chief Licensing Branch No. 2, Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Butler:

SUBJECT:

AMENDMENTTO FACILITYOPERATING LICENSE NPF-21, WPPSS NUCLEAR PRO3ECT NO. 2 During their regular meeting of June 20 1985, the Washington State Energy Facility Site Evaluation Council reviewed and subsequently adopted a motion indicating their concurrence with the Washington Public. Power Supply System's request, by letter dated 3une 18, 1985, for an emergency change to the Operating License for Nuclear Project No. 2. Specifically, the Supply System's request involves an emergency change to Technical Specification 3.8.0.2, Primary Containment Penetration Conductor Overcurrent Protective Devices.

The Council was notified of the proposed amendment request by the Supply System in accordance with the notification requirements of 10 CFR 50.91.

We appreciate the opportunity to review the proposed license amendment.

Sincerely, Curtis Eschels Chairman CE:MM:ab cc: Don Mazur, WPPSS 3erry Sorensen, WPPSS 3ohn Bradfute, NRC .

850702053i 850b27 PDR ADDCN, 05000397 P PDR

0