|
|
(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML080880151 | | | number = ML080880151 |
| | issue date = 04/02/2008 | | | issue date = 04/02/2008 |
| | title = Summary of March 18, 2008 Meeting to Discuss the January 31, 2008, License Amendment Request (LAR) for a Digital Upgrade to Oconee Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) (TAC Nos. MD7999, MD8000, | | | title = Summary of March 18, 2008 Meeting to Discuss the January 31, 2008, License Amendment Request (LAR) for a Digital Upgrade to Oconee Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) |
| | author name = Olshan L N | | | author name = Olshan L |
| | author affiliation = NRC/NRR/ADRO/DORL/LPLII-1 | | | author affiliation = NRC/NRR/ADRO/DORL/LPLII-1 |
| | addressee name = | | | addressee name = |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:April 2, 2008LICENSEE:DUKE POWER COMPANY LLC (DUKE) | | {{#Wiki_filter:April 2, 2008 LICENSEE: DUKE POWER COMPANY LLC (DUKE) |
| FACILITY:OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE) | | FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE) |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF MARCH 18, 2008, MEETING TO DISCUSS THE JANUARY 31,2008, LICENSE AMENDMENT REQUEST (LAR) FOR A DIGITAL UPGRADETO OCONEE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD7999, MD8000, AND MD8001)On March 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) met with Duke (thelicensee) to discuss the January 31, 2008, LAR for a digital upgrade to the Oconee RPS/ESPS. | | OF MARCH 18, 2008, MEETING TO DISCUSS THE JANUARY 31, 2008, LICENSE AMENDMENT REQUEST (LAR) FOR A DIGITAL UPGRADE TO OCONEE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD7999, MD8000, AND MD8001) |
| Enclosed is a list of the attendees. The handout provided by the licensee during the meeting is available in the Agencywide Documents Access and Management System (ADAMS) under accession number ML080840040. The handout provided by the NRC is available under ADAMS accession number ML080840038. During the meeting, it was discovered that the NRC handout contained several typographical errors. The corrected version of the NRC handout is available under ADAMS accession number ML080840044.The NRC staff stated that this LAR represents the most extensive use of digital systems on anoperating plant in the U.S. and is one of the most significant licensing actions currently under NRC review. The NRC staff stated that the licensee has provided sufficient technical information in both scope and depth to accept the LAR for a detailed technical review. | | On March 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) met with Duke (the licensee) to discuss the January 31, 2008, LAR for a digital upgrade to the Oconee RPS/ESPS. |
| However, in its handout, the NRC staff identified 6 items that present significant challenges to completing a comprehensive review of the LAR so that the NRC staff can make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of the health and safety of the public. The NRC staff requested that the licensee provide a schedule by April 1, 2008, for submittingthe additional information specified in items 2 through 6 of the NRC handout. The NRC staff stated that no additional information is needed at this time on item 1, but that the NRC staff will be reviewing the defense-in-depth and diversity (D3) analysis in accordance with the Interim Staff Guidance on D3.The NRC staff stated that, based on timely responses to the information requested in items 2through 6 and all additional requests for additional information, the safety evaluation of the LAR is scheduled to be completed by June 30, 2009, with the issuance of the amendments probably 1 to 2 months later. | | Enclosed is a list of the attendees. The handout provided by the licensee during the meeting is available in the Agencywide Documents Access and Management System (ADAMS) under accession number ML080840040. The handout provided by the NRC is available under ADAMS accession number ML080840038. During the meeting, it was discovered that the NRC handout contained several typographical errors. The corrected version of the NRC handout is available under ADAMS accession number ML080840044. |
| Duke-2-The licensee stated that it intends to implement the digital upgrade to RPS/ESPS on Unit 1during the refueling outage scheduled to begin in December 2009. In order to accomplish this, the licensee requested that the NRC staff issue the amendments by March 31, 2009. The NRC staff stated, that by March 31, 2009, it would have a good indication as to whether the LAR would be found acceptable or not acceptable, but that it was unlikely that the amendments would be issued by March 31, 2009. Both the NRC staff and the licensee stated that they will re-examine their schedules and have further discussions on these schedules./RA/Leonard N. Olshan, Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287 | | The NRC staff stated that this LAR represents the most extensive use of digital systems on an operating plant in the U.S. and is one of the most significant licensing actions currently under NRC review. The NRC staff stated that the licensee has provided sufficient technical information in both scope and depth to accept the LAR for a detailed technical review. |
| | However, in its handout, the NRC staff identified 6 items that present significant challenges to completing a comprehensive review of the LAR so that the NRC staff can make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of the health and safety of the public. |
| | The NRC staff requested that the licensee provide a schedule by April 1, 2008, for submitting the additional information specified in items 2 through 6 of the NRC handout. The NRC staff stated that no additional information is needed at this time on item 1, but that the NRC staff will be reviewing the defense-in-depth and diversity (D3) analysis in accordance with the Interim Staff Guidance on D3. |
| | The NRC staff stated that, based on timely responses to the information requested in items 2 through 6 and all additional requests for additional information, the safety evaluation of the LAR is scheduled to be completed by June 30, 2009, with the issuance of the amendments probably 1 to 2 months later. |
| | |
| | Duke The licensee stated that it intends to implement the digital upgrade to RPS/ESPS on Unit 1 during the refueling outage scheduled to begin in December 2009. In order to accomplish this, the licensee requested that the NRC staff issue the amendments by March 31, 2009. The NRC staff stated, that by March 31, 2009, it would have a good indication as to whether the LAR would be found acceptable or not acceptable, but that it was unlikely that the amendments would be issued by March 31, 2009. Both the NRC staff and the licensee stated that they will re-examine their schedules and have further discussions on these schedules. |
| | /RA/ |
| | Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| List of Attendeescc w/encl: See next page Duke-2-The licensee stated that it intends to implement the digital upgrade to RPS/ESPS on Unit 1during the refueling outage scheduled to begin in December 2009. In order to accomplish this, the licensee requested that the NRC staff issue the amendments by March 31, 2009. The NRC staff stated, that by March 31, 2009, it would have a good indication as to whether the LAR would be found acceptable or not acceptable, but that it was unlikely that the amendments would be issued by March 31, 2009. Both the NRC staff and the licensee stated that they will re-examine their schedules and have further discussions on these schedules./RA/Leonard N. Olshan, Project ManagerPlant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-269, 50-270, and 50-287 | | |
| | List of Attendees cc w/encl: See next page |
| | |
| | Duke The licensee stated that it intends to implement the digital upgrade to RPS/ESPS on Unit 1 during the refueling outage scheduled to begin in December 2009. In order to accomplish this, the licensee requested that the NRC staff issue the amendments by March 31, 2009. The NRC staff stated, that by March 31, 2009, it would have a good indication as to whether the LAR would be found acceptable or not acceptable, but that it was unlikely that the amendments would be issued by March 31, 2009. Both the NRC staff and the licensee stated that they will re-examine their schedules and have further discussions on these schedules. |
| | /RA/ |
| | Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| List of Attendeescc w/encl: See next pageDistribution | | |
| :PUBLICS.Arndt, NRR LPL2-1 R/FJ. Sharkey, NR RidsNrrDorlLpl2-1 (MWong)P. Loeser, NRR RidsNrrLAMO'Brien (hard copy)RidsNrrPMMChernoff RidsNrrPMLOlshan (hard copy)S. Bailey, NRR RidsOgcRpM.Cox, EDO, Rgn II RidsAcrsAcnw&mMailCenterRidsRgn2MailCenter (KWeaver)
| | List of Attendees cc w/encl: See next page Distribution: |
| | PUBLIC S.Arndt, NRR LPL2-1 R/F J. Sharkey, NR RidsNrrDorlLpl2-1 (MWong) P. Loeser, NRR RidsNrrLAMOBrien (hard copy) RidsNrrPMMChernoff RidsNrrPMLOlshan (hard copy) S. Bailey, NRR RidsOgcRp M.Cox, EDO, Rgn II RidsAcrsAcnw&mMailCenter RidsRgn2MailCenter (KWeaver) |
| C. Tucci, NRR W. Kemper, NRR I. Ahmed, NRR RidsNrrDorl (TMcGinty) | | C. Tucci, NRR W. Kemper, NRR I. Ahmed, NRR RidsNrrDorl (TMcGinty) |
| P.Hiland, NRR N. Carte, NRRAccession Number: ML080880151OFFICENRR/LPL2-1/PMNRR/LP2-1/LANRR/LPL2-1/BCNAMELOlshanMO'BrienMWongDATE04/02/0804/02/0804/02/08 OFFICIAL RECORD COPY EnclosureMEETING ATTENDEESFROM MARCH 18, 2008, MEETING WITH DUKE POWER COMPANY LLC (DUKE)TO DISCUSS THE JANUARY 31, 2008, LICENSE AMENDMENT REQUESTFOR A DIGITAL UPGRADE TO THE OCONEE RPS/ESPS NRC DUKEW. KemperR. GillI. AhmedR. Freudenberger M. WongM. Bailey T. McGintyT. Owusu P. HilandB. Shingleton L. OlshanG. Davenport N. CarteD. Richardson S. ArndtB. Geddes J. Sharkey P. Loeser M. Chernoff S. BaileyOTHERR. Gardner, AREVAM. Burzynski, AREVA J. Riley, Nuclear Energy Institute G. Clefton, Nuclear Energy Institute J. Weil, McGraw-Hill S. Hanada, Mitsubishi Nuclear Energy Systems D. Raleigh, Scientech Oconee Nuclear Station, Units 1, 2, and 3 cc: | | P.Hiland, NRR N. Carte, NRR Accession Number: ML080880151 OFFICE NRR/LPL2-1/PM NRR/LP2-1/LA NRR/LPL2-1/BC NAME LOlshan MOBrien MWong DATE 04/02/08 04/02/08 04/02/08 OFFICIAL RECORD COPY |
| Mr. Bruce H. HamiltonVice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672Ms. Lisa F. VaughnAssociate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202Manager, LISNUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035Senior Resident InspectorU.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672Mr. Henry Porter, DirectorDivision of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.
| | |
| Columbia, SC 29201-1708Mr. Michael A. SchoppmanFramatome ANP 1911 North Ft. Myer Dr.
| | MEETING ATTENDEES FROM MARCH 18, 2008, MEETING WITH DUKE POWER COMPANY LLC (DUKE) |
| Suite 705 Rosslyn, VA 22209Mr. B. G. DavenportRegulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672Mr. Leonard G. GreenAssistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602Mr. R. L. Gill, Jr.Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.
| | TO DISCUSS THE JANUARY 31, 2008, LICENSE AMENDMENT REQUEST FOR A DIGITAL UPGRADE TO THE OCONEE RPS/ESPS NRC DUKE W. Kemper R. Gill I. Ahmed R. Freudenberger M. Wong M. Bailey T. McGinty T. Owusu P. Hiland B. Shingleton L. Olshan G. Davenport N. Carte D. Richardson S. Arndt B. Geddes J. Sharkey P. Loeser M. Chernoff S. Bailey OTHER R. Gardner, AREVA M. Burzynski, AREVA J. Riley, Nuclear Energy Institute G. Clefton, Nuclear Energy Institute J. Weil, McGraw-Hill S. Hanada, Mitsubishi Nuclear Energy Systems D. Raleigh, Scientech Enclosure |
| Mail Stop EC05P Charlotte, NC 28202Division of Radiation ProtectionNC Dept of Environment, Health, & Natural
| |
|
| |
|
| Resources 3825 Barrett Dr. | | Oconee Nuclear Station, Units 1, 2, and 3 cc: |
| Raleigh, NC 27609-7721Mr. Peter R. Harden, IVVP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210Mr. Henry BarronGroup Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006Mr. Charles BrinkmanDirector, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852Ms. Kathryn B. NolanSenior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202}} | | Mr. Bruce H. Hamilton Mr. Leonard G. Green Vice President, Oconee Site Assistant Attorney General Duke Power Company LLC NC Department of Justice 7800 Rochester Highway P.O. Box 629 Seneca, SC 29672 Raleigh, NC 27602 Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr. |
| | Associate General Counsel and Managing Manager - Nuclear Regulatory Attorney Issues and Industry Affairs Duke Energy Carolinas, LLC Duke Power Company LLC 526 South Church Street - EC07H 526 S. Church St. |
| | Charlotte, North Carolina 28202 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr. |
| | Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman P.O. Box 1006-EC07H Framatome ANP Charlotte, NC 28201-1006 1911 North Ft. Myer Dr. |
| | Suite 705 Mr. Charles Brinkman Rosslyn, VA 22209 Director, Washington Operations Westinghouse Electric Company Mr. B. G. Davenport 12300 Twinbrook Parkway, Suite 330 Regulatory Compliance Manager Rockville, MD 20852 Oconee Nuclear Site Duke Energy Corporation Ms. Kathryn B. Nolan ON03RC Senior Counsel 7800 Rochester Highway Duke Energy Carolinas, LLC Seneca, SC 29672 526 South Church Street - EC07H Charlotte, NC 28202}} |
Letter Sequence Meeting |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0807303392008-01-31031 January 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09 Project stage: Request ML0806503202008-03-0505 March 2008 3/18/2008 - Forthcoming Meeting with Duke Power Company LLC, Oconee, Units 1, 2, and 3 to Discuss the January 31, 2008 License Amendment Request for Digital Upgrade to the Reactor Protective System and Engineered Safeguards Protective Syste Project stage: Meeting ML0808400402008-03-18018 March 2008 Duke Handout from 03/18/08 Meeting Project stage: Request ML0808400382008-03-18018 March 2008 Draft NRC Handout from 03/18/2008 Meeting Project stage: Request ML0808400442008-03-20020 March 2008 Corrected NRC Handout from 03/18/2008 Meeting, Draft Project stage: Request ML0808801512008-04-0202 April 2008 Summary of March 18, 2008 Meeting to Discuss the January 31, 2008, License Amendment Request (LAR) for a Digital Upgrade to Oconee Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) Project stage: Meeting ML0809900862008-04-0303 April 2008 Schedule for Providing Information Requested During March 18, 2008, Duke/Nrc Meeting Associated with the License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade.. Project stage: Meeting ML0809900512008-04-0303 April 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 1 Project stage: Supplement ML0808605472008-04-10010 April 2008 /2/3, Call Summary to Discuss the Availability of Documents Related to the January 31, 2008 License Amendment Request Project stage: Other ML0810705212008-04-24024 April 2008 Acceptance Review of January 31, 2008, License Amendment Request for a Upgrade to the Reactor Protective System and Engineered Safeguards Protective System Project stage: Acceptance Review ML0812702222008-04-29029 April 2008 Rps/Esps Digital LAR, Oconee Nuclear Station, Non-Proprietary Material Project stage: Request ML0812601672008-04-29029 April 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 2 Project stage: Supplement ML0814300032008-05-15015 May 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 3 Project stage: Supplement ML0810601562008-05-27027 May 2008 Areva Np Incorp. Request for Withholding Information from Public Disclosure for Oconee, Units 1,2, & 3 Project stage: Withholding Request Acceptance ML0815501452008-05-28028 May 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 4 Project stage: Supplement ML0815603312008-06-16016 June 2008 Summary of Closed Meeting to Discuss Two Issues Related to the Oconee, Units 1, 2, and 3, January 31, 2008, License Amendment Request (LAR) Project stage: Meeting ML0819001972008-07-23023 July 2008 /2/3, Trip Report for NRC Staff Visit to Discuss Issues Identified in the Acceptance Review Letter Regarding the Digital Upgrade of the Reactor Protective System and Esps (TAC MD7999-MD8001) Project stage: Acceptance Review ML0823306182008-08-28028 August 2008 Nonproprietary Version- Oconee Nuclear Station, Units 1, 2, Request for Additional Information Digital Upgrade of Reactor Protective System and Engineered Safeguards Protective System Project stage: RAI ML0826310132008-10-10010 October 2008 Summary of Meeting to Discuss August 20, 2008, Request for Additional Information Pertaining the Digital Upgrade to the Oconee Reactor Protective System and Engineered Safeguards Protective System (TAC Nos. MD7999, MD80000, and MD8001) Project stage: RAI ML0830804532008-11-12012 November 2008 Trip Report for U.S. Nuclear Commission (NRC) Staff'S Oconee Nuclear Station, Units 1, 2, and 3 (Oconee) - Thread Audit at Areva for Digital Upgrade of the Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) Project stage: Other ML0832603052008-11-24024 November 2008 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing Project stage: Other ML0832602582008-11-24024 November 2008 FRN: Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0906202452009-03-11011 March 2009 Request for Additional Information (RAI) Regarding License Amendment Request (LAR) to Change Technical Specifications as Well as Cyber Security Features Related to Replacement of Current Analog Reactor. Project stage: RAI ML0913804332009-04-30030 April 2009 Response to Supplemental Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Supplement ML0917704362009-06-19019 June 2009 Suppl. Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Suppl. 17 Project stage: Request ML0918300102009-07-13013 July 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0923205502009-08-10010 August 2009 Supplemental Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number Project stage: Supplement ML0921807362009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and MD8001) - Sup Project stage: Withholding Request Acceptance ML0921806152009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and 8001) - Suppl Project stage: Withholding Request Acceptance ML0921706842009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective Systems/ Engineered Safeguards Protective System Digital Upgrade (Tac Nos. MD7999, MD8000, and MD8001) - S Project stage: Withholding Request Acceptance ML0920801012009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade - Supplement 6 Project stage: Withholding Request Acceptance ML0920800742009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0926700632009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000 and MD8001 Project stage: Withholding Request Acceptance ML0926701022009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0926701302009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0929600422009-10-23023 October 2009 Decontrolled Version of Transmittal Letter for Draft Safety Evaluation for Acceptance of the Reactor Protective System and Engineered Safeguard Protective System (Rps/Esps) Digital Upgrades Project stage: Draft Approval ML0924504412009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0924502332009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0924503862009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 15-2), Project stage: Withholding Request Acceptance ML0924504122009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 16-1), Project stage: Withholding Request Acceptance ML0924504572009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 16-3), Project stage: Withholding Request Acceptance ML0924504912009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 17), Project stage: Withholding Request Acceptance ML0924505432009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 12), TAC Nos. MD7999, MD8000, and MD8001 Project stage: Withholding Request Acceptance ML0930704632009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0930707182009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0930707342009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0933101832009-11-19019 November 2009 Comments on Draft NRC Safety Evaluation for Acceptance of the Reactor Protective System and Engineered Safeguards Protective System Digital Upgrade Project stage: Request ML0931000772009-12-0101 December 2009 Environmental Assessment and Finding of No Significant Impact Project stage: Other ML0931001732009-12-0101 December 2009 Environmental Assessment and Finding of No Significant Impact Project stage: Other NRC-2009-0537, Environmental Assessment and Finding of No Significant Impact2009-12-0101 December 2009 Environmental Assessment and Finding of No Significant Impact Project stage: Other 2008-05-28
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML23118A2852023-05-0202 May 2023 Public Meeting Summary - 2022 Annual Assessment Meeting Regarding Catawba Nuclear Station, McGuire Nuclear and Oconee Nuclear Station ML22200A0772022-08-0808 August 2022 SLRA - Summary of July 14, 2022 and July 28, 2022 Public Meetings ML22193A0182022-07-18018 July 2022 SLRA - Summary of June 30, 2022 Public Meeting ML22129A0062022-05-10010 May 2022 Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 ML22124A2052022-05-0404 May 2022 Summary of May 4, 2022, Clarification Call with Duke Energy Carolinas, LLC, Application to Revise TS 3.7.7, Low Pressure Service Water (LPSW) System ML22130A0122022-05-0404 May 2022 SLRA - Summary of April 28, 2022 Public Meeting ML22075A2042022-04-0505 April 2022 SLRA - Summary of March 7, 2022 Public Meeting ML22084A6142022-04-0404 April 2022 SLRA - Summary of March 16, 2022 (Closed Public Meeting) ML22094A1112022-04-0404 April 2022 Public Meeting Summary 2021 Annual Assessment Meeting Catawba Dockets Nos. 50-413 and 50-414; McGuire No. 50-369 and 50-370; Oconee. 50-269, 50-270, and 50-287 ML22063A1162022-03-0808 March 2022 SLRA - Summary of Public Meeting Dated February 17, 2022 ML21341A5542021-12-29029 December 2021 Summary of November 29, 2021, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Planned License Amendment Request to Relocate ML21348A5452021-12-14014 December 2021 December 13, 2021, Clarification Call Summary Use of an Alternative to the ASME Code Case N-853 Acceptance Criteria ML21279A1542021-11-0808 November 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary Memo ML21279A1192021-08-25025 August 2021 August 25, 2021, Oconee Nuclear Station, Units 1, 2, and 3 Subsequent License Renewal Application Public Environmental Scoping Meeting Summary ML21195A2712021-07-14014 July 2021 Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - Summary ML21195A2692021-07-14014 July 2021 Meeting Summary: Pre-Submittal Meeting for the Oconee Subsequent License Renewal Application (EPID Number: L-2020-RNW-0028) (Docket Numbers: 50 269, 50-270, and 50-287) - Memo ML21102A0612021-04-27027 April 2021 April 14, 2021, Meeting Summary Regarding Pre-Application Meeting to Discuss Proposed Relief Request Related to Code Case N-853 ML21099A0932021-04-0909 April 2021 Public Meeting Summary - 2020 Annual Assessment Meeting Regarding Catawba, McGuire, and Oconee Nuclear Stations ML20266G2192020-11-0303 November 2020 Regulatory Audit Report Regarding License Amendment Request to Revise the Licensing Basis for High Energy Line Breaks Outside of the Containment Building ML20141L4172020-05-20020 May 2020 EOC Public Meeting Summary ML19331A5202019-12-12012 December 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Submitted License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML19220A6702019-08-26026 August 2019 Summary of August 7, 2019, Meeting with Duke Energy Progress, LLC and Duke Energy Carolinas, LLC to Discuss a Proposed License Amendment Request for a Common Emergency Plan ML19207A0172019-07-30030 July 2019 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding High Energy Line Break Licensing Basis ML19102A3352019-04-12012 April 2019 Public Meeting Summary - Oconee Nuclear Station Docket Nos. 50-269, 50-270, and 50-287 ML19087A0622019-04-11011 April 2019 Summary of March 25, 2019, Public Teleconference with Duke Energy to Discuss the Request for Additional Information Response Regarding the Proposed Alternative to the Depth Sizing Qualification Requirement (Duke Energy Fleet Relief Request ML18227B2122018-09-0505 September 2018 Summary of August 1, 2018, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Tornado Mitigation Licensing Basis ML18134A2292018-05-14014 May 2018 Summary of April 26, 2018, Public Teleconference with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment and 3 Regarding Technical Specification 3.8.1 ML18082A1082018-03-29029 March 2018 Summary of February 28, 2018, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed LAR Regarding Tornado Mitigation Licensing Basis ML18082A0582018-03-23023 March 2018 Summary of Meeting with Oconee Nuclear Station to Discuss Annual Assessment of Oconee for the Period of January 01, 2017 - December 31, 2017 ML17179A3472017-07-18018 July 2017 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss Proposed License Amendment Request for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Thermal Margin for the Standby Shutdown Facility ML17103A0292017-04-13013 April 2017 Summary of Meeting to Provide Opportunities to Discuss Annual Assessment of Oconee Nuclear Station Units 1, 2 and 3 ML16166A4022016-06-27027 June 2016 Summary of November 18, 2015, and December 15, 2015, Meetings with Duke Energy Carolinas, LLC to Discuss a Proposed Relief Request in Accordance with 10 CFR 50.55a(z) for the Oconee Nuclear Station, Units 1, 2, and 3 ML16132A4352016-05-20020 May 2016 Summary of October 13, 2015, Meeting with Duke Energy Carolinas, LLC to Discuss Proposed LAR to Support Keowee Dam Stator Replacement ML15161A4312015-06-19019 June 2015 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss Ongoing Major Projects at Oconee Nuclear Station, Units 1, 2 and 3 ML15089A1642015-04-27027 April 2015 Summary of February 25, 2015, Partially Closed Meeting with Industry Stakeholders Regarding the Babcock and Wilcox Loss of Coolant Accident Evaluation Model Analysis ML15113A6262015-04-23023 April 2015 April 14, 2015 Summary of Public Meeting on Oconee Nuclear Station, Units 1, 2 and 3 to Discuss the Annual Assessment ML14356A0052014-12-31031 December 2014 Summary of December 3, 2014, Category 1 Public Meeting with Duke Energy Carolinas, LLC to Discuss NTTF Recommendation 2.1, Flooding Response for Oconee Nuclear Station, Units 1, 2, and 3 ML14147A3652014-05-27027 May 2014 Annual Assessment Public Meeting Summary Memo ML14069A3492014-03-13013 March 2014 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss Ongoing Major Projects at Oconee Nuclear Station, Units 1, 2, and 3 ML13336A5982013-12-0404 December 2013 Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Proposed One-time TS Completion Time Change to Perform Khu Generator Field Pole Rewind Maintenance - Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. ME9021, ME9022, and M ML13312A9882013-11-0808 November 2013 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Provide Opportunities to Discuss the Planned Fukushima-Related Modifications ML13281A5412013-10-21021 October 2013 9/24/2013 - Oconee Nuclear Station, Units 1, 2, and 3, Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Jocassee Dam Seismic Analysis ML13281A6972013-10-21021 October 2013 10/3/13 Summary of Meeting with Duke Energy Carolinas, LLC to Discuss the Protected Service Water System Operation - Oconee Nuclear Station Units 1, 2, and 3 (TAC Nos. ME7737, ME7738, ME7739, ME7746, ME7747, and ME7748) ML13241A4482013-08-29029 August 2013 August 28, 2013 Summary of Public Meeting - Major Projects Status Meeting with Oconee ML13225A2932013-08-12012 August 2013 7/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop ML13134A5232013-05-14014 May 2013 5/9/2013 Summary of Public Meeting with Duke Energy Corp., Oconee Nuclear Station to Provide Opportunities to Discuss the Annual Assessment for the Year 2012 ML13122A1912013-05-0606 May 2013 Summary of 04/10/13, Meeting with Duke Energy Carolinas, LLC, to Discuss Milestones Related to an Apparent Violation of License Conditions on Fire Protection (EA-13-010) ML13122A4362013-05-0606 May 2013 Summary of April 9, 2013, Meeting with Duke Energy Carolinas, LLC, to Discuss the Re-evaluation of External Flooding for Oconee Nuclear Station, Units 1, 2, and 3 ML13092A3632013-04-0404 April 2013 3/25/2013 - Oconee Nuclear Station, Units 1, 2, and 3 - Summary of Meeting with Duke Energy Carolinas, LLC, to Discuss the Flood Hazard Reevaluation Report ML13072A4262013-03-18018 March 2013 3/5/13 Summary of Meeting with Oconee Nuclear Station, Units 1, 2, and 3 - Predecisional Enforcement Conference Summary 2023-05-02
[Table view] |
Text
April 2, 2008 LICENSEE: DUKE POWER COMPANY LLC (DUKE)
FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 (OCONEE)
SUBJECT:
SUMMARY
OF MARCH 18, 2008, MEETING TO DISCUSS THE JANUARY 31, 2008, LICENSE AMENDMENT REQUEST (LAR) FOR A DIGITAL UPGRADE TO OCONEE REACTOR PROTECTIVE SYSTEM (RPS) AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS) (TAC NOS. MD7999, MD8000, AND MD8001)
On March 18, 2008, the U.S. Nuclear Regulatory Commission (NRC) met with Duke (the licensee) to discuss the January 31, 2008, LAR for a digital upgrade to the Oconee RPS/ESPS.
Enclosed is a list of the attendees. The handout provided by the licensee during the meeting is available in the Agencywide Documents Access and Management System (ADAMS) under accession number ML080840040. The handout provided by the NRC is available under ADAMS accession number ML080840038. During the meeting, it was discovered that the NRC handout contained several typographical errors. The corrected version of the NRC handout is available under ADAMS accession number ML080840044.
The NRC staff stated that this LAR represents the most extensive use of digital systems on an operating plant in the U.S. and is one of the most significant licensing actions currently under NRC review. The NRC staff stated that the licensee has provided sufficient technical information in both scope and depth to accept the LAR for a detailed technical review.
However, in its handout, the NRC staff identified 6 items that present significant challenges to completing a comprehensive review of the LAR so that the NRC staff can make an independent assessment regarding the acceptability of the LAR in terms of regulatory requirements and the protection of the health and safety of the public.
The NRC staff requested that the licensee provide a schedule by April 1, 2008, for submitting the additional information specified in items 2 through 6 of the NRC handout. The NRC staff stated that no additional information is needed at this time on item 1, but that the NRC staff will be reviewing the defense-in-depth and diversity (D3) analysis in accordance with the Interim Staff Guidance on D3.
The NRC staff stated that, based on timely responses to the information requested in items 2 through 6 and all additional requests for additional information, the safety evaluation of the LAR is scheduled to be completed by June 30, 2009, with the issuance of the amendments probably 1 to 2 months later.
Duke The licensee stated that it intends to implement the digital upgrade to RPS/ESPS on Unit 1 during the refueling outage scheduled to begin in December 2009. In order to accomplish this, the licensee requested that the NRC staff issue the amendments by March 31, 2009. The NRC staff stated, that by March 31, 2009, it would have a good indication as to whether the LAR would be found acceptable or not acceptable, but that it was unlikely that the amendments would be issued by March 31, 2009. Both the NRC staff and the licensee stated that they will re-examine their schedules and have further discussions on these schedules.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page
Duke The licensee stated that it intends to implement the digital upgrade to RPS/ESPS on Unit 1 during the refueling outage scheduled to begin in December 2009. In order to accomplish this, the licensee requested that the NRC staff issue the amendments by March 31, 2009. The NRC staff stated, that by March 31, 2009, it would have a good indication as to whether the LAR would be found acceptable or not acceptable, but that it was unlikely that the amendments would be issued by March 31, 2009. Both the NRC staff and the licensee stated that they will re-examine their schedules and have further discussions on these schedules.
/RA/
Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287
Enclosure:
List of Attendees cc w/encl: See next page Distribution:
PUBLIC S.Arndt, NRR LPL2-1 R/F J. Sharkey, NR RidsNrrDorlLpl2-1 (MWong) P. Loeser, NRR RidsNrrLAMOBrien (hard copy) RidsNrrPMMChernoff RidsNrrPMLOlshan (hard copy) S. Bailey, NRR RidsOgcRp M.Cox, EDO, Rgn II RidsAcrsAcnw&mMailCenter RidsRgn2MailCenter (KWeaver)
C. Tucci, NRR W. Kemper, NRR I. Ahmed, NRR RidsNrrDorl (TMcGinty)
P.Hiland, NRR N. Carte, NRR Accession Number: ML080880151 OFFICE NRR/LPL2-1/PM NRR/LP2-1/LA NRR/LPL2-1/BC NAME LOlshan MOBrien MWong DATE 04/02/08 04/02/08 04/02/08 OFFICIAL RECORD COPY
MEETING ATTENDEES FROM MARCH 18, 2008, MEETING WITH DUKE POWER COMPANY LLC (DUKE)
TO DISCUSS THE JANUARY 31, 2008, LICENSE AMENDMENT REQUEST FOR A DIGITAL UPGRADE TO THE OCONEE RPS/ESPS NRC DUKE W. Kemper R. Gill I. Ahmed R. Freudenberger M. Wong M. Bailey T. McGinty T. Owusu P. Hiland B. Shingleton L. Olshan G. Davenport N. Carte D. Richardson S. Arndt B. Geddes J. Sharkey P. Loeser M. Chernoff S. Bailey OTHER R. Gardner, AREVA M. Burzynski, AREVA J. Riley, Nuclear Energy Institute G. Clefton, Nuclear Energy Institute J. Weil, McGraw-Hill S. Hanada, Mitsubishi Nuclear Energy Systems D. Raleigh, Scientech Enclosure
Oconee Nuclear Station, Units 1, 2, and 3 cc:
Mr. Bruce H. Hamilton Mr. Leonard G. Green Vice President, Oconee Site Assistant Attorney General Duke Power Company LLC NC Department of Justice 7800 Rochester Highway P.O. Box 629 Seneca, SC 29672 Raleigh, NC 27602 Ms. Lisa F. Vaughn Mr. R. L. Gill, Jr.
Associate General Counsel and Managing Manager - Nuclear Regulatory Attorney Issues and Industry Affairs Duke Energy Carolinas, LLC Duke Power Company LLC 526 South Church Street - EC07H 526 S. Church St.
Charlotte, North Carolina 28202 Mail Stop EC05P Charlotte, NC 28202 Manager, LIS NUS Corporation Division of Radiation Protection 2650 McCormick Dr., 3rd Floor NC Dept of Environment, Health, & Natural Clearwater, FL 34619-1035 Resources 3825 Barrett Dr.
Senior Resident Inspector Raleigh, NC 27609-7721 U.S. Nuclear Regulatory Commission 7812B Rochester Highway Mr. Peter R. Harden, IV Seneca, SC 29672 VP-Customer Relations and Sales Westinghouse Electric Company Mr. Henry Porter, Director 6000 Fairview Road Division of Radioactive Waste Management 12th Floor Bureau of Land and Waste Management Charlotte, NC 28210 Dept. of Health and Env. Control 2600 Bull St. Mr. Henry Barron Columbia, SC 29201-1708 Group Vice President, Nuclear Generation and Chief Nuclear Officer Mr. Michael A. Schoppman P.O. Box 1006-EC07H Framatome ANP Charlotte, NC 28201-1006 1911 North Ft. Myer Dr.
Suite 705 Mr. Charles Brinkman Rosslyn, VA 22209 Director, Washington Operations Westinghouse Electric Company Mr. B. G. Davenport 12300 Twinbrook Parkway, Suite 330 Regulatory Compliance Manager Rockville, MD 20852 Oconee Nuclear Site Duke Energy Corporation Ms. Kathryn B. Nolan ON03RC Senior Counsel 7800 Rochester Highway Duke Energy Carolinas, LLC Seneca, SC 29672 526 South Church Street - EC07H Charlotte, NC 28202