Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML0807303392008-01-31031 January 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number 2007-09 Project stage: Request ML0804607072008-02-13013 February 2008 Units 1 & 2 and Oconee Independent Spent Fuel Storage Instillation, and William States Lee III Nuclear Station - Organizational Changes, Effective February 17, 2008 Project stage: Request ML0806503202008-03-0505 March 2008 3/18/2008 - Forthcoming Meeting with Duke Power Company LLC, Oconee, Units 1, 2, and 3 to Discuss the January 31, 2008 License Amendment Request for Digital Upgrade to the Reactor Protective System and Engineered Safeguards Protective Syste Project stage: Meeting ML0808400402008-03-18018 March 2008 Duke Handout from 03/18/08 Meeting Project stage: Request ML0808400382008-03-18018 March 2008 Draft NRC Handout from 03/18/2008 Meeting Project stage: Request ML0808400442008-03-20020 March 2008 Corrected NRC Handout from 03/18/2008 Meeting, Draft Project stage: Request ML0808801512008-04-0202 April 2008 Summary of March 18, 2008 Meeting to Discuss the January 31, 2008, License Amendment Request (LAR) for a Digital Upgrade to Oconee Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) Project stage: Meeting ML0809900862008-04-0303 April 2008 Schedule for Providing Information Requested During March 18, 2008, Duke/Nrc Meeting Associated with the License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Meeting ML0809900512008-04-0303 April 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 1 Project stage: Supplement ML0808605472008-04-10010 April 2008 /2/3, Call Summary to Discuss the Availability of Documents Related to the January 31, 2008 License Amendment Request Project stage: Other ML0810705212008-04-24024 April 2008 Acceptance Review of January 31, 2008, License Amendment Request for a Upgrade to the Reactor Protective System and Engineered Safeguards Protective System Project stage: Acceptance Review ML0812601672008-04-29029 April 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 2 Project stage: Supplement ML0812702222008-04-29029 April 2008 Rps/Esps Digital LAR, Oconee Nuclear Station, Non-Proprietary Material Project stage: Request ML0814300032008-05-15015 May 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 3 Project stage: Supplement ML0810601562008-05-27027 May 2008 Areva Np Incorp. Request for Withholding Information from Public Disclosure for Oconee, Units 1,2, & 3 Project stage: Withholding Request Acceptance ML0815501452008-05-28028 May 2008 License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Supplement 4 Project stage: Supplement ML0815603312008-06-16016 June 2008 Summary of Closed Meeting to Discuss Two Issues Related to the Oconee, Units 1, 2, and 3, January 31, 2008, License Amendment Request (LAR) Project stage: Meeting ML0819001972008-07-23023 July 2008 /2/3, Trip Report for NRC Staff Visit to Discuss Issues Identified in the Acceptance Review Letter Regarding the Digital Upgrade of the Reactor Protective System and Esps (TAC MD7999-MD8001) Project stage: Acceptance Review ML0823306182008-08-28028 August 2008 Nonproprietary Version- Oconee Nuclear Station, Units 1, 2, Request for Additional Information Digital Upgrade of Reactor Protective System and Engineered Safeguards Protective System Project stage: RAI ML0827504992008-09-30030 September 2008 Third Ten Year Inservice Inspection Interval Request for Relief No. 04-ON-009, Revision 1, Request for Additional Information Response Project stage: Request ML0826310132008-10-10010 October 2008 Summary of Meeting to Discuss August 20, 2008, Request for Additional Information Pertaining the Digital Upgrade to the Oconee Reactor Protective System and Engineered Safeguards Protective System (TAC Nos. MD7999, MD80000, and MD8001) Project stage: RAI ML0830804532008-11-12012 November 2008 Trip Report for U.S. Nuclear Commission (NRC) Staffs Oconee Nuclear Station, Units 1, 2, and 3 (Oconee) - Thread Audit at Areva for Digital Upgrade of the Reactor Protective System (RPS) and Engineered Safeguards Protective System (Esps) Project stage: Other ML0832602582008-11-24024 November 2008 FRN: Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for a Hearing Project stage: Other ML0832603052008-11-24024 November 2008 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity for Hearing Project stage: Other ML0906205812009-02-27027 February 2009 Fitness-For- Duty Program Performance Data Reports for July 1, 2008 Through December 31, 2008 Project stage: Request ML0907001202009-03-0606 March 2009 Supplemental Response to Request for Additional Information for License Amendment, Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change No. 2007-09, Supplement 14 Project stage: Supplement ML0906202452009-03-11011 March 2009 Request for Additional Information (RAI) Regarding License Amendment Request (LAR) to Change Technical Specifications as Well as Cyber Security Features Related to Replacement of Current Analog Reactor Project stage: RAI ML0910006592009-04-0303 April 2009 Response to Supplemental Request for Additional Information Associated with Cyber Security Features of Reactor Protective System and Engineered Safeguards Protective System Digital Upgrade Project stage: Supplement ML0917704362009-06-19019 June 2009 Suppl. Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change (TSC) Number 2007-09, Suppl. 17 Project stage: Request ML0918300102009-07-13013 July 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0923205502009-08-10010 August 2009 Supplemental Request for Additional Information for License Amendment Request for Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade, Technical Specification Change Number Project stage: Supplement ML0920801012009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade - Supplement 6 Project stage: Withholding Request Acceptance ML0921706842009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective Systems/ Engineered Safeguards Protective System Digital Upgrade (Tac Nos. MD7999, MD8000, and MD8001) - s Project stage: Withholding Request Acceptance ML0921806152009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and 8001) - Suppl Project stage: Withholding Request Acceptance ML0921807362009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000, and MD8001) - Sup Project stage: Withholding Request Acceptance ML0920800742009-09-0202 September 2009 Request for Withholding Information from Public Disclosure for Oconee Nuclear Station, Units 1, 2, and 3 Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0926700632009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (TAC Nos. MD7999, MD8000 and MD8001 Project stage: Withholding Request Acceptance ML0926701302009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0926701022009-10-0909 October 2009 Request for Withholding Information from Public Disclosure Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0929600422009-10-23023 October 2009 Decontrolled Version of Transmittal Letter for Draft Safety Evaluation for Acceptance of the Reactor Protective System and Engineered Safeguard Protective System (Rps/Esps) Digital Upgrades Project stage: Draft Approval ML0924504412009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0924504572009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 16-3), Project stage: Withholding Request Acceptance ML0924504912009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 17), Project stage: Withholding Request Acceptance ML0924505432009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 12), TAC Nos. MD7999, MD8000, and MD8001 Project stage: Withholding Request Acceptance ML0924504122009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 16-1), Project stage: Withholding Request Acceptance ML0924503862009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade (Supplement 15-2), Project stage: Withholding Request Acceptance ML0924502332009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0924503252009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0930704632009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance ML0930707182009-11-12012 November 2009 Request for Withholding Information from Public Disclosure, Regarding Reactor Protective System/Engineered Safeguards Protective System Digital Upgrade Project stage: Withholding Request Acceptance 2008-05-28
[Table View] |
Text
luke
.fnergy RPSIESPS Digital LAR March 18, 2008 Oconee Nuclear Station
Duke Snergy Objeedvas
- Provide Technical Information associated with RPS/ESPS V&V Process and ISG 4 Data Communication
- Discuss NRC LAR Review/Plan and Milestones to facilitate resource planning by Duke
- Communicate Duke Unit 1 RPS/ESPS Schedule to facilitate NRC site visits/audits 2
P Duke
_ergy Agenda
- . RPS/ESPS Project V&V Process
- . Duke Oversight of AREVA documents LAR Submittal Quality S:.
ISG 4 Data Communication Compliance Matrix Status of LAR Acceptance Review
- . NRC LAR Review/Plan-and Milestones Duke Plan To Support Staff Licensing Phase
- . Unit 1 RPS/ESPS Schedule
- . LAR Document Availability
luke Require-wnts and Guidance
,nergy for V& V
- NRC Regulations for V&V Processes
> 50.55a(h) - IEEE Std 603 Appendix B - Criterion I, 11, 111, Xl, and XVlll S:. Regulatory Guidance provides an acceptable method for meeting the applicable requirements
>RG1
>RG1
.152 - IEEE Std 7-4.3.2
.168-IEEE Std 1012 o:o Applicable requirements and guidance addressed in RPS/ESPS LAR - Enclosure 1, Section 4.2 4
Duke AEVA V
ess E7
~gn ergy AEV
- . AREVA V&V organization is outlined in several documents including:
Software Quality Assurance Plan V&V Plan V&V Position Paper AREVA Operating Instructions for V&V
- These documents, as a whole, demonstrate that the V&V team is independent from a managerial, financial, and technical standpoint o:. AREVA V&V organization discussed in LAR Enclosure 1 Sections 3.4.3.2.4 & 5 5
kDuke Duke Review ofAREVA V& V UVEn ergy_
- . Performed detail review of the AREVA V&V documents S:.
Initial review determined compliance with IEEE 1012 not clear S:. Requested Position Paper be developed to justify exception from IEEE 1012
- o Several meetings and reviews ensued to gain an understanding of the adequacy of the AREVA V&V process S:o AREVA pointed to the Westinghouse Common Q SPM Topical Report and NRC SE as describing a similar methodology to the AREVA process
- o Following Duke's review and comment resolution Duke concluded that the AREVA V&V documents provided an acceptable method of complying with NRC regulations S:. LAR Sections 3.3.3 and 3.4.3 provide detailed information on the Duke quality review efforts 6
'uke Duke Oversight of ARE VA
, nergy Documents, o;. RPS/ES QMP LQST implemented to address LAR document completeness and accuracy o:. LQST consist of steering team members and core team reviewers from Duke plant engineering, Duke Major Projects engineering, AREVA AE group, and AREVA I&C group.
o:. 35 AREVA documents subject to LQST 1/08 review from 3/07 to o:. 43 comment resolution meetings involving 8 - 12 individuals (average length of meeting - 2.5 hrs)
- . Approved by LQST Steering Team only after LQST core team reviewer comments were resolved satisfactorily 7
Duke SF-CEnergy o:o LAR based on numerous technical documents that support the contents of the LAR which were reviewed and approved by Duke o LAR sections 3.3.3 and 3.4.3 provide information on quality of hardware and software respectively
+ LAR provides information recommended by the regulatory guidance o LAR submitted under oath and affirmation following a rigorous development process 8
Duke Energy IS G 4 Compliance Matrix o:o Data communication addressed in:
SNumerous Sections of the LAR as noted in compliance matrix-particularly 3.4.6 of Enclosure 1 and 9.2 of
> Separate cyber security submittal
> TXS Topical Report
> TXS Safety Evaluation
> December 13-14, 2006 meeting.
o:o Handout -,Compliance Matrix 9
Duke Energy NRC discussion o:. Status of LAR Acceptance Review o;, NRC LAR-Review Plans and Milestones 10
Duke wnergy Duke Plan To Support Staff Licensing Phase o:o Overall objective is to resolve concerns in a timely and appropriate manner.
o:o Staff Level
. Several phone calls each week STechnical level meetings monthly or as needed SWritten submittals made as needed to support the LAR review plan o:o Management Level SPhone calls as needed SPeriodic drop-in visits SStatus review meetings as needed o:o Executive Level meetings
> At least one during the licensing review 11
p.uke
.n ergy Unit 1 RPS/ESPS ScheduwediMilestones 4*0*
3/1 -9/08 10/24 - 12/19/08 3/1 - 3/21/09 4/08-3/09 3/31/09 4/09 - 12/09 4/09 - 12/09 10/09 - 12/09 Factory Acceptance Test procedure development Factory Acceptance Test Site Acceptance Test Installation Procedures/PMT Procedure Development Latest NRC SE date for Unit 1 Installation in Fall 2009 Plant Personnel Training Plant Procedure Development Install Unit 1 RPS/ESPS 12
ID1uke 9kergy LAR Document Availability Document Date LAR Encl. 1, Table 1-2 RTM - Post FAT 2/09 Item 2 FAT Procedures 9/08 Item 16a FAT Report 1/09 Item 16b Power Imb. SLs & TS Setpoints Calc.
7/09 Item 34 Duke I&C procedures 10/09 Item 39 SAT Plan 8/08 Item 44 SAT Procedures 2/09 Item 44a SAT Report 5/09 Item 44b 13
Duke mnergy Action Items and Closing Remarks 14