October 10, 2008 LICENSEE: DUKE ENERGY CAROLINAS, LLC FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3

SUBJECT:

SUMMARY

OF SEPTEMBER 8, 2008, MEETING TO DISCUSS AUGUST 20, 2008, REQUEST FOR ADDITIONAL INFORMATION PERTAINING THE DIGITAL UPGRADE TO THE OCONEE REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (TAC NOS. MD7999, MD8000, AND MD8001)

On September 8, 2008, the U.S. Nuclear Regulatory Commission (NRC) met with Duke Energy Carolinas, LLC (the licensee), to discuss the August 20, 2008, request for additional information (RAI) pertaining to the January 31, 2008, license amendment request (LAR) for a digital upgrade to the Oconee reactor protective system and engineered safeguards protective system (RPS/ESPS). The August 20, 2008, RAI is available in the Agencywide Document and Management System (ADAMS) under Accession No. ML083231598, and the January 31, 2008, LAR is available under ADAMS Accession No. ML080730339. Enclosed is a list of the attendees.

The licensee discussed how they intend to respond to a number of the 84 questions in the RAI.

Most of the discussion during the meeting involved proprietary material. The licensee stated that they will be providing their response to the RAI by September 30, 2008.

/RA/

Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

List of Attendees cc w/encl: Distribution via ListServ

LICENSEE: DUKE ENERGY CAROLINAS, LLC FACILITY: OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3

SUBJECT:

SUMMARY

OF SEPTEMBER 8, 2008, MEETING TO DISCUSS AUGUST 20, 2008, REQUEST FOR ADDITIONAL INFORMATION PERTAINING THE DIGITAL UPGRADE TO THE OCONEE REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (TAC NOS. MD7999, MD8000, AND MD8001)

On September 8, 2008, the U.S. Nuclear Regulatory Commission (NRC) met with Duke Energy Carolinas, LLC (the licensee), to discuss the August 20, 2008, request for additional information (RAI) pertaining to the January 31, 2008, license amendment request (LAR) for a digital upgrade to the Oconee reactor protective system and engineered safeguards protective system (RPS/ESPS). The August 20, 2008, RAI is available in the Agencywide Document and Management System (ADAMS) under accession number ML083231598, and the January 31, 2008, LAR is available under ADAMS accession number ML080730339. Enclosed is a list of the attendees.

The licensee discussed how they intend to respond to a number of the 84 questions in the RAI.

Most of the discussion during the meeting involved proprietary material. The licensee stated that they will be providing their response to the RAI by September 30, 2008.

/RA/

Leonard N. Olshan, Project Manager Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-269, 50-270, and 50-287

Enclosure:

List of Attendees cc w/encl: Distribution via ListServ DISTRIBUTION:

Public Branch Reading File RidsEdoMailCenter Resource RidsNrrDorl Resource RidsNrrOd Resource RidsNrrDorlLpl2-1 Resource RidsOgcRp Resource RidsNrrPMLOlshan Resource RidsOpaMail Resource RidsNrrLAMOBrien Resource RidsOcaMailCenter Resource RidsSecyMailCenter Resource RidsRgn1MailCenter Reource RidsWpcMailCenter Resource RidsNrrPMTAlexion Resource RidsAcrsAcnw_MailCTR Resource MCox, EDO R-II Accession Number: ML082631013 OFFICE LPL2-1/PM LPL2-1/LA LPL2-1/BC NAME LOlshan GLappert MWong DATE 10/10/08 10/10/08 10/10/08 OFFICIAL RECORD COPY

MEETING ATTENDEES FROM SEPTEMBER 8, 2008, MEETING WITH DUKE ENERGY CAROLINAS, LLC TO DISCUSS THE AUGUST 20, 2008, REQUEST FOR ADDITIONAL INFORMATION PERTAINING TO THE DIGITAL UPGRADE TO THE OCONEE REACTOR PROTECTIVE SYSTEM AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM NRC DUKE ENERGY CAROLINAS, LLC I. Ahmed G. Davenport P. Loeser B. Shingleton M. Waterman K. Ward D. Santos E. Burchfield N. Carte R. Freunenberger S. Bailey M. Bailey J. Williams W. Kemper L. Olshan OTHER S. Kelley, AREVA NP, Inc.

J. Weil, McGraw-Hill