ML080650320

From kanterella
Jump to navigation Jump to search

3/18/2008 - Forthcoming Meeting with Duke Power Company LLC, Oconee, Units 1, 2, and 3 to Discuss the January 31, 2008 License Amendment Request for Digital Upgrade to the Reactor Protective System and Engineered Safeguards Protective Syste
ML080650320
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/05/2008
From: Olshan L
NRC/NRR/ADRO/DORL/LPLII-1
To: Melanie Wong
NRC/NRR/ADRO/DORL/LPLII-1
Olshan L N, NRR/DORL, 415-1419
References
TAC MD7999, TAC MD8000, TAC MD8001
Download: ML080650320 (5)


Text

March 5, 2008 MEMORANDUM TO: Melanie C. Wong, Chief Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Leonard N. Olshan, Project Manager /RA/

Plant Licensing Branch II-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH DUKE POWER COMPANY LLC, OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3 DATE & TIME:

Tuesday, March 18, 2008 10:30 a.m. - 12:30 p.m.

LOCATION:

U.S. Nuclear Regulatory Commission (NRC)

Executive Boulevard Building 6003 Executive Boulevard, Room EBB2B18 Rockville, Maryland PURPOSE:

To discuss the January 31, 2008, license amendment request for a digital upgrade to the reactor protective system and engineered safeguards protective system at Oconee Nuclear Station, Units 1, 2, and 3 (TAC NOS. MD7999, MD8000, and MD8001)

CATEGORY 1:

  • This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

Proprietary information will be discussed at certain times during this meeting. These portions of the meeting will be closed to members of the public who have not been granted access to the information by the owner of the information.

MEETING CONTACTS:

Leonard N. Olshan, NRR John F. Stang, NRR 301-415-1419 301-415-1345 lno@nrc.gov jfs2@nrc.gov

  • Commission's Policy Statement on Enhancing Public Participation in NRC Meetings (67 FR 36920), May 28, 2002

M. Wong PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation NRC DUKE P. Hiland R. Freudenberger T. McGinty R. Gill W. Kemper B. Shingleton, et al M. Wong I. Ahmed P. Loeser N. Carte L. Olshan Docket Nos: 50-269, 50-270, and 50-287

Enclosure:

Agenda cc w/encl: See next page

M. Wong PARTICIPANTS:

Participants from the NRC include members of the Office of Nuclear Reactor Regulation NRC DUKE P. Hiland R. Freudenberger T. McGinty R. Gill W. Kemper B. Shingleton, et al M. Wong I. Ahmed P. Loeser N. Carte L. Olshan Docket Nos: 50-269, 50-270, and 50-287

Enclosure:

Agenda cc w/encl: See next page Distribution:

PUBLIC P. Hiland, NRR LPL2-1 R/F W. Kemper RidsNrrAdro I. Ahmed RidsNrrDorl (TMcGinty)

P. Loeser RidsNrrDorlLpl2-1 (MWong)

N. Carte RidsNrrPMLOlshan (hard copy)

RidsOgcMailCenter RidsNrrLAMOBrien (hard copy)

Receptionist (OWFN and TWFN)

RidsAcrsAcnwMailCenter RidsRgn2MailCenter (JMoorman)

RidsOpaMail Kclark, OPA, Rgn II T. Liu, NRR M. Cox, EDO Rgn II PMNS Accession Number: ML080650320 OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRR/LPL2-1/BC NAME LOlshan MOBrien MWong DATE 3 /5/08 3 /5/08 3/5/08 OFFICIAL RECORD COPY

Enclosure FORTHCOMING MEETING ON MARCH 18, 2008, WITH DUKE POWER COMPANY LLC TO DISCUSS OCONEE NUCLEAR STATION, UNITS 1, 2, AND 3, LICENSE AMENDMENT REQUEST (LAR) FOR DIGITAL UPGRADE TO REACTOR PROTECTIVE SYSTEM (RPS)

AND ENGINEERED SAFEGUARDS PROTECTIVE SYSTEM (ESPS)

AGENDA 10:30 a.m. - 10:35 a.m.

Open remarks 10:35 a.m. - 10:50 a.m.

Duke/AREVA plan to support NRC staff licensing phase 10:50 a.m. - 11:05 a.m.

NRC staff review plan and milestones 11:05 a.m. - 11:15 a.m.

NRC staff cyber security review 11:15 a.m. - 11:30 a.m.

Duke communications plan 11:30 a.m. - 11:45 a.m.

Unit 1 RPS/ESPS project schedule 11:45 a.m. - 12:15 p.m.

Discussion on technical issues, including Interim Staff Guidance 4 comparison matrix, validation and verification, and requirements traceability 12:15 p.m. - 12:30 p.m.

Closing remarks 12:30 Adjourn

Oconee Nuclear Station, Units 1, 2, and 3 cc:

Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 Ms. Lisa F. Vaughn Associate General Counsel and Managing Attorney Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, North Carolina 28202 Manager, LIS NUS Corporation 2650 McCormick Dr., 3rd Floor Clearwater, FL 34619-1035 Senior Resident Inspector U.S. Nuclear Regulatory Commission 7812B Rochester Highway Seneca, SC 29672 Mr. Henry Porter, Director Division of Radioactive Waste Management Bureau of Land and Waste Management Dept. of Health and Env. Control 2600 Bull St.

Columbia, SC 29201-1708 Mr. Michael A. Schoppman Framatome ANP 1911 North Ft. Myer Dr.

Suite 705 Rosslyn, VA 22209 Mr. B. G. Davenport Regulatory Compliance Manager Oconee Nuclear Site Duke Energy Corporation ON03RC 7800 Rochester Highway Seneca, SC 29672 Mr. Leonard G. Green Assistant Attorney General NC Department of Justice P.O. Box 629 Raleigh, NC 27602 Mr. R. L. Gill, Jr.

Manager - Nuclear Regulatory Issues and Industry Affairs Duke Power Company LLC 526 S. Church St.

Mail Stop EC05P Charlotte, NC 28202 Division of Radiation Protection NC Dept of Environment, Health, & Natural Resources 3825 Barrett Dr.

Raleigh, NC 27609-7721 Mr. Peter R. Harden, IV VP-Customer Relations and Sales Westinghouse Electric Company 6000 Fairview Road 12th Floor Charlotte, NC 28210 Mr. Henry Barron Group Vice President, Nuclear Generation and Chief Nuclear Officer P.O. Box 1006-EC07H Charlotte, NC 28201-1006 Mr. Charles Brinkman Director, Washington Operations Westinghouse Electric Company 12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 Ms. Kathryn B. Nolan Senior Counsel Duke Energy Carolinas, LLC 526 South Church Street - EC07H Charlotte, NC 28202