Line 53: |
Line 53: |
| ML13240A154 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE klm RI/DRP RI/DRP RI/DRP NAME NPerry/NSP per telephone ARosebrook/AAR DSchroeder/DLS DATE 8/27/13 8/26/13 9/3/13 | | ML13240A154 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE klm RI/DRP RI/DRP RI/DRP NAME NPerry/NSP per telephone ARosebrook/AAR DSchroeder/DLS DATE 8/27/13 8/26/13 9/3/13 |
|
| |
|
| Page 1 of 2 08/02/2013 13:18:06Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteGinnaInspection / Activity Plan 07/01/2013 | | Page 1 of 2 08/02/2013 13:18:06 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site GinnaInspection / Activity Plan 07/01/2013 |
| -12/31/201471124-RADIATION SAFETY INSPECTION 11 IPRadiological Environmental Monitoring Program71124.0707/15/2013 07/19/20137111121-CDBI81 IPComponent Design Bases Inspection711112107/22/2013 07/26/2013 1 IPComponent Design Bases Inspection711112108/05/2013 08/09/2013 1 IPComponent Design Bases Inspection711112108/19/2013 08/23/2013EP EX-EP EXERCISE EVALUATION 61 IPExercise Evaluation - Hostile Action (HA) Event711140709/16/2013 09/20/2013 1 IPExercise Evaluation - Scenario Review711140809/16/2013 09/20/201371124-RADIATION SAFETY INSPECTION 11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0612/09/2013 12/13/2013 1 IPRadiological Environmental Monitoring Program71124.0712/09/2013 12/13/2013 1 IPOccupational Exposure Control Effectiveness71151-OR01 12/09/2013 12/13/201371152B-PI&R BIENNIAL 11 IPProblem Identification and Resolution71152B02/24/2014 03/01/2014 1 IPProblem Identification and Resolution71152B03/10/2014 03/15/2014TI 182-DEGRAD UNDERGROUND PIPING - PHASE 2 11 IPReview of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/18202/10/2014 02/14/201471124-RADIATION SAFETY INSPECTION 11 IPRadiological Hazard Assessment and Exposure Controls71124.0103/03/2014 03/07/2014 1 IPOccupational ALARA Planning and Controls71124.0203/03/2014 03/07/201471124.08-RADWASTE11 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0803/31/2014 04/04/2014 ISFSI-ISFSI ROUTINE INSPECTION 11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.104/07/201404/11/20147111108P-INSERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P05/05/2014 05/16/2014 HP-HP OUTAGE INSPECTIONS 11 IPRadiological Hazard Assessment and Exposure Controls71124.0105/12/2014 05/16/2014 1 IPOccupational ALARA Planning and Controls71124.0205/12/2014 05/16/2014 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/12/2014 05/16/2014 1 IPOccupational Dose Assessment71124.0405/12/2014 05/16/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | -12/31/201471124-RADIATION SAFETY INSPECTION 1 1 IP Radiological Environmental Monitoring Program71124.07 07/15/2013 07/19/20137111121-CDBI 8 1 IP Component Design Bases Inspection7111121 07/22/2013 07/26/2013 1 IP Component Design Bases Inspection7111121 08/05/2013 08/09/2013 1 IP Component Design Bases Inspection7111121 08/19/2013 08/23/2013EP EX-EP EXERCISE EVALUATION 6 1 IP Exercise Evaluation - Hostile Action (HA) Event7111407 09/16/2013 09/20/2013 1 IP Exercise Evaluation - Scenario Review7111408 09/16/2013 09/20/201371124-RADIATION SAFETY INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 12/09/2013 12/13/2013 1 IP Radiological Environmental Monitoring Program71124.07 12/09/2013 12/13/2013 1 IPOccupational Exposure Control Effectiveness71151-OR01 12/09/2013 12/13/201371152B-PI&R BIENNIAL 1 1 IP Problem Identification and Resolution71152B 02/24/2014 03/01/2014 1 IP Problem Identification and Resolution71152B 03/10/2014 03/15/2014TI 182-DEGRAD UNDERGROUND PIPING - PHASE 2 1 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 02/10/2014 02/14/201471124-RADIATION SAFETY INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/03/2014 03/07/2014 1 IP Occupational ALARA Planning and Controls71124.02 03/03/2014 03/07/201471124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 03/31/2014 04/04/2014 ISFSI-ISFSI ROUTINE INSPECTION 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/07/201404/11/20147111108P-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/05/2014 05/16/2014 HP-HP OUTAGE INSPECTIONS 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/12/2014 05/16/2014 1 IP Occupational ALARA Planning and Controls71124.02 05/12/2014 05/16/2014 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/12/2014 05/16/2014 1 IP Occupational Dose Assessment71124.04 05/12/2014 05/16/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
|
| |
|
| Page 2 of 2 08/02/2013 13:18:06Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteGinnaInspection / Activity Plan 07/01/2013 | | Page 2 of 2 08/02/2013 13:18:06 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site GinnaInspection / Activity Plan 07/01/2013 |
| -12/31/201471124-RADIATION SAFETY INSPECTION 11 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0306/02/2014 06/06/2014 1 IPOccupational Dose Assessment71124.0406/02/2014 06/06/20147111107T-TRIENNIAL HEAT SINK 11 IPHeat Sink Performance7111107T06/23/2014 06/27/201412/1EXAM-GINNA INITIAL EXAM 31 FY15-GINNA INITIAL OPERATOR LICENSING EXAM U0190011/03/201411/07/2014 1 FY15-GINNA INITIAL OPERATOR LICENSING EXAM U0190012/01/2014 12/12/2014EP PROG-EP PROGRAM INSPECTION 11 IPAlert and Notification System Testing711140208/04/2014 08/08/2014 1 IPEmergency Preparedness Organization Staffing and Augmentation System711140308/04/2014 08/08/2014 1 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140508/04/2014 08/08/2014 MODS-PERMANENT PLANT MODIFICATIONS 41 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T08/04/2014 08/08/2014 1 IPEvaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T08/18/2014 08/22/201471124-RADIATION SAFETY INSPECTION 11 IPRadiation Monitoring Instrumentation71124.0508/25/2014 08/29/20147111111B-GINNA REQUAL INSPECTION WITH P/F RESULTS 21 IPLicensed Operator Requalification Program7111111B11/17/201411/21/201471124-RADIATION SAFETY INSPECTION 11 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0611/03/201411/07/2014 1 IPOccupational Exposure Control Effectiveness71151-OR0111/03/201411/07/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. | | -12/31/201471124-RADIATION SAFETY INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 06/02/2014 06/06/2014 1 IP Occupational Dose Assessment71124.04 06/02/2014 06/06/20147111107T-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance7111107T 06/23/2014 06/27/201412/1EXAM-GINNA INITIAL EXAM 3 1 FY15-GINNA INITIAL OPERATOR LICENSING EXAM U0190011/03/201411/07/2014 1 FY15-GINNA INITIAL OPERATOR LICENSING EXAM U01900 12/01/2014 12/12/2014EP PROG-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 08/04/2014 08/08/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/04/2014 08/08/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/04/2014 08/08/2014 MODS-PERMANENT PLANT MODIFICATIONS 4 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 08/04/2014 08/08/2014 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 08/18/2014 08/22/201471124-RADIATION SAFETY INSPECTION 1 1 IP Radiation Monitoring Instrumentation71124.05 08/25/2014 08/29/20147111111B-GINNA REQUAL INSPECTION WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program7111111B11/17/201411/21/201471124-RADIATION SAFETY INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0611/03/201411/07/2014 1 IPOccupational Exposure Control Effectiveness71151-OR0111/03/201411/07/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures. |
| }} | | }} |
Revision as of 00:41, 14 July 2018
Similar Documents at Ginna |
---|
Category:Inspection Plan
MONTHYEARIR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) IR 05000244/20220052022-08-31031 August 2022 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2022005) IR 05000244/20210062022-03-0202 March 2022 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2021006) IR 05000244/20210052021-09-0101 September 2021 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, Llc (Report 05000244/2021005 ML21119A1082021-04-27027 April 2021 Ti 2515/194 Inspection Documentation Request IR 05000244/20200062021-03-0303 March 2021 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020006) ML21011A0872021-01-11011 January 2021 LLC: Notification of Conduct of a Fire Protection Team Inspection IR 05000244/20200052020-08-31031 August 2020 Updated Inspection Plan for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2020005) IR 05000244/20190062020-03-0303 March 2020 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2019006) IR 05000244/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 0500244/2019005) IR 05000244/20180062019-03-0404 March 2019 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2018006) IR 05000244/20180052018-08-28028 August 2018 R. E. Ginna Nuclear Power Plant LLC Updated Inspection Plan: Inspection Report 05000244/2018005 IR 05000244/20170062018-02-28028 February 2018 Annual Assessment Letter for R. E. Ginna Nuclear Power Plant, LLC (Reports 05000244/2017006, 05000244/2017402, and 05000244/2017501) IR 05000244/20170052017-08-28028 August 2017 Updated Inspection Plan for R. E. Ginna Nuclear Power Plant - Inspection Report 05000244/2017005 IR 05000244/20160062017-03-0101 March 2017 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant (Report 05000244/2016006) IR 05000244/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant, (Report 0500244/2016005) IR 05000244/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2015006) IR 05000244/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2015005) ML15170A3942015-06-17017 June 2015 Document Request for Appendix R Licensing Basis (Updated and Modified Request List of Documents from the Inspection Plan) ML15147A0042015-05-26026 May 2015 LLC - Notification of Conduct of a Triennial Fire Protection Baseline Inspection and Request for Information (9-2015) IR 05000244/20140012015-03-0404 March 2015 2014 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2014001)(w/Inspection Plan) IR 05000244/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - R.E. Ginna Nuclear Power Plant (Report 05000244-14-006) IR 05000244/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2013001)(w/Inspection Plan) IR 05000244/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - R.E. Ginna Nuclear Power Plant (Report 05000244-13-006) IR 05000244/20120012013-03-0404 March 2013 Annual Assessment Letter for the R.E. Ginna Nuclear Power Plant (Report 05000244/2012001) ML12244A3322012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Ginna Nuclear Power Plant IR 05000244/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000244-11-001) ML1124207882011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - R. E. Ginna Nuclear Power Plant IR 05000244/20100012011-03-0404 March 2011 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant (Report 05000244/2010001) ML1024401992010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - R.E. Ginna Nuclear Power Plant ML1016600092010-06-15015 June 2010 Pre-Inspection Cover Sheet and Inspection Plan (6/21-6/25/10) ML1006208332010-03-0303 March 2010 Annual Assessment Letter (Report 05000244-10-001) ML0924402302009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna Nuclear Power Plant, Dated 09/01/09 IR 05000244/20090012009-03-0404 March 2009 IR 05000244-09-001, Ginna Nuclear Power Plant Annual Assessment Letter, Dated 03/04/09 IR 05000244/20080012008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, R.E. Ginna, (IR 05000244-08-001) ML0806100142008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Ginna Station (05000244/2008001) ML0734709602007-12-13013 December 2007 ROP8 - Ginna - Change to Inspection Plan, 12/13/07 ML0724309382007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - R.E. Ginna ML0706106172007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Ginna Station (05-244/2007001) ML0624304962006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant ML0606203182006-03-0202 March 2006 2006-001 - Annual Assessment Letter - R. E. Ginna Nuclear Power Plant (Report 05-244/2006001) ML0524206822005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - R. E. Ginna Nuclear Power Plant IR 05000244/20050012005-03-0202 March 2005 Annual Assessment Letter - R.E. Ginna Nuclear Power Plant (Report 05000244/2005001) ML0424408312004-08-30030 August 2004 2004 Ginna Mid-Cycle Performance Review and Inspection Plan ML0406301752004-03-0202 March 2004 2003-04 Annual Assessment Letter - Ginna ML0306200212003-03-0303 March 2003 2003 Annual Assessment Letter - R.E. Ginna Nuclear Power Plant ML0223802522002-08-26026 August 2002 2002 Ginna Mid-Cycle Performance Review and Inspection Plan 2024-08-29
[Table view] Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] |
Inspection Report - Ginna - 2013006 |
---|
|
|
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 September 3, 2013 Mr. Joseph E. Pacher, Vice President R. E. Ginna Nuclear Power Plant Constellation Energy Nuclear Group, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - R.E. GINNA NUCLEAR POWER PLANT (REPORT 05000244/2013006)
Dear Mr. Pacher:
On August 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of the R.E. Ginna Nuclear Power Plant (Ginna). The NRC reviewed the most recent quarterly performance indicators in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Ginna operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Ginna during the most recent quarter was within the Licensee Response Column of the NRC's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (Green), and all performance indicators demonstrated that your performance was within the nominal, expected range (Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
In addition to baseline inspections, the NRC will perform Inspection Procedure 60855.1,
"Operation of an Independent Spent Fuel Storage Installation at Operating Plants," and Temporary Instruction 2515/182, "Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks- Phase II."
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Managem ent System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at (610) 337-5262 with any questions you have regarding this letter.
Sincerely,/RA/ Daniel L. Schroeder, Chief Projects Branch 1
Division of Reactor Projects
Docket No: 50-244 License No: DPR-18
Enclosure:
Ginna Inspection/Activity Plan
cc w/encl: Distribution via ListServ
ML13240A154 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE klm RI/DRP RI/DRP RI/DRP NAME NPerry/NSP per telephone ARosebrook/AAR DSchroeder/DLS DATE 8/27/13 8/26/13 9/3/13
Page 1 of 2 08/02/2013 13:18:06 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site GinnaInspection / Activity Plan 07/01/2013
-12/31/201471124-RADIATION SAFETY INSPECTION 1 1 IP Radiological Environmental Monitoring Program71124.07 07/15/2013 07/19/20137111121-CDBI 8 1 IP Component Design Bases Inspection7111121 07/22/2013 07/26/2013 1 IP Component Design Bases Inspection7111121 08/05/2013 08/09/2013 1 IP Component Design Bases Inspection7111121 08/19/2013 08/23/2013EP EX-EP EXERCISE EVALUATION 6 1 IP Exercise Evaluation - Hostile Action (HA) Event7111407 09/16/2013 09/20/2013 1 IP Exercise Evaluation - Scenario Review7111408 09/16/2013 09/20/201371124-RADIATION SAFETY INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.06 12/09/2013 12/13/2013 1 IP Radiological Environmental Monitoring Program71124.07 12/09/2013 12/13/2013 1 IPOccupational Exposure Control Effectiveness71151-OR01 12/09/2013 12/13/201371152B-PI&R BIENNIAL 1 1 IP Problem Identification and Resolution71152B 02/24/2014 03/01/2014 1 IP Problem Identification and Resolution71152B 03/10/2014 03/15/2014TI 182-DEGRAD UNDERGROUND PIPING - PHASE 2 1 1 IP Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 2515/182 02/10/2014 02/14/201471124-RADIATION SAFETY INSPECTION 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 03/03/2014 03/07/2014 1 IP Occupational ALARA Planning and Controls71124.02 03/03/2014 03/07/201471124.08-RADWASTE 1 1 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.08 03/31/2014 04/04/2014 ISFSI-ISFSI ROUTINE INSPECTION 1 1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 04/07/201404/11/20147111108P-INSERVICE INSPECTION 1 1 IP Inservice Inspection Activities - PWR7111108P 05/05/2014 05/16/2014 HP-HP OUTAGE INSPECTIONS 1 1 IP Radiological Hazard Assessment and Exposure Controls71124.01 05/12/2014 05/16/2014 1 IP Occupational ALARA Planning and Controls71124.02 05/12/2014 05/16/2014 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 05/12/2014 05/16/2014 1 IP Occupational Dose Assessment71124.04 05/12/2014 05/16/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
Page 2 of 2 08/02/2013 13:18:06 Report 22 Unit NumberPlanned Dates Start EndInspection ActivityTitle No. of Staff on Site GinnaInspection / Activity Plan 07/01/2013
-12/31/201471124-RADIATION SAFETY INSPECTION 1 1 IP In-Plant Airborne Radioactivity Control and Mitigation71124.03 06/02/2014 06/06/2014 1 IP Occupational Dose Assessment71124.04 06/02/2014 06/06/20147111107T-TRIENNIAL HEAT SINK 1 1 IP Heat Sink Performance7111107T 06/23/2014 06/27/201412/1EXAM-GINNA INITIAL EXAM 3 1 FY15-GINNA INITIAL OPERATOR LICENSING EXAM U0190011/03/201411/07/2014 1 FY15-GINNA INITIAL OPERATOR LICENSING EXAM U01900 12/01/2014 12/12/2014EP PROG-EP PROGRAM INSPECTION 1 1 IP A lert and Notification System Testing7111402 08/04/2014 08/08/2014 1 IP Emergency Preparedness Organization Staffing and Augmentation System7111403 08/04/2014 08/08/2014 1 IP Correction of Emergency Preparedness Weaknesses and Deficiencies7111405 08/04/2014 08/08/2014 MODS-PERMANENT PLANT MODIFICATIONS 4 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 08/04/2014 08/08/2014 1 IP Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications7111117T 08/18/2014 08/22/201471124-RADIATION SAFETY INSPECTION 1 1 IP Radiation Monitoring Instrumentation71124.05 08/25/2014 08/29/20147111111B-GINNA REQUAL INSPECTION WITH P/F RESULTS 2 1 IP Licensed Operator Requalification Program7111111B11/17/201411/21/201471124-RADIATION SAFETY INSPECTION 1 1 IP Radioactive Gaseous and Liquid Effluent Treatment71124.0611/03/201411/07/2014 1 IPOccupational Exposure Control Effectiveness71151-OR0111/03/201411/07/2014 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.