Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 and Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 ML24067A2532024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report 2024-09-25
[Table view] Category:License-Operator
MONTHYEARML24234A0922024-08-21021 August 2024 Requalification Program Inspection RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) 2024-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARRS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23247A0092022-09-28028 September 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20329A4322020-11-17017 November 2020 Final Qa/Related Forms (Folder 1) ML20329A4422020-09-17017 September 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20329A1812020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test Outlines (Folder 2) ML20329A1412020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML20328A2792020-09-17017 September 2020 Handouts to Applicants (Folder 3) ML20321A2792020-09-17017 September 2020 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML20322A3502020-09-17017 September 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20328A1622020-09-17017 September 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20328A2912020-09-17017 September 2020 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML22103A2232020-08-26026 August 2020 Revised Draft Written Examination and Operating Test Outlines (2022 Regional Audit Corrective Action) (Folder 2) ML20329A2002020-08-26026 August 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20329A2392020-07-22022 July 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20329A2232020-07-22022 July 2020 Draft Written Examination (Folder 2) ML20329A3542020-07-22022 July 2020 Licensee 75-Day Letter Transmitting the Draft Written Exam and Operating Test Material (Folder 2) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19323D1722019-11-18018 November 2019 R. E. Ginna Nuclear Power Plant - Senior Reactor and Reactor Operator Initial License Examinations ML21041A2942019-10-0303 October 2019 Original Questions for Modified Written Exam Questions RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML18353A6082018-12-18018 December 2018 Senior Reactor Operator Retake License Examinations ML18344A5852018-12-10010 December 2018 R. E. Ginna - Reactor Operator Retake License Examinations ML19119A1472018-10-30030 October 2018 Final Qa/Related Forms (Folder 1) ML19156A1482018-08-27027 August 2018 Final Qa/Related Form - ES-201-1 (Folder 1) ML18233A5092018-08-21021 August 2018 Operator Licensing Operating Test Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17272A3242017-09-28028 September 2017 R. E. Ginna - Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17114A2862017-04-21021 April 2017 Miscellaneous Exam Material (Folder 1) ML17114A2172017-04-21021 April 2017 Final Qa/Related Forms (Folder 1) ML17114A3172017-04-21021 April 2017 Handouts to Applicants (Folder 3) ML17123A1722017-04-14014 April 2017 Post Exam Comments Resolution References (Folder 1) ML17114A3752017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML17114A1562017-03-0909 March 2017 Final Qa/Related Forms - ES-401 (Folder 1) ML17114A3812017-03-0909 March 2017 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML17104A2162017-03-0707 March 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17066A2272017-03-0707 March 2017 Initial Operator Licensing Operating Test Approval: R. E. Ginna Nuclear Power Plant ML17104A2012017-03-0303 March 2017 Final Operating Test (Sections a, B, and C) (Folder 3) ML17114A4232017-01-19019 January 2017 Draft Written Exam (Folder 2) ML17114A4372017-01-19019 January 2017 Draft Operating Exam (Section a, Section B, Section C) (Folder 2) ML17114A3522017-01-19019 January 2017 Final Outlines (Folder 3) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17114A4112016-12-0909 December 2016 Draft - Outlines (Folder 2), (Facility Letter. Dtd ML16286A4132016-10-11011 October 2016 Senior Reactor and Reactor Operator Initial License Examinations - )R.E. Ginna Nuclear Power Plant) ML15156A5522015-01-21021 January 2015 Final Qa/Related Forms (Folder 1) ML15043A6792014-12-16016 December 2014 Final Written Examination with Answer Key (401-5 Format) (Folder 2) ML15043A6802014-12-16016 December 2014 Handouts to Applicants (Folder 3) 2023-06-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION une 7, 2013
SUBJECT:
R. E. GINNA NUCLEAR POWER PLANT - NRC INITIAL OPERATOR LICENSING RETAKE EXAMINATION REPORT 05000244/2013301
Dear Mr. Pacher:
On May 16, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed retake examinations at R. E. Ginna Nuclear Power Plant. The enclosed report documents the examination findings, which were discussed on May 28, 2013, with Mr. Tom Paglia and other members of your staff.
The retake examinations included the evaluation of two applicants for reactor operator licenses and two applicants for instant senior reactor operator licenses. Written and operating examinations were developed using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The license examiner determined that all four of the applicants passed their respective retake examinations. Appropriate licenses were issued on June 5, 2013.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams/web-based.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket No. 50-244 License No. DPR-18
Enclosure:
NRC Initial Operator Licensing Examination Report 05000244/2013301 w/Attachment: Supplemental Information
REGION I==
Dockets: 50-244 Licenses: DPR-18 Report : 05000244/2013301 Licensee: Constellation Energy Nuclear Group, LLC Facility: R. E. Ginna Nuclear Power Plant Location: 1503 Lake Road Ontario, NY 14519 Dates: May 15 - 16, 2013 (Operating Test Administration)
April 26, 2013 (Written Examination Administration)
May 3 to May 20, 2013 (NRC Examination Grading)
June 5, 2013 (Licenses Issued)
Examiner: D. Silk, Chief Examiner, Operations Branch Approved By: Donald E. Jackson, Chief Operations Branch Division of Reactor Safety i Enclosure
Summary of Findings ER 05000244/2013301; April 26, 2013 through May 16, 2013; R. E. Ginna Nuclear Power Plant; Initial Operator Licensing Examination Report.
One NRC examiner evaluated the competency of two retake applicants for reactor operator licenses and two retake applicants for instant senior reactor operator licenses at R. E. Ginna Nuclear Power Plant. The facility licensee developed the examinations using NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
The written examination was administered by the facility on April 26, 2013. The NRC examiner administered the operating tests on May 15-16, 2013. The license examiner determined that all four of the applicants passed their respective examinations. The appropriate licenses were issued on June 5, 2013.
A. NRC-Identified and Self-Revealing Findings No findings were identified.
B. Licensee-Identified Violations None.
ii Enclosure
REPORT DETAILS 4. OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications a. Examination Scope The examiner reviewed the four license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The reactor operator retake applicants requested waivers for the operating portion of the examination and the senior reactor operator retake applicants requested waivers for the written examination and the dynamic simulator portion of the operating test. These waivers were granted by Region I. In addition, because all of the applicants had exceeded 24 months since passing a generic fundamental examination (GFE), the licensee requested a waiver asking for a deferral of a GFE examination until after the completion of the NRC retake examinations. This waiver was granted by NRC headquarters.
b. Findings No findings were identified.
.2 Operator Knowledge and Performance a. Examination Scope On April 26, 2013, the licensee proctored the administration of the written examinations to the two reactor operator retake applicants. The licensee staff graded the written examinations, analyzed the results, and presented their analysis to the NRC on May 3, 2013.
The NRC examiner administered the job performance measure portion of the operating examination to the two senior reactor operator retake applicants on May 15-16, 2013.
These applicants participated in a control room and facilities walkthrough test consisting of 10 system tasks and an administrative test consisting of five tasks.
b. Findings All four of the retake applicants passed their respective examinations. For the written examinations, the reactor operator applicants average score was 83.3 percent and ranged from 81.3 to 85.3 percent.
Enclosure
The NRC examiner completed the final grading of the written examination on May 3, 2013, and conducted a review of each missed question to determine the accuracy and validity of the examination questions. Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee determined that the 22 questions that were missed by half or more of the applicants were valid. (Note: This was a high number due to the fact that only two individuals took the written examination.) The licensee conducted a performance analysis for all 75 questions. Based on their review and analysis, the licensee did not submit any post-examination comments.
The text of the examination questions may be accessed in the Agency-wide Documents Access and Management System (ADAMS) system under the accession numbers noted in Attachment 1. However, in accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years.
.3 Initial Licensing Examination Development a. Examination Scope The facility licensee developed the examinations in accordance with NUREG-1021, Revision 9, Supplement 1. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement. The facility licensee submitted both the written and operating examination outlines on January 29, 2013. The chief examiner reviewed the outlines against the requirements of NUREG-1021, and provided comments to the licensee. The facility licensee submitted the draft written examination package on March 22, 2013, and the draft operating examination on April 8, 2013. The chief examiner reviewed the draft examination package against the requirements of NUREG-1021, and provided comments to the licensee. The licensee satisfactorily completed comment resolution for the written and operating examination on April 24, 2013. The NRC conducted an onsite validation of the operating examinations and provided minor editorial comments on May 13-14, 2013.
b. Findings The NRC approved the initial examination outline and advised the licensee to proceed with the operating examination development.
The examiner determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed operating examination.
.4 Simulation Facility Performance a. Examination Scope The examiner observed simulator performance with regard to plant fidelity during the examination validation and administration.
Enclosure
b. Findings No findings were identified.
.5 Examination Security a. Examination Scope The examiner reviewed examination security for examination development and during the examination administration week for compliance with NUREG-1021 requirements.
Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings During the administration of the written examination, one of the reactor operator applicants demonstrated signs of anxiety while taking the test. The proctor contacted the escort and informed him of the applicants condition. On a subsequent restroom break, a discussion occurred outside of the exam room and out of the presence of the proctor between the applicant and the escort in which the applicant was encouraged to relax and take one question at a time. There was some small talk (i.e., weather, NFL draft) that occurred. When this event was relayed to the chief examiner, it was stated that no discussion pertaining to the examination occurred. The escort was not part of the exam development team and, although not on the security agreement, he was aware of exam security considerations. Regional management requested the licensee to reconstruct the specifics of this event and details of the conversation between the applicant and the escort and then state why they believed that exam integrity was maintained. This information, and a Regional recommendation, was forwarded to NRC headquarters for their assessment. NRC headquarters decided that no examination security breech occurred. However, NRC headquarters instructed the Region to do the following: 1) Prior to the next Ginna initial operator licensing examination, reinforce the examination security expectations with the licensee, 2) ensure the examination security issue is documented in the examination report as required by ES-501 E.3.a, and 3) prior to the next initial examination verify that licensee corrective actions have been taken to prevent recurrence as specified in ES-201, Attachment 1, Physical Security Guidelines Item 5.
4OA6 Meetings, including Exit The chief examiner presented the examination results to Ms. A. Smith, Nuclear Training Manager and Mr. T. Paglia, Operations Manager of your staff on May 28, 2013. Your staff did not identify any information or materials used during the examination as proprietary.
Attachments:
1. Supplemental Information 2. Simulator Fidelity Report Enclosure
A-1 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel A. Smith, Nuclear Training Manager K. Garnish, General Supervisor, Operations Training J. List, Supervisor Operations Continuing Training D. Dean, Operations Exam Reviewer (SRO)
P. Landers, Lead Exam Developer S. Reed, Nuclear Training Instructor NRC Personnel N. Perry, Senior Resident Inspector ITEMS OPENED, CLOSED, AND DISCUSSED Opened NONE Opened and Closed NONE Closed NONE Discussed NONE ADAMS DOCUMENTS REFERENCED Accession No. ML -13149A412 FINAL-Written Exam (Note: In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for 2 years.)
Accession No. ML - 13149A419 FINAL-Operating Exam (JPMs only)