IR 05000397/2014404: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 20: Line 20:
{{#Wiki_filter:" " September 4, 2014  
{{#Wiki_filter:" " September 4, 2014  


Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)
Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)  
 
Richland, WA 99352-0968
Richland, WA 99352-0968


Line 26: Line 27:


==Dear Mr. Reddemann:==
==Dear Mr. Reddemann:==
On July 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Columbia Generating Station and discussed the results of this inspection with Mr. G. Hettel, Vice President Operations, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
On July 24, 2014, the U.S. Nuclear Regulator y Commission (NRC) completed a security inspection at the Columbia Generating Station and discussed the results of this inspection with Mr. G. Hettel, Vice President Operations, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.


The NRC inspectors did not identify any findings or violations of more than minor significance.
The NRC inspectors did not identify any findings or violations of more than minor significance.


In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for  
 
your response.


Sincerely,/RA/
Sincerely,/RA/
Line 41: Line 46:


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/o enclosure: Electronic Distribution for Columbia Generating Station  
Supplemental Information  
 
cc w/o enclosure: Electronic Distribution for Columbia Generating Station  


ML14248A632 Entire Report: SUNSI Review Complete By: JRL Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:
ML14248A632 Entire Report: SUNSI Review Complete By: JRL Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:
SUNSI Review Complete By: JRL Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 ABC:DRP/D PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME JLarsen/pbh JDrake JRollins MHaire WWalker MHaire SIGNATURE /RA/ MSH for /RA/ /RA/ MSH for /RA/ /RA/ /RA/ DATE 9/2/14 9/2/14 8/29/14 8/29/14 9/2/14 9/4/14 Letter to Mark from Mark S. Haire, dated September 4, 2014
SUNSI Review Complete By: JRL Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 ABC:DRP/D PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME JLarsen/pbh JDrake JRollins MHaire WWalker MHaire SIGNATURE /RA/ MSH for /RA/ /RA/ MSH for /RA/ /RA/ /RA/ DATE 9/2/14 9/2/14 8/29/14 8/29/14 9/2/14 9/4/14 Letter to Mark from Mark S. Haire, dated September 4, 2014


SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404 Electronic distribution by RIV w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404 Electronic distribution by RIV w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) Security Specialist/NSIR (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov) Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov
Administrative Assistant (Douglas.Bodine@nrc.gov) Electronic distribution by RIV w/o enclosure: Regional Administrator (Marc.Dapas@nrc.gov)
) Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Administrative Assistant (Douglas.Bodine@nrc.gov)
Electronic distribution by RIV w/o enclosure
: Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Jeremy.Groom@nrc.gov)
Senior Resident Inspector (Jeremy.Groom@nrc.gov)  
 
Resident Inspector (Dan.Bradley@nrc.gov)
Resident Inspector (Dan.Bradley@nrc.gov)
Administrative Assistant (Douglas.Bodine@nrc.gov) Acting Branch Chief, DRP/D (James.Drake@nrc.gov) Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Administrative Assistant (Douglas.Bodine@nrc.gov) Acting Branch Chief, DRP/D (James.Drake@nrc.gov) Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov) Project Manager (Andrea.George@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Project Manager (Andrea.George@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)  
 
ACES (R4Enforcement.Resource@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Revision as of 11:10, 1 July 2018

IR 05000397/2014404, on 07/24/14, Columbia Generating Station, NRC Security Inspection Report
ML14248A632
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/04/2014
From: Haire M S
Plant Support Branch-1
To: Reddemann M E
Energy Northwest
References
IR 2014404
Download: ML14248A632 (4)


Text

" " September 4, 2014

Mr. Mark Chief Executive Officer Energy Northwest P.O. Box 968 (Mail Drop 1023)

Richland, WA 99352-0968

SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404

Dear Mr. Reddemann:

On July 24, 2014, the U.S. Nuclear Regulator y Commission (NRC) completed a security inspection at the Columbia Generating Station and discussed the results of this inspection with Mr. G. Hettel, Vice President Operations, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC inspectors did not identify any findings or violations of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for

your response.

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No.: 50-397 License No.: NPF-21 Nonpublic

Enclosure:

NRC Inspection Report 05000397/2014404

w/Attachment:

Supplemental Information

cc w/o enclosure: Electronic Distribution for Columbia Generating Station

ML14248A632 Entire Report: SUNSI Review Complete By: JRL Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only:

SUNSI Review Complete By: JRL Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 ABC:DRP/D PSI:PSB1 C:PSB1 C:PBA C:PSB1 NAME JLarsen/pbh JDrake JRollins MHaire WWalker MHaire SIGNATURE /RA/ MSH for /RA/ /RA/ MSH for /RA/ /RA/ /RA/ DATE 9/2/14 9/2/14 8/29/14 8/29/14 9/2/14 9/4/14 Letter to Mark from Mark S. Haire, dated September 4, 2014

SUBJECT: COLUMBIA GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000397/2014404 Electronic distribution by RIV w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Richard.Skokowski@nrc.gov

) Senior Resident Inspector (Jeremy.Groom@nrc.gov)

Administrative Assistant (Douglas.Bodine@nrc.gov)

Electronic distribution by RIV w/o enclosure

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov) Acting DRP Deputy Director (Michael.Hay@nrc.gov) DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Jeremy.Groom@nrc.gov)

Resident Inspector (Dan.Bradley@nrc.gov)

Administrative Assistant (Douglas.Bodine@nrc.gov) Acting Branch Chief, DRP/D (James.Drake@nrc.gov) Senior Project Engineer, DRP/D (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Andrea.George@nrc.gov) Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov) Technical Support Assistant (Loretta.Williams@nrc.gov) Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Anthony.Bowers@nrc.gov)

ROPreports