ML20147C709: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20147C709
| number = ML20147C709
| issue date = 09/26/1978
| issue date = 09/26/1978
| title = Ack Receipt of IE Inspec Repts#50-413/78-8,#50-414/78-7, on 780815-18.Does Not Consider Any Info Therein to Be Proprietary
| title = Ack Receipt of IE Inspec Repts 50-413/78-8, 50-414/78-7, on 780815-18.Does Not Consider Any Info Therein to Be Proprietary
| author name = Dail L
| author name = Dail L
| author affiliation = DUKE POWER CO.
| author affiliation = DUKE POWER CO.
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:.
{{#Wiki_filter:.
          .                  DUlm POWEIt COMPANY e e 802     "8                   OI:N1;IC A L OFFICICS                                               TttteHesti ant 422 $00TH CHURCH $17tti                                                                 y CII Alt Lo'I'n:. N. C. O S2-12 g g.// g [B
DUlm POWEIt COMPANY TttteHesti ant e e 802 "8
{/'l September 26, 1978 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station IE:II:JJB Inspection Reports: 50-413/78-8 and 50-414/78-7 Duke File: CN-1412.ll-1
OI:N1;IC A L OFFICICS y
422 $00TH CHURCH $17tti g g [B CII Alt Lo'I'n:. N. C. O S2-12 g.//
{/'l September 26, 1978 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station IE:II:JJB Inspection Reports:
50-413/78-8 and 50-414/78-7 Duke File:
CN-1412.ll-1


==Dear Mr. O'Reilly:==
==Dear Mr. O'Reilly:==
In response to Mr. Murphy's letter of September 21, 1978 transmitting the subjcct IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary.
In response to Mr. Murphy's letter of September 21, 1978 transmitting the subjcct IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary.
Very truly yours, k
Very truly yours, k
Line 28: Line 31:
Design Engineering JDW/tas l
Design Engineering JDW/tas l
1 93 :lla 62d3S P.!
1 93 :lla 62d3S P.!
7 2//>/ W W                                           YlO8030 'Y1NY '"
7 2//>/ W W YlO8030 'Y1NY '"
                                                                    - >= u r T:
- >= u r T:
1                                                   __ . _ - _.__      _____ _ _ _ _ _ . - _ _ _ _ _ _ _          _      .-}}
1
_}}

Latest revision as of 13:30, 11 December 2024

Ack Receipt of IE Inspec Repts 50-413/78-8, 50-414/78-7, on 780815-18.Does Not Consider Any Info Therein to Be Proprietary
ML20147C709
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/26/1978
From: Dail L
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20147C713 List:
References
NUDOCS 7810130096
Download: ML20147C709 (1)


Text

.

DUlm POWEIt COMPANY TttteHesti ant e e 802 "8

OI:N1;IC A L OFFICICS y

422 $00TH CHURCH $17tti g g [B CII Alt Lo'I'n:. N. C. O S2-12 g.//

{/'l September 26, 1978 Mr. J. P. O'Reilly, Director U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Re: Catawba Nuclear Station IE:II:JJB Inspection Reports:

50-413/78-8 and 50-414/78-7 Duke File:

CN-1412.ll-1

Dear Mr. O'Reilly:

In response to Mr. Murphy's letter of September 21, 1978 transmitting the subjcct IE Inspection Reports, Duke Power does not consider any of the information contained in those reports to be proprietary.

Very truly yours, k

L. C. Dail Vice President I

Design Engineering JDW/tas l

1 93 :lla 62d3S P.!

7 2//>/ W W YlO8030 'Y1NY '"

- >= u r T:

1

_