ML20205M772
| ML20205M772 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/08/1999 |
| From: | Gordon Peterson DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20205M755 | List: |
| References | |
| TAC-M99322, TAC-M99323, NUDOCS 9904160040 | |
| Download: ML20205M772 (21) | |
Text
-
)
Duke Energy Corporation f --
I S U ED9f97.-
Catawba Nudcar Station 4800 Concor&ad York, SC 29745 Gnry R. l%serwn (803)83I'425I**
y;,., ygg, (803) 831-3426Mx April 8, 1999 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Subject:
Duke Energy Corporation Catawba Nuclear Station Docket No. 50-413 and 50-414 1998 UFSAR Update TAC Nos. M99322 and M99323 Pursuant to 10CFR 50.71(e), please find enclosed the original and ten copies of the 1998 Updated Final Safety Analysis Report (UFSAR) for Catawba Nuclear Station.
The effective date of the changes provided by this submittal is October 24, 1998.
There are certain revisions subsequent to October 24, 1998 concerning the implementation of the Improved Technical Specifications.
I certify that I am a duly authorized officer of Duke Energy Corporation, and that the information contained herein accurately represents changes made to the Catawba Nuclear Station UFSAR since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirement.
If there are ny questions concerning this submittal, please cont.act J.
lenn at (803) 831-3051.
.-e&~ -
f
~~
G. R.
Peterson Attachments l
K
~
l L
s
f U.S. Regulatory Commission f
Document Control Desk April 8, 1999 i
Page 2
{
xc:
L. A. Reyes, Regional, Administrator USNRC, Region II P.S. Tam, Project Manager USNRC, ONRR D. J. Roberts Senior Resident Inspector (CNS) 1 w
7,,', 7 j o
-;gO-U.S.-Regulatory Commission Document Control. Desk
- A p r i l-~; 8,- 1 9 9 9 -
Page.' 3 bxc:
NCMPA-1 NCEMC bxc w/o attachments:
~
G. D. Gilbert M.
T.
Cash' J.
E.
Burchfield P. R. Newton B. J. Horsley J. W. Glenn ELL SREC-PMPA Document Control File 801.01 Group File 801.01 l
i L
s
Catawba Nuclear Station i
24 October 1998 UFSAR Update instructions for Updating Manuals Text / 81/2" x 11" Tables and Figures Chapter 1: Introduction and General Description of the Station TAbi REMOVE INSERT 1
Title Page 1997 Update Title Page 1998 Update 1.0 TOC (All Pages)
TOC 1-1 to 1-iv LOT (All Pages)
LOT 1 v to 1-vi LOF (All Pages)
LOF 1-vil to 1-viil Chapter 1 ~
1-1 to 1-2 1.1 All Pages 1-3 to 1-4 1.2 All Pages 1-5 to 1 10 1.3 All Pages 1 11 to 1-12 1.4 All Pages 1-13 to 1-14 1.5 All Pages 1-15 to 126 1.6 All Pages 1-27 to 1-28 1.7 All Pages 1-29 to 176 1.8 All Pages 177 to 1-114 1.9 All Pages 1-115 to 1 124 AT Table 1-4 (Page 1 of 5)
Table 14 (Page 1 of 6)
Table 1-4 (Page 2 of 5)
Table 1-4 (Page 2 of 6)
Table 1-4 (Page 3 of 5)
Table 1-4 (Page 3 of 6)
Tuble 1-4 (Page 4 of 5)
Table 1-4 (Page 4 of 6)
Table 14 (Page 5 of 5)
Table 1-4 (Page 5 of 6)
O N/A Table 1-4 (Page 6 of 6)
N/A Table 1 12 (Pages 1-42) (New)
AF none none Chapter 2: Site Characteristics i
TAB REMOVE INSERT 2.0 TOC (All Pages)
TOC (2-1 to 2-vl)
LOT (All Pages)
LOT (2-vil to 2-x)
LOF (All Pages)
LOF (2-xi to 2-xvi)
Chapter 2 21 to 2-2 2.1 All Pages 2-3 to 2-8 2.2 All Pages 2-9 to 2-16 2.3 All Pages 217 to 2-40 2.4 All Pages 2-41 to 2-82 2.5 All Pages 2-83 to 2166 2.6 All Pages 2-167 to 2-180 AT none none AF none none O
Page 1 3/16/99 i
Catawba Nuoiser Station 24 October 1998 UFSAR Update instruotione for updating manuale Text / 81/2" x 11" Tables and Figures O
. Chapter 3: Design Critoria TA8 REMOVE INSERT TOC' TOC (3-1 to 3-viii)
LOT LOT (3-ix to 3-xii)
LOF-LOF (3-xiil to 3-xx)
Chapter 3 3-1 to 3-2 3.1 All Pages 3-3 to 3-30 3.2 All Pages 3-31 to 3-36 3.3 M Pages 3-37 to 3-40 3.4 All Pages 3-41 to 3-42 3.5 M Pages 3-43 to 3-58 3.6 M Pages 3-59 to 344 3.7 All Pages 345 to 3-128 3.8 M Pages 3-129 to 3-160 3.9 M Pages 3-161 to 3-222 3.10.
M Pages 3-223 to 3-226 3.11 M Pages 3-227 to 3-232 AT-Table 3-4 (Page 4 of 15)
Table 3-4 (Page 4 of 15)
Table 3-4 (Page 11 of 15)
Table 3-4 (Page 11 of 15)
Table 3-104 (Page 25 of 88)
Table 3-104 (Page 25 of 88)
O Table 3-104 (Page 28 of 88)
Table 3-104 (Page 28 of 88) 5 Table 3-104 (Page 68 of 88)
Table 3-104 (Page 68 of 88)
Table 3-104 (Page 6g of 88)
Table 3-104 (Page 6g of 88)
Table 3-104 (Page 70 of 88)
Table 3-104 (Page 70 of 88)
Table 3-105 (Page 6 of 20)
Table 3105 (Page 6 of 20)
Table 3-106 (Page 5 of 20)
Table 3-106 (Page 5 of 20)
Table 3-108 (Page 6 of 20)
Table 3106 (Page 6 of 20)
Table 3-106 (Page 17 of 20)
Table 3-106 (Page 17 of 20)
AF none none Chapter 4: Reactor TAB REMOVE INSERT TOC TOC (4-1 to 4-iv)
LOT LOT (4-v to 4-vi)
'LOF LOF (4 vil to 4-viii)
Chapter 4 4-1 to 4-2 4.1 M Pages 4-3 to 44 4.2 All Pages 4-7 to 4-32 4.3
- M Pages 4-33 to 448 4.4 M Pages 449 to 4-98 4.5 M Pages 4-99 to 4-100 Page 2 3/16/99
('
1 Catawba Nuclear Station 24 October 1998 UFSAR Update instructions for Updating Manuals Text / 81/2" x 11" Tables and Figures Chapter 4: Reactor (continued)
TAB REMOVE INSERT 4.6 All Pages 4101 to 4104 AT Table 4-1 (Page 1 of 6)
Table 4-1 (Page 1 of 6)
Table 4-1 (Page 2 of 6)
Table 4-1 (Page 2 of 6)
Table 4-1 (Page 3 of 6)
Table 41 (Page 3 of 6)
Table 4-1 (Page 5 of 6)
Table 4-1 (Page 5 of 6)
Table 4-1 (Page 6 of 6)
Table 41 (Page 6 of 6)
Table 4-2 (Page 1 of 2)
Table 4-2 (Page 1 of 2)
Table 4-4 (Page 1 of 2)
Table 4-4 (Page 1 of 3)
Table 4-4 (Page 2 of 2)
Table 4-4 (Page 2 of 3)
N/A Table 4-4 (Page 3 of 3)
Table 4-11,4-12 Table 4-11,4-12 Table 4-17 (Page 1 of 2)
Table 417 (Page 1 of 2)
Table 4-17 (Page 2 of 2)
Table 4-17 (Page 2 of 2)
AF Figure 4-3 Figure 4-3 Figure 4-10 Figure 4-10 Figure 4-20 Figure 4-20 Figure 4-36 Figure 4-36 (Deleted)
Figure 4-56 Figure 4-56 (Deleted) j O
Figure 4-57 Figure 4-57 (Deleted)
Figure 4-60 Figure 4-60 (Deleted)
Figure 4-75 Figure 4-75 Figure 4-76 Figure 4 76 N/A Figure 4 78 (New Figure)
Chapter 5: Reactor Coolant System and Connected Systems TAB REMOVE INSERT TOC TOC (5-1 to 5-Iv)
LOT LOT (5-v to 5-vi)
LOF LOF (5-vil to 5-viii)
Chapter 5 5-1 to 5-2 5.1 All Pages 5-3 to 5-6 5.2 All Pages 5-7 to 5-30 5.3 All Pages
- 5-31 to 5-50 5.4 All Pages 5-51 to 5-110 AT Table 5-1 (Page 1 of 2)
Table 5-1 (Page 1 of 2)
Table 5-1 (Page 2 of 2)
Table 5-1 (Page 2 of 2)
Table 5-3,5-4 Table 5-3,5-4 Table 5-5 (Page 1 of 2)
Table 5-5 (Page 1 of 2)
,C)
Table 5-5 (Page 2 of 2)
Table 5-5 (Page 2 of 2)
V Page 3 3/16/99 j
Catawba Nuclear Station 24 October 1998 UFSAR Update L
Instructions for Updating Manuals l
Text / 81/2" x 11" Tables and Figures Chapter 5: Reactor Coolant System and Connected Systems (continued)
TAB REMOVE INSERT I
AT Table 5-8,5-9 Table 5-8,5-9 (Deleted)
Table 5-10 Table 5-10 Table 5-12 (Page 1 of 2)
Table 5-12 (Page 1 of 2)
Table 5-12 (Page 2 of 2)
Table 5-12 (Page 2 of 2)
Table 5-13 (Page 1 of 2)
Table 5-13 (Page 1 of 2)
Table 5-14 Table 514 Table 5-15 Table 5-15 Table 5-16 Table 516 Table 5-17 Table 5-17 Table 5-20 Table 5-20 Table 5-21 (Page 2 of 3)
Table 5-21 (Page 2 of 3)
Table 5 22 (Page 1 of 3)
Table 5-22 (Page 1 of 3)
Table 5-22 (Page 2 of 3)
Table 5-22 (Page 2 of 3)
Table 5-23 Table 5-23 Table 5-25 Table 5-25 Table 5-26 (Page 1 of 2)
Table 5-26 (Page 1 of 2)
Table 5-28,5-29 Table 5-28,5-29 Table 5-30 Table 5-30 Table 5-31 (Page 1 of 7)
Table 5-31 (Page 1 of 7)
Table 5-31 (Page 2 of 7)
Table 5 31 (Page 2 of 7)
O Table 5-31 (Page 3 of 7)
Table 5-31 (Page 3 of 7)
Table 5-31 (Page 4 of 7)
Table 5-31 (Page 4 of 7)
Table 5-31 (Page 5 of 7)
Taole S 31 (Page 5 of 7)
Table 5-31 (Page 6 of 7)
Table 5-31 (Page 6 of 7)
Table 5-31 (Page 7 of 7)
Table 5-31 (Page 7 of 7)
Table 5-34,5-35 Table 5-34,5-35 Table 5-38 Table 5-38 Table 5-39 Table 5-39,5-40 (New)
N/A Table 5-41 (New)
AF Figure 5-13 Figure 5-13 Figure 5-14 Figure 5-14 Figure 5-24 Figure 5-24 Figure 5-32 Figure 5-32 Chapter 6: Engineered Safety Features TAB REheOVE INSERT TOC TOC (6-1 to 6-vi)
LOT LOT (6-vil to 6-x)
LOF LOF (6-xi to 6-xvi)
Chapter 6 6-1 to 6-2 6.1 All Pages 6-3 to 6-10 Page 4 3/16/99
Catawba Nuclear Station 24 October 1998 UFSAR Update instructkms for Updating Manuals Text / 81/2" x 11" Tables and Figures OChapter 6: Engineered Safety Features (continued)
TAB' REMOVE INSERT 6.2
' All Pages 6-11 to 6-92 6.3 All Pages 6-93 to 6-126 6.4 All Pages 6-127 to 6-130 6.5 All Pages 6-131 to 6-136 6.6 All Pages 6-137 to 6-138 6.7 All Pages 6-139 to 6-202 AT Table 6-2,6-3 Table 6-2,6-3 Table 6-8 (Page 2 of 3)
Table 6-8 (Page 2 of G)
Table 6-61 Table 6-61 Table 6-62 Table 6-62 Table 6-70,6-71 Table 6-70,6-71 Table 6-77 Notes (5 Pages)
Table 6-77 Notes (4 Pages)
Table 6-87 (Page 1 of 2)
Table 6-87 (Page 1 of 2)
Table 6-87 (Page 2 of 2)
Table 6-87 (Page 2 of 2)
Table 6-89 (Page 2 of 3)
Table 6-89 (Page 2 of 3)
Table 6-91 (Page 3 of 13)
Table 6-91 (Page 3 of 13)
Table 6-93 (Page 1 of 2)
Table 6-93 (Pege 1 of 2)
Table 6-93 (Page 2 of 2)
Table 6-93 (Page 2 of 2)
Table 6-96 (Page 1 of 2)
Table 6-96 (Page 1 of 2)
O-N/A Table 6-100 (Page 2 of 2)
Table 6-105 Table 6-105 Table 6-106 Table 6-106 Table 6-107 Table 6-107 Table 6-108,6-109 Table 6-108,6-109 Table 6-110,6-111 (Page 1 of 2) Table 6110,6-111 (Page 1 of 2)
Table 6-127 (Page 2 of 3)
Table 6-127 (Page 2 of 3)
Table 6-127 (Page 3 of 3)
Table 6-127 (Page 3 of 3)
AF Figure 6-96 Figure 6-96 Figure 6-115 Figure 6-115 j
Figure 6-176 Figure 6-176 1
N/A Figure 6-203 (New Figure) j Chapter 7: Instrumentation and Controls l
TAB REMOVE INSERT TOC TOC (7-1 to 7-xvi)
LOT LOT (7-xvilto 7 xviii)
LOF LOF (7 xix to 7 xx)
Chapter 7 7-1 to 7-2
)
.7.1 All Pages 7-3 to 7-20 7.2 All Pages 7 21 to 7-46 Page 5 3/16/99
Catawba Nuclear Station 24 October 1998 UFSAR Update instructions for Updating Manuals Text / 81/2" x 11" Tables and Figures OV Chapter 7: Instrumentation and Controls (continued)
TAB REMOVE INSERT 7.3
/.ll Pages 7-47 to 7-66 7.4 All Pages 7-67 to 7 86 7.5 All Pages 7-87 to 7-88 7.6 All Pages 7-89 to 7154 7.7 All Pages 7-155 to 7-178 7.8 All Pages 7-179 to 7-182 AT Table 7-3 (Page 1 of 2)
Table 7-3 (Page 1 of 3)
Table 7-3 (Page 2 of 2)
Table 7 3 (Page 2 of 3)
N/A Table 7-3 (Page 3 of 3)
Table 7-4 (Page 1 of 4)
Table 7-4 (Page 1 of 4)
Table 7-4 (Page 2 of 4)
Table 7-4 (Page 2 of 4)
Table 7-4 (Page 3 of 4)
Table 7-4 (Page 3 of 4)
Table 7-4 (Page 4 of 4)
Tab 7-4 (Page 4 of 4)
Table 7-14 Table 714
'N/A Table 715 (Page 1 of 3)
N/A Table 7-15 (Page 2 of 3)
N/A Table 7-15 (Page 3 of 3)
N/A Table 7-15 (Table Notations)
AF mm mm Chapter 8: Electric Power TAB REMOVE INSERT TOC TOC (8-1 to 8-li)
LOT LOT (8-1i1 to 8-tv)
LOF LOF (8-v to 8-vi)
Chapter 8 8-1 to 8-2 8.1 All Pages 8-3 to 810 8.2 All Pages 8-11 to 816 8.3 All Pages 8-17 to 8-54 l
AT Table 8-6 (Page 1 of 10)
Table 8-6 (Page 1 of 10) l Table 8-6 (Page 2 of 10)
Table 8-6 (Page 2 of 10)
Table 8-6 (Page 3 of 10)
Table 8-6 (Page 3 of 10)
Table 8-6 (Page 4 of 10)
Table 8-6 (Page 4 of 10)
Table 8-6 (Page 5 of 10)
Table 8-6 (Page 5 of 10) l Table 84 (Page 6 of 10)
Table 8-6 (Page 6 of 10)
Table 8-6 (Page 7 of 10)
Table 8-6 (Page 7 of 10)
Table 8-6 (Page 8 of 10)
Table 8-6 (Page 8 of 10)
/
Table 8-6 (Page 9 of 10)
Table 8-6 (Page g of 10) l Page 6 3/16/99 m
Catawba Nuclear Mation 24 October 1998 UFSAd Update instructions for Updating Manuals Text / 81/2" x 11"Tatdoe and Fi,ws 9
O Chapter' : Electric Power (continued) d TAB' REMOVE INSERT
-- AT Table 8-6 (Page 10 of 10)
Table 8-6 (Page 10 of 10)
Table 8-7 Table 8 AF none none Chapter 9: Auxiliary Systema TAB REMOVE INSERT TOC _
TOC (9-1 to 9-viii)
LOT LOT (9-ix to 9-x)
LOF LOF (9-xl to 9-xvi)
Chapter 9 9-1 to 9-2 9.1 All Pages 9-3 to 9-30 9.2 All Pages 9 31 to 946 9.3 All Pages 9-67 to 9116 O9.5 9.4 AllPages 9-117 to 9-138
- All Pages -
9-139 to 9-166 AT Table 9-1 (Page 2 of 3)
Table 9-1 -(Page 2 of 3)
Table 9-3 (Page 1 of 2)
Table 9-3 (Page 1 of 2)
Table 9-4 (Page 4 of 5)
Table 9-4 (Page 4 of 5)
Table 9-6 (Page 15 of 16)
Table 9-6 (Page 15 of 16)
Table 9-8 (Page 1 of 2)
Table 94 (Page 1 of 2)
Table 9-15 Table 9-15 Table 916 Table 9-16 Table 9-23 (Page 32 of 42)
Table 9-23 (Page 32 of 42)
Table 9-23 (Page 33 of 42)
Table 9-23 (Page 33 of 42)
Table 9-28,9-29 Thble 9-28,9-29 Table 9-30 Table 9-30 Table 9-31(Page 1 of 9)
Table 9-31(Page 1 of 9)
Table 9-31(Page 2 of 9)
Table 9-31(Page 2 of 9)
Table 9 31(Page 3 of 9)
Table 9-31(Page 3 of 9)
Table 9-31(Page 4 of 9)
Tabie 9-31(Page 4 of 9)
Table 9-31(Page 5 of 9)
Table 9-31(Page 5 of 9)
Table 9-31(Page 6 of 9)
Table 9-31(Page 6 of 9)
Table 9-31(Page 7 of 9)
Table 9-31(Page 7 of 9)
Table 9-31(Page 8 of 9)
Table 9-31(Page 8 of 9)
Table 9-31(Page 9 of 9)
Table 9-31(Page 9 of 9)
Table 9-32(Page 1 of 2)
Table 9 32(Page 1 of 2)
Table 9-32(Page 2 of 2)
Table 9-32(Page 2 of 2)
- Table 9-33 Table 9 33 Page 7 3/16/99
n Catawba Nucisar Station 24 octater19es UFSAR Update Instructione for Updating Manuele l_
Text / 81/2" x 11" Tables and Figurse O
Chapter 9: Auxiliary Systeme (continued)
TAB REMOVE INSERT AT Table 9-35 (Page 2 of 10)
Table 9-35 (Page 2 of 10)
Tabic 9-35 (Page 3 of 10)
Table 9-35 (Page 3 of 10)
Table 9-35 (Page 4 of 10)
Table 9-35 (Page 4 of 10)
Table 9-35 (Page 5 of 10)
Table 9-35 (Page 5 of 10)
Table 9-35 (Page 6 of 10)
Table 9-35 (Page 6 of 10)
Table 9-35 (Page 7 of 10)
Table 9-35 (Page 7 of 10) 1 Table 9-35 (Page 8 of 10)
Table 0-35 (Page 8 of 10)
Table 9-35 (Pa0e 9 of 10)
'Trif' G-35 (Page 9 of 10)
Table 9-35 (Page 10 of 10) 7tn4 > e35 (Page 10 of 10)
Table 9-36 (Page 1 of 5)
. "IJA436 (Page 1 of 5)
Table 9-36 (Page 2 of 5)
Tabie 9-36 (Page 2 of 5)
Table 9-36 (Page 3 of 5)
Table 9-36 (Page 3 of 5)
Table 9-36 (Page 4 of 5)
Table 9-36 (Page 4 of 5)
Table 9-36 (Page 5 of 5)
Table 9-36 (Page 5 of 5)
Table 9-37 Table 9-37 I
Table 9-38 Table 9-38 Table 9-39 Table 9-39 T& H TM W AF Figure 9-13 Figure 9-13 Figure 9-57 Figure 9-57 Figure 9-58 Figure 9-58 l
l Chapter 10: Steam and Power Converelon TA8 REMOVE INSERT j
TOC TOC (10-1 to 10-11) l LOT LOT (10-lii to 10-Iv)
LOF LOF (10-v to 10-vi)
Chapter 10 10-1 to 10-2 10.1 All Pages 10 3 to 10-4 10.2 All Pages 10-5 to 1016 10.3 All Pages 10-17 to 10-22 l
10.4 All Pages 10-23 to 10-54 l
AT.
Table 104 (Page 1 of 2)
Table 104(Page 1 of 2)
Table 10-6 (Page 2 of 2)
Table 10-6 (Page 2 of 2)
Table 10-11 (Page 2 of 3)
Table 10-11 (Page 2 of 3)
Table 10-14 (Page 2 of 2)
Table 10-14 (Page 2 of 2)
AF.
none none Page 8 3/16/99 i
i I
j' Catawba Nuclear Station 24 October 1998 UFSAR Update instructions for Updating Manuals j
Text / 81/2" x 11* Tables and Figures O
I Chapter 11: Radioactive Waste Management TAB REMOVE INSERT TOC TOC (11-i to 11-iv)
LOT LOT (11-v to 11-vi)
LOF LOF (11-vil to 11-viii)
Chapter 11 11-1 to 112 11.1 All Pages 11-3 to 11-8 11.2 All Pages 11-9 to 11-38
]
11.3 AllPages 11-39 to 11-50 11.4 All Pages 11-51 to 11-60 11.5 All Pages 1161 to 1172 11.6 All Pages 11-73 to 11-78 i
i AT Table 11 13 Table 11 13
/
Chapter 12: Radiation Protection TAB REMOVE INSERT TOC TOC (12-1 to 12-11)
LOT LOT (12-lii to 12-iv)
LOF LOF (12-v to 12-vi)
Chapter 12 12-1 to 12-2 12.1 All Pages 12-3 to 12-6 12.2 All Pages 12-7 to 12-10 12.3 All Pages 1211 to 12 20 12.4 All Pages 12-21 to 12-24 12.5 All Pages 12-25 to 12-36 AT none none AF none none Chapter 13: Conduct of Operations TAB REMOVE INSERT TOC TOC (13-1 to 13-li) t l
LOT LOT (13lil to 13-iv)
LOF LOF (13-v to 13-vi)
I Page 9 3/16/99
1 Catawba Nuclear Station 24 October 1998 UFSAR Update instructions for Updating Manuals Text / 81/2" x 11" Tables and Figures O
Ch pter13: Conduct of Operations (continued)
Chapter 13 13-1 to 13-2 13.1 All Pages 13-3 to 13-10 13.2-All Pages 13-11 to 13-16
)
13.3 All Pages 13-17 to 13-18 13.4 All Pages 1319 to 13-22 13.5 All Pages 13-23 to 13-28 13.6 All Pages 13-29 to 13-30 AT none none AF Figure 13-3 Figure 13-3 Figure 13-4 Figure 13-4 Chapter 14: Initial Test and Operation TAB REMOVE INSERT TOC TOC (14-i to 14-iv)
LOT LOT (14v to 14-vi) p LOF LOF (14-vil to 14-viii)
\\
Chapter 14 14-1 to 14-2 14.1 AII Pages 14-3 to 14-4 14.2 All Pages 14-5 to 1414 14.3 All Pages 14-15 to 14-22 14.4 All Pages 14-23 to 14-66 14.5 All Pages 14-67 to 14-88 AT none none AF none none Chapter 15: Accident Analysis TAB REMOVE INSERT TOC TOC (15-1 to 15-vi)
LOT LOT (15vlito 15-viii)
LOF LOF (15-ix to 15-xiv)
Chapter 15 15-1 to 1512 O
Page 10 3/16/99 l
m
Catawba Nuclear Station 24 October 1998 UFSAR Update instructions for Updating Manuals Text / 81/2" x 11" Tables and Figures OChapter 15: Accident Analysis (contirrded)
TAB REMOVE INSERT 15.1 All Pages 15-13 to 15-28 15.2 Ali Pages 15-29 to 15-46 15.3 All Pages 15-47 to 15-54 15.4 All Pages 15-55 to 15-86 15.5 All Pages 15-87 to 15-92 15.6 All Pages 15-93 to 15118 15.7 All Pages15-119 to 15-126 15.8 All Pages 15127 to 15128 AT Table 15-4 (Page 2 of 5)
Table 15-4 (Page 2 of 5)
Table 15-5,154 Table 15-5,15-6
. Table 15-7 Table 15-7 Table 15-18 (Page 1 of 3)
Table 15-18 (Page 1 of 3)
Table 15-18 (Page 2 of 3)
Table 15-18 (Page 2 of 3)
Table 15-23 (Page 2 of 4)
Table 15-23 (Page 2 of 4)
Table 15-38,15-39 Table 15-38,15-39 Table 15-56 Table 15-56 Table 15-61 Table 15-61 Table 1543 Table 1543 Table 1544 Table 1544 AF
. Figure 15-41 (Part 1of 2)
Figure 15-41 (Part 1of 2)
Figure 15-41 (Part 2 of 2)
Figure 15-41 (Part 2 of 2)
Figure 15-42 (Part 1 of 2)
Figure 15-42 (Part 1 of 2)
Figure 15-42 (Part 2 of 2)
Figure 15-42 (Part 2 of 2)
Figure 15-43 Figure 15-43 Figure 1542 Figure 1542 Figure 1543 Figure 1543 Figure 1544 Figure 1544 Figure 1545 Figure 1545 Figure 1546 -
Figure 1546 Chapter 16 Selected Lloonoce Commitments TAB-REMOVE INSERT None None Chapter 17: Quality Assurance TAB REMOVE INSERT TOC TOC (17-l to 17-li)
Chapter 17_
17-1 to 17 2 17.1
. All Pages 17 3 to 17-7 i
Page 11' 3/16/99 l.
7 Catawba Nuclear Station 24 October 1998 UFSAR Update instructions for Updating Manuals Text / 81/2" x 11" Tables and Figures Chapter 17: Quality Assurance (continued)
TAB REMOVE ~
INSERT
~AT none none AF none none TOC = Table of Contents t
LOT = List of Tables l
LOF = List of Figures l
AT= AppendixTables
' AF = Appendix Figures i
i i
l l
Page 12 3/16/99 L
I l
Catawba Nuclear Station f
24 October 1998 UFSAR Update instructions for Updating Manual 11" x 17" Tables and Figures Chapter 1: Introduction and General Description of the Station TAB REMOVE INSERT l
l AF Figure 1-22 Figure 1-22 Figure 1-23 Figure 123 Chapter 5: Reactor Coolant System and Connected Systems TAB REMOVE INSERT AF Figure 5-2 Figure 5-2 Figure 5-3 Figure 5-3 Figure 5-6 Figure 5-6 Figure 5-16 Figure 5-16 Figure 5-17 Figure 5-17 Figure 5-18 Figure 518 N/A Figure 5-33 (New)
N/A Figure 5-34 (New)
Chapter 6: Engineered Safety Features TAB REMOVE INSERT OAT Table 6-74 (6 Pages)
Table 6-74 (6 Pages)
Table 6-77 (35 Pages)
Tablo 6-77 (49 Pages)
AF 6 109 6-109 6-116 6-116 6-128 6-128 6 129 6-129 6-130 6-130 6-131 6-131 Chapter 8: Electric Power j
l TAB REMOVE INSERT AF Figure 8-1 Figure 8-1 Figure 8-21 Figure 8-21 j.
Page 13 3/16/99 L
L l
Catawba Nuclear Station 24 October 1998 UFSAR Update Instructions for Updating Manual i
11" x 17" Tables and Figures er 9: Auxiliary Systems TAB REMOVE INSERT AF Figure 9-12 Figure 9-12 Figure 9-22 Figure 9-22 Figure 9-23 Figure 9-23 Figure 9-24 Figure 9-24 Figure 9-25 Figure 9-25 Figure 9-26 Figure 9-26 Figure 9-27 Figure 9-27 l
Figure 9-28 Figure 9-28 Figure 9-30 Figure 9-30 Figure 9-31 Figure 9-31 Figure 9-36 Figure 9-36 Figure 9-38 Figure 9-38 l
Figure 9-39 Figure 9-39 Figure 9-40 Figure 9-40 Figure 9-42 Figure 9-42 Figure 9-43 Figure 9-43 Figure 9-44 Figure 9-44 Figure 9-45 Figure 9-45 Figure 9-46 Figure 9-46 Figure 9-47 Figure 9-47 m
Figure 9-48 Figure 9-48
(',)
Figure 9-49 Figure 9-49 Figure 9-51 Figure 9-51 Figure 9-52 Figure 9-52 Figure 9-59 Figure 9-59 Figure 941 Figure 941 Figure 942 Figure 9-62 Figure 943 Figure 9-63 Figure 944 Figure 944 Figure 945 Figure 945 Figure 946 Figure 946 Figure 948 Figure 9-68 Figure 9-69 Figure 9-69 Figure 9-70 Figure 9-70 Figure 9-71 Figure 9-71 Figure 9 72 Figure 9-72 Figure 9-73 Figure 9-73 Figure 9-75 Figure 9-75 Figure 9 76 Figure 9-76 Figure 9-77 Figure 9-77 Figure 9-78 Figure 9 78 Figure 9-79 Figure 9 79 Figure 9-80 Figure 9-80 Figure 941 Figure 941 i
l Figure 9 62 Figure 9-82 Figure 9-84 Figure 944 Page 14 3/16/99 l
E
Catawba Nuc6eer Ctation 24 October 1998 UFSAR Update Instructions for Updating Manual 11" x 17" Tables and Figures 9: Auxiliary Systerns(continued)
TAB REMOVE INSERT
-AF Figure 945 Figure 945 Figure 947 Figurw 947 Figure 949 Figure 949 Figure 9 Figure 9-90 Figure 9-91 Figure 9-91 Figure 9-93 Figure 9-93 Figure 9-94 Figure 9-94 Figure 9-95
' Figure 9-95 Figure 9-96 Figure 9-96 Figure 9-98 Figure 9-98 Figure 9-99
. Figure 9-99 Figure 9101 Fgure 9-101 Figure 9-103 Figure 9-103 Figure 9-106 Figure 9-106 Figure 9-108 Figure 9-108 Figure 9-109 Figure 9-109 Figuro 9-110 Figure 9-110 Figure 9-111 Figure 9111 Figure 9-112 Figure 9-112 Figure 9-113 Figure 9-113 Figure 9-114 Figure 9-114 O
Figure 9-115 Figure 9-115 Figuro 9-116 Figure 9-116 Figure 9117 Figure 9-117 -
Figure 9-118 Figure 9-118 Figure 9-119 Figure 9-119 Figure 9-121 Figure 9-121 Figure 9-122 Figure 9122-Figure 9-123 Figure 9-123 Figure 9124 Figure 9-124 Figure 9-125 Figure 9-125 Figure 9-128 Figure 9-128 Figure 9-129 Figure 9-129 Figure 9-131 Figure 9-131 Figure 9-135 Figure 9-135 l
Figure 9-136 Fgure 9-136 l
i Fgure 9-138 Figure 9-138 Figure 9-139 Figure 9-139 i
Fgure 9-140 Figure 9-140 Figure 9141 Figure 9-141 Figure 9142 Figure 9-142
. Figure 9-144 Figure 9-144 Figure 9-182 Figure 9-182 i
Figure 9-183 Figure 9-183
)
l Figure 9-184 Figure 9-184
' Figure 9-185 Figure 9-185 Page 15 3/16/99 t
EK Catawba Nuclear Station 24 October 1998 UFSAR Update Instructions for Updating Manual 11" x 17" Tables and Figures 9: Auxiliary Systems (continued)
TAB REMOVE INSERT AF Figure 9-186 Figure 9-186 Figure 9-187 Figure 9-187 N/A Figure 9-200 (New)
N/A Figure 9-201 (New)
N/A Figure 9-202 (New)
N/A Figure 9-203 (New)
N/A Fgure 9-204 (New)
N/A Figure 9-205 (New)
N/A Figure 9-206 (New)
N/A Figure 9-207 (New)
N/A Fgure 9-208 (New)
N/A Figure 9-209 (New)
N/A Figure 9-210 (New)
N/A Figure 9-211 (New)
-N/A Figure 9-212 (New)
N/A Figure 9-213 (New)
N/A Figure 9-214 (New)
N/A Figure 9-215 (New)
N/A Figure 9-216 (New)
N/A Figure 9-217 (New)
N/A Figure 9-220 (New) _
O.
N/A Figure 9-221 (New)
N/A Figure 9-222 (New)
N/A Figure 9-223 (New)
N/A Figure 9-224 (New)
N/A Figure 9-225 (New)
N/A Figure 9-226 (New)
N/A Figure 9-227 (New)
N/A Figure 9-228 (New)
N/A Figure 9-229 (New)
N/A Fgure 9-230 (New)
N/A Figure 9-231 (New)
N/A Figure 9-232 (New)
N/A Figure 9-233 (New)
N/A Figure 9-234 (New)
N/A Figure 9-235 (New)
N/A Figure 9-236 (New)
N/A Figure 9-237 (New)
N/A Figure 9-238 (New)
N/A Figure 9-239 (New)
N/A Figure 9-240 (New)
N/A_
Figure 9-241 (New)
N/A Figure 9-242 (New)
N/A Figure 9-243 (New)
N/A Figure 9-244 (New)
N/A Figure 9-245 (New)
Page 16 3/16/99
Catawba Nuoleer Station 24 october 199s UFSAR Update Instructione for Updating Manual L
11" x 17" Tables and Figurse Si. Auxiliary Sye'a' me (continued)"
TA8 REMOVE AF.
N/A Figure 9-246 (New)
N/A Figure 9-247 (New)
N/A Figure 9-248 (New)
N/A Figure 9-249 (New)
[.
.N/A Figure 9-250 (New)
N/A Figure 9-251 (New)
N/A Figure 9-252 (New)
N/A
. Figure 9-253 (New)
N/A Figure 9-254 (New)
N/A Figure 9-255 (New)
N/A Figure 9-256 (New)
N/A Figure 9-257 (New) -
N/A Figure 9-258 (New)
N/A' Figure 9-259 (New)
N/A Figure 9-200 (New)
.N/A Figure 9-261 (New)
N/A Figure 9-292 (New)
N/A-Figure 9-263 (New) l N/A Figure 9-264 (New)
Chapter 10: Steam and Power Converelon i
TAB REMOVE INSERT AF Figure 10 5 Figure 10-5 Figure 10 7 Figure 10-7 Figure 10-8 Figure 10 8 Figure 1010 Figure 10-10 l
Figure 10-12 Figure 1012 Figure 10-13 Figure 10-13 Figure 10-15 Figure 10-15
' Figure 10-16 Figure 10-16 Figure 10-17 Figure 10-17 l
Figure 10-18 Figure 1018 Figure 10-19 Figure 10-19 l
Figure 10-22 Figure 10-22 l
Figure 10-23 Figure 10-23 Figure 10-24 Figure 10-24 Figure 10-25 Figure 10-25 Figure 10-26 Figure 10-26 Figure 10-27 Figure 10-27 Figure 10-28 Figure 10-28 Figere 10-29 Figure 10-29
" Figure 10-31 Figure 10-31 1
O Figure 10-33 Figure 10-33..
j h
Page 17 3/16/99
E Catawba Nuclear Station 24 October 1998 UFSAR Update instructions for Updating Manual 11" x 17" Tables and Figures O
Q Chapter 10: Steam and Power Conversion (continued)
TAB REMOVE INSERT AF Figure 10-34 Figure 10-34 Figure 10-35 Figure 10 35 Figure 10-36 Figure 10-36 Figure 10-37 Figure 10-37 Figure 10-38 Figure 10-38 Figure 10-39 Figure 10-39 Figure 10-40 Figure 10-40 Chapter 11: Radioactive Waste Management TAB REMOVE INSERT AF Figure 112 Figure 11-2 Figure 113 Figure 11-3 Figure 11-4 Figure 11-4 Figure 115 Figure 11-5 Figure 11-7 Figure 117 Figure 11-9 Figure 11-9 j
Figure 11-10 Figure 11-10 Figure 11-11 Figure 11 11 Figure 11-12 Figure 11 12 Figure 11-13 Figure 11-13 Figure 11-14 Figure 11-14 Figure 1115 Figure 11 15 Figure 11-17 Figure 11-17 Figure 11-18 Figure 11-18 Figure 11-19 Figure 11 19 Figure 11-20 Figure 1120 Figure 1122 Figure 1122 Figure 1123 Figure 1123 Figure 11-24 Figure 1124 Figure 1125 Figure 1125 Figure 1126 Figure 1126 Figure 1127 Figure 1127 Figure 1128 Figure 1128 Figure 11-30 Figure 11-30 Figure 11-37 Figure 1137 Figure 11-39 Figure 11-39 l
N/A Figure 11-40 (New) l N/A Figure 11-41 (New) l N/A Figure 11-42 (New)
N/A Figure 11-43 (New)
AT = Appendix Tables AF = Appendix Figures l
Page 18 3/16/99 L