IR 05000354/2021005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:September 1, 2021
 
==SUBJECT:==
UPDATED INSPECTION PLAN FOR THE HOPE CREEK NUCLEAR GENERATING STATION (REPORT 05000354/2021005)
 
==Dear Mr. Carr,==
The enclosed inspection plan lists the inspections scheduled through June 30, 2023, for Hope Creek Generating Station (Hope Creek). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
 
In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:
https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.
 
The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff.The staff expects to communicate the schedule for these inspections to each utility separately.
 
E. Carr 2
 
Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electrical Power Systems (NRC Bulletin 2012- 01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Please contact me at 610-337-5312 with any questions you have regarding this letter.
 
Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety
 
Docket No. 50- 354 License No. NPF-57
 
Enclosure:
Hope Creek Inspection Plan
 
Distribution via ListServ E. Carr 3
 
SUBJECT: UPDATED INSPECTION PLAN FOR THE HOPE CREEK NUCLEAR GENERATING STATION (R EPORT 05000354/2021005) DATED SEPTEMBER 1, 2021
 
Distribution w/encl: (via E-mail)
BBickett, DORS PFinney, DORS GWalbert, DORS JPatel, DORS, SRI DBeacon, D ORS, RI SCalabrese, DORS AMcCraw, RI, OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1 Resource ROPReports Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource
 
DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-2 2 Second Quarter Process/Branch 3/ROP-2 2 MC ltr Hope CreekFINAL.docx ADAMS Accession No. ML21242A024 SUNSI Review n -Sensitive Publvlle Sensitive n -Publiclyvlable
 
OFFICE RI/DORS RI/DORS ME PFinney BBictt TE /30/2021 0 011 OFFIAL RERD CO IP 22b Site Inspection Activity Plan Hope Creek
 
07/01/2021 - 06/30/2023
 
Unit Start End Activity CAC Title Staff Count
 
DESIGN BASIS ASSURANCE INSPECTION - TEAMS 6
 
1 8/1/2021 8/7/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
 
1 8/15/2021 8/21/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)
 
PI&R BIENNIAL - HC 4
 
1 8/30/2021 9/3/2021 IP 71152B 000747 Problem Identification and Resolution
 
1 9/13/2021 9/17/2021 IP 71152B 000747 Problem Identification and Resolution
 
TI-194 Open Phase Condition Inspection - Hope Creek 2
 
1 9/20/2021 9/24/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)
 
EP EXERCISE INSPECTION - HOPE CREEK 5
 
1 11/1/2021 11/5/2021 IP 71114.01 000716 Exercise Evaluation
 
1 11/1/2021 11/5/2021 IP 71151 001397 Performance Indicator Verification
 
Security Baseline Inspection-HC 1
 
1 11/8/2021 11/10/2021 IP 71130.09 001656 Security Plan Changes
 
RP Rad Hazard; ALARA; In-Plant Airborne; Dose Assess; PIs 71124.01/.02/.03/.04/71151 1
 
1 11/15/2021 11/19/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
1 11/15/2021 11/19/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls
 
1 11/15/2021 11/19/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1 11/15/2021 11/19/2021 IP 71124.04 000728 Occupational Dose Assessment
 
1 11/15/2021 11/19/2021 IP 71151 000746 Performance Indicator Verification
 
RP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 1
 
1 1/24/2022 1/28/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment
 
Fire Protection - Hope Creek 3
 
1 2/14/2022 2/18/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
 
1 2/28/2022 3/4/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
 
EP EXERCISE INSPECTION - HOPE CREEK 4
 
1 5/9/2022 5/13/2022 IP 71114.01 000716 Exercise Evaluation
 
1 5/9/2022 5/13/2022 IP 71151 001397 Performance Indicator Verification
 
Access Control, Protective Strat, TSR, SPR, PI-HC 4
 
1 6/6/2022 6/10/2022 IP 71130.02 000734 Access Control
 
1 6/6/2022 6/10/2022 IP 71130.05 000737 Protective Strategy Evaluation
 
1 6/6/2022 6/10/2022 IP 71130.09 001656 Security Plan Changes
 
1 6/6/2022 6/10/2022 IP 71130.14 000743 Review of Power Reactor Target Sets
 
Prepared on 8/25/2021 9:26:08 AM 1 of 3 IP 22b Site Inspection Activity Plan
 
1 6/6/2022 6/10/2022 IP 71151 001338 Performance Indicator Verification
 
Design Basis Assurance Inspection - Power Operated Valves - Hope Creek 3
 
1 7/11/2022 7/15/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1 7/25/2022 7/29/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements
 
RP Rad Environmental Monitoring Program 71124.07 1
 
1 8/1/2022 8/5/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program
 
FY22 Hope Creek Initial Licensing Examination 4
 
1 6/26/2022 7/1/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1 8/7/2022 8/19/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)
 
Hope Creek Requal Inspection with P/F Results 2
 
1 9/12/2022 9/16/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 9/12/2022 9/16/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance
 
Inservice Inspection - Hope Creek 1
 
1 10/3/2022 10/7/2022 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
 
RP Rad Hazard Assessment; Performance Indicator Verification 71124.01/71151 1
 
1 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
1 10/17/2022 10/21/2022 IP 71151 000746 Performance Indicator Verification
 
RP Rad Airborne / Dose Assessment 71124.03/.04 1
 
1 11/28/2022 12/2/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1 11/28/2022 12/2/2022 IP 71124.04 000728 Occupational Dose Assessment
 
RP Rad Instrumentation 71124.05 1
 
1 1/16/2023 1/20/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation
 
Heat Sink Inspection - Hope Creek 1
 
1 2/26/2023 3/4/2023 IP 71111.07T 000700 Heat Sink Performance
 
FORCE-ON-FORCE PLANNING AND EXERCISE - SL/HC 4
 
1 2/27/2023 3/3/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
 
1 3/20/2023 3/24/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing
 
RP Rad Hazard Assess & Control 71124.01 1
 
1 3/6/2023 3/10/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls
 
Access Control, Equipment, Sec Trng, Sec Plan Review, PI-HC 3
 
1 5/8/2023 5/12/2023 IP 71130.02 000734 Access Control
 
1 5/8/2023 5/12/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance
 
1 5/8/2023 5/12/2023 IP 71130.07 000739 Security Training
 
1 5/8/2023 5/12/2023 IP 71130.09 001656 Security Plan Changes
 
Prepared on 8/25/2021 9:26:08 AM 2 of 3 IP 22b Site Inspection Activity Plan
 
1 5/8/2023 5/12/2023 IP 71151 001338 Performance Indicator Verification
 
EP PROGRAM INSPECTION - HOPE CREEK 1
 
1 6/5/2023 6/9/2023 IP 71114.02 000717 Alert and Notification System Testing
 
1 6/5/2023 6/9/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System
 
1 6/5/2023 6/9/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes
 
1 6/5/2023 6/9/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness
 
1 6/5/2023 6/9/2023 IP 71151 001397 Performance Indicator Verification
 
PI&R Team Inspection - HC 4
 
1 6/12/2023 6/16/2023 IP 71152B 000747 Problem Identification and Resolution
 
1 6/26/2023 6/30/2023 IP 71152B 000747 Problem Identification and Resolution
 
Prepared on 8/25/2021 9:26:08 AM 3 of 3
}}
}}

Latest revision as of 23:16, 19 November 2024

Updated Inspection Plan for the Hope Creek Nuclear Generating Station (Report 05000354/2021005)
ML21242A024
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/01/2021
From: Brice Bickett
Reactor Projects Branch 3
To: Carr E
Public Service Enterprise Group
References
IR 2021005
Download: ML21242A024 (6)


Text

September 1, 2021

SUBJECT:

UPDATED INSPECTION PLAN FOR THE HOPE CREEK NUCLEAR GENERATING STATION (REPORT 05000354/2021005)

Dear Mr. Carr,

The enclosed inspection plan lists the inspections scheduled through June 30, 2023, for Hope Creek Generating Station (Hope Creek). The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In response to the COVID-19 public health emergency (PHE), the NRC is adjusting inspection plans and schedules in order to safeguard the health and safety of both NRC and licensee staff while still effectively implementing the ROP. Each planned inspection is being carefully reviewed in order to determine if any portions of the inspection can be performed remotely, determine how best to perform on-site portions to minimize personnel health risks, and adjust inspection schedules if needed. This is done in accordance with guidance contained in the February 1, 2021 memo, Calendar Year 2021 Inspection Guidance During COVID-19 Telework Restrictions (ML21027A274). For inspections requiring extensive coordination with offsite organizations, such as evaluated emergency preparedness exercises, NRC guidance and frequently asked questions for security and emergency preparedness can be found here:

https://www.nrc.gov/about-nrc/covid-19/security-ep/. Similarly, the NRC has developed guidance if force-on-force inspections cannot be completed as scheduled due to an emergency, such as the COVID-19 PHE. These changes help ensure the health and safety of both NRC and licensee staff while maintaining the NRCs important safety and security mission during the COVID-19 PHE. The attached inspection plan is accurate on the date of issuance but remains subject to change based on approval of potential exemption requests or other changes needed due to changing conditions in the COVID-19 PHE. NRC staff will contact your appropriate regulatory affairs staff in order to coordinate inspection planning and scheduling.

The NRC will also be performing baseline inspections of licensee cyber security programs. The specific schedule and procedure to be used for these inspections is being developed by the NRC staff.The staff expects to communicate the schedule for these inspections to each utility separately.

E. Carr 2

Additionally, during this period the NRC will schedule an additional inspection per a revised version of Temporary Instruction (TI) 2515/194, Inspection of the Licensees Implementation of Industry Initiative Associated with the Open Phase Condition Design Vulnerabilities in Electrical Power Systems (NRC Bulletin 2012- 01) for any sites who elect to implement the guidance of the Industry Initiative on Open Phase Condition, Revision 3 (ML19163A176), which included an option for relying on annunciation and operator manual actions instead of automatic protective features to isolate a power supply affected by an open phase condition. Licensees will be individually notified when the NRC schedules these inspections.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 610-337-5312 with any questions you have regarding this letter.

Sincerely, Brice A. Bickett, Chief Projects Branch 3 Division of Operating Reactor Safety

Docket No. 50- 354 License No. NPF-57

Enclosure:

Hope Creek Inspection Plan

Distribution via ListServ E. Carr 3

SUBJECT: UPDATED INSPECTION PLAN FOR THE HOPE CREEK NUCLEAR GENERATING STATION (R EPORT 05000354/2021005) DATED SEPTEMBER 1, 2021

Distribution w/encl: (via E-mail)

BBickett, DORS PFinney, DORS GWalbert, DORS JPatel, DORS, SRI DBeacon, D ORS, RI SCalabrese, DORS AMcCraw, RI, OEDO RidsNrrPMHopeCreek Resource RidsNrrDorlLpl1 Resource ROPReports Resource DORS Specialist Branch Chiefs DRSS Reactor Branch Chiefs DTifft, RI, SLO DScrenci, RI, PAO NSheehan, RI, PAO RidsNrrDirslpab Resource ROPassessment Resource

DOCUMENT NAME: https://usnrc.sharepoint.com/teams/ROPAssessmentMeetings/Shared Documents/ROP-2 2 Second Quarter Process/Branch 3/ROP-2 2 MC ltr Hope CreekFINAL.docx ADAMS Accession No. ML21242A024 SUNSI Review n -Sensitive Publvlle Sensitive n -Publiclyvlable

OFFICE RI/DORS RI/DORS ME PFinney BBictt TE /30/2021 0 011 OFFIAL RERD CO IP 22b Site Inspection Activity Plan Hope Creek

07/01/2021 - 06/30/2023

Unit Start End Activity CAC Title Staff Count

DESIGN BASIS ASSURANCE INSPECTION - TEAMS 6

1 8/1/2021 8/7/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

1 8/15/2021 8/21/2021 IP 71111.21M 000713 Design Bases Assurance Inspection (Teams)

PI&R BIENNIAL - HC 4

1 8/30/2021 9/3/2021 IP 71152B 000747 Problem Identification and Resolution

1 9/13/2021 9/17/2021 IP 71152B 000747 Problem Identification and Resolution

TI-194 Open Phase Condition Inspection - Hope Creek 2

1 9/20/2021 9/24/2021 TI 2515/194 000512 Inspection of the Licensees Implementation of Industry Initiative Associated With the Open Phase Condition Design Vulnerabilities In Electric Power Systems (NRC Bulletin 2012-01)

EP EXERCISE INSPECTION - HOPE CREEK 5

1 11/1/2021 11/5/2021 IP 71114.01 000716 Exercise Evaluation

1 11/1/2021 11/5/2021 IP 71151 001397 Performance Indicator Verification

Security Baseline Inspection-HC 1

1 11/8/2021 11/10/2021 IP 71130.09 001656 Security Plan Changes

RP Rad Hazard; ALARA; In-Plant Airborne; Dose Assess; PIs 71124.01/.02/.03/.04/71151 1

1 11/15/2021 11/19/2021 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1 11/15/2021 11/19/2021 IP 71124.02 000726 Occupational ALARA Planning and Controls

1 11/15/2021 11/19/2021 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1 11/15/2021 11/19/2021 IP 71124.04 000728 Occupational Dose Assessment

1 11/15/2021 11/19/2021 IP 71151 000746 Performance Indicator Verification

RP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 1

1 1/24/2022 1/28/2022 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment

Fire Protection - Hope Creek 3

1 2/14/2022 2/18/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

1 2/28/2022 3/4/2022 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)

EP EXERCISE INSPECTION - HOPE CREEK 4

1 5/9/2022 5/13/2022 IP 71114.01 000716 Exercise Evaluation

1 5/9/2022 5/13/2022 IP 71151 001397 Performance Indicator Verification

Access Control, Protective Strat, TSR, SPR, PI-HC 4

1 6/6/2022 6/10/2022 IP 71130.02 000734 Access Control

1 6/6/2022 6/10/2022 IP 71130.05 000737 Protective Strategy Evaluation

1 6/6/2022 6/10/2022 IP 71130.09 001656 Security Plan Changes

1 6/6/2022 6/10/2022 IP 71130.14 000743 Review of Power Reactor Target Sets

Prepared on 8/25/2021 9:26:08 AM 1 of 3 IP 22b Site Inspection Activity Plan

1 6/6/2022 6/10/2022 IP 71151 001338 Performance Indicator Verification

Design Basis Assurance Inspection - Power Operated Valves - Hope Creek 3

1 7/11/2022 7/15/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements 1 7/25/2022 7/29/2022 IP 71111.21N.02 001645 Design-Basis Capability of Power-Operated Valves Under 10 CFR 50.55a Requirements

RP Rad Environmental Monitoring Program 71124.07 1

1 8/1/2022 8/5/2022 IP 71124.07 000731 Radiological Environmental Monitoring Program

FY22 Hope Creek Initial Licensing Examination 4

1 6/26/2022 7/1/2022 OV 000956 FB-OR-ONSITE VALIDATION OF INITIAL LICENSE EXAMINATION (OV)

1 8/7/2022 8/19/2022 EXAD 000500 FB-OR-INITIAL LICENSE EXAM ADMINISTRATION (EXAD)

Hope Creek Requal Inspection with P/F Results 2

1 9/12/2022 9/16/2022 IP 71111.11A 000703 Licensed Operator Requalification Program and Licensed Operator Performance 1 9/12/2022 9/16/2022 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance

Inservice Inspection - Hope Creek 1

1 10/3/2022 10/7/2022 IP 71111.08G 000701 Inservice Inspection Activities (BWR)

RP Rad Hazard Assessment; Performance Indicator Verification 71124.01/71151 1

1 10/17/2022 10/21/2022 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

1 10/17/2022 10/21/2022 IP 71151 000746 Performance Indicator Verification

RP Rad Airborne / Dose Assessment 71124.03/.04 1

1 11/28/2022 12/2/2022 IP 71124.03 000727 In-Plant Airborne Radioactivity Control and Mitigation

1 11/28/2022 12/2/2022 IP 71124.04 000728 Occupational Dose Assessment

RP Rad Instrumentation 71124.05 1

1 1/16/2023 1/20/2023 IP 71124.05 000729 Radiation Monitoring Instrumentation

Heat Sink Inspection - Hope Creek 1

1 2/26/2023 3/4/2023 IP 71111.07T 000700 Heat Sink Performance

FORCE-ON-FORCE PLANNING AND EXERCISE - SL/HC 4

1 2/27/2023 3/3/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

1 3/20/2023 3/24/2023 IP 71130.03 000735 Contingency Response - Force-On-Force Testing

RP Rad Hazard Assess & Control 71124.01 1

1 3/6/2023 3/10/2023 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls

Access Control, Equipment, Sec Trng, Sec Plan Review, PI-HC 3

1 5/8/2023 5/12/2023 IP 71130.02 000734 Access Control

1 5/8/2023 5/12/2023 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance

1 5/8/2023 5/12/2023 IP 71130.07 000739 Security Training

1 5/8/2023 5/12/2023 IP 71130.09 001656 Security Plan Changes

Prepared on 8/25/2021 9:26:08 AM 2 of 3 IP 22b Site Inspection Activity Plan

1 5/8/2023 5/12/2023 IP 71151 001338 Performance Indicator Verification

EP PROGRAM INSPECTION - HOPE CREEK 1

1 6/5/2023 6/9/2023 IP 71114.02 000717 Alert and Notification System Testing

1 6/5/2023 6/9/2023 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System

1 6/5/2023 6/9/2023 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes

1 6/5/2023 6/9/2023 IP 71114.05 000720 Maintenance of Emergency Preparedness

1 6/5/2023 6/9/2023 IP 71151 001397 Performance Indicator Verification

PI&R Team Inspection - HC 4

1 6/12/2023 6/16/2023 IP 71152B 000747 Problem Identification and Resolution

1 6/26/2023 6/30/2023 IP 71152B 000747 Problem Identification and Resolution

Prepared on 8/25/2021 9:26:08 AM 3 of 3