05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram
ML24043A168 | |
Person / Time | |
---|---|
Site: | Hope Creek |
Issue date: | 02/12/2024 |
From: | Agster T Public Service Enterprise Group |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
References | |
LR-N24-0008 LER 2023-003-00 | |
Download: ML24043A168 (1) | |
Similar Documents at Hope Creek | |
---|---|
Category:Letter
MONTHYEARML24351A0952024-12-17017 December 2024
[Table view]Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0071, Supplement to License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-12-0606 December 2024 Supplement to License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle LR-N24-0069, Independent Spent Fuel Storage Installation - Report of 10 CFR 72.48 Changes, Tests and Experiments2024-12-0202 December 2024 Independent Spent Fuel Storage Installation - Report of 10 CFR 72.48 Changes, Tests and Experiments IR 05000354/20240032024-10-23023 October 2024 Integrated Inspection Report 05000354/2024003 ML24295A3742024-10-23023 October 2024 Project Manager Assignment ML24291A0572024-10-17017 October 2024 License Amendment Request (LAR) – Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5, Supplement 1 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) LR-N24-0059, 2024 Annual 10 CFR 50.46 Report2024-09-30030 September 2024 2024 Annual 10 CFR 50.46 Report LR-N24-0056, Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-09-26026 September 2024 Response to Request for Additional Information Associated with License Amendment Request - Revise Hope Creek Generating Station Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle IR 05000272/20244032024-09-25025 September 2024 And Salem Nuclear Generating Station, Units 1 and 2, Cybersecurity Inspection Report 05000354/2024403, 05000272/2024403, and 05000311/2024403 (Cover Letter Only) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24255A8042024-09-11011 September 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N24-0057, In-Service Inspection Activities2024-09-10010 September 2024 In-Service Inspection Activities 05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000354/20240052024-08-29029 August 2024 Updated Inspection Plan for Hope Creek Generating Station (Report 05000354/2024005) LR-N24-0044, Relief Request VR-042024-08-0606 August 2024 Relief Request VR-04 IR 05000354/20240022024-07-30030 July 2024 Integrated Inspection Report 05000354/2024002 ML24200A0572024-07-18018 July 2024 Request for Withholding Information from Public Disclosure for License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves ML24197A0552024-07-15015 July 2024 Requalification Program Inspection ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) LR-N24-0030, License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves2024-06-28028 June 2024 License Amendment Request to Revise Technical Specification Lift Settings for Reactor Coolant System Safety/Relief Valves IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24150A1002024-05-28028 May 2024 Core Operating Limits Report, Reload 25, Cycle 26, Revision 23 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle2024-05-20020 May 2024 License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle ML24142A4072024-05-20020 May 2024 License Amendment Request (LAR) - Hope Creek Technical Specification Conversion to NUREG-1433, Revision 5 IR 05000354/20240012024-05-0808 May 2024 Integrated Inspection Report 05000354/2024001 IR 05000354/20240102024-05-0707 May 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000354/2024010 LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000354/20243012024-04-10010 April 2024 Initial Operator Licensing Examination Report 05000354/2024301 LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24080A3962024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report IR 05000354/20230062024-02-28028 February 2024 Annual Assessment Letter for Hope Creek Generating Station (Report 05000354/2023006) IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0010, Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges2024-02-22022 February 2024 Technical Specification 6.9.1.5.b: 2023 Annual Report of SRV Challenges 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram IR 05000354/20230042024-02-0101 February 2024 Integrated Inspection Report 05000354/2023004 ML24030A8752024-02-0101 February 2024 Operator Licensing Examination Approval ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000354/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000354/2023401 2024-09-05 Category:Licensee Event Report (LER) MONTHYEAR05000354/LER-2024-001-01, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement2024-09-0505 September 2024
[Table view]Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) Supplement 05000354/LER-2024-001, Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT)2024-07-0202 July 2024 Invalid Primary Containment Integrated Leak Rate As-Found Test (ILRT) 05000354/LER-2023-003-01, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-03-19019 March 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram 05000354/LER-2023-003, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram2024-02-12012 February 2024 Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram 05000354/LER-2023-001-02, Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable2023-09-25025 September 2023 Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable 05000354/LER-2023-001-01, Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable2023-09-11011 September 2023 Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable 05000354/LER-2023-001, Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable2023-06-20020 June 2023 Technical Specification Required Shutdown Due to Declaring the Suppression Chamber and Primary Containment Inoperable 05000354/LER-1922-002, Inoperable Isolation Actuation Instrumentation Caused by Failure to Remove Electrical Jumper2023-01-18018 January 2023 Inoperable Isolation Actuation Instrumentation Caused by Failure to Remove Electrical Jumper 05000354/LER-2022-001, B EDG Inoperable Resulting in a Condition Prohibited by Technical Specifications2022-03-18018 March 2022 B EDG Inoperable Resulting in a Condition Prohibited by Technical Specifications 05000354/LER-2021-001, Safety Relief Valve (SRV) As-Found Setpoint Failures2021-08-13013 August 2021 Safety Relief Valve (SRV) As-Found Setpoint Failures 05000354/LER-2019-002, Safety Relief Valve (SRV) As-found Set-point Failures2020-01-0606 January 2020 Safety Relief Valve (SRV) As-found Set-point Failures 05000354/LER-2019-001, Manual Scram and Manual Actuation of Reactor Core Isolation Cooling2019-10-0202 October 2019 Manual Scram and Manual Actuation of Reactor Core Isolation Cooling 05000354/LER-2018-004, High Pressure Coolant Injection System Inoperable Due to Failed Fuse2018-11-20020 November 2018 High Pressure Coolant Injection System Inoperable Due to Failed Fuse 05000354/LER-2018-002-01, Safety Relief Valve L (SRV) As-Found Setpoint Failure2018-10-0303 October 2018 Safety Relief Valve L (SRV) As-Found Setpoint Failure 05000354/LER-2018-003-01, Feedwater Isolation Valve Leakage Exceeded Technical Specification Limit2018-09-12012 September 2018 Feedwater Isolation Valve Leakage Exceeded Technical Specification Limit LR-N18-0065, Safety Relief Valve (SRV) As-Found Setpoint Failure2018-06-18018 June 2018 Safety Relief Valve (SRV) As-Found Setpoint Failure 05000354/LER-2018-001, Operations with a Potential to Drain the Reactor Vessel Without Secondary Containment2018-06-18018 June 2018 Operations with a Potential to Drain the Reactor Vessel Without Secondary Containment 05000354/LER-2018-003, Feedwater Isolation Valve Leakage Exceeded Technical Specification Limit2018-06-18018 June 2018 Feedwater Isolation Valve Leakage Exceeded Technical Specification Limit 05000354/LER-1917-001, Regarding Secondary Containment Door Not Latched in Closed Position2017-07-0707 July 2017 Regarding Secondary Containment Door Not Latched in Closed Position 05000354/LER-2016-006, Regarding Mode Change Without B Channel Level Instrumentation Operable2017-01-0909 January 2017 Regarding Mode Change Without B Channel Level Instrumentation Operable 05000354/LER-2016-005, Regarding Reactor Protection System Actuation While the Reactor Was Shutdown2017-01-0404 January 2017 Regarding Reactor Protection System Actuation While the Reactor Was Shutdown 05000354/LER-2016-004, Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment2016-12-20020 December 2016 Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment 05000354/LER-2016-003, Regarding As-Found Values for Safety Relief Valve Lift Set Points Exceed Technical Specification Allowable Limit2016-12-20020 December 2016 Regarding As-Found Values for Safety Relief Valve Lift Set Points Exceed Technical Specification Allowable Limit 05000354/LER-2016-002, Regarding High Pressure Coolant Injection System Inoperable2016-10-0505 October 2016 Regarding High Pressure Coolant Injection System Inoperable 05000354/LER-2016-001, Regarding High Pressure Coolant Injection System Found to Be Inoperable During Testing2016-10-0404 October 2016 Regarding High Pressure Coolant Injection System Found to Be Inoperable During Testing 05000354/LER-2015-005, Regarding Reactor Scram Due to Invalid RRCS Actuation2015-11-24024 November 2015 Regarding Reactor Scram Due to Invalid RRCS Actuation 05000354/LER-2015-004, Regarding As-Found Values for Safety Relief Valve Lift Set Points Exceed Technical Specification Allowable Limit2015-07-30030 July 2015 Regarding As-Found Values for Safety Relief Valve Lift Set Points Exceed Technical Specification Allowable Limit 05000354/LER-2015-003, Regarding Conditions Prohibited by Technical Specifications Due to Low Pressure ECCS2015-07-0606 July 2015 Regarding Conditions Prohibited by Technical Specifications Due to Low Pressure ECCS 05000354/LER-2015-002, Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment2015-06-10010 June 2015 Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment 05000354/LER-2015-001, Regarding Conditions Prohibited by Technical Specifications Due to Core Spray Lnoperabilities2015-05-29029 May 2015 Regarding Conditions Prohibited by Technical Specifications Due to Core Spray Lnoperabilities 05000354/LER-2013-011, Regarding Filtration, Recirculation, and Ventilation System Exceeded Technical Specification Allowed Outage Time2015-03-25025 March 2015 Regarding Filtration, Recirculation, and Ventilation System Exceeded Technical Specification Allowed Outage Time 05000354/LER-2013-010, Regarding Loss of Both Control Room Chillers2014-02-18018 February 2014 Regarding Loss of Both Control Room Chillers 05000354/LER-2013-009, Regarding Automatic Actuation of the Reactor Protection System Due to a Main Turbine Trip2014-01-28028 January 2014 Regarding Automatic Actuation of the Reactor Protection System Due to a Main Turbine Trip 05000354/LER-2013-008, Regarding Automatic Actuation of the Reactor Protection System Due to a Main Turbine Trip2014-01-28028 January 2014 Regarding Automatic Actuation of the Reactor Protection System Due to a Main Turbine Trip 05000354/LER-2013-007, Regarding As-Found Values for Safety Relief Valve Lift Set Points Exceed Technical Specification Allowable Limit2014-01-16016 January 2014 Regarding As-Found Values for Safety Relief Valve Lift Set Points Exceed Technical Specification Allowable Limit 05000354/LER-2013-006, Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Operable2013-12-24024 December 2013 Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment Operable 05000354/LER-2013-005, Regarding Low-Low Set Safety/Relief Valve Pilot Solenoid Operated Valve Failed As-Found Testing2013-12-17017 December 2013 Regarding Low-Low Set Safety/Relief Valve Pilot Solenoid Operated Valve Failed As-Found Testing 05000354/LER-2013-004, Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment2013-12-10010 December 2013 Regarding Operations with a Potential to Drain the Reactor Vessel (OPDRV) Without Secondary Containment 05000354/LER-2013-003, Through-wall Flaw Discovered on RHR Shutdown Cooling Return Vent Line2013-08-0808 August 2013 Through-wall Flaw Discovered on RHR Shutdown Cooling Return Vent Line 05000354/LER-2013-002, Regarding Reactor Scram Due to Degrading Condenser Vacuum2013-08-0808 August 2013 Regarding Reactor Scram Due to Degrading Condenser Vacuum 05000354/LER-2013-001, Regarding High Pressure Coolant Injection System Inoperable Due to Control Relay Failure2013-06-0505 June 2013 Regarding High Pressure Coolant Injection System Inoperable Due to Control Relay Failure 05000354/LER-2012-004-01, Regarding As-found Values for Safety Relief Valve Lift Setpoints Exceed Technical Specification Allowable2012-12-10010 December 2012 Regarding As-found Values for Safety Relief Valve Lift Setpoints Exceed Technical Specification Allowable 05000354/LER-2012-006, High Pressure Coolant Injection System Inoperable2012-10-31031 October 2012 High Pressure Coolant Injection System Inoperable 05000354/LER-2012-005, Regarding RCIC Bearing Low Oil Pressure Indication on Remote Shutdown Panel Inoperable2012-08-23023 August 2012 Regarding RCIC Bearing Low Oil Pressure Indication on Remote Shutdown Panel Inoperable 05000354/LER-2012-004, As Found Values for Safety Relief Valve Lift Setpoints Exceed Technical Specification Allowable2012-07-0303 July 2012 As Found Values for Safety Relief Valve Lift Setpoints Exceed Technical Specification Allowable 05000354/LER-2012-003, Regarding Operation with the Potential to Drain the Reactor Vessel2012-05-14014 May 2012 Regarding Operation with the Potential to Drain the Reactor Vessel 05000354/LER-2012-002, Regarding High Pressure Coolant Injection System Inoperable2012-05-14014 May 2012 Regarding High Pressure Coolant Injection System Inoperable 05000354/LER-2012-001, Regarding Average Power Range Monitor Flow Unit Summers Out of Tech Spec Tolerance2012-05-0303 May 2012 Regarding Average Power Range Monitor Flow Unit Summers Out of Tech Spec Tolerance LR-N12-0114, Retraction of Licensee Event Report 2011-0012012-04-13013 April 2012 Retraction of Licensee Event Report 2011-001 LR-N05-0143, Special Report 05-001-01 Regarding the Cause of Failure and Channel Restoration2005-03-31031 March 2005 Special Report 05-001-01 Regarding the Cause of Failure and Channel Restoration 2024-09-05 |
Event date: | |
---|---|
Report date: | |
Reporting criterion: | 10 CFR 50.73(a)(2)(iv)(A), System Actuation |
3542023003R00 - NRC Website | |
text
Thomas R. Agster Plant Manager, Hope Creek Generating Station, PSEG Nuclear LLC PO Box236 PSEG I NUCLEAR Hancocks Bridge, New Jersey 08038-0221 LR-N24-0008 February 12, 2024 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354 10 CFR 50.73
Subject:
Licensee Event Report 2023-003-00, Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram In accordance with 10 CFR 50.73(a)(2)(iv)(A), PSEG Nuclear LLC submits the attached licensee event report (LER).
There are no regulatory commitments contained in this letter.
Please contact Bernadette Humphrey at (856) 339 - 1308 if you have questions.
- so.-.i(.lA. c.. Mo5~
l>c,A. 11-ftCPflA'J.'{ * "002.
T omas R. Agster Plant Manager, Hope Creek Generating Station Attachment: Licensee Event Report cc:
USNRC Regional Administrator - Region 1 USN RC NRR Project Manager - Hope Creek USNRC Senior Resident Inspector-Hope Creek NJ Department of Environmental Protection, Bureau of Nuclear Engineering
Abstract
Hope Creek Generating Station 00354 3
Inadvertent Main Turbine Control Valve Closure Caused Reactor Scram 12 14 2023 2023 003 00 02 12 2024 1
88 Bernadette Humphrey (856) 339 - 1308 03 15 2024 ABSTRACT On December 14, 2023, at 1939 EST, while attempting to manually close a failed open #4 turbine control valve (TCV), the #4 TCV closed rapidly. This caused a scram on average power range monitor (APRM) high neutron flux due to a rise in reactor pressure.
Hope Creek Generating Station (HCGS) repaired the #4 TCV by replacing the servo valve. In addition, the fast-acting solenoid (FAS) valve and the shutoff valve were replaced. HCGS synchronized the Main Generator to the grid on December 17, 2023, at 1537 EST.
/~\\
"-+-i **,......, +o' 00 I
[{]
[{] Page of
- 3. LER NUMBER YEAR SEQUENTIAL NUMBER REV NO.
052 050 PREVIOUS EVENTS There have been no previous events at HCGS in the last three years where the #4 TCV caused a reactor scram.
CORRECTIVE ACTIONS
Hope Creek Generating Station (HCGS) repaired the #4 TCV by replacing the servo valve, the fast-acting solenoid valve, and shutoff valve. HCGS synchronized the Main Generator to the grid on December 17, 2023, at 1537 EST.
Additional corrective actions will be determined in the Root Cause Evaluation.
COMMITMENTS
There are no regulatory commitments in this LER.
3 3
Hope Creek Generating Station 00354 2023 003 00