{{#Wiki_filter:November 12, 2021
{{#Wiki_filter:==SUBJECT:==
 
==SUBJECT:==
PERRY NUCLEAR POWER PLANT - INTEGRATED INSPECTION REPORT 05000440/2021003
PERRY NUCLEAR POWER PLANT - INTEGRATED INSPECTION REPORT 05000440/2021003


Line 30: Line 28:
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.


Sincerely, Signed by Dickson, Billy on 11/12/21 Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects Docket No. 05000440 License No. NPF-58
Sincerely, Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects Docket No. 05000440 License No. NPF-58


===Enclosure:===
===Enclosure:===
As stated
As stated  


==Inspection Report==
==Inspection Report==
Docket Number: 05000440 License Number: NPF-58 Report Number: 05000440/2021003 Enterprise Identifier: I-2021-003-0100 Licensee: Energy Harbor Nuclear Corp.
Docket Number: 05000440
 
License Number: NPF-58
 
Report Number: 05000440/2021003
 
Enterprise Identifier: I-2021-003-0100
 
Licensee: Energy Harbor Nuclear Corp.
 
Facility: Perry Nuclear Power Plant
 
Location: Perry, OH
 
Inspection Dates: July 01, 2021 to September 30, 2021
 
Inspectors: T. Ospino, Resident Inspector J. Steffes, Senior Resident Inspector
 
Approved By: Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects


Facility: Perry Nuclear Power Plant Location: Perry, OH Inspection Dates: July 01, 2021 to September 30, 2021 Inspectors: T. Ospino, Resident Inspector J. Steffes, Senior Resident Inspector Approved By: Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects Enclosure
Enclosure


=SUMMARY=
=SUMMARY=
Line 44: Line 60:


===List of Findings and Violations===
===List of Findings and Violations===
No findings or violations of more than minor significance were identified.
No findings or violations of more than minor significance were identified.


Line 62: Line 77:


==REACTOR SAFETY==
==REACTOR SAFETY==
==71111.01 - Adverse Weather Protection==
==71111.01 - Adverse Weather Protection==
===External Flooding Sample (IP Section 03.03) (1 Sample)===
===External Flooding Sample (IP Section 03.03) (1 Sample)===
: (1) Ground erosion impacting flood mitigation barrier on August 5, 2021
: (1) Ground erosion impacting flood mitigation barrier on August 5, 2021


==71111.04 - Equipment Alignment==
==71111.04 - Equipment Alignment==
===Partial Walkdown Sample (IP Section 03.01) (3 Samples)===
===Partial Walkdown Sample (IP Section 03.01) (3 Samples)===
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
: (1) Division 1 direct current system while the division 3 diesel was unavailable on August 31, 2021
: (1) Division 1 direct current system while the division 3 diesel was unavailable on August 31, 2021
: (2) Low pressure core spray system on September 11, 2021 (3)   "B" residual heat removal system (RHR) while the "A" RHR system was unavailable for maintenance on September 21, 2021
: (2) Low pressure core spray system on September 11, 2021 (3) "B" residual heat removal system (RHR) while the "A" RHR system was unavailable for maintenance on September 21, 2021


===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
===Complete Walkdown Sample (IP Section 03.02) (1 Sample)===
Line 79: Line 91:


==71111.05 - Fire Protection==
==71111.05 - Fire Protection==
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)===
===Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)===
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:
Line 90: Line 101:


==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
==71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance==
 
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)
Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01)
(1 Sample)
: (1) The inspectors observed and evaluated licensed operator performance in the Control Room during downpower for control rod sequence exchange and surveillance testing on August 28, 2021.
: (1) The inspectors observed and evaluated licensed operator performance in the Control Room during downpower for control rod sequence exchange and surveillance testing on August 28, 2021.


Line 100: Line 109:


==71111.12 - Maintenance Effectiveness==
==71111.12 - Maintenance Effectiveness==
Quality Control (IP Section 03.02)


Quality Control (IP Section 03.02)
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:
The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:


==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
==71111.13 - Maintenance Risk Assessments and Emergent Work Control==
===Risk Assessment and Management Sample (IP Section 03.01) (7 Samples)===
===Risk Assessment and Management Sample (IP Section 03.01) (7 Samples)===
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:
    (1)   "B" average power range monitor card failure on July 14, 2021
 
(1) "B" average power range monitor card failure on July 14, 2021
: (2) Reactor water cleanup system filter inlet temperature on July 26, 2021
: (2) Reactor water cleanup system filter inlet temperature on July 26, 2021
: (3) Nuclear closed cooling system high temperature alarm emergent work on July 27, 2021
: (3) Nuclear closed cooling system high temperature alarm emergent work on July 27, 2021
Line 117: Line 126:


==71111.15 - Operability Determinations and Functionality Assessments==
==71111.15 - Operability Determinations and Functionality Assessments==
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
===Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)===
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:
Line 126: Line 134:


==71111.18 - Plant Modifications==
==71111.18 - Plant Modifications==
Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)


Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02)
(1 Sample)
The inspectors evaluated the following temporary or permanent modifications:
The inspectors evaluated the following temporary or permanent modifications:
: (1) Electric fire pump oil system modification as part of the equivalent change package 20-0090-001 on July 20, 2021
: (1) Electric fire pump oil system modification as part of the equivalent change package 20-0090-001 on July 20, 2021


==71111.19 - Post-Maintenance Testing==
==71111.19 - Post-Maintenance Testing==
===Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)===
===Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)===
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:
Line 139: Line 145:
: (2) Division 2 EDG RPM meter replacement on July 2, 2021
: (2) Division 2 EDG RPM meter replacement on July 2, 2021
: (3) Unit 2 2A normal battery charger following capacitor replacement on July 13, 2021
: (3) Unit 2 2A normal battery charger following capacitor replacement on July 13, 2021
: (4) Average power range monitor channel B following flow card replacement NESC07771-001 on July 14, 2021 (5)   "A" RHR system following valve maintenance on July 20, 2021
: (4) Average power range monitor channel B following flow card replacement NESC07771-001 on July 14, 2021 (5) "A" RHR system following valve maintenance on July 20, 2021
: (6) Microwave tower seismic monitor system cable replacement on August 5, 2021
: (6) Microwave tower seismic monitor system cable replacement on August 5, 2021
: (7) RRCS following optical isolator card replacement on August 16, 2021
: (7) RRCS following optical isolator card replacement on August 16, 2021
: (8) Replacement of master trip unit for ECCS drywell pressure high channel "E" on August 17, 2021
: (8) Replacement of master trip unit for ECCS drywell pressure high channel "E" on August 17, 2021
: (9) Containment radiation monitor inboard suction isolation relay replacement on August 31, 2021
: (9) Containment radiation monitor inboard suction isolation relay replacement on August 31, 2021
==71111.22 - Surveillance Testing==
==71111.22 - Surveillance Testing==
The inspectors evaluated the following surveillance tests:
The inspectors evaluated the following surveillance tests:


Line 151: Line 157:
{{IP sample|IP=IP 71111.22|count=1}}
{{IP sample|IP=IP 71111.22|count=1}}


    (1)   "B" RHR system, ISI-E12-T1101-2 on July 27, 2021
(1) "B" RHR system, ISI-E12-T1101-2 on July 27, 2021


===RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)===
===RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)===
Line 157: Line 163:


==71114.06 - Drill Evaluation==
==71114.06 - Drill Evaluation==
 
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)
Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01)
(1 Sample)
: (1) The inspectors evaluated an ERO drill on September 15, 2021
: (1) The inspectors evaluated an ERO drill on September 15, 2021


Line 167: Line 171:


==OTHER ACTIVITIES - BASELINE==
==OTHER ACTIVITIES - BASELINE==
===71151 - Performance Indicator Verification


===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:
The inspectors verified licensee performance indicators submittals listed below:
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04) ===
 
MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===
{{IP sample|IP=IP 71151|count=1}}
{{IP sample|IP=IP 71151|count=1}}
: (1) Unit 1 (April 1, 2020 through March 31, 2021)
: (1) Unit 1 (April 1, 2020 through March 31, 2021)
Line 179: Line 185:
: (1) Unit 1 (April 1, 2020 through March 31, 2021)
: (1) Unit 1 (April 1, 2020 through March 31, 2021)


===71153 - Follow-Up of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03) ===
===71153 - Follow-Up of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03)===
{{IP sample|IP=IP 71153|count=1}}
{{IP sample|IP=IP 71153|count=1}}
: (1) Review of personnel performance following a plant scram during the evolution on March 4,
: (1) Review of personnel performance following a plant scram during the evolution on March 4,


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Minor Violation                                                                     71152 Minor Violation: On February 2, 2021, during performance of the SVI-E22-T2001, HPCS pump and valve operability test, Revision 35, the NRC inspectors noted that the licensee had left the high-pressure core spray (HPCS) pump room water-tight door open during the surveillance test for passage. Procedure OAI-0201 Operations General instructions and Good Operating Practices Revision 46, Attachment 1, section 6, states in part that, ECCS/RCIC pump room water-tight doors were designed to minimize suppression pool inventory loss due to an unisolable leak in the suction piping upstream of the containment isolation valve. These water-tight doors should remain closed except during the passage through them. Do not leave the door open or blocked open without permission from the Shift manager. The licensee restored compliance by closing the watertight door following the completion of the surveillance test.
Minor Violation 71152 Minor Violation: On February 2, 2021, during performance of the SVI-E22-T2001, HPCS pump and valve operability test, Revision 35, the NRC inspectors noted that the licensee had left the high-pressure core spray (HPCS) pump room water-tight door open during the surveillance test for passage. Procedure OAI-0201 Operations General instructions and Good Operating Practices Revision 46, Attachment 1, section 6, states in part that, ECCS/RCIC pump room water-tight doors were designed to minimize suppression pool inventory loss due to an unisolable leak in the suction piping upstream of the containment isolation valve. These water-tight doors should remain closed except during the passage through them. Do not leave the door open or blocked open without permission from the Shift manager. The licensee restored compliance by closing the watertight door following the completion of the surveillance test.


After multiple conversations with staff and management, the inspectors concluded permission to maintain the door open for other than passage was neither sought nor given. The inspectors questioned licensee staff to understanding better if their observation was in line with OAI-0201 procedural requirements. The licensee generated an action tracking item, ATL-2021-0270-ATA-59, to answer the inspectors questions but did not address the inspectors concerns associated with the procedural implementation. The inspectors reengaged licensee staff to reemphasize the concern related to not restoring plant configuration following passage through the HPCS pump room water-tight door. The licensee generated CR 2021-05010, NRC ID: Actions of OAI-201 not strictly adhered to during testing, to document the inspectors concern.
After multiple conversations with staff and management, the inspectors concluded permission to maintain the door open for other than passage was neither sought nor given. The inspectors questioned licensee staff to understanding better if their observation was in line with OAI-0201 procedural requirements. The licensee generated an action tracking item, ATL-2021-0270-ATA-59, to answer the inspectors questions but did not address the inspectors concerns associated with the procedural implementation. The inspectors reengaged licensee staff to reemphasize the concern related to not restoring plant configuration following passage through the HPCS pump room water-tight door. The licensee generated CR 2021-05010, NRC ID: Actions of OAI-201 not strictly adhered to during testing, to document the inspectors concern.
Line 200: Line 206:
=DOCUMENTS REVIEWED=
=DOCUMENTS REVIEWED=


Inspection Type             Designation       Description or Title                                       Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                                 Date
Procedure Date
71111.01   Calibration       2021-04069         Ground Erosion on East side of Owner Controlled Area       5/19/2021
71111.01 Calibration 2021-04069 Ground Erosion on East side of Owner Controlled Area 5/19/2021
Records                             Fencing Continues to Degrade
Records Fencing Continues to Degrade
71111.04   Drawings         206-0051-00000     Class 1E DC System                                         DDD
71111.04 Drawings 206-0051-00000 Class 1E DC System DDD
256-0051-00000     Class 1E DC System                                         DDD
256-0051-00000 Class 1E DC System DDD
2-0705-00000     Low Pressure Core Spray System                             HH
2-0705-00000 Low Pressure Core Spray System HH
Procedures       ELI-R42           Direct Current Systems: Batteries Chargers Switchboards   8
Procedures ELI-R42 Direct Current Systems: Batteries Chargers Switchboards 8
VLI-12             Residual Heat Removal System                               9/21/2021
VLI-12 Residual Heat Removal System 9/21/2021
VLI-C41           Standby Liquid Control System                             9/16/2021
VLI-C41 Standby Liquid Control System 9/16/2021
VLI-E21           Low Pressure Core Spray System                             11
VLI-E21 Low Pressure Core Spray System 11
71111.05   Corrective Action ATA-2021-12850     Pre-Fire Plan FPI-OIB Page 6 Needs Corrected as it         9/9/2021
71111.05 Corrective Action ATA-2021-12850 Pre-Fire Plan FPI-OIB Page 6 Needs Corrected as it 9/9/2021
Documents                           Appears That Ventilation Panel 1H51-P038 is being
Documents Appears That Ventilation Panel 1H51-P038 is being
Resulting from                       Depicted Instead of Gaitronics Station R51-H071(IBH-01).
Resulting from Depicted Instead of Gaitronics Station R51-H071(IBH-01).
Inspection
Inspection
Fire Plans       1AB-2             Unit 1 599 Elevation                                     8/2/2021
Fire Plans 1AB-2 Unit 1 599 Elevation 8/2/2021
1CC-3a             Unit 1- Division-2 Diesel Generator Switchgear and Reactor 7/28/2021
1CC-3a Unit 1-Division-2 Diesel Generator Switchgear and Reactor 7/28/2021
Protection System Room
Protection System Room
1CC-4C and         125 Volt D-C Distribution and Battery RMS 638-6 Elev     8/9/2021
1CC-4C and 125 Volt D-C Distribution and Battery RMS 638-6 Elev 8/9/2021
1CC-4D
1CC-4D
1DG-1A             Unit 1- Division 2 Diesel Generator Building 6206 and   7/27/2021
1DG-1A Unit 1-Division 2 Diesel Generator Building 6206 and 7/27/2021
6466
6466
1RB-1B             Unit 1 Containment to Drywell Space                       9/16/2021
1RB-1B Unit 1 Containment to Drywell Space 9/16/2021
DG-1D             Diesel Generator Building 620 6 and 646 6             8/9/2021
DG-1D Diesel Generator Building 620 6 and 646 6 8/9/2021
OIB-3             Intermediate Building 620 6 Elevation                   9/9/2021
OIB-3 Intermediate Building 620 6 Elevation 9/9/2021
71111.11Q Corrective Action 2021-06658         ICS Rod Scram Timing Recorder Software Recorded 11         9/2/2021
71111.11Q Corrective Action 2021-06658 ICS Rod Scram Timing Recorder Software Recorded 11 9/2/2021
Documents                           Control Rods with Valid Scram Times and 7 Rods with
Documents Control Rods with Valid Scram Times and 7 Rods with
Invalid Scram Time Data.
Invalid Scram Time Data.
Miscellaneous     Drill             Perry ERO Integrated Drill Scenario Guide                 9/15/2021
Miscellaneous Drill Perry ERO Integrated Drill Scenario Guide 9/15/2021
Evolution Specific Perry Nuclear Power Plant August 2021 Sequence             0
Evolution Specific Perry Nuclear Power Plant August 2021 Sequence 0
Reactivity Plan   Exchange
Reactivity Plan Exchange
OTL               OTL 3058 2021-03_Perry SGC-1 Simulator Out of the Box     7/26/2021
OTL OTL 3058 2021-03_Perry SGC-1 Simulator Out of the Box 7/26/2021
71111.12   Procedures       SVI-C85-T0422     Turbine Bypass System Response Time and System             4
71111.12 Procedures SVI-C85-T0422 Turbine Bypass System Response Time and System 4
Functional Check
Functional Check
Inspection Type             Designation     Description or Title                                       Revision or
Inspection Type Designation Description or Title Revision or
Procedure                                                                                               Date
Procedure Date
71111.13   Corrective Action 2021-05710     NCC HX Outlet Temp High Alarm                             7/27/2021
71111.13 Corrective Action 2021-05710 NCC HX Outlet Temp High Alarm 7/27/2021
Documents         2021-06189     Emergency Diesel Generator Signature Analysis Results     8/16/2021
Documents 2021-06189 Emergency Diesel Generator Signature Analysis Results 8/16/2021
21-06319     Leak on C85 system                                         8/20/2021
21-06319 Leak on C85 system 8/20/2021
CR 2021-05668   RWCU Filer Demin Inlet Temperature May Not be Valid       7/26/2021
CR 2021-05668 RWCU Filer Demin Inlet Temperature May Not be Valid 7/26/2021
Miscellaneous     Perry logs     Logs 13-15 July 2021                                       7/15/2021
Miscellaneous Perry logs Logs 13-15 July 2021 7/15/2021
Procedures       SOI-N34         Main Lube Oil System                                       23
Procedures SOI-N34 Main Lube Oil System 23
Work Orders       200858816       Communication Error on N240/CR                             7/12/2021
Work Orders 200858816 Communication Error on N240/CR 7/12/2021
200860379       DIV 2 RRCS Tripped Offline Due to Optical Isolater Failure 8/16/2021
200860379 DIV 2 RRCS Tripped Offline Due to Optical Isolater Failure 8/16/2021
Error Code 2C2509 HPII/OI System TST03 Card Input Path
Error Code 2C2509 HPII/OI System TST03 Card Input Path
Failed System Test CR# 2021-06057
Failed System Test CR# 2021-06057
71111.15   Calculations     GEN-022         Mission Times                                             0
71111.15 Calculations GEN-022 Mission Times 0
Corrective Action 2021-05079     No Response from DIV 2 DG RPM Meter                       7/1/2021
Corrective Action 2021-05079 No Response from DIV 2 DG RPM Meter 7/1/2021
Documents         2021-05317     Communication Error on Accelerometer Free Field by         7/12/2021
Documents 2021-05317 Communication Error on Accelerometer Free Field by 7/12/2021
Microwave Tower Building
Microwave Tower Building
21-05386     APRM B Flow Test Potentiometer #1 Broken                   7/14/2021
21-05386 APRM B Flow Test Potentiometer #1 Broken 7/14/2021
21-06057     RRCS Tripped Offline                                       8/10/2021
21-06057 RRCS Tripped Offline 8/10/2021
CR 2021-06174   Aux Switch Guide Arm Broken on ESW A Discharge Strainer   08/15/2021
CR 2021-06174 Aux Switch Guide Arm Broken on ESW A Discharge Strainer 08/15/2021
Blowdown Valve
Blowdown Valve
CR 2021-06319   Leak on Steam Bypass and Pressure Regulator System         8/20/2021
CR 2021-06319 Leak on Steam Bypass and Pressure Regulator System 8/20/2021
Corrective Action 2021-06049     Seismic Monitor Indication Card Jumper Requirement         8/10/2021
Corrective Action 2021-06049 Seismic Monitor Indication Card Jumper Requirement 8/10/2021
Documents
Documents
Resulting from
Resulting from
Inspection
Inspection
Drawings         302-0021-00000 Steam Bypass and Pressure Regulation System               U
Drawings 302-0021-00000 Steam Bypass and Pressure Regulation System U
Work Orders       200321593       Bypass Valve Timing Test with Accumulators Isolated       4/15/2009
Work Orders 200321593 Bypass Valve Timing Test with Accumulators Isolated 4/15/2009
71111.18   Engineering       ECP 20-0090-001 Replace the Motor Fire Pump Motors Upper and Lower Oil   0
71111.18 Engineering ECP 20-0090-001 Replace the Motor Fire Pump Motors Upper and Lower Oil 0
Changes                           Drain Plugs with Drain Valves for Ease of Sampling
Changes Drain Plugs with Drain Valves for Ease of Sampling
71111.19   Miscellaneous     NOP-WM-4300-   Post Maintenance Checklist                                 7/20/2021
71111.19 Miscellaneous NOP-WM-4300- Post Maintenance Checklist 7/20/2021
Procedures       ICI-C-C22-2     Redundant Reactivity Control System (RRCS) Analog Trip     3
Procedures ICI-C-C22-2 Redundant Reactivity Control System (RRCS) Analog Trip 3
Module
Module
Work Orders       200585453       Replace 7300MFD Caps* BTRY CHGR FD-2-A                     7/13/2021
Work Orders 200585453 Replace 7300MFD Caps* BTRY CHGR FD-2-A 7/13/2021
200773676       Replace Power Supply PS22 in 1H13P0672                     6/30/2021
200773676 Replace Power Supply PS22 in 1H13P0672 6/30/2021
Inspection Type         Designation       Description or Title                                     Revision or
 
Procedure                                                                                             Date
Inspection Type Designation Description or Title Revision or
200773858         Replace MTU 1B21N0694E                                   8/17/2021
Procedure Date
200794131         Perform MCC Bucket EF1D107-B Checks to (1D17F0081B)       8/30/2021
200773858 Replace MTU 1B21N0694E 8/17/2021
200855016         Replace APRM B Flow Card                               7/14/2021
200794131 Perform MCC Bucket EF1D107-B Checks to (1D17F0081B) 8/30/2021
200858139         No Response from Div 2 DG RPM Meter                       7/2/2021
200855016 Replace APRM B Flow Card 7/14/2021
200858816         Communication Error on N240/CR                           7/12/2021
200858139 No Response from Div 2 DG RPM Meter 7/2/2021
71111.22   Procedures   ISI-E12-T1101-2   Residual Heat Removal System "B Loop" (RHR) Functional   7/27/2021
200858816 Communication Error on N240/CR 7/12/2021
71111.22 Procedures ISI-E12-T1101-2 Residual Heat Removal System "B Loop" (RHR) Functional 7/27/2021
Pressure Test Class 2
Pressure Test Class 2
PYBP-SITE-0029     Reactor Coolant System (RCS) Leakage Monitoring           8/6/2021
PYBP-SITE-0029 Reactor Coolant System (RCS) Leakage Monitoring 8/6/2021
SVI-B21-T0137E     ECCS Drywall Pressure High Channel E Functional For       8/17/2021
SVI-B21-T0137E ECCS Drywall Pressure High Channel E Functional For 8/17/2021
1B21-N694E
1B21-N694E
SVI-C51-T0027-B   APRM B Channel Functional for 1C51-K605B                 7/14/2021
SVI-C51-T0027-B APRM B Channel Functional for 1C51-K605B 7/14/2021
SVI-D51-T0324     Free Field Seismic Motion Recorder Channel Functional for 1
SVI-D51-T0324 Free Field Seismic Motion Recorder Channel Functional for 1
OD51-R240
OD51-R240
Work Orders   200778088         SVI-E22T1319 HPCS D/G Start and Load                     7/7/2021
Work Orders 200778088 SVI-E22T1319 HPCS D/G Start and Load 7/7/2021
200793722         SRV Pressure Actuation Channel E Functional for           8/16/2021
200793722 SRV Pressure Actuation Channel E Functional for 8/16/2021
1B21-N668E
1B21-N668E
200793780         (92d) ECCS Drywell Pressure High Channel A Functional   7/20/2021
200793780 (92d) ECCS Drywell Pressure High Channel A Functional 7/20/2021
for 1B21-N694A
for 1B21-N694A
200798467         SVI-E12T2002 RGR B Pmp & Vlv OPER (PI)                 7/27/2021
200798467 SVI-E12T2002 RGR B Pmp & Vlv OPER (PI) 7/27/2021
200807944         (SR) PTI-M15-P3015 B Grain Thief                       7/21/2021
200807944 (SR) PTI-M15-P3015 B Grain Thief 7/21/2021
71114.06   Procedures   ERO               2021 3rd Quarter ERO Table-Top Drill TSC-EOF 7/15/2021   8/5/2021
71114.06 Procedures ERO 2021 3rd Quarter ERO Table-Top Drill TSC-EOF 7/15/2021 8/5/2021
through 8/12/2021
through 8/12/2021
71153     Miscellaneous Event Notification EN # 55712 Manual Reactor Protection System (RPS)         4/5/2021
71153 Miscellaneous Event NotificationEN # 55712 Manual Reactor Protection System (RPS) 4/5/2021
Actuation At Zero Percent Power
Actuation At Zero Percent Power
11
11
}}
}}

Latest revision as of 11:59, 19 November 2024

Integrated Inspection Report 05000440/2021003
ML21316A046
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/12/2021
From: Billy Dickson
NRC/RGN-III/DRP/B2
To: Penfield R
Energy Harbor Nuclear Corp
References
IR 2021003
Download: ML21316A046 (13)


Text

SUBJECT:

PERRY NUCLEAR POWER PLANT - INTEGRATED INSPECTION REPORT 05000440/2021003

Dear Mr. Penfield:

On September 30, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant. On October 28, 2021, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects Docket No. 05000440 License No. NPF-58

Enclosure:

As stated

Inspection Report

Docket Number: 05000440

License Number: NPF-58

Report Number: 05000440/2021003

Enterprise Identifier: I-2021-003-0100

Licensee: Energy Harbor Nuclear Corp.

Facility: Perry Nuclear Power Plant

Location: Perry, OH

Inspection Dates: July 01, 2021 to September 30, 2021

Inspectors: T. Ospino, Resident Inspector J. Steffes, Senior Resident Inspector

Approved By: Billy C. Dickson, Jr., Chief Branch 2 Division of Reactor Projects

Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

The plant began the inspection period at full power. On August 28, 2021, reactor power was lowered to 65 percent to perform a rod sequence exchange. The Unit was returned to full power on August 31, 2021. The Unit remained at or near full power for the remainder of the inspection period with several exceptions. Specifically, on several occasions, power was reduced between 1 and 16 percent ranging from a few hours to several days due to environmental conditions.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident and regional inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time, the resident inspectors performed periodic site visits each week, increasing the amount of time on site as local COVID-19 conditions permitted.

As part of their onsite activities, resident inspectors conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities; and completed on site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

External Flooding Sample (IP Section 03.03) (1 Sample)

(1) Ground erosion impacting flood mitigation barrier on August 5, 2021

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Division 1 direct current system while the division 3 diesel was unavailable on August 31, 2021
(2) Low pressure core spray system on September 11, 2021 (3) "B" residual heat removal system (RHR) while the "A" RHR system was unavailable for maintenance on September 21, 2021

Complete Walkdown Sample (IP Section 03.02) (1 Sample)

(1) Standby liquid control system on September 16, 2021

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (6 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Division 2 emergency diesel generator (EDG) room on July 27, 2021
(2) Auxiliary building 599-foot elevation on August 2, 2021
(3) Diesel generator building on the 620-foot elevation on August 9, 2021
(4) 125 volt DC distribution and battery rooms on August 9, 2021
(5) Intermediate building 620-foot elevation on September 9, 2021
(6) Containment on September 16, 2021

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during downpower for control rod sequence exchange and surveillance testing on August 28, 2021.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (2 Samples)

(1) The inspectors observed and evaluated an operations crew-evaluation scenario in the plant training simulator on July 26, 2021.
(2) The inspectors observed and evaluated an operations crew-evaluation during the Emergency Response Organization (ERO) integrated drill on September 16, 2021.

71111.12 - Maintenance Effectiveness

Quality Control (IP Section 03.02)

The inspectors evaluated the effectiveness of maintenance and quality control activities to ensure the following SSC remains capable of performing its intended function:

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) "B" average power range monitor card failure on July 14, 2021

(2) Reactor water cleanup system filter inlet temperature on July 26, 2021
(3) Nuclear closed cooling system high temperature alarm emergent work on July 27, 2021
(4) Seismic monitor system emergent work on August 5, 2021
(5) Redundant reactivity control system (RRCS) emergent work on August 10, 2021
(6) Division 3 EDG power cylinder P6 emergent work on August 18, 2021
(7) Steam bypass and pressure regulator system emergent work on August 20, 2021

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) Division 2 EDG operability determination following RPM meter failure during surveillance run on July 2, 2021
(2) RRCS based on testing card error code on August 10, 2021
(3) Emergency service water "A" discharge strainer backwash valve guide arm broken during maintenance on August 24 to August 25, 2021
(4) Steam bypass and pressure regulating system accumulator leak on August 26 to August 27, 2021

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (1 Sample)

The inspectors evaluated the following temporary or permanent modifications:

(1) Electric fire pump oil system modification as part of the equivalent change package 20-0090-001 on July 20, 2021

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (9 Samples)

The inspectors evaluated the following post-maintenance test activities to verify system operability and functionality:

(1) Channel "D" and "H" average power range monitor system power supply replacement on June 30, 2021
(2) Division 2 EDG RPM meter replacement on July 2, 2021
(3) Unit 2 2A normal battery charger following capacitor replacement on July 13, 2021
(4) Average power range monitor channel B following flow card replacement NESC07771-001 on July 14, 2021 (5) "A" RHR system following valve maintenance on July 20, 2021
(6) Microwave tower seismic monitor system cable replacement on August 5, 2021
(7) RRCS following optical isolator card replacement on August 16, 2021
(8) Replacement of master trip unit for ECCS drywell pressure high channel "E" on August 17, 2021
(9) Containment radiation monitor inboard suction isolation relay replacement on August 31, 2021

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Inservice Testing (IP Section 03.01)

(1) "B" RHR system, ISI-E12-T1101-2 on July 27, 2021

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) Reactor coolant system leakage review based on noted trend on August 6, 2021

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated an ERO drill on September 15, 2021

Drill/Training Evolution Observation (IP Section 03.02) (1 Sample)

The inspectors evaluated:

(1) ERO tabletop training evaluation on August 5,

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS05: Safety System Functional Failures (SSFFs) Sample (IP Section 02.04)===

(1) Unit 1 (April 1, 2020 through March 31, 2021)

MS06: Emergency AC Power Systems (IP Section 02.05) (1 Sample)

(1) Unit 1 (April 1, 2020 through March 31, 2021)

MS07: High Pressure Injection Systems (IP Section 02.06) (1 Sample)

(1) Unit 1 (April 1, 2020 through March 31, 2021)

71153 - Follow-Up of Events and Notices of Enforcement Discretion Personnel Performance (IP Section 03.03)

(1) Review of personnel performance following a plant scram during the evolution on March 4,

INSPECTION RESULTS

Minor Violation 71152 Minor Violation: On February 2, 2021, during performance of the SVI-E22-T2001, HPCS pump and valve operability test, Revision 35, the NRC inspectors noted that the licensee had left the high-pressure core spray (HPCS) pump room water-tight door open during the surveillance test for passage. Procedure OAI-0201 Operations General instructions and Good Operating Practices Revision 46, Attachment 1, section 6, states in part that, ECCS/RCIC pump room water-tight doors were designed to minimize suppression pool inventory loss due to an unisolable leak in the suction piping upstream of the containment isolation valve. These water-tight doors should remain closed except during the passage through them. Do not leave the door open or blocked open without permission from the Shift manager. The licensee restored compliance by closing the watertight door following the completion of the surveillance test.

After multiple conversations with staff and management, the inspectors concluded permission to maintain the door open for other than passage was neither sought nor given. The inspectors questioned licensee staff to understanding better if their observation was in line with OAI-0201 procedural requirements. The licensee generated an action tracking item, ATL-2021-0270-ATA-59, to answer the inspectors questions but did not address the inspectors concerns associated with the procedural implementation. The inspectors reengaged licensee staff to reemphasize the concern related to not restoring plant configuration following passage through the HPCS pump room water-tight door. The licensee generated CR 2021-05010, NRC ID: Actions of OAI-201 not strictly adhered to during testing, to document the inspectors concern.

Screening: The inspectors determined the performance deficiency was minor because they answered no to all of the questions contained in Section 05.01 of IMC 0612, Issue Screening. The performance deficiency is minor consistent with Example 4.a. of IMC 0612, Appendix E. Specifically, based on several factors such as personnel in the vicinity and the existence of control room alarms to alert operators of a leak in the room, leaving the doors open for a short duration had no safety impact and is, therefore, minor.

Enforcement:

This failure to comply with 10 CFR 50 Appendix B, Criterion V, Instructions, Procedures, and Drawings, constitutes a minor violation that is not subject to enforcement action in accordance with the NRCs Enforcement Policy.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 28, 2021, the inspectors presented the integrated inspection results to Mr. R. Penfield, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.01 Calibration 2021-04069 Ground Erosion on East side of Owner Controlled Area 5/19/2021

Records Fencing Continues to Degrade

71111.04 Drawings 206-0051-00000 Class 1E DC System DDD

256-0051-00000 Class 1E DC System DDD

2-0705-00000 Low Pressure Core Spray System HH

Procedures ELI-R42 Direct Current Systems: Batteries Chargers Switchboards 8

VLI-12 Residual Heat Removal System 9/21/2021

VLI-C41 Standby Liquid Control System 9/16/2021

VLI-E21 Low Pressure Core Spray System 11

71111.05 Corrective Action ATA-2021-12850 Pre-Fire Plan FPI-OIB Page 6 Needs Corrected as it 9/9/2021

Documents Appears That Ventilation Panel 1H51-P038 is being

Resulting from Depicted Instead of Gaitronics Station R51-H071(IBH-01).

Inspection

Fire Plans 1AB-2 Unit 1 599 Elevation 8/2/2021

1CC-3a Unit 1-Division-2 Diesel Generator Switchgear and Reactor 7/28/2021

Protection System Room

1CC-4C and 125 Volt D-C Distribution and Battery RMS 638-6 Elev 8/9/2021

1CC-4D

1DG-1A Unit 1-Division 2 Diesel Generator Building 6206 and 7/27/2021

6466

1RB-1B Unit 1 Containment to Drywell Space 9/16/2021

DG-1D Diesel Generator Building 620 6 and 646 6 8/9/2021

OIB-3 Intermediate Building 620 6 Elevation 9/9/2021

71111.11Q Corrective Action 2021-06658 ICS Rod Scram Timing Recorder Software Recorded 11 9/2/2021

Documents Control Rods with Valid Scram Times and 7 Rods with

Invalid Scram Time Data.

Miscellaneous Drill Perry ERO Integrated Drill Scenario Guide 9/15/2021

Evolution Specific Perry Nuclear Power Plant August 2021 Sequence 0

Reactivity Plan Exchange

OTL OTL 3058 2021-03_Perry SGC-1 Simulator Out of the Box 7/26/2021

71111.12 Procedures SVI-C85-T0422 Turbine Bypass System Response Time and System 4

Functional Check

Inspection Type Designation Description or Title Revision or

Procedure Date

71111.13 Corrective Action 2021-05710 NCC HX Outlet Temp High Alarm 7/27/2021

Documents 2021-06189 Emergency Diesel Generator Signature Analysis Results 8/16/2021

21-06319 Leak on C85 system 8/20/2021

CR 2021-05668 RWCU Filer Demin Inlet Temperature May Not be Valid 7/26/2021

Miscellaneous Perry logs Logs 13-15 July 2021 7/15/2021

Procedures SOI-N34 Main Lube Oil System 23

Work Orders 200858816 Communication Error on N240/CR 7/12/2021

200860379 DIV 2 RRCS Tripped Offline Due to Optical Isolater Failure 8/16/2021

Error Code 2C2509 HPII/OI System TST03 Card Input Path

Failed System Test CR# 2021-06057

71111.15 Calculations GEN-022 Mission Times 0

Corrective Action 2021-05079 No Response from DIV 2 DG RPM Meter 7/1/2021

Documents 2021-05317 Communication Error on Accelerometer Free Field by 7/12/2021

Microwave Tower Building

21-05386 APRM B Flow Test Potentiometer #1 Broken 7/14/2021

21-06057 RRCS Tripped Offline 8/10/2021

CR 2021-06174 Aux Switch Guide Arm Broken on ESW A Discharge Strainer 08/15/2021

Blowdown Valve

CR 2021-06319 Leak on Steam Bypass and Pressure Regulator System 8/20/2021

Corrective Action 2021-06049 Seismic Monitor Indication Card Jumper Requirement 8/10/2021

Documents

Resulting from

Inspection

Drawings 302-0021-00000 Steam Bypass and Pressure Regulation System U

Work Orders 200321593 Bypass Valve Timing Test with Accumulators Isolated 4/15/2009

71111.18 Engineering ECP 20-0090-001 Replace the Motor Fire Pump Motors Upper and Lower Oil 0

Changes Drain Plugs with Drain Valves for Ease of Sampling

71111.19 Miscellaneous NOP-WM-4300- Post Maintenance Checklist 7/20/2021

Procedures ICI-C-C22-2 Redundant Reactivity Control System (RRCS) Analog Trip 3

Module

Work Orders 200585453 Replace 7300MFD Caps* BTRY CHGR FD-2-A 7/13/2021

200773676 Replace Power Supply PS22 in 1H13P0672 6/30/2021

Inspection Type Designation Description or Title Revision or

Procedure Date

200773858 Replace MTU 1B21N0694E 8/17/2021

200794131 Perform MCC Bucket EF1D107-B Checks to (1D17F0081B) 8/30/2021

200855016 Replace APRM B Flow Card 7/14/2021

200858139 No Response from Div 2 DG RPM Meter 7/2/2021

200858816 Communication Error on N240/CR 7/12/2021

71111.22 Procedures ISI-E12-T1101-2 Residual Heat Removal System "B Loop" (RHR) Functional 7/27/2021

Pressure Test Class 2

PYBP-SITE-0029 Reactor Coolant System (RCS) Leakage Monitoring 8/6/2021

SVI-B21-T0137E ECCS Drywall Pressure High Channel E Functional For 8/17/2021

1B21-N694E

SVI-C51-T0027-B APRM B Channel Functional for 1C51-K605B 7/14/2021

SVI-D51-T0324 Free Field Seismic Motion Recorder Channel Functional for 1

OD51-R240

Work Orders 200778088 SVI-E22T1319 HPCS D/G Start and Load 7/7/2021

200793722 SRV Pressure Actuation Channel E Functional for 8/16/2021

1B21-N668E

200793780 (92d) ECCS Drywell Pressure High Channel A Functional 7/20/2021

for 1B21-N694A

200798467 SVI-E12T2002 RGR B Pmp & Vlv OPER (PI) 7/27/2021

200807944 (SR) PTI-M15-P3015 B Grain Thief 7/21/2021

71114.06 Procedures ERO 2021 3rd Quarter ERO Table-Top Drill TSC-EOF 7/15/2021 8/5/2021

through 8/12/2021

71153 Miscellaneous Event NotificationEN # 55712 Manual Reactor Protection System (RPS) 4/5/2021

Actuation At Zero Percent Power

11