November 12, 2020

SUBJECT:

PERRY NUCLEAR POWER PLANT - INTEGRATED INSPECTION REPORT 05000440/2020003 AND 07200069/2020001

Dear Mr. Payne:

On September 30, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant. On October 22, 2020, the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Billy C. Dickson, Jr, Chief Branch 2 Division of Reactor Projects

Docket Nos. 05000440; 07200069 License No. NPF-58

Enclosure:

As stated

Inspection Report

Docket Number:

05000440; 07200069

License Number:

NPF-58

Report Number:

05000440/2020003; 07200069/2020001

Enterprise Identifier: I-2020-003-0032

Licensee:

Energy Harbor Nuclear Corp.

Facility:

Perry Nuclear Power Plant

Location:

Perry, OH

Inspection Dates:

July 01, 2020 to September 30, 2020

Inspectors:

S. Bell, Health Physicist

R. Edwards, Senior Health Physicist

N. Fields, Health Physicist

J. Nance, Operations Engineer

T. Ospino, Resident Inspector

J. Steffes, Senior Resident Inspector

Approved By:

Billy C. Dickson, Jr, Chief

Branch 2

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

PLANT STATUS

The plant began the inspection period at rated thermal power. On September 12, 2020, reactor power was lowered to 58 percent to perform a rod sequence exchange. Operators returned the unit to rated thermal power on September 13, 2020. The unit remained at, or near, rated thermal power for the remainder of the inspection period except on the occasions where operators reduced power to maintain condensate demineralizer outlet temperature and high condenser circulating water outlet temperature at or below their respective upper limits due to environmental conditions. The power reductions varied between 1 and 16 percent of rated thermal power and lasted from a few hours to several days.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515, Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), resident inspectors were directed to begin telework and to remotely access licensee information using available technology. During this time the resident inspectors performed periodic site visits each week and during that time conducted plant status activities as described in IMC 2515, Appendix D; observed risk significant activities, and completed on-site portions of IPs. In addition, resident and regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on-site. The inspections documented below met the objectives and requirements for completion of the IP.

REACTOR SAFETY

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (2 Samples)

(1) Residual heat removal (RHR) system C on July 30, 2020
(2) Division 1 diesel generator on August 28, 2020

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during downpower for, and during, rod sequence exchange on September 12, 2020

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Samples)

(1) The inspectors observed and evaluated licensed operator performance in the simulator on August 31, 2020

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (1 Sample)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Fire protection system following excessive vibrations observed during motor fire pump functionality test on September 4, 2020

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Emergent work and risk assessment associated with the plant process computer upgrade activities between July 1 to August 7, 2020
(2) Emergent work and risk assessment associated with the overspeed trip work on the high pressure core spray (HPCS) system on August 8, 2020
(3) Emergent work and risk assessment associated with the unplanned inoperability of the standby liquid control (SLC) system on August 21, 2020
(4) Emergent work and risk assessment associated with reactor water cleanup system A on September 18 to 20, 2020

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (4 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) HPCS ESW 1P45F0552 check valve prompt operability determination on July 13, 2020
(2) SLC tank high level alarm during performance of standby liquid transfer system surveillance on August 20, 2020 3)

Local power range monitor operability challenged following gain adjustments that could not be validated due to plant process computer communication issues on July 21 to 23, 2020

(4) Review of compensatory measures associated with the unexpected seismic system non-functionality on August 24 to 26, 2020

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (7 Samples)

The inspectors evaluated the following post maintenance test activities to verify system operability and functionality:

(1) Unit 2 air compressor electrical breaker, H2210, functionality following refurbishment on July 20, 2020
(2) HPCS system following the replacement of the emergency service water heat exchanger relief valve on August 8, 2020
(3) Division 3 diesel generator system performance following potentiometer R3 replacement on August 8, 2020
(4) Axial power range monitor D channel calibration of 1C51-K605D following relay replacement on August 10, 2020
(5) Division 1 diesel generator system operability test following ventilation damper motor replacement on August 21, 2020
(6) SVI-C41-T1026, "Standby Liquid Control Boron Concentration," following chemical addition to restore SLC system operability on August 27, 2020
(7) Unit 2 air compressor test following the replacement of two Potter & Brumfield time delay relays on September 22, 2020

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance tests:

Surveillance Tests (other) (IP Section 03.01)

(1) Remote shutdown control panel reactor core isolation cooling system surveillance on July 21, 2020
(2) SVI-R44-T2002, "Division 2 Diesel Generator Starting Air SCV and FCV Operability Test" on July 27, 2020
(3) SVI-C41-T2001B, "Standby Liquid Control B Pump and Valve Operability Test" on July 31, 2020
(4) A RHR system operability test on September 20, 2020
(5) SVI-C51-T0027-A, "APRM A Channel Functional for 1C51-K6005A" on September 22, 2020
(6) B recirculating water pump hydraulic unit 1 functionality test following filter replacement on September 24, 2020

Inservice Testing (IP Section 03.01) (2 Samples)

(1) C RHR system operability test on July 30, 2020
(2) HPCS pump discharge pressure surveillance on August 2, 2020

RCS Leakage Detection Testing (IP Section 03.01) (1 Sample)

(1) Drywell floor drain sump surveillance on August 24, 2020

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Inspectors observed and evaluated licensee performance during the emergency response organization integrated drill on August 12 to 13,

RADIATION SAFETY

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Permanent Ventilation Systems (IP Section 03.01) (1 Sample)

The inspectors evaluated the configuration of the following permanently installed ventilation systems:

(1) Fuel Handling Building Ventilation System

Temporary Ventilation Systems (IP Section 03.02) (1 Sample)

The inspectors evaluated the configuration of the following temporary ventilation systems:

(1) Maintenance Rebuild Room 599' Intermediate Building

71124.06 - Radioactive Gaseous and Liquid Effluent Treatment

Walkdowns and Observations (IP Section 03.01) (3 Samples)

The inspectors evaluated the following radioactive effluent systems during walkdowns:

(1) Liquid Radwaste System - Auxiliary Building East 620 (including the Radiation Monitor) and the Radwaste Building 602' (including the Discharge Flow Control Valves)
(2) Unit One Plant Vent (including associated Radiation Monitor and sampling lines located in the Intermediate Building 682)
(3) Offgas Gaseous Effluent System (including the associated Radiation Monitor and sampling lines from the Turbine Building 620' to discharge header)

Sampling and Analysis (IP Section 03.02) (3 Samples)

(1) Inspectors evaluated the compensatory sample program
(2) Inspectors evaluated the sampling and sample analysis of the U1 Plant Vent
(3) Inspectors evaluated the sampling and sample analysis of the Unit 2 Turbine Power Complex Sump

Dose Calculations (IP Section 03.03) (2 Samples)

The inspectors evaluated the following dose calculations:

(1) January 2020 Liquid and Gaseous Effluent Release Data
(2) February 2020 Liquid and Gaseous Effluent Release Data

Abnormal Discharges (IP Section 03.04) (1 Sample)

The inspectors evaluated the following abnormal discharges:

(1) In-leakage into the Nuclear Closed Cooling (NCC) system in 2018-2019

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification

The inspectors verified licensee performance indicators submittals listed below:

MS08: Heat Removal Systems (IP Section 02.07)===

(1) Unit 1 (July 1, 2019-June 30, 2020)

MS09: Residual Heat Removal Systems (IP Section 02.08) (1 Sample)

(1) Unit 1 (July 1, 2019-June 30, 2020)

MS10: Cooling Water Support Systems (IP Section 02.09) (1 Sample)

(1) Unit 1 (July 1, 2019-June 30, 2020)

PR01: Radiological Effluent Technical Specifications/Offsite Dose Calculation Manual Radiological Effluent Occurrences (RETS/ODCM) Radiological Effluent Occurrences Sample (IP Section 02.16) (1 Sample)

(1) Unit 1 (07/01/2019-06/30/2020)

OTHER ACTIVITIES

- TEMPORARY INSTRUCTIONS, INFREQUENT AND ABNORMAL

60855.1 - Operation of an Independent Spent Fuel Storage Installation at Operating Plants Operation of an Independent Spent Fuel Storage Installation at Operating Plants

(1) The inspectors evaluated the licensees independent spent fuel storage installation (ISFSI) cask loading from August 17 to August 21, 2020. Specifically, the inspector observed the following activities:
  • Radiological contamination survey of the annulus between the transfer cask (HI-TRAC) and the Multi-Purpose Canister (MPC) and removing the annulus seal on August 17
  • Hydrostatic test of the lid-to-shell weld and the post-hydro visual and dye penetrant examinations of the lid-to-shell weld on August 18
  • Vacuum drying and backfill evolutions on August 18 and 19
  • Vent and drain port cover plate welding on August 19
  • Transfer of the MPC from the HI-TRAC to the storage cask (HI-STORM) and transport of the HI-STORM from the fuel handling building on August 20

The inspector performed a walkdown of the ISFSI pad, including independent radiation surveys, and a walkdown of the ISFSI haul path on August 20.

The inspectors evaluated the following:

  • Spent fuel selection for the 5 casks in the loading campaign
  • Selected condition reports written since November 2018
  • Selected 10 CFR 72.48 screenings performed since November 2018

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On July 31, 2020, the inspectors presented the radiation protection baseline inspection results to Mr. F. Payne, Site Vice President, and other members of the licensee staff.
  • On August 21, 2020, the inspectors presented the independent spent fuel storage installation cask loading inspection results to Mr. F. Payne, Site Vice President, and other members of the licensee staff.
  • On October 22, 2020, the inspectors presented the integrated inspection results to Mr. F. Payne, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

60855.1

ALARA Plans

200316

Load Spent Fuel into HI-STORM's # 919/920/921/922/923

Calculations

FM-067

Assemblies and Decay Heat for First Spent Fuel Dry

Storage Campaign

09/17/2010

Corrective Action

Documents

Selected Condition Reports

11/01/2018 to

08/21/2020

CR-2013-04223

MS-C-13-03-30: Spent Fuel Dry Storage FSAR Contains

Conflicting Direction

03/22/2013

CR-2020-04224

Auxiliary Hook Reeving Questioned

05/13/2020

CR-2020-06009

Dry Cask Storage - MPC #496 Drain Tube Length Short

07/28/2020

CR-2020-06816

MPC #500 Drain Tube Came Into Contact with HI-TRAC

08/31/2020

FCR30781002-

R1,

FCR30781007,

FCR30781009

Holtec Field Condition Reports

07/27/2020,

08/04/2020,

08/11/2020

Corrective Action

Documents

Resulting from

Inspection

CR-2020-06507

20 NRC ISFSI Inspection: PMI-0031, Fuel Handling

Building Crane Preventative Maintenance Errors

08/18/2020

Engineering

Changes

2.48 Evaluation

No. 1298

ECO 5014-266R1

2.48 Evaluation

No. 1353

SMDR-1021-2785

2.48 Screen No.

20-01017

Revision 10 to Perry 10 CFR 72.212 Evaluation Report

ECO 5014-266

Decrease the Local Temperature Limit Under Short-Term,

Off-Normal, and Accident Conditions from 650F to 572F

Engineering

Evaluations

Perry Nuclear Power Plant 10 CFR 72.212 Evaluations

Report

SMDR 1021-2785 MPC-68 Fabrication

09/24/2018

Miscellaneous

Selected 10 CFR 72.48 Screenings

11/01/2018 to

08/03/2020

ASME Section IX Welder Performance Qualifications

05/11/2020,

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

06/17/2020,

07/10/2020

20 SFDS Campaign Overall Dose Tracking

08/03/2020

2019 ISFSI Pad 40 CFR 90 and 10 CFR 72.104

Compliance

08/20/2020

Certifications for NDE Personnel

04/23/2020

Qualification Records for Dry Cask Personnel

08/03/2020,

08/19/2020

Fuel Bundle Sipping Records for the Perry 2020 Dry Cask

Campaign

07/27/2020

Cask Fuel Reports for MPC-0919-0496, MPC-0920-0497,

MPC-0921-0498, MPC-0922-0499, and MPC-0923-0500

08/03/2020

2018 Annual Environmental and Effluent Release Report

for the Perry Nuclear Power Plant

03/2019

2019 Annual Environmental and Effluent Release Report

for the Perry Nuclear Power Plant

03/2020

13-140

Change Notice 10 CFR 72.212 Report

08/01/2013

DOC-1025-011

Documentation Package for HI-TRAC 125D for First

Energy (Perry)

RAD 16-02392

Regulatory Applicability Determination Procedure GMI-

213 Rev. 18

Procedures

MC-GTAW

ASME Section IX Welding Procedure Specification

MN-GTAW

ASME Section IX Welding Procedure Specification

GMI-0210

Multi-Purpose Canister (MPC) Loading

GMI-0212

Spent Fuel Dry Storage Ancillary Equipment Preparation,

Inspection and Mobilization

GMI-0213

Multi-Purpose Canister (MPC) Sealing

18, 23, 24

GMI-0213,

MPC Helium Backfill Calculation, MPC #498

08/17/2020

GMI-0215

Spent Fuel Dry Storage Response to Abnormal Conditions

GMI-0220

Multi-Purpose Canister (MPC) Preparation for Loading

GMI-0221

HI-STORM Movement

GMI-0222

Multi-Purpose Canister (MPC) Transfer

HPI-D0005

RP Monitoring Requirements for Dry Fuel Storage Loading

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Operations

IOI-19

Spent Fuel Dry Cask Storage

NOP-LP-2601

Procedure/Work Instruction Use and Adherence

NOP-NF-3002,

Verification SNM Physical Inventory Summary,

MPC-0498-0921

08/15/2020

Radiation

Surveys

PY-M-20200808-

Can #22 / 8.177 kW MPC/HI-TRAC Contamination Survey

Hold Point 5.1.1

08/08/2020

PY-M-20200811-

Can #22 / 8.177 kW-MPC/HI-TRAC on Decon Pad Hold

Point 5.5.2

08/10/2020

PY-M-20200813-

Can #22 / 8.177 kW-Post Annulus Drain/Pre-Stack Up

Survey Hold Point 5.7.2

08/13/2020

PY-M-20200813-

Can #23 / 7.408 kW MPC/HI-TRAC Contamination Survey

Hold Point 5.1.1

08/13/2020

PY-M-20200813-

Can #22 / 8.177 kW-Top of HI-STORM/Contamination

Hold Point 5.7.11

08/13/2020

PY-M-20200813-

Can #22 / 8.177 kW-HI-STORM Survey Hold Point 5.7.13 /

ISFSI Survey Step 4.4.1

08/13/2020

Radiation Work

Permits (RWPs)

200315 through

200321

Dry Cask Storage Project

Self-

Assessments

ATL-2018-1297-

ATA-18

20 Perry Dry Cask Loading Campaign Readiness

Review

07/27/2020

MS-C-19-03-30

Fleet Oversight Audit Report: Independent Spent Fuel

Storage Installation (ISFSI)

03/28/2019

SA-BN-2020-

1861

20 Dry Cask Storage Pre-Campaign 4 Self-Assessment

05/29/2020

Work Orders

200692837

Prefab Hi-STORMs/4th Campaign

11/01/2019

200711367

Periodic Crane Maintenance on FHB Crane

05/21/2020

200752617

Special Lifting Device Testing PMI-0120

05/18/2020

200752622

Inspect Dry Cask Storage Concrete Areas

06/20/2019

200752623

Inspect Dry Cask Storage Concrete Areas

07/15/2020

200752641

PMI-0121 Int/Ext Visual Inspection

07/23/2020

200827374

Perform Inspection SFDS ANSI 14.6 Lift Devices

07/22/2020

71111.04

Drawings

2-0352-00000

Standby Diesel Generator Fuel Oil System

LL

2-0353-00000

Standby Diesel Generator Lube Oil

T

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

2-0354-00000

Standby Diesel Generator Jacket Water

V

Procedures

SOI-E12

Residual Heat Removal Systems (E12) Rev. 27

2/25/2020

SVI-E12-T1182C

RHR C LPCI Valve Lineup Verification and System Venting

Rev. 19

2/25/2020

VLI-E12

Residual Heat Removal System (E12) Rev. 15

03/26/2019

VLI-R45

Division 1 and 2 Diesel Generator Fuel Oil System (Unit 1)

VLI-R46

Division 1 and 2 Diesel Generator Jacket Water Systems

(Unit 1)

VLI-R47

Division 1 and 2 Diesel Generator Lube Oil

Work Orders

200752000

RHR PUMP C

07/30/2020

71111.11Q Miscellaneous

Evolution Specific

Reactivity Plan

Perry Nuclear Power Plant March 2020 Sequence

Exchange

Simulator Guide

OTLC-3058202009_PY-SGC1

Procedures

FTI-B-0002

Special Maneuver Control Rod Movement Sheet

09/03/2020

71111.12

Corrective Action

Documents

CR 2020-05132

Greater Than 25 Percent Drop in Battery Voltage When

Starting the Diesel Fire Pump

06/17/2020

CR 2020-06129

Low Specific Gravity on the Diesel Fire Pump Battery

PY-0P5455001B Cell Number Two

08/03/2020

CR 2020-06136

Unplanned Fire Impairment - Diesel Fire Pump Battery Out

of Specification

08/03/2020

CR 2020-06939

Motor Fire Pump Excessive Vibrations

09/04/2020

71111.13

Corrective Action

Documents

CR 2016-06758

HPCS Diesel Overspeed Trip Occurred Slightly Low

05/24/2016

CR 2020-05711

Improper Functioning of TIP Machine

07/15/2020

CR 2020-06113

Div 3 Start Signal Computer Point did not Show Change in

State on TRA Archive Plot

08/02/2020

CR 2020-06561

Standby Liquid Control Hi/Lo Alarm During Standby Liquid

Control Transfer Pump and Valve Test

08/20/2020

CR 2020-07279

F/D A Combined Vent and Slowdown Valve G36F0013a

Failed Reposition During RWCU Precoat

09/18/2020

CR 2020-07319

RWCU F/D A Combined Vent and Blowdown Valve did

not Make Up Open Limit - Stopped Backwash

09/20/2020

CR 2020-07329

RWCU F/D A Combined Vent and Blowdown Valve

Sticking and Loose Components

09/20/2020

Miscellaneous

GEN-MNT-004-

Material Accountability Log

09/19/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

GMI-0021

Fastener Torque Data Sheet

08/10/2020

IP-ENG-001

Form 4

Design Change Package 19-0095-001

2/10/2020

NOBP-SS-1201-

CDA Impact Analysis

06/11/2020

NOP-OP-1001-12 Zero Energy Checklist (FENOC)

09/19/2020

NOP-SS-1001-02

Software Change Description

06/09/2020

NOP-SS-1001-05 Software Test

06/09/2020

NOP-WM-1001-

Work In Progress Log (WO200825503)

06/26/2020

NOP-WM-1001-

Work In Progress Log

06/01/2020

NOP-WM-1001-

Work In Progress Log

08/08/2020

NOP-WM-1001-

Work In progress Log

09/18/2020

NOP-WM-4300-

Configuration Control Log

08/08/2020

NOP-WM-9001-

FENOC Maintenance Closure Sheet

09/20/2020

Procedures

GEI-0007-A

Instructions for Cable and Wire Terminations

06/19/2020

NOBP-SS-1201-

CDA Impact Analysis

06/08/2020

NOP-OP-1007

Risk Management

NOP-WM-WM-

4300-05

Post Maintenance Checklist

07/21/2020

SOI-E22-B

Division 3 Diesel Generator

Work Orders

200651581

Process Computer

06/01/2020

200684962

Adjust Overspeed Trip Setpoint

08/08/2020

200825503

Firewall

06/25/2020

200832116

Determine Cause of Valve Indication for 1G36F0013A

Being Lost

09/18/2020

200832140

Work Associated with 1G36F0013A

09/20/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.15

Corrective Action

Documents

CR 2020-05484

ESW C Discharge Check Valve Did Not Pass Exercise

Open Flow Required by SVI-P45-T2003

07/06/2020

CR 2020-05844

Plant Computer Data Acquisition System Upgrade

Disables TRA Function

07/21/2020

CR 2020-05852

SVI-C51-T5351 LPRM Calibrations Unable to be

Completed Due to No Communication Between Traversing

In-core Probe Machines and Plant Computer

07/21/2020

CR 2020-06561

Standby Liquid Control Hi/Lo Level Alarm During SLC

Transfer Pump and Valve

08/20/2020

CR 2020-06618

Unexpected Seismic Alarm Received

08/23/2020

Procedures

PYBP-POS-0030

Transient Strategies and Mitigating Actions

SOI-C41

Standby Liquid Control System

2/20/2018

SVI-C41-T2001-B Standby Liquid Control B Pump and Valve Operability Test 06/27/2019

SVI-P45-T2003

HPCS ESW Pump and Valve Operability Test

07/06/2020

SVI-P45-T2003

HPCS ESW Pump and Valve Operability Test

07/02/2019

Work Orders

200738424

SVI-E12-T2003 RHR C Pump and Valve Operability Test

07/29/2020

200750879

SVI-C41-T2001B Standby Liquid Control B Pump and

Valve Operability Test

07/31/2020

71111.19

Calculations

ATL-2020-0553-

ATA-12

DIV3 ESW Flow Change

07/08/2020

Corrective Action

Documents

CR 2020-06249

Failed PMT for HPCS Diesel Heat Exchanger ESW Relief

08/07/2020

CR 2020-06264

Division 3 DG Ran Unloaded for Greater Than 30 Minutes

08/08/2020

CR 2020-06279

Evaluate the Failure Analysis Report from Target Rock for

the 5 Failed Relief Valves (CR 2020 06279) for Further

Actions (if needed) at Perry to Prevent Additional Failures

09/08/2020

CR 2020-06545

Complete a Past Operability Review as Requested by

SARO and Document or Attach the Results (AFTER)

08/26/2020

CR 2020-07380

APRM A Power Adjustment Potentiometer is Giving

Intermittent Voltage

09/22/2020

Corrective Action

Documents

Resulting from

Inspection

ATL-2020-0553-

ATA-17

Plant Narrative Log Typo

07/20/2020

Miscellaneous

IMI-E3-20

Generic Relay Test Data Sheet

09/05/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Measuring and

Test Equipment

Traveler

Measuring and Test Equipment Traveler

08/08/2020

NOP-WM-1001-

Work In Progress Log

08/08/2020

NOP-WM-4300-

Post Maintenance Checklist

09/22/2020

NOP-WM-4300-

Post Maintenance Checklist

08/04/2020

Operability

Evaluations

ATL-2020-0553-

ATA-13

How Does Check Valve Operability Impact DIV3 ESW

Operability

07/08/2020

Procedures

GEI-0135 Rev. 34 ABB Power Circuit Breakers 5KV Types 5HK250 and

5HK350 Maintenance

07/19/2020

GMI-0008 Rev.

Pressure Relief Device Bench Testing

08/08/2020

NOP-WM-1001-

Work In Progress Log

09/05/2020

NOP-WM-2003-

Test Cover Sheet

08/21/2020

NOP-WM-4300-

Post Maintenance Checklist

07/19/2020

PTI-M43-P0005

Diesel Generator Building Ventilation System Damper

Stroking - Division 1

2/05/2019

SOI-P51/52

Service and Instrumentation Air System - Section 7.1

07/20/2020

SVI-C51-T0027-A APRM A Channel Functional for 1C51-K6005A

05/03/2018

SVI-C51-T0027-E APRM E Channel Functional for 1C51-K6005E

05/03/2018

Work Orders

200559679

Remove/Replace Relief Valve

08/08/2020

2005674309

Service Air Compressor, 2P51-C001 Breaker

Refurbishment

05/04/2020

200738804

APRM D Channel Calibration for 1C51-K605D

06/11/2020

200759507

Div1 DG RM Supp Fan 1A Recirc Air Damper

08/18/2020

200773708

DG3 Replace Potentiometer R3 - VOLT Reg. Range

08/08/2020

200821012

Replace Potter & Brumfield MDR Relay 1C71A-KO12A

and 1C7 1A-KO12E

09/22/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.22

Corrective Action

Documents

CR 2006-00254

CR for Trending: RTV or Other Sealant is Not Acceptable

for Use in EHC System

01/08/2016

CR 2020-02421

Potential Unacceptable Precondition of SVI-R44-T2001 in

Relation to DIV1 Diesel Generator Run

2/19/2016

CR 2020-07380

APRM A Power Adjustment Potentiometer is Giving

Intermittent Voltage

09/22/2020

Miscellaneous

NOP-OOP-1001-

Zero Energy Checklist (FENOC)

09/22/2020

NOP-WM-1001-

Work In Progress Log

09/16/2020

NOP-WM-4300-

Post Maintenance Checklist

09/24/2020

Procedures

ISI-E22-T1100-2

High Pressure Core Spray (E22) Functional Pressure Test

- Class 2

PMI-0116

Fullers Earth Filter Replacement Instructions

09/22/2020

PTI-GEN-P0012

Total Water Leakage Rate of Primary Coolant from

Systems Outside Containment

10/03/2019

SOI-E12

RHR A Pump and Valve Operability Test

05/25/2020

SOI-E22A

High Pressure Core Spray System

SOI-P42

Emergency Closed Cooling System

SVI-C51-T0027-A APRM A Channel Functional for 1C51-K6005A

SVI-C61-T1200

Remote Shutdown Control Test RCIC and RHR

SVI-E31-T0375

Drywell Floor Drain Sump Flow Monitoring System

Channel Functional for 1E31-K606

TAI-0506

Preparations of Inservice Inspections Instructions

TAI-2000-2

Vibration Monitoring

VLI-R44

Division 1 and 2 Diesel Generator Starting Air System

Work Orders

200738424

SVI-E12-T2003 RHR C Pump & Valve Operability Test

07/30/2020

200738517

SVI-E22-T1200 1 (92D) HPCS Pump Discharge Pressure

- High (Bypass) Channel Functional for 1E22-N651

2/08/2020

20075200

RHR C Pump

07/30/2020

200752935

Replace Fullers Earth Filter/B33 HPU B SL-1

09/24/2020

200754875

Drywell Floor Drain Sump Flow Monitoring System

Channel Functional for 1E31-K606

08/24/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

200761516

SVI-C61-T1200 RSD Ctrl Test - RCIC/ RHR

07/21/2020

200761928

ISI-E22-T1100-2 High Pressure Core Spray Pressure Test

- Class 2

2/08/2020

200792554

RHR A Pump and Valve Operability Test

08/18/2020

71114.06

Miscellaneous

Scenario Guide

Perry Emergency Response Organization Drill Scenario

Guide

71124.06

Corrective Action

Documents

20-01864

The 20202 Reactor Water to NCC Leakage Methodology

03/06/2020

20-02048

Detectable Tritium Above 2000 pCi/l Detected in Manhole

03/10/2020

20-02224

Tritium Detected in Aux. Boiler Deaerator Drain

03/14/2020

Corrective Action

Documents

Resulting from

Inspection

20-05865

NRC ID: ODCM Procedure Correction

07/21/2020

Miscellaneous

Effluent Monitor Availability Data July 1, 2019 through

June 30, 2020

Various

2018 Annual Environmental and Effluent Release Report

04/29/2019

2019 Annual Environmental and Effluent Release Report

04/17/2020

19-016

Liquid Radwaste Release Permit

03/21/2019

19-092

Liquid Radwaste Release Permit

2/14/2019

19-093

Liquid Radwaste Release Permit

2/15/2019

Procedures

Offsite Dose Calculation Manual

Offsite Dose Calculation Manual

CHI-0005A

Miscellaneous Gaseous Effluent Sampling

CHI-0007

Midas

CHI-0022A

Composites

REC-0104

Chemistry Specifications

Self-

Assessments

SA-BN-2020-

1868

20 Radioactive Gaseous and Liquid Effluents

05/13/2020

71151

Calculations

Radiological Effluent Dose Summary Information July 2019

through June 2020

Various

Miscellaneous

NOBP-LP-4012-

Mitigating Systems Performance Index (MSPI)

Unavailability Index (UAI) and Unreliability Index (URI) for

Emergency Service Water (ESW)

07/01/2019 -

06/30/2020

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PI Summary

Report

Mitigating Systems Performance Indicator Heat Removal

System

07/01/2019 -

06/30/2020

PI Summary

Report

Mitigating Systems Performance Indicator Residual Heat

Removal System

07/01/2019 -

06/30/2020

PI Summary

Report

Mitigating Systems Performance Indicator Cooling Water

Systems

07/01/2019 -

06/30/2020