| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 2
| page count = 2
| project = TAC:51680, TAC:51681
| stage = Other
}}
}}



Latest revision as of 15:47, 26 September 2022

Notifies of Possible Problem Re 10CFR50.49 Equipment Qualification Deadline for Electrical Components of HPCI Control Sys.Problems First Discovered on 830825.Extension of Rulemaking Deadline May Be Requested.Util Awaiting Data
ML20081C508
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/24/1983
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 NED-83-517, TAC-51680, TAC-51681, NUDOCS 8310310265
Download: ML20081C508 (2)


Text

. -___ _ ______________________________.

  • Georgia Power Cctrpany g 333 Piedmont Avenue Atlanta, Georg a 29308 Telephone 404 5266526 Ma:l;ng Addrew Post of tce Box 4545 Atlanta. Georg'a 30302 h Gaorgia Power L T. Gucwa rne soutwo ewinc system Mrager Nac! ear Engenrenng and CNef Nuclear Eng nwr NED-83-517 October 24, 1983 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 Division of Licensing U. S. Nuclear Regulatory Comnission Wachington, D. C. 20555 NRC DOCKF?r 50-366 OPERATIfG LICENSE NPF-5 EIWIN I. HA'ICH NUCLEAR PLANT UNIT 2 NOTIFICATION OF POTENTIAL PROBLEM REGARDIIG THE 10 CFR 50.49 BQUIPMENP QUALIFICATION DEADLINE Gentlemen:

In accordance with the requirements of 10 CFR 50.49(h), Georgia Power Ccrapany (GPC) hereby provides notification of equignent qualification problems which could result in a request for extension of the rulemaking deadline (i.e., end of the seccad refueling outage after March 31, 1982).

The problems being encountered involve certain installed electrical components of the control system for the High Pressure Coolant Injection (HICI) system turbine at Plant Hatch Unit 2. These problems were first discovered by GPC on August 25, 1983.

The equipment items involved and the current status of GPC qualification efforts for each item are as follows:

1. Woodward Magnetic Pick Up, Part No. 1680-622; and Woodward Hydraulic Actuator Part No. R8250-133.

GPC is currently in the process of obtaining qualification test data from Wyle Labs. The schedule for completion of the qualification analysis for the Hatch components cannot be finalized until this information has been obtained, which should be sometime within the next four weeks.

8310310265 831024 PDR ADOCK 05000366 P PDR llaO

O Georgia Power d Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, Chief Operating Reactors Branch No. 4 October 24, 1983 Page Two

2. HPCI Turbine Auxiliary Oil Pump Motor, Vacuum Punp Motor, and Condensate Pump Motor.

GPC is currently in the process of obtaining qualification test data from Terry Turbine. The schedule for completion of the qualification analysis for the Hatch components cannot be finalized until this information has been obtained, which should be sometime within the next six weeks.

Upon receipt of the appropriate information from Wyle Labs and Terry Turbine, GPC will perform a Plant Hatch specific qualification analysis for the specified components. Should GPC make a determination that any of these equipment items either cannot be environmentally qualified using the existing data or the qualification analysis cannot be completed prior to the rulemaking deadline, then GPC will subnit a request for extension of the deadline as prescribed by 10 CFR 50.49(g) .

Very truly yours, WE Qw L. T. Gucwa CBS/mb xc: J. T. Beckham, Jr.

H. C. Nix, Jr.

J. P. O'Reilly (NRC- Region II)

Senior Resident Inspector 700775

, _ . . .. - , _ _ - - - _.