ML20235D235: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 15: Line 15:
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| document type = INTERNAL OR EXTERNAL MEMORANDUM, MEMORANDUMS-CORRESPONDENCE
| page count = 3
| page count = 3
| project =
| stage = Other
}}
}}



Latest revision as of 16:48, 6 October 2021

Discusses Proposed CP Stage Health & Safety Review Schedule for Util Application for CP Docketed on 751107.Proposed Schedule Includes 761004 as Date for Issuing SER W/Final Sser Scheduled for 770110
ML20235D235
Person / Time
Site: 05000000, Phipps Bend
Issue date: 11/24/1975
From: Boyd R
Office of Nuclear Reactor Regulation
To: Rusche B
Office of Nuclear Reactor Regulation
Shared Package
ML20235B454 List:
References
FOIA-87-554 NUDOCS 8709250163
Download: ML20235D235 (3)


Text

b Distribution Docket Files ~ 'R. DeYoung R. Klecker

, NRC PDR E 24 M V. Moore M. Williams

.p Local PDR NRR Rdg (MGroff)

K. Goller D. Eisenhut

-l .D. Skovholt W. Haass i

' LWR 1-2 File E. Butcher TIC Docket Jies. STN 50-5 E. Case J. Cutch&n and STN 5& 554 R. S. Boyd M. Rushbrook R. Heineman LWR 1 BCs Ben C. Busche, Director, Offica of Nuclear Esaster Regulatima FRop0SID CF STAGE EEALTR AND SAFETT RETIEW SCRIBULE, PRIFpS BEND NUCLEAR PLANT, UNITS 1 & 2 1 The Tennessee Talley Authority construction permit application was

, docketed on November 7, 1975. We are propostas few your approval, a CF stase beslth and safety review schedule that meets our 14 meeth objective for i M ag the final (after ACRS) SER supplement. The proposed schedule facindes October 4,1976 as the data for issuing

. the SER with a final SER supplement scheduled for January 10, 1977.

i The standard delta of 160 days between the final SEE supplement and i an ASLB decision results in a prospective decision date of June 19, 1977. Spesific dates for all of the latermediate milestemas are provided la amelaeures 1 & 2.

l Too should note that the proposed prospective deeistem date is appese-imately 2 months later than the April 1, 1977 date that the applicant desires a construction permit. Since our proposed schedule is based on a contested hearing, we believe that it may be possibla to satisfy I the applicant's reguast and modify the schedule after the A8LB has ruled on any proposed petitionsi for leave to intervene. Since the

plant is a standard GESSAR-238 EUR-6/ Mark III, we should be able to L improve on this schedule if we do not encounter difficult site related problems.

4 A schedule for the envirowntal review is not being proposed for your approval at this time because the applicant will not file the environ-mental report until January 1976. The applicant has indicated that .

an LWA will mot be needed u til about March 1977.

t'1*f.tDI )

@C geger  :'

Roger 6. Boyd, Acting Director l Division of Reactor Licensing l Office of Nuclear Reactor Regulation Enclosures

1. Level C Milestones FeI A - E'T - SS'/

, 2. Level D Network u-o "c =

  • L:WR 1- DE ..AD:L .TR TR ._..D _

suaaae

  • JCute n" r J. [ .RC ousk _J azarella RHein ...RSBoM _ _

.n. , WRgut}er 11f/ 75 11/jj/75 11/94/75_ 11/g/75 11/g/75

  • "****"""'""*'*'"*"**'*****-'a*

i 'a'g.j g "5' b [ *B N Y I PDR FOIA MCCREAB7-554 PDR

4 ENCLOSUR" l

- Level C Milectones l ,

Phipps Bend Nuclear Plant, Units 1 6 2 Docket Nos. STN 50-553/554 FSAR Docketed 11/07/75C

01-6 12/15/75E l 01-9 Applicant's Resronse to Acceptance Review Questions Rec ~eived Formal Ql's to I Pl! From Containment Safety 01/05/76E 5-0 01/05/76E 5-1 Formal Ql'r to 1Pl! From Engineering Formal Ql's to LPH From Reactor Safety 01/05/76F 5-2 01/lo/76E 1

5-3 Formal Ql's to LPli From Site Safety 01/05/76E 5-4 Formal Q1's to LPH From QA & 9 LPH Issues Formal CS Q1's to Applicant 01/10/76E 8-0 01/19/76E l 8-1~ LPM Issues Formal Engineering Ql's to Applicant LPM Issues Formal Reactor Safety Ql's to Applicant 01/lo/76T 8-2 02/02/76E 8-3 LPM Issues Formal Site Safety Ql's to Applicant LPl1 Issues Formal QA & 0 Ql's to Applicant 01/19/76E 8+4 Applicant's Response to Formal CS Ql's Received 03/OR/76E 9-0 03/08/76E l 9-1 Applicant's Response to Formal Engineering Ql's Received Applicant's Response to Formal Reactor Safety Q1's Received 03/08/76E 9-2 03/22/76E Applicant's Response to Formal Site Safety Q1's Received 9-3 03/08/76E 9-4 Applicant's Restonse to Formal QA & 0 Q1's Received 05/03/76E 12-0 Fornal CS Staf f Positions to LPM ~ 05/03/76E 12-1 Formal Engineering Staff Positions to LPM Formal Reactor S1fety Staff Positions to LPM 05/03/76E 12-2 05/03/76E 12-3 Formal Site Saf ety Staf f Positions to LPM 05/03/76E 12-4 Formal QA & 0 Staf f Positions to LPM 05/17/76E 14-0 LPM Issues Formal CS Staf f Positions to Applicant LPM lssues Formel Engineering Staff Positions to Applicant 05/17/76E l 14-1 05/17/76E 14-2 LPH Issues Formal Reactor Safety Staf f Positions to Applicant LPM Issues Formal Site Safety Staff Positions to Applicant 05/17/76E f 14-3 05/17/76E l 14-4 LPM Issues Formal QA & 0 Staf f Positions to Applicant Applicant's Response to Formal CS Staf f Yositions Received 07/05/76E 15-0 07/05/76E 15-1 Applicant's Response to formal Engineering Staff Positions Received Applicant's Response to Formal Reactor Safety Staff Positions 07/05/76E 15-2 Received 07/05/76E 15-3 Applicant's Respanse to Formal Si te Saf ety Staf f Positions Received 07/05/76E 15-4 Applicant's Resf once to Formal QA & O Staf f Positions  ;

Received 08/23/76E l 24-0 S.E. Input Rece'ved from TR 09/D6/76E 24-9 0 Draf t SE issued by LP:t Final AD Review of Draf t SE Complete 09/21/76E 24-98 l ,

t . _ - _ _ _ _ _ _ _ _ _ _ _ _ _

I l

25 Safety Evaluati n Issued 10/04/76E 25-8 ACRS !!ceting Ce plete 11/04/76E 27 ACRS Letter Rec. ived 11/22/76E 27-5 Tech Review Int .t to SE Supplement Complete 12/13/76E 27-8 Financini Testi eny Input Received by LPt1 12/13/76E 28 Supplement to F.E. Issued , 01/10/77E 38-91 Earliest Start ( f Rad /Saf ety llearing 02/09/77E 39-51 End of Raf/Fafer.y llenring 04/10/77E 39-85 ASLB Decision E:ndered 06/19/77E 40 Licensing Effor t Complete 06/19/77E 42 Prospective Decision Date 06/19/77E l

l l

l '

_