ML20235B453
Text
-
..WA ~ ST~ $$Y f, ** *"%
1
\\
d At$rONSE Tyre W **'
I l "
E I
RESPONSE TO FREEDOM OF
- g
/
INFORMATION ACT (FOIA) REQUEST SEP 2 21987 eeese
)
DOCLET NUMeERi$l l# sapersadei nEQUESTER PART 1.-RECC-RDS RELEASED OR NOT LOCATED (See checked bonesi No agency records sesut to Ww request have been located.
No additional agency escords msbesct to the request have been located.
Agency records sub# set to we esquest that are identtied in Appends N
ere streedy evtAetwo for pubhc erap3: tion and copying in the NRC Public Document Room.
1717 H Street, N.W., Washnenon, DC.
A0ency records subeset to se request that are identHied in Appendis b
N ere beeng medir available for public inspecion and copymg in the NRC Pubic Document i;oo.n 1717 h Street. N W.. Weehengton, DC, in a fo6 der under the FOIA number and requestar name.
The nonproprietary verson of the proposalls) that you agreed to accept in a telephone conversaten with a member of n'y staff is now being made avalabie for pubic s1spectur sid coyhe.s the NRC Putec tncument Room,1717 H Street, N W., Washington, DC, in a foider urrte' the FOIA number and requester name.
Enclosed is informaton on how p mer obtain eccess to and the charges for copying records placed en tPe hiRC Public Doc.nment Room.1717 H Street, N.W., Washington, DC
]
A ertcy records cabsect to to weet are enclosed. Any applicable charge for copies of the records prp.ced and payr:ent procedures are noced in the con %ents section 0
P.ecords inutjoct to tim recret have been gferred to another Federal agency (ies) for review and direct response to you.
In view of NRC's response to the request, no further action is being taken on appeal letter dated PART tl.A-INFORMATION WITHHELD FROM PUBUC DISCLOSURE
]
4 I
Certain information in the utpmsted records is being withheld from public declosure pursuant to the F(MA esemptons desenbod in and for the reasons stated in Part 11. sec-tions B, C, and D. Any renamed portsons of the documents for which only part of the record is being weemed are being made available for public inspection and copymg en the NRC Public Document Room.1717 H Street, N W., Washington, DC, in a folder under the FOlA twtier and requester name.
Comments s.'n4 4 h h '-
4 iL g w
06c., w oA%
b M4 R/o7/7 3 so - 3 '7 6 R/90 } '14 so-vg-wy y:n / w
$92l@jo9870522 NCCREAB7-554 PDR f f f l."\\ g n & Q /3u; Ay q
l l
l h
NIC FOIM 464 iPart n is em J
L
Re: F01A-87-554 APPENDIX A RECORDS MAINTAINED AMONG PDR_ FILES 1.
10/24/78 Letter from Alan D. Parr to B.W. Gilman, subject:
Issuance of Interim Safety Evaluation Report. (3 pages)
Accession No. 7811020003.
l f
i l
l
\\
1.
Re: F01A-87-554' APPENDIX B RECORDS IN PDR UNDER REQUEST g
1.
12/15/69 Letter from Howard Price to Edward J. Bauser, w/ attached letter 11-13-69 from Eliot Priest to' Peter Morris, concerning deferring Seabrook unit. (2 pages) 2.
12/8/72 Memo from John F. O' Leary to Constissioner Ramey (included distribution pages)- (5 pages) w/ attachment of 4 biter (6 pages), concerning Status of Newbold Island Review.
3.
10/23/73 Letter dated 10/19/73 from R.I. Smith to L. Manning Muntzing regarding Newbold Island. (3 pages) 4.
11/1/73 Letter from John Betz to L. Manning Muntzinf referencing amendunt No.13 and No.15 w/ attachment. (52 pages) 1 5.
12/14/73 Letter from A. Giambusso to W.C. Tallman regarding schedule for review of application for construction:
pemits at Seabrook. (4 pages) 6.
1/2/74 Letter from A. Giambusso to Walter L. Baumann reference request for explanation of the basis for AEC Reg Staff's conclusion concerning relocation of Newbold.
( 9 p@
7.
1/2/74 Letter from John O' Leary to L. Manning Muntzing, referencing construction Permit Review Schedule for the Allens Creek Nuclear Generating Station. (2 pages) 8.
Undated Letter from Mat.. McDowell to President Nixon, subject:
Expediting construction of HL&P Allen Creek Nuclear Power Plant. (4 pages) 9.
9/25/74 Letter from Daniel R. Nuller to Paul Dragoumis concerning changes in established schedule for environmental review.
(2pages)
- 10. 9/27/74 Letter from Potomac Electric Power to R.C. DeYoung referencing schedule for Douglas Point. (2 pages)
- 11. 1/28/75 Memo from Walter Paulson to Potomac Electric Power Co.,
nubject: Summary of Meeting to Discuss A Schedule for Resolving Open Items and Issuances of the Safety
{
Evaluation Report. (3 pages) 12, 3/12/75 Letter from Pepco to A. Giambusso, regarding submission ofnewapplications.(2pages) e__ _-- _ _ _ __
Re: F01A-87-554 APPENDIX B Itontinued)
RECORDS IN PDR UNDER REQUEST,
13, 5/23/75 Letter' from Paul Dragoumis to Lee Gossick, referencing current status of the project and to summarize action planned. (Douglas Point). (3 pages)
- 14. 6/6/75 Letter from FEPC0 to Walter R. Butler, referencing schedule for providing detailed information on Mark III containment system for Douglas Point. (2 pages)
- 15. 8/12/75 Memo from M.D. Lynch to Walter R. Butler referencing meeting to discuss completion of the Douglas Point review.
(2.pages) 16.
11/24/75 Letter from B.J. Youngblood to Dr. James Coughlin, referencing incomplete or inadequate responses. (8 pages) 17.
11/24/75 Letter from Roger S. Boyd to Ben Rusche seject: Proposed CP Stage Health & Safety Review Schedule, Phipps Bend NuclearPlant1&2.(3pages) 18.
12/10/75 Letter from Roger Boyd to Dr. James Counglin transmittion of Narble Hill Review Schedule. (3 pages)
- 19. 6/14/76 NRC Distribution For Part 50 Docket Material, with 6/11/76 letter, subject: Revision #1 to Phipps Bend.
(5pages)
- 20. 3/8/77 Meeting on March 10, 1977 to discuss NRC Staff environment review of NEP 1 & 2 &pplication. (2 pages) before ASLB, Muglas Point. (4 pages)g Conference Inquiry NRC Staff res>onse to Board Prehearin 21, 5/20/77
- 22. 6/9/77 Letter from Thomas Baxter to Elizabeth Bowers referencing of indefinite deferral of Douglas Point (2 pages) with similar copies to Commission Barnes (2 pages) and News release (3pages).
l ft3. 6/21/77 Letter to Geoffrey P. Gitner to Elizabeth Bowers, referencing sita suitability hearing for Douglas Point.
(2pages) 1978 to discuss Susanary of Meeting held on August 22,(6 pages)
- 24. 8/31/i'8 review issues on Allen Creek Unit 1.
Ra: F01A-87-554 APPENDIX B (Continued)
RECORDS IN PDR UNDER REQUEST i
- 25. 8/16/78 Memo from John Stolz thru Roger Boyd to Harold Denton, Review Schedule htters. (g with applications to Discuss subject: Sumary of meetin
~
7pages) s
- 26. 2/9/78 Memo from Roger Boyd to B.W. Coston subject:
Environmental Review Schedule. (5 pages)
- 27. 8/4/77 Letter from Roger S. Boyd to B.W. Colston, subject:
Schedule for the Radiological Safety Review of Sundeset Nuclear Plant, Unit 1 & 2. (5 pages) 28.
11/16/78 Letter from Jay E. Silberg to Elzabeth S. Bowers concerning schedule delay. (5 pages) 4
_ -.. _ _ _... _ _. _