{{#Wiki_filter:March 22, 2021
{{#Wiki_filter:
 
==SUBJECT:==
H. B. ROBINSON STEAM ELECTRIC PLANT - TRIENNIAL INSPECTION OF EVALUATION OF CHANGES, TESTS AND EXPERIMENTS BASELINE INSPECTION REPORT 05000261/2021010
 
==Dear Mr. Kapopoulos,==
Jr.:
On March 4, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at H. B. Robinson Steam Electric Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
 
No findings or violations of more than minor significance were identified during this inspection.
 
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
 
Sincerely,
/RA/
James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 05000261 License No. DPR-23
 
===Enclosure:===
As stated
 
==Inspection Report==
Docket Number: 05000261 License Number: DPR-23 Report Number: 05000261/2021010 Enterprise Identifier: I-2021-010-0034 Licensee: Duke Energy Progress, LLC Facility: H. B. Robinson Steam Electric Plant Location: Hartsville, SC Inspection Dates: March 01, 2021 to March 05, 2021 Inspectors: G. Ottenberg, Senior Reactor Inspector M. Riley, Reactor Inspector T. Su, Reactor Inspector Approved By: James B. Baptist, Chief Engineering Branch 1 Division of Reactor Safety Enclosure
 
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a triennial inspection of evaluation of changes, tests and experiments baseline inspection at H. B. Robinson Steam Electric Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
 
===List of Findings and Violations===
 
No findings or violations of more than minor significance were identified.
 
===Additional Tracking Items===
None.
 
=INSPECTION SCOPES=
 
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.
 
==REACTOR SAFETY==
 
===71111.17T - Evaluations of Changes, Tests, and Experiments Sample Selection (IP Section 02.01) ===
{{IP sample|IP=IP 71111.17|count=18}}
The inspectors reviewed the following evaluations, screenings, and/or applicability determinations for 10 CFR 50.59 from March 1, 2018 until December 8, 2020.
: (1) 10 CFR 50.59 Screening- AR02123977, EC 291093, Revision 19, 4KV Breaker Replacement
: (2) 10 CFR 50.59 Screening- AR02025142, EC 296680, Revision 0, MCC-5(1CR), MCC-6(3M) AND (4M) Breaker Replacement
: (3) 10 CFR 50.59 Screening- AR01966006, EC 297202, Revision 11, Install Cut-out Switch in Main Control Room to Isolate Loads in Aux Panel DC to Eliminate SISBO as Fire Event Coping Method
: (4) 10 CFR 50.59 Screening- AR02196053, EC 408590, Revision 0, RC-516, Anti-Rotation Kit (LTAM RNP-15-0012)
: (5) 10 CFR 50.59 Screening- AR02142938, EC 408709, Revision 0, MCCB Replacement of 125VDC Distribution Panel B Breaker 1 to Support NFPA 805 LAR
: (6) 10 CFR 50.59 Screening- AR02156891, EC 409626, Revision 2, This Modification Will Install a Manual Disconnect in the Motor Power Leads for MOV LCV-115C. This Disconnect Will Allow Operator Locally in the Charging Pump Room
: (7) 10 CFR 50.59 Screening- AR02224446, EC 412755, Revision 0, Remove CC-747A;B AND CC-774 From IST Program
: (8) 10 CFR 50.59 Screening- AR02230817, EC 413542, Revision 0, Remove Containment Purge Valve V12-9 and Temporarily Replace With a Spool Piece
: (9) 10 CFR 50.59 Screening- AR02245177, EC 414306, Revision 0, Hagan Replacement for NUS Setpoint Stations
: (10) 10 CFR 50.59 Screening- AR02288932, EC 416046, Revision 0, Pressurizer PORV Safety Function Documentation Changes
: (11) 10 CFR 50.59 Screening- AR02332953, EC 417696, Revision 0, Replace the K301 and K302 Relays in Battery Charger A Child EC
: (12) 10 CFR 50.59 Screening- AR01995442, EC 294433, Revision 1, Unit 1 Diesel Fuel Oil System Transfer to RNP Unit 2 Control
: (13) 10 CFR 50.59 Evaluation- ARs 02209962 and 02311356, Revisions 0 and 1, Cycle 32 Core Reload
: (14) 10 CFR 50.59 Evaluation- AR02237127, EC 412513, Revision 0, Partial Length Shield Assemblies Removal
: (15) 10 CFR 50.59 Evaluation- AR02195350, EC 409565, Revision 1, Replacement of Motor Control Center (MCC) - 9 Feeder Breaker
: (16) 10 CFR 50.59 Evaluation- AR 2240867, EC 287742, Revision 9, Turbine Control System Upgrade
: (17) 10 CFR 50.59 Evaluation- AR02192768, EC 403230, Revision 3, Adoption of GL 87-11 for Postulated Pipe Rupture Outside of Containment Admin Revision
: (18) 10 CFR 50.59 Evaluation- AR02289112, EC 415049, Revision 1, Replace ESF Timing Relays Train A
 
==INSPECTION RESULTS==
No findings were identified.
 
==EXIT MEETINGS AND DEBRIEFS==
The inspectors verified no proprietary information was retained or documented in this report.
* On March 4, 2021, the inspectors presented the triennial inspection of evaluation of changes, tests and experiments baseline inspection results to Ernest J. Kapopoulos, Jr.
 
and other members of the licensee staff.
 
=DOCUMENTS REVIEWED=
 
Inspection Type              Designation    Description or Title                                      Revision or
Procedure                                                                                              Date
71111.17T Calculations      E1/E2 Room Loss E1/E2 Room Loss of HVAC Model                              Rev. 2
of HVAC Model
RNP-E-2.012    Overcurrent Protection and Coordination for Feeder Breaker Rev. 5
to MCC 6
RNP-E-6.005    Overcurrent Protection and Coordination of the 125V DC    Rev. 4
Distribution System (Trains A & B)
RNP-E-9.005    FUSE ANALYSIS FOR EMERGENCY BUSES E1 AND E2                Rev. 3
RNP-E-9.008    Control Circuit Fuse Analysis for 4.16KV Switch Gear      Rev. 4
Busses 1, 2, 3 and 4
RNP-M/HVAC-    E1/E2 Room Loss of HVAC Model                              Rev. 2
1069
RNP-M/MECH-    THERMAL RELIEF VALVES CC-774, CC-747A, CC-747B            Rev. 0
21            OVER-PRESSURE PROTECTION ANALYSIS
Corrective Action 2018-3125      Potentially non-conservative design limit for Biasi CHF
Documents                        Correlation
2019-170        Inconsistent CHF design limit / application for Biasi CHF
correlation
NCR 02203295,  Various                                                    Various
2310600,
00712316,
2145569
Corrective Action NCR 02372104    2021 NRC 50.59 Inspection: UFSAR Change wording and        dated
Documents                        5059 con                                                  03/01/2021
Resulting from    NCR 02372708    2021 NRC 50.59 Insp: Removal of CCW relief valves from    dated
Inspection                        IST                                                        03/04/2021
NCR 02372743    2021 NRC 50.59 Inspection: NRC Observation for EC          dated
415049                                                    03/04/2021
Drawings          5379-00685      CHEMICAL AND VOLUME CONTROL SYSTEM                        Rev. 62
SH00001        PURIFICATION AND MAKE-UP FLOW DIAGRAM
5379-00685      CHEMICAL AND VOLUME CONTROL SYSTEM                        Rev. 65
SH00002        PURIFICATION AND MAKE-UP FLOW DIAGRAM
5379-00685      CHEMICAL & VOLUME CONTROL SYSTEM                          Rev. 1
Inspection Type Designation Description or Title                                Revision or
Procedure                                                                      Date
SH00004    PURIFICATION & MAKE-UP FLOW DIAGRAM
5379-376    COMPONENT COOLING WATER SYSTEM FLOW                Rev. 44
SH00001    DIAGRAM
5379-376    COMPONENT COOLING WATER SYSTEM FLOW                Rev. 34
SH00002    DIAGRAM
5379-376    COMPONENT COOLING WATER SYSTEM FLOW                Rev. 30
SH00003    DIAGRAM
5379-376    COMPONENT COOLING WATER SYSTEM FLOW                Rev. 36
SH00004    DIAGRAM
5379-684    CHEMICAL & VOLUME CONTROL SYSTEM BORON              Rev. 11
RECIRC. DISTILLATE - FLOW DIAGRAM
5379-685    CHEMICAL & VOLUME CONTROL SYSTEM                    Rev. 40
SH00003    PURIFICATION & MAKE-UP FLOW DIAGRAM
5379-686    CHEMICAL & VOLUME CONTROL SYS - BORON              Rev. 29
SH00001    RECIRCULATION PROCESS & STORAGE - FLOW DIAG
5379-686    CHEMICAL & VOLUME CONTROL SYS - BORON              Rev. 19
SH00002    RECIRCULATION PROCESS & STORAGE - FLOW DIAG
B-190628    CHEMICAL AND VOLUME CONTROL SYSTEM                  Rev. 20
SH00479
B-190628    CV PURGE OR REFUELING FAN, HVE 1A, CONTROL          Rev. 11
SH00523    WIRING DIAGRAM
B-190628    CV PURGE OR REFUELING FAN, HVE-1B, CONTROL          Rev. 10
SH00524    WIRING DIAGRAM
B-190628    CONTAINMENT PURGE SUPPLY AND EXHAUST VALVE          Rev. 22
SH00525    CONTROL V12-6, 7, 8, AND 9
G-190234    STEAM GENERATOR BLOW-DOWN AND WET LAYUP            Rev. 40
SH00001    SYSTEM FLOW DIAGRAM
G-190234    STEAM GENERATOR BLOW-DOWN AND WET LAYUP            Rev. 46
SH00002    SYSTEM FLOW DIAGRAM
HBR2-11260  ZONE MAP FOR ENVIRONMENTAL PARAMETERS              Rev. 5
SH00004    REACTOR AUX BLDG. EL. 242`-6" AND 246`-0"
HBR2-11260  ZONE MAP FOR ENVIRONMENTAL PARAMETERS              Rev. 21
SH00008
HBR2-12646  Schematic 300A Battery Charger 480VAC 3 Phase 60 HZ Rev. 2
Inspection Type          Designation  Description or Title                                      Revision or
Procedure                                                                                      Date
25VDC
HBR2-12647  Schematic 300AMP Battery Charger 480VAC 3phase 60Hz      Rev. 1
25VDC
Engineering  EC 287742    TCS Base - System Integration                            Rev. 9
Changes      EC 291093    4KV Breaker Replacement                                  Rev. 19
EC 296680    Evaluation for MCC-5 (1CR), MCC-6 (3M) and (4M) Breaker  Rev. 0
Replacement
EC 403230    Adoption Of GL 87-11 For Postulated Pipe Rupture Outside  Rev. 3
Of Containment
EC 409626    This Modification Will Install a Manual Disconnect in the Rev. 2
Motor Power Leads for MOV LCV-115C. This Disconnect
Will Allow Operator Locally in the Charging Pump Room
EC 412755    REMOVE CC-747A;B AND CC-774 FROM IST PROGRAM              Rev. 0
EC 413542    REMOVE CONTAINMENT PURGE VALVE V12-9 AND                  Rev. 0
TEMPORILY REPLACE WITH A SPOOL PIECE
EC 415049    Replace ESF Timing Relays for Train A                    Rev. 1
EC 416046    Pressurizer PORV Safety Function Document Changes        Rev. 0
EC 416046    Pressurizer PORV Safety Function Documentation Changes    Rev. 0
EC 417696    Replace the K301 and K302 Relays in Battery Charger A    Rev. 0
Engineering  Zachry      ROBINSON COMPONENT COOLING WATER (CCW)                    Rev. 0
Evaluations  Engineering  THERMAL RELIEF VALVES (3) REQUIRE REPLACEMENT
Study R18001
Miscellaneous 5AD 02191770 0000403230 - 002 ADOPTION OF GL 87-11 FOR                dated
POSTULATED PIPE                                          03/15/2018
5AD 02224444 50.59 EC 412755 R0, REMOVE CC-747A;B AND CC-774          dated
FROM IST                                                  08/14/2018
5AD 02230815 REMOVE CONTAINMENT PURGE VALVE V12-9 AND                  dated
TEMPORARILY REPLACE                                      09/14/2018
5AD 02230920 0000287742 - 001                                          dated
TCS BASE - SYSTEM INTEGRATION                            09/15/2018
5AD 02245175 Hagan Replacement for NUS Setpoint Stations              dated
11/25/2018
5AD 02289109 EC 415049 replaces ten (10) A-Train Engineered            dated
Safeguards                                                08/28/2019
Inspection Type Designation      Description or Title                                  Revision or
Procedure                                                                              Date
5AD 02289410    EC 416046 Pressurizer PORV Safety Function            dated
Documentation                                        08/29/2019
2-209-234      MAGNECRAFT TDRPRO-5100 SERIES TIME DELAY              Rev. 0
RELAY VENDOR MANUAL
CC-060-          AZZ Nuclear Certificate of Conformance                Rev. 0
351027168-1
CC-060-          NLI CERTIFICATION OF CONFORMANCE                      Rev. 0
351027168-1
DBD              SYS DBD - Electrical Power Distribution System        Rev. 13
                /R87038/SD16
LCPR 2020-RNP-  NRC Safety Evaluation for DPC-NE-3008 and DPC-NE-3009 dated
016              (Supporting Reference 1)                              10/22/2020
LDCR 18-0031    N/A                                                  dated
03/13/2019
LDCR 20-0007    RNP-F/NFSA-0299, Revision 1                          dated
06/03/2020
Letter to J. A. SAFETY EVALUATION BY THE OFFICE OF NUCLEAR            dated
Jones, CP&L      REACTOR REGULATION REGARDING THE                      11/21/1975
from
: [[contact::K. Goller]],  CONSEQUENCES OF HIGH ENERGY PIPING FAILURES
NRC              OUTSIDE CONTAINMENT
Letter to J. F. ACCEPTANCE FOR REFERENCING OF TOPICAL                dated
Mallay, SPC from REPORT EMF-84-093(P), REVISION 1, "STEAMLINE          02/16/1999
: [[contact::F. Akstulewicz]],  BREAK METHODOLOGY FOR PWRS" (TAC NO. MA2438)
NRC
ML031150493      RELAXATION IN ARBITRARY INTERMEDIATE PIPE            dated
RUPTURE REQUIREMENTS (GENERIC LETTER 87- 11]          06/19/1987
ML15156A209      RESPONSE TO REQUEST FOR ADDITIONAL                    dated
INFORMATION (RAI) REGARDING TECHNICAL                06/05/2018
SPECIFICATION CHANGES TO SUPPORT SELF
PERFORMANCE OF CORE RELOAD DESIGN AND
SAFETY ANALYSES
ML17292A040      TECHNICAL SPECIFICATION CHANGES TO SUPPORT            dated
SELF PERFORMANCE OF CORE RELOAD DESIGN AND            10/19/2017
SAFETY ANALYSES
Inspection Type      Designation      Description or Title                                    Revision or
Procedure                                                                                      Date
ML17292A040      SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1              dated
AND
: [[contact::H. B. ROBINSON STEAM ELECTRIC PLANT]], UNIT            04/29/2019
NO. 2 - ISSUANCE OF AMENDMENTS REVISING
TECHNICAL SPECIFICATIONS TO SUPPORT SELF-
PERFORMANCE OF CORE RELOAD DESIGN AND
SAFETY ANALYSES (EPID L-2017-LLA-0356)
ML18310A131      SUPPLEMENT FOR LICENSE AMENDMENT REQUEST                dated
TO SELF-PERFORM CORE RELOAD DESIGN AND                  11/06/2018
SAFETY ANALYSES
NUS-A417SA      SET800 Equivalency Evaluation                            Rev. 1
NUS-AxxxSA      SET800 Requirements                                      Rev. 0
QR-351027168-1  QUALIFICATION REPORT FOR TIME DELAY RELAY                Rev. 0
MAGNECRAFT PIN: TDRPRO-5102
RNP-RA/17-0082  License Amendment Request Proposing to Revise Technical  dated
Specification 3.4.3, "RCS Pressure and Temperature (P/T) 02/07/2018
Limits
Westinghouse    Remote/Manual Set Point Station                          dated
Bulletin IB-129-                                                          11/1968
154
Procedures AD-DC-ALL-0201  Development and Maintenance of Controlled Procedure      Rev. 26
Manual Procedures
AD-EG-ALL-1122  Failure Modes and Effects Analysis and Single Failure    Rev. 2
Analysis
AD-EG-ALL-1130  ACTIVATION OF ENGINEERING CHANGES                        Rev. 4
AD-EG-ALL-1132  PREPARATION AND CONTROL OF DESIGN CHANGE                Rev. 16
ENGINEERING CHANGES
AD-EG-ALL-1134  PREPARATION AND CONTROL OF EVALUATION                    Rev. 5
ENGINEERING CHANGES
AD-EG-ALL-1137  ENGINEERING CHANGE PRODUCT SELECTION                    Rev. 8
AD-EG-ALL-1157  Engineering of Plant Digital Systems and Components      Rev. 4
AD-EG-ALL-1903  CYBER SECURITY CRITICAL SYSTEMS AND CRITICAL            Rev. 13
DIGITAL ASSETS IDENTIFICATION AND ASSESSMENT
AD-LS-ALL-0005  UFSAR UPDATES                                            Rev. 8
AD-LS-ALL-0007  APPLICABILITY DETERMINATION PROCESS                      Rev. 7
Inspection Type        Designation    Description or Title                              Revision or
Procedure                                                                              Date
AD-LS-ALL-0008 10 CFR 50.59 REVIEW PROCESS                      Rev. 2
DSP-020        Shutdown from the Control Room with a Fire in the Rev. 1
Emergency Switchgear Room
GP-002        COLD SHUTDOWN TO HOT SUBCRITICAL AT NO LOAD      Rev. 145
TAVG
GP-007        PLANT COOLDOWN FROM MODE 3 TO MODE 5              Rev. 111
OP-306        COMPONENT COOLING WATER SYSTEM                    Rev. 78
OP-910        SPENT FUEL PIT COOLING AND PURIFICATION SYSTEM    Rev. 46
OP-921        CONTAINMENT AIR HANDLING                          Rev. 59
OST-942        CCW TO SAFETY RELATED EQUIPMENT VALVE            Rev. 7
POSITION VERIFICATION
Work Orders 13316126-01,  Various                                          Various
13316126-02,
13316127-01,
13316127-02,
13316127-04
10
}}
}}

Revision as of 22:23, 8 September 2021

Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010
ML21081A078
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/22/2021
From: James Baptist
NRC/RGN-II/DRS/EB1
To: Kapopoulos E
Duke Energy Progress
References
IR 2021010
Download: ML21081A078 (12)


Text