ML21152A167: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:TENNESSEE VALLEY AUTHORITY Tennessee Valley  Authority,  PostOffice Box2000, SoddyDaisy, Tennessee  37384 May27,2021 10CFR50.54(q) 10CFR72.44(f)
{{#Wiki_filter:}}
ATTN:Document                Control Desk U.S. Nuclear    Regulatory        Commission Washington,      D.C. 20555-0001 Sequoyah      Nuclear        Plant,  Units1and2 Renewed      Facility    Operating    License  Nos. DPR-77 andDPR-79 NRCDocket        Nos.      50-327,  50-328,  and72-034
 
==Subject:==
Emergency                    Plan  Implementing  Procedure    Revisions Inaccordance        with    therequirements    of10CFR50.54(q) and 10CFR72.44(f),          the Tennessee Valley Authority      issubmitting    a description  ofchanges  tothe Sequoyah Nuclear    Plant(SQN)
Radiological    Emergency          Plan. Theaffected  documents    arethe SQN Emergency Plan Implementing      Procedures        (EPIPs)  listedbelow.
8              23              Personnel  AccountabilityandEvacuation              May  19,2021 10              34                  Medical  Emergency    Response                  May  19,2021 Theabove      referenced        revisions  wereevaluated  inaccordance    with 10CFR50.54(q)(3) and 10CFR72.44(f).            It wasdetermined    that the changes  donotreduce    theeffectiveness  ofthe Emergency        Plan.      Details  oftherevisions  areincluded  intheenclosure.
There  arenonewregulatory              commitments    contained  inthis letter.Should youhaveany questions    concerning        this submittal, please contact  Mr.Paul  Gain, Site Emergency Preparedness        Manager,      at(423)  843-7088.
Respectfully, Reneau,    William        Wa*ct"s",dper"*"*""'
Christopher              .Doajeo:c2o21.os.2816:26:,2 ThomasB.Marshall Site Vice  President Sequoyah      Nuclear        Plant
 
U.S. Nuclear  Regulatory  Commission Page  2 May27,  2021
 
==Enclosure:==
SQN  Units  1& 2 Description      ofRevision/Change cc: NRCRegional Administrator              -
RegionII NRCSenior    Resident      Inspector  -
Sequoyah Nuclear Plant NRCDirector    -
Division    ofFuel  Management, NMSS
 
ENCLOSURE:          SQNUNITS1& 2 DESCRIPTION  OFREVISION/CHANGE EP[P-8 Rimilion    23 a  Appendix    C,page18,Step  [10),        theCECC(Central corrected          Emergency Control Center)    Director's phone number.
EP1P-10 Rimfilog.34 a  Page7,added a notetoclarify      that  theMERT(Medical Emergency
 
===Response===
Team)
Leader  andthe Emergency Medical      Professional role canbe      bythesame performed individual.
* Page29,updatedcontact      information  forSQNMedical Staff.}}

Revision as of 12:10, 22 June 2021

Emergency Plan Implementing Procedure Revisions
ML21152A167
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 05/27/2021
From: Marshall T
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML21152A167 (3)


Text