ML20205F953: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:efet/&
                                                  Noventer 6,1985
  .
  /AlabamaPowerCompany
      ATTN: Mr. R. P. Mcdonald
                  Senior Vice President
      P. 0. Box 2641
              -
      Birmingham, AL 35291
      Gentlemen:
      SUBJECT:      REPORT NOS. 50-348/85-32 AND 50-364/85-32
      Thank you for your response of October 21, 1985, to our Notice of Violation
      issued on September 20, 1985, concerning activities conducted at your Farley
    , facility. We have examined your response to Violation 2 and found that it meets
      the requirements of 10 CFR 2.201. We will examine the implementation of your
      corrective actions during future inspections.
      With regard to Violation 1 which was cited during the same inspection, Region II
      will promptly evaluate your delayed response upon receipt.
      We appreciate your cooperation in this matter.
                                                    Sincerely,
                                                      (Original signed by DMVerrelli)
                                                    Roger D.- Walker, Director
                                                    Division of Reactor Projects
      cc:  M.0.'Whitt,ExecutiveVice
          ud. D.  President
                      Woodard, General Manager -
          d.NuclearPlant
                  G. Hairston,--III, General
                  Manager-Nuclear Support
          /J.W.McGowan, Manager-SafetyAudit
            j and Engineering Review
          A . G. Ware, Supervisor-Safety Audit
                  and Engineering Review
      bec:,./    NRC Resident Inspector
            d . Reeves, Project Manager, NRR
                Document Control Desk
                State of Alabama
                  8511130070 851106
                  PDR
                  A      ADOCK 05000348
                                      PDR
      RII                  RII            RII                                        RII
      -    -
        mith:pph
                            M5
                          ABelisle        CJ
                                                \
                                                'an          {bn        RII(A
                                                                          FCdntyell
                                                                                          hl
                                                                                      DVerrelli
      11/o4/85            11/oV/85        11/ /85        11  /85      11/f/85      11///85
                                                              '
                                                                                                ' 0
L                                                                                    n oi        1
}}
}}

Revision as of 19:27, 29 December 2020

Ack Receipt of 851021 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-348/85-32 & 50-364/85-32.Delayed Response to Violation 1 Will Be Promptly Evaluated Upon Receipt
ML20205F953
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/06/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
References
NUDOCS 8511130070
Download: ML20205F953 (1)


See also: IR 05000348/1985032

Text

efet/&

Noventer 6,1985

.

/AlabamaPowerCompany

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. 0. Box 2641

-

Birmingham, AL 35291

Gentlemen:

SUBJECT: REPORT NOS. 50-348/85-32 AND 50-364/85-32

Thank you for your response of October 21, 1985, to our Notice of Violation

issued on September 20, 1985, concerning activities conducted at your Farley

, facility. We have examined your response to Violation 2 and found that it meets

the requirements of 10 CFR 2.201. We will examine the implementation of your

corrective actions during future inspections.

With regard to Violation 1 which was cited during the same inspection, Region II

will promptly evaluate your delayed response upon receipt.

We appreciate your cooperation in this matter.

Sincerely,

(Original signed by DMVerrelli)

Roger D.- Walker, Director

Division of Reactor Projects

cc: M.0.'Whitt,ExecutiveVice

ud. D. President

Woodard, General Manager -

d.NuclearPlant

G. Hairston,--III, General

Manager-Nuclear Support

/J.W.McGowan, Manager-SafetyAudit

j and Engineering Review

A . G. Ware, Supervisor-Safety Audit

and Engineering Review

bec:,./ NRC Resident Inspector

d . Reeves, Project Manager, NRR

Document Control Desk

State of Alabama

8511130070 851106

PDR

A ADOCK 05000348

PDR

RII RII RII RII

- -

mith:pph

M5

ABelisle CJ

\

'an {bn RII(A

FCdntyell

hl

DVerrelli

11/o4/85 11/oV/85 11/ /85 11 /85 11/f/85 11///85

'

' 0

L n oi 1