{{#Wiki_filter:. - _ _ _            .
.k  .
ER0',iN & ROOT, INC.          PRCCEDURE                        EFFECT!'lE
                                            '                                                    PAGE
,<w                        CPSES                  NUMEER        RE'!!SION            DATE    I                    .
I l
J03 35-1195 CP-CPM 10.2          2              7/12/83      1 of 3              I i
TITLE:                        ORIGINATOR:      /
L/
fx' [                  I'{)[8 u, , .
          ? CLEANING AND                    -
MdI#                                    7'C
                                                                                                        *'/$ ,
INSULATING STAIHLESS      ,  RE'/IEWED BY:        .
                                                                            /
l EQU M E.                                                    '
Dm :
          . g\) -@                                                                                                  j
                                                                ,.        Tf 0,< CA
                                            !  APPRO'/ED BY I < ' -[N " /D              '-                'S CONSTRUCTI)i PROJECT MANAGER          DATE          .
i                                                                                      O                I
            ! o.i              TABLE OF CONTENTS      c                      F                    T              -i '
                                                              -                = l lLi                UEI"'"""
            ! 2.0
            ' 2.1 PROCEDURE CLEANING hMEEmNUN.EON                                                !
i l
~
l 2.2              INSTALLATION                            AlA          r=    r"                        l i
UIA- 0-Ov p                  :::"""                                    s/sy This procedure provides the criteria for the final surface l j l
            -                  cleanliness of stainless steel pipe and equipment inside and                            '
            !                  outside of the Containment Building, and identifies the types i                  of insulation which are acceptable for use on stainless steel.                          ,
Installation of reflective insulation is not within the scope of this procedure.                                                                              ,
i 1.2            GENERAL                                                                                  i i
              .                All stainless steel piping and equipment shall be cleaned in
              !                  accordance with the criteria stated herein.
I All stainless steel piping and ' equipment inside the Containment                            ,
Building that is to be insulated with reflective insulation shall have a swipe test performed to determine the chloride and fluoride concentrations.
l i
All Westinghouse supplied equipment, regardless of insulation type                              I I
or loaction, shall also be suject to the swipe test requirement.                        ,
8606120154 860512 PDR        FOIA PDR.
GARDE 85-59 1$
 
BROWN & ROOT, INC.                  PROCEDURE                      EFFECTIVE NUMBER          REVISION        DATE          PAGE CPSES u-CP-CPM 10.2            2          7/12/83      1 of 3
                                                                                  ** see orteinal cover sheet **    ******
TITLE:                              ORIGINATOR Date CLEANING AND INSULATING STAINIESS                                                                  ******
REVIEWED BY: ** see orteinal cover sheet **
STEEL PIPE AND                                                    B4R QA                  Date EQUIPMENT
                                                                                  ** eee cricinal cova- ahee* **    ******
IUGC0 QA                      Date APPROVED BY: ** see orfeinal cover sheet **
CONSTRUCTION PROJECT MGR          Date 0.1.      TABLE OF CONTENTS 1.0      I' NTRODUCTION 1.1      SCOPE 1.2      CENERAL 2.0      PROCEDURE 2.1      CIIANING I                    2.2      INSTALLATION
: i. a
 
==1.0      INTRODUCTION==
 
1.1      SCOPE This procedure provides the criteria for the final surface                            ;
cleanliness of all class,                1, 2, and 3 stainless steel pipe, l
non-Q stainless steel pipe whose design temperature exceeds                          .
I 300*F, and stainless steel equipment, and identifies the types of insulation which are acceptable for use on stainless steel.
Installation of re flective insulation is not within the . scope o f this procedure.
1.2      CENERAL All stainless steel piping and equipment shall be cleaned in accordance with the criteris stated herein.
All stainless steel piping and equipment inside the Containment Building that is to he insulated with reflective insula t io n shall have a swipe test performed to determine the chloride and fluoride concentrations.
All Westinghouse supplied equipment, regardless of insulation type or location, shall also be subject to the swipe test requireme nt .
CP-CPM 10.2 Rev. 2 DCN #1                                        07/16/84      Sheet 2 of 2 a
g"h
 
t N                                                                                                                                !
u JOB 35-1195 COMANCHE PEAK STEAM ELECTRIC STATION Construction Procedure 1
DOCUMENT CHANGE NOTICE NUMBER Notice applicable to Construction Precedure No. 35-1195- cp_cou              in_,    Rev. 2      .
This change will be incorporated in the next revision of the procedure.
Change the procedure as follows:
Please replace the following page with the attached:
Page 1 of 3 Reviewed by:
W
                                    % Tgtnator FJW Date
:,&4 f Brown & Root QuaTiry Assurance I        'I Date
                                                                ,                            /          n    ,
Y$r $, n, $ o f bid l ^          '1- to -pl Approved by:                                                                              Date TUGCD QuaMty Assurance
                                    ;  h.hi'As-.- kW ?"S''$,b                                        07l16/84 Effective Date Construction Project Manager              Date
:_                      t-___ __-____1
 
          .o
                                                          .                PROCEDIRE                          EFFECTIVE BROWN & ROOT, INC.                                NUMBER      REVISION                DATE    PAGE CPSES                                                                                    '
    ,n JOB 35-1195
'                                                                                                                        2 of 3 CP-CPM 10.2              2          7/12/83 All other stainless steel piping and equipment shall meet the acceptance criteria stated in Section 2.0.
Non-Westinghouse supplied equipment is identified by tag numbers prefixed with CP1, CP2, or CPX. West.inghouse supplied equipment is identified with TBX or TCX tag number prefixes.
For stainless steel piping and equipment that will be insulated with reflective insulation, acceptance of cleanliness shall be documented by Brown & Root QC in accordance with QC procedures.
2.0                  PROCEDURE 2.1                  CLEANING Stainless steel piping and equipment surfaces within the scope of this procedure shall be cleaned to the extent necessary to ensure the criteria discussed below are obtained. Cleaning may be per-fonned by vacuuming, wiping, or blowdown with compressed air, and flapping / grinding. Welds which have received preservice exami-nation shall not be cleaned by grinding or flapping. When compressed air is used, care shall be taken to prevent contamination of other items in the area. All stainless steel items shall be given a final rinsing with Grads "A" water.
The external surfaces shall meet the following criteria:
: 1. The surface shall be free of particulate contaminants such as sand , metal chips , weld siag , etc.
: 2. The surface shall be free of organic film contamination such as oils and preservatives as determined by visual examination. If surfaces fail to meet this criteria, and degreasing is required, use Stoddard solvent, mineral spirits, isopropyl alcohol, ethyl alcohol, acetone, toluene, methyl ethyl ketone, or an approved liquid penetrant cleaner to clean the surface. De-greasing shall be followed by rinsing with Grade "A" water.
: 3. Paint on stainless steel pipe surfaces shall be treated as follows:
: a. On piping systems with a design temperature of 300 F or less:
: 1) All paint on surfaces that is visible and accessible shall be removed.                                                        ];
: 2) Surfaces for which visual inspection is not feasible                      .!I (such as adjacent to pipe supports), pressure spraying with all the following liquids shall be used to clean
      --                                                    the pipe:                                                              i 1
 
.~.            . - . .    .                . - - - . . . . . .              .            - - -              _
PROCEDIRE                    EFFECTIVE BROWN & ROOT, INC.                            NUMBER        REVISION      DATE        PAGE CPSES
:~\
CP-CPM 10.2            2      7/12/83    3 of 3 First, MEK, or approved liquid penetrant cleaner; next, acetone or ethyl alcohol; finally, demineralized water.
: b.          On piping systems with a design temperature greater than 30TF:
: 1) All paint on surfaces that is visible and accessible shall be removed.
: 2) On surfaces for which visible inspection is not feasible, a dark abrasive cloth shall be used to clean the surfaces.
If paint shows on the cloth, a new clean cloth shall be used until all paint is removed from the pipe. If it is not possible to satisfactorily remove the paint in this manner, the p1pe surface snall be made accessible f r pair.t removal by dismantling pipe supports as necessary.
: 3) Following any paint removal, pressure spraying with all the following liquids shall be used to clean the pipe:
First, MEK, or approved liquid penetrant cleaner; i      ,
next, acetone or ethyl alcohol; and finally de-
      '-                                                                  mineralized water.
2.2          INSTALLATION Only the following products may be used on stainless steel piping and equipment:
: 1.        Calcium silicate, all            types
: 2.        Ryder thermocote cement, all types
: 3.        Temp mat
: 4.        Aluminum lagging with moisture barrier, all types
: 5.        81-27 foster adhesives
: 6.        fiberglass, KNAJF pipe and block types only.
When installing the insulation, the craftsman shall take care not to contaminate the cleaned surfaces or the insulation.
Insulation contaminated with mud, paint, grease, etc. shall not be applied to stainless steel surfaces.
l i
s_ -
l l
                                                                          -}}

Latest revision as of 13:14, 16 December 2020

Rev 2 to Procedure CP-CPM 10.2, Cleaning & Insulating Stainless Steel Pipe & Equipment
ML20195F495
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/12/1983
From:
BROWN & ROOT, INC. (SUBS. OF HALLIBURTON CO.)
To:
Shared Package
ML20195F283 List: ... further results
References
FOIA-85-59 CP-CPM-10.2, NUDOCS 8606120154
Download: ML20195F495 (5)


Text

. - _ _ _ .

.k .

ER0',iN & ROOT, INC. PRCCEDURE EFFECT!'lE

' PAGE

,<w CPSES NUMEER RE'!!SION DATE I .

I l

J03 35-1195 CP-CPM 10.2 2 7/12/83 1 of 3 I i

TITLE: ORIGINATOR: /

L/

fx' [ I'{)[8 u, , .

? CLEANING AND -

MdI# 7'C

  • '/$ ,

INSULATING STAIHLESS , RE'/IEWED BY: .

/

l EQU M E. '

Dm :

. g\) -@ j

,. Tf 0,< CA

! APPRO'/ED BY I < ' -[N " /D '- 'S CONSTRUCTI)i PROJECT MANAGER DATE .

i O I

! o.i TABLE OF CONTENTS c F T -i '

- = l lLi UEI"'"""

! 2.0

' 2.1 PROCEDURE CLEANING hMEEmNUN.EON  !

i l

~

l 2.2 INSTALLATION AlA r= r" l i

UIA- 0-Ov p  :::""" s/sy This procedure provides the criteria for the final surface l j l

- cleanliness of stainless steel pipe and equipment inside and '

! outside of the Containment Building, and identifies the types i of insulation which are acceptable for use on stainless steel. ,

Installation of reflective insulation is not within the scope of this procedure. ,

i 1.2 GENERAL i i

. All stainless steel piping and equipment shall be cleaned in

! accordance with the criteria stated herein.

I All stainless steel piping and ' equipment inside the Containment ,

Building that is to be insulated with reflective insulation shall have a swipe test performed to determine the chloride and fluoride concentrations.

l i

All Westinghouse supplied equipment, regardless of insulation type I I

or loaction, shall also be suject to the swipe test requirement. ,

8606120154 860512 PDR FOIA PDR.

GARDE 85-59 1$

BROWN & ROOT, INC. PROCEDURE EFFECTIVE NUMBER REVISION DATE PAGE CPSES u-CP-CPM 10.2 2 7/12/83 1 of 3

    • see orteinal cover sheet ** ******

TITLE: ORIGINATOR Date CLEANING AND INSULATING STAINIESS ******

REVIEWED BY: ** see orteinal cover sheet **

STEEL PIPE AND B4R QA Date EQUIPMENT

    • eee cricinal cova- ahee* ** ******

IUGC0 QA Date APPROVED BY: ** see orfeinal cover sheet **

CONSTRUCTION PROJECT MGR Date 0.1. TABLE OF CONTENTS 1.0 I' NTRODUCTION 1.1 SCOPE 1.2 CENERAL 2.0 PROCEDURE 2.1 CIIANING I 2.2 INSTALLATION

i. a

1.0 INTRODUCTION

1.1 SCOPE This procedure provides the criteria for the final surface  ;

cleanliness of all class, 1, 2, and 3 stainless steel pipe, l

non-Q stainless steel pipe whose design temperature exceeds .

I 300*F, and stainless steel equipment, and identifies the types of insulation which are acceptable for use on stainless steel.

Installation of re flective insulation is not within the . scope o f this procedure.

1.2 CENERAL All stainless steel piping and equipment shall be cleaned in accordance with the criteris stated herein.

All stainless steel piping and equipment inside the Containment Building that is to he insulated with reflective insula t io n shall have a swipe test performed to determine the chloride and fluoride concentrations.

All Westinghouse supplied equipment, regardless of insulation type or location, shall also be subject to the swipe test requireme nt .

CP-CPM 10.2 Rev. 2 DCN #1 07/16/84 Sheet 2 of 2 a

g"h

t N  !

u JOB 35-1195 COMANCHE PEAK STEAM ELECTRIC STATION Construction Procedure 1

DOCUMENT CHANGE NOTICE NUMBER Notice applicable to Construction Precedure No. 35-1195- cp_cou in_, Rev. 2 .

This change will be incorporated in the next revision of the procedure.

Change the procedure as follows:

Please replace the following page with the attached:

Page 1 of 3 Reviewed by:

W

% Tgtnator FJW Date

,&4 f Brown & Root QuaTiry Assurance I 'I Date

, / n ,

Y$r $, n, $ o f bid l ^ '1- to -pl Approved by: Date TUGCD QuaMty Assurance

h.hi'As-.- kW ?"S$,b 07l16/84 Effective Date Construction Project Manager Date
_ t-___ __-____1

.o

. PROCEDIRE EFFECTIVE BROWN & ROOT, INC. NUMBER REVISION DATE PAGE CPSES '

,n JOB 35-1195

' 2 of 3 CP-CPM 10.2 2 7/12/83 All other stainless steel piping and equipment shall meet the acceptance criteria stated in Section 2.0.

Non-Westinghouse supplied equipment is identified by tag numbers prefixed with CP1, CP2, or CPX. West.inghouse supplied equipment is identified with TBX or TCX tag number prefixes.

For stainless steel piping and equipment that will be insulated with reflective insulation, acceptance of cleanliness shall be documented by Brown & Root QC in accordance with QC procedures.

2.0 PROCEDURE 2.1 CLEANING Stainless steel piping and equipment surfaces within the scope of this procedure shall be cleaned to the extent necessary to ensure the criteria discussed below are obtained. Cleaning may be per-fonned by vacuuming, wiping, or blowdown with compressed air, and flapping / grinding. Welds which have received preservice exami-nation shall not be cleaned by grinding or flapping. When compressed air is used, care shall be taken to prevent contamination of other items in the area. All stainless steel items shall be given a final rinsing with Grads "A" water.

The external surfaces shall meet the following criteria:

1. The surface shall be free of particulate contaminants such as sand , metal chips , weld siag , etc.
2. The surface shall be free of organic film contamination such as oils and preservatives as determined by visual examination. If surfaces fail to meet this criteria, and degreasing is required, use Stoddard solvent, mineral spirits, isopropyl alcohol, ethyl alcohol, acetone, toluene, methyl ethyl ketone, or an approved liquid penetrant cleaner to clean the surface. De-greasing shall be followed by rinsing with Grade "A" water.
3. Paint on stainless steel pipe surfaces shall be treated as follows:
a. On piping systems with a design temperature of 300 F or less:
1) All paint on surfaces that is visible and accessible shall be removed. ];
2) Surfaces for which visual inspection is not feasible .!I (such as adjacent to pipe supports), pressure spraying with all the following liquids shall be used to clean

-- the pipe: i 1

.~. . - . . . . - - - . . . . . . . - - - _

PROCEDIRE EFFECTIVE BROWN & ROOT, INC. NUMBER REVISION DATE PAGE CPSES

~\

CP-CPM 10.2 2 7/12/83 3 of 3 First, MEK, or approved liquid penetrant cleaner; next, acetone or ethyl alcohol; finally, demineralized water.

b. On piping systems with a design temperature greater than 30TF:
1) All paint on surfaces that is visible and accessible shall be removed.
2) On surfaces for which visible inspection is not feasible, a dark abrasive cloth shall be used to clean the surfaces.

If paint shows on the cloth, a new clean cloth shall be used until all paint is removed from the pipe. If it is not possible to satisfactorily remove the paint in this manner, the p1pe surface snall be made accessible f r pair.t removal by dismantling pipe supports as necessary.

3) Following any paint removal, pressure spraying with all the following liquids shall be used to clean the pipe:

First, MEK, or approved liquid penetrant cleaner; i ,

next, acetone or ethyl alcohol; and finally de-

'- mineralized water.

2.2 INSTALLATION Only the following products may be used on stainless steel piping and equipment:

1. Calcium silicate, all types
2. Ryder thermocote cement, all types
3. Temp mat
4. Aluminum lagging with moisture barrier, all types
5. 81-27 foster adhesives
6. fiberglass, KNAJF pipe and block types only.

When installing the insulation, the craftsman shall take care not to contaminate the cleaned surfaces or the insulation.

Insulation contaminated with mud, paint, grease, etc. shall not be applied to stainless steel surfaces.

l i

s_ -

l l

-