Mb b UNITED STATES
!~
~t NUCLEAR REGULATORY COMMISSION h
WASHINGTON, D. C. 20555
\\...../
Docket Nos. 50-445/50-445 MAY 121986 Ms. Billie Pirner Garde, Director Environmental Whistleblower Clinic Government Accountability Project 1555 Connecticut Avenue, NW, Suite 202 IN RESPONSE REFER Washington, D.C.
20036 TO F01A-85-59
Dear Ms. Garde:
This is in further response to your letter dated January 21, 1985, in which you requested, pursuant to the Freedom of Information Act (F0IA), records related to the NRC Comanche Peak Task Force established in March, 1984.
We are now placing one additional box of records (Box 10) in the QA/QC category, covering Appendix S records numbered I through 127, into the Public Document Room (PDR) in file F01A-85-59 under your name. A copy of Appendix S is enclosed.
A separate set of these records, which are being disclosed in their entirety, is being made available for public inspection and copying at the Local Public Document Room (LPDR) located at the University of Texas Library, 701 South Cooper Street, Arlington, Texas.
Additional boxes of records in the QA/QC category are currently urder review and will be placed in the POR and LPDR in the coming weeks.
-~
Sincerely, wj A&1b)
Donnie H. Grimsley, Director Division of Rules and Records Office of Administration
Enclosure:
As stated l
I 8606120023 860512 PDR FOIA CARDE85-59 PDR
RE:
F01A-85-59 APPENDIX S Box 10-QA/QC Page 1.
1/11/80 Brown & Root Inc.
2 NCR M-1889 2.
2/29/80 Brown & Root Inc.
9 NCR No. M-2002 l
3.
10/7/80 Brown & Root Inc.
9 NCR M-2374 (figure 16.1-1) 4.
12/19/80 Comanche Peak Steam 4
Electric Station NCR M-81-00161 Rev. 1 5.
1/29/81 Brown & Root Inc.
31 NCR M-2507 R. 2 6.
10/1/81 Comanche Peak Steam 2
Electric Station NCR M-81-01003 7.
12/31/81 Comanche r ak Steam 3
e Electric Station NCR M-81-01537 8.
1/18/82 Comanche Peak Steam Electric 4
Station NCR M-81-01548
l 9.
3/16/82 Brown & Root Inc.
5 NCR M-32555
- 10. 4/14/82 Brown & Root Inc.
2 NCR M-3152
- 11. 8/2/82 Comanche Peak Steam Electric 4
Station NCR M-81-012484 R. 1
- 12. 8/19/82 Brown & Root Inc.
103 NCR M-3033 Rev. 1 13.
1/21/83 Brown & Root Inc.
3 NCR M-4707S
- 14. 2/7/83 Brown & Root Inc.
3 NCR M-5003S
- 15. 2/7/83 Brown & Root Inc.
3 NCR M5004S R
16, 2/14/83 Brown & Root Inc.
2 NCR M5001S
- 17. 3/7/83 Brown & Root Inc.
2 NCR M5002S
- 18. 4/19/83 Brown & Root Inc.
3 NCR M5874S
- 19. 4/19/83 Brown &' Root Inc.
3 NCR M5872S
- 20. 4/19/83 Comanche Peak Steam 3
2
Electric Station
'NCR M-83-00965 -
- 21. 4/20/83 Brown & Root, Inc.
3 NCR M5871S
- 22. 4/20/83 Brown & Root, Inc.
2 NCR M5873S
- 23. 5/1/83 Brown & Root Inc.
7 NCR M5805 R. 1
- 24. 6/8/83 Brown & Root Inc.
2 NCR M7247S
- 25. 7/1/83 Brown & Root Inc.
2 NCR M8178
- 26. 7/1/83 Brown & Root Inc.
4 NCR M8180 4
- 27. 7/12/83 Brown & Root Inc.
3 NCR M-7821
- 28. 8/8/83 Comanche Peak Steam 3
Electric Station NCR M-83-01505
- 29. 8/25/83 Brown & Root Inc.
4 NCR M-7391 Rev. 1
- 30. 9/14/83 Brown & Root Inc.
8 NCR 10-411 3
- 31. 9/14/83 Brown & Root Inc.
5 NCR M-9721 32.
10/12/83 Brown & Root Inc.
1 NCR M-5332-5 33.
11/14/83 Brown & Root Inc.
1 NCR M-11154 34.
11/10/83 Brown & Root, Inc.
1 NCR M-111215 35.
12/7/83 Brown & Root, 2nc.
1 NCR M-124185 36.
5/17/83 Brown & Root,Inc.
2 NCR M-13464
- 37. 6/5/84 Comanche Peak Steam 24 Electric Station 5
NCR C-84-01331 Rev. 4
- 38. 7/20/84 Brown & Root, Inc.
3 NCR M-14371N
- 39. 8/14/84 Brown & Root, Inc.
2 NCR M-13453N Rev. 1 40.
10/29/84 Comanche Peak Steam 8
Electric Station NCR M-84-100536 Rev. 2 41.
12/10/84 Comanche Peak Steam 5
Electric Station NCR M-84-100538 Rev. 1 4
42.
1/28/85 List of Pipe Hangers 2
- 43. No Date List of NCRs sent to NRC 4
- 44. No date Facsimile Transmittal 4
Request with List of 42 Pipe supports 45.
11/15/74 CPSES Construction 21 Procedure 35-1195-DCP-3 Rev. 9
- 48. 2/6/80 Brown & Root CPSES 4
Procedure CP-CPM 6.9F Rev. 0
- 49. 2/6/80 Brown & Root CPSES 1
Procedure CP-CPM 6.9F Rev. O figure 6.9F-1
- 50. 2/6/80 Brown & Root CPSES 1
.rocedure CP-CPM 6.9F Table 6.9F-1 51, 2/6/80 Brown & Root CPSES 1
Procedure CP-CPM 6.9F Rev. 1 Table of Contents 5
4
- 52. 2/18/80 TUSI Procedure CP-EP-4.5 3
Design Verification Rev.1
- 53. 3/31/80 CPSES Construction 8
Procedure Document Change Notice Number 1
- 54. 4/28/80 CPSES Construction Procedure 1
Document Change Notice Number 2
- 55. 5/19/80 CPSES Construction 1
Procedure Document Change Notice Number 3
- 56. 8/5/80 CPSES Construction 1
Procedure Document Change Notice Number 4
- 57. 8/6/80 Brown & Root Inc.
12 CPSES Procedure No.
OCP-3 Rev. 10
- 58. 9/3/80 Brown & Root, Inc.
16 Procedure No. CP-CPM-9.10 Rev. 0
- 59. 9/3/80 Brown & Root, Inc.
2 CPSES Number CP-CPM-9.10 Rev. 0
- 60. 9/8/80 Brown & Root, Inc.
3 CPSES Number QI-QAP-11.1-28 Rev. 0 6
61.
10/16/80 Procedure for confirming upset 2
threads for Rigid sway struts for TUSI Project 62.
12/8/80 Brown & Root, Inc.
3 Procedure Number QI-QAP-11.1-28 Rev 4 63.
1/7/81 Brown & Root CPSES 26 Procedure No. QI-QAP-11.1-28 Rev. 5 64.
2/18/81 Brown & Root CPSES 26 Procedure No. QI-QAP-11.1-28 Rev. 6
- 65. 3/9/81 Brown & Root CPSES 13 Procedure DCP-3 Rev. 11
- 66. 4/27/81 Texas Utilities Services 22 9
Instruction CP-EI-4.5-1 Rev. 1 General Program for As-Built Piping Verification 67.
5/28/81 Brown & Root Number 40 l
QI-QAP-11.1-28 Rev. 7 68.
12/28/81 Brown & Root Procedure 9
Number DCP-3 Rev. 12 CPSES Document Control Program 69.
1/15/82 Brown & Root Procedure 23 Number DCP-3 Rev. 13 7
70.
1/15/82 Brown & Root 4
QI-QAP-11.1-28 Rev. 8
- 71. 6/21/82 Gibbs & Hill ltr to 3
Texas Utilities Generating Company Attachment to CPP-8001
- 72. 6/11/82 Texas Utilities Services 3
Inc. Procedure CP-EP-4.0 Rev. 3
- 73. 8/18/82 Brown & Root 11 Procedure number DCP-3 Rev. 14 74.
10/29/82 Brown & Root 32 QI-QAP-11.1-28a Rev. 0 75.
12/15/82 Brown & Root 56 QI-QAP-11.1-28 Rev. 16 76.
1/17/83 Brown & Root 17 Procedure Number DCP-3 Rev. 15
- 77. 2/2/83 Brown & Root Inc.
62 QI-QAP-11.1-28 Rev. 17
- 78. 8/5/83 Brown & Root 11 Procedure DCP-3 Rev. 16 8
- 79. 4/12/83 Brown & Root CPSES 64 QI-QAP-11.1-28 Rev. 19
- 80. 4/28/83 Brown & Root CPSES 42 QI-QAP-11.1-28a Rev. 2
- 81. 5/16/83 Brown & Root CPSES 64 QI-QAP-11.1-28 Rev. 20
- 82. 6/29/83 Brown & Root CPSES 42 QI-QAP-11.1-28a Rev. 3
- 83. 6/29/83 Brown & Root CPSES 65 QI-QAP-11.1-28 Rev. 21 84.
7/12/83 Brown & Root CPSES 5
CP-CPM-10.2 Rev. 2
- 85. 8/4/83 Brown & Root CPSES 66 QI-QAP-11.1-28 Rev. 22
- 86. 9/22/83 Brown & Root CPSES 14 CP-CPM-6.3 Rev. 10
- 87. 9/27/83 Brown & Root Interoffice 23 Memo,
Subject:
Approval of Welding Procedure IM-262?S 88, 10/11/83 Texas Utilities Services 4
Inc. CP-EI-4.5-4 Rev. 7 9
89.
11/8/83 Brown & Root QI-QAP-11.1-28a 46 Rev. 5 90.
10/24/83 Brown & Root 66 QI-QAP-11.1-28 Rev. 23 91.
10/27/83 Texas Utilities Services 6
Inc. CP-El-4.0-13 Rev. 9
- 92. 3/5/84 Brown & Root 4
CP-CPM-14.1 Rev. 2
- 93. 3/16/84 Brown & Root CPSES 15 Procedure DCP-3 Rev. 17
- 94. 4/6/84 Texas Utilities Generating 16 Company QI-QAP-11.4-1 Rev. 18
- 95. 4/18/84 Brown & Root Inc.
73 QI-QAP-11.1-28 Rev. 24 96.
10/2/84 Misc. Procedures 27 and memos
- 97. 7/1/82 TUGC0 CPSES 6
QI-QP-11.2-1 Rev. 9
- 98. 2/2/83 Brown & Root CPSES 41 QI-QAP-11.1-28a Rev. 1
- 99. 3/31/83 Brown & Root CPSES 64 QI-QAP 11.1-28 Rev. 18 10
100. 8/4/83 Brown & Root CPSES 44 QI-QAP-11.1-28a Rev. 4 101. 5/9/84 Brown & Root 18 Procedure DCP-3 Rev. 18 102. 5/14/84 Brown & Root 48 Procedure CP-CPM-6.9E Rev. 7 103. 6/11/84 Brown & Root 37 CP-QAP-16.1 Rev. 21 104. 6/11/84 Brown & Root 76 QI-QAP-11.1-28 Rev. 25 105, 6/19/84 TUGC0 Instruction 6
Number QI-QP-11.10-5 Rev. 10 106. 7/5/84 TUGC0 Engineering Div 3
CP-El-4.0-54 Rev. I 107. 7/10/84 Brown & Root Procedure 45 Number CP-CPM-6.9G Rev. 6 108. 7/12/84 TUGC0 Engineering Division 8
Instruction CP-El-4.0-1 Rev. 12 109. 7/12/84 TUGC0 Engineering Division 8
Instruction CP-EI-4.0-1 Rev. 12 11
6 110. 7/30/84 TUGC0 Engineering Div 11 Instruction CP-EI-4.5-1 Rev. 10 111.8/6/84 TUGC0 Office 20 Memorandum to Distribution
Subject:
Quality Document Index (Non-ASME) 112. 8/7/84 TUGC0 Procedure No.
3 CP-QP-11.10 Rev. 3 113. 8/24/84 TUGC0 Instruction 62 Number QI-QP-11.10-1 Rev. 29 114. 8/31/84 Brown & Root 30 Procedure Number ECP-10 Rev. 8 4
115. 9/11/84 TUGC0 Instruction 17 Number QI-QP-11.10-2 Rev. 28 116. 9/18/84 Brown & Root 11 Procedure Number CP-CPM 6.9c Rev. 2 117, 9/21/84 TUGC0 Instruction 5
QI-QP-11.14-4 Rev. 14 118. 9/21/84 TUGC0 Instruction 36 QI-QP-11.10-1a Rev. 1 12
119. 9/21/84 TUGC0 Instruction 5
QI-QP-11.14-4 Rev. 14 120. 9/21/84 TUGC0 Instruction 37 QI-QP-11.10-1a Rev. l' 121. 9/21/84 Brown & Root 21 Procedure Number CP-CPM-6.98 Rev. 2 122. No date Quality Documents 8
Index (ASME) 123. No date TRT Reviewer Notes 3
124. 1/85 SSER Supplement No. 7 74 NUREG-0797 125. 2/85 SSER Supplement No. 8 103 NUREG-0797 126. 3/85 SSER Supplement No. 9 92 NUREG-0797 127. 5/85 SSER Supplement No. 11 196 NUREG-0797 13
}
.g GOVERNMENT ACCOUNTADIUTY PROJECT 1335 Connecticut Avenue N.W.. Suite 202 Washington, D.C. 20036 (202)232-8550 G:85 :104 January 21, 1985 FREEDOM OF INFORMATION ACT REQUEST FiiEribu'i UF IM 0hMA110N ACT. REQUESI, MAUN Director
~
Office of Administration Nuclear Regulatory Commission Washington, D.C.
20555 To Whom it May Concern:
Pursuant to the Freedom of Information Act ("FOIA"), 5 U.S.C. 5 552, the Government Accountability Project (" GAP") requests copies of any and all agency records and information, including but not limited to notes, letters, memoranda, drafts, minutes, diaries, logs, calendars, tapes, transcripts, summaries, interview re-ports, procedures, instructions, engineering analyses, drawings, files, graphs, charts, maps, photographs, agreements, handwritten notes, studies, data sheets, notebooks, books, telephone messages, computations, voice recordings, computer runof fs, any other data compilations, interim and/or final reports, status reg ports, and any and all other records relevant to and/or generated in connection with the overview, ragulation and investigation of the Comanche Peak Nuclear Plant
~
by any person, branch, or department of the NRC since January 18, 1985.
This request includes all agency records as defined in 10 C.F.R. 6 9.3a(b) and the NRC Manual, Appendix 0211, Parts 1. A.2 and A.3 (approved October 8,1980) whether they currently exist in the NRC official, " working," investigative or other files, or at any other location, including private residences.
If any records as defined in 10 C.F.R. 5 9.3a(b) and the NRC Manual, supra, and covered by this request have been destroyed and/or removed after this request, please provide all surrounding records, including but not limited to a list of all records which have been or are destroyed and/or removed, a description of the action (s) taken relevant to, generated in connection with, and/or issued in order to implement the action (s).
GAP requests that fees be waived, because " finding the information can be con-sidered as primarily benefitting the general public," 5 U.S.C. $ 552(a)(4)(a).
GAP is a non-profit, non-partisan public interest organization concerned with honest and open government. Through public outreach, the Project promotes whistleblowers as agents of government accountability. Through its Citizens Clinic, GAP offers assistance to local public interest and citizens groups seeking to ensure the health and safety of their communities. The Citizens Clinic is currently assisting several citizens groups, local governments and intervenors in the central Texas area concerning the construction of the Comanche Peak nuclear power plant.
N wnerrr o
,\\e 4
~
director Office of Administration Page Two We are requesting the above information as part of an ongoing monitoring project on the adequacy of the NRC's efforts to protect public safety and health at nuclear power plants.
For any documents or portions that you deny due to a specific FOIA exemption, please provide an index itemizing and describing the documents or portions of documents withheld. The index should provide a detailed jusitfication of your grounds for claiming each exemption, explaining why each exemption is relevant to the document or portion of the document. withheld. This index is required under Vaughn v. Rosen (I), 484 F.2d 820 (D.C. Cir. 1973), cert. denied, 415 U.S.
977 (1974).
We look forward to your response to this request within ten days.
Sincerely, ib Billie Pirner Garde Citizens Clinic Director e