{{#Wiki_filter:* BROWN & RCOT, INC. ISSUE CPSES NIFBER REVISION DATE PAGE QI-QAP.11.1 28A 3 1 of 42 g ORIGINATOR:bctb/\\3 w ue M 6\\2.@ 33 TITLE: IN 0 REVIEWED BY: 4 6!d) 0F ASME CLASS 1, T DATE 2, and 3 j / f SNUBBERS APPROVED BY: Aud. fo/f#/93 DATE SiteQAManag
1.0 REFERENCES
1-A ASME Boiler & Pressure Vessel Code Section III,1974 Edition, with Addenda through Winter 1974 1-B CP.QAP 11.1, " Fabrication and Installation Inspection of Components, Component Supports and Piping" 1.C QI.QAP-2.1 5, " Training and Certi fication of Mechanical Inspection Personnel" 1-D CP.QAP.16.1, " Control of Nonconforming Items" 1.E CP.QAP-8,5, " Reclassification of Code Material" 2.0 GENERAL 2.1 PURPOSE AND SCOPE This instruction delineatas the criteria and inspection requirements to be used when perfonning fabrication and installation of ASME Class 1, 2, and 3 snubber assemblies (Reference 1.A and 1.B). FOR E 0 K ON O K_Y 2.2 SNUBBER These are supplied by both ITT Grinnell and NPSI in seven sizes, 1/4 through 100. All seven sizes are available in two configurations. One configuration is the fixed length type (ITT Grinnell - figure 306, NPSI - SMF). In this type, the bracket is attached directly to the snubber housing (see Attachments 1 and 2). The other configuration is the variable length type (ITT Grinnell figure 307, NPSI - SMA). The variable length snubber is supplied with a transition kit which consists of an adapter that mounts directly to s the snubber, a pipe extension piece with an internally threaded end coupling welded on one end, and an eyerod which threads into the end coupling. (See Attachments 1 and 2). 8606120150 860512 @-. ~ PDR FOIA GARDE 85-59 PDR
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 gl.QAP 11.128A 3 2 of 42 2 5 1983 2.3 RESPONSIBILITY The Completions / Start-Up QC Superintendent shall be responsible for the implimentation of this procedure. 2.4 PERSONNEL QUALIFICATIONS All B&R inspectors shall be trained, qualified and certified in accordance with the requirements of Reference 1.C. 2.5 ANI HOLD POINTS ANI hold points for snubber installation shall be established from pipe supports listed on the Hanger Installation Tracking System (HITS). The ANI's selection of hold points are listed on Attachment 3. Additional hold points may be selected irom current HITS lists. The Mi11 wright Superintendent shall notify the QC Superintendent, or his designee, prior to installing a snubber that the ANI has established a hold point. The QC Superintendent, or his designee, shall notify the ANI that construction is ready to install a snubber listed as a hold point by the ANI. After completion of installation ac tivities, Quality Engineering Systems (QES) shall include pipe support Multiple Weld Dr.ta Card (MWDC) in the documentation package for the ANI to sign off his hold point for snubber installation. 3.0 INSTRUCTIONS 3.1 MATERIALS 3.1.1 Verification and Transfer of Material Traceability The QC Inspector shall verify material acceptability per the Material Requisition (MR) (signed by QC Receiving) on the QC Checklist. Prior to material separation QCI shall verify that material ID marking (heat number, heat code, etc.) has t een transferred. This will be documented in the comment sec. tion of the QC Checklist ( Attachment 4) or Vendor Supplied Lomponent Modification Record (Attachment 5) as applicable.
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP 11.1 28A 3 3 of 42 JUN 291983 3.1.2 Material Salvaging Salvaging of snubber (s) and associated hardware shall be accomplished in accordance with Attachment 6. 3.2 ROUTINE OBSERVATIONS Inspection personnel performing inspections shall monitor general workmanship conditions in all phases of snubber modification and installation. Observations shall include, but are not limited to: a. Handling / rigging b. Housekeeping / storage maintenance / physical damage c. In. process modification and installation d. Exposed machined surfaces are free of rust and foreign material Observations which are adverse to quality and existing site procedures shall be docuinented in accordance with Reference 1.D. 4.0 WELDING 4.1 WELDING INSPECTION REQUIREMENTS (GENERAL) Visual welding inspection shall be in accordance with the requirements of this instruction. QC shall verify that the welder (s) is qualified ~ to perform the work in accordance with the WPS by checking the Welding
- Matrix, and shall verify that the WPS and filler material listed on the WFML are the same as those listed on the WDC.
4.1.1 . Cleaniiness (when required) Cleanliness before fit.up shall be as follows: a. Before wel ding, the weld joint shall be free of
- moisture, dirt, oil, grease and other deleterious foreign materials for an area two inches (2") each side of the joint.
b. The base material shall be mechanically cleaned at least 1/2" inch each side of the weld joint.
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI-QAP-11.1-28A 3 g gg1983 4 of 42 4.1.2 Fi_t-Up (when required) a. Transition kits with socket couplings shall have end cap fitup with an end gap 1/16" prior to welding as illustrated in Attachment 7. b. Solid type couplings on snubber transition kits shall be welded in place while maintaining a tolerance of approximately 1/16" variation from the pipe centerline. c. Welding of the solid end coupling nut to the extension pipe alignment must be maintained within 1/2*. 4.2 WELD SIZES 4.2.1 F_orward Bracket Modification (NPSI) In those cases where the forward bracket is modified to 1 obtain the proper C-C dimension, the weld size for attaching lug and plate for snubber sizes 1/4 thru 10 is shown below: Snubber Size Weld Size Weld Length 1/4 3/16" 3/4" Lg. 1/2 3/16" 3/4" Lg. 1 3/16" All Around 3 1/4 " All Around 10 5/16" All Around In addition the QC Inspector will verify that the lug, when
- cut, meets the dimensional requirements as shown in.
4.2.2 Transition _ Kit Modification In those cases where the mounting plate is furnished as a bulk item and requires attachment by welding to the extension pipe the minimum weld size will be equal to the wall thickness of the pipe. In those cases where it is necessary to reweld the end coupling nut to the extension pipe for ITT Grinnell snubber transition kits, the following minimum weld sizes shall apply: e
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP-11.1-28A 3 5 of 42 g g g gg Snubber Size Fillet Weld Size (Min)* k, 1/8" 1 3/16" 3 3/16" 10 1/4 " 35 1/2" 100 3/4" The weld size need not be larger than the thickness of the coupling. In those cases where it is necessary to reweld the solid end coupling nut for NPSI snubbers the following fillet weld size shall apply: Snubber Size Fillet Weld Size (Min)* k, 3/16" 1 3/16" 3 3/16" 10 1/4 " 35 3/8" 100 5/8" The weld si ze shall not be larger than the thickness of the coupling. 4.2.3 Final Weld Inspection Fillet weld sizes specified in Paragraph 4.2.1 and 4.2.2, shall be the size required along the full length of the weld joint. However, a fillet weld in any single continuous weld may be less than the specified fillet weld dimension by not more than 1/16 inch provided that the total undersize portion of the weld does not exceed 10% of the length of the wel d. Individual undersize weld portions shall not exceed 2 inch in length. Oversize fillet welds shall be acceptable provided additional weld does not distort the items being joined together. ~ Distortion due to welding shall be reported in accordance with Reference 1.D. The final surface of welds shall be free from defects such as sharp surface irregularities, slag and cracks. Undercut shall not exceed 1/32 inch.
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP.11.1-28A 3 6 of 42 g NOTE: Only indications with major dimensions greater than 1/16 of an inch shall be considered relevant. 4.2.3.1 Class 1 Fillet Welds QCI shall evaluate all Class 1 fillet welds to determine if they are full fillet wel ds. If it is determined that a weld is a full fillet weld, QCI shall notify ANI and perform a PT examination. NOTE: A full fillet weld is a fillet weld whose size is equal to the thickness of the thinner member joined. 4.3 WELD REPAIRS Weld repairs shall meet the acceptance criteria applicable for the original weld. 4.4 FINAL WELD DOCUMENTATION Actual wel d sizes will be recorded on the QC Checklist,. Welding Operations shall be documented on the VSCMR. 5.0 SNUBBER INSTALLATION AND MODIFICATIONS 5.1 MODIFICATON OF PIPE CLAMPS The clamps shall be examined for minimum and maximum edge distance at snubber end per Attachment 9. When interference exists between pipe clamps and snubbers, the clamps may be i, modified within the allowable minimum and maximum edge distances as per Attachment 9. NOTE: The pin shall be removed prior to modifying the clamp. 5.2 SNUBBER BOLTING MINIMLft ENGAGEMENT In those cases where the bolts which attach the snubber forward bracket or transition kit to the snubber do not protrude completely through the tapped hole in the snubber i flange, the inspection criteria shown in Attachment 10 shall be used to determine if sufficient thread engagement has been obtained, mA
.~ ~ T BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP.11.1 28A 3 7 of 42 g l 5.3 PIPE CLAMP AND REAR BRACKET MATERIAL IDENTIFICATION QCI shall record the pipe clamp and rear bracket material identification number, if visible on the QC Checklist. In cases where the material ID is not visible, then the QCI shall annotate Quality Engineering Systems (QES) in the space provided. Upon final review of the snubber installation documetation, QES shall verify material identification from I previous hanger installation documentation. 5.4 MODIFICATION OF NPSI REAR BRACKETS When the snubber interferes with the rear bracket, the rear brackets for 35 and 100 snubbers may be modified in accordance with Attachment 11. Modification may be by themal means or machining. If thermal cutting is used, the cut edges shall be smoothened by machining. In either case, the pin shall be removed prior to the modification. 5.5 MODIFICATION OF FORWARD BRACKETS FOR SNUBBER SIZES 35 AND 100 Modification of forward brackets for 35 and 100 snubbers shall be done in accordance with Attachment 12. 1 5.6 MODIFICATION OF SNUBBER TRANSITION KITS (GENERAL) Shortening or lengthening of snubber transition kits to a length that will render snubber pin to pin dimensions outside maximum lengths specified in Attachment 22 must be approved by Engineering by a design change. NOTE 1: If the threaded portion of the eyerod bottoms out in the transition kit before the desired adjustment is acheived, the eyerod may be shortened 4 to achieve the necessary adjustment.
- However, enough threads shall remain to allow full thread ungagement in the coupling nut.
NOTE 2: For identification of snubber parts / hardware discussed in this section, see Attachments 1 and 2. a. For both NPSI and ITT Grinnell snubbers the required transition kit length shall be detemined by measuring the pin to pin (C.C) distance in the fi el d. Then subtract the actual cold setting (AC dimension shown on the design drawing) from the existing pin to pin dimension. The difference between these two dimensions is the transition kit length required to maintain the proper cold setting.
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP 11.128A 3 8 of 42 ga g The C.C dimension provided in the Bill of Material or in the sketch are provided for material take off purposes only. The maximum C.C dimensions are provided in Attachment 22 for the different size snubbers. Deviation from these dimensions is not permitted unless authorized by a design change. b. Deviation of more than 1/8" from the specified cold setting (AC dimension shown on the design drawing) is not pennitted unless authorized by a design change. c. If adjustment of an ITT. Fig. 307 snubber is required for installation, the threaded eye rod in the transition kit has an adjustment capability of 131/2". For NPSI SMA snubbers, this adjustment capacity is 1 3/4". Any further adjustment necessary may be made only by modification of the transition kits. d. In order to lengthen the tran:,ition kit, remove the end coupling by grinding or cutting. Snubber sizes 1/4 through 10 have a transition kit mounting plate which must also be removed. e. If the mounting plate is damaged during removal, a new one shall be fabricated from SA 36 or SA 515 Grade 65 steel. f. Replace the pipe portion of the transition kit with a size and grade of pipe selected in accordance with 3 and cut to length necessary to acheive the required pin to pin dimension. g. The length of ITT Fig. 306 snubbers can be adjusted only by the use of shim plates placed behind the rear bracket. NPSI.SMF snubbers can be adjusted either by placing shim plates behind the rear bracket, or by trimming the forward bracket in accordance with Paragraph 4.2.1. h. In those cases where interference problems exist when installing snubbers, they may be mounted 180' ~ (end to end) from the configuration shown on the design drawing. 5.6.1 Mounting of Forward Bracket or Transition Kit into SnubberBody For snubber sizes 35 & 100, screw the transition kit or forward bracket into the internal threads at the base of the snubber until it bottoms against the internal dust cover
- =. - -. - BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISIOW DATE PAGE JOB 35-1195 QI.QAP-11.1 28A 3 9 of 42 gg or until the threads meet the minimum thread engagement. For NPSI forward bracket or transition kit, minimun thread engagement is as detailed in Attachment 12. For ITT supplied forward bracket and transition kit, the existing thread length provided on the part is adequate. However, trimming of the thread length for ITT parts is prohibited, unless authorized by Engineering. The thread engagement operation should be completed by hand. If more force is required, remove part and clean all internal and external threads. If after cleaning, thightening is difficult, a strap wrench or other non-marring tool may be used to assist in the tightening P operation. However, the parts shall not be forced. After fully engaging the threads or bottoming, the forward bracket may be unscrewed up to a maxmimum of 1/2 turn to achieve correct orientation of the lugs and pins on each end of the snubber per the pipe support sketch. CAUTION: Do not unscrew more than 1/2 turn. 5.7 INSPECTION CRITERIA The following are inspection requirements when inspecting snubbers: a. To prevent binding within the clamp and/or bracket, snubber shall not be installed with an off-set of more than 5 (five) degrees. b. Verify that flat washers are installed between the spherical bearing and each cl amp hal f. The spacers - may not fit when assembling the rear bracket due to the tolerances. At this time, one or more of the spacers may be deleted. For horizontal brackets or clamps if only one spacer is installed, it should be pl aced on the underside of the spherical bearing when applicable. NOTE: Minor adjustments of the pipe clamp may be required to facilitate snubber installation. c. The clamp pin should be long enough to accomodate l cotter pins on either side, d. Veri fy pinned connections have fully opened cotter pins or split snap rings installed. e. Verify spherical bearings are tightly staked in the attachment ends. f. Verify that exposed threaded surfaces are free of excessive rust or for#pterial. W
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI-QAP-11.1-28A 3 JUN 291983 10 of 42 g. Verify that spherical bearings are free of foreign material and gimbals freely in it's race. NOTE: QCI shall document resul ts of cleanliness, and operability of component support parts (i.e., spherical bearings, pins, etc.) on the QC Snubber Checklist in Comments Section. 5.7.1 Snubber Alignment Due to Field Conditions Due to fiel d conditions, it may be necessary to adjust the alignment between the snubber end cap and the mounting hardware (rear bracket or pipe clamp) in order to allow a full 5* misalignment tolerance. All adjustments of thi s type shall be perfomed in accordance wi th the following instructions and witnessed by the QCI. 5.7.1.1 Snubber Sizes 1/4 through 10 - See Attachment 14. 1. Remove attachments from the snubber. 2. Place the snubber in a vertical position on a table-setting on the snubber housing. 3. While keeping a slight downward hand pressure, on the top to avoid linear movement, use retaining ring pliers to free retaining ring. 4. While maintaining a slight downward hand pressure, slowly turn end cap by hand only to desired rotational position. Do not use wrench or other mechanical means. 5. While maintaining hand pressure, replace retaining ring. Expand and contract arrestor slowly through full stroke to determine that repositioning has not damaged internal ~ components.
- 5. 7.1. 2 Snubber sizes 35 & 100 - See Attachment 15.
1. With the assembly cradled in a bench, remove the three indicator tube mounting screws. Extend the snubber sufficiently to expose the telescoping tube. 2. While the telescoping tube is restrained from rotating, loosen the left hand threaded nut (ring). (Nut has been torqued to 150 2 20 f t. lbs. ) Rotate the end cap to the desired position.
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP.11.1 28A 3 11 of 42 g g g ggg CAUTION: Under no circumstances shall the end cap be rotated more than one complete turn from the bottomed out position. 3. Re. torque the left hand threaded nut to 150 20 ft. lbs. 4. Replace the indicator tube and screws. 5. Mount the transition kit or forward bracket into the internal threads at the base of snubber as detailed in Paragraph 5.6.1. 5.7.2 Snubber Operation The snubber operation shall be checked to veri fy the distance of travel to ensure the snubber is in proper working condition. Snubber Size h 1 3 10 35 100 Stroke / Length Inches 4 2 4 5 6 6 6 NOTE: Snubbers with "L" suffix will have an extended stroke length of twice the stroke length shown above. 5.7.3 Reinstallation / Staking, of Spherical Bearings 1 Reinstallation or staking of spherical bearings shall be accomplished in accordance with Attachment 16. 6.0 GENERAL REQUIREMENTS a. Never interchange NPSI and ITT Grinnel parts or hardware. However, except for the feedwater and mainsteam systems, NPSI and Grinell snubber bodies may be interchanged. I b. It is extremely important that the clamp halves are parallel (see illustration on Attachment 17). Excessive gap at the upper end of the clamp can allow enough space for the spherical bearing to be dislodged from the eye rod end. Flat washers may be installed to fill the gap. c. At no time shall installed snubbers be used as steps or hand.hol ds. NOTE: Pipe clamp assembly infonnation - see Attachment 17 21.
L..._ BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP.11.1 28A 3 12 of 42 g d. When arc wel ding, do not attach ground to snubber or any part of the snubber which will cause arcing current to pass through snubbers. e. Do not sandblast snubbers. Snubbers are pre-finished with acceptable corrosion protection. f. If sandblasting is to be perfonned on adjacent parts such as unfinished pipe or structure, snubber and bearings on attaching parts must be masked for protection, g. Use care ti align snubber as closely as possible to avoid forces tending to rotate the pipe clamps or induce bending. h. If a snubber is accidentally dropped, check the function by extending and retracting through the full stroke. If there is no evidence of sticking or binding, it may be assumed that no internal damage has occurred. If there is evidence of a mal function, it shall be documented in accordance with Reference 1-D. i 1. To avoid driving spherical bearings free or damaging bearings, use care in inserting pins. Pins should be snug but not tight. Light tapping is allowable. j. Under no circumstances should the snubber housing be twi sted relative to the position indicator tube. This may result in a jammed snubber. 7.0 BASE METAL REPAIR Base metal defects shall be documented in accordance with Reference 1.D. 8.0 TORQUE REQUIREMENTS Torquing shall be witnessed by QC and documented by signature and date on the QC Checklist. The M&TE number and the torque value shall be recorded on QC Checklist. Mounting bolts for transition kits or forward brackets shall be torqued as follows: Snubber Size 1 3 10 Torque Value (IN/LB) 22 45 120 440
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP-11.1 28A 3 13 of 42 While torquing these bolts on sized \\ through 10 snubbers, hold the snubber assembly by the transition kit extension piece, or by the forward bracket. When holding by the forward bracket, care shall be taken not to damage the spherical bearing. While holding the snubber assembly by the transition kit extention piece, the eye rod jam nut shall be torqued as follows: Snubber Size k& 1 3 10 35 100 Torque Value (FT/LB) 40 40 80 100 150 220 9.0 SAFETY WIRING On NFSI snubbers, sizes 1/4 through 10, the transition kit or forward bracket mounting bolts shall be safety wired by passing a single strand of stainless steel wire through a series of holes in the bolts. The two ends of the wire shall be joined at a point between any two bolts. A pigtail of 1/4" to 1/2" in length with 3 to 6 twists shall be made at the end of the wiring. The pigtail should be bent back and under to prevent it from becoming a snag. Safety wiring shall have sufficient tension so that wire slack is minimal, but wire is not overstressed. QCI's signature for Operation No. 11 on QC Checklist for snubber installation shall provide objective evidence that safety wiring operation has been verified and found satisfactory. NOTE: In those cases, where attachment bolts between forward bracket assembly and snubber assembly are safety wired by the vendor, QCI shall verify that the following conditions exist: a. Bolts are tight. b. Lockwire is not damaged. c. Lockwire is crimped. If any of the above conditions are unsatisfactory, the bolts shall be retorqued and the new lockwire shall be installed as detailed above. X. A. 2
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 gl QAP-11.128A 3 14 of 42 g gg / 10.0 FINAL SNUBBER INSPECTION 10.1 , SNUBBER INSTALLATION When the snubber installation is complete and ready for final inspection, Construction shall notify Quality Control and present to the inspec tor the snubber installation information, for review and final inspection After the snubber is presented to QCI for inspection by Construction, discrepancies identified during inspections that do not require an Engineering evaluation or rework documentation will be identified 'to the Craft and corrected prior to QCI acceptance. 10.2 DOCtMENTATION The results of the snubber inspections shall be documented on the QC Checklist (Attachment 4). After completion, the checklist will be transmitted to QES for review of material identification as discussed in Paragraph 5.3. Upon completion of this review, QES shall file the checklist in the respective hanger installation documentation. 10.3 NONCONFORMING CONDITIONS Nonconforming conditions related to item noncompliance with procedure or drawing shall be documented on an NCR in accordance with Reference 1-D. 10.4 MODIFICATION PACKAG5S v Final inspected items requiring modification as a result of the issuance of design change or Item Removal Notice (IRN) shall be ' reinspected in accordance with the applicable requirements of this' procedure. 1 i
- .s L
N W
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 3 JUN 29198;l OI-OAP-ll.1-28; 1 15 of 42 ATTAQEDTT 1 i 1/4 THROUGH 10 il \\ NPS-SMF ITT-FIG. 306 p l,TitAMamCN J*L W e ce + Snuhter Housing \\__ aABEBf94 la,tq PO SI T,iCf.
- gem, E..
- em EYE M,
NPS-SPA ITT-FI3e 307 e _ ;h \\ n.216-em 4 y 4.--g - -.-~ .y -,.y-, w-g ,,m y 4 g -y.. -g-,, e-w--w y,,,
1 BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE OI-OAP-11.1-28A 16 of 42 v ATTAcee7r 2 SNUB 8ER SIZE 35 & 100 e f c-IPS.5m \\ ITT.FIE. 3CE E M Oc 5 N w _._._c l j i Q e aamsuasttwed M.PA IT".F!3. 2Cf o _Js L t ~p
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 3 JUN 29198-: 17 or 42 7I-GAP-ll.1-28A ATIAGEEvr 3 SMJBBER INSTALIATICN - ANI HOID POINIS Pipe Support MS-1-074-009-S52K MS-2-026-405-S72K E-1-052-012-C41K MS-2-257-402-S72K m 026-006-S32K E-2-052-E07-C41K SF-X-003-004-F43K m-2-014-401-532K SI-1-031-031-Y32K m-2-024-401-S22K SI-1-197-002-S32K m-2-027-403-S32K SF-2-Oll-E01-S42K SI-2-044-415-S32K SI-2-051-415-<42K SI-2-072-402-S32K 4 l - ;g - 's j
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 Q::-OAP-ll.1-29A 3 g 9 91983 18 of 42 ATTAONENT 4 s ~ Page of QC CHECKLIST FOR $NUBBER INSTALLATION QI-QAP 11.1-28A . REV. PARA. OP NO. OPERATION QCI/DATE $AT/UNSAT N/A 1. Manger i N/A 2. Snubber Serial # 5.7.2 $NUBBER OPERATION: 3. Snubber Size 4 Stroke Length 8.0 5 Torque of Transition Kit or Forward Bracket: MT&E VALUE 8.0 6. Torque of Adjustable Eye Rod End Jam Net: MT4E 5.7.1 7. Torque of Ring Nut (35 & 100 Only) MT&E VALUE 5.7.1 8. Relative Angle Adjustment (If Required) 5.7.2 9. Reverify Snubber Operation: Stroke Length a 3.1.1 MATERIAL 1. D. (As Applicable) 10. Forward Bracket t' 11. (Bulk) Base Plate 11A. (Bulk) Forward Bracket Eye i 12. Transition Kit I l 13. Adapter Plate 14 Eye Rod 15. Coupling Nut 16. Barrel
BRO'iN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 Q::-QAP-ll.1-28A 3 JUN 291983 19 of 42 ATTAQMNT 4 (Cbntinued) t QC CHECKLIST FOR $NUBBER INSTALLATION (Continued) Page of f l QI.QAP 11.1-28A , REY. I PARA. OP NO. OPERATION QCI/DATE SAT /UNSAT 3.1.1 17. (100 Only) Spherical Bearing Pins 18 (35 & 100 Caly) Eye Rcd Jam Nut 19. (If Visible) Pipe Clamp 20 (If Visible) Rear Brackst 5.6 21. Verification of Full Thread Engagement Of Eye Rod in Coupling Nut 5.6 22. C C Olmension 5.6 23. A-C Dimension per DWG. 4.4 ACTUAL WELD $1ZES (Modifications Only) 24 Transition Kit 25. Forward Bracket 5.2 26. Minimum Thread Engagement Com;11es With 0. 27. Installation Complete 28. QC Supervision Review N/A NCR COMMENTS NOTE: ANY CPERATIONS THAT ARE NOT APPLICABLE MUST BE MARKED "NA". IN!TIALED Af;D DATED BT THE QCI. M_V. ' I I
l 4 4 BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 3 Q[-CAP-ll.1-28A JUN 291982 20 of 42 ATT50NENT 5 (Front) VOCOR SUPPLIED COMPONENT M)DIFICATION RECORD Card serial # Camponent serial e Vendor Supplied Camponent Criginal i-Modification kacord Hanger f i [ De819nated Menger # an s.;an a g au. g .a g ai i
- JA g 6..u.
( e.gg c:gg g l ,asip..G:.STOL CLt i ..sv.e.4-J =ese e - m.4 ~ ~. % e. 4 % as w.a., 4 mwaa,..
- L MIT OtpT"":2 MI:"."3 ::::
.u f? (2).
- 1. N.8C"! 'J?*. F.. c T. r! r' sa *?'t 'TS***!*H'""F TT'T t' 1 ?,
.a us.. 1..
- ee.
.n . _a:n-a. .a:. s se. er.,.. i 4 . ' =. p,. e...p g. i. t..... .+. c e......=..... i; E
- h G
.a a -w-m.:.. s wsa -.q .,v.i ,w a,...i.... e s. -- u..:2 2.A, . ei .a.4,, .(.. e. AT".ll3 .it6 =4 M g a.T .i.hi 4 3. C;.3 l 4 I LEr1L Cut j u.T j_ e e [ 6 1 8 I \\ e j I i i l ~ i l k G SC M* N4 3*A":C D4 !! C 3 *tt ' 3% A*El"*.4?T.7 1C ".4 ""*1 'Jr".-l7 ': * ".i d N u -vow.,e?+*---~,e 4 ww ww aP=y v- =e-Me eves--*v- -e-?
- -*e=
9 wvr-er .WT-t' ewe -w ee sw w-w w7e--c'--+-v--'eWea--*-o-<e-rwemw=--M=*--e**r-m'eme-P+r>~ehe rd e-(tae--'-w-Nsy-
1 1 i BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 JUN 29198.: 21 e 42 CI-QAP-ll.1-28A ^ AITAONENT 5 (Back) VDCOR SUPPLIED COMPONENT MODITICATION RECORD l seC:".T"**" + e 9?? a. .u 4..e ,,a, = s u.. ._r.. C 367 G e.. s. Agy, 9 g;,,;3 l l 1,I I t u [ l i t t I x a: l #1 e.
- 1sP"St **.
I !%nter 'te. i C n.'.: a m 2 3s.t.:s fortat *i ! c!u.r l.::=e s; en:esa.; ov:=, i e. :-.. e : 1 --- m
- a. i i:: = *.:=.
j i i i 8 4 f i i l I r e i l 4 i., i I I i i. i t l I l 6 e I 4 8 e s I' e i , -~ j I am e J i- ) _s... _ - _.,. - -.. _ ~ ~.. _ ~ _. _. - - -, _ _, _ _, _ -., _. _ _ _.
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI-QAP.11.1 28A 3 22 of 42 ATTACHMENT 6 1.0 GENERAL 1.1 PURPOSE AND SCOPE This instruction provides the inspection and verification requirements for material or items to be salvaged from Vendor supplied and B&R fabricated snubbers assembl ies, ASME Class 1, 2, and 3 and subsequently used in the fabrication of Class 1, 2 and 3 supports. 2.0 INSTRUCTION 2.1 SALVAGING Never interchange NPSI and ITT Grinnel parts or hardware. However except for the feedwater and mainsteam systems, NPSI and Grinnel snubber bodies may be interchanged. Snubbers and associated hardware may be used on component supports other than those for which they are designated, provided requirements of this instruction are met. When an item is salvaged for use on a support other than the one for which it was designated, the original support mark and serial number; or mark, MIC or heat number; or mark and heat code shall remain distinguishable on the item. If the vendor fabricated snubber assembly with ASME Code 1 plates are salvaged and used on supports other than those for which they are designated, the Code plate (s) shall remain attached to the item if one or more welds remain. When all vendor wlds are removed, the code plate (s) shall be removed, provided the original support number is transferred to the vendor part. Authorization to remove name plates which are shown on the drawing shall be provided by Engineering on the appropriate design change. Construction shall transmit the Code plate (s) to QC by a 3-part memo. QC will subsequently transmit the Code plate (s) to the Owner. For B&R fabricated snubber assemblies that are to be salvaged which contain welds and these welds are to be salvaged, Welding Engineering is responsible for providing the documentation (WDC, WFML, etc.) necessary for QC to accept these welds. This documentation shall become part of the new snubber data package.
4 BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP.11.1 28A 3 JUN 291983 23 of 42 ATTACFf4ENT 6 (Continued) 2.2 LOCATION OF SALVAGED SUPPORTS When B&R fabricated and vendor supplied snubber assemblies, either Code stamped or not, are designated for salvage and returned to the warehouse, these assemblies shall be reinspected by receiving QC in accordance with Paragraph 2.3. B&R fabricated and vendor supplied snubber assemblies that are to be salvaged need not be returned to the warehouse. ASME Field QCI shall reinspect the salvaged items in accordance with Paragraph 2.4. 2.3 SALVAGED MATERIAL RELEASED FROM WAREHOUSE Upon receipt of Material pequisitions (MR) from the warehouse i for salvaged snubber assemblies / parts, the Receiving Inspector shall verify the following: a. The MR identifies the intended use of the material or parts. b. The MR identifies the original mark or support number from which it was salvaged if the part being salvaged is a Code stamped part. c. All material, parts, or assemblies are identified by a unique mark or assembly number traceable to the original support identification for vendor supplied Code stamped parts. d. B&R fabricated snubber assemblies parts or materials and B&R bulk exhibit a heat number which is traceable to an available. material certification.
- e. _ All vendor supplied snubber parts, material s, or assemblies are traceable to an available material certification.
Upon completion of the above verification, the Receiving Inspector will sign and date the MR. 4
- I
.. _ = W
.= BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI.QAP.11.1-28A 3 24 of 42 ATTACHMENT 6 (Continued) 2.4 INSPECTION AFTER RELEASE TO FIELD Once salvaged
- parts, material s, and/or assemblies are in the field for the construction, Quality Control shall perform the following verifications:
a. All vendor supplied, Code stamped, support parts or b assemblies exhibit the unique identification number as L shown on the corresponding MR. b. All B&R fabricated snubber parts, and bulk material P exhibit the heat number as shown on the MR, if released from the warehouse. If the snubber part was not returned to the warehouse, the original MR shall be referenced on the QC Checklist. Upon verification, the QC Inspector shall assure that the above applicable information is recorded on the appropriate form. QC acceptance shall be documented by signature and date in the Comment Section of the QC Checklist for Snubber Installation. 2.5 MATERIAL RE. CLASSIFICATION When a salvaged snubber or part is to be used on a higher Code Class than it was originally supplied for, it shall be evaluated in accordance with Reference 1.E. NOTES: 1) No evaluation i s needed when a salvaged snubber or part is to be used on a lower Code class than it was originally supplied for. -I m A.vm
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 O r-CAP-11.1-28A JUN 291982 2s or 42 ATr CHMENT 7 NPSI SOChTr TYPE COUPLING END CAP FITUP
- 1. Scribe lins l'/2" from
... tace of coupling.
- 2. Scribe line 2" with pipe fully insarted.
nto CAP ~ g N$ ] i i 3 / ' HH0/4 \\ '/ / /g h\\sunxxmuxum6xww 1/16" GAP \\\\\\$, rucn to unnzsc /, //H/H/HHA 2.f6
- 3. Sackout pipe 1/16" before welding.
- 4. Maasure 1 1/16" fres scribe _ ark on and cap to scribe mark on pipe
,. in order to achieve 1/16" and gap. r a .e.. . - ~ c
~ BROWN & ROOT, INC. gSSyg CPSES NUMBER REVISION DATE PAGE JOB 35-1195 l UN 291983 J 3 QI e ll.1-28A 2s e 42 ATIAQiMENT 8 FORWARD BRACKET MODIFICATION (DIMENSIONAL REQUIREMENTS) Snubber sizes 1, 3, and 10 C a e l= n . FEE "~ SI X am. O ur. 1 Ib 1 Hist I b Z II*fM S V fler anal to t== i g gym M' ' MM.AM - Ac!W azul! & 4 Snubber sizes k and C 7
- ~ c' ~~~
1 2 MIN MAA] 17s.shs \\ ~ i FE:s h 1 m .l l s g -7 N Yb VW j 47XX2' 2DRING IN PUM $C7"d $2 D W P V W
] i BROWN & ROOT, INC. ISSUE CPSES NUMBER RE'!!SION DATE PAGE JOB 35-1195 3 JUN 291983 OI-OAP-ll.1-28A 27 of 42 ATTACHMENT #9 PIPE CLAMP EDGE DISTANCE PIN H0tt W(J i ) Edge distance Min / Max 4 NPSI ITT
- swasa MIN. EDGE MAX. EDGE MIN. EDGE MAX EDGE SIZE DISTANCE DISTANCE DISTANCE DISTANCE k,
5/8" 5/8" 1 3/4" 1" 5/8" 15/16" 3 15/16" 1 \\" 15/16" 1 3/16" 10 1 k" 1 9/16" i k" 1 9/16" 35 2" 2 3/8" 1 13/16"
- 2 13/16
100 4" 4 9/16" 3" 3 7/16"
- If the snubber end cap hub protrudes, the 213/16" edge distance must be reduced by the amount the hub extends beyond the snubber body.
Engineer-ing shall be notified if such a reduction exceeds the minimum edge dis-tance. 5 m
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 OI-GAP-ll.1-28A JUN 291983 28 or 42 ATTAOf eTr 10 SNUBBER BOLTING MINIMUM ENGAGEMENT Sradser Size Minim m 2 read sees nigagunant 1/4 - 1/2 3/16" l' 5/16" 3 5/16" 10 9/16" 35 m m Applicable 100 teot M 14~ ht= 4 4
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE
- 8 35-
- 5 JUN,2 91983 3
42 11,1_,g, ATIAONENr 11 FIELD MODIFICATION OF SIZE 35 AND 100 SNUBBER REAR BFACKEIS m er ' *ir
- 3' Og
" ] "7 k 45* N ,f"" } [N [M s r s -{ l/ } I a m i [-[1 9, l 's = o v i f I I I I A!GIE OF IIADDG 00 to 30 0 NGIE OF IDADDG 3 to 450 o-ea as. ~, Y <ts.T s, @#~- i-.- s 1 pysy~ n-a v l l .- ~ W ,u _ r. I I I A!CLE OF IDADING 450 to 75 A!GIE OF IDADDG 75 to 900 W?, x twim e y I z I nyrE: ss N ar4 i M 1. Renove pin prior to ico P4 i s y4 i a nodifying rear bracket. 2. All the details shcun abmre include 5 offset. m ,e y e w
-~
,e p ,- - - --- -+ a
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 3 CI-<)AP-ll.1-28A JUN 291983 30 or 42 ATTACHSENT12 A e (! NPSI i j l l / F < 15/,5 o. } Y2x 1/o7$ 7 I t v (9)J FIN L F \\ F7 Fi] A C SIZE TL18 4 MIN HAX MIN MAX I I 35 4k 22 15/16 1 /8 1 Y16 3 /8 21 13/16 1 7 3 3 5 5 /4 29 11/16 1 /8 ! V16 100 7 /16 31 /8 s$3 M I.*i) F F1 35, 35L, 35XL 3 1/2 1 3/8 100,100L,100XL 4 1/2 3/4 35, 35L, 35XL 2 7/8 3/8 3/16 ~ 100,100L,100XL 3 5/8 5/16 doTtt.' l.5TAkt 6cA:210Cs 10 PLAct, bom Sidts.' 2.A=C*T1.1 INWTt2tAL of FCRNM2D 2:RACVtT CYE Mad D"Wh ADafT ER 15 % L
- Required thread engagement for forward bracket or 1
transition kit.
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE QI-CAP-ll.1-281 3 JUN 291983 31 of 42 ATIA3 M Nr 13 NPSI TRANSITION KIT PIPE SIZING GUIDE Snu W r Size Pipe Size h 1" Sch. 40 \\ 1" Sch. 40 1 lk" Sch. 40 3 1 " Sch. 40 10 2" Sch. 80 35 4" Sch. 80 100 6" Sch. 120 Pipe material shall be SA-106, Grade B, unless otherwise specified by design. ITT GRINNELL TPINSITICN KIT PIPE SIZING GUIDE Snubber Size Pipe Size h 1" Sch. 40 b 1" Sch. 40 1 1" Sch. 80 3 2" Sch. 40 10 2 " Sch. 40 35 4 " O.D.x 8" Wall 100 5-9/16" O.D. x 1" Wall Pipe material shall be SA-53, Grade B, or SA-106, Grade B.
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JUN 29 E 32 or 42 (M-oAP-11.1-28A ATIAGCENT 14 MECHMICAL SICCK ARRESTOR SIZES 1/4 through 10 mD CAP fC-1 i pos m CN E1BE INDICK M 0 . s.' E D GER / anc f. No s l e+ b e
BROWN & ROOT, INC. !$5UE CPSES NUMBER REVISION DATE PAGE 1 JOB 35-1195 3 l QI-OAP-ll.1-28A JUN 291981 33 of 42 ATIAOte7r 15 MECHANICAL SHOCK ARRESTOR samnICar. I BEARDG l, DO CAP 4T% -- Run wr I / sCau /,TzucscxwDn 'IUBE [ DOICNIOR _emar.. M es .es. I'.: E Dn 0 W e 1
i SROWN & ROOT INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 3 J[jN 291983 34 or 42 QI-QAP-11.1-28A ATTACHMENT 16 1.0 GENERAL 1.1 PURPOSE AND SCOPE This attachment provides the inspector with the inspection l criteria to be used when inspecting the res taking of spherical bearings. 2.0 INSTRUCTION 2.1 SPHERICAL BEARING STAKING INSPECTION Spherical bearings that are loose in the eye rod or snubber ends or have become dislodged require restaking prior to installation. Prior to commencement of the staking opera tion, cons truction personnel will, notify QC. This notification gives the QC Inspector an opportunity to monitor the s taking operation. Upon completion of the staking operation, the QC Inspector shall inspect the eye rod (or snubber end) to verify the following: a. The eye rod hole is not defonned; b. The bearing race is centered in the eye rod hole and should be staked approximately 1/16" from the edge. However, this dimension is not critical as long as the bearing meets the conditions in C, D and E below. c. The bearing shall be free from rust, dirt and other foreign material; d. The bearing gimbal moves freely in its race. e. The race is secured within the eye rod. 2.2 DOCUMENTATION restaking shall be documented on an Spherical bearing (See Table 1 of this Attachment) and on Inspection Report the MWDC. The support mark number shall be recorded in the " Identification No." block. Completed documentation shall be reviewed and transmitted to Quality Engineering Systems for filing in respective hanger document package. 2.3 NONCONFORMANCES All nonconforming conditions shall be reported in accordance with Reference 1-D. \\ O4D
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI-QAP-11.1-28A 3 JUN 291983 3s nr 42 ATTACHMENT 16 (Continued) TABLE 1 counca nu stuu aucmc susscu IMSPtCTION REPCRT p 94 Jource nisaw maa.m ~.nu eauerm sannrena as. m. . u m..o. -,. -... m. m..m.,. . ct-ow-u.1-2sA 3\\".3IMa C%'<*iW2* C1%lQt:'8 C 7,%,e. C 91*M, o,, vism sesa.ra C uurtC'un towutes, au. amtsaets afaa sarapaces, C saaret*'en esmsurgr. waar'wactone siene ustus' es.sw '#I'" ,,8,8 IMMN ATTPleufa3 garg ,7,,, A. Eve r=nd %f e act da e.wd 1 6 r f i
- s. Bearing race center ano stesse g
C. Bearing free from dirt, rust, foreign material i S. Bear 4ae e4atait freely (. bCort supDert Mrs % ster (leentiflCatten NW9ere ll team it 'l l l l 6 i i l II 11 reaaame iswes secs, tru (h ( Na n
.85
- ng. ~ N.
gtc~ a QvO %r **- o2 gim Aa e u2 2. E u. w yQ wen m= Re h YN> i {4 U H g tsN n j ~ p 0 o 1 0 T.o g l 0 s 3h3o 6 f-0 6 o f g o - o T '0 Te }w f ) 2 of 2 0 2 c.f ~ 0 p 0* TD m o. o T o E *g 4L me
- a. s
~ a a I DS s u 4 2 E c l C*f T'0 O o a o / J0 l0 v0 .G 3 o6 R E s3 O6 o8 e4 f g e~ 2l r 8, c2 E C 8 t g io w-oM 0 m 'o a a o0 fs. C A v o y as ooc A m't s P n 0 A 6 o C G, ). aE L m l 3 t2 t s s O 8 oI P f f o 8
- s'
- 4 o.
,o o 0o M.O. 1O 1O a S f V To E i 4 o o$ 0S sS t ee mt i s l t 2O 3O j w, 3 ms 4 O O 0 0 ,s Z o e I P S *p To 0 T5 p Me o, 0 o3 M T Oaxo V4 u g '9 s 7 L s A O g 8 p "S
- 4 1o 1O L
S / 4t 0 oa A C 3 f a y ,1
- s.
_R s t, R. i **- k. g (d _.O E T
- t l
I C I g g A g, e q ,R .t _P r E, g. p g. g /*a x O / '.D y SL e l* 1 3 l g .a r ,P t . P" v E t r /' ~ M i,. a P t A 7-L S 0 g 4 f 6 r I on H o O L 5 c-8 , g, 3-w g n a S 1 ~ w P C e '1 wr y4 s - ~ g >A )a cC i st
- r
- - - ~ D %v pR m i TO ( g T_ l r mo rM ry f.. ,O i J mm g S6m e*- n To r u m.'p \\- i .l y t s u_ oi 3 .'l ~ Bs PP c - 1i5s } 8a NN 8 1
- *X
~ Y6 1 l p~ (z' n
i BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 35-1195 l OI-0AP-ll.1-28A 3 JUN ?91983 37 or 42 i ATrJGMENT 18 NPSI CIAMP Bmas & STUDS SIZE i l Q.' .ll..%.,.I El s _.4_ .s Isii:.,l l $eT 1 4El j* 0 jE he s .\\ '. a. < g.;ylE? sec llf4ta= s. E i,,*? %.2 {W. %,. W. =i ..s-- { s. i. Irt l e g g .r m p kk h.. b
- 1;;..it p* 0 's
?- s. -s.?:.6.9 a,P9t+. Pr i, $_.1'. > wips i.*.*1@r't.' e' -l ' giabk lik f 4 4 3: g *,o o ,+ A ijs O !gf$wu.(qv '. i a 1 g f 'g, ' I a Y i g'd$ f d gi ims e:s.:simes.i:;m ,? j 2 ul 3! 5 '.':li A A - E ' E 'N "= l O gy ?] t e j,- e-i e g j '5 W N rs" N a' N 3-W 4 p r. gf @g 4 f ee t__ ..g
- _ Eg sii-I i
$ $4 - SE b i . 7__ % i - m e Is<s f8 $j i,in .)d ' I ~ /. l i 9: / \\ l: l 3. i, uL. 9 -D [ lli T;i . *"'w" L '_ .I i:.:: 4, w,a x l t j l j
BROWN & ROOT. INC. ISSUE CPSES NUMBER REVISION DATE PAGE i JOB 35-1195 I 3I-OAP-11.1-28A JUN 291983 38 or 42 ATIAONENT 19 NPSI BEARDG SPACER, MASHER SIZE 0 I = t-co d a g 2 v y5
- Wm&
(n C Ng' 'o[e w o V) N m 6 ~<Tg d d N ~ Z H (tg y N--- e a v d e o. + e <- 4 0 0 m u m 'd h = h cr@m =% [. ~ T .mo i t e i ei t / i rgt i - pT;.g 7 j s Q LD il i. l l [ s.
,-n
- - - - - - ~ ~, --m--.-----,-,,---,--m, ,,..,,,n--~ -,,,.. = -,,,,-
s 1 n m g 5 s 5 1 s. = l
- e u
n, m o g m, 1 mo N
- ma m
1
- -- -T 4
h...;. '.. CLAMP PI N S...... ,M ~ PIN '5PLEAR, EC ',l*PlH.tEMG.TW; ~ E 31Ah4EC5l7.E35 i 9 gpCk ggggyy,.~.~. Vo*/ j p--. 1/g 7 i - J ~ 8 ~oa AS DESCRIBED g 2 ._ t o. P/4 p : iX I "7 s g-- .i, 5-7tr g I n ea s.n -i-e n ?. l k
- k,, 8f g
.s M u w p 9 4 E 1.- , yg.,# g. .-ga. . = p / 8 9.- 1 afI.*if ;.- = 2 y a 6 g; =s. ~ ..S'p m i s c -- o.... 4 g .n N i w 2 i 8 o G Cz o-to um ,T.,.,,,. ,q n w n m i \\ m ri y I. -. l r a h" O m ~ Jh M
BROWN & ROOT, INC. IS$yg i CPSES NUMBER REVISION DATE PAGE JOB 35-1195 QI-QAP-ll.1-287 3 JUN 291982 40 or 42 ATIACHMENT 21 ITT GRINNELL CLAMP PART SIZES w a.o um, a.a., s,.c.r.. M** s4-t93 ca s7 s4307 ca a a sa106 ca a w vehn ns. m. 4 sin. Siza Dniese Botad 4STM A307 GRA 4A-53 CR s 3/4-1 k 37a 3/8-16 z 2" U2" Sch 40 .38 ID D* M Fig. 306/307 Jise ig.36 372 1/2-13 x 2 1/4 1/4 4 2 ,0 k 4 - 10 3" Imag 3/4-10 a 3" 3/4" sch 40 5/l* Imes 3/4-24 ,49, 3/4-10 s 3 1/4 3/4" sch 40 Fim.33 10 4-4 .497 3/4-10 x 3 U2 1 0 Psg. 306/307 stae 1 10-14 4 3/8" Lees 3/4-1o x 3 3/4 18-34 3/4-10 m 4" 3/4-4 E Dia. 1-4 3 41/2 1" Sch 40 pipe.781D.123 00 Fie, 3C6/307 Staa3 4-36 7$ M y, 3.* 1 3/I' I""8
- 23' ThI 1 1/4-10
- pga, 1 U4-?x5" 1 1/4 och 40 1 1/4 sch 40 Fig. 306/307 sine 10 W 36 7i
- tonn 1 1/4-7-5 1/2 1 3#E" W
'IU I#"8 3'8 2-4 1/2a7 1/ 2 2" sch 40 1 U2" och 40 Fig. 306/307 t'i,,,3/8 3 I*a* st= 33 to-ta 2-4 uzns .2s" tons 3o La-13 age hardened 1 1/2-4x 7 1 1/2" och 40 I" 20-36 1 1/2-6m? 1/2 1 2-44/2ma 1/2 2"seb40 24 L 6.----- 2.499TEI. I4' Fig. 306/307 2.497 2.33 f.D* Staa 100 a 1 1/2-ema 1 1/2" seh 40 mg 10 14 11/2-4ms 1/2 21/2 1mes .123 Thick 16-14 1 1/2-6 9 30 36 1 1/2-4x10 i Icad Stud and Clamp bolt lengths are approximate, however, ruits shall have full thread engagenent. 'Iblerance on spv ar lengths are + 1/16". + Tolerance on Washers thicknesses are + 1/32", I.D.'s and O.D.'s are ~ naminal dimensions, the only consider tion is that they fit on the load stud with contact against-the h,11 bearing. e I
BROWN & ROOT, INC. ISSUE CPSES NUMBER REVISION DATE PAGE JOB 25-1195 OI-QAP-ll.1-28A. 3 JUN 291983 41 e 42 ATIAmMENT 21 (Continued) ITT CLAM P Stock S)IE:S FIG. 306/,307 g{ $d i h size i S.ss 3 5.se to %se 55 Sese im E G H E G H E. G H E G H E G H E G H up b7r 54 1.l5 3A !%-l% 2% L1 1% 7 % l% 4% 1 h.25 5% l%-l% 2% ki l 'h 7 1 1% 4% 1 %.2% 5 84 1% l% 2% bi l% 7 bl% A% 7 541 5% 1%- l'1 4% %.1% 2% 7 blu 4% 7 02X 5% 8% 5 24 64 2-2 % 5% nal% 34 7 4.l% Ak 1 4 11 5% 8% E?% GE 2f,2% 5% %.1% 3L_L51% 4% ? '4 24 5% B1 5 21 6L 33%5'% kl% 31 ? Sth 4% 9 W.2% 5'/n Bk 0 23 6k 3% 44GW 1.1% 3% 1 bm aw 1 y, tr, 5% 8k %2r,1,Gk n% is6 9% 4)i4% C 71 42 4% 7% %A)L5% in b2LS'% 8%%2X'6% 11 % I:5 9% 4%5% 1W %Z 5% 1% %.In 5% 7% b77,6% 9Ya % 3 I % 11 % fr5 9% 5%.0%'85/s W2 5h 6% %.7 cw 8% %5 'i k to %.411 %I tin' u.s_.Sh lGW IS7 12 1 6%MS% %> 2 7 9% S2n 1%. % ks 8% t!% %.5 8%tI2% is1 10 4 :53 1% 8 It %I 8%40%lon k2 B% low Si ton %4 9% 12 % M.6 to1Il4% in 6 12.% f6% 15 4 itX2 $2(M 11 % 5 2X9* 11 % u.5 lo'/s 15 % iss 113 tt% lM 15% 11 4 %9 i3 W @Lt41 12% L2A leva I% 05 Ilk 14/t IsS 124 IG 11 1 14%' la 1410 15 4: ,,141 E% 15 %%3 11% 15 % US 12 % 15W i= 5 ' 13 1 11 418 foi i4 17. 9 i4 %' 1611A % 14 % W5 12 %11% E5 13 % tch 156 14 4 18 %%9 15% 2n ILtc is% ,1Wt.% 1012d __L'ih%d is% 15 % %5 I41 t1% 1:1 is% tin ISS fG% 2 ILit IGX IGJ %.4 15% 15 kk.$ IGM 19 % ix1 11_&21 % 14 9 (8% '25 ILIZ 19 % j 24 P M 2t% %s418% Zi$ msg 912,5.ug125'12c'4 l MJs ef.Xtt%3' 25L7_ZZ_ EN1 24.552i'E 4 K.1 22 % 2cn In Lie 2s% 29% 7 t 55 .i n p rrm [ 4,, ,,r rr II l'i ll I;; .Op \\.' LA u PlPE $1Z$ G-S1DCM Sl?G a ->rn- - ~, ~
l t SROWN & ROOT. INC. ISSUE CPSES NtJMBER REVISION DATE PAGE JOB 35-1195. QI-OAP-ll.1-28n3 . JUN 29198-42 or 42 ATTIOly.527f 22 N.P.S.I. SHOCK ARRESIOR-AD3USTABLE (SMA) SIZE k b 1 3 10 35 100 MAX CC* 66 66 66 86 100 120 120 I1 G ES N.P.S.I. SHOCK ARRFSIOR-FIXED (SMF) SIZE b 1 3 10 35 100 MAX CC* 19 17 22-7/8 28-7/8 34 48-7/8 61-3/4 t INCHES GnINZLL SHOCK ARRESTOR-FIXED (FIG. 306) SIZE k 1 3 10 35 100 MAX C-C* 12-3/16 9-5/16 14-9/16 19-1/8 23-5/16 30 35-13/16 INCHES GRINNELL SHOCK ARRESIOR-ail 7USTABLE (FIG. 307) SIZE b' 1 3 10 35 100 MAX (r* 62 62-3/4 62 51 72 117 117 INCHES SNUBBER SET AT MID-RAN3E OF STROKE F01A-85-59 s/$2, m t -. ....... _.... _ _...'_.. _.. _. _~ .. _ _. _.......}}