ML20133H814: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:- _ _ _ _ _ _ . _ _ _ _ _ _ _ _ - . _
                                                                                                                  \lE llnd October 10, 1985 tu Power Company jst:  Mr. H. B. Tucker, Vice President
;          Nuclear Production Department
! c2 South Church Street Icharlotte,NC 28242 Gentlemen:
 
==SUBJECT:==
CATAWBA NUCLEAR STATION EXAMINATION REPORT 413/0L-SS-03 The NRC administered examinations on September 9 - 13, 1985, to employees of your company who had applied for licenses to operate the Catawba Nuclear Plant. At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.
A table summarizing the examination results for each examined individual is provided as Enclosure 2.
Copies of the written examination questions and answer key are included in this report as Enclosure 3.
In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 a,d 3 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will net be sent to the Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, (Original signed by VPanciera for)
Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects
 
==Enclosures:==
: 1. Examination Report 50-413/0L-85-03
: 2. Table of Examination Results (Official Use Only-Privacy Act Information)
: 3. R0/SRO Exam Questions and Answer Key cc w/encls:      (See page 2) 8510180124 851010 PDR G      ADOCK 05000413 PDR 2:L f >l
 
Duke Power Company                      2 October 10, 198s cc w/encls. 1 & 2:
H. B. Barron, Superintendent of Operations J. W. Hampton, Station Manager P. C. McAnuity, Training and Safety Coordinator cc wiencls. 1, 2, & 3:
G. Barrett, Training Supervisor bec w/encls. 1, 2, & 3:
Senior Resident Inspector bcc w/ encl. 1:
Project Manager, NRR State of South Carolina EG&G Idaho bcc w/encls. 1 & 3:
Operator Licensing Branch, DHFS,NRR Document Control Desk T gers:es      BAWilson        C  1-lan      HCDance 1oiyi8s      p1oi,iss          1oqi8s        1oiri8s}}

Latest revision as of 01:16, 23 July 2020

Forwards Exam Rept 50-413/OL-85-03 of Exam Administered on 850909-13
ML20133H814
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 10/10/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20133H816 List:
References
NUDOCS 8510180124
Download: ML20133H814 (2)


Text

- _ _ _ _ _ _ . _ _ _ _ _ _ _ _ - . _

\lE llnd October 10, 1985 tu Power Company jst: Mr. H. B. Tucker, Vice President

Nuclear Production Department

! c2 South Church Street Icharlotte,NC 28242 Gentlemen:

SUBJECT:

CATAWBA NUCLEAR STATION EXAMINATION REPORT 413/0L-SS-03 The NRC administered examinations on September 9 - 13, 1985, to employees of your company who had applied for licenses to operate the Catawba Nuclear Plant. At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided as Enclosure 2.

Copies of the written examination questions and answer key are included in this report as Enclosure 3.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 a,d 3 will be placed in NRC's Public Document Room. Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will net be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by VPanciera for)

Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects

Enclosures:

1. Examination Report 50-413/0L-85-03
2. Table of Examination Results (Official Use Only-Privacy Act Information)
3. R0/SRO Exam Questions and Answer Key cc w/encls: (See page 2) 8510180124 851010 PDR G ADOCK 05000413 PDR 2:L f >l

Duke Power Company 2 October 10, 198s cc w/encls. 1 & 2:

H. B. Barron, Superintendent of Operations J. W. Hampton, Station Manager P. C. McAnuity, Training and Safety Coordinator cc wiencls. 1, 2, & 3:

G. Barrett, Training Supervisor bec w/encls. 1, 2, & 3:

Senior Resident Inspector bcc w/ encl. 1:

Project Manager, NRR State of South Carolina EG&G Idaho bcc w/encls. 1 & 3:

Operator Licensing Branch, DHFS,NRR Document Control Desk T gers:es BAWilson C 1-lan HCDance 1oiyi8s p1oi,iss 1oqi8s 1oiri8s