ML20133Q269: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:.
'
        --              -            - .                    .                    _ _
                                                                                                            . , . .      . . .    - - - _
            s  .o                                                                                                    '  O W~mi
.
    -  <
                                                                                                  ..-
                                                                                                                  -
                                                                                                                            pn
.
                                  ,-
                                                        ..-
                                                            -
                                                                                                                              ct
                    ""
:
                                                        SEP 101985
            Dt.ke Power Company
      / ATTN:      Mr. H. B. Tucker, Vice Presider.t
                    Nuclear Production Department
.          422 South Church Street
;
            Charlotte, NC 28242
            Gentlemen:
  ,        SUBJECT: REPORT NOS. 50-413/85-35 AND 50-414/85-32
)
'          On July ZT - August 25, 1985, NRC inspected activities authorized by NRC
            Operating License No. NPF-35 and Construction Permit No. CPPR-117 for your
  ,
            Catawba facility.        At the conclusion of the inspection, the findings were
            discussed with those me2ers of your staff identified in the enclosed inspection
  i        report.
.
            Areas examined during the inspectic9 are identified in the report. Wif
            areas, the    inspection consisted of sOective examinations of proced(/hin                              res and these
            representative records, interviews with personnel, and observation of ahtivities
            in progress.                                                                                            1
                                                                                                                      ,
,
            Within the scope of the inspection, no violations or dwf ations were identified.
i
  l
            Your attention is invitea to unresolved items identified in the inspection
  ,        report. These matters will be pursued during future inspections.
            Should you have any questions concerning this letter, please contact us.
                                                              Sincerely,
                                                                ORIGINAL SIGNED BY
                                                                                                                                          i
                                                              VIRGIL L. BROWNLEE
                                                              Virgil L. Brownlee, Chief
                                                              Reactor Projects Branch 2
;                                                            Division of Reactor Projects
            Enclosure:
            Inspection Report Nos. 50-413/35-35
              and 50-414/35-32
        yR.w/L.encl:
                  Dick,  Vice President - Construction
        # W. Hampton, Station Manager
            bec w/ encl:    (See page 2)
                    8511010469 850910
l                  PDR    ADOCK 05000413
-
                    G                    PDR
                                                                                                                                    *la
                                                                                                                                L Eo l'
                              ___          _ .._ _ _ .            __ _ - - . _ _ _ _ _ _ . . _ _ . _ _ . ...- _._-
 
  y
  Duke Power Company          2
  b c w/ encl:
  [G.. N.
      Johnson, ELD
          Jabbour, NRR
  Document Control Desk
  State of South Carolina
l
t
i
          I
  RII                  RI    g
  CBtrger:bhg          HDance
  Sf /85                  /85
  g8                  ff'l
                      c)
                                  - - _
}}
}}

Latest revision as of 23:48, 22 July 2020

Forwards Insp Repts 50-413/85-35 & 50-414/85-32 on 850727-0825.No Violation or Deviation Noted
ML20133Q269
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 09/10/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20133Q273 List:
References
NUDOCS 8511010469
Download: ML20133Q269 (2)


See also: IR 05000413/1985035

Text

.

'

-- - - . . _ _

. , . . . . . - - - _

s .o ' O W~mi

.

- <

..-

-

pn

.

,-

..-

-

ct

""

SEP 101985

Dt.ke Power Company

/ ATTN: Mr. H. B. Tucker, Vice Presider.t

Nuclear Production Department

. 422 South Church Street

Charlotte, NC 28242

Gentlemen:

, SUBJECT: REPORT NOS. 50-413/85-35 AND 50-414/85-32

)

' On July ZT - August 25, 1985, NRC inspected activities authorized by NRC

Operating License No. NPF-35 and Construction Permit No. CPPR-117 for your

,

Catawba facility. At the conclusion of the inspection, the findings were

discussed with those me2ers of your staff identified in the enclosed inspection

i report.

.

Areas examined during the inspectic9 are identified in the report. Wif

areas, the inspection consisted of sOective examinations of proced(/hin res and these

representative records, interviews with personnel, and observation of ahtivities

in progress. 1

,

,

Within the scope of the inspection, no violations or dwf ations were identified.

i

l

Your attention is invitea to unresolved items identified in the inspection

, report. These matters will be pursued during future inspections.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNED BY

i

VIRGIL L. BROWNLEE

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report Nos. 50-413/35-35

and 50-414/35-32

yR.w/L.encl:

Dick, Vice President - Construction

  1. W. Hampton, Station Manager

bec w/ encl: (See page 2)

8511010469 850910

l PDR ADOCK 05000413

-

G PDR

  • la

L Eo l'

___ _ .._ _ _ . __ _ - - . _ _ _ _ _ _ . . _ _ . _ _ . ...- _._-

y

Duke Power Company 2

b c w/ encl:

[G.. N.

Johnson, ELD

Jabbour, NRR

Document Control Desk

State of South Carolina

l

t

i

I

RII RI g

CBtrger:bhg HDance

Sf /85 /85

g8 ff'l

c)

- - _