ML20091F763: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.= y    -
r    .
i, UNION ELECTRIC COM PANY 1908 GRATIOT STREET                                      ]
ST, Louis, MISSOURI                                      l
    " "'', d *f."."'"                May 29,1984                .r. cou f
Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear JMgulatory Commission Washington, D.C. 20555
 
==Dear Mr. Denton:==
ULNRC-833 DOCKET NUMBER 50-403 CALLAWAY PLANT, UNIT 1 CALLAWAY PUMP AND VALVE INSERVICE TESTING PROGRAM
 
==Reference:==
ULNRC-738 dated January 31, 1984 The referenced letter transmitted the Callaway Pump and Valve Inservice Testing Program. Included as attachments to this letter are updates to the Callaway testing program.                  Attachment 1 is a brief description of the changes and Attachment 2 contains revised replacement pages.
If there are any questions, please contact us.
Very truly yours, b                  A 1
                                                    \
h}}J d Dona    F. S hnell DS/lw cc:    J. J. Holonich pm,aq u
 
STATE OF MISSOURI )
                    )    SS CITY OF ST. LOUIS )
Robert J. Schukai, of lawful age, being first duly sworn upon oath says that he is General Manager-Engineering (Nuclear) for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
By    '
C-          O Robe t J. Schukai Genera    anager-Engineering Nuclear SUBSCRIBED and sworn to before me this d        ay of                      , 198 j
Y 0/4gBARBARA JkFkFF k NOTARY PUBLIC. STATE OF MISSOURI MY COMMIS$10N EXP!RES APRIL 22,1985 ST. LOUIS COUNTY i
 
d cc: Glenn L. Koester Vice President Operations Kansas Gas & Electric P.O. Box 208 Wichita, Kansas              67201 Donald T. McPhee i                      Vice President Kansas City Power and Light Company 1330 Baltimore Avenue Kansas City, Missouri 64141 Gerald Charnoff, Esq.
1 Shaw, Pittman, Potts & Trowbridge 1800 M. Street, N.W.
Washington, D.C.                      20036 Nicholas A. Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville, Maryland                                              20850 John H. Neisler Callaway Resident Office U.S. Nuclear Regulatory Commission RRil Steedman, Missouri 65077 William Forney Division of Projects and Resident Programs, Chief, Section lA U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 4
Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission RR$1 l
Steedman, Missouri                                      65077
 
1 ATTACHMENT-l J                      .
CHANGES TO CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM ITEM 1:  CHANGE:  Delete Relief Request #P01 BASIS FOR CHANGE: Relief Request no longer applies since we are committed to the 1980 Edition through Winter 1981 Addenda of Section XI of the ASME Boiler and Pressure Vessel Code whicn only requires testing on a quarterly frequency (IWP-3400).
ITEM 2: CHANGE: Add Relief Valve Test (RVT) for valve EN-V-0057 Page 31 BASIS FOR CHANGE: Test.was unintentionally omitted from program.
ITEM 3: CHANGE: Delete Stroke Test (BT) and Position Indication Test (PIT) for valves AL-HV-0005,. AL-HV-0007, Al-HV-0009 and Al-HV-0011.
BASIS FOR CHANGE: These valves are system control valves which are exempt from testing in accordance with subsection IWV-1200. Section XI of the ASME Boiler and Pressure Vessel Code,1980 Edition through Winter 1981 Addenda.
ITEM 4: CHANGE:  Revise stroke times on the following valves:
AL-HV-0034 from 15 seconds to 30 seconds AL-HV-0035 from 15 seconds to 30 seconds AL-HV-0036 from 15 seconds to 30 seconds BB-HV-8001A from 5 seconds to 10 seconds BB-HV-80018 from 5 seconds to 10 seconds BB-HV-8002A from 5 seconds to 10 seconds BB-HV-8002B from 5 seconds to 10 seconds BG-HV-8357A from 5 seconds to 10 seconds BG-HV-83578 from 5 seconds to 10 seconds BN-HV-0003 from 15 seconds to 65 seconds BN-HV-0004 from 15 seconds to 65 seconds EG-HV-0011 from 10 seconds to 23 seconds EG-HV-0012 from 10 seconds to 23 seconds EG-HV-0013 from 10 seconds to 23 seconds EG-HV-0014 from 10 seconds to 23 seconds EG-HV-0072 from 10 seconds to 23 seconds EG-HV-0073 from 10 seconds to 23 seconds EG-HV-0074 from 10 seconds to 23 seconds                ;
EG-HV-0075 from 10 seconds to 23 seconds                ;
EM-HV-8807A from 10 seconds to 15 seconds EM-HV-8807B from 10 seconds to 15 seconds EM-HV-8837A from 5 seconds to 10 seconds o
 
                ? ATTACHMENT:                                                                      1
: .      Page 2,
          <*-          ~
ITEM-4: Continued EM-HV-88378 from 5 seconds to 10 seconds
                                        'EP-HV-8950A from 5 seconds to 10 seconds                    '
EP-HV-89508 from 5 seconds to 10 seconds EP-HV-8950C from 5 seconds to 10 seconds
                                        'EP-HV-8950D from 5 seconds to 10 seconds                  ,
EP-HV-8950E: from 5 seconds to 10 seconds EP-HV-8950F from 5 seconds to 10 seconds KA-HV-0030 from 10 seconds to 12 seconds-                1 KJ-HV-0001 from 10 seconds to 12 seconds KJ-HV-0002 from 10 seconds to 12 seconds
                                        -KJ-HV-0101.from 10 seconds to 12 seco'ds n
KJ-HV-0102 from 10 seconds to 12 seconds-                  ,
BASIS FOR CHANGE: Delete inaccurate stroke times and replace          ;
with' stroke times in accordance with vendor specifications.
ITEM 5:  CHANGE: Change valve number on Relief Request #BL 1"from            ,
BG-8046 to BL-8046.
BASIS FOR CHANGE: BG-8046 was a typo.
ITEM'6:  CHANGE: Add stroke test:in the closed direction for valves BN-LCV-0112D and BN-LCV-0112E.
BASIS FOR CHANGE: Valves must close to isolate Refueling Water      i Storage Tank from Centrifugal Charging Pumps for Cold Leg Recirculation. ', Test was unintentionally omitted from program.
f' r
1 fI
* i                                                                                                ,
d g
 
                                          , . .c; . .
Attcchm:nt 2 CALLAWAY PUMP AND VALVE INSERVICE TESTING PROGRAM List of Changed Pages Remove                        Insert  -
page      5                  page 5 page      9                  page 9 page      12                  page 12 page      17                  page 17 page      23                  page 23 page      24                  page 24 page 28                      page 28 page      30                  page 30 page      31                  page 31 page      32                  page 32 page      40                  page 40 page      44                  page 44 page      45                  page 45 page      46                  page 46 page      47                  page 47 e
6 4
e t
          ~
  , . -}}

Latest revision as of 00:28, 13 May 2020

Forwards Updates & Revised Replacement Pages to Pump & Valve, Inservice Testing Program
ML20091F763
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/29/1984
From: Schnell D
UNION ELECTRIC CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20091F768 List:
References
ULNRC-833, NUDOCS 8406040001
Download: ML20091F763 (6)


Text

.= y -

r .

i, UNION ELECTRIC COM PANY 1908 GRATIOT STREET ]

ST, Louis, MISSOURI l

" ", d *f."."'" May 29,1984 .r. cou f

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear JMgulatory Commission Washington, D.C. 20555

Dear Mr. Denton:

ULNRC-833 DOCKET NUMBER 50-403 CALLAWAY PLANT, UNIT 1 CALLAWAY PUMP AND VALVE INSERVICE TESTING PROGRAM

Reference:

ULNRC-738 dated January 31, 1984 The referenced letter transmitted the Callaway Pump and Valve Inservice Testing Program. Included as attachments to this letter are updates to the Callaway testing program. Attachment 1 is a brief description of the changes and Attachment 2 contains revised replacement pages.

If there are any questions, please contact us.

Very truly yours, b A 1

\

hJ d Dona F. S hnell DS/lw cc: J. J. Holonich pm,aq u

STATE OF MISSOURI )

                   )    SS CITY OF ST. LOUIS )

Robert J. Schukai, of lawful age, being first duly sworn upon oath says that he is General Manager-Engineering (Nuclear) for Union Electric Company; that he has read the foregoing document and knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief. By ' C- O Robe t J. Schukai Genera anager-Engineering Nuclear SUBSCRIBED and sworn to before me this d ay of , 198 j Y 0/4gBARBARA JkFkFF k NOTARY PUBLIC. STATE OF MISSOURI MY COMMIS$10N EXP!RES APRIL 22,1985 ST. LOUIS COUNTY i

d cc: Glenn L. Koester Vice President Operations Kansas Gas & Electric P.O. Box 208 Wichita, Kansas 67201 Donald T. McPhee i Vice President Kansas City Power and Light Company 1330 Baltimore Avenue Kansas City, Missouri 64141 Gerald Charnoff, Esq. 1 Shaw, Pittman, Potts & Trowbridge 1800 M. Street, N.W. Washington, D.C. 20036 Nicholas A. Petrick Executive Director SNUPPS 5 Choke Cherry Road Rockville, Maryland 20850 John H. Neisler Callaway Resident Office U.S. Nuclear Regulatory Commission RRil Steedman, Missouri 65077 William Forney Division of Projects and Resident Programs, Chief, Section lA U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 4 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission RR$1 l Steedman, Missouri 65077

1 ATTACHMENT-l J . CHANGES TO CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM ITEM 1: CHANGE: Delete Relief Request #P01 BASIS FOR CHANGE: Relief Request no longer applies since we are committed to the 1980 Edition through Winter 1981 Addenda of Section XI of the ASME Boiler and Pressure Vessel Code whicn only requires testing on a quarterly frequency (IWP-3400). ITEM 2: CHANGE: Add Relief Valve Test (RVT) for valve EN-V-0057 Page 31 BASIS FOR CHANGE: Test.was unintentionally omitted from program. ITEM 3: CHANGE: Delete Stroke Test (BT) and Position Indication Test (PIT) for valves AL-HV-0005,. AL-HV-0007, Al-HV-0009 and Al-HV-0011. BASIS FOR CHANGE: These valves are system control valves which are exempt from testing in accordance with subsection IWV-1200. Section XI of the ASME Boiler and Pressure Vessel Code,1980 Edition through Winter 1981 Addenda. ITEM 4: CHANGE: Revise stroke times on the following valves: AL-HV-0034 from 15 seconds to 30 seconds AL-HV-0035 from 15 seconds to 30 seconds AL-HV-0036 from 15 seconds to 30 seconds BB-HV-8001A from 5 seconds to 10 seconds BB-HV-80018 from 5 seconds to 10 seconds BB-HV-8002A from 5 seconds to 10 seconds BB-HV-8002B from 5 seconds to 10 seconds BG-HV-8357A from 5 seconds to 10 seconds BG-HV-83578 from 5 seconds to 10 seconds BN-HV-0003 from 15 seconds to 65 seconds BN-HV-0004 from 15 seconds to 65 seconds EG-HV-0011 from 10 seconds to 23 seconds EG-HV-0012 from 10 seconds to 23 seconds EG-HV-0013 from 10 seconds to 23 seconds EG-HV-0014 from 10 seconds to 23 seconds EG-HV-0072 from 10 seconds to 23 seconds EG-HV-0073 from 10 seconds to 23 seconds EG-HV-0074 from 10 seconds to 23 seconds  ; EG-HV-0075 from 10 seconds to 23 seconds  ; EM-HV-8807A from 10 seconds to 15 seconds EM-HV-8807B from 10 seconds to 15 seconds EM-HV-8837A from 5 seconds to 10 seconds o

               ? ATTACHMENT:                                                                      1
. Page 2,
         <*-           ~

ITEM-4: Continued EM-HV-88378 from 5 seconds to 10 seconds

                                       'EP-HV-8950A from 5 seconds to 10 seconds                    '

EP-HV-89508 from 5 seconds to 10 seconds EP-HV-8950C from 5 seconds to 10 seconds

                                        'EP-HV-8950D from 5 seconds to 10 seconds                   ,

EP-HV-8950E: from 5 seconds to 10 seconds EP-HV-8950F from 5 seconds to 10 seconds KA-HV-0030 from 10 seconds to 12 seconds- 1 KJ-HV-0001 from 10 seconds to 12 seconds KJ-HV-0002 from 10 seconds to 12 seconds

                                        -KJ-HV-0101.from 10 seconds to 12 seco'ds n

KJ-HV-0102 from 10 seconds to 12 seconds- , BASIS FOR CHANGE: Delete inaccurate stroke times and replace  ; with' stroke times in accordance with vendor specifications. ITEM 5: CHANGE: Change valve number on Relief Request #BL 1"from , BG-8046 to BL-8046. BASIS FOR CHANGE: BG-8046 was a typo. ITEM'6: CHANGE: Add stroke test:in the closed direction for valves BN-LCV-0112D and BN-LCV-0112E. BASIS FOR CHANGE: Valves must close to isolate Refueling Water i Storage Tank from Centrifugal Charging Pumps for Cold Leg Recirculation. ', Test was unintentionally omitted from program. f' r 1 fI

  • i ,

d g

                                         , . .c; . .

Attcchm:nt 2 CALLAWAY PUMP AND VALVE INSERVICE TESTING PROGRAM List of Changed Pages Remove Insert - page 5 page 5 page 9 page 9 page 12 page 12 page 17 page 17 page 23 page 23 page 24 page 24 page 28 page 28 page 30 page 30 page 31 page 31 page 32 page 32 page 40 page 40 page 44 page 44 page 45 page 45 page 46 page 46 page 47 page 47 e 6 4 e t

          ~
 , . -}}