Category:CORRESPONDENCE-LETTERS
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span ML20217M5711999-10-20020 October 1999 Forwards Insp Repts 50-445/99-15 & 50-446/99-15 on 990822- 1002.Two Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20212L2891999-10-0101 October 1999 Discusses Closeout of GL 97-06, Degradation of Steam Generator Internals. Purpose of GL Was to Obtain Info That Would Enable NRC to Verify That Condition of Licensee SG Internals Comply with Current Licensing Bases TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 ML20212F7481999-09-24024 September 1999 Forwards SER Authorizing Relief from Exam Requirement of 1986 Edition ASME Code,Section XI Pursuant to 10CFR50.55a(a)(3)(ii) for Relief Request A-3 & 10CFR50.55a(g)(6)(i) for Relief Requests B15,16,17 & C-4 ML20212F1041999-09-23023 September 1999 Requests That NRC Be Informed of Any Changes in Scope of Y2K System Deficiencies Listed or Util Projected Completion Schedule for Comanche Peak Steam Electric Station,Units 1 & 2 ML20212E6661999-09-21021 September 1999 Advises That Info Contained in Application & Affidavit, (CAW-99-1342) Re WCAP-15009,Rev 0, Comache Peak Unit 1 Evaluation for Tube Vibration Induced Fatigue, Will Be Withheld from Public Disclosure ML20212D9111999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of CPSES & Did Not Identify Any Areas in Which Performance Warranted Insp Beyond Core Insp Program.Core Insp Plan at Facility Over Next 7 Months.Insp Plan Through March 2000 Encl ML20212A7601999-09-14014 September 1999 Forwards Insp Repts 50-445/99-14 & 50-446/99-14 on 990707-0821.Four Violations Occurred & Being Treated as Ncvs.Conduct of Activities Was Generally Characterized by safety-conscious Operations & Sound Radiological Controls TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211P3761999-09-0707 September 1999 Ack Receipt of Ltr Dtd 990615,transmitting Rev 30 to Physical Security Plan,Per 10CFR50.54(p).No NRC Approval Is Required ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211J3801999-08-27027 August 1999 Forwards Corrected TS Page 3.8-26 to Amend 66 to Licenses NPF-87 & NPF-89,respectively.Footnote on TS Page 3.8-26 Incorrectly Deleted ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20211B2861999-08-18018 August 1999 Forwards Insp Repts 50-445/99-13 & 50-446/99-13 on 990720- 23.No Violations Noted.Insp Included Implementation of Licensee Emergency Plan & Procedures During Util Biennial Emergency Preparedness Exercise ML20211C4661999-08-18018 August 1999 Discusses Proprietary Info Re Thermo-Lag.NRC Treated Bisco Test Rept 748-105 as Proprietary & Withheld It from Public Disclosure,Iaw 10CFR2.790 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety ML20211C4571999-08-16016 August 1999 Forwards Omitted Subj Page of Contractor TER TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210R2221999-08-12012 August 1999 Forwards Insp Repts 50-445/99-10 & 50-446/99-10 on 990510-0628.Violations Noted & Being Treated as Ncvs, Consistent with App C of Enforcement Policy ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210K2321999-07-29029 July 1999 Forwards Insp Repts 50-445/99-12 & 50-446/99-12 on 990530-0710.No Violations Noted ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210D8231999-07-23023 July 1999 Forwards Safety Evaluation of Relief Requests Re Use of 1998 Edition of Subsections IWE & Iwl of ASME Code for Containment Insp ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20210C3331999-07-16016 July 1999 Forwards Exam Repts 50-445/99-301 & 50-446/99-301 on 990618- 24.Exam Included Evaluation of Six Applicants for Senior Operator Licenses ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 1999-09-07
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARTXX-9924, Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span1999-10-22022 October 1999 Forwards Responses to Questions by NRC Re Application for Amends to Licenses NPF-87 & NPF-89,by Incorporating Changes Increasing RWST low-level Setpoint from Greater than But Equal to 40% to Greater than But Equal to 45% of Span TXX-9923, Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred1999-10-15015 October 1999 Forwards Monthly Operating Repts for Sept 1999 for CPSES, Units 1 & 2,per Plant TS 5.6.4.No Failures of Challenges to PORVs of SV for Units Occurred ML20217E7951999-10-12012 October 1999 Forwards COLR for Unit 1,Cycle 8,per TS 5.6.5 ML20216J5571999-10-0101 October 1999 Provides Final Response to GL 98-01,suppl 1, Y2K Readiness of Computer Sys at Npps TXX-9922, Forwards Revised COLR, for Cycle 5 for Unit 21999-10-0101 October 1999 Forwards Revised COLR, for Cycle 5 for Unit 2 ML20212G0721999-09-24024 September 1999 Forwards Rev 4 to Augmented Inservice Insp Plan for CPSES, Unit 1. Future Changes & Revs to Unit 1 Augmented Inservice Insp Plan Will Be Available on Site ML20212H0461999-09-24024 September 1999 Forwards Rev 6 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan for 1st Interval on 990820 TXX-9921, Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC1999-09-10010 September 1999 Suppls 981221 LAR 98-010 to Licenses NPF-87 & NPF-89, Clarfying Conditions of Use Re Analytical Methods Used to Determine Core Operating Limits,Per Telcon with NRC ML20211L9871999-09-0303 September 1999 Forwards Rev 31 to Technical Requirements Manual. All Changes Applicable to Plants Have Been Reviewed Under Util 10CFR50.59 Process & Found Not to Include Any USQs TXX-9915, Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl1999-09-0303 September 1999 Responds to 990701 & 0825 RAI Telcons Re Spent Fuel Pool Temp,Per LAR 98-008,which Requested Increase in Spent Fuel Storage capacity.Marked-up Page 4-1 of CPSES Fuel Storage Licensing Rept, Encl ML20211K2231999-08-31031 August 1999 Forwards Txu Electric Comments of Rvid,Version 2 ML20211G1081999-08-26026 August 1999 Responds to NRR Staff RAI Re Util Mar 1999 Submittal for NRC Review & Approval of Changes to CPSES Emergency Classification Procedure ML20211G7301999-08-26026 August 1999 Forwards Revs 29 & 30 to CPSES Technical Requirements Manual (Trm). Attachments 1 & 2 Contain Description of Changes for Revs 29 & 30 Respectively ML20211G3441999-08-25025 August 1999 Forwards Response to NRC RAI on LAR 98-010 for Cpses,Units 1 & 2.Communication Contains No New Licensing Commitments Re Cpses,Units 1 & 2 ML20210U3981999-08-17017 August 1999 Forwards Monthly Operating Repts for July 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs or SVs for Plant Occurred ML20211C0991999-08-17017 August 1999 Forwards Rev 3 to ASME Section XI ISI Program Plan,Unit 2 - 1st Interval, Replacing Rev 2 in Entirety TXX-9919, Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 9908021999-08-16016 August 1999 Forwards Relief Request A-3,Rev 1 to Unit 1 ISI Program,Per Conversations Between NRC & Txu Electric on 990802 ML20210R6561999-08-13013 August 1999 Forwards Response to NRR 990805 Telcon RAI Re License Amend Request 98-010,to Increase Power for Operation of CPSES Unit 2 to 3445 Mwth & Incorporating Addl Changes Into Units 1 & 2 TS ML20210S6411999-08-12012 August 1999 Informs That Wg Guldemond,License SOP-43780,is No Longer Performing Licensed Duties.Discontinuation of License Is Requested ML20210N1101999-08-0404 August 1999 Provides Supplemental Info to Util 990623 License Amend Request 99-005 Re Bypassing DG Trips.Info Replaces Info Contained in Subject Submittal in Attachment 2,Section II, Description of TS Change Request TXX-9918, Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-9906301999-08-0202 August 1999 Forwards CPSES 10CFR50.59 Evaluation Summary Rept 0008,for 970802-990201 & CPSES Commitment Matl Change Evaluation Rept 0003,for 970802-990630 ML20210J2301999-08-0202 August 1999 Forwards Amend 96 to CPSES Ufsar.Replacement of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,Rev 2 ML20210J6071999-08-0202 August 1999 Forwards line-by-line Descriptions of Changes in Amend 96 to CPSES UFSAR Transmitted by Util Ltr TXX-99166,dtd 990802. Replacment of FSAR Figures with Plant Process Flow Diagrams Meets Intent & Requirements of NRC Reg Guide 1.70,rev 2 TXX-9916, Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 9907271999-08-0202 August 1999 Notifies NRC That CPSES Units 1 & 2,improved TS Implemented on 990727 ML20210G5861999-07-29029 July 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period of Jan-June 1999 ML20210J0121999-07-27027 July 1999 Forwards Summary of Methodology for Determination of NDE Measurement Uncertainty,In Response to Recent Discussions with NRC Re LAR 98-006 Concerning Rev to SG Tube Plugging Criteria TXX-9917, Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES1999-07-26026 July 1999 Provides Info Re Augmented Inservice Insp Plan,Which Requires Periodic Insp of Rv Head & Internals Lifting Devices at CPSES ML20210F3121999-07-26026 July 1999 Responds to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, ML20210C2931999-07-21021 July 1999 Supplements 880323 Response to NRC Bulletin 88-02, Rapidly Propagating...Sg Tubes, Non-proprietary WCAP-15010 & Proprietary Rev 0 to WCAP-15009, CP Unit 1 Evaluation for Tube Vibration... Encl.Proprietary Rept Withheld ML20210D3211999-07-21021 July 1999 Provides List of Estimates of Licensing Actions,In Response to Administrative Ltr 99-02,dtd 990603 ML20209H2551999-07-16016 July 1999 Forwards ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2 & Containment ISI Summary Rept for Fourth Refueling Outage of CPSES Unit 2,per ASME Boiler & Pressure Vessel Code,Section Xi,Paragraph IWA-6230 ML20209H0111999-07-16016 July 1999 Forwards Relief Request C-4 to CPSES Unit 2 ISI Program for Approval ML20209G0721999-07-13013 July 1999 Forwards Monthly Operating Repts for June 1999 for CPSES, Units 1 & 2,per TS 6.9.1.5.No Failures or Challenges to PORVs of SV Occurred During Reporting Period ML20209F0681999-07-0909 July 1999 Informs That Effective 990514,TU Electric Formally Changed Name to Txu Electric.Change All Refs of TU Electric to Txu Electric on Correspondence Distribution Lists ML20209E0421999-07-0909 July 1999 Forwards Response to NRC Request for Addl Info on LAR 98-010.Attachment 1 Is Affidavit for Info Supporting LAR 98-010 ML20209B6021999-06-30030 June 1999 Submits Second Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Readiness Disclosure for Reporting Status of Facility Y2K Readiness Encl ML20195J6981999-06-15015 June 1999 Provides Addl Info Related to Open Issue,Discussed in 990610 Conference Call with D Jaffe Re ISI Program Relief Request L-1 Submitted by Util on 980220 ML20196A4921999-06-15015 June 1999 Forwards Rev 30 to Physical Security Plan.Rev Withheld,Per 10CFR73.21 ML20195J0491999-06-14014 June 1999 Submits Response to RAI Re Implementation of 1.0 Volt Repair Criteria ML20195J0651999-06-14014 June 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves 05000445/LER-1999-001, Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 11999-06-0808 June 1999 Forwards LER 99-001-00, Some Electrical Contacts for RCS Pressure Relief Valves Were Not Included in Surveillance Testing Procedures. New Licensing Commitments Identified in Attachment 1 ML20195F0091999-06-0808 June 1999 Forwards Response to RAI Re Units 1 & 2 ISI Program for Relief Requests E-1 & L-1.Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20207E1921999-05-28028 May 1999 Submits Updated Request for NRC Staff to Review & Approve Certain Changes to CPSES Emergency Plan Submitted in 981015 & s Prior to Changes Being Implemented at CPSES ML20207E1711999-05-28028 May 1999 Supplements 990526 LAR 99-004 as TU Electric Believes Extingency Exists in That Proposed Amend Was Result of NOED Granted to Prevent Shudown of CPSES Unit 1 ML20207D9841999-05-26026 May 1999 Requests That NRC Exercise Enforcement Discretion to Allow Cpses,Unit 1 to Remain in Mode 1,power Operation,Without Having Performed Svc Test,Per SR 4.8.2.1d on Unit 1 Battery BT1ED2 ML20195B6351999-05-25025 May 1999 Submits Response to RAI Re GL 95-07, Pressure Locking & Thermal Binding of Safety Related Power Operated Gate Valves TXX-9912, Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise1999-05-21021 May 1999 Forwards Txu Electric (Formerly TU Electric) CPSES Emergency Preparedness Exercise Scenario Manual for 990721-22,Graded Exercise ML20206U1981999-05-20020 May 1999 Forwards Form 10K Annual Rept,Per 10CFR50.71(b). Communication Contains No New Licensing Basis Commitments Re Cpses,Units 1 & 2 ML20196L1931999-05-20020 May 1999 Forwards MOR for Apr 1999 for Cpses,Units 1 & 2.During Reporting Period There Have Been No Failures or Challenges to Power Operated Relief Valves or Safety Valves TXX-9911, Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld1999-05-14014 May 1999 Forwards non-proprietary & Proprietary Responses to RAI Re LAR 98-010 by Incorporating Attached Changes Into CPSES Unit 2 OL NPF-89 & CPSES Units 1,OL NPF-87 & 2 TS to Increase Licensed Power.W & Caldon Proprietary Responses Withheld 1999-09-03
[Table view] Category:LEGAL/LAW FIRM TO NRC
MONTHYEARML20055E2741990-05-0101 May 1990 FOIA Request for Investigation Rept 4-89-008 ML20042E3291990-04-10010 April 1990 Advises That Due to Clerical Error,Author Ltrs to NRC Re Insp Repts 50-445/90-05 & 50-446/90-05 Not Served.Repts Will Be Served to All Parties on Attached List ML20042E3311990-03-31031 March 1990 Advises That Open Issues Re Thermo-Lag Insulation Matl & Harassment & Intimidation of QC Inspector Not Addressed in Insp Repts 50-445/90-05 & 50-446/90-05.CASE Questions Whether Formulas to Mfg Thermo-Lag Changed ML20042E3351990-03-28028 March 1990 Requests Listed Info or Basis for Specific Action Re C Grimes 900208 Ltr to J Cahill Re Issuance of License NPF-28,specifically Why Temporary Exemption from Schedular Requirements Granted ML20042E4301990-03-26026 March 1990 Lists Questions Based on Review of Insp Repts 50-445/89-88, 50-446/89-88,50-445/88-88 & 50-446/88-88,including Contamination Problems Found Inside Namco Switches in 1989 & Aircom Fasteners ML20043B7341990-03-0202 March 1990 FOIA Request for Records Re Insp Performed by C Williams on 900207-0302 Concerning ASME Section III Compliance Review & Weld 12A ML20011F0091990-02-0808 February 1990 Certifies That Util Covered for Decontamination Liability & Excess Property Insurance,Effective on 900208 ML20012D6361990-02-0505 February 1990 Responds to Util 891221 Ltr to NRC Re thermo-lag Dispute ML20012D5951990-02-0505 February 1990 FOIA Request for Documents & Records Relevant to & Generated in Connection W/Insp Repts 50-445/90-05 & 50-446/90-05 on 900131 Re Therm-o-Lag Issues ML20005G5381990-01-10010 January 1990 Urges Resolution of Issues in Dispute & Matters of Concern to Case Prior to Fuel Load Decision.Issues Include, Auxiliary Feedwater Check Valve & Pending Enforcement Action & Station Svc Water Sys Enforcement Action ML20005G5481990-01-0909 January 1990 Forwards Analytical Evaluation of Station Svc Water Sys for Facilities by Case Consultant J Doyle Dtd 891231.Rept Submitted to Document Events Re Removal of Plastite Liner in Station Svc Water Sys in Spring 1988 ML19354D7631990-01-0909 January 1990 Forwards Rev 0 to Case Final Rept, Analytical Evaluation of Station Svc Water Sys,Comanche Peak Nuclear Power Station. Rept Contains Conclusions Applicable to Issues of Regulatory Character & Competence of Util to Manage & Operate Plant ML20005G6951990-01-0909 January 1990 Corrected Ltr Discussing K Doyle Rept, Analytical Evaluation of Station Svc Water Sys for Comanche Peak. Rept Concludes That Probable Cause of Failures of Sys Due to Inability of Util Personnel to Perform Accurate Analysis ML20005G6751989-12-12012 December 1989 FOIA Request for Documents Re Insp Repts 50-445/89-23 & 50-446/89-23 on 890405-0502 ML20006B8811989-12-0505 December 1989 Appeals Denial of FOIA Request for App B Records ML19332F4911989-12-0101 December 1989 Discusses NRC 891027 Ltr to B Brink Re Citizens for Fair Util Regulation 891016 Request for Stay.Nrc Must Be Consistent in Application of NRC Procedures Re Probing of Allegations.Improprietaries Should Be Sought from Case ML20005G5441989-11-29029 November 1989 Requests That NRC Independently Conduct Insp/Investigation of Dispute Between Case & Util Re Thermo-Lag & Thermo Science,Inc Qc/Qa Breakdown.Util 891116 Ltr to Case Re Results of Investigation of Inspector a Concerns Encl ML20011D1221989-11-20020 November 1989 Discusses Concerns Re Integrity of Regulatory Process as Affecting Plant ML19332D7371989-10-0606 October 1989 FOIA Request for Records Re Chronology of Events Beginning 1985 ML19332F3141989-09-27027 September 1989 FOIA Request for Documents Re 890908 Insp Repts 50-445/89-38 & 50-446/89-38 ML20247R0381989-09-23023 September 1989 Advises of Case Position Re Need for Regulatory Enforcement Action in Response to Mgt Process & Administrative Control Failures Evidenced by 890505 Event at Facility ML20248C2711989-09-23023 September 1989 Requests Reclassification of Violations Noted in Insp Rept 50-445/88-47 & 50-446/88-42 on 880707-0802.Informs Case Believes Further Insp & Enforcement Review Appropriate ML20245J9341989-06-30030 June 1989 Forwards Util Response to Cap Rock Electric Cooperative,Inc Request for Order Modifying Antitrust License Conditions ML20248D6571989-06-16016 June 1989 Ofc of Inverstigations Subpoena to Jj Macktal,Nrc Investigation 4-89-008.* Requests Leave of 5 Days to Respond to Request Filed for Enforcement of Subpoena & to Brief Commission on Issues Re Subpoena ML20246K3781989-05-22022 May 1989 Requests Status of NRC Determination of Pending Fee Waiver Requests for FOIAs 89-47 & 89-52 ML20245A0381989-05-12012 May 1989 Forwards Request from Cap Rock Electric Cooperative,Inc for Order Enforcing & Modifying Antitrust License Conditions & Certificate of Svc.W/O Request ML20244D8701989-04-0606 April 1989 Forwards Endorsement 27 to Nelia NF-274 ML20246K3621989-03-30030 March 1989 Responds to Responding to Appeal of Denial of Fee Waivers for 890301 FOIA Requests.Justification for Fee Waiver Provided ML20246K3401989-03-0101 March 1989 Appeals Denial of Two Requests for Fee Waivers Re FOIAs 89-47 & 89-52 on Behalf of Jj Macktal & SM Hasan.Purpose of Requests to Examine Process Utilized by EDO & NRC for Revoking Confidentiality of Allegers ML20244D8771989-01-26026 January 1989 FOIA Request for Records Re Settlement Negotiations & Agreements in Licensing Proceedings Effectuated During Jul 1988 ML20246K2061989-01-25025 January 1989 FOIA Request for Records Re Revocation of Confidentiality on 890123 by V Stello & Requests for Info by Third Parties Which Concerns SM Hasan or Jj Macktal &/Or Respective Allegations About Facility ML20205D1401988-10-14014 October 1988 Forwards State of Tx Public Utils Commission Substantive Rule 23.66 Re Wheeling for Cogenerators ML20151U5971988-08-0808 August 1988 Requests Withdrawal of Portion of 860131 Filing Re Case Request for Imposition of Fine,For Suspension of Const Activities & for Hearing on Application to Renew CP ML20150E1411988-07-12012 July 1988 Forwards Suppl Filing of Response of Applicant to Motions to Stay,To Intervene & for Sua Sponte Relief Filed by Various Parties ML20150E2061988-07-10010 July 1988 Clarifies Relevant Issues Raised in LC Clark Re Recent Filings by J Doe.W/Supporting Info & Certificate of Svc ML20150D5031988-07-0808 July 1988 Forwards Motions to Intervene & for Sua Sponte Filed on Behalf of Citizens for Fair Util Regulation & Individual Residents ML20150D5091988-07-0707 July 1988 Forwards Substitute Pleadings of Petitioner J Doe ML20150D5261988-07-0606 July 1988 Forwards Motion for Permission to Withdraw Pleadings W/O Prejudice & W/Leave to File Substitute Pleadings within 48 H ML20151Y6221988-04-29029 April 1988 Forwards Wg Counsil Transmitting Errata to Project Status Repts for Mechanical Suppl a - Sys Interaction & Mechanical Suppl B - Fire Protection. Related Correspondence ML20151T7141988-04-26026 April 1988 Forwards Applicants Answers to Board 14 Questions Re Action Plan Results Rept VII.a.9.Checklists Used for Reinsp/ Documentation Review for 81 Items of Equipment & Matl Not Included W/Answers Due to Vol Amounting More than 1,000 Pp ML20151E9771988-04-0808 April 1988 Informs That Applicants Notified Board & Parties of Availability in TU Electric Document Room of Matls Ref in NRC Sser 14.W/Certificate of Svc ML20148M0221988-03-30030 March 1988 Forwards Exhibit 18 Introduced to Record by Counsel for co-owners During Williams 880218 Deposition & Pages 190-195 & 464-465 of Transcript,Representing Entire Contents of Deposition Re Exhibit.W/Certificate of Svc ML20148K3681988-03-24024 March 1988 Forwards Excerpts from Form 10-K Filed by Util W/Security & Exchange Commission.Excerpts Contain Financial Disclosures Re Facility.Info Provided to Keep Board Apprised of Matters Re Facility ML20150D0151988-03-21021 March 1988 Forwards Transcripts of Meeting Held on 871217-18 & 880218 Between Case & Util.W/O Encl.W/Certificate of Svc ML20150D0201988-03-18018 March 1988 Informs That on 880314,CASE Filed Tenth Progress Rept W/ Board & Urged Board to Review Transcript of Public Meetings Held Between Case & Applicants in Which Walsh/Doyle Issues Discussed.W/Certificate of Svc.Related Correspondence ML20148G1411988-03-17017 March 1988 Forwards Ltr of Even Date from Util to NRC Which Transmits Copies of Errata Prepared for Project Status Rept Re Cable Tray & Cable Tray Hangers & Conduit Supports Train C 2 Inch Diameter & Less ML20150D0381988-03-14014 March 1988 Forwards Util Informing That Licensee Still Collecting Documents for Files Containing Documentation for Result Rept VII.a.9 ML20196D5001988-02-0808 February 1988 Forwards Wg Counsil Transmitting Project Status Rept for Civil/Structural, Rev 0.Related Correspondence ML20195J0621988-01-15015 January 1988 Forwards Wg Counsil to Nrc,Transmitting Project Rept for Electrical, Rev 0.Rept Also Sent to J Ellis & Cygna.Related Correspondence ML20147D5771988-01-14014 January 1988 Forwards Util Form 8-K,current Repts, & 1214,filed W/Securities & Exchange Commission.Documents Forwarded as Part of Parties Efforts to Keep Board Apprised to Matters Re Facility.Related Correspondence 1990-05-01
[Table view] |
Text
- f. ATTACHMENT D O WEST TEXAS LEGAL SERVICES
( 406 W. T. WAGGONER BLDG.
(810 HOUSTON STJ
. FORT WORTH TEXAS 76102 (817) 336 3943 April 11, 1979 Lawrence J. Chandler, Esq.
Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Comanche Peak Contentions
Dear Mr. Chandler:
1 I have enclosed a rough draft of forty-five (45) potential l C Contentions for your consideration and a basis for our discussion next week. I do not regard'this as a filing, and you are the only person who is receiving a copy of our proposed Contentions.
I am going to continue to investigate the possibilities for Contentions up until the deadline for submission of Contentions, but this is a complete list of what I have to date.
Is there any possibility that I will have word from the Board on my Motion For Continuance before May 1, 19797 ;r I hope this material is of some assistance.
Sincerely, Geoffr . Gay Attorney at Law GMG:emp Enclosures 80031900 A p3
1 UNITED STATES OF AMERICA o NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )
)
TEXAS UTILITIES GENERATING COMPANY, ET AL. ) Docket Nos. 50-445
) 50-446 (Comanche Peak Steam Electric Station. )
Units 1 and 2) )
CERTIFICATE OF SERVICE I hereby certify that copies of "NRC STAFF ANSWER TO ACORN'S RESPONSE TO NRC STAFF'S STATUS REPORT ON PROPOSED STIPULATIONS AND ACORN'S REQUEST THAT THE NRC STAFF BE ORDERED TO FURTHER NEGOTIATION ON ADMISSIBILITY OF PROPOSED CONTENTIONS" in the above-captioned proceeding have been served onethe follow-ing by deposit in the United States mail, first class, or, as indicated by an I asterisk, through deposit in the Nuclear Regulatory Commission's internal mail )
system, this 10th day of March, 1980: 1 Elizabeth S. Bowers, Esq., Chairman
Atomic Safety and Licensing Board Assistant Attorney General j U.S. Nuclear Regulatory Commission Environmental Protection Division l Washington, DC 20555 P. O. Box 12548, Capitol Station l Austin, TX 78711 l Dr. Forrest J. Remick, Member ;
Atomic Safety and Licensing Board Mr. Richard Fouke l 305 E. Hamilton Avenue 1668-B Carter Drive l State College, PA 16801 Arlington, TX 76010 Dr. Richard Cole, Member Atomic Safety and Licensing Board Atomic Safety and Licensing Board Panel
- U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555 Washington, DC 20555 Ninholas S. Reynolds, Esq. Atomic Safety and Licensing Appeal bevoise & Liberman Panel (5)*
400 17th Street, N.W. U.S. Nuclear Regulatory Commission
.ashington, DC 20036 Washington, DC 20555 Mrs. Juanita Ellis Docketing and Service Section (7)*
President, CASE Office of the Secretary 1426 South Polk Street U.S. Nuclear Regulatory Commission Dallas, TX 75224 Washington, DC 20555 Mr. Geoffrey M. Gay West Texas Legal Services 100 Main Street (Lawyers Bldg.)
Fort Worth, TX 76102 beA.
MarjoYie Ulman Rothschild Counsel for NRC Staff
ATTACHMENT A April 6,1979 6 s. IL.ncy lloidam Jacobson CFUR 1400 Hemphill Fort Worth, TX 76104 In the liatter of Texas Utilities Generating Company, et al.
(Comanche Peak Steam Electric Station, Units 1 and 2)
Docket Nos. 50-445 and 50-446
Dear I.!rs. Jacobson:
This veill confirra cur meeting scheduled for 2: 30 p.m. on April 16, 1979 to discuss cententions in connection with the ' captioned precading. I have arranged for the use of a conference room at the llRC'c Region IV cffices on the 10th floor at 611 Ryan Pla:a Drive, Suite 1000, Arlington, Texas for thia meeting.
In the meantime, please send me a copy of your propose.d contentions so that I can review them prior to our meeting. A draft will suffice.
, Sincerely, Lawrence J. Chandler Counsel for NRC Staff cc: Nicholas S. Reynolds has 3 905'll 0 3 6 G
ATTACHMENT B April 6,1979 Geoffrey M. Gay, Esq.
V.'est Texas Legal Scrvices 406 W. T. Waggoner Building 810 liouston Street 5 Forth Worth, TX 76102
.E i In the Matter of Texas Utilities Generating Company, e_tt al.
(Comanche Peak Steam Electric Station, Units 1 and 2) i' Docket Nos. 50-445 and 50_-446 I: Desr Mr. Gay:
This will confirm car :necting scheduled for 10 a.m. cn April 17, 1979 1
,. to discuss contentions in connection vcith the captiened proceeding. I have arranged for the use of a conference room at the NRC's Region IV
{ offices on the 10th floor at 611 Ryan Plaza Drive, Suite 1000, Arlington.
{; Texas for this mc.etIng.
l In the meantime, please send me a ccpy of your proposed contentions so that I can review them prior to our meeting. A draft will suffice.
t
^
Sincerely, j..
Lawrence J. Chandler Counsel for NRC Staff cc: Nicholas S. Reynolds
(
6uJLr go T2 ST)/ 4'3
\ .
ATTACHMENT C April 6,1979 Mrs. Juanita Ellis President, CASE 1426 South Polk Street Dallas, TX 75224 I
T, In the Matter of Texas Utilities Generating Company, d al.
i (Comanche Peak Steam Electric Station, Units 1 and 2)
V.
Docket Nos. 50-445 and 50-446
,,i
Dear Mrs. Ellis:
f This will confirm our meeting scheduled for 10 a.m. on April 18, 1979
" to discuss contentions in connection with the captioned proceeding. I
, ha* e arranged for the u:,e of a conference room at the NRC's Region IV
{
offices on the loth flour at 611 Ryan Plaza Drive, Culte 1000, Arlington, p Texas for this meeting.
( In the meantime, please send me a copy of your proposed ceintentions
{l co that I can review them prior to our meeting. A draft will suffice.
Sincerely, t
k p
1' Lawrence J. Chandler
'j Counsel for NRC Staff cc: Nicholas S. Reynolds W
D%4 qc7agi/ O 3(s0
?
o ATTACHMENT E t
July 5,1979 Geoffrey M. Gay, Esq.
West Texas Legal Services 406 W. T. Warr.oner Bldg.
i 810 llouston Street Fort Worth, TX 76102 i In the Matter of Texas Utilities Generating Company, et al.
l (Comanche Peak Steam Electric Station, Units 1 and 2) 1 Docket Nos. 50-445 and 50-446
.i
Dear ik. Gay:
1 This will confirm our meeting scheduled for July 19, 1979 at 9:30 a.m. at your office, to discuss the contentions ACORN has proposed in this proceeding.
1 i
l As indicated during our recent phone conversation, I will be accompanied by {
[ Hr. Chandler and Mr. Spottswood Burwell, the Staff's Licensing Project Manager '
A responsible for the review of the Comanche Peak application. Mr. David Preicter of the Texas Attorney General's Office, will also be present. In addition, it is expected that Mr. Nicholas Reynolds, possibly accompaaied by a representative of the applicants, will attend our meeting in an effort to l determine whether agreement can be reached on contentions.
Sincerely, i
i j . Marjorie B. Ulman Counsel for NRC Staff ;
cc: Service List
! i f 1 bW 740f /5000 y
ATTACHKENT F July 30, 1979 Geoffrey :;. Gay, Esq.
1:est Texas Lcgal Services 40G l'.T. t.'a::: ener C1dg.
810 !!ouston Street Fort i: orth, Texas 70102 et al.
In the ;;atter ofPeak (Co.:anc!ic Texas Utilities Stea:.; Cenerating Electric C<mpany,f7)~
Stction, i.' nits 1 n Doc!.ct ::es. 50-455 and E0-645
Dear Mr. Gay:
In connection uith our t.e:. ting on July 19t:,, I h;ve cncle:. ~t cc,:y of a recent lSC Final Environne tal Stater.cnt (FES) containing : c i:c=rion of decoziissioning. This discussion is found in section 10.2.4. Plerse note that the costs given are in 1975 dollars. Fcr exac.ple, the p;ragraMi" on the costs of uoth'aalling (see p.10-4, 7th paragraph) shoulo r.:cd: ...
the r.;othballing alternative costs about 52.45 uillion initi:.lly plus an l annual maintenance and surveillance cost of fl07,000, in 1975 dollars."
(The underlined phrase should be added).
l Sincerely,
- .:arjorie C. Ul:.an Counsel for ;.aC St:7f
Enclosure:
As stated I
l cc u/o cncl: Scrvice List i
i qqo42CM 97 e
L_
ATTACHMENT C
('
lk Avp,u::t 21,1979 Ccoffrey M. Cny, L.sa.
West Tc::an Lc ral f urvict r.
405 U. T. Un,g o:xr 121c':. .
8101:oucron Stre.c.t Fort Worth, TX 76102 In the latter of l Texas Utilities Genc-rctius Co pany, et al.
l (Comanche Peak Stenti Electric Station, Units 1 and 2)
,- 11.oc. !:e t !!as . 50-445 nnd 50-446 j
i Decr Mr. Cay:
i In conne.ction VIth (sr recce: phone converiction, I iave entlosci, a copy of ;
, AC0"J1':: ccntentions, vhich 1:!1.'et ti.e ch nres r..de. et the nenting,cf the parties hcId en July 19, 1979, tr.( the to irions taken by the. pcrties et l
} that c:ceting,. h I i.a rurn. you reccpr.1:c, the ponitiene tA ci wer0 art fiac1 l and arc suhjcct. to change. A cenference er.ll to further distvss thcse coa- l tcntion: iu tcntativ-ly cchc'uled for Aur.uat 30 or 31.
l 4
Sincerely,
- 1 Marjorio B. Ulman
! l Counsel for NRC Staff l 1
Enclosure:
As stated 4
. i
- cc w/o enclosure
- '
- Service List j
I' k
I.
I be qqoq 6 0 5 m _
i
,4 i
Anmannrr G p-
.Xin,.,2 .% S '22#'
. .,1.g ; ., u s
{ .
DCT 4 :373
..i:... ' . L. : , E s r. .
. s :. T. . ..t Lt..:1 ._r/icas ;
i ... - i:. L t rc ; (La ger's Pl. .)
T :: : ... T=t s 7W2
)
- .. Itc ".sttar of T.-
- 1
' tilities Cenerating Ca.pany, et al. '
(Cc Enc:it i ci.f. . .o :lectric Sti. tion Units 1 ano 2) _
- . * * * . r.r-? ? 5 :s,d Y' /.; C l
l Eri r : r. L.:.y : ,
..C. s :s .
l l
in ::ccr ..c.: ' i tr c/r recent t:1erbnc conversation, I have prepsred and
- . n . i . - .'ruf t sti;alttie cc.. rin;' 15.2 contentions of- the Texas Associc-
...i t; f rgi.nizatiu.s $r ?ef or- .:. > ( ACUT.::). This draft sti tulation ti r , f.
l r fi. : . p..
- e,itica cf the ; rties s it!. rest.act to t'.est contentions, cs s . t . . i ;.
- i:. tu_ stst: . .: c f ct..hr tit,s ; rrviost i;. tr ns .itted to .rou am:
,i. .
iicu.:'s cc.a.sel, nn. in t..t i;.rtics ' ::;lephont coaference of I.t':est 21,
\
l
- '... t to tnt ccn f . re:.i. . u l i , :: . 2.t c f f r. :.s:. . : r : i ts r. c i ti 1 C
r;c t rd-i:e ;
's "5efety" cer.tu. tic: 21, rcir tin: to 9 er: enc rirnnir ^. it.t St. fi's r.essessr.cr.t is baset on r.cer.t ctvelo;aents, r ere fully ciscussed
- .cle , micn have occurred in ttc croc of energency plcnning. The ce:. ult-tivt i .,5ct of tnese develornents c.atses the Staff to Sclieve thct the L..rcks shculd defer further consideration of contention 31. Therefort , the treff h.s includec in the stipulation a separate pragraph coverino centen-tica ?1, which reflects this position.
The (cvelopt.cnts referred to abcvc are: 1) the Ccmission issued a "fiotice'~
of Trorased Expedited Dule e':it- en th:. Accouacy cr.d I.cceptence of Ercriei.:s I li.:.:.in, l. cand i.uclecr facilities" (1:otice). 44 Fet. f:t .. 41/J3 (July 17 .
IE E ); 2) the Joint EPA-1:.'.C Tu.L Force flannino Basis for Develnrent of
- t t i .- En: Local Covertriciit !: ficionicel E; orcency t:esnnnse Plcns in 5.tt' nrt a!t .t .ter ..ucletr ir:er ,1:.r ts (,:.isc-0326) (Joint Task Forcc) is pa:c-in. .icr t..e Cor.r..ission for it:, cpurcycl; and on July 23,197:., "r. Penton, i.in cter of ':uclear f.ecctor i,e. 21tticr., ; pro .algett:i SECY-79 A.50, "Actier.
Tlcr fer fremptly Irprovins L s r: er.cy Preparedness," (Action Plan). The
. otic; cf Prcpose ! I:ule>cl.in:. 2y not directly effect this proceedir9 beccuse c cijer rortica of it relate: to c; . rs tir.: reac tcrn. Ho.:cver, tbs Joint Tcs' Ferec report is ir part=1 tt this treceedirt beaust it fcr.s a na.ior Icrtic:. cf the Lecis for ext..:.;ia e :erptncy olt.nnia; to ct least ten r:ilet.
It. ti.. Actico Plc.n, ':r. br.te: 1, . ir:.ctcr, Office of ..ecicar Potetor ! c:. cit-Liv., r fic..:.c tp to :.l::L ic.r 's U. . i ta s 4.r t till:~
=
M O -e
= .: ... ,.
~-
xd..Ar. w . ~
- - sh-:: m, w :. ..a::-m . w w m & ,w ..
. . .2v . v =. - .. .
- , . :, tiic relctionship of '.t.tc/ local r.lans to the licens-(C) u 's vid federal plans so ts t., cssure the caput ility to tiI e (;prepriate cocnjercy ac tions, Assure that this caps-Lilit;. cill te exter<ed to c. (Mstance of 10 niles as soon c:. r.cticol, Lit not lat<.r r:r Jcnutry 1, E;1.
To ; t,it. . yu 1.~. ur.tra1:.r.fint tt.. r.t.+t c'evelo atnts in c '.::rgency plcnnin:,
! . .'..; 1 t t i v. copics of th; dece- -. r. f arr:.-: to t.bnyc.
l 1e :1m t ';,r.t. ii. te i t i f yo ; t wl. ' r . v i . this dri.f t stirelation on an expe- 1
- t. i. t. .. 1;;is, sir.:t I till be cont :ti . jou and .~.pplictut's counsel shortly
. r '. ' e' 1 > r : i ' r; -' .: r 'M i- r: . , c' 't ctic::s to t' o 1: n:vr;c in t' e t.ti, a l t.tica. The craf t stipulction an'.i statorent of conter.tions uill ti.cn Le preptred in final forr ano tre.nsnitted to you for your signature, under s@i rcte cover. As prepared in final foru, the docunents uill reflect cor -
r..:ticr.s cr cLEncer agrecd to by the rsrties. Af ter signature, the stipul6-tipi cnt st:.;c. ent of contentions i:111 t..' transnitted to the Licensin; 1.osr::
f.r its cc::.iderition.
Tii.cerely, 2 rf t rie L. L'Ir.cn Co;nsel for !:::C Ltaff 1
i.nc1ccurcs : 1
- 1. Fc 'eri.1 !.eaister I;ot. c dLtc c u ly l i , Ib /!
'. : UI'EG-0Y:f.
L. SECV-70-60 ..
i
~~
/. ircf t f tipulation -
cc w/:r.cles.uro (4: Service List (except Licensing [,oard r.:.m. .rs) l cc .r/v triclosur.'s: Licensing Lourd t .ra
.. j
.... .: .;. . . A.
- m. . _ . . - . . . . . -
7 .w - . . . . . . . . . . -
l
(}
l ATTACHMENT I t <
! l
. l
' L((
January 25, 1980 l
~
Geoffrey E Gay, Esq.
West Texas Legal Services 100 Main Street (Lawyers Bldg.)
l Fort Worth, TK 76102 In the Matter of Texas Utilities Generating Company, et al.
(Comaaeha peak Steam Elaetric station. Unita 1 sad 2)
Docket Noe. S H 45 and 50-446 _
Dear Mr. Cay:
Eselosed is the stipalation covering the contentions proposait by ACORN for admission as issues in controversy in this proceeding. The stipulation has been signed by counsel for the Applicants and Staff and includes as an attach-meet a statensat of ACORN's proposed contentions.
(
The stipulation and attachment differ in some respects from the draft statement of.coatentions and draft stipulation forwarded to you in August and October 1979, respectively. The draft statement of contentions and draft stipulation reflected the positions taken by the parties at the July meeting of the parties and la the parties' telephone conferences of Angust 31, 1979. As you recognise, these positions were act final. As a result of further negotiations betwee's the parties subsequent to the meeting of the parties in July 1979 and telephone conference of Angust 31, 1979, there has been a change of position with respect to several contentions. In particular, we note that the draft stipulation, indicated that the parties had agreed to defer seasideration of contention 24.*f Bowever, the parties have now agreed that deferral is no longer acessaary and have takaa positions with respect to this contention. Also note a change in the position of the Applicants regarding contentica 2. The stipulation and attachment also now reflect the request of the Applicants and staff that the Licensing Board defer ruling on the admis.sibility of contention 25. The language of contentions 3., 5., and 12. has been changed to conform to the language agreed to by the parties at their July aceting. In addition, the contention designated as number 33 la the draft statement of contentions has been deleted, since ACORN agreed at the meeting to withdraw this contention. Based on our records, these
. are the saly changes of substance in the stipulation and statement of contentions.
- / As the stipulation and statement of contentions indicate, the contentions have been renumbered. Unless otharvise acted, we are referring to ths eententions as renumbered.
200 2W 5
s e
I would appreciate it if you would review the stipulation and attachment on as espedited basis. Please return the stipulation to me after signature, with the attachment, so both can be submitted to the Licensing Board for its ecosideration. An extra copy of each is enclosed for your retention. Thank you for your cooperat{on.
Sincerely, Marjorie Ulman Rothschild Counsel for NRC Staff
Enclosure:
As stated ec w/o ancl: Servios List v - *
- i. 3 ATTACHMENT J
(
February 25, 1980 ,
l 1
Eli:abeth % Bovers. Esq. , Chairran Richard Cole, Esq. , lhber Atomic Safety and Licensing Board Atonic Safety and Licensing Board U.S. !!ucicar Regulatory Co= mission U.S. Nucicar Regulatory Con.ission m
Washington, DC 20555 Uashington, DC 20555 i Dr. Torrest J. Remick, !! ember Atomic Safety and Licensing Board 305 E. Hamilton Avenue State College, PA 16801 (
I In the !!atter of l Texas Utilities Cencrating Conpany, et al.
(Co::nche Peak Steam Electric Station, Unita 1 and 2)
Docket Nos. 50-445 and 50-446
Dear !Icebers of the Board:
On January 25, 1980, the NRC Staff filed a " Status Report on Proposed Stipuls-tions and Request to Schedule Prehearing Conference." This report responded to the request of the Atomic Safety and Licensing Board (the Licensing Board) l for an appraisal of the status of negotiations among the parties to this pro- !
ceeding concerning the contentions of the respective Intervenors. The report reflected the Staff's belief, on that date, that the stipulations on contentions which had been executed by the Applicants and the Staff would shortly be executed ,
by the Intervenors. Accordingly, the Staff 1) suggested that the Licensing .
Ecard schedule a prehearing conference on P. arch 20, 1980, to hear oral argument on contentions and 2) proposed that the parties file statements of position on contentions on February 29, 1980.
Since the filing of the Staff's status report, the stipulatiens have not been executed by the Intervenors. The staff continues to be hopeful that it will be possible to reach a stipulation on contentions. However, since the parties have not yet reached such a stipulation, the Staff believes that it would be pre: nature to file statements of position on contentions on February 29, 1980, especially since the Licensing Board is not considering having a prehearing conference until April 30, 1980. The Staff therefore does not intend to file a statement of position on contentions on February 29, 1980. In the event that the parties reach a stipulation on contentions, it is the Staff's inten-tion that the stipulation provide that the parties will file statecents of position on contentions no later than twenty (20) days prior to the holding k
b W-1 g o o 2 1 3 o 0 5 2-
r l6 of the prehcaring confcrcnce. If it is not roccible to reach a stipulation, the Staff vill file a etctcrent of pocition on the contentions originally prepot.cd or as arcaded by the Intcrvcnors no later than twenty (20) d ys prior to ti,e prehearing confcrcnce.
Sinecrcly, IMrjoric Ulran nothschild Ceansel for I;RC Staff ec: Scrvice List
(
., .