ML19332F873: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
(One intermediate revision by the same user not shown) | |||
Line 20: | Line 20: | ||
=Text= | =Text= | ||
{{#Wiki_filter:'* ^ - ' | {{#Wiki_filter:'* ^ - ' | ||
[pg | [pg | ||
. i | . i | ||
. -j | . -j W$4.F CREEK | ||
W$4.F CREEK | |||
~ | ~ | ||
NUCLEAR OPERATING CORPORATION Gen D. Wilhers e,ees n one -l cw n e nouse om ar 1 December 14, 1989 | NUCLEAR OPERATING CORPORATION Gen D. Wilhers e,ees n one -l cw n e nouse om ar 1 December 14, 1989 | ||
Line 36: | Line 33: | ||
The purpose of this letter is to request that the Nuclear Regulatory' Cocunission (NRC). authorize the use of'ASME'Section XI Code Case-N-401 : | The purpose of this letter is to request that the Nuclear Regulatory' Cocunission (NRC). authorize the use of'ASME'Section XI Code Case-N-401 : | ||
entitled " Eddy Current Examination, Section XI, Division 1" pursuant to 10 CFR 50.55a(a) (3) for Wolf Creek Generating--Station. | entitled " Eddy Current Examination, Section XI, Division 1" pursuant to 10 CFR 50.55a(a) (3) for Wolf Creek Generating--Station. | ||
This Code Case-revision was approved-by the-ASME Boiler and Pressure Vessel Code = Committee on May 4, 1988. | |||
Code Case N-401 was' approved by the Code Co ^*r -- I February 20, 1984-.and I is listed as an approved Code' Case in Regulatory Guide 1.147. Code Case N-- | Code Case N-401 was' approved by the Code Co ^*r -- I February 20, 1984-.and I is listed as an approved Code' Case in Regulatory Guide 1.147. Code Case N-- | ||
401 specifies that, 'when demonstrated equivalent to the Authorized Nuclear , | 401 specifies that, 'when demonstrated equivalent to the Authorized Nuclear , | ||
Inservice Inspector, digitized collection and, storage of eddy current test data may :be used as' an alternative to magnetic tape and strip chart ; | Inservice Inspector, digitized collection and, storage of eddy current test data may :be used as' an alternative to magnetic tape and strip chart ; | ||
recording of eddy current test data required by Section XI, . Division 1, r | recording of eddy current test data required by Section XI, . Division 1, r Appendix IV. Code Case N-401-1 adds the requirements for calibration to the g original provisions of Code Case N-401. Periodic calibration in accordance with IV-3000 is required only for analog elements of the digital eddy current data collection and storage equipment. This Code Case will allow the use of current equipment and practices used by eddy current testing contractors and provide appropriate calibration of' digital eddy current data equipment. This Code ' case provides an acceptable level of quality and safety when the Section XI requirements can not be met. A copy of this Code Case is attached to this letter. | ||
Appendix IV. Code Case N-401-1 adds the requirements for calibration to the g | |||
original provisions of Code Case N-401. Periodic calibration in accordance with IV-3000 is required only for analog elements of the digital eddy current data collection and storage equipment. This Code Case will allow the use of current equipment and practices used by eddy current testing contractors and provide appropriate calibration of' digital eddy current data | |||
equipment. This Code ' case provides an acceptable level of quality and safety when the Section XI requirements can not be met. A copy of this Code Case is attached to this letter. | |||
Since Code Case N-401-1 is not currently listed in Regulatory Guide 1.147, Revision 7, as a Code Case endorsed by the NRC, Wolf Creek Nuclear Operating Corporation (WCNOC) requests approval of this Code Case by February 1, 1990. Approval by this date will allow WCNOC to use this Code Case _during the fourth refueling outage which is scheduled to start on March 8, 1990. | Since Code Case N-401-1 is not currently listed in Regulatory Guide 1.147, Revision 7, as a Code Case endorsed by the NRC, Wolf Creek Nuclear Operating Corporation (WCNOC) requests approval of this Code Case by February 1, 1990. Approval by this date will allow WCNOC to use this Code Case _during the fourth refueling outage which is scheduled to start on March 8, 1990. | ||
l | l | ||
: I Q 1 l' | : I Q 1 l' | ||
\\ | \\ | ||
P.O. Box 411/ Burlington, KS 66639 / Phone:(316) 364 8831 I An Equal opporknty Employer M F/HC/ VET n 92 | P.O. Box 411/ Burlington, KS 66639 / Phone:(316) 364 8831 I An Equal opporknty Employer M F/HC/ VET n 92 e | ||
e | |||
m: | m: | ||
. ~ ... . - - | . ~ ... . - - | ||
yq;;- y i **y,, e , | yq;;- y i **y,, e , | ||
-WM 89-0256- ' | -WM 89-0256- ' | ||
, tPage:2.of 2. | , tPage:2.of 2. | ||
N . December 14,'1989 - | N . December 14,'1989 - | ||
1 | 1 7g This Code-Case-was approved for use at 0conee, McGuire and Catawba Nuclear-Stations- in a letter- dated February 25.. 1989 from D.- B.-- Matthews to v" ' | ||
7g This Code-Case-was approved for use at 0conee, McGuire and Catawba Nuclear- | |||
Stations- in a letter- dated February 25.. 1989 from D.- B.-- Matthews to v" ' | |||
-H. B..-Tucker ~of Duke: Power Company. . If;you have_any questions concerning. | -H. B..-Tucker ~of Duke: Power Company. . If;you have_any questions concerning. | ||
4 this matter. please contact me or Mr. 0. L. Maynard of my staff. | 4 this matter. please contact me or Mr. 0. L. Maynard of my staff. | ||
Very truly yours. | Very truly yours. | ||
---+Y . | ---+Y . | ||
Bart D. Withers President and- 'I Chief Executive Officer p | Bart D. Withers President and- 'I Chief Executive Officer p | ||
l c BDW/sem Attachment 'l cc: B..L. Bartlett-(NRC), w/a 1 E.-J.: Holler'(NRC).-w/a R. D. Martin = (NRC), w/a D. V. Pickett (NRC), w/a | l c BDW/sem Attachment 'l cc: B..L. Bartlett-(NRC), w/a 1 E.-J.: Holler'(NRC).-w/a R. D. Martin = (NRC), w/a D. V. Pickett (NRC), w/a i | ||
i | |||
-1 i | -1 i | ||
# .e l | # .e l | ||
i 1 | i 1 | ||
. - . - . . - - ,-..---_m..._ | . - . - . . - - ,-..---_m..._ | ||
o,. . - - - -_ | o,. . - - - -_ | ||
''TAttachment-to WM 89-0256^ ' | ''TAttachment-to WM 89-0256^ ' | ||
Page.1 of 1 | Page.1 of 1 | ||
-' CASE > | -' CASE > | ||
N-401 , | N-401 , | ||
CASES OF ASME DOILER AND PRESSURE VESSEL CODE | CASES OF ASME DOILER AND PRESSURE VESSEL CODE Approval Date: May 4.1988 See NumerieelIndes for expirstron, and any reaffirmation dates. | ||
Case N 4011 Eddy Current Examination Section XI, Didsfon 1 Inquiry: Is it permissible, as an alternative to the Section XI, Division 1 Appendix IV, requirement for magnetic tape and strip chart recording of eddy current test data, to use digitized collection and storage of data as the permanent record for eddy current examina-tions, and to what extent do the calibration require-ments of IV 3000 apply? | |||
Approval Date: May 4.1988 See NumerieelIndes for expirstron, and any reaffirmation dates | l Reply: It is the opinion of the Committee that, when demonstrated equival< t to the Authorized Nuclear ' | ||
Case N 4011 Eddy Current Examination Section XI, Didsfon 1 Inquiry: Is it permissible, as an alternative to the Section XI, Division 1 Appendix IV, requirement for magnetic tape and strip chart recording of eddy current test data, to use digitized collection and storage of data as the permanent record for eddy current examina- | |||
tions, and to what extent do the calibration require-ments of IV 3000 apply? | |||
l | |||
Reply: It is the opinion of the Committee that, when demonstrated equival< t to the Authorized Nuclear ' | |||
l Inservice Inspector, digitized collection and storage of l | l Inservice Inspector, digitized collection and storage of l | ||
eddy current test data may be used as an alternative l to magnetic tape and strip chart recording of eddy l | eddy current test data may be used as an alternative l to magnetic tape and strip chart recording of eddy l | ||
current test data required by Section XI. Division 1, Appendix IV. Periodic calibration in accordance with | current test data required by Section XI. Division 1, Appendix IV. Periodic calibration in accordance with IV 3000 is required only for the analog elements of the digital cddy current data collection and storage equipment. | ||
IV 3000 is required only for the analog elements of the digital cddy current data collection and storage equipment. | |||
I' l' | I' l' | ||
l l. | l l. | ||
j. | j. | ||
l | l l .. | ||
l .. | |||
I l | I l | ||
l i *A* | l i *A* | ||
j | j | ||
. _ _ _ . - _ _ _ _ . _ _ _ . . _ _ . ,}} | . _ _ _ . - _ _ _ _ . _ _ _ . . _ _ . ,}} |
Latest revision as of 11:04, 18 February 2020
ML19332F873 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 12/14/1989 |
From: | Withers B WOLF CREEK NUCLEAR OPERATING CORP. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
RTR-REGGD-01.147, RTR-REGGD-1.147 WM-89-0256, WM-89-256, NUDOCS 8912190241 | |
Download: ML19332F873 (3) | |
Text
'* ^ - '
[pg
. i
. -j W$4.F CREEK
~
NUCLEAR OPERATING CORPORATION Gen D. Wilhers e,ees n one -l cw n e nouse om ar 1 December 14, 1989
'l U. S. Nuclear, Regulatory Commission ATTN:. Document Control Desk
. Hall Station Pl-137 ..
Washington, D. C. 20555 l
Subject:
Docket No. 50-482: Request for Use of ASME Code Case j N-401-1 Gentlemen:
The purpose of this letter is to request that the Nuclear Regulatory' Cocunission (NRC). authorize the use of'ASME'Section XI Code Case-N-401 :
entitled " Eddy Current Examination,Section XI, Division 1" pursuant to 10 CFR 50.55a(a) (3) for Wolf Creek Generating--Station.
This Code Case-revision was approved-by the-ASME Boiler and Pressure Vessel Code = Committee on May 4, 1988.
Code Case N-401 was' approved by the Code Co ^*r -- I February 20, 1984-.and I is listed as an approved Code' Case in Regulatory Guide 1.147. Code Case N--
401 specifies that, 'when demonstrated equivalent to the Authorized Nuclear ,
Inservice Inspector, digitized collection and, storage of eddy current test data may :be used as' an alternative to magnetic tape and strip chart ;
recording of eddy current test data required by Section XI, . Division 1, r Appendix IV. Code Case N-401-1 adds the requirements for calibration to the g original provisions of Code Case N-401. Periodic calibration in accordance with IV-3000 is required only for analog elements of the digital eddy current data collection and storage equipment. This Code Case will allow the use of current equipment and practices used by eddy current testing contractors and provide appropriate calibration of' digital eddy current data equipment. This Code ' case provides an acceptable level of quality and safety when the Section XI requirements can not be met. A copy of this Code Case is attached to this letter.
Since Code Case N-401-1 is not currently listed in Regulatory Guide 1.147, Revision 7, as a Code Case endorsed by the NRC, Wolf Creek Nuclear Operating Corporation (WCNOC) requests approval of this Code Case by February 1, 1990. Approval by this date will allow WCNOC to use this Code Case _during the fourth refueling outage which is scheduled to start on March 8, 1990.
l
- I Q 1 l'
\\
P.O. Box 411/ Burlington, KS 66639 / Phone:(316) 364 8831 I An Equal opporknty Employer M F/HC/ VET n 92 e
m:
. ~ ... . - -
yq;;- y i **y,, e ,
-WM 89-0256- '
, tPage:2.of 2.
N . December 14,'1989 -
1 7g This Code-Case-was approved for use at 0conee, McGuire and Catawba Nuclear-Stations- in a letter- dated February 25.. 1989 from D.- B.-- Matthews to v" '
-H. B..-Tucker ~of Duke: Power Company. . If;you have_any questions concerning.
4 this matter. please contact me or Mr. 0. L. Maynard of my staff.
Very truly yours.
---+Y .
Bart D. Withers President and- 'I Chief Executive Officer p
l c BDW/sem Attachment 'l cc: B..L. Bartlett-(NRC), w/a 1 E.-J.: Holler'(NRC).-w/a R. D. Martin = (NRC), w/a D. V. Pickett (NRC), w/a i
-1 i
- .e l
i 1
. - . - . . - - ,-..---_m..._
o,. . - - - -_
TAttachment-to WM 89-0256^ '
Page.1 of 1
-' CASE >
N-401 ,
CASES OF ASME DOILER AND PRESSURE VESSEL CODE Approval Date: May 4.1988 See NumerieelIndes for expirstron, and any reaffirmation dates.
Case N 4011 Eddy Current Examination Section XI, Didsfon 1 Inquiry: Is it permissible, as an alternative to the Section XI, Division 1 Appendix IV, requirement for magnetic tape and strip chart recording of eddy current test data, to use digitized collection and storage of data as the permanent record for eddy current examina-tions, and to what extent do the calibration require-ments of IV 3000 apply?
l Reply: It is the opinion of the Committee that, when demonstrated equival< t to the Authorized Nuclear '
l Inservice Inspector, digitized collection and storage of l
eddy current test data may be used as an alternative l to magnetic tape and strip chart recording of eddy l
current test data required by Section XI. Division 1, Appendix IV. Periodic calibration in accordance with IV 3000 is required only for the analog elements of the digital cddy current data collection and storage equipment.
I' l'