| | issue date = 08/20/2012 | | | issue date = 08/20/2012 |
| | title = Official Exhibit - ENT000551-00-BD01 - Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 3 (May 2, 2011) | | | title = Official Exhibit - ENT000551-00-BD01 - Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 3 (May 2, 2011) |
| | author name = Harris B K | | | author name = Harris B |
| | author affiliation = NRC/NRR/DLR/RPB1 | | | author affiliation = NRC/NRR/DLR/RPB1 |
| | addressee name = Allen B S | | | addressee name = Allen B |
| | addressee affiliation = FirstEnergy Nuclear Operating Co | | | addressee affiliation = FirstEnergy Nuclear Operating Co |
| | docket = 05000286, 05000247, 05000346 | | | docket = 05000286, 05000247, 05000346 |
Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| | project = TAC:ME4640 | | | project = TAC:ME4640 |
| | | stage = RAI |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:ENT000551 Submitted: August 20, 2012 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3) ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #: Identified: Admitted: Withdrawn: Rejected: Stricken: Other: ENT000551-00-BD0110/15/201210/15/2012.. .. I' 0 < 0 .. : o v " **** .. UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Barry S. Allen Vice President, Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, OH 43449 May 2,2011 SUBJECT: REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION-BATCH 3 (TAC NO. ME4640) Dear Mr. Allen: By letter dated August 27,2010, FirstEnergy Nuclear Operating Company, submitted an application pursuant to Title 10 Code of the Federal Regulation Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power During its review, the staff has identified areas where additional information is needed to complete the review. The staffs requests for additional information are included in the Enclosure. Further requests for additional information may be issued in the future. Items in the enclosure were discussed with Mr. Cliff Custer, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2277 or bye-mail at brian. harris2@nrc.gov. Docket No. 50-346 Enclosure: As stated cc w/encl: Listserv Sincerely, // ; 11/ /' . £;/j/ 1// '-'Srlan K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation 43 the scope of LRA Section 4.3.2.3.3. 2. Justify that the Fatigue Monitoring Program can adequately ensure the CUF for HELB locations remain below 0.1 by using systematic counting of plant transient cycles associated with HELB analysis. Provide any appropriate revisions to the program elements of the Fatigue Monitoring Program, as needed, to incorporate activities for ensuring that the CUF for HELB locations remain below 0.1. RAI4.3-14 In LRA Section 4.3.4, the applicant discussed the methodology to determine the locations that require environmentally assisted fatigue (EAF) analyses consistent with NUREG/CR-6260 "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." The staff recognized that, in LRA Table 4.3-2, there are fifteen plant-specific locations listed, based on the six generic components identified in NUREG/CR-6260. The GALL Report AMP X.M1, "Metal Fatigue of Reactor Coolant Pressure Boundary" states that the impact of the reactor coolant environment on a sample of critical components should include the locations identified in NUREG/CR-6260 as a minimum, and that additional locations may be needed. It was not clear to the staff whether the applicant verified that the plant-specific locations listed in the LRA Table 4.3-2 were bounding for the generic NUREG/CR-6260 components. Furthermore, the staff noted that the applicant's plant-specific configuration may contain locations that should be analyzed for the effects of the reactor coolant environment other than those identified in NUREG/CR-6260. The staff requests the following information: 1. Confirm and justify that the plant-specific locations listed in LRA Table 4.3-2 are bounding for the generic NUREG/CR-6260 components. 2. Confirm and justify that the LRA Table 4.3-2 locations selected for environmentally assisted fatigue analyses consists of the most limiting locations for the plant (beyond the generic locations identified in the NUREG/CR-6260 guidance). If these locations are not bounding, clarify the locations that require an environmentally assisted fatigue analysis and the actions that will be taken for these additional locations. RAI4.3-1S LRA Section 4.3.1.2 states that "Transients 9C, 90, and 32 are the only transients affecting Class 1 components where the 60-year projected cycles exceed the design cycles". The applicant stated that HPI nozzles 2-1 and 2-2 are limited to 40 cycles for Transients 9C and 90, respectively, and it will manage cumulative fatigue damage of these nozzles for the period of extended operation. However, it is not clear to the staff if there are other components that have Transient 9C or 90 in the design-basis fatigue calculation and whether these components will be affected if the 60-year projected cycles are exceeded. | | {{#Wiki_filter:United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc. |
| }} | | In the Matter of: |
| | (Indian Point Nuclear Generating Units 2 and 3) |
| | ASLBP #: 07-858-03-LR-BD01 |
| | ~ |
| | ..~..: |
| | I' o |
| | v " |
| | 0 0 |
| | Docket #: 05000247 l 05000286 Exhibit #: ENT000551-00-BD01 Admitted: 10/15/2012 Identified: 10/15/2012 Withdrawn: |
| | ENT000551 Submitted: August 20, 2012 |
| | ~1-? ~l Rejected: Stricken: |
| | **** .. Other: |
| | UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2011 Barry S. Allen Vice President, Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, OH 43449 |
| | |
| | ==SUBJECT:== |
| | REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION-BATCH 3 (TAC NO. ME4640) |
| | |
| | ==Dear Mr. Allen:== |
| | |
| | By letter dated August 27,2010, FirstEnergy Nuclear Operating Company, submitted an application pursuant to Title 10 Code of the Federal Regulation Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants~' During its review, the staff has identified areas where additional information is needed to complete the review. The staffs requests for additional information are included in the Enclosure. Further requests for additional information may be issued in the future. |
| | Items in the enclosure were discussed with Mr. Cliff Custer, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2277 or bye-mail at brian. harris2@nrc.gov. |
| | Sincerely, |
| | / /' |
| | //; |
| | ~/::;;;!l 11 |
| | £;/j/ |
| | ./4:?7:2.--~~* '- |
| | 1// |
| | 'Srlan K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346 |
| | |
| | ==Enclosure:== |
| | |
| | As stated cc w/encl: Listserv |
| | |
| | 43 the scope of LRA Section 4.3.2.3.3. |
| | : 2. Justify that the Fatigue Monitoring Program can adequately ensure the CUF for HELB locations remain below 0.1 by using systematic counting of plant transient cycles associated with HELB analysis. Provide any appropriate revisions to the program elements of the Fatigue Monitoring Program, as needed, to incorporate activities for ensuring that the CUF for HELB locations remain below 0.1. |
| | RAI4.3-14 In LRA Section 4.3.4, the applicant discussed the methodology to determine the locations that require environmentally assisted fatigue (EAF) analyses consistent with NUREG/CR-6260 "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." The staff recognized that, in LRA Table 4.3-2, there are fifteen plant-specific locations listed, based on the six generic components identified in NUREG/CR-6260. |
| | The GALL Report AMP X.M1, "Metal Fatigue of Reactor Coolant Pressure Boundary" states that the impact of the reactor coolant environment on a sample of critical components should include the locations identified in NUREG/CR-6260 as a minimum, and that additional locations may be needed. It was not clear to the staff whether the applicant verified that the plant-specific locations listed in the LRA Table 4.3-2 were bounding for the generic NUREG/CR-6260 components. Furthermore, the staff noted that the applicant's plant-specific configuration may contain locations that should be analyzed for the effects of the reactor coolant environment other than those identified in NUREG/CR-6260. |
| | The staff requests the following information: |
| | : 1. Confirm and justify that the plant-specific locations listed in LRA Table 4.3-2 are bounding for the generic NUREG/CR-6260 components. |
| | : 2. Confirm and justify that the LRA Table 4.3-2 locations selected for environmentally assisted fatigue analyses consists of the most limiting locations for the plant (beyond the generic locations identified in the NUREG/CR-6260 guidance). If these locations are not bounding, clarify the locations that require an environmentally assisted fatigue analysis and the actions that will be taken for these additional locations. |
| | RAI4.3-1S LRA Section 4.3.1.2 states that "Transients 9C, 90, and 32 are the only transients affecting Class 1 components where the 60-year projected cycles exceed the design cycles". |
| | The applicant stated that HPI nozzles 2-1 and 2-2 are limited to 40 cycles for Transients 9C and 90, respectively, and it will manage cumulative fatigue damage of these nozzles for the period of extended operation. However, it is not clear to the staff if there are other components that have Transient 9C or 90 in the design-basis fatigue calculation and whether these components will be affected if the 60-year projected cycles are exceeded.}} |
Letter Sequence RAI |
---|
TAC:ME4640, Steam Generator Tube Integrity (Approved, Closed) |
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples, L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems., L-11-334, Reply to Request Additional Information for the Review of the License Renewal Application Amendment No. 21, L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal, L-12-444, Submittal of Contractor Equivalent Margins Assessments for Reactor Vessel Welds (Nonproprietary Versions), L-12-456, Notification of Closure of Commitments Related to the Review of the License Renewal Application, L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45), L-13-330, License Renewal Application Amendment No. 46 - Annual Update, L-13-341, Review of the Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station, L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 48, L-14-206, License Renewal Application Amendment No. 50 - Annual Update, L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55, L-15-139, License Renewal Reactor Vessel Internals Inspection Plan, L-15-214, License Renewal Application Amendment No. 59 - Annual Update, L-15-309, License Renewal Application Amendment No. 60, L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits., ML102450565, ML111050091, ML11110A089, ML11110A091, ML11110A092, ML11110A093, ML11110A094, ML11110A095, ML11110A105, ML11110A106, ML11110A107, ML11122A014, ML11126A017, ML11126A018, ML11126A019, ML11126A020, ML11126A021, ML11126A022, ML11126A023, ML11126A024, ML11126A025, ML11126A026, ML11126A032, ML11126A033, ML11126A034, ML11126A035, ML11126A036, ML11126A037, ML11126A038, ML11126A039, ML11126A040, ML11126A041, ML11126A042, ML11126A043... further results
|
MONTHYEARML11126A0882008-01-12012 January 2008 Drawing No. LR-M041B, Revision 1, Piping & Instrument Diagram Primary Service Water System. Job Code 12501 Project stage: Other ML11126A0902008-01-15015 January 2008 Drawing No. LR-OS41A1, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems.2008-01-15015 January 2008 Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems. Project stage: Other ML11126A0682008-05-0505 May 2008 Drawing No. LR-M-037E, Revision 28, Piping & Instrument Diagram Clean Liquid Radioactive Waste System. Project stage: Other ML11126A0652008-08-0606 August 2008 Drawing No. LR-M036B, Revision 1, Piping & Instrument Diagram Component Cooling Water System. Project stage: Other ML11126A0592008-10-0909 October 2008 Drawing No. LR-M033A, Revision 1, Piping & Instrument Diagram High Pressure Injection. Project stage: Other ML11126A0632008-10-10010 October 2008 Drawing No. LR-M033B, Revision 1, Piping & Instrument Diagram Decay Heat Train 1. Project stage: Other ML11126A0702008-10-10010 October 2008 Drawing No. LR-M033C, Revision 1, Piping & Instrument Diagram Decay Heat Train 2. Project stage: Other ML11126A0742008-11-0606 November 2008 Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System. Project stage: Other ML11126A0832008-12-18018 December 2008 Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 Project stage: Other ML11126A0712009-04-0707 April 2009 Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems. Project stage: Other ML11126A0892009-04-0707 April 2009 Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System. Project stage: Other ML1024505652010-08-27027 August 2010 License Renewal Application and Ohio Coastal Management Program Consistency Certification Project stage: Other ML1104500462011-02-17017 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection Project stage: RAI ML11126A0792011-02-25025 February 2011 Drawing No. LR-M900A, Revision 0, Instrument Air System Piping Schematic. Project stage: Other ML1104205972011-02-28028 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 2.4 Project stage: RAI ML1106801722011-03-17017 March 2011 Request for Additional Information on the Reactor Vessel Surveillance Aging Management Program, Time-Limited Aging Analyses for Neutron Embrittlement of the Rv and Internals, and Other TLAAs for the Review of the Davis-Besse Nuclear Power S Project stage: RAI ML1107007322011-03-18018 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.2 & 2.3 Project stage: RAI L-11-078, Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 12011-03-18018 March 2011 Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 1 Project stage: Response to RAI ML11068A0002011-03-21021 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 4.7 (TAC Number ME4640) Project stage: RAI L-11-079, Reply to Request for Additional Information for the Review of the License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-11-089, Reply to Request for Additional Information for the Review License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review License Renewal Application Project stage: Response to RAI ML1108206242011-03-30030 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.1 (Tac No. ME4640) Project stage: RAI ML1109002952011-03-31031 March 2011 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station Project stage: Approval ML1108204902011-04-0505 April 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 1 Project stage: RAI ML11110A0932011-04-15015 April 2011 Drawing No. M-037D, Rev. 21, Clean Liquid Radioactive Waste System Project stage: Other ML11110A1072011-04-15015 April 2011 Drawing No. M-045, Rev. 56, Chemical Addition Systems Project stage: Other ML11110A1062011-04-15015 April 2011 Drawing No. M-042C, Rev. 33, Sampling System Sh. 3 Project stage: Other ML11110A1052011-04-15015 April 2011 Drawing No. M-040A, Rev. 76, Reactor Coolant System Details Project stage: Other ML11110A0952011-04-15015 April 2011 Drawing No. M-039B, Rev. 18, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0942011-04-15015 April 2011 Drawing No. M-039A, Rev. 33, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0922011-04-15015 April 2011 Drawing No. M-037C, Rev. 30, Clean Liquid Radioactive Waste System Project stage: Other L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples2011-04-15015 April 2011 Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples Project stage: Other L-11-107, Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application...2011-04-15015 April 2011 Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application... Project stage: Response to RAI ML11110A0882011-04-15015 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application, Sections 2.2 & 2.3, License Renewal Application Amendment No. 3, and Revised License Renewal Project stage: Response to RAI ML11110A0912011-04-15015 April 2011 Drawing No. M-011, Rev. 61, Domestic Water System Project stage: Other ML11110A0892011-04-15015 April 2011 Drawing No. M-0060, Rev. 52, Auxiliary Feedwater System Project stage: Other ML1110500912011-04-19019 April 2011 Scoping and Screening Audit Report Regarding the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Other L-11-115, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42011-04-20020 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 4 Project stage: Response to RAI ML1109807182011-04-20020 April 2011 Request for Additional Information for the Review of the Davis-Bessie Nuclear Power Station - Batch 2 Project stage: RAI ML11126A0362011-04-29029 April 2011 Drawing No. LR-M017D, Revision 1 Piping & Instrument Diagram, Steam Blackout Diesel Generator. Project stage: Other ML11126A0352011-04-29029 April 2011 Drawing No. LR-M017C, Revision 2, Piping & Instrument Diagram, Fuel Oil. Project stage: Other ML11126A0342011-04-29029 April 2011 Drawing No. LR-M017B, Revision 1, Piping & Instrument Diagram, Diesel Generators Air Start. Project stage: Other ML11126A0332011-04-29029 April 2011 Drawing No. LR-M016B, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0322011-04-29029 April 2011 Drawing No. LR-M016A, Revision 1, Piping & Instrument Diagram Station Fire Protection System Project stage: Other ML11126A0262011-04-29029 April 2011 Drawing No. LR-M010C, Revision 1, Piping & Instrument Diagram Make-up Water Treatment System Project stage: Other ML11126A0252011-04-29029 April 2011 Drawing No. LR-M010A, Revision 1, Piping & Instrument Diagram Make-Up Water Treatment System Project stage: Other ML11126A0242011-04-29029 April 2011 Drawing No. LR-M009B, Revision 1, Piping & Instrument Diagram Cooling Water System Project stage: Other ML11126A0192011-04-29029 April 2011 Drawing No. LR-M003A, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 1 Project stage: Other ML11126A0452011-04-29029 April 2011 Drawing No. LR-M024H, Revision 1, Piping & Instrument Diagram, No. 2 Main and Auxiliary Turbine Driven Feed Pumps. Project stage: Other 2011-02-25
[Table View] |
Official Exhibit - ENT000551-00-BD01 - Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 3 (May 2, 2011)ML12340A729 |
Person / Time |
---|
Site: |
Davis Besse, Indian Point ![Entergy icon.png](/w/images/7/79/Entergy_icon.png) |
---|
Issue date: |
08/20/2012 |
---|
From: |
Harris B License Renewal Projects Branch 1 |
---|
To: |
Allen B FirstEnergy Nuclear Operating Co |
---|
SECY RAS |
References |
---|
RAS 23331, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, TAC ME4640 |
Download: ML12340A729 (2) |
|
|
---|
Category:Legal-Exhibit
MONTHYEARML15337A3522015-11-17017 November 2015 Official Exhibit - NYS000582-00-BD01 - Diagram of Strength Vs Amplitude by Dr. Richard T. Lahey ML15337A3372015-11-11011 November 2015 Official Exhibit - ENTR00726-00-BD01 - Track 2 Hearing Exhibit List ML15337A3322015-11-0505 November 2015 Official Exhibit - ENT000726-00-BD01 - Entergy Track 2 Hearing Exhibit List ML15337A3352015-11-0505 November 2015 Official Exhibit - RIVR14001-00-BD01 - Riverkeeper Tailored Track 2 Exhibit List ML15337A3362015-11-0505 November 2015 Official Exhibit - NRCR10001-00-BD01 - NRC Staff Track 2 Exhibit List ML15337A3332015-11-0404 November 2015 Official Exhibit - NYSR25001-00-BD01 - NYS Revised Tailored Exhibits List Relevant to Track 2 Contentions ML15337A3312015-11-0303 November 2015 Official Exhibit - NRC000230-00-BD01 - Corrections to Prefiled Testimony NRC000168 and NRC000197 ML15337A3262015-10-29029 October 2015 Official Exhibit - ENT000722-00-BD01 - Supplemental Testimony of Entergy Witnesses Nelson Azevedo, Timothy Griesbach & Randy Lott ML15337A3292015-10-29029 October 2015 Official Exhibit - ENTR16001-00-BD01 - Entergy Revised Exhibit List ML15337A3242015-09-23023 September 2015 Official Exhibit - NYS000576-00-BD01 - Pre-Filed Supplemental Testimony of Richard T. Lahey Re Contentions NYS-25, NYS-26B/RK-TC-1B & NYS-38/RK-TC-5 ML15337A2932015-09-0909 September 2015 Official Exhibit - NYS000567-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2942015-09-0909 September 2015 Official Exhibit - NYS000568-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York in Support of Contention NYS-25 (Public, Redacted) (September 9, 2015) ML15337A2952015-09-0909 September 2015 Official Exhibit - NYS000569-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2962015-09-0909 September 2015 Official Exhibit - NYS000570-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-26B/RK-TC-1B (Public, Redacted) (September 9, 2015) ML15337A2972015-09-0909 September 2015 Official Exhibit - RIV000164-00-BD01 - NUREG-1740, ACRS, Voltage-Based Alternative Repair Criteria: a Report to the Advisory Committee on Reactor Safeguards by the Ad Hoc Subcommittee on a Differing Professional Opinion (2001) ML15337A3042015-09-0909 September 2015 Official Exhibit - NYS000571-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of David J. Duquette in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A3062015-09-0909 September 2015 Official Exhibit - NYS000572-PUB-00-BD01 - Pre-filed Supplemental Reply Testimony of Richard T. Lahey, Jr. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A3072015-09-0909 September 2015 Official Exhibit - NYS000573-PUB-00-BD01 - Supplemental Reply Statement of Position of the State of New York and Riverkeeper, Inc. in Support of Contention NYS-38/RK-TC-5 (Public, Redacted) (September 9, 2015) ML15337A2832015-09-0909 September 2015 Official Exhibit - NYS000563-00-BD01 - Pressurized Water Reactor (PWR) Systems, USNRC Technical Training Center, Reactor Concepts Manual, Pages 4-1 to 4-28 ML15337A2822015-09-0909 September 2015 Official Exhibit - NYS000566-00-BD01 - Figure 1 for Supplemental Reply Testimony of Dr. Richard T. Lahey ML15337A3142015-09-0404 September 2015 Official Exhibit - ENTR00615-PUB-00-BD01 - Entergy'S Statement of Position Re Contention NYS-25 (Embrittlement) - Redacted ML15334A2822015-08-10010 August 2015 Official Exhibit - ENT000680-00-BD01 - Curriculum Vitae of Barry M. Gordon ML15334A2842015-08-10010 August 2015 Official Exhibit - ENT000687-00-BD01 - NRC, Safety Evaluation Report, Topical Report on ASME Section III Piping and Component Fatigue Analysis Utilizing the Westems Computer Code (WCAP-17577, Revision 2) (Undated) ML15334A2632015-08-10010 August 2015 Official Exhibit - ENT000648-00-BD01 - M. Mitchell, Chief, Vessels and Internals Integrity Branch, Response to Non-Concurrence Regarding Safety Evaluation for Topical Report MRP-227 Pressurized Water Reactor Internals Inspection and Evaluat ML15334A2442015-08-10010 August 2015 Official Exhibit - ENT000641-00-BD01 - Final License Renewal Interim Staff Guidance LR-ISG-2011-04, Updated Aging Management Criteria for Reactor Vessel Internal Components for Pressurized Water Reactors (May 28, 2013) ML15334A2402015-08-10010 August 2015 Official Exhibit - ENT000637-00-BD01 - NUREG-1874, Recommended Screening Limits for Pressurized Thermal Shock (PTS) (March 2010) ML15334A2362015-08-10010 August 2015 Official Exhibit - ENT000625-00-BD01 - Letter from N. Salgado to Vice President, Operations, Entergy Nuclear Operations, Inc., IP Nuclear Generating Unit No. 3 Relief Requests RR-3-45 and RR-3-46 for Reactor Vessel Head Penetrations Examina ML15334A2342015-08-10010 August 2015 Official Exhibit - ENT000624-00-BD01 - Letter from N. Salgado to Vice Pres., Operations, Entergy Nuclear Operations, Inc., IP Nuclear Generating Unit No. 2 - Relief from the Examination Area for Reactor Vessel Head Penetration . . . ML15334A2312015-08-10010 August 2015 Official Exhibit - ENT000621-00-BD01 - Westinghouse, WCAP-17894-NP, Rev. 0, Component Inspection Details Supporting Aging Management of Reactor Internals at Indian Point Unit 2 (Sept. 2014) ML15334A2232015-08-10010 August 2015 Official Exhibit - ENT000629-00-BD01 - Letter from C. Grimes, NRC, to D. Walters, NEI, License Renewal Issue No. 98-0030 Thermal Aging Embrittlement of Cast Austenitic Stainless Steel Components (May 19, 2000) ML15334A2202015-08-10010 August 2015 Official Exhibit - ENT000618-00-BD01 - Curriculum Vitae of Randy G. Lott ML15334A2192015-08-10010 August 2015 Official Exhibit - ENT000617-00-BD01 - Curriculum Vitae of Timothy J. Griesbach ML15335A2112015-08-10010 August 2015 Official Exhibit - ENTR20186-00-BD01 - Curriculum Vitae of Mark A. Gray ML15335A2192015-08-10010 August 2015 Official Exhibit - ENTR00031-00-BD01 - Curriculum Vitae of Alan B. Cox ML15335A2202015-08-10010 August 2015 Official Exhibit - ENTR00184-00-BD01 - Curriculum Vitae of Jack R. Strosnider ML15335A2732015-08-10010 August 2015 Official Exhibit - NRC000183-00-BD01 - NRC Inspection Manual, Inspection Procedure 71013, Site Inspection for Plants with a Timely Renewal Application (Sept. 25, 2013) ML15335A2822015-08-10010 August 2015 Official Exhibit - NRC000220-00-BD01 - Pressurized Water Reactor Owners Group (PWROG) Presentation Slides, Industry and NRC Coordination Meeting Materials Programs Technical Exchange: Clevis Insert Bolt Update, (June 2014) ML15335A2902015-08-10010 August 2015 Official Exhibit - NRC000222-00-BD01 - IP3 FSAR Rev. 04 Chapter 3 (2011) (Excerpt) ML15335A2912015-08-10010 August 2015 Official Exhibit - NRCR00118-00-BD01 - Indian Point Unit 3 Technical Specifications (Excerpt) (Revised) ML15335A2922015-08-10010 August 2015 Official Exhibit - NRCR00105-00-BD01 - Ching Ng Statement of Professional Qualifications (Revised) ML15335A2932015-08-10010 August 2015 Official Exhibit - NRCR00104-00-BD01 - on Yee Statement of Professional Qualifications (Revised) ML15335A3002015-08-10010 August 2015 Official Exhibit - NRC000205-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 3 - Reactor (2014) ML15335A3012015-08-10010 August 2015 Official Exhibit - NRC000206-00-BD01 - Indian Point, Unit 2, Updated Final Safety Analysis Report (Ufsar), Rev. 25, Chapter 14 - Safety Analysis (2014) ML15335A3022015-08-10010 August 2015 Official Exhibit - NRC000207-00-BD01 - Regulatory Information Conference Presentation Slides, Recent Materials Inspections of PWR Reactor Internals (Mar. 2015) ML15334A2282015-08-10010 August 2015 Official Exhibit - ENT000634-00-BD01 - Entergy, IP2, FSAR Update, Revision 25 (2014) (Excerpts) ML15337A3202015-08-10010 August 2015 Official Exhibit - ENT000699-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson Azevedo, Robert Dolansky, Alan Cox, Jack Strosnider, Timothy Griesbach, Barry Gordon, Randy Lott, and Mark Gray Regarding Contention NYS-38/RK ML15337A3192015-08-10010 August 2015 Official Exhibit - ENT000698-PUB-00-BD01 - Entergy'S Revised Statement of Position Regarding Contention NYS-38/RK-TC-5(Safety Commitments) (Aug. 10, 2015)Redacted ML15337A2782015-08-10010 August 2015 Official Exhibit - NRC000168-PUB-00-BD01 - NRC Staff Testimony of Dr. Allen Hiser, Dr. Ching Ng, Mr. Gary Stevens, P.E., and Mr. on Yee, Concerning Contentions NYS-26B/RK-TC-1B and NYS-38/RK-TC-5 ML15337A2712015-08-10010 August 2015 Official Exhibit - NRC000223-00-BD01 - IP3 FSAR Rev. 04 Chapter 14 (2011) ML15337A3182015-08-10010 August 2015 Official Exhibit - ENT000679-PUB-00-BD01 - Redacted Revised Testimony of Entergy Witnesses Nelson F. Azevedo, Alan B. Cox, Jack R. Strosnider, Randy G. Lott, Mark A. Gray, and Barry M. Gordon Regarding Contention NYS-26B/RK-TC-1B (Metal Fat 2015-09-09
[Table view] |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01
~
..~..:
I' o
v "
0 0
Docket #: 05000247 l 05000286 Exhibit #: ENT000551-00-BD01 Admitted: 10/15/2012 Identified: 10/15/2012 Withdrawn:
ENT000551 Submitted: August 20, 2012
~1-? ~l Rejected: Stricken:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2011 Barry S. Allen Vice President, Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, OH 43449
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION-BATCH 3 (TAC NO. ME4640)
Dear Mr. Allen:
By letter dated August 27,2010, FirstEnergy Nuclear Operating Company, submitted an application pursuant to Title 10 Code of the Federal Regulation Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants~' During its review, the staff has identified areas where additional information is needed to complete the review. The staffs requests for additional information are included in the Enclosure. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Cliff Custer, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2277 or bye-mail at brian. harris2@nrc.gov.
Sincerely,
/ /'
//;
~/::;;;!l 11
£;/j/
./4:?7:2.--~~* '-
1//
'Srlan K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc w/encl: Listserv
43 the scope of LRA Section 4.3.2.3.3.
- 2. Justify that the Fatigue Monitoring Program can adequately ensure the CUF for HELB locations remain below 0.1 by using systematic counting of plant transient cycles associated with HELB analysis. Provide any appropriate revisions to the program elements of the Fatigue Monitoring Program, as needed, to incorporate activities for ensuring that the CUF for HELB locations remain below 0.1.
RAI4.3-14 In LRA Section 4.3.4, the applicant discussed the methodology to determine the locations that require environmentally assisted fatigue (EAF) analyses consistent with NUREG/CR-6260 "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." The staff recognized that, in LRA Table 4.3-2, there are fifteen plant-specific locations listed, based on the six generic components identified in NUREG/CR-6260.
The GALL Report AMP X.M1, "Metal Fatigue of Reactor Coolant Pressure Boundary" states that the impact of the reactor coolant environment on a sample of critical components should include the locations identified in NUREG/CR-6260 as a minimum, and that additional locations may be needed. It was not clear to the staff whether the applicant verified that the plant-specific locations listed in the LRA Table 4.3-2 were bounding for the generic NUREG/CR-6260 components. Furthermore, the staff noted that the applicant's plant-specific configuration may contain locations that should be analyzed for the effects of the reactor coolant environment other than those identified in NUREG/CR-6260.
The staff requests the following information:
- 1. Confirm and justify that the plant-specific locations listed in LRA Table 4.3-2 are bounding for the generic NUREG/CR-6260 components.
- 2. Confirm and justify that the LRA Table 4.3-2 locations selected for environmentally assisted fatigue analyses consists of the most limiting locations for the plant (beyond the generic locations identified in the NUREG/CR-6260 guidance). If these locations are not bounding, clarify the locations that require an environmentally assisted fatigue analysis and the actions that will be taken for these additional locations.
RAI4.3-1S LRA Section 4.3.1.2 states that "Transients 9C, 90, and 32 are the only transients affecting Class 1 components where the 60-year projected cycles exceed the design cycles".
The applicant stated that HPI nozzles 2-1 and 2-2 are limited to 40 cycles for Transients 9C and 90, respectively, and it will manage cumulative fatigue damage of these nozzles for the period of extended operation. However, it is not clear to the staff if there are other components that have Transient 9C or 90 in the design-basis fatigue calculation and whether these components will be affected if the 60-year projected cycles are exceeded.