Letter Sequence RAI |
|---|
TAC:ME4640, Steam Generator Tube Integrity (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples, L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems, L-11-334, Reply to Request Additional Information for the Review of the License Renewal Application Amendment No. 21, L-12-337, Review of the Safety Evaluation Report with Open Items Related to the License Renewal, L-12-341, Firstenergy Nuclear Operating Cos Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), L-12-444, Submittal of Contractor Equivalent Margins Assessments for Reactor Vessel Welds (Nonproprietary Versions), L-12-456, Notification of Closure of Commitments Related to the Review of the License Renewal Application, L-13-257, Notification of Completion of a License Renewal Commitment Related to the Review of License Renewal Application TAC No. ME4640) and License Renewal Application Amendment No. 45), L-13-330, License Renewal Application Amendment No. 46 - Annual Update, L-13-341, Review of the Safety Evaluation Report Related to the License Renewal of Davis-Besse Nuclear Power Station, L-14-085, License Renewal Application (TAC No. ME4640) Amendment No. 48, L-14-206, License Renewal Application Amendment No. 50 - Annual Update, L-15-120, Notification of Completion of License Renewal Commitments Related to the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application and License Renewal Application Amendment No. 55, L-15-139, License Renewal Reactor Vessel Internals Inspection Plan, L-15-214, License Renewal Application Amendment No. 59 - Annual Update, L-15-309, License Renewal Application Amendment No. 60, L-15-310, C-CSS-099.20-069, Rev 0, Shield Building Laminar Cracking Limits, ML111050091, ML11110A089, ML11110A091, ML11110A092, ML11110A093, ML11110A094, ML11110A095, ML11110A105, ML11110A106, ML11110A107, ML11122A014, ML11126A017, ML11126A018, ML11126A019, ML11126A020, ML11126A021, ML11126A022, ML11126A023, ML11126A024, ML11126A025, ML11126A026, ML11126A032, ML11126A033, ML11126A034, ML11126A035, ML11126A036, ML11126A037, ML11126A038, ML11126A039, ML11126A040, ML11126A041, ML11126A042, ML11126A043... further results
|
MONTHYEARML11126A0842003-01-22022 January 2003 Drawing No. LR-M039A, Revision 3, Piping & Instrument Diagram Miscellaneous Liquid Radioactive Waste. Job Code 12501 Project stage: Other ML11126A0762003-01-22022 January 2003 Drawing No. LR-M047, Revision 1, Piping & Instrument Diagram Radwaste Drumming Station Project stage: Other ML11126A0552003-08-12012 August 2003 Drawing No. LR-M030B, Revision 1, Reactor Coolant System Instrumentation Project stage: Other ML11126A0862005-08-23023 August 2005 Drawing No. LR-M040D, Revision 2, Piping & Instrument Diagram Reactor Coolant Pump & Motor. Job Code 12501 Project stage: Other ML11126A0882008-01-12012 January 2008 Drawing No. LR-M041B, Revision 1, Piping & Instrument Diagram Primary Service Water System. Job Code 12501 Project stage: Other ML11126A0902008-01-15015 January 2008 Drawing No. LR-OS41A1, Revision 1, Operational Schematic Emergency Diesel Generator Systems Project stage: Other L-11-131, Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems2008-01-15015 January 2008 Drawing No. LR-OS041A2, Revision 1, Operational Schematic Emergency Diesel Generator Systems Project stage: Other ML11126A0682008-05-0505 May 2008 Drawing No. LR-M-037E, Revision 28, Piping & Instrument Diagram Clean Liquid Radioactive Waste System Project stage: Other ML11126A0652008-08-0606 August 2008 Drawing No. LR-M036B, Revision 1, Piping & Instrument Diagram Component Cooling Water System Project stage: Other ML11126A0592008-10-0909 October 2008 Drawing No. LR-M033A, Revision 1, Piping & Instrument Diagram High Pressure Injection Project stage: Other ML11126A0632008-10-10010 October 2008 Drawing No. LR-M033B, Revision 1, Piping & Instrument Diagram Decay Heat Train 1 Project stage: Other ML11126A0702008-10-10010 October 2008 Drawing No. LR-M033C, Revision 1, Piping & Instrument Diagram Decay Heat Train 2 Project stage: Other ML11126A0742008-11-0606 November 2008 Drawing No. LR-M043, Revision 1, Piping & Instrument Diagram Auxiliary Building Chilled Water System Project stage: Other ML11126A0832008-12-18018 December 2008 Drawing No. LR-M038C, Revision 2, Piping & Instrument Diagram Gaseous Radioactive Waste System. Job Code 12501 Project stage: Other ML11126A0712009-04-0707 April 2009 Drawing No. LR-M034, Revision 1, Piping & Instrument Diagram Emerg. Core Cooling System Ctmt. Spray & Core Flooding Systems Project stage: Other ML11126A0892009-04-0707 April 2009 Drawing No. LR-OS002, Revision 1, Operational Schematic Makeup and Purification System Project stage: Other ML1104500462011-02-17017 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Fire Protection Project stage: RAI L-11-037, Independent Spent Fuel Storage Installation - Changes, Tests, and Experiments2011-02-17017 February 2011 Independent Spent Fuel Storage Installation - Changes, Tests, and Experiments Project stage: Request ML11126A0792011-02-25025 February 2011 Drawing No. LR-M900A, Revision 0, Instrument Air System Piping Schematic Project stage: Other ML1104205972011-02-28028 February 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 2.4 Project stage: RAI ML1106801722011-03-17017 March 2011 Request for Additional Information on the Reactor Vessel Surveillance Aging Management Program, Time-Limited Aging Analyses for Neutron Embrittlement of the Rv and Internals, and Other TLAAs for the Review of the Davis-Besse Nuclear Power s Project stage: RAI L-11-078, Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 12011-03-18018 March 2011 Reply to Request for Additional Information for the Review of License Renewal Application (TAC ME4640) Amendment No. 1 Project stage: Response to RAI ML1107007322011-03-18018 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.2 & 2.3 Project stage: RAI ML11068A0002011-03-21021 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Section 4.7 (TAC Number ME4640) Project stage: RAI L-11-079, Reply to Request for Additional Information for the Review of the License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI L-11-089, Reply to Request for Additional Information for the Review License Renewal Application2011-03-23023 March 2011 Reply to Request for Additional Information for the Review License Renewal Application Project stage: Response to RAI ML1108206242011-03-30030 March 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station-Section 2.1 (Tac No. ME4640) Project stage: RAI ML1109002952011-03-31031 March 2011 Safety Evaluation Report Related to the License Renewal of Salem Nuclear Generating Station Project stage: Approval ML1108204902011-04-0505 April 2011 Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 1 Project stage: RAI ML11110A0882011-04-15015 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application, Sections 2.2 & 2.3, License Renewal Application Amendment No. 3, and Revised License Renewal Project stage: Response to RAI L-11-107, Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application.2011-04-15015 April 2011 Reply to Request for Additional Information on Reactor Vessel Surveillance Aging Management Program & Time-Limited Aging Analyses for Neutron Embrittlement for Review of License Renewal Application & License Renewal Application. Project stage: Response to RAI L-11-114, Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples2011-04-15015 April 2011 Drawing No. M-042B, Rev. 35, Sampling System Sh. 2 Local Grab Samples Project stage: Other ML11110A0892011-04-15015 April 2011 Drawing No. M-0060, Rev. 52, Auxiliary Feedwater System Project stage: Other ML11110A0912011-04-15015 April 2011 Drawing No. M-011, Rev. 61, Domestic Water System Project stage: Other ML11110A0922011-04-15015 April 2011 Drawing No. M-037C, Rev. 30, Clean Liquid Radioactive Waste System Project stage: Other ML11110A0932011-04-15015 April 2011 Drawing No. M-037D, Rev. 21, Clean Liquid Radioactive Waste System Project stage: Other ML11110A0942011-04-15015 April 2011 Drawing No. M-039A, Rev. 33, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A0952011-04-15015 April 2011 Drawing No. M-039B, Rev. 18, Miscellaneous Liquid Radioactive Waste Project stage: Other ML11110A1052011-04-15015 April 2011 Drawing No. M-040A, Rev. 76, Reactor Coolant System Details Project stage: Other ML11110A1062011-04-15015 April 2011 Drawing No. M-042C, Rev. 33, Sampling System Sh. 3 Project stage: Other ML11110A1072011-04-15015 April 2011 Drawing No. M-045, Rev. 56, Chemical Addition Systems Project stage: Other ML1110500912011-04-19019 April 2011 Scoping and Screening Audit Report Regarding the Davis-Besse Nuclear Power Station License Renewal Application Project stage: Other ML1109807182011-04-20020 April 2011 Request for Additional Information for the Review of the Davis-Bessie Nuclear Power Station - Batch 2 Project stage: RAI L-11-115, Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 42011-04-20020 April 2011 Reply to Request for Additional Information for the Review of the License Renewal Application and License Renewal Application Amendment No. 4 Project stage: Response to RAI ML11126A0342011-04-29029 April 2011 Drawing No. LR-M017B, Revision 1, Piping & Instrument Diagram, Diesel Generators Air Start Project stage: Other ML11126A0172011-04-29029 April 2011 Drawing No. LR-M006E, Revision 1, Piping & Instrument Diagram Condensate System Project stage: Other ML11126A0182011-04-29029 April 2011 Drawing No. LR-M007A, Revision 1, Piping & Instrument Diagram Steam Generator Secondary System Project stage: Other ML11126A0192011-04-29029 April 2011 Drawing No. LR-M003A, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 1 Project stage: Other ML11126A0202011-04-29029 April 2011 Drawing No. LR-M003B, Revision 1, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 2 Project stage: Other ML11126A0212011-04-29029 April 2011 Drawing No. LR-M003C, Revision 2, Piping & Instrument Diagram Main Steam and Reheat System. Sheet 3 Project stage: Other 2011-02-17
[Table View] |
Official Exhibit - ENT000551-00-BD01 - Letter from B. Harris, NRC Project Manager, to B. Allen, FENOC, Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station - Batch 3 (May 2, 2011)| ML12340A729 |
| Person / Time |
|---|
| Site: |
Davis Besse, Indian Point  |
|---|
| Issue date: |
08/20/2012 |
|---|
| From: |
Harris B License Renewal Projects Branch 1 |
|---|
| To: |
Allen B FirstEnergy Nuclear Operating Co |
|---|
| SECY RAS |
| References |
|---|
| RAS 23331, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01, TAC ME4640 |
| Download: ML12340A729 (2) |
|
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit Entergy Nuclear Operations, Inc.
In the Matter of:
(Indian Point Nuclear Generating Units 2 and 3)
ASLBP #: 07-858-03-LR-BD01
~
..~..:
I' o
v "
0 0
Docket #: 05000247 l 05000286 Exhibit #: ENT000551-00-BD01 Admitted: 10/15/2012 Identified: 10/15/2012 Withdrawn:
ENT000551 Submitted: August 20, 2012
~1-? ~l Rejected: Stricken:
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 2,2011 Barry S. Allen Vice President, Davis-Besse Nuclear Power Station FirstEnergy Nuclear Operating Company 5501 North State Route 2 Oak Harbor, OH 43449
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE DAVIS-BESSE NUCLEAR POWER STATION-BATCH 3 (TAC NO. ME4640)
Dear Mr. Allen:
By letter dated August 27,2010, FirstEnergy Nuclear Operating Company, submitted an application pursuant to Title 10 Code of the Federal Regulation Part 54 for renewal of Operating License NPF-3 for the Davis-Besse Nuclear Power Station. The staff of the U.S. Nuclear Regulatory Commission (NRC or the staff) is reviewing this application in accordance with the guidance in NUREG-1800, "Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plants~' During its review, the staff has identified areas where additional information is needed to complete the review. The staffs requests for additional information are included in the Enclosure. Further requests for additional information may be issued in the future.
Items in the enclosure were discussed with Mr. Cliff Custer, of your staff, and a mutually agreeable date for the response is within 30 days from the date of this letter. If you have any questions, please contact me by telephone at 301-415-2277 or bye-mail at brian. harris2@nrc.gov.
Sincerely,
/ /'
//;
~/::;;;!l 11
£;/j/
./4:?7:2.--~~* '-
1//
'Srlan K. Harris, Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosure:
As stated cc w/encl: Listserv
43 the scope of LRA Section 4.3.2.3.3.
- 2. Justify that the Fatigue Monitoring Program can adequately ensure the CUF for HELB locations remain below 0.1 by using systematic counting of plant transient cycles associated with HELB analysis. Provide any appropriate revisions to the program elements of the Fatigue Monitoring Program, as needed, to incorporate activities for ensuring that the CUF for HELB locations remain below 0.1.
RAI4.3-14 In LRA Section 4.3.4, the applicant discussed the methodology to determine the locations that require environmentally assisted fatigue (EAF) analyses consistent with NUREG/CR-6260 "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." The staff recognized that, in LRA Table 4.3-2, there are fifteen plant-specific locations listed, based on the six generic components identified in NUREG/CR-6260.
The GALL Report AMP X.M1, "Metal Fatigue of Reactor Coolant Pressure Boundary" states that the impact of the reactor coolant environment on a sample of critical components should include the locations identified in NUREG/CR-6260 as a minimum, and that additional locations may be needed. It was not clear to the staff whether the applicant verified that the plant-specific locations listed in the LRA Table 4.3-2 were bounding for the generic NUREG/CR-6260 components. Furthermore, the staff noted that the applicant's plant-specific configuration may contain locations that should be analyzed for the effects of the reactor coolant environment other than those identified in NUREG/CR-6260.
The staff requests the following information:
- 1. Confirm and justify that the plant-specific locations listed in LRA Table 4.3-2 are bounding for the generic NUREG/CR-6260 components.
- 2. Confirm and justify that the LRA Table 4.3-2 locations selected for environmentally assisted fatigue analyses consists of the most limiting locations for the plant (beyond the generic locations identified in the NUREG/CR-6260 guidance). If these locations are not bounding, clarify the locations that require an environmentally assisted fatigue analysis and the actions that will be taken for these additional locations.
RAI4.3-1S LRA Section 4.3.1.2 states that "Transients 9C, 90, and 32 are the only transients affecting Class 1 components where the 60-year projected cycles exceed the design cycles".
The applicant stated that HPI nozzles 2-1 and 2-2 are limited to 40 cycles for Transients 9C and 90, respectively, and it will manage cumulative fatigue damage of these nozzles for the period of extended operation. However, it is not clear to the staff if there are other components that have Transient 9C or 90 in the design-basis fatigue calculation and whether these components will be affected if the 60-year projected cycles are exceeded.