| title = 04/16/2013 Meeting Summary with the Public to Discuss the Annual Assessment of the Watts Bar Nuclear Unit 2 Construction Project
| title = Meeting Summary with the Public to Discuss the Annual Assessment of the Watts Bar Nuclear Unit 2 Construction Project
| author name = Haag R C
| author name = Haag R
| author affiliation = NRC/RGN-II/DCP/CPB3
| author affiliation = NRC/RGN-II/DCP/CPB3
| addressee name = Skaggs M D
| addressee name = Skaggs M
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000391
| docket = 05000391
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:April 17, 2013 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 17, 2013 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801


==SUBJECT:==
==SUBJECT:==
Line 22: Line 22:


==SUMMARY==
==SUMMARY==
  - WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)
  - WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)


==Dear Mr. Skaggs:==
==Dear Mr. Skaggs:==


This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on April 16, 2013 at 1:00 p.m. The meeting's purpose was to provide opportunities to discuss the annual assessment of the Watts Bar Nuclear Unit 2 Construction Project with the public.  
This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on April 16, 2013 at 1:00 p.m. The meeting's purpose was to provide opportunities to discuss the annual assessment of the Watts Bar Nuclear Unit 2 Construction Project with the public.
 
On April 16, 2013, the NRCs Chief of Construction Projects Branch 3, and the Resident Inspectors, held a Category 1 meeting that was attended by members of the public and TVA employees. This Category 1 public meeting provided an informative presentation to engage the public in a discussion of the NRCs annual assessment of the Watts Bar Nuclear Plant Unit 2 construction project for the period from January 1 through December 31, 2012. The list of attendees (Enclosure 1) and the presentation material used for discussions (Enclosure 2) are attached to this letter.
On April 16, 2013, the NRC's Chief of Construction Projects Branch 3, and the Resident Inspectors, held a Category 1 meeting that was attended by members of the public and TVA employees. This Category 1 public meeting provided an informative presentation to engage the public in a discussion of the NRC's annual assessm ent of the Watts Bar Nuclear Plant Unit 2 construction project for the period from January 1 through December 31, 2012. The list of attendees (Enclosure 1) and the presentation material used for discussions (Enclosure 2) are attached to this letter.  
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506.
 
Sincerely,
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document  
                                                        /RA/
 
Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects
Room (PDR) or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506
. Sincerely,         /RA/ Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects


==Enclosures:==
==Enclosures:==
: 1. List of Attendees 2. Handout- 2012 EOC WB2 Presentation_Public UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257
: 1. List of Attendees
 
: 2. Handout- 2012 EOC WB2 Presentation_Public
M. Skaggs 2 cc w/encl:
Mr. Gordon P. Arent
 
Senior Manager, Licensing WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381
 
Mr. O. J. Zeringue, General Manager Engineering and Construction WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381
 
Mr. R. A. Hruby, General Manager Technical Services WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City Tennessee 37381
 
Ms. Donna Guinn, Manager Licensing and Industry Affairs
 
WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381
 
Mr. Preston D. Swafford
 
Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 1101 Market Place 3R Lookout Place Chattanooga, Tennessee 37402-2801
 
County Executive 375 Church Street Suite 215 Dayton, Tennessee 37321
 
Mr. Dave Gronek Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381
 
Mr. R. R. Baron, Senior Manager Nuclear Construction Quality Assurance WBN Unit Two Watts Bar Nuclear Plant  Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381
 
Mr. Joseph Shea, Vice President Nuclear Licensing Tennessee Valley Authority
 
1101 Market Street
 
3R Lookout Place
 
Chattanooga, TN 37402-2801 Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority
 
400 West Summit Hill Drive 6A West Tower Knoxville, Tennessee 37402
 
Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental
 
Health & Conservation Division of Radiological Health 3 rd Floor, L&C Annex 401 Church Street
 
Nashville, TN 37243-1532
 
Mr. T. P. Cleary Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 County Mayor P.O. Box 156 Decatur, Tennessee 37322
 
Ms. Ann P. Harris 341 Swing Loop Rockwood, TN 37854


M. Skaggs 3 cc email distribution w/encl:
M. Skaggs                           2 cc w/encl:                           Mr. R. R. Baron, Senior Manager Mr. Gordon P. Arent                  Nuclear Construction Quality Assurance Senior Manager, Licensing            WBN Unit Two WBN Unit Two                          Watts Bar Nuclear Plant Watts Bar Nuclear Plant              Tennessee Valley Authority Tennessee Valley Authority            P.O. Box 2000 P.O. Box 2000                        Spring City, Tennessee 37381 Spring City, Tennessee 37381 Mr. Joseph Shea, Vice President Mr. O. J. Zeringue, General Manager  Nuclear Licensing Engineering and Construction          Tennessee Valley Authority WBN Unit Two                          1101 Market Street Watts Bar Nuclear Plant              3R Lookout Place Tennessee Valley Authority            Chattanooga, TN 37402-2801 P.O. Box 2000 Spring City, Tennessee 37381          Mr. E. J. Vigluicci Assistant General Counsel Mr. R. A. Hruby, General Manager      Tennessee Valley Authority Technical Services                    400 West Summit Hill Drive WBN Unit Two                          6A West Tower Watts Bar Nuclear Plant              Knoxville, Tennessee 37402 Tennessee Valley Authority P.O. Box 2000                        Mr. Lawrence E. Nanney, Director Spring City Tennessee 37381          Tennessee Department of Environmental Health & Conservation Ms. Donna Guinn, Manager              Division of Radiological Health Licensing and Industry Affairs        3rd Floor, L&C Annex WBN Nuclear Plant                    401 Church Street Tennessee Valley Authority            Nashville, TN 37243-1532 P.O. Box 2000 Spring City, Tennessee 37381          Mr. T. P. Cleary Site Vice President Mr. Preston D. Swafford              Watts Bar Nuclear Plant Chief Nuclear Officer                Tennessee Valley Authority and Executive Vice President        P.O. Box 2000 Tennessee Valley Authority            Spring City, Tennessee 37381 1101 Market Place 3R Lookout Place                      County Mayor Chattanooga, Tennessee 37402-2801    P.O. Box 156 Decatur, Tennessee 37322 County Executive 375 Church Street Suite 215                            Ms. Ann P. Harris Dayton, Tennessee 37321              341 Swing Loop Rockwood, TN 37854 Mr. Dave Gronek Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381
Greg Scott Tennessee Valley Authority Electronic Mail Distribution


Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution Brenda Derrick Electronic Mail Distribution  
M. Skaggs                    3 cc email distribution w/encl:
Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution Brenda Derrick Electronic Mail Distribution


ML13107B494
ML13107B494_ _____         P SUNSI REVIEW COMPLETE OFFICE                RII:DCP          RII:DCP          RII:DCP          RII:DCP        RII:DCP          RII:DCP        RII:DCI SIGNATURE RCH              JBB5 NAME                  RHaag            JBaptist DATE                    04/17/2013      04/17/2013 E-MAIL COPY?            YES        NO YES          NO YES          NO    YES        NO YES          NO YES      NO      YES  NO Letter to Michael D. Skaggs from Robert C. Haag dated April 17, 2013.
_ _____ P   SUNSI REVIEW COMPLETE Letter to Michael D. Skaggs from Robert C. Haag dated April 17, 2013.  


==SUBJECT:==
==SUBJECT:==
Line 93: Line 48:


==SUMMARY==
==SUMMARY==
  - WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)
  - WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)
Distribution w/encl
Distribution w/encl:
:
Region II Regional Coordinator, OEDO (J. Cassidy)
Region II Regional Coordinator, OEDO (J. Cassidy) J. Quichocho, NRR J. Poole, NRR A. Hon, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI S. Dubose, RII Administrative Assistant Region II State Liaison Officer Region II Public Affairs Officer   OE Mail (email address if applicable) ConE_Resource@nrc.gov PUBLIC}}
J. Quichocho, NRR J. Poole, NRR A. Hon, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI S. Dubose, RII Administrative Assistant Region II State Liaison Officer Region II Public Affairs Officer OE Mail (email address if applicable)
ConE_Resource@nrc.gov PUBLIC}}

Latest revision as of 06:43, 6 February 2020

Meeting Summary with the Public to Discuss the Annual Assessment of the Watts Bar Nuclear Unit 2 Construction Project
ML13107B494
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/17/2013
From: Haag R
NRC/RGN-II/DCP/CPB3
To: Skaggs M
Tennessee Valley Authority
Michelle Adams
References
IR-13-601
Download: ML13107B494 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 17, 2013 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

- WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)

Dear Mr. Skaggs:

This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on April 16, 2013 at 1:00 p.m. The meeting's purpose was to provide opportunities to discuss the annual assessment of the Watts Bar Nuclear Unit 2 Construction Project with the public.

On April 16, 2013, the NRCs Chief of Construction Projects Branch 3, and the Resident Inspectors, held a Category 1 meeting that was attended by members of the public and TVA employees. This Category 1 public meeting provided an informative presentation to engage the public in a discussion of the NRCs annual assessment of the Watts Bar Nuclear Plant Unit 2 construction project for the period from January 1 through December 31, 2012. The list of attendees (Enclosure 1) and the presentation material used for discussions (Enclosure 2) are attached to this letter.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506.

Sincerely,

/RA/

Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects

Enclosures:

1. List of Attendees
2. Handout- 2012 EOC WB2 Presentation_Public

M. Skaggs 2 cc w/encl: Mr. R. R. Baron, Senior Manager Mr. Gordon P. Arent Nuclear Construction Quality Assurance Senior Manager, Licensing WBN Unit Two WBN Unit Two Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, Tennessee 37381 Spring City, Tennessee 37381 Mr. Joseph Shea, Vice President Mr. O. J. Zeringue, General Manager Nuclear Licensing Engineering and Construction Tennessee Valley Authority WBN Unit Two 1101 Market Street Watts Bar Nuclear Plant 3R Lookout Place Tennessee Valley Authority Chattanooga, TN 37402-2801 P.O. Box 2000 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Assistant General Counsel Mr. R. A. Hruby, General Manager Tennessee Valley Authority Technical Services 400 West Summit Hill Drive WBN Unit Two 6A West Tower Watts Bar Nuclear Plant Knoxville, Tennessee 37402 Tennessee Valley Authority P.O. Box 2000 Mr. Lawrence E. Nanney, Director Spring City Tennessee 37381 Tennessee Department of Environmental Health & Conservation Ms. Donna Guinn, Manager Division of Radiological Health Licensing and Industry Affairs 3rd Floor, L&C Annex WBN Nuclear Plant 401 Church Street Tennessee Valley Authority Nashville, TN 37243-1532 P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. P. Cleary Site Vice President Mr. Preston D. Swafford Watts Bar Nuclear Plant Chief Nuclear Officer Tennessee Valley Authority and Executive Vice President P.O. Box 2000 Tennessee Valley Authority Spring City, Tennessee 37381 1101 Market Place 3R Lookout Place County Mayor Chattanooga, Tennessee 37402-2801 P.O. Box 156 Decatur, Tennessee 37322 County Executive 375 Church Street Suite 215 Ms. Ann P. Harris Dayton, Tennessee 37321 341 Swing Loop Rockwood, TN 37854 Mr. Dave Gronek Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

M. Skaggs 3 cc email distribution w/encl:

Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution Brenda Derrick Electronic Mail Distribution

ML13107B494_ _____ P SUNSI REVIEW COMPLETE OFFICE RII:DCP RII:DCP RII:DCP RII:DCP RII:DCP RII:DCP RII:DCI SIGNATURE RCH JBB5 NAME RHaag JBaptist DATE 04/17/2013 04/17/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Michael D. Skaggs from Robert C. Haag dated April 17, 2013.

SUBJECT:

PUBLIC MEETING

SUMMARY

- WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)