Line 2: Line 2:
| number = ML15099A563
| number = ML15099A563
| issue date = 04/09/2015
| issue date = 04/09/2015
| title = 04/07/2015 Public Meeting Summary - Regulatory Conference with Entergy Operations, Inc., for Waterford Steam Electric Station, Unit 3
| title = Public Meeting Summary - Regulatory Conference with Entergy Operations, Inc., for Waterford Steam Electric Station, Unit 3
| author name = Farnholtz T R
| author name = Farnholtz T
| author affiliation = NRC/RGN-IV
| author affiliation = NRC/RGN-IV
| addressee name = Chisum M R
| addressee name = Chisum M
| addressee affiliation = Entergy Operations, Inc
| addressee affiliation = Entergy Operations, Inc
| docket = 05000382
| docket = 05000382
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:,^BRES^*****UNITED STATESNUCLEAR REGULATORY COMMISSIONREGION IV1600 E LAMAR BLVDARLINGTON, TX 76011-4511April 9, 2015EA-14-228Mr. Michael R. ChisumSite Vice PresidentEntergy Operations, Inc.17265 River RoadKillona, LA 70057-0751
{{#Wiki_filter:,^BRES^                                     UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 9, 2015 EA-14-228 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.
17265 River Road Killona, LA 70057-0751


==SUBJECT:==
==SUBJECT:==
PUBLIC MEETING SUMMARY - REGULATORY CONFERENCE WITHENTERGY OPERATIONS, INC. FOR WATERFORD STEAM ELECTRICSTATION, UNIT 3
PUBLIC MEETING  
 
==SUMMARY==
- REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, INC. FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3


==Dear Mr. Chisum:==
==Dear Mr. Chisum:==
This refers to the Category 1 meeting conducted on April 7, 2015, in Arlington, Texas. Thepurpose of this meeting was to allow representatives of Entergy Operations, Inc., the licenseefor Waterford Steam Electric Station, Unit 3, to meet with U.S. Nuclear Regulatory Commission(NRC) personnel to discuss their position with regard to the preliminary Greater-than-Greenfinding and associated apparent violation. The apparent violation of Title 10 of the Code ofFederal Regulations (10 CFR) Part 50, Appendix B, Criterion XVI, "Corrective Action," wasassociated with through-wall corrosion of vent piping for the emergency diesel generator fuel oilday tanks. The holes En these vent pipes could allow water to enter the day tanks andcontaminate the diesel fuel oil, challenging the operability and functionality of both safety-relatedemergency diesel generators. The apparent violation is discussed in NRC InspectionReport 05000382/2014007, dated January 22, 2015 (ADAMS Accession No. ML15022A637).During the meeting, Entergy Operations, Inc., representatives provided an assessment of thesignificance of the finding, their root cause evaluation and corrective actions, and the results oftests they conducted on the effects of water contamination of the diesel fuel oil. A member ofthe public asked questions about why it took the NRC so long to identify the issue, the effect aclogged roof drain would have, and the probability of a loss of offsite power event. TheRegion IV Regional Administrator responded to these questions.A list of attendees and a copy of the presentation handouts are enclosed.In accordance with Title 10 of the Coofe of Federal Regulations (10 CFR) 2.390, "PublicInspections, Exemptions, Requests for Withholding," a copy of this letter, its enclosure, andyour response (if any) will be available electronically for public inspection in the NRC's PublicDocument Room or from the Publicly Available Records (PARS) component of the NRC'sAgencywide Documents Access and Management System (ADAMS). ADAMS is accessible M. Chisum-2-from the NRC Web site at httD://www.nrc.aov/readina-rm/adams.html (the Public ElectronicReading Room).Sincerely,IRfiJThomas R. Farnholtz, ChiefEngineering Branch 1Division of Reactor SafetyDocket No. 50-382License No. NPF-38
 
This refers to the Category 1 meeting conducted on April 7, 2015, in Arlington, Texas. The purpose of this meeting was to allow representatives of Entergy Operations, Inc., the licensee for Waterford Steam Electric Station, Unit 3, to meet with U.S. Nuclear Regulatory Commission (NRC) personnel to discuss their position with regard to the preliminary Greater-than-Green finding and associated apparent violation. The apparent violation of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion XVI, "Corrective Action," was associated with through-wall corrosion of vent piping for the emergency diesel generator fuel oil day tanks. The holes En these vent pipes could allow water to enter the day tanks and contaminate the diesel fuel oil, challenging the operability and functionality of both safety-related emergency diesel generators. The apparent violation is discussed in NRC Inspection Report 05000382/2014007, dated January 22, 2015 (ADAMS Accession No. ML15022A637).
During the meeting, Entergy Operations, Inc., representatives provided an assessment of the significance of the finding, their root cause evaluation and corrective actions, and the results of tests they conducted on the effects of water contamination of the diesel fuel oil. A member of the public asked questions about why it took the NRC so long to identify the issue, the effect a clogged roof drain would have, and the probability of a loss of offsite power event. The Region IV Regional Administrator responded to these questions.
A list of attendees and a copy of the presentation handouts are enclosed.
In accordance with Title 10 of the Coofe of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
 
M. Chisum                             from the NRC Web site at httD://www.nrc.aov/readina-rm/adams.html (the Public Electronic Reading Room).
Sincerely, IRfiJ Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38


==Enclosures:==
==Enclosures:==
: 1. List of Attendees2. Entergy Presentation Handoutsec w/encl:Electronic Distribution  
: 1. List of Attendees
: 2. Entergy Presentation Handouts ec w/encl:
Electronic Distribution


ML15099A56313 SUNSI ReviewBy: JLDi B Non-SensitiveD Sensitive13 Publicly AvailableD Non-Publicly AvailableKeyword:RGN-002OFFICESRI:DRS/EB1SPAOC:DRS/EB1NAME! JDixonVDricksTFarnholtzSIGNATURE l /RA//RA//RA/DATE4/8/20154/8/20154/8/2015 Letter to Michael R. Chisum from Thomas R. Farnholtz, dated April 9,2015
ML15099A563 13 SUNSI Review          i B Non-Sensitive        13 Publicly Available          Keyword:
By: JLD                    D Sensitive            D Non-Publicly Available      RGN-002 OFFICE        SRI:DRS/EB1  SPAO        C:DRS/EB1 NAME        ! JDixon        VDricks    TFarnholtz SIGNATURE l /RA/           /RA/       /RA/
DATE          4/8/2015      4/8/2015    4/8/2015 Letter to Michael R. Chisum from Thomas R. Farnholtz, dated April 9,2015


==SUBJECT:==
==SUBJECT:==
PUBLIC MEETING SUMMARY - REGULATORY CONFERENCE WITHENTERGY OPERATIONS, iNC. FORWATERFORD STEAM ELECTRICSTATION, UNIT 3DESTRIBUTION:Regionai Administrator (Marc.Dapas@nrc.gov)Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)DRP Director (Troy.Pruett@nrc.gov)Acting DRP Deputy Director (Thomas. Farnholtz@nrc.gov)DRS Director (Anton.Vegef@nrc.gov)DRS Deputy Director (Jeff.CIark@nrc.gov)Senior Resident inspector (Frances.Ramirez@nrc.gov)Resident Inspector (Chris.Speer@nrc.gov)WAT Administrative Assistant (Linda.Dufrene@nrc.gov)Branch Chief, DRP/D (Michael.Hay@nrc.gov)Senior Project Engineer, DRP/E (Bob.Hagar@nrc.gov)Project Engineer, DRP/D (Brian.Parks@nrc.gov)Project Engineer, DRP/D (Jan.Tice@nrc.gov)Public Affairs Officer (Victor.Dricks@nrc.gov)Public Affairs Officer (Lara.Uselding@nrc.gov)Project Manager (Michael.0renak@nrc.gov)Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)RITS Coordinator (Marisa.Herrera@nrc.gov)ACES (R4Enforcement.Resource@nrc.gov)Regional Counsel (Karla.Fuller@nrc.gov)Congressional Affairs Officer (Jenny.Weil@nrc.gov)Technical Support Assistant (Loretta.Williams@nrc.gov)RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)RIV/ETA: OEDO (Michael.Waters@nrc.gov)ROPreports  
PUBLIC MEETING  
^RRES%,***^SIGN-IN SHEETU S. NUCLEAR REGULATORY COMMISSIONWATERFORD REGULATORY CONFERENCEAPRIL 7, 2015Name^/4f%s^A(lfc\<^n}Q&ra\^ju^^.0^^/^/ C^d6^^~3^ ^C. Qu. ^^ Tt^Ai[1^0 (a C<<r^iz-r ^/A.^/M^.^/C^c^<- A.M.XOO/1//<^^^S t^l/^^^tA?/A:e ^y<4 /^\r'^5'<<"^\^^\\^T^AJ^ ^}L^\O^&#xa3;f{:^/^ ^+if^i^. ^ i\^Y^\~fc)OhAfr4y&.>> s3^C(*?&S3^/W ^M^^bCfTVM^ k^ CM.! ^^/^L^ Milj4&r^MA\^ A^eir??o/^(V\-,\L^(V\J \i\ ; a 0^.^Cr<<Xi(^<\.v\^e/'/V\id^^ <^^o^'>> n^"bO/N^^Organization&^e^\/&r^ejr'o^\%JTiL*.^-TSf/T&tC^YvfS^r^cL^//IAPJ^/f^f^^ i^ /e\J 3-^' Sts-^ /4u C. rt tfjl^P/L /hs^c.^?/&^v^^&#xa3;A) HL(/^I^^Sf.hfT^(^.6-\fe^\/rr^>><<< q <^&J-r^A^tCU^S^N Hu^es{^f^f^^^t-\y)^^r'-3\e(^lA^^cX^/ P^ivV 6ci(eA.t/ MU^CAA<^ni^yr\^^L^\^^1_( ff^^^)'(^')PageLa, 9-  
 
.^ ^^SIGN-IN SHEETU. S. NUCLEAR REGULATORY COMMISSIONWATERFORD REGULATORY CONFERENCEAPRIL 7, 2015NameC3^<-<^<i ^Ll^^e 11-(%o\o<<r^ \^^C.^Q6fY^oi-c^or\^/6L^V\L-\ &^a^mtfc-fc-C^i<. 6pff&^(V\^./c ^o.9o.ASeO^ f^/vc^&.r^L.<v^^To>^ ra/^lvt.\^-a.^t'^t. ^UA&dv^VN^N *>t>^ftr>>^ ^.C.^o^t-^(vlxdiiL *T<^u IorC^\<>V. t^cL'er^^\0-cV\ ^ (><-a>>^iA<^n,-L^ S-^^^^Afr&i^ ro&iM'^Tv^/^45 ^UL.L.ti^AJ<^^^. ^r^^.& \J ^f.l^C^se.C^r]L S4^+'Vs o^^erOrganization^n^^<< . OP&#xa3;(2P^) dts^ ^.^l^^C [^Gt C^k^e^A)ftsC \^Q Cff^e),00,0 ^a^/Co/ci ^;^ d^'i^-^klA)^C \^ok^M ^&\de^rA)(kC. (Ll^J ^^al/U^n^C ^ b^y &SL?.^(k(. <L\U b^pJ^ b^-Pft)tt.C (Lt^ &<- C>1^^^C ^\\} <^^^f lrv-s(>ectp^I^U. d^ <<n.o/ l^<.^^^0 W 6fcA^JILC- <<\^ AC^^ Afifcr^. Lifc^A)ILC. (Ly</ A^<,<J(LC ^ A^<*/^jft-C /Z.II/ ^(tP^<?. C rt.^^ r^^^>>/vK<D^f^(^ UQ^C. (^-^ f^&^')^V-C P-liZ ^RS/Y^^. C^o^\^ (f^nt)C^*^)e^^-of'Page ^: of:
==SUMMARY==
ENCLOSURE 2ENTERGY PRESENTATION HANDOUTS
- REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, iNC. FORWATERFORD STEAM ELECTRIC STATION, UNIT 3 DESTRIBUTION:
'"^EntefgyWATERFORD 3REGULATORY CONFERENCEThrough-Wall Corrosion onEmergency Diesel Generator A and BDay Tank VentsApri 7,2015 Entei^gyOP EN NG REMARKSMichael ChisumSite Vice PresidentWaterford 3 Waterford 3 RepresentativesRan GilmoreBrian LankaManager, Systems and ComponentsEngineeringDirector, EngineeringJessica Walker PRA Consultant, Jensen HughesMarvin ChaseDirector, Regulatory & PerformanceImprovement Agenda. Overview of Performance Deficiency. Causes and Corrective ActionsnQ&#xa9;Inputs to the Risk CalculationSafety Significance CalculationConclusion f:s:'EntergyOVERVIEW OFPERFORMANCE DEFICIENCYRan GilmoreManager, Systems and Components EngineeringWaterford 3 Performance DeficiencyFailure to identifyand correctthrough-wallcorrosion on theA and BEmergencyDiesel GeneratorFuel Oil DayTank Vent I'nes.
Regionai Administrator (Marc.Dapas@nrc.gov)
As-Foundnter'm repairHoleLocated atRoofon MissileShield Sidei^
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Impact on PlantNot to Scale
DRP Director (Troy.Pruett@nrc.gov)
^\^\\\^\\\\\\\\\>X\^\\\Y^.\\\\\\\^\\\N\\\\\<\\NS?^u^^i?oS^-J >:CQ\s\\v;.xs\\\<\\\\<\\\<\\\\\\\'^^^1g5g^.\\^\\\N\\\\\\\\\V^\\\\\\\\^\\\y1F?S^\\\\\\^\\\\^\\\^^^\\\c^\^^^^.\\\^\\v^\\^^\\\\^^\\\^\\^^\\\'S;lIsI
Acting DRP Deputy Director (Thomas. Farnholtz@nrc.gov)
~'sfEnte^gyCAUSES ANDCORRECTIVE ACTIONSRan GilmoreManager, Systems and Components Engi eeringWaterford 3 Day Tank Vent Line Evaluation Resu tsDirect Cause. Failure of the pipe coating al owed accelerated, local,general corrosion to occur.Key Cause0 Failure mechanism ofthrough-wall corrosion combinedwith postulated precipitation events at the site couldchallenge EDG safety functions.a Corrective ActionsReplace Temporary Repair with a Permanent DesignChange. Immediate Walkdown of Roofs for Similar Configuration- Reassess impact of Non-Safety Components on EDG(s). Emergency Diesel Generator Comprehensive hlealthAssessment General Corrosion Evaluation Results. Direct Cause. Normalization of external corrosion on plant equipmentby station personnel.3 Key CauseInadequate programmatic guidance to ensureconsistent identification and correction of coatingdegradation and external corrosion0 Corrective Actions0 Create an External Corrosion standard and programcapable of identifying, prioritizing, monitoring, applyingresources and repairing degradation of plant equipmentrelated to external corrosion.6 Utilizing an External Corrosion Team m ^ MEntergyINPUTS TO THE R SKCALCULATIONRan Gi moreManager, Systems and Components EngWaterford 3 Key Inputs0&#xa9;Water Intrusion Rate. Hole Size and Location0 Analytic Estimate0 Roof TestWater Tolerance of EDG. Test Approache Test Results Determination of hlole SizeFuel Oil Day Tank B (East Vent)Not to Scale Determination of Hole SizeFuel Oi Day Tank A (West Vent)Not to Scale Water Intrusion AnalysisVent BRequired PondingDepth: A VentNot to Scale Water Intrusion Analysis454035305 252015105Day Tank Accumulations567Rain Rate (In/hr)- -West ("A") Tank.East ("B") TankT9T10-r11t12 Roof TestPurpose9 Validate AnalyticalModel of RoofDrainage0 Assess PondingDepth andBoundaries0 Assess DebrisBehavior Roof TestResults&deg; Water Did Not ReachFuel Oil Day Tank A VentLine in 20 GPM (5 in/hr)Test0 Drain Resistance is LessThan CalculatedWater Line Near "A" Venty^s^"\
DRS Director (Anton.Vegef@nrc.gov)
Roof TestAs-found Debris LocationResults- Found debris did nottransport when placed nas-found location.e Manually placed next to drainto evaluate effectsDebris Next to DrainDebris in As-found Location-.^^
DRS Deputy Director (Jeff.CIark@nrc.gov)
Roof Ponding Test ResultssI454035302520151050Day Tank AccumulationsRoof PondingResult-r1.r-^-^u^^zT6T7T8T9T10T11112Rain Rate (in/hr)-J-West ("A") Tank Water Tolerance TestingG Waterford EDG Characteristics toMaintain in Test System- Delivery of water to engine0 Engine combustion conditions&deg; Engine loading during a LOOPe Approach0 Full Scale Testing at Sumner MunicipalLight Plant (SMLP) in Sumner. IA0 12 cylinder Cooper-Bessemer KSVEngine similar to the 16 cylinder Cooper-Bessemer KSV engines at Waterford9 Duplicate Waterford fuel delivery skid atSumner Water Tolerance Testing1. Delivery of Waterto the EngineDuplicate Waterford Fuel Supply System.Maintain fuel (and water) flow rates through system the same as atWaterford by: (1) scaling the load profile, and (2) providing takeofffrom header to simulate "missing" four cylinders.2. EngineCombustionConditionsUse similar Cooper-Bessemer KSV Engine with same bore, stroke,cylinder liners, pistons, and similar cylinder heads.Load SMLP engine at a conservatively greater power per cylinderper cycle (to maintain consistent fuel flow rate).Fuel Injection System with similar characteristics.(Waterford: Bendix FDX-22, SMLP: Bendix FDX-22G)3. Engine LoadingUse Load Bank to simulate Waterford LOOP load profile (scaled to12 cylinders).SMLP governor is slower than the Waterford governor, whichresults in a conservative measure of the impact on EDG frequency.
Senior Resident inspector (Frances.Ramirez@nrc.gov)
Water Tolerance TestingTower with Day TankNew Fuel Header 4 Cylinder Take-Off-\^^.-r^fwind Straii lers.4 Water Tolerance TestingConduct of Test. "Trickle" Test (Loss of Offsite Power with Rain Event). Diesel Started and Loaded to Maximum Peak LOOP Load Scaled tothe SMLP Engine9 Water Introduced into Day Tank at Specified Flow Rate&deg; "Slug" Test (Loss of Offsite Power after Rain Event)" Diesel in StandbySpecified Water Volume Added to Day Tank and Settled into LowPoint of Piping- Diesel Started and Loaded with LOOP Load Profile Scaled to SMLPEngine
Resident Inspector (Chris.Speer@nrc.gov)
>s:'EntergyTEST RESULTSBrian LankaDirector, EngineeringWaterford 3 Water Tolerance Testing CasesBase Line0 No water testSug. 1 Gallon. 5 Gallon with 24 hour endurance run- 7 Gallon (5.4 in/hr)Trickle. 2.7 GPH Trickle0 21 GPH Trickle with 24 hour endurance run. 40 GPH Trickle (11 in/hr)
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)
Water Tolerance TestingAS-BUILT WATERFORD FUEL AND WATER TEST MECHANICAL SYSTEMMPR DwuimntWo. OQe.10e2.140M75-REVISKlN 6->>27<a)1SnFS^-^ff^-Qs^^^^^^^imsTiwwutsimwssiiaiaimiwfMiwnfwvnwisi.ENS'ffittBAWTmUMCTfflSwnanEW^nm^wapni^&sect;%^>>^%>>i:p"tcn"1G6NEf>*TOR(;*86liffi.TEBS^SSSSSlSS^^^WcS'W"FUEtlWOCOaiBNfWto'FigUrtl. Test System Schemaficig Water Tolerance Test Video.^-V.i"'-.:u/i;...?-<^ip-20t^^^^><" ""'>....-^b)
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
Water Tolerance TestingTest TypeWater VoIume/FlowEngine Fuel RackPositionGenerator Output FrequencyTrickle2.7 GPH for 1 hourNo detectable effectNo detectable effectTrickle221 GPH for 1 hourUp to 2 mm increase1No detectable effectTrickle40 GPH for 1 hourUp to 3 mm increase1No detectable effectSlug1 GallonNo detectable effectNo detectable effectSlug25 GallonUp to 3 mm increase1<1 Hz decrease1Slug7 GallonUp to 10 mm increase11 Hz decrease during a minor load step12 Hz decrease during a major load step11. Compared with the response in the baseline test.2. A 24-hour endurance test was performed immediately afterthis test.
Senior Project Engineer, DRP/E (Bob.Hagar@nrc.gov)
Water Intrusion Rate Determination45403530^25I.20IS1050Day Tank AccumulationsI 40 GPH TrickleRoof PondingResult-T1567Rain Rate (In/hr)^West("A")Tank112
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
( _ _ IEntergySAFETY SIGNIFICANCECALCULATIONJessica Walker, PRA ConsultantJensen hlughes Risk AnalysisRisk = Frequency of the Event* ConsequencesInitiating Event FrequencyRainfall Rate ProbabilityLOOP FrequencyLikelihood of High RainfallCoincident with LOOPConsequencesConditional Core DamageProbabilities. Coincident. Non-Coincident Rainfall RateNational Weather Service Data for Waterford 3Plant0 Provides average recurrence interval in years to achievehour ong rainfall in inchesUsed to determine probability of specific rainfa I ratesAverageRecurrenceInterval(years)10 25 50 100 200 500 1,000Inches ofRainfall in 1.89 2.21 2.77 3.27 3.98 4.57 5.18 5.83 6.72 7.43One HourExample: 2 percent (1/50) of the time the highest rainfall rate during theyear is approximately 4.6 in/hr nitiating Event Frequency Rainfall RateTook the average recurrence interval and assumed adirect probabi ity of rain0 Conservatively used the annual recurrence as the probability&deg; Probability of having a rainfall rate of 4.57 in/hr is 0.02 (1/50)Fina Probability Values interpolated from available data toprovide rainfall rates that correspond with testing>> 5.4in/hr=7.1E-03. 11 in/hr = 9.5E-04**Note: Data past 8 in/hr has greater uncertainty 9.5E-04 (8 in/hr value) utilized Initiating Event FrequencyLOOP FrequencyCoincident - Severe Weather Related LOOP. 12 separate severe weather induced LOOP events at U.S.nuclear plants from 1986 through 2012. Dividing by total critical reactor years during this period(2,332.6 rcry). Weather induced at power LOOP Frequency of 5.1 E-03/yrNon-Coincident - LOOP not caused by weather. Utilized the WFSAt-Power model0 Removed the Severe Weather events" LOOP Frequency of 2.1 E-02/yr Initiating Event FrequencyRainfall and LOOP. Historical weather induced LOOP events. Lightning strikes8 High winds (e.g. tornado and hurricane)e No mention of significant rainfall' Review of rainfall data for these events. Rainfall not a direct cause of Loss of Offsite PowerSevere Weather assumed to cause both theLOOP and the extreme ra'nfallInitiating Frequency. Severe Weather LOOP
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
* Rainfall Probabi ity CoinddentACDF CalculatioInitiating Event Frequency&deg; Severe Weather LOOPFrequency9 Utilized Severe WeatherOffsite Recovery Factors0 Coincident Rainfall RateProbabilityConsequencesSuccessful 40 GPH trickletest. Assumed reduced reliability ofdiesels- Utilized WF3 Internal EventPRA Model. CCDPpo = 2.92E CCDP^eline = 5.28E-04ACDF = LOOP
Public Affairs Officer (Victor.Dricks@nrc.gov)
* RR * (CCDPpo-CCDP^iine)5.1 E-03/yr
Public Affairs Officer (Lara.Uselding@nrc.gov)
* 9.5E-04 * (2.92E 5.28E-04) = 1.16E-08/yr Non-CoincidentACDF CalculationInitiating Event Frequency0 LOOP Frequency withoutSevere Weather- Rainfall Rate Probability. Exposure time of 0.019year8 Based on EDG surveillancetesting frequencyConsequencesSuccessful 7 gallon slugtest. Assumed failed diesels at >5.4 in/hr rainfallUtilized WF3 InternalEvent PRA Model. CCDFpD=1.19E-03/yr. CCDF^eiine = 4.39E-06/yrACDF = (RR) * (exp) * (CCDFpo-CCDF^eiine)ACDF = (7 1E-03) * (0.019) * (1.19E-03/yr - 4.39E-06/yr)ACDF = 1.62E-07/yr Combined ACDF Results&deg; Coincident LOOPACDF = 1.16E-08/vr. Non-Coincident LOOPACDF = 1.62E-07/vr" Total ACDF = 1.73E-07/vrQ LERF calculations performed in similar manner as CDFcalculationsTotal ALERF = 1.77E-09/vr Coincident LOOPCDF Sensitivity Frequency0 Lower Bound CaseR 5th percentile for severe weather LOOP frequency0 5th percentile for probability of rainfall rate- Total ACDF = 2.41 E-08/vr0 Nominal Case0 Nominal severe weather LOOP frequency0 Nominal probability of rainfal rate- Total ACDF = 1 .73E-07/vr0 Upper Bound Case0 95th percentile for severe weather LOOP frequency0 95th percentile for probability of rainfall rate< Total ACDF = 5.81 E-07/vr Non - Coincident LOOPCDF Sensitivity Rainfall RateLower Bound Case. Rainfall rate of 6.4 in/hrffl Total ACDF = 7.96E-08/vrNominal Case0 Rainfall rate of 5.4 in/hr. Total ACDF == 1.73E-07/vrUpper Bound Case8 Rainfall rate of 4.4 in/hrTotal ACDF = 4.72E-07/vr PRA Specific Conservatisms. Coincident Case. Diesels showed successful operation during 40 GPH trickle test. Analysis assumes run failure ofdiesels increased by a factor of 10above 8 in/hr rainfall. Analysis utilizes 8 in/hr rainfall although 40 GPH is closer to 11 in/hr. Assumed that a LOOP at Waterford occurs coincident with thehighest rainfall event of the year. Non-Coincident Case. Diesel showed successfu operation during 7 gallon slug test. Analysis failed both diesels for rainfall rates above 5.4 in/hr- No credit assumed in PRAfor restart ofdiesels Ente^yCONCLUSIONMarvin ChaseDirector, Regu atory and Performance mprovementWaterford 3 Sum naryCompleted Extensive Water Tolerance Testing ofDiesel Generator&deg; Trickle TestsB S ug TestsIn ALL Cases Diesel Demonstrated ContinuedCapability to Perform its Safety Function Summary. Established Station Rainfall Rate0 Determined Roof Ponding Depths. Determined Water Intrusion Rates via Day Tank VentDetermined LOOP Coincident with RainfallFrequency from NRC Data" PRA ResultsOrganizational Learnings Conclusion. The station conclusion is that the PRA resultssupport a determination that the failure to identifyand correct through-wa I corrosion on the A and BEDG Fuel Oil Day Tank Vent lines is of a very lowsafety significance EntergyCLOSING COMMEN SMichael ChisumSite Vice PresidentWaterford 3 Letter to Michael R. Chisum from Thomas R. Farnholtz, dated April 9,2015
Project Manager (Michael.0renak@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
ROPreports
 
SIGN-IN SHEET
^RRES%,
U S. NUCLEAR REGULATORY COMMISSION WATERFORD REGULATORY CONFERENCE
***^                                APRIL 7, 2015 Name                                  Organization
                ^/4f%s^                       &^e^\/
                    }Q&ra\^ju^                 &r^ejr'o^\
A (lfc\<^n      ^.0                                  %JTiL*.
    ^^/^/ C^d6^                                 Sf/T&tC^Y
                                                            ^-T v
    ^~3^ ^C. Qu.                                   fS^r^cL^/
                                                                /
    ^^ Tt^Ai[                                   /IAPJ^
1^0 (a C<<r                                   f^f^
  ^iz-r ^/A.^/M^.^/C                                 ^ i^ /e
      ^c^<- A .M.XOO                             \J 3-^' Sts-^ /4u C. rt tfj
  /1//<^^^S t^l/^^^t                            l^P/L /hs^c.
A?/A:e ^y<4 /                               ^?/&^v
    ^\   r'^5'<<"^     \^^\\^                 ^^&#xa3;A) HL(/^I^^S T^AJ^ ^}L^\O^&#xa3;                             f.hfT^(^.6-\
f{:^/^ ^+                                       fe^\/
if^i^. ^ i\^Y^\                       ^> rr    ><<< q <^
    ~fc)OhAfr4y&.>> s3^C(*?&S                    &J-r^A^tC 3^/W ^M^^bCfTV                              U^S^N Hu^es M^ k^ CM.! ^^/^                             {^
f^f ^^
L^ Milj4&r
  ^MA\^ A^eir??o/^                             ^t-\y)^^r'-
3
(^l (V\-,\L^       (V\J \i\ ; a 0^.^             A^^cX^/
                                                      \e  P^ivV 6ci(eA.t/ MU^CAA< '(^')
Cr<<Xi(        ^<\.v\^e/'                           ^ni^
    /V\id^^ <^^o^                                       yr\^^L        1_
          '>> n^     "bO/N^^                               ^\^^           ( ff^^^)
Page La, 9-
 
SIGN-IN SHEET
.^ ^^
U. S. NUCLEAR REGULATORY COMMISSION WATERFORD REGULATORY CONFERENCE APRIL 7, 2015 Name                              Organization C3^<-<^<i ^Ll^^e 11-(                    ^n^^<< . OP&#xa3;(2P^) dts^ ^
                                                    .^
  %o\o<<r^ \^^C.          ^Q6f                        l^^C [^Gt C^k^e^
Y^oi                -c^ or\ ^                    A)ftsC \^Q Cff^e)
    ^/6L V\L-\ &      ^a^mtfc-fc-              ,00,0 ^a^/Co/ci ^;^ d^'i^-^kl      ^ (f^nt)
C^i<. 6pff&^                                 A)^C \^ok^M ^&\de^r              C^*^)
(V\^./c ^o.9o.A                                  A)(kC. (Ll^J ^^al/U^n        e^^-
SeO^ f^/vc                                    ^C ^ b^y &SL?.
        ^ &.r^       L.<v^^                      ^(k(. <L\U b^pJ^ b^-P To>^ ra/^lvt.\^-a.                          ft)tt.C (Lt^ &<- C>1^^
      ^t'^t. ^UA&dv                                ^C ^\\} <^^^f lrv-s(>ectp^
      ^VN^N *>t>^ftr>>                             I^U. d^ <<n.o/ l^<.^^
                  ^ ^.C.^o^t-^                     ^0 W 6fcA (vlxdiiL *T<^u I or                          ^JILC- <<\^ AC^^ Afifcr^. Lifc^
C^\<>V. t^cL'er^                           A)ILC. (Ly</ A^<,
          ^\0-cV\ ^ (><-a>>^iA<^                     <J(LC ^ A^<*
n,-L^ S-^^^                                 /^jft-C /Z.II/ ^(tP
      ^Afr&i^ ro&iM                               ^<?. C rt.^^ r^^^>>
  '^Tv^/^45 ^UL.L.ti^AJ                           /vK<              D^f
    <^^^. ^ r^                                     ^(^ UQ
    ^.& \J ^f.l^     C^se.                         ^C. (^-^ f^&^')
C^r]L S4^+'                                      ^V-C P-liZ ^RS Vs o^       ^ er                                /Y^^. C^o^\
Page ^:of' of:
 
ENCLOSURE 2 ENTERGY PRESENTATION HANDOUTS
 
'"^Entefgy WATERFORD 3 REGULATORY CONFERENCE Through-Wall Corrosion on Emergency Diesel Generator A and B Day Tank Vents Apri 7,2015
 
Entei^gy OP EN NG REMARKS Michael Chisum Site Vice President Waterford 3
 
Waterford 3 Representatives Ran Gilmore      Manager, Systems and Components Engineering Brian Lanka      Director, Engineering Jessica Walker PRA Consultant, Jensen Hughes Marvin Chase    Director, Regulatory & Performance Improvement
 
Agenda
. Overview of Performance Deficiency
. Causes and Corrective Actions n
Inputs to the Risk Calculation Q
Safety Significance Calculation
&#xa9; Conclusion
 
f:s:'Entergy OVERVIEW OF PERFORMANCE DEFICIENCY Ran Gilmore Manager, Systems and Components Engineering Waterford 3
 
Performance Deficiency Failure to identify and correct through-wall corrosion on the A and B Emergency Diesel Generator Fuel Oil Day Tank Vent I'nes.
 
As-Found    nter'm repair Hole Located at Roof on Missile Shield Side i^
 
Impact on Plant Not to Scale
 
I s
I
        ^\^\\\^\\\\\\\\\>X\^\\\Y^.\\\\\\\^\\\N\\\\\<\\NS?^
u^^-J >:
CQ
                                                            ?oS^
              \s\\v;.xs\\\<\\\\<\\\<\\\\\\\'                            .\\^\\\N\\\\\\\\\V^\\\\\\\\^\\\y
                                                            ^^^1 g5g^
1 F?S^\\\\\\^\\\\^\\\^^^\\\c^\^^^^.\\\^\\v^\\^^\\\\^^\\\^\\^^\\\'S;l
 
~'sfEnte^gy CAUSES AND CORRECTIVE ACTIONS Ran Gilmore Manager, Systems and Components Engi eering Waterford 3
 
Day Tank Vent Line Evaluation Resu ts Direct Cause
. Failure of the pipe coating al owed accelerated, local, general corrosion to occur.
Key Cause 0 Failure mechanism ofthrough-wall corrosion combined with postulated precipitation events at the site could challenge EDG safety functions.
a Corrective Actions Replace Temporary Repair with a Permanent Design Change
. Immediate Walkdown of Roofs for Similar Configuration
- Reassess impact of Non-Safety Components on EDG(s)
. Emergency Diesel Generator Comprehensive hlealth Assessment
 
General Corrosion Evaluation Results
. Direct Cause
  . Normalization of external corrosion on plant equipment by station personnel.
3 Key Cause Inadequate programmatic guidance to ensure consistent identification and correction of coating degradation and external corrosion 0 Corrective Actions 0 Create an External Corrosion standard and program capable of identifying, prioritizing, monitoring, applying resources and repairing degradation of plant equipment related to external corrosion.
6 Utilizing an External Corrosion Team
 
m ^ M Entergy INPUTS TO THE R SK CALCULATION Ran Gi more Manager, Systems and Components Eng Waterford 3
 
Key Inputs 0
Water Intrusion Rate
  . Hole Size and Location 0 Analytic Estimate 0 Roof Test
&#xa9; Water Tolerance of EDG
  . Test Approach e Test Results
 
Determination of hlole Size Fuel Oil Day Tank B (East Vent)
Not to Scale
 
Determination of Hole Size Fuel Oi Day Tank A (West Vent)
Not to Scale
 
Water Intrusion Analysis Vent B Required Ponding Depth: A Vent Not to Scale
 
Water Intrusion Analysis Day Tank Accumulations 45 40 35 30 5 25 20 5
15 10 T  T  -r  t 567                        9 10 11  12 Rain Rate (In/hr)
            - -West ("A") Tank      .East ("B") Tank
 
Roof Test Purpose 9 Validate Analytical Model of Roof Drainage 0 Assess Ponding Depth and Boundaries 0 Assess Debris Behavior
 
Roof Test Water Line Near "A" Vent Results
&deg; Water Did Not Reach Fuel Oil Day Tank A Vent Line in 20 GPM (5 in/hr)
Test                                          y^s
                                                  ^
0 Drain Resistance is Less Than Calculated
                                                      "\
 
Roof Test                            As-found Debris Location Results
- Found debris did not transport when placed n as-found location.
e Manually placed next to drain to evaluate effects Debris Next to Drain        Debris in As-found Location
                            -.^^
 
Roof Ponding Test Results Day Tank Accumulations 45 40 35 30 Roof Ponding                                .r-^
Result s25 20
                                            -^
I 15 10                            ^
5                      u^
0 -r z        T        T  T  T  T  T  1 1                            6        7  8  9  10 11 12 Rain Rate (in/hr)
                      -J-West ("A") Tank
 
Water Tolerance Testing G Waterford EDG Characteristics to Maintain in Test System
  - Delivery of water to engine 0 Engine combustion conditions
  &deg; Engine loading during a LOOP e Approach 0 Full Scale Testing at Sumner Municipal Light Plant (SMLP) in Sumner. IA 0 12 cylinder Cooper-Bessemer KSV Engine similar to the 16 cylinder Cooper-Bessemer KSV engines at Waterford 9 Duplicate Waterford fuel delivery skid at Sumner
 
Water Tolerance Testing
: 1. Delivery of Water Duplicate Waterford Fuel Supply System.
to the Engine Maintain fuel (and water) flow rates through system the same as at Waterford by: (1) scaling the load profile, and (2) providing takeoff from header to simulate "missing" four cylinders.
: 2. Engine            Use similar Cooper-Bessemer KSV Engine with same bore, stroke, Combustion      cylinder liners, pistons, and similar cylinder heads.
Conditions Load SMLP engine at a conservatively greater power per cylinder per cycle (to maintain consistent fuel flow rate).
Fuel Injection System with similar characteristics.
(Waterford: Bendix FDX-22, SMLP: Bendix FDX-22G)
: 3. Engine Loading    Use Load Bank to simulate Waterford LOOP load profile (scaled to 12 cylinders).
SMLP governor is slower than the Waterford governor, which results in a conservative measure of the impact on EDG frequency.
 
Water Tolerance Testing Tower with Day Tank              New Fuel Header 4 Cylinder Take-Off
                                                                    -\
                                                ^
                            ^.-r^f w              ind Straii lers
                                                                .4
 
Water Tolerance Testing Conduct of Test
. "Trickle" Test (Loss of Offsite Power with Rain Event)
  . Diesel Started and Loaded to Maximum Peak LOOP Load Scaled to the SMLP Engine 9 Water Introduced into Day Tank at Specified Flow Rate
&deg; "Slug" Test (Loss of Offsite Power after Rain Event)
  " Diesel in Standby Specified Water Volume Added to Day Tank and Settled into Low Point of Piping
  - Diesel Started and Loaded with LOOP Load Profile Scaled to SMLP Engine
 
>s:'Entergy TEST RESULTS Brian Lanka Director, Engineering Waterford 3
 
Water Tolerance Testing Cases Base Line 0 No water test Sug
. 1 Gallon
  . 5 Gallon with 24 hour endurance run
- 7 Gallon (5.4 in/hr)
 
Trickle
. 2.7 GPH Trickle 0 21 GPH Trickle with 24 hour endurance run
. 40 GPH Trickle (11 in/hr)
 
Water Tolerance Testing                                                                       MPR DwuimntWo. OQe.10e2.140M75-REVISKlN 6->>27<a)1S AS-BUILT WATERFORD FUEL AND WATER TEST MECHANICAL SYSTEM nFS^
                        -^ff^-Q s^
                                                                                          ^^^
                                                                                          ^^^
ENS'ffittBAWTmUMCTfflS          G6NEf>*TOR(;*86liffi.TEBS wnanEW^nm^wapni                ^SSSSSlSS^^^WcS'W" imsTiwwutsimwssiiaiaimiw
                                                                                ^&sect;%^>>^%>>i:p"tcn"1 FUEtlWOCOaiBNfWto' fMiwnfwvnwisi.
FigUrtl. Test System Schemafic                  ig
 
Water Tolerance Test Video
      .^-         u/
V.i"'-.:
t^
i;
                                    ^^
                                    ^><" ""'>...
ip-20
                      ...?-<^
                                        .-^
b
)
 
Water Tolerance Testing Water VoIume/Flow Engine Fuel Rack Test Type                                                                Generator Output Frequency Position Trickle        2.7 GPH for 1 hour            No detectable effect            No detectable effect Trickle2        21 GPH for 1 hour          Up to 2 mm increase1              No detectable effect Trickle        40 GPH for 1 hour          Up to 3 mm increase1              No detectable effect Slug                1 Gallon              No detectable effect            No detectable effect Slug2                5 Gallon              Up to 3 mm increase1             <1 Hz decrease1 1 Hz decrease during a minor load step1 Slug                7 Gallon            Up to 10 mm increase1 2 Hz decrease during a major load step1
: 1. Compared with the response in the baseline test.
: 2. A 24-hour endurance test was performed immediately afterthis test.
 
Water Intrusion Rate Determination Day Tank Accumulations 45 40 I 40 GPH Trickle 35 Roof Ponding 30    Result
^25 I.20 IS 10 5
0 -T                                                      1 1                  567                                12 Rain Rate (In/hr)
                      ^West("A")Tank
 
( _ _ I Entergy SAFETY SIGNIFICANCE CALCULATION Jessica Walker, PRA Consultant Jensen hlughes
 
Risk Analysis Risk = Frequency of the Event* Consequences Initiating Event Frequency                    Consequences Rainfall Rate Probability                Conditional Core Damage LOOP Frequency                          Probabilities
                                            . Coincident Likelihood of High Rainfall
                                            . Non-Coincident Coincident with LOOP
 
Rainfall Rate National Weather Service Data for Waterford 3 Plant 0 Provides average recurrence interval in years to achieve hour ong rainfall in inches Used to determine probability of specific rainfa I rates Average Recurrence Interval 10 25 50 100 200 500 1,000 (years)
Inches of Rainfall in 1.89 2.21 2.77 3.27 3.98 4.57 5.18 5.83 6.72 7.43 One Hour Example: 2 percent (1/50) of the time the highest rainfall rate during the year is approximately 4.6 in/hr
 
nitiating Event Frequency Rainfall Rate Took the average recurrence interval and assumed a direct probabi ity of rain 0 Conservatively used the annual recurrence as the probability
&deg; Probability of having a rainfall rate of 4.57 in/hr is 0.02 (1/50)
Fina Probability Values interpolated from available data to provide rainfall rates that correspond with testing
>> 5.4in/hr=7.1E-03
. 11 in/hr = 9.5E-04*
*Note: Data past 8 in/hr has greater uncertainty 9.5E-04 (8 in/hr value) utilized
 
Initiating Event Frequency LOOP Frequency Coincident - Severe Weather Related LOOP
  . 12 separate severe weather induced LOOP events at U.S.
nuclear plants from 1986 through 2012
  . Dividing by total critical reactor years during this period (2,332.6 rcry)
  . Weather induced at power LOOP Frequency of 5.1 E-03/yr Non-Coincident - LOOP not caused by weather
  . Utilized the WFSAt-Power model 0 Removed the Severe Weather events
  " LOOP Frequency of 2.1 E-02/yr
 
Initiating Event Frequency Rainfall and LOOP
. Historical weather induced LOOP events
  . Lightning strikes 8 High winds (e.g. tornado and hurricane) e No mention of significant rainfall
' Review of rainfall data for these events
  . Rainfall not a direct cause of Loss of Offsite Power Severe Weather assumed to cause both the LOOP and the extreme ra'nfall Initiating Frequency
  . Severe Weather LOOP
* Rainfall Probabi ity
 
CoinddentACDF Calculatio Initiating Event Frequency                     Consequences
&deg; Severe Weather LOOP                    Successful 40 GPH trickle Frequency                              test 9 Utilized Severe Weather              . Assumed reduced reliability of Offsite Recovery Factors                diesels 0 Coincident Rainfall Rate            - Utilized WF3 Internal Event Probability                            PRA Model
                                          . CCDPpo = 2.92E-03
                                          - CCDP^eline = 5.28E-04 ACDF = LOOP
* RR * (CCDPpo-CCDP^iine) 5.1 E-03/yr
* 9.5E-04 * (2.92E 5.28E-04) = 1.16E-08/yr
 
Non-CoincidentACDF Calculation Initiating Event Frequency                    Consequences 0 LOOP Frequency without                Successful 7 gallon slug Severe Weather                       test
  - Rainfall Rate Probability             . Assumed failed diesels at >
5.4 in/hr rainfall
  . Exposure time of 0.019 year Utilized WF3 Internal Event PRA Model 8 Based on EDG surveillance testing frequency                  . CCDFpD=1.19E-03/yr
                                          . CCDF^eiine = 4.39E-06/yr ACDF = (RR) * (exp) * (CCDFpo-CCDF^eiine)
ACDF = (7 1E-03) * (0.019) * (1.19E-03/yr - 4.39E-06/yr)
ACDF = 1.62E-07/yr
 
Combined ACDF Results
&deg; Coincident LOOPACDF = 1.16E-08/vr
. Non-Coincident LOOPACDF = 1.62E-07/vr
" Total ACDF = 1.73E-07/vr Q LERF calculations performed in similar manner as CDF calculations Total ALERF = 1.77E-09/vr
 
Coincident LOOP CDF Sensitivity Frequency 0 Lower Bound Case R 5th percentile for severe weather LOOP frequency 0 5th percentile for probability of rainfall rate
  - Total ACDF = 2.41 E-08/vr 0 Nominal Case 0 Nominal severe weather LOOP frequency 0 Nominal probability of rainfal rate
  - Total ACDF = 1 .73E-07/vr 0 Upper Bound Case 0 95th percentile for severe weather LOOP frequency 0 95th percentile for probability of rainfall rate
  < Total ACDF = 5.81 E-07/vr
 
Non - Coincident LOOP CDF Sensitivity Rainfall Rate Lower Bound Case
. Rainfall rate of 6.4 in/hr ffl Total ACDF = 7.96E-08/vr Nominal Case 0 Rainfall rate of 5.4 in/hr
. Total ACDF == 1.73E-07/vr Upper Bound Case 8 Rainfall rate of 4.4 in/hr Total ACDF = 4.72E-07/vr
 
PRA Specific Conservatisms
. Coincident Case
  . Diesels showed successful operation during 40 GPH trickle test
    . Analysis assumes run failure ofdiesels increased by a factor of 10 above 8 in/hr rainfall
    . Analysis utilizes 8 in/hr rainfall although 40 GPH is closer to 11 in/hr
  . Assumed that a LOOP at Waterford occurs coincident with the highest rainfall event of the year
. Non-Coincident Case
  . Diesel showed successfu operation during 7 gallon slug test
  . Analysis failed both diesels for rainfall rates above 5.4 in/hr
- No credit assumed in PRAfor restart ofdiesels
 
Ente^y CONCLUSION Marvin Chase Director, Regu atory and Performance mprovement Waterford 3
 
Sum nary Completed Extensive Water Tolerance Testing of Diesel Generator
  &deg; Trickle Tests B S ug Tests In ALL Cases Diesel Demonstrated Continued Capability to Perform its Safety Function
 
Summary
. Established Station Rainfall Rate 0 Determined Roof Ponding Depths
  . Determined Water Intrusion Rates via Day Tank Vent Determined LOOP Coincident with Rainfall Frequency from NRC Data
" PRA Results Organizational Learnings
 
Conclusion
. The station conclusion is that the PRA results support a determination that the failure to identify and correct through-wa I corrosion on the A and B EDG Fuel Oil Day Tank Vent lines is of a very low safety significance
 
Entergy CLOSING COMMEN S Michael Chisum Site Vice President Waterford 3
 
Letter to Michael R. Chisum from Thomas R. Farnholtz, dated April 9,2015


==SUBJECT:==
==SUBJECT:==
PUBLIC MEETING SUMMARY - REGULATORY CONFERENCE WITHENTERGY OPERATIONS, INC. FOR WATERFORD STEAM ELECTRICSTATION, UNET 3DISTRIBUTiON:Regional Administrator (Marc.Dapas@nrc.gov)Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)DRP Director (Troy.Pruett@nrc.gov)Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)DRS Director (Anton.Vegel@nrc.gov)DRS Deputy Director (Jeff.Clark@nrc.gov)Senior Resident Inspector (Frances.Ramirez@nrc.gov)Resident Inspector (Chris.Speer@nrc.gov)WAT Administrative Assistant (Linda.Dufrene@nrc.gov)Branch Chief, DRP/D (Michael.Hay@nrc.gov)Senior Project Engineer, DRP/E (Bob.Hagar@nrc.gov)Project Engineer, DRP/D (Brian.Parks@nrc.gov)Project Engineer, DRP/D (Jan.Tice@nrc.gov)Public Affairs Officer (Victor.Dricks@nrc.gov)Public Affairs Officer (Lara.Uselding@nrc.gov)Project Manager (Michael.0renak@nrc.gov)Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)RITS Coordinator (Marisa.Herrera@nrc.gov)ACES (R4Enforcement.Resource@nrc.gov)Regional Counsel (Karla.Fuller@nrc.gov)Congressional Affairs Officer (Jenny.Weil@nrc.gov)Technical Support Assistant (Loretta.Williams@nrc.gov)RiV Congressional Affairs Officer (Angel.Moreno@nrc.gov)RIV/ETA: OEDO (Michael.Waters@nrc.gov)ROPreports}}
PUBLIC MEETING  
 
==SUMMARY==
- REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, INC. FOR WATERFORD STEAM ELECTRIC STATION, UNET 3 DISTRIBUTiON:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Frances.Ramirez@nrc.gov)
Resident Inspector (Chris.Speer@nrc.gov)
WAT Administrative Assistant (Linda.Dufrene@nrc.gov)
Branch Chief, DRP/D (Michael.Hay@nrc.gov)
Senior Project Engineer, DRP/E (Bob.Hagar@nrc.gov)
Project Engineer, DRP/D (Brian.Parks@nrc.gov)
Project Engineer, DRP/D (Jan.Tice@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Michael.0renak@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
RiV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
ROPreports}}

Latest revision as of 13:53, 5 February 2020

Public Meeting Summary - Regulatory Conference with Entergy Operations, Inc., for Waterford Steam Electric Station, Unit 3
ML15099A563
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/09/2015
From: Thomas Farnholtz
NRC Region 4
To: Chisum M
Entergy Operations
References
EA-14-228
Download: ML15099A563 (57)


Text

,^BRES^ UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 April 9, 2015 EA-14-228 Mr. Michael R. Chisum Site Vice President Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

SUBJECT:

PUBLIC MEETING

SUMMARY

- REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, INC. FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3

Dear Mr. Chisum:

This refers to the Category 1 meeting conducted on April 7, 2015, in Arlington, Texas. The purpose of this meeting was to allow representatives of Entergy Operations, Inc., the licensee for Waterford Steam Electric Station, Unit 3, to meet with U.S. Nuclear Regulatory Commission (NRC) personnel to discuss their position with regard to the preliminary Greater-than-Green finding and associated apparent violation. The apparent violation of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion XVI, "Corrective Action," was associated with through-wall corrosion of vent piping for the emergency diesel generator fuel oil day tanks. The holes En these vent pipes could allow water to enter the day tanks and contaminate the diesel fuel oil, challenging the operability and functionality of both safety-related emergency diesel generators. The apparent violation is discussed in NRC Inspection Report 05000382/2014007, dated January 22, 2015 (ADAMS Accession No. ML15022A637).

During the meeting, Entergy Operations, Inc., representatives provided an assessment of the significance of the finding, their root cause evaluation and corrective actions, and the results of tests they conducted on the effects of water contamination of the diesel fuel oil. A member of the public asked questions about why it took the NRC so long to identify the issue, the effect a clogged roof drain would have, and the probability of a loss of offsite power event. The Region IV Regional Administrator responded to these questions.

A list of attendees and a copy of the presentation handouts are enclosed.

In accordance with Title 10 of the Coofe of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

M. Chisum from the NRC Web site at httD://www.nrc.aov/readina-rm/adams.html (the Public Electronic Reading Room).

Sincerely, IRfiJ Thomas R. Farnholtz, Chief Engineering Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38

Enclosures:

1. List of Attendees
2. Entergy Presentation Handouts ec w/encl:

Electronic Distribution

ML15099A563 13 SUNSI Review i B Non-Sensitive 13 Publicly Available Keyword:

By: JLD D Sensitive D Non-Publicly Available RGN-002 OFFICE SRI:DRS/EB1 SPAO C:DRS/EB1 NAME  ! JDixon VDricks TFarnholtz SIGNATURE l /RA/ /RA/ /RA/

DATE 4/8/2015 4/8/2015 4/8/2015 Letter to Michael R. Chisum from Thomas R. Farnholtz, dated April 9,2015

SUBJECT:

PUBLIC MEETING

SUMMARY

- REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, iNC. FORWATERFORD STEAM ELECTRIC STATION, UNIT 3 DESTRIBUTION:

Regionai Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas. Farnholtz@nrc.gov)

DRS Director (Anton.Vegef@nrc.gov)

DRS Deputy Director (Jeff.CIark@nrc.gov)

Senior Resident inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/E (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Michael.0renak@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

ROPreports

SIGN-IN SHEET

^RRES%,

U S. NUCLEAR REGULATORY COMMISSION WATERFORD REGULATORY CONFERENCE

      • ^ APRIL 7, 2015 Name Organization

^/4f%s^ &^e^\/

}Q&ra\^ju^ &r^ejr'o^\

A (lfc\<^n ^.0 %JTiL*.

^^/^/ C^d6^ Sf/T&tC^Y

^-T v

^~3^ ^C. Qu. fS^r^cL^/

/

^^ Tt^Ai[ /IAPJ^

1^0 (a C<<r f^f^

^iz-r ^/A.^/M^.^/C ^ i^ /e

^c^<- A .M.XOO \J 3-^' Sts-^ /4u C. rt tfj

/1//<^^^S t^l/^^^t l^P/L /hs^c.

A?/A:e ^y<4 / ^?/&^v

^\ r'^5'<<"^ \^^\\^ ^^£A) HL(/^I^^S T^AJ^ ^}L^\O^£ f.hfT^(^.6-\

f{:^/^ ^+ fe^\/

if^i^. ^ i\^Y^\ ^> rr ><<< q <^

~fc)OhAfr4y&.>> s3^C(*?&S &J-r^A^tC 3^/W ^M^^bCfTV U^S^N Hu^es M^ k^ CM.! ^^/^ {^

f^f ^^

L^ Milj4&r

^MA\^ A^eir??o/^ ^t-\y)^^r'-

3

(^l (V\-,\L^ (V\J \i\ ; a 0^.^ A^^cX^/

\e P^ivV 6ci(eA.t/ MU^CAA< '(^')

Cr<<Xi( ^<\.v\^e/' ^ni^

/V\id^^ <^^o^ yr\^^L 1_

'>> n^ "bO/N^^ ^\^^ ( ff^^^)

Page La, 9-

SIGN-IN SHEET

.^ ^^

U. S. NUCLEAR REGULATORY COMMISSION WATERFORD REGULATORY CONFERENCE APRIL 7, 2015 Name Organization C3^<-<^<i ^Ll^^e 11-( ^n^^<< . OP£(2P^) dts^ ^

.^

%o\o<<r^ \^^C. ^Q6f l^^C [^Gt C^k^e^

Y^oi -c^ or\ ^ A)ftsC \^Q Cff^e)

^/6L V\L-\ & ^a^mtfc-fc- ,00,0 ^a^/Co/ci ^;^ d^'i^-^kl ^ (f^nt)

C^i<. 6pff&^ A)^C \^ok^M ^&\de^r C^*^)

(V\^./c ^o.9o.A A)(kC. (Ll^J ^^al/U^n e^^-

SeO^ f^/vc ^C ^ b^y &SL?.

^ &.r^ L.<v^^ ^(k(. <L\U b^pJ^ b^-P To>^ ra/^lvt.\^-a. ft)tt.C (Lt^ &<- C>1^^

^t'^t. ^UA&dv ^C ^\\} <^^^f lrv-s(>ectp^

^VN^N *>t>^ftr>> I^U. d^ <<n.o/ l^<.^^

^ ^.C.^o^t-^ ^0 W 6fcA (vlxdiiL *T<^u I or ^JILC- <<\^ AC^^ Afifcr^. Lifc^

C^\<>V. t^cL'er^ A)ILC. (Ly</ A^<,

^\0-cV\ ^ (><-a>>^iA<^ <J(LC ^ A^<*

n,-L^ S-^^^ /^jft-C /Z.II/ ^(tP

^Afr&i^ ro&iM ^<?. C rt.^^ r^^^>>

'^Tv^/^45 ^UL.L.ti^AJ /vK< D^f

<^^^. ^ r^ ^(^ UQ

^.& \J ^f.l^ C^se. ^C. (^-^ f^&^')

C^r]L S4^+' ^V-C P-liZ ^RS Vs o^ ^ er /Y^^. C^o^\

Page ^:of' of:

ENCLOSURE 2 ENTERGY PRESENTATION HANDOUTS

'"^Entefgy WATERFORD 3 REGULATORY CONFERENCE Through-Wall Corrosion on Emergency Diesel Generator A and B Day Tank Vents Apri 7,2015

Entei^gy OP EN NG REMARKS Michael Chisum Site Vice President Waterford 3

Waterford 3 Representatives Ran Gilmore Manager, Systems and Components Engineering Brian Lanka Director, Engineering Jessica Walker PRA Consultant, Jensen Hughes Marvin Chase Director, Regulatory & Performance Improvement

Agenda

. Overview of Performance Deficiency

. Causes and Corrective Actions n

Inputs to the Risk Calculation Q

Safety Significance Calculation

© Conclusion

f:s:'Entergy OVERVIEW OF PERFORMANCE DEFICIENCY Ran Gilmore Manager, Systems and Components Engineering Waterford 3

Performance Deficiency Failure to identify and correct through-wall corrosion on the A and B Emergency Diesel Generator Fuel Oil Day Tank Vent I'nes.

As-Found nter'm repair Hole Located at Roof on Missile Shield Side i^

Impact on Plant Not to Scale

I s

I

^\^\\\^\\\\\\\\\>X\^\\\Y^.\\\\\\\^\\\N\\\\\<\\NS?^

u^^i -J >:

CQ

?oS^

\s\\v;.xs\\\<\\\\<\\\<\\\\\\\' .\\^\\\N\\\\\\\\\V^\\\\\\\\^\\\y

^^^1 g5g^

1 F?S^\\\\\\^\\\\^\\\^^^\\\c^\^^^^.\\\^\\v^\\^^\\\\^^\\\^\\^^\\\'S;l

~'sfEnte^gy CAUSES AND CORRECTIVE ACTIONS Ran Gilmore Manager, Systems and Components Engi eering Waterford 3

Day Tank Vent Line Evaluation Resu ts Direct Cause

. Failure of the pipe coating al owed accelerated, local, general corrosion to occur.

Key Cause 0 Failure mechanism ofthrough-wall corrosion combined with postulated precipitation events at the site could challenge EDG safety functions.

a Corrective Actions Replace Temporary Repair with a Permanent Design Change

. Immediate Walkdown of Roofs for Similar Configuration

- Reassess impact of Non-Safety Components on EDG(s)

. Emergency Diesel Generator Comprehensive hlealth Assessment

General Corrosion Evaluation Results

. Direct Cause

. Normalization of external corrosion on plant equipment by station personnel.

3 Key Cause Inadequate programmatic guidance to ensure consistent identification and correction of coating degradation and external corrosion 0 Corrective Actions 0 Create an External Corrosion standard and program capable of identifying, prioritizing, monitoring, applying resources and repairing degradation of plant equipment related to external corrosion.

6 Utilizing an External Corrosion Team

m ^ M Entergy INPUTS TO THE R SK CALCULATION Ran Gi more Manager, Systems and Components Eng Waterford 3

Key Inputs 0

Water Intrusion Rate

. Hole Size and Location 0 Analytic Estimate 0 Roof Test

© Water Tolerance of EDG

. Test Approach e Test Results

Determination of hlole Size Fuel Oil Day Tank B (East Vent)

Not to Scale

Determination of Hole Size Fuel Oi Day Tank A (West Vent)

Not to Scale

Water Intrusion Analysis Vent B Required Ponding Depth: A Vent Not to Scale

Water Intrusion Analysis Day Tank Accumulations 45 40 35 30 5 25 20 5

15 10 T T -r t 567 9 10 11 12 Rain Rate (In/hr)

- -West ("A") Tank .East ("B") Tank

Roof Test Purpose 9 Validate Analytical Model of Roof Drainage 0 Assess Ponding Depth and Boundaries 0 Assess Debris Behavior

Roof Test Water Line Near "A" Vent Results

° Water Did Not Reach Fuel Oil Day Tank A Vent Line in 20 GPM (5 in/hr)

Test y^s

^

0 Drain Resistance is Less Than Calculated

"\

Roof Test As-found Debris Location Results

- Found debris did not transport when placed n as-found location.

e Manually placed next to drain to evaluate effects Debris Next to Drain Debris in As-found Location

-.^^

Roof Ponding Test Results Day Tank Accumulations 45 40 35 30 Roof Ponding .r-^

Result s25 20

-^

I 15 10 ^

5 u^

0 -r z T T T T T T 1 1 6 7 8 9 10 11 12 Rain Rate (in/hr)

-J-West ("A") Tank

Water Tolerance Testing G Waterford EDG Characteristics to Maintain in Test System

- Delivery of water to engine 0 Engine combustion conditions

° Engine loading during a LOOP e Approach 0 Full Scale Testing at Sumner Municipal Light Plant (SMLP) in Sumner. IA 0 12 cylinder Cooper-Bessemer KSV Engine similar to the 16 cylinder Cooper-Bessemer KSV engines at Waterford 9 Duplicate Waterford fuel delivery skid at Sumner

Water Tolerance Testing

1. Delivery of Water Duplicate Waterford Fuel Supply System.

to the Engine Maintain fuel (and water) flow rates through system the same as at Waterford by: (1) scaling the load profile, and (2) providing takeoff from header to simulate "missing" four cylinders.

2. Engine Use similar Cooper-Bessemer KSV Engine with same bore, stroke, Combustion cylinder liners, pistons, and similar cylinder heads.

Conditions Load SMLP engine at a conservatively greater power per cylinder per cycle (to maintain consistent fuel flow rate).

Fuel Injection System with similar characteristics.

(Waterford: Bendix FDX-22, SMLP: Bendix FDX-22G)

3. Engine Loading Use Load Bank to simulate Waterford LOOP load profile (scaled to 12 cylinders).

SMLP governor is slower than the Waterford governor, which results in a conservative measure of the impact on EDG frequency.

Water Tolerance Testing Tower with Day Tank New Fuel Header 4 Cylinder Take-Off

-\

^

^.-r^f w ind Straii lers

.4

Water Tolerance Testing Conduct of Test

. "Trickle" Test (Loss of Offsite Power with Rain Event)

. Diesel Started and Loaded to Maximum Peak LOOP Load Scaled to the SMLP Engine 9 Water Introduced into Day Tank at Specified Flow Rate

° "Slug" Test (Loss of Offsite Power after Rain Event)

" Diesel in Standby Specified Water Volume Added to Day Tank and Settled into Low Point of Piping

- Diesel Started and Loaded with LOOP Load Profile Scaled to SMLP Engine

>s:'Entergy TEST RESULTS Brian Lanka Director, Engineering Waterford 3

Water Tolerance Testing Cases Base Line 0 No water test Sug

. 1 Gallon

. 5 Gallon with 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> endurance run

- 7 Gallon (5.4 in/hr)

Trickle

. 2.7 GPH Trickle 0 21 GPH Trickle with 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> endurance run

. 40 GPH Trickle (11 in/hr)

Water Tolerance Testing MPR DwuimntWo. OQe.10e2.140M75-REVISKlN 6->>27<a)1S AS-BUILT WATERFORD FUEL AND WATER TEST MECHANICAL SYSTEM nFS^

-^ff^-Q s^

^^^

^^^

ENS'ffittBAWTmUMCTfflS G6NEf>*TOR(;*86liffi.TEBS wnanEW^nm^wapni ^SSSSSlSS^^^WcS'W" imsTiwwutsimwssiiaiaimiw

^§%^>>^%>>i:p"tcn"1 FUEtlWOCOaiBNfWto' fMiwnfwvnwisi.

FigUrtl. Test System Schemafic ig

Water Tolerance Test Video

.^- u/

V.i"'-.:

t^

i;

^^

^><" ""'>...

ip-20

...?-<^

.-^

b

)

Water Tolerance Testing Water VoIume/Flow Engine Fuel Rack Test Type Generator Output Frequency Position Trickle 2.7 GPH for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> No detectable effect No detectable effect Trickle2 21 GPH for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Up to 2 mm increase1 No detectable effect Trickle 40 GPH for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> Up to 3 mm increase1 No detectable effect Slug 1 Gallon No detectable effect No detectable effect Slug2 5 Gallon Up to 3 mm increase1 <1 Hz decrease1 1 Hz decrease during a minor load step1 Slug 7 Gallon Up to 10 mm increase1 2 Hz decrease during a major load step1

1. Compared with the response in the baseline test.
2. A 24-hour endurance test was performed immediately afterthis test.

Water Intrusion Rate Determination Day Tank Accumulations 45 40 I 40 GPH Trickle 35 Roof Ponding 30 Result

^25 I.20 IS 10 5

0 -T 1 1 567 12 Rain Rate (In/hr)

^West("A")Tank

( _ _ I Entergy SAFETY SIGNIFICANCE CALCULATION Jessica Walker, PRA Consultant Jensen hlughes

Risk Analysis Risk = Frequency of the Event* Consequences Initiating Event Frequency Consequences Rainfall Rate Probability Conditional Core Damage LOOP Frequency Probabilities

. Coincident Likelihood of High Rainfall

. Non-Coincident Coincident with LOOP

Rainfall Rate National Weather Service Data for Waterford 3 Plant 0 Provides average recurrence interval in years to achieve hour ong rainfall in inches Used to determine probability of specific rainfa I rates Average Recurrence Interval 10 25 50 100 200 500 1,000 (years)

Inches of Rainfall in 1.89 2.21 2.77 3.27 3.98 4.57 5.18 5.83 6.72 7.43 One Hour Example: 2 percent (1/50) of the time the highest rainfall rate during the year is approximately 4.6 in/hr

nitiating Event Frequency Rainfall Rate Took the average recurrence interval and assumed a direct probabi ity of rain 0 Conservatively used the annual recurrence as the probability

° Probability of having a rainfall rate of 4.57 in/hr is 0.02 (1/50)

Fina Probability Values interpolated from available data to provide rainfall rates that correspond with testing

>> 5.4in/hr=7.1E-03

. 11 in/hr = 9.5E-04*

  • Note: Data past 8 in/hr has greater uncertainty 9.5E-04 (8 in/hr value) utilized

Initiating Event Frequency LOOP Frequency Coincident - Severe Weather Related LOOP

. 12 separate severe weather induced LOOP events at U.S.

nuclear plants from 1986 through 2012

. Dividing by total critical reactor years during this period (2,332.6 rcry)

. Weather induced at power LOOP Frequency of 5.1 E-03/yr Non-Coincident - LOOP not caused by weather

. Utilized the WFSAt-Power model 0 Removed the Severe Weather events

" LOOP Frequency of 2.1 E-02/yr

Initiating Event Frequency Rainfall and LOOP

. Historical weather induced LOOP events

. Lightning strikes 8 High winds (e.g. tornado and hurricane) e No mention of significant rainfall

' Review of rainfall data for these events

. Rainfall not a direct cause of Loss of Offsite Power Severe Weather assumed to cause both the LOOP and the extreme ra'nfall Initiating Frequency

. Severe Weather LOOP

  • Rainfall Probabi ity

CoinddentACDF Calculatio Initiating Event Frequency Consequences

° Severe Weather LOOP Successful 40 GPH trickle Frequency test 9 Utilized Severe Weather . Assumed reduced reliability of Offsite Recovery Factors diesels 0 Coincident Rainfall Rate - Utilized WF3 Internal Event Probability PRA Model

. CCDPpo = 2.92E-03

- CCDP^eline = 5.28E-04 ACDF = LOOP

  • RR * (CCDPpo-CCDP^iine) 5.1 E-03/yr
  • 9.5E-04 * (2.92E 5.28E-04) = 1.16E-08/yr

Non-CoincidentACDF Calculation Initiating Event Frequency Consequences 0 LOOP Frequency without Successful 7 gallon slug Severe Weather test

- Rainfall Rate Probability . Assumed failed diesels at >

5.4 in/hr rainfall

. Exposure time of 0.019 year Utilized WF3 Internal Event PRA Model 8 Based on EDG surveillance testing frequency . CCDFpD=1.19E-03/yr

. CCDF^eiine = 4.39E-06/yr ACDF = (RR) * (exp) * (CCDFpo-CCDF^eiine)

ACDF = (7 1E-03) * (0.019) * (1.19E-03/yr - 4.39E-06/yr)

ACDF = 1.62E-07/yr

Combined ACDF Results

° Coincident LOOPACDF = 1.16E-08/vr

. Non-Coincident LOOPACDF = 1.62E-07/vr

" Total ACDF = 1.73E-07/vr Q LERF calculations performed in similar manner as CDF calculations Total ALERF = 1.77E-09/vr

Coincident LOOP CDF Sensitivity Frequency 0 Lower Bound Case R 5th percentile for severe weather LOOP frequency 0 5th percentile for probability of rainfall rate

- Total ACDF = 2.41 E-08/vr 0 Nominal Case 0 Nominal severe weather LOOP frequency 0 Nominal probability of rainfal rate

- Total ACDF = 1 .73E-07/vr 0 Upper Bound Case 0 95th percentile for severe weather LOOP frequency 0 95th percentile for probability of rainfall rate

< Total ACDF = 5.81 E-07/vr

Non - Coincident LOOP CDF Sensitivity Rainfall Rate Lower Bound Case

. Rainfall rate of 6.4 in/hr ffl Total ACDF = 7.96E-08/vr Nominal Case 0 Rainfall rate of 5.4 in/hr

. Total ACDF == 1.73E-07/vr Upper Bound Case 8 Rainfall rate of 4.4 in/hr Total ACDF = 4.72E-07/vr

PRA Specific Conservatisms

. Coincident Case

. Diesels showed successful operation during 40 GPH trickle test

. Analysis assumes run failure ofdiesels increased by a factor of 10 above 8 in/hr rainfall

. Analysis utilizes 8 in/hr rainfall although 40 GPH is closer to 11 in/hr

. Assumed that a LOOP at Waterford occurs coincident with the highest rainfall event of the year

. Non-Coincident Case

. Diesel showed successfu operation during 7 gallon slug test

. Analysis failed both diesels for rainfall rates above 5.4 in/hr

- No credit assumed in PRAfor restart ofdiesels

Ente^y CONCLUSION Marvin Chase Director, Regu atory and Performance mprovement Waterford 3

Sum nary Completed Extensive Water Tolerance Testing of Diesel Generator

° Trickle Tests B S ug Tests In ALL Cases Diesel Demonstrated Continued Capability to Perform its Safety Function

Summary

. Established Station Rainfall Rate 0 Determined Roof Ponding Depths

. Determined Water Intrusion Rates via Day Tank Vent Determined LOOP Coincident with Rainfall Frequency from NRC Data

" PRA Results Organizational Learnings

Conclusion

. The station conclusion is that the PRA results support a determination that the failure to identify and correct through-wa I corrosion on the A and B EDG Fuel Oil Day Tank Vent lines is of a very low safety significance

Entergy CLOSING COMMEN S Michael Chisum Site Vice President Waterford 3

Letter to Michael R. Chisum from Thomas R. Farnholtz, dated April 9,2015

SUBJECT:

PUBLIC MEETING

SUMMARY

- REGULATORY CONFERENCE WITH ENTERGY OPERATIONS, INC. FOR WATERFORD STEAM ELECTRIC STATION, UNET 3 DISTRIBUTiON:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Frances.Ramirez@nrc.gov)

Resident Inspector (Chris.Speer@nrc.gov)

WAT Administrative Assistant (Linda.Dufrene@nrc.gov)

Branch Chief, DRP/D (Michael.Hay@nrc.gov)

Senior Project Engineer, DRP/E (Bob.Hagar@nrc.gov)

Project Engineer, DRP/D (Brian.Parks@nrc.gov)

Project Engineer, DRP/D (Jan.Tice@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Michael.0renak@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

RiV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)

ROPreports