{{#Wiki_filter:Attachment 1 to NLS-85-327 CAROLINA POWER&LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 6 PART 7 PROCEDURE TYPE: INSERVICE INSPECTION PROGRAM (ISI)NUMBER: 'SI"201 PROCEDURE TITLE: ASME PRESERVICE INSPECTION PROGRAM PLAN (EXCEPT REACTOR VESSEL)REVISION 2 APPROVED: Signature g-Zo-85 Date TITLE: lV)C~~~+SUT P'di~~1\aSOmeoOm SSoma.PDR, ADOCK 05000400 9,.'.;.PDR I Page 1 oE 78  
{{#Wiki_filter:Attachment 1 to NLS-85-327 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 6 PART 7 PROCEDURE TYPE:     INSERVICE INSPECTION PROGRAM (ISI)
, 0 I t List of Effective Pa es~Pa e 1-78 Revision 2 ISI-201 Rev.2 Page 2 of 78 Table of Contents Page 1.0 Introduction
NUMBER:             'SI"201 PROCEDURE TITLE:     ASME PRESERVICE INSPECTION PROGRAM PLAN (EXCEPT REACTOR VESSEL)
REVISION 2 APPROVED:                                             g -Zo -85 Signature                    Date TITLE:       lV) C   ~       ~~+           SUT P'di~~
1 9,.'.;
  \
aSOmeoOm SSoma         .
PDR, ADOCK 05000400
                        .PDR I
Page 1 oE 78


==2.0 Requirements==
I t 0
for Preservice Inspection


==3.0 Exemptions==
List of Effective Pa es
      ~Pa e                            Revision 1-78                                  2 ISI-201 Rev. 2                              Page 2 of 78


===4.0 Exceptions===
Table of Contents Page 1.0  Introduction                                    4 2.0  Requirements  for Preservice Inspection        5 3.0 Exemptions                                      5 4.0  Exceptions                                     7 5.0 QuaLity Assurance                               8 6.0 Examination Procedures                         8 7.0  Ultrasonic Testing                              9 8.0  EvaLuation Criteria                            11 9.0  Records and Reports                            12 10.0  Personnel Qualification                        12 11.0  Pre-examination Requirements                  12 12.0  Program Plan Notes                            13 Table 1                                              14 Figure 1                                            15 Appendix A                                          16 Appendix  B                                        47 Appendix C                                          63 Appendix D                                          71 Appendix  E                                          77 ISI-201 Rev. 2                              Page 3  of 78
5.0 QuaLity Assurance 6.0 Examination Procedures


==7.0 Ultrasonic==
==1.0   INTRODUCTION==
Testing 8.0 EvaLuation Criteria 9.0 Records and Reports 10.0 Personnel Qualification 11.0 Pre-examination Requirements 12.0 Program Plan Notes Table 1 Figure 1 Appendix A Appendix B Appendix C Appendix D Appendix E 4 5 5 7 8 8 9 11 12 12 12 13 14 15 16 47 63 71 77 ISI-201 Rev.2 Page 3 of 78


==1.0 INTRODUCTION==
This Program PLan has been prepared to fulfiLL the remaining Preservice Inspection (PSI) requirements for Shearon Harris NucLear Power Plant. The reactor pressure vessel preservice program pLan was previously submitted on March 14, 1983. This Program Plan has been written to meet the requirements specified by the Code of Federal ReguLations 10 CFR 50.55a.        The Program Plan has been expanded to include augmented inservice inspection requirements which comply with the following'.
A. U.S. Nuclear Regulatory Commission Standards Review Plan, Section 3.6.1 "Plant Design for Protection Against Postulated Piping Failures in Fluid Systems Outside Containment" (NUREG 75/087 Updated to NUREG-0800, 1981).
B. U.S. Nuclear Regulatory Commission Standard Review PLan, Section 6.6 "Inservice Inspection of Class 2 & 3 Components" (NUREG-0800, 1981) .
C. U.S. Nuclear Regulatory Commission Regulatory Guide 1.14 "Reactor Coolant Pump Fl'ywheeL Integrity."
D. Request  for additional information  from  NRC  to  CP&L by  Letter dated October 11, 1983.
In addition to the above, the Program PLan also incorporates the SHNPP FSAR commitments on Preservice/Inservice    Inspection.
The scope  of examinations, procedures and acceptance criteria meet the requirements outlined in Section XI of the ASNE Boiler and Pressure VesseL Code, "Rules for lnservice Inspection of NucLear Power PLant Components," 1980 Edition, with addenda through Minter 1981. Accordingly, aLL class 1, 2, and 3 pressure retaining components and their supports as defined by 10 CFR 50 and NRC Regulatory Guide 1.26, will be examined to comply with ASiME Code Section XI requirements to the extent practicable within the limitations of the component, or system portion, design and geometry.
ALL  Class 1, 2, and  3 water, steam,  air and  other  fluid  systems within the scope of  ASME Section XI  are listed in  Table 3.2.2-1 of the FSAR.
Several piping systems  will receive augmented inspections for protection against postulated piping failures as outlined in Section 3.6.1 and 6.6 of the Standard Review Plan. The extent of examinations to those piping systems is defined by Shearon Harris Nuclear Power Plant FSAR Section 6.6.8. Augmented examinations will also be performed on the flywheel of the Reactor Coolant pumps in accordance with Regulatory Guide 1.14.      Augmented components and examinations are Listed in Appendix D.
ISI-201 Rev. 2                                            Page 4  of 78


This Program PLan has been prepared to fulfiLL the remaining Preservice Inspection (PSI)requirements for Shearon Harris NucLear Power Plant.The reactor pressure vessel preservice program pLan was previously submitted on March 14, 1983.This Program Plan has been written to meet the requirements specified by the Code of Federal ReguLations 10 CFR 50.55a.The Program Plan has been expanded to include augmented inservice inspection requirements which comply with the following'.
2.0   RE VIREMENT FOR   PRESERVICE INSPECTION The Preservice Inspection requirements stipulated by 10 CFR 50.55a(g)(3) estabLish the applicabLe Edition of Section XI of the ASME Code for the components of a facility whose construction permit was issued after July 1, 1974.
A.U.S.Nuclear Regulatory Commission Standards Review Plan, Section 3.6.1"Plant Design for Protection Against Postulated Piping Failures in Fluid Systems Outside Containment" (NUREG 75/087 Updated to NUREG-0800, 1981).B.U.S.Nuclear Regulatory Commission Standard Review PLan, Section 6.6"Inservice Inspection of Class 2&3 Components" (NUREG-0800, 1981).C.U.S.Nuclear Regulatory Commission Regulatory Guide 1.14"Reactor Coolant Pump Fl'ywheeL Integrity." D.Request for additional information from NRC to CP&L by Letter dated October 11, 1983.In addition to the above, the Program PLan also incorporates the SHNPP FSAR commitments on Preservice/Inservice Inspection.
The safety classification system for radioactive water/steam-containing components important to the safety of water-cooled nuclear power plants is discussed in FSAR Section 3.2.
The scope of examinations, procedures and acceptance criteria meet the requirements outlined in Section XI of the ASNE Boiler and Pressure VesseL Code,"Rules for lnservice Inspection of NucLear Power PLant Components," 1980 Edition, with addenda through Minter 1981.Accordingly, aLL class 1, 2, and 3 pressure retaining components and their supports as defined by 10 CFR 50 and NRC Regulatory Guide 1.26, will be examined to comply with ASiME Code Section XI requirements to the extent practicable within the limitations of the component, or system portion, design and geometry.ALL Class 1, 2, and 3 water, steam, air and other fluid systems within the scope of ASME Section XI are listed in Table 3.2.2-1 of the FSAR.Several piping systems will receive augmented inspections for protection against postulated piping failures as outlined in Section 3.6.1 and 6.6 of the Standard Review Plan.The extent ofexaminations to those piping systems is defined by Shearon Harris Nuclear Power Plant FSAR Section 6.6.8.Augmented examinations will also be performed on the flywheel of the Reactor Coolant pumps in accordance with Regulatory Guide 1.14.Augmented components and examinations are Listed in Appendix D.ISI-201 Rev.2 Page 4 of 78 2.0 RE VIREMENT FOR PRESERVICE INSPECTION The Preservice Inspection requirements stipulated by 10 CFR 50.55a(g)(3) estabLish the applicabLe Edition of Section XI of the ASME Code for the components of a facility whose construction permit was issued after July 1, 1974.The safety classification system for radioactive water/steam-containing components important to the safety of water-cooled nuclear power plants is discussed in FSAR Section 3.2.2.2 Definition of Owner Intent In accordance with the requirements set forth by 10 CFR 50.55a, the Shearon Harris PLant must comply with the requirements of the 1974 Edition of Section XI, with addenda through Summer 1975 as modified by Appendix III of Winter 1975 Addenda.However, in order to comply with a more recent code and addenda, Carolina Power&Light has elected to comply with the 1980 Edition of Section XI, with addenda through Winter 1981 and Code Case N-335.The extent of examination seLection of Class 1 and Class 2 piping has been determined by the requirements of the 1974 Edition of Section XI with Addenda through Summer 1975 as allowed by 10 CFR 50.55a (b)(2).In addition, this Program Plan includes Augmented Inspections from NUREG 75/087,"Plant Design f'o r Protection Against Postulated Piping Failures in Fluid Systems Outside Containment" and Regulatory Guide 1.14,"Reactor Coolant Pump Flywheel Integrity." Additional inspections will be performed on certain systems'equired to satisfy NRC questions submitted during the FSAR review.3.0 EXEMPTIONS The following exemptions from examination requirements are applicable to CLass 1, 2, and 3 piping', components and their supports.In Appendices A and B of this Program Plan under Code categories B-J for Class 1 and C-F for CLass 2 piping welds, the specific L'ine number identified and the corresponding examination method required is applicable to all circumferential welds located on that portion of pipe.Realizing this is a conservative basis for.weld selection for Class 2 piping PSI, this approach will not only enhance system reliability but will consequentially establish superior baseline information for future Code examination
2.2   Definition of   Owner Intent In accordance with the requirements set forth by 10 CFR 50.55a, the Shearon Harris PLant must comply with the requirements of the 1974 Edition of Section XI, with addenda through Summer 1975 as modified by Appendix III of Winter 1975 Addenda. However, in order to comply with a more recent code and addenda, Carolina Power & Light has elected to comply with the 1980 Edition of Section XI, with addenda through Winter 1981 and Code Case N-335.
.requirements.
The extent of examination seLection of Class 1 and Class 2 piping has been determined by the requirements of the 1974 Edition of Section XI with Addenda through Summer 1975 as allowed by 10 CFR 50.55a   (b)(2).
ISI-201 Rev.2 Page 5 of 78  
In addition, this Program Plan includes Augmented Inspections from NUREG 75/087, "Plant Design f'o r Protection Against Postulated Piping Failures in Fluid Systems Outside Containment" and Regulatory Guide 1.14, "Reactor Coolant Pump Flywheel Integrity."
Additional inspections will be performed on certain to satisfy NRC questions submitted during the FSAR systems'equired review.
3.0   EXEMPTIONS The following exemptions from examination requirements are applicable to CLass 1, 2, and 3 piping', components and their supports.
In Appendices   A and B of this Program Plan under Code categories B-J for Class 1 and C-F for CLass 2 piping welds, the specific L'ine number identified and the corresponding examination method required is applicable to all circumferential welds located on that portion of pipe. Realizing this is a conservative basis for
. weld selection for Class 2 piping PSI, this approach will not only enhance system reliability but will consequentially establish superior baseline information for future Code examination
  . requirements.
ISI-201 Rev. 2                                                       Page 5 of 78


===3.1 Class===
3.1   Class   1 Components except. piping     will be exempted in accordance with IWB-1220 (1980 Edition thru and including Minter 1981 Addenda) from the volumetric and surface examination requirements of IWB-2500.
1 Components except.piping will be exempted in accordance with IWB-1220 (1980 Edition thru and including Minter 1981 Addenda)from the volumetric and surface examination requirements of IWB-2500.Category B-J components will be exempted in accordance with IWB-1229 (1974 Edition thru and including Summer 1975 Addenda)from the voLumetric and surface examination requirements of IWB-2500.In A Code Categories B-L-2 and B-M-2 a VT-3 examination is required.It is CP&L's position that this is an Inservice requirement and does not appLy to Preservice.
Category B-J components will be exempted in accordance with IWB-1229 (1974 Edition thru and including Summer 1975 Addenda) from the voLumetric and surface examination requirements of IWB-2500.
Class 1 nonexempt components and examination requirements are Listed in Appendix A.3.2 Class 2 Components except piping will be exempted in accordance with IWC-1220 (1980 Edition thru and including Winter 1981 Addenda)from the volumetric and surface examination requirements of IWC-2500.Category C-F components wilL be exempted in accordance with IMC" 1220 (1974 Edition thru and including Summer 1975 Addenda)from the volumetric and surface examination requirements of IWC-2500.The control of water chemistry to minimize stress corrosion described in Paragraph 1WC-1220(c) is not used as a basis for exempting components.
In A Code Categories B-L-2 and B-M-2 a VT-3 examination is required. It is CP&L's position that this is an Inservice requirement and does not appLy to Preservice.
The current PSI Program for CLass 2 piping system welds subject to examination encorporates a significant number of surface examinations because of design waLL thickness.
Class   1 nonexempt components   and examination requirements   are Listed in Appendix A.
LOCFR50.55a(b)(2)(iv) requires that ASHE Code Class 2 piping welds in the Residual Heat Removal (RHR)Systems, Emergency Core Cooling (ECCS)Systems,.pnd Containment Heat Removal (CHR)Systems be examined.These systems were exempted by Section XI exclusion criteria in IWC-1220.To satisfy regulatory inspection requirements CP&L implemented an augmented program (Appendix D, Note 5)of inspection to perform a volumetric and/or surface examination on a Large representative sample of welds in these systems.The same criteria of Paragraph 2 of Section 3.0 has also been appLied for weld selection where all of the circumferential welds on the Line listed are to be examined.The lines selected for augmentation are in areas that CP&L evaluated to be service sensitive.
3.2   Class 2 Components   except piping   will be exempted in accordance with IWC-1220 (1980   Edition thru and including Winter 1981 Addenda) from the volumetric and surface examination requirements of IWC-2500.
Category C-F components wilL be exempted in accordance with IMC" 1220 (1974 Edition thru and including Summer 1975 Addenda) from the volumetric and surface examination requirements of IWC-2500.
The control of water chemistry to minimize stress corrosion described in Paragraph 1WC-1220(c) is not used as a basis for exempting components.
The current PSI Program for CLass 2 piping system welds subject to examination encorporates a significant number of surface examinations because of design waLL thickness.
LOCFR50.55a(b)(2)(iv) requires that ASHE Code Class 2 piping welds in the Residual Heat Removal (RHR) Systems, Emergency Core Cooling (ECCS) Systems,.pnd Containment Heat Removal (CHR) Systems be examined. These systems were exempted by Section XI exclusion criteria in     IWC-1220. To satisfy regulatory inspection requirements     CP&L implemented an augmented program (Appendix D, Note 5)   of inspection to perform a volumetric and/or surface examination on a Large representative sample of welds in these systems. The same criteria of Paragraph 2 of Section 3.0 has also been appLied for weld selection where all of the circumferential welds on the Line listed are to be examined.       The lines selected for augmentation are in areas that CP&L evaluated to be service sensitive.
Mithin the scope of the PSI Program Plan there are no Code Category C-0 or C-G components subject to inspection requirements of Table IWC-2500-1.
Mithin the scope of the PSI Program Plan there are no Code Category C-0 or C-G components subject to inspection requirements of Table IWC-2500-1.
Class'nonexempt components and examination requirements are listed in Appendix B.ISI-201 Rev.2 Page 6 of 78  
Class'     nonexempt components   and examination requirements   are listed   in Appendix B.
ISI-201 Rev.     2                                         Page   6 of 78


===3.3 Class===
3.3   Class   3 Integral attachments of supports and restraints to components wiLL be exempted in accordance with IWD-1220 (1980 Edition thru and including Winter 1981 Addenda) from the visual examination VT-3, except that all Auxiliary Feedwater integral attachments on piping greater than 1" nominal pipe size will,receive a VT-3 visual examination.
3 Integral attachments of supports and restraints to components wiLL be exempted in accordance with IWD-1220 (1980 Edition thru and including Winter 1981 Addenda)from the visual examination VT-3, except that all Auxiliary Feedwater integral attachments on piping greater than 1" nominal pipe size will, receive a VT-3 visual examination.
Class 3 nonexempt components     and examination requirements   are listed in   Appendix C.
Class 3 nonexempt components and examination requirements are listed in Appendix C.3.4 Com onent Su orts Component supports selected for examinati'on will be the supports of those components greater than one inch in diameter that are required to be examined under IWB, IWC, and IWD.In addition, the examination requirements shall apply to the component support types identified in IWF-1210.Preservice inspection shall be performed by the required examinations listed in Table IWF-2500-1.
3.4   Com onent   Su orts Component   supports selected for examinati'on will be the supports of those components greater than one inch in diameter that are required to be examined under IWB, IWC, and IWD. In addition, the examination requirements shall apply to the component support types identified in     IWF-1210.
All required VT-3 examinations will commence upon completion of Final System Turnover on a system as described in the Harris Plant Start-up ,Manual.ALL snubbers vill receive a preservice inspection and functionaL test prior to the commencement of hot functionaL testing of completed systems.Manufacturers test data may be used to satisfy the Preservice testing requirements.
Preservice inspection shall be performed by the required examinations listed in Table IWF-2500-1. All required VT-3 examinations will commence upon completion of Final System Turnover on a system as described in the Harris Plant Start-up
3.5 Exem t Com onents All Class 1, 2 and 3 components exempted from Prqpervice examination requirements will have undergone the system hydrostatic test when the system has been completed as required by ASHE Section III.Preservice hydrostatic testing is not required by Section XI, IWA-5215.4.0 EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as aLLowed by 10 CFR 50.55 a(a)(2), provided that design fabrica'tion, installation, testing and inspection performed in compLiance with Codes and Section XI requirements would resuLt in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative.,examination will provide an acceptable level of quaLity and safety.Detailed descriptions and justifications for exceptions taken wilL be submitted when needed by a Request for Relief.Relief Requests when identified during PSI will be categorized as to type identifying where the code requirements cannot be met and a ISI-201 Rev.2 Page 7 of 78  
,Manual.
ALL snubbers   vill receive a preservice inspection and functionaL test prior to the     commencement   of hot functionaL testing of completed systems.       Manufacturers test data may be used to satisfy the Preservice testing requirements.
3.5   Exem t   Com onents All Class   1, 2 and 3 components exempted from Prqpervice examination requirements will have undergone the system hydrostatic test when the system has been completed as required by ASHE Section III. Preservice hydrostatic testing is not required by Section XI, IWA-5215.
4.0   EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as aLLowed by 10 CFR 50.55 a(a)(2), provided that design fabrica'tion, installation, testing and inspection performed in compLiance with Codes and Section XI requirements would resuLt in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative.,examination will provide an acceptable level of quaLity and safety.
Detailed descriptions and justifications for exceptions taken wilL be submitted when needed by a Request for Relief. Relief Requests when identified during PSI will be categorized as to type identifying where the code requirements cannot be met and a ISI-201 Rev. 2                                             Page   7 of 78


===4.0 EXCEPTIONS===
4.0   EXCEPTIONS (continued) supportin'g technical   justification wiLL be submitted""6 (six) months   prior to anticipated fueL Loading'here applicabLe. The specific components that faLL into CP&L's categories for Request for, Relief will be submitted at least 3 (three) months prior to anticipated fuel Loading.
(continued) supportin'g technical justification wiLL be submitted""6 (six)months prior to anticipated fueL Loading'here applicabLe.
5.0   QUALITY ASSURANCE The PSI Program PLan   will be performed, in accordance with the requirements of the CP&L Quality Assurance Manual 'which is in compliance with Appendix B of 10 CFR 50.
The specific components that faLL into CP&L's categories for Request for, Relief will be submitted at least 3 (three)months prior to anticipated fuel Loading.5.0 QUALITY ASSURANCE The PSI Program PLan will be performed, in accordance with the requirements of the CP&L Quality Assurance Manual'which is in compliance with Appendix B of 10 CFR 50.6.0 EXAMINATION PROCEDURES SubarticLe IWA-1400 of Section XI requires the development and preparation of written examination procedures necessary for the conduct of the nondestructive examinations associated with PSI operations.
6.0   EXAMINATION PROCEDURES SubarticLe IWA-1400 of Section XI requires the development and preparation of written examination procedures necessary for the conduct of the nondestructive examinations associated with PSI operations. The written procedures for the performance of visual, surface, and vol'umetric examinations are provided by the NDE Contractor and wiLL be reviewed an'd approved by CP&f. prior to use.
The written procedures for the performance of visual, surface, and vol'umetric examinations are provided by the NDE Contractor and wiLL be reviewed an'd approved by CP&f.prior to use.Methods, techniques, and procedures for the preservice inspections are titled visual, surface, and volumetric.
Methods, techniques, and procedures for the preservice inspections are titled visual, surface, and volumetric. Each term describes a, generaL method permitting a selection of different techniques and procedures restricted to that method to accommodate varying degrees of accessibility and radiation Levels.
Each term describes a, generaL method permitting a selection of different techniques and procedures restricted to that method to accommodate varying degrees of accessibility and radiation Levels.A visual examination is employed to provide a report of the general condition of the part, component, or surface to be examined, incLuding such conditions as scratches, wear, cracks, corrosion or erosion on the surfaces;misalignment or movement of the part of component; or evidence of leaking.Visual examina-tions are applicable to welds, support members, v'alves, pumps, fasteners, cladding, etc.Visual examination procedure is based on the requirements of IMA-2210 of Section XI of the ASME Code.I A Liquid penetrant examination is specified as the surface examination method to delineate or verify the presence of cracks or discontinuities open to the examination surface.Liquid penetrant examination procedure is in compliance with the requirements of Article 6 of Section V of the ASME Code, as required, by Section XI IMA-2222.As a substitute to liquid penetrant, SHNPP can utilize'a magnetic particle examination to satisfy surface examination requirements.
A visual examination is employed to provide a report of the general condition of the part, component, or surface to be examined, incLuding such conditions as scratches, wear, cracks, corrosion or erosion on the surfaces; misalignment or movement of the part of component; or evidence of leaking. Visual examina-tions are applicable to welds, support members, v'alves, pumps, fasteners, cladding, etc. Visual examination procedure is based on the requirements of IMA-2210 of Section XI of the ASME Code.
The ultrasonic pulse echo examination is selected as the volumetric examination method to indicate the presence of subsurface discontinuities by examining the entire volume of metaL contained beneath the surface to be examined.Ultrasonic examination is in compliance with Appendix III of Section XI (or Articles 4 and 5 of.Section V, as applicable) of the ASME Code, as required by Section XI IWA-2232 and including Code.Case N-335 as amended in Section 7.0.Radiography may be used as a substitute for ultrasonic examination when access to,welds is restricted.
I A Liquid penetrant examination is specified as the surface examination method to delineate or verify the presence of cracks or discontinuities open to the examination surface. Liquid penetrant examination procedure is in compliance with the requirements of Article 6 of Section V of the ASME Code, as required, by Section XI IMA-2222. As a substitute to liquid penetrant, SHNPP can utilize'a magnetic particle examination to satisfy surface examination requirements.
ISI-201 Rev.-2'Page 8 of 78  
The ultrasonic pulse echo examination is selected as the volumetric examination method to indicate the presence of subsurface discontinuities by examining the entire volume of metaL contained beneath the surface to be examined. Ultrasonic examination is in compliance with Appendix III of Section XI (or Articles 4 and 5 of. Section V, as applicable) of the ASME Code, as required by Section XI IWA-2232 and including Code .Case N-335 as
              -2'Page amended in Section 7.0. Radiography may be used as a substitute for ultrasonic examination when access to,welds is restricted.
ISI-201 Rev.                                                     8 of 78


==7.0 ULTRASONIC==
7.0 ULTRASONIC TESTING The calibration standard design drawing is part of the PSI Program Plan and shown in Figure 1.       Table 1'ists all UT Calibration Standards required to perform the UT examinations.         All calibration standards are retained on site.
TESTING The calibration standard design drawing is part of the PSI Program Plan and shown in Figure 1.Table 1'ists all UT Calibration Standards required to perform the UT examinations.
The UT   examination calibration standard design and material selection are in accordance with Subarticle III-3400 of Appendix III to Section XI 1980 Edition including Winter 81 addenda. In addition to the required notches, drilled holes have been installed as additional reflectors in accordance with the provisions of Article 5 of Section V of the Code. These additional reflectors are allowed by Subarticle III-3400 of Appendix   III of Section XI.
All calibration standards are retained on site.The UT examination calibration standard design and material selection are in accordance with Subarticle III-3400 of Appendix III to Section XI 1980 Edition including Winter 81 addenda.In addition to the required notches, drilled holes have been installed as additional reflectors in accordance with the provisions of Article 5 of Section V of the Code.These additional reflectors are allowed by Subarticle III-3400 of Appendix III of Section XI.A.In addition to this requirement it is CP&L's intent to perform ultrasonic examinations on austenitic stainless steel piping utilizing ASHE Boiler and Pressure Vessel Code Case N-335 with the following input: L.Personnel and procedures used to perform the examinations shall be qualified in accordance with a program described in Appendix E.The J.A.Jones EPRI NDE Center IGSCC Training/Qualification Program may be used in Lieu of or integral to this program.2.Level I examiners will not be used to monitor the ultrasonic instrument during examinations.
A. In addition to this requirement     it is CP&L's intent to perform ultrasonic examinations on austenitic stainless steel piping utilizing ASHE Boiler and Pressure Vessel Code Case N-335 with the following input:
3.The typical calibration block design to be utilized is shown in Figure 1.CP&L reserves the right to change segments of piping used dependent upon pipe size, (e.g., small diameter piping (4 in may be 360 degree sections).
L. Personnel and procedures used to perform the examinations shall be qualified in accordance with a program described in Appendix E. The J. A. Jones EPRI NDE Center IGSCC Training/Qualification Program may be used in Lieu of or integral to this program.
Calibration reflectors shalL be instalLed as follows: a.For calibration blocks with pipe waLL nominal thicknesses of one (1)inch and greater Paragraph A.4 below applies.b.'or calibration blocks with pipe waLL nominal thickness Less than one (1)inch to and including 0.5 inch a single side drilLed hole (SDH)will be installed at 1/2t.Notches wiLL be staggered at the I.D.and O.D.Locations.
: 2. Level I examiners will not be used   to monitor the ultrasonic instrument during examinations.
c~For calibration blocks with pipe wall nominaL thickness less than 0.5 inch no SDH wilL be installed.
: 3. The typical calibration block design to be utilized is shown in Figure 1. CP&L reserves the right to change segments of piping used dependent upon pipe size, (e.g.,
I.D.and O.D.notches will be staggered to prevent interference during calibration.
small diameter piping ( 4 in may be 360 degree sections). Calibration reflectors shalL be instalLed as follows:
ISI-201 Rev.2 Page 9 of 78 J
: a. For calibration blocks with pipe   waLL nominal thicknesses   of one (1) inch and greater Paragraph A.4 below applies.
: b. 'or   calibration blocks with pipe thickness Less than one (1) inch waLL nominal to and including 0.5 inch a single side drilLed hole (SDH) will be installed at 1/2t. Notches wiLL be staggered at the I.D. and O.D. Locations.
c ~   For calibration blocks with pipe wall nominaL thickness less than 0.5 inch no SDH wilL be installed. I.D. and O.D. notches   will be staggered to prevent interference during calibration.
ISI-201 Rev. 2                                             Page 9 of 78


==7.0 ULTRASONIC==
J 7.0 ULTRASONIC TESTING     (continued)
TESTING (continued) 4.'or angle beam calibration Subparagraph 3.2.2(d), of Code Case N-335 is revised to read as follows: a~"Where the caLibration is Limited to the haLf V path due to material attenuation or examination technique selection, side drilled holes shaLL be used to obtain the slope and shape of the DAC curve.A minimum of two holes, each of the same diameter and Located at 1/4t and 3/4t, shaLL be placed in the calibration bLock.The diameter of the holes shalL be in accordance with Fig.T-546.1 of Article 5 oE Section V.The holes shaLL be perpendicular to the examination beam direction.
: 4. 'or   angle beam calibration Subparagraph   3.2.2(d), of Code Case   N-335 is revised to read   as follows:
The minimum hoLe Length shaLL be L<inches.Calibration shall be accomplished by constructing a DAC curve from the side drilled holes so that the maximum amplitude point is at 80%FSH.Once the shape and slope are determined and marked on the screen, the curve shall be extrapolated 1/4t to cover the full examination thickness'ext, establish the sensitivity Erom the inside diameter (I.D.)surface notches by setting the indication amplitude at the Level of the DAC curve." 5.Recording requirements of Subparagraph 4.5.1, Code Case N-335 will be amended to read: a 0 The following indications shall be recorded and investigated by a Level II or LeveL III examiner to the extent necessary to determine the shape, type, and Location of the reflector.
a ~   "Where the caLibration is Limited to the haLf V path due to material attenuation or examination technique selection, side drilled holes shaLL be used to obtain the slope and shape of the DAC curve. A minimum of two holes, each of the same diameter and Located at 1/4t and 3/4t, shaLL be placed in the calibration bLock. The diameter of the holes shalL be in accordance with Fig. T-546.1 of Article 5 oE Section V. The holes shaLL be perpendicular to the examination beam direction.
1)An indication of a suspected flaw originating in the HAZ or adjacent base metal regardless of ampLitude.
The minimum hoLe Length shaLL be L< inches.
2)Any indication 20%of DAC or greater other than those from geometric or metallurgical origin.b.Indications 50%of DAC or greater from geometric or metallurgical origin shall be recorded.Criteria to record geometric and metaLLurgicaL ultrasonic indications is described as amended above.These indications will not be reported, they will be recorded for the record and for future correlation to similar indications during Inservice Inspection.
Calibration shall be accomplished by constructing a DAC curve from the side drilled holes so that the maximum amplitude point is at 80% FSH. Once the shape and slope are determined and marked on the screen, the curve shall be extrapolated 1/4t to cover the full examination thickness'ext, establish the sensitivity Erom the inside diameter (I.D.) surface notches by setting the indication amplitude at the Level of the DAC curve."
Ambiguous responses from geometry will be evaluated and characterized on a case basis using multiple ultrasonic techniques and correlation to radiographic results.ISI-201 Rev.2 Page 10 of 78  
: 5. Recording requirements     of Subparagraph   4.5.1, Code Case N-335   will be   amended to read:
a 0   The following indications shall be recorded and investigated by a Level II or LeveL III examiner to the extent necessary to determine the shape, type, and Location of the reflector.
: 1)   An indication of a suspected flaw originating in the HAZ or adjacent base metal regardless of ampLitude.
: 2)   Any indication 20% of DAC or greater other than those from geometric or metallurgical origin.
: b. Indications 50% of DAC or greater from geometric or metallurgical origin shall be recorded.
Criteria to record geometric       and metaLLurgicaL ultrasonic indications is     described as amended above.
These indications will not be reported, they will be recorded for the record and for future correlation to similar indications during Inservice Inspection.
Ambiguous responses from geometry will be evaluated and characterized on a case basis using multiple ultrasonic techniques and correlation to radiographic results.
ISI-201 Rev. 2                                               Page 10 of 78


==7.0 ULTRASONIC==
7.0   ULTRASONIC TESTING         '(continued)
TESTING'(continued) 6.'ince Supplement 7 of Code Case N-335'ill be applied to SHNPP austenitic piping weLds, concerns regarding Supplement 7 in Appendix III of Section XI do not apply.This position is taken as a result of the major , improvements preferred in N-335.B.The investigation, evaluation, or corrective measures taken as a result of indications recorded during piping ultrasonic examinations shalL be based up A.5.above.It.is CP&L's belief that in amending N-335, Paragraph 4.5.1 with more stringent requirement in A.5 above will ensure adequate evaluation and, if necessary, corrective action for disposition of any indication investigated and found to be other than geometric or metallurgical in nature.C.NOTE: Cast austenitic stainless steel fittings, nozzles, and other piping components will be ultrasonically examined using state-, of-the-art techniques, eg.duaL search units, etc.Technique Limitations due to material attenuation, noise, and access wiLL be documented in the record.Capabilities to examine cast austenitic stainLess steel ultrasonically is a function of the thickness involved.Cast main Loop piping, cast-to-cast fitting welds or assembLies are recognized uninspectable.
: 6.     'ince       Supplement 7 of Code Case N-335'ill be applied to SHNPP austenitic piping weLds, concerns regarding Supplement 7 in Appendix III of Section XI do not apply. This position is taken as a result of the major
Thinner wall cast piping, fittings or assemblies as in the pressurizer surge Line are inspectable in most cases using conventional UT techniques.
          ,   improvements preferred in N-335.
Cast to wrought stainless steel welds wiLL be examined from the.~rought side, the cast side wiLL be examined if it is determined that the results are meaningfuL.
B. The investigation, evaluation, or corrective measures taken as a result of indications recorded during piping ultrasonic examinations shalL be based up A.5. above.             It. is CP&L's belief that in         amending   N-335, Paragraph 4.5.1   with more stringent requirement in A.5           above will ensure   adequate evaluation and, if necessary, corrective action for disposition of any indication investigated and found to               be other than geometric or metallurgical in nature.
The examination record will reflect all scanning Limitations.
C. Cast     austenitic stainless steel fittings, nozzles, and other piping components will be ultrasonically examined using state-, of-the-art techniques, eg. duaL search units, etc.
On November 2, 1984, a technical meeting was hgld with CP&L in the NRC Region LI Office for the purpose of providing an opportunity to demonstrate the capabilities of CP&L's ultrasonic examination procedure and equipment to detect actual flaws and artificial reflectors in Region II's Centrifugally Cast Stainless Steel test specimens'P&L's.ultrasonic procedure IST-501, and equipment demonstrated conservative detection capability.
Technique Limitations due to material attenuation, noise, and access wiLL be documented in the record. Capabilities to examine cast austenitic stainLess steel ultrasonically is a function of the thickness involved. Cast main Loop piping, cast-to-cast fitting welds or assembLies are recognized uninspectable. Thinner wall cast piping, fittings or assemblies         as in the pressurizer surge Line are inspectable in most cases using conventional UT techniques. Cast to wrought stainless steel welds wiLL be examined from the.
The report in totaL is contained in NRC Report No.50-400/84-40.
      ~rought side, the cast side wiLL be examined if it is determined that the results are meaningfuL. The examination record will reflect all scanning Limitations.
NOTE:          On November 2, 1984, a       technical meeting was hgld with CP&L in the NRC Region       LI Office for the purpose of providing an opportunity to demonstrate the capabilities of CP&L's ultrasonic examination procedure and equipment to detect actual flaws and artificial reflectors in Region II's Centrifugally Cast Stainless Steel test specimens'P&L's.ultrasonic           procedure IST-501, and equipment demonstrated       conservative detection capability. The report in totaL is contained in             NRC Report No. 50-400/84-40.
8.0  EVALUATION CRITERIA Evaluation      of.,  any indications detected during PSI shall be made in accordance with IWA-3000 of Section XI. Indications detected may be evaluated by other nondestructive methods, where practical, to assist in the determination of size, shape, location, and orientation before final disposition is            made.
ISI-201 Rev.        2                                                Page  11  of 78


==8.0 EVALUATION==
9.0   RECORDS    AND REPORTS A  system  of records of the Preservice Inspection, plans, schedules, and calibration standards; the examination results and reports, the corrective action required and taken, will be developed and maintained at the site in accordance with IWA-6000 of Section XI.
CRITERIA Evaluation of., any indications detected during PSI shall be made in accordance with IWA-3000 of Section XI.Indications detected may be evaluated by other nondestructive methods, where practical, to assist in the determination of size, shape, location, and orientation before final disposition is made.ISI-201 Rev.2 Page 11 of 78  
10.0  PERSONNEL. QUALIFICATION PersonneL    performing nondestructive examination operations shall be qualified with procedures prepared in accordance with SNT-TC-1A, 1980 Edition, for the applicable examination technique and methods as required by IWA-2300 of Section XI. All examinations shalL be performed and the results evaluated by qualified nondestructive examination personnel.
For those nondestructive         examination methods not covered by SHT-TC-1A documents,       qualification will be based on the particular method involved.        Such qualification provides for uniform programs of training,      evaluation,    and certification of personnel. For personnel performing ultrasonic inspections the additionaL requirements of Section 7.0 will be required.
11.0 PRE-EXAMINATION RE UIREMENTS General provisions for accessibility have been defined by IWA-1500 of Section XI of the ASME Code.
: l. To  the maximum extent possible, systems and components that require inspection in accordance with the requirements of ASME Section XI will be designed with adequate        physical access to allow the required inspection.
Requests    for relief, from ASME Code Requirements, wiLL be submitted when plant design does not allow the necessary access  for inspections.
: 2. It  is intended that piping systems requiring ultrasonic inspection will. be designed so that aLL welds requiring inspection are physicaLLy accessible for inspection with ultrasonic equipment.
A. Access  wilL be provided by Leaving adequate space around pipes  at  these welds and by means of'emovable insuLation and shielding as required.
B. Pipes welded to    fittings will be designed to permit
            =meaningfuL    examination  by avoidance of irregular surface geometries.
C. The  surface of welds will be smoothed and contoured to permit effective use of ultrasonic transducers or surface examination indicators.
ISI-201 Rev.     2                                             Page 12 of 78


===9.0 RECORDS===
11.0 PRE-EXAMINATION RE UIREMENTS (continued)
AND REPORTS A system of records of the Preservice Inspection, plans, schedules, and calibration standards; the examination results and reports, the corrective action required and taken, will be developed and maintained at the site in accordance with IWA-6000 of Section XI.10.0 PERSONNEL.
D. Piping systems requiring surface or visual examination will be .designed to aLlow access and visibility adequate for performance of such examination.
QUALIFICATION PersonneL performing nondestructive examination operations shall be qualified with procedures prepared in accordance with SNT-TC-1A, 1980 Edition, for the applicable examination technique and methods as required by IWA-2300 of Section XI.All examinations shalL be performed and the results evaluated by qualified nondestructive examination personnel.
12.0 PROGRAM PLAN NOTES NOTE 1. Augmented Program FSAR Section   6.6.8.b NOTE 2. Augmented Program FSAR Section   6.6.8.c NOTE 3. Augmented Program FSAR Section   6.6.8.d NOTE 4. Augmented Program FSAR Section   6.6.8.e NOTE 5. Augmented Program Review   of the FSAR and request for additional information regarding Preservice (PSI)/Inservice (ISI) Program, Section 250.1 paragraph   2 NOTE 6. ISI Requirement Only (Not Required for PSI)
For those nondestructive examination methods not covered by SHT-TC-1A documents, qualification will be based on the particular method involved.Such qualification provides for uniform programs of training, evaluation, and certification of personnel.
NOTE 7. No circumferential weld on this Line.
For personnel performing ultrasonic inspections the additionaL requirements of Section 7.0 will be required.11.0 PRE-EXAMINATION RE UIREMENTS To the maximum extent possible, systems and components that require inspection in accordance with the requirements of ASME Section XI will be designed with adequate physical access to allow the required inspection.
ISI-201 Rev. 2                                           Page 13 of 78
General provisions for accessibility have been defined by IWA-1500 of Section XI of the ASME Code.l.Requests for relief, from ASME Code Requirements, wiLL be submitted when plant design does not allow the necessary access for inspections.
 
2.It is intended that piping systems requiring ultrasonic inspection will.be designed so that aLL welds requiring inspection are physicaLLy accessible for inspection with ultrasonic equipment.
TABLE 1 CALIBRATION BLOCKS Piping Calibration                         Piping Cal.
A.Access wilL be provided by Leaving adequate space around pipes at these welds and by means of'emovable insuLation and shielding as required.B.Pipes welded to fittings will be designed to permit=meaningfuL examination by avoidance of irregular surface geometries.
Blocks                      Haterial        Block Number 3 lit   2.5'W             SA351 CR.CF8A      UT-6 31"      2.5" HW           A508 CL2            UT-7 II 29      2.33 HW           SA376 TP304N        UT-8 2t~t I sch 80 (XS)     A106 GR.B          UT-10 II 3      sch 40S (STD)   A312-304            UT-11 3ll    sch 80 (XS)     A106 CR.B          UT-l,2 3ll    sch 160           A106 GR.B          UT-13 3ll    sch 160           A376-304            UT-14 4 II  sch 40 (STD)     A106 GR.B          UT-15 4ll    sch 80 (XS)     A106 GR.B          UT-16 4ll    sch 160           A376-304            UT-17 I                                          UT-18 6      sch 80 (XS)     A106 GR.B 6lt    sch 120           A106 GR.B          UT-19 I
C.The surface of welds will be smoothed and contoured to permit effective use of ultrasonic transducers or surface examination indicators.
6      sch 160           A376-304            UT-20 8lt    sch 40S (STD)   A312-304            UT-21 8ll    sch 80 (XS)     A106 GR.B          UT-22 1 0ll    sch 140 (XXS)   A376-316            UT-23 1Z"      sch 40S (STD)   A312-304            UT-24 12ll    sch 60           A106 GR.B           UT-25 II 1Z      sch  140          A376-304           UT-26 II 14      sch  40            A358-304           UT-27 14ll    sch  160          A376-316           UT-28
ISI-201 Rev.2 Page 12 of 78 11.0 PRE-EXAMINATION RE UIREMENTS (continued)
        .668" HW          A106 GR.B         UT-29 16"      1.006" HW          A106 GR.B         UT-30 32lt    1.051" MW          A106 GR.C.         UT-31 34ll    2.0"  HW          A106 GR.C.         UT-32 Deleted and replace d by UT41 44" 1.447" HW               A106 GR.C.          UT-33 50" 3.Z79 HW               A155 KC 70          UT-34 50" 1..700 HW               A155 KC 70          UT-35 UT-36 Deleted 14" sch 160                 SA106-304          UT-37 UT     evaluation blocks   A516 Gr. 65        UT-38 UT     evaluation blocks   SA240-304          UT-39 6" sch 160                 SA376-316          UT-40 30" sch NA                 A106 Gr. B          UT-41 10" sch 140                 SA376-304           UT-42 Vessel Cal.ibration
D.Piping systems requiring surface or visual examination will be.designed to aLlow access and visibility adequate for performance of such examination.
* Blocks Pressurizer Shel.l         SA533  CRA, CL2    UT-50 S/G Channel Head (PRI)     SA533  CRBt CL1    UT-51 S/G Secondary Shell         SA533 CRA, CL2   UT-52 Regenerative      HT EX    SA351  CF8      UT-53 RHR HT EX                  SA515  70        UT-54 BIT Shell                  SA351  CF8A        UT-55 BIT Head                    SA240  Type 304    UT-56 ISI-201 Rev.       2                                         Page 14 of 78
12.0 PROGRAM PLAN NOTES NOTE 1.Augmented Program FSAR Section 6.6.8.b NOTE 2.Augmented Program FSAR Section 6.6.8.c NOTE 3.Augmented Program FSAR Section 6.6.8.d NOTE 4.Augmented Program FSAR Section 6.6.8.e NOTE 5.Augmented Program-Review of the FSAR and request for additional information regarding Preservice (PSI)/Inservice (ISI)Program, Section 250.1 paragraph 2 NOTE 6.ISI Requirement Only (Not Required for PSI)NOTE 7.No circumferential weld on this Line.ISI-201 Rev.2 Page 13 of 78 TABLE 1 CALIBRATION BLOCKS Piping Calibration Blocks Haterial Piping Cal.Block Number 3 lit 31" 2 9 I I 2t~t I 3 I I 3ll 3ll 3ll 4 I I 4ll 4ll 6 I 6lt 6 I 8lt 8ll 1 0ll 1Z" 12ll 1 Z I I 1 4 I I 14ll 16" 32lt 34ll 2.5'W 2.5" HW 2.33 HW sch 80 (XS)sch 40S (STD)sch 80 (XS)sch 160 sch 160 sch 40 (STD)sch 80 (XS)sch 160 sch 80 (XS)sch 120 sch 160 sch 40S (STD)sch 80 (XS)sch 140 (XXS)sch 40S (STD)sch 60 sch 140 sch 40 sch 160.668" HW 1.006" HW 1.051" MW 2.0" HW SA351 CR.CF8A A508 CL2 SA376 TP304N A106 GR.B A312-304 A106 CR.B A106 GR.B A376-304 A106 GR.B A106 GR.B A376-304 A106 GR.B A106 GR.B A376-304 A312-304 A106 GR.B A376-316 A312-304 A106 GR.B A376-304 A358-304 A376-316 A106 GR.B A106 GR.B A106 GR.C.A106 GR.C.UT-6 UT-7 UT-8 UT-10 UT-11 UT-l,2 UT-13 UT-14 UT-15 UT-16 UT-17 UT-18 UT-19 UT-20 UT-21 UT-22 UT-23 UT-24 UT-25 UT-26 UT-27 UT-28 UT-29 UT-30 UT-31 UT-32 Deleted replace and d by UT41 44" 1.447" HW 50" 3.Z79 HW 50" 1..700 HW 14" sch 160 UT evaluation blocks UT evaluation blocks 6" sch 160 30" sch NA 10" sch 140 A106 GR.C.A155 KC 70 A155 KC 70 SA106-304 A516 Gr.65 SA240-304 SA376-316 A106 Gr.B SA376-304 UT-33 UT-34 UT-35 UT-36 UT-37 UT-38 UT-39 UT-40 UT-41 UT-42 Deleted Vessel Cal.ibration
 
*Blocks Pressurizer Shel.l S/G Channel Head (PRI)S/G Secondary Shell Regenerative HT EX RHR HT EX BIT Shell BIT Head SA533 CRA, CL2 SA533 CRBt CL1 SA533 CRA, CL2 SA351-CF8 SA515-70 SA351 CF8A SA240 Type 304 UT-50 UT-51 UT-52 UT-53 UT-54 UT-55 UT-56 ISI-201 Rev.2 Page 14 of 78 0 0~~~~~~'~~~
0 0
APPENDIX A CLASS 1 INSPECTION PLAN  
                  ~ ~
  ~ ~ ~
    '      ~ ~ ~
~
 
APPENDIX A CLASS 1 INSPECTION PLAN  


==SUMMARY==
==SUMMARY==
ISI-201 Rev.2 Page 16 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN SUiMMARY ASME SECTION Xr EDITION 80W81 CATEGORY: B-B, Pressure Retaining Welds in Vessels other than Reactor Vessel.s ITEM: B2.11, Circumferential Welds SYSTEM/~Cofs onent FLOW FLOW DIAGRAM-DIAG (2165-G)COORD LINE NUNEER EXAM RELIEF PROGRAM HETHOU RE(EUEST Notes PZR 801 J-6 Vol ISI-201 Rev.2 Page 17 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ISI-201 Rev. 2                         Page 16 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUiMMARY ASME SECTION Xr EDITION 80W81 CATEGORY:       B-B, Pressure Retaining Welds in Vessels other than Reactor Vessel.s ITEM:           B2.11, Circumferential Welds FLOW        FLOW SYSTEM/           DIAGRAM    -  DIAG        LINE          EXAM    RELIEF      PROGRAM
~Cofs onent       (2165-G)     COORD       NUNEER       HETHOU   RE(EUEST     Notes PZR             801         J-6                       Vol ISI-201 Rev. 2                                           Page 17 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-B, Pressure Retaining Welds in Vessels other than Reactor Vessels ITEM: B2.12, Longitudinal Welds SYSTEM/~Com onent PZR FLOW FLOW DIAGRAM DIAG (2165-G)COORD 801 J-6 LINE NUMBER EXAM METHOD Vol RELIEF PROGRAM~RE UEST NotesISI-201 Rev.2 Page 18 of 78


SHEARON HARRIS UNIT NO.1'RESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:      B-B, Pressure  Retaining Welds in Vessels other than Reactor Vessels ITEM:          B2.12,  Longitudinal  Welds FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE          EXAM    RELIEF        PROGRAM
~Com  onent      (2165-G)    COORD      NUMBER      METHOD    ~RE  UEST      Notes PZR              801      J-6                      Vol ISI-201 Rev. 2                                          Page  18 of  78
 
SHEARON HARRIS UNIT NO.
INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-B, Pressure Retaining Welds in Vessels other than Reactor Vessel ITEM: B2.40, Tubesheet-to-Head Weld (Primary Side)SYSTEM/~Com onene S/G S/G S/G FLOW DIAGRAM (2165-G), 800 800 800 FLOW DIAG COORD E-4 H-4 E-17 LINE NUMBER 1A 1B'C EXAM METHOD Vol Vol Vol RELIEF PROGRAM REQUEST Notes ISI-201 Rev.2 Page 19 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
1'RESERVICE ASME SECTION XI EDITION 80W81 CATEGORY:      B-B, Pressure Retaining Welds in Vessels other than Reactor Vessel ITEM:          B2.40, Tubesheet-to-Head Weld (Primary Side)
FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE          EXAM          RELIEF    PROGRAM
~Com  onene      (2165-G),    COORD      NUMBER        METHOD        REQUEST    Notes S/G            800        E-4          1A          Vol S/G            800        H-4          1B'C        Vol S/G            800        E-17                      Vol ISI-201 Rev. 2                                              Page 19 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-D, Full Penetration Welds of Nozzles in Vessels-Inspection Program B ITEM: B3.110, Nozzle to Vessel Welds*SYSTEM/~Com onent PZR FLOW DIAGRAM (2165-G)801 FLOW DIAG COORD J-6 LINE NUMBER EXAM'METHOD Vol RELIEF PROGRAM REIEUEST NotesISI-201 Rev.2 Page 20 of 78 SHEARON HARRIS UNIT NO.1.PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     B-D, Full Penetration   Welds of Nozzles in Vessels Inspection Program B ITEM:         B3.110, Nozzle to Vessel Welds
* FLOW      FLOW SYSTEM/           DIAGRAM    DIAG        LINE          EXAM    RELIEF      PROGRAM
~Com onent       (2165-G)   COORD      NUMBER        'METHOD    REIEUEST    Notes PZR              801       J-6                       Vol ISI-201 Rev. 2                                         Page 20 of 78
 
SHEARON HARRIS UNIT NO. 1.
PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-D, FuLL Penetration Welds of Nozzles in Vessels-Inspection Program B ITEM: B3.120,.Nozzle Inside Radius Section SYSTEM/~corn onenr.FLOW FLOW DIAGRAM DIAG (2165-.G)COORD LINK NUMBER EXAM RELIEF PROGRAM METHOD RE(EUEST Notes PZR 801 J-6 Vol ISI-201 Rev.2 Page 21 of 78 SHEARON HARRIS UNIT,NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:       B-D, FuLL Penetration   Welds of Nozzles in Vessels   Inspection Program B ITEM:           B3.120,.Nozzle Inside Radius Section FLOW      FLOW SYSTEM/           DIAGRAM      DIAG        LINK          EXAM    RELIEF      PROGRAM
~corn onenr.       (2165-.G)   COORD       NUMBER         METHOD   RE(EUEST     Notes PZR               801       J-6                       Vol ISI-201 Rev. 2                                           Page 21 of 78
 
SHEARON HARRIS UNIT,NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: ITEM: B-D, Full.Penetration Welds of Nozzles in Vessels-Inspection Program B B3.130, Nozzle-to-Vessel Welds SYSTEM/~con onent S/G S/G S/G FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD E-4 H-4 E-17 LINE NUMBER lA 1B 1C EXAM METHOD Vol Vol Vol RELIEF PROGRAM RE<EUEST Notes ISI-201 Rev.2 Page 22 of 78  
 
'
ASME SECTION XI EDITION 80W81 CATEGORY:     B-D, Full. Penetration Welds of Nozzles in Vessels Inspection Program B ITEM:          B3.130, Nozzle-to-Vessel Welds FLOW      FLOW SYSTEM/           DIAGRAM    DIAG        LINE        EXAM    RELIEF      PROGRAM
SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
~con onent       (2165-G)     COORD        NUMBER      METHOD  RE<EUEST    Notes S/G              800       E-4           lA          Vol S/G              800      H-4           1B          Vol S/G              800      E-17         1C         Vol ISI-201 Rev. 2                                         Page 22 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: ITEM:.B-D, Full Penetration Welds of Nozzles in Vessels-Inspection Program B B3.140, Nozzle Inside Radius Section SYSTEM/~Com onenn S/G S/G S/G FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD E-4 H-4 E-17 LINE NUMBER 1A 1B 1C EXAM METHOD Vol Vol Vol RELIEF PROGRAM~RE UEST Nonce ISI"201 Rev.2 Page 23 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:   . B-D, Full Penetration   Welds of Nozzles in Vessels - Inspection Program B ITEM:          B3.140, Nozzle Inside Radius Section FLOW      FLOW SYSTEM/           DIAGRAM    DIAG        LINE          EXAM    RELIEF      PROGRAM
~Com onenn       (2165-G)   COORD      NUMBER        METHOD    ~RE UEST    Nonce S/G              800       E-4           1A          Vol S/G              800      H-4           1B          Vol S/G              800      E-17         1C           Vol ISI"201 Rev. 2                                           Page 23 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: ITEM: B-E, Pressure Retaining Partial Penetration Welds in Vessels 84.20, Heater Penetration Welds SYSTEM/~Com onent PZR FLOW DIAGRAM (2165-G)801 FLOW DIAG COORD J-6 LINE NUMBER EXAM RELIEF PROGRAM METHOD REQUEST Notes VT-2 ISI-201 Rev.2 Page 24 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     B-E, Pressure Retaining Partial Penetration Welds in Vessels ITEM:          84.20, Heater Penetration Welds FLOW      FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM    RELIEF      PROGRAM
~Com onent       (2165-G)     COORD       NUMBER       METHOD   REQUEST     Notes PZR              801      J-6                      VT-2 ISI-201 Rev. 2                                         Page 24 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE   INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION BOW81 CATEGORY: ITEM: B-F, Pressure Retaining Dissimilar Metal Welds B5.40,.Nozzle-to-Safe End Butt Welds, nps>4", Pressurizer SYSTEM/~Com onent RC RC RC RC RC RC FLOW DIAGRAM (2165-G)801 801 801 801 801 801 FLOW DIAG COORD M-6 H-8 H-6 H-5 H-3 I-7 LINE NUMBER RC14-35 RC6-124 RC6-126 RC6-128 RC6-135 RC4-231 EXAM METHOD Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur RELIEF PROGRAM REIEUEST Noces ISI-201 Rev.2 Page 25 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION BOW81 CATEGORY:    B-F, Pressure  Retaining Dissimilar Metal Welds ITEM:        B5.40,. Nozzle-to-Safe End Butt Welds, nps > 4", Pressurizer FLOW        FLOW SYSTEM/        DIAGRAM      DIAG        LINE          EXAM    RELIEF      PROGRAM
~Com  onent      (2165-G)    COORD        NUMBER        METHOD    REIEUEST    Noces RC              801        M-6      RC14-35      Vol  & Sur RC              801        H-8      RC6-124      Vol  & Sur RC              801        H-6      RC6-126      Vol  & Sur RC              801        H-5      RC6-128      Vol  & Sur RC              801        H-3      RC6-135      Vol  & Sur RC              801        I-7      RC4-231      Vol  & Sur ISI-201 Rev. 2                                            Page 25 of  78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: ITEM: B-F, Pressure Retaining Dissimilar Welds 65.70, Nozzle-to-Safe End Butt Welds, nps>4", Steam Generator SYSTEM/~Com onent RC RC RC RC RC RC FLOW DIAGRAM (2165"G)800 800 800 800 800 800 FLOW DIAG COORD E-1 K-1 E-19 G-7 J-7 G-14 LINE NUiMBER RC31-2 RC31-5 RC31-8 RC29-1 RC29-4 RC29-7 EXAi 1 METHOD Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur RELIEF PROGRAM RE<EUEST Motet ISI-201 Rev.2 Page 26 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     B-F, Pressure Retaining Dissimilar Welds ITEM:        65.70, Nozzle-to-Safe End Butt Welds, nps   > 4", Steam Generator FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAi1    RELIEF      PROGRAM
~Com onent     (2165"G)     COORD        NUiMBER      METHOD      RE<EUEST      Motet RC            800       E-1         RC31-2    Vol  & Sur RC            800        K-1         RC31-5    Vol  & Sur RC            800        E-19       RC31-8     Vol  & Sur RC            800        G-7        RC29-1     Vol & Sur RC            800        J-7        RC29-4    Vol & Sur RC            800        G-14        RC29-7    Vol & Sur ISI-201 Rev. 2                                             Page 26 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: ITEM: B-G-l, Pressure Retaining BoLting, Greater than 2" in Diameter B6.180, BoLts and Studs SYSTEM/~Com onent RCP RCP RCP FLOW DIAGRAM (216S-G)800 800 800 FLOW DIAG COORD C-3 L"3 C-17 LINE NUMBER 1A 1B 1C EXAM NETHOD Vo1 Vol Vol RELIEF PROGRAM~RE HEST NotesISI-201 Rev.2 Page 27 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     B-G-l, Pressure Retaining BoLting, Greater than 2" in Diameter ITEM:        B6.180, BoLts and Studs FLOW      FLOW SYSTEM/         DIAGRAM    DIAG        LINE          EXAM  RELIEF      PROGRAM
~Com onent       (216S-G)   COORD      NUMBER      NETHOD    ~RE HEST    Notes RCP            800       C-3         1A            Vo1 RCP            800      L"3         1B            Vol RCP            800      C-17         1C           Vol ISI-201 Rev. 2                                         Page 27 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-G-1, Pressure Retaining BoLting, Greater than 2" in Diameter ITEM: B6.190, F1ange Surface SYSTEM/~corn onent RCP RCP RCP FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD C-3 L"3 C-17 LINE NUMBER lA 1B 1C EXAM METHOD VT-1 VT-1 VT-1 RELIEF PROGRAM~E<EUEST NotesISI-201 Rev.2 Page 28 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:      B-G-1, Pressure Retaining BoLting, Greater than 2" in Diameter ITEM:          B6.190, F1ange Surface FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~corn  onent      (2165-G)    COORD      NUMBER      METHOD  ~E<EUEST      Notes RCP            800        C-3          lA          VT-1 RCP            800        L"3          1B          VT-1 RCP            800        C-17        1C          VT-1 ISI-201 Rev. 2                                        Page  28 of  78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-G-1, Pressure Retaining Bolting, Greater than 2" in Diameter'TEM: B6.200, Nuts, Bushings and Washers SYSTEM/C~om anent RCP RCP RCP FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD C-3 L-3 C-17 LINE NUMBER 1A 1B lc EXAM METHOD VT-1 VT-1 VT-1 RELIEF PROGRAM REQUEST NotesISI-201 Rev.2 Page 29 of 78.
 
SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:     B-G-1, Pressure Retaining Bolting, Greater than 2" in Diameter
'TEM:         B6.200, Nuts, Bushings and Washers FLOW      FLOW SYSTEM/           DIAGRAM    DIAG        LINE          EXAM    RELIEF    PROGRAM C~om anent       (2165-G)   COORD      NUMBER      METHOD    REQUEST    Notes RCP            800       C-3         1A          VT-1 RCP            800      L-3         1B           VT-1 RCP            800      C-17        lc          VT-1 ISI-201 Rev. 2                                       Page 29 of 78.
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM: B7.20, Bolts, Studs and Nuts SYSTEM/~Com onent PZR FLOW FLOW DIAGRAM DIAG (2165-G)COORD 801 J-6 LINE NUMBER EXAM RELIEF PROGRAM METHOD RE(EVERT Motet VT-1 ISI-201 Rev.2 Page 30 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:      B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM:          B7.20, Bolts, Studs and Nuts FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~Com  onent      (2165-G)    COORD      NUMBER      METHOD  RE(EVERT    Motet PZR            801        J-6                      VT-1 ISI-201 Rev. 2                                        Page  30 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
, ASME SECTION XI EDITION 80W81 CATEGORY: B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM: B7.30, Bolts, Studs and Nuts (Vessels)SYSTEM/~Con onent Stm Gen Stm Gen Stm Gen FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD C-3 L-3 C-17 LINE NUMBER 1A 1B lc EXAM METHOD VT-1 VT-1 VT-1 RELIEF PROGRAM RE<EUEST Notes ISI-201 Rev.2 Page 31 oE 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:     B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM:         B7.30, Bolts, Studs and Nuts (Vessels)
FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~Con onent       (2165-G)     COORD      NUMBER      METHOD  RE<EUEST      Notes Stm Gen          800       C-3         1A          VT-1 Stm Gen          800        L-3         1B           VT-1 Stm Gen          800        C-17        lc          VT-1 ISI-201 Rev. 2                                         Page 31 oE 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-G-1, Pressure Retaining Bolting, 2" and less in Diameter ITEM: B7.60, Bolts, Studs and Nuts SYSTEM/~Com onent RCP RCP RCP FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD C-3 L-3 C-17 LINE NUMBER 1A 1B lc EXAM METHOD VT-1 VT-1 VT"1 RELIEF PROGRAM REQUEST Notes ISI-201 Rev.2 Page 32 of 78 Oi CATEGORY: ITEM'HEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN SUMiMARY ASME SECTION XI EDITION 80W81 B-,G-2, Pressure Retaining Bolting, 2",and less'n Diameter B7.50, Bolts, Studs and Nuts (Piping)SYSTEM/~Com onent CS CS CS Rc Rc Rc Rc Rc RC Rc Rc Rc FLOW DIAGRAM ,(2165-G)803 803 803 802 802 802 802 802 802 801 801 801 FLOW DIAG COORD G-9 G-9 G-9 B-14 B-14 B-14 A-14 A-14 A-14 H-8 H-6 H-5 LINE NUMBER CS1<-16 CSl<-17 CS1~<-18 RC3-21 RC3-40 RC3-61 RC2-24 RC2-43 RC2-64 RC6-124 RC6-126 RC6-128'XAM METHOD VT-1 VT-1 VT-1 VT-1.VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 RELIEF PROGRAM RE(EUEST.NotesISI-201 Rev.2 Page 33 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION  XI EDITION 80W81 CATEGORY:    B-G-1, Pressure Retaining Bolting, 2" and less in Diameter ITEM:        B7.60, Bolts, Studs and Nuts FLOW      FLOW SYSTEM/          DIAGRAM    DIAG        LINE            EXAM  RELIEF    PROGRAM
~Com  onent      (2165-G)    COORD      NUMBER        METHOD  REQUEST    Notes RCP            800      C-3          1A            VT-1 RCP            800      L-3          1B            VT-1 RCP            800      C-17        lc            VT"1 ISI-201 Rev. 2                                        Page 32 of 78
 
HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUMiMARY Oi ITEM'HEARON                      ASME SECTION XI EDITION 80W81 CATEGORY:    B-,G-2, Pressure  Retaining Bolting, 2",and  less'n Diameter B7.50, Bolts,    Studs and Nuts (Piping)
FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE                  RELIEF        PROGRAM
  ~Com  onent      ,(2165-G)      COORD      NUMBER      METHOD    RE(EUEST    . Notes CS              803        G-9      CS1<-16        VT-1 CS              803        G-9      CSl<-17        VT-1 CS              803        G-9      CS1~<-18        VT-1 Rc              802          B-14    RC3-21          VT-1 .
Rc              802          B-14    RC3-40          VT-1 Rc              802          B-14    RC3-61          VT-1 Rc              802        A-14      RC2-24          VT-1 Rc              802        A-14      RC6-128'XAM RC2-43          VT-1 RC              802        A-14      RC2-64          VT-1 Rc              801        H-8      RC6-124        VT-1 Rc              801          H-6      RC6-126        VT-1 Rc              801          H-5                      VT-1 ISI-201 Rev. 2                                          Page 33  of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE     INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASiME SECTION XI EDITION 80W81 CATEGORY: B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM: B7.70, Bolts, Studs and Nuts (Valves)SYSTEiM/~Con onent RC RC RC RC RC RC RC RC RC RC RC RC RC CS CS CS CS'S CS FLOW DIAGRAM (2165-G)800 800 800 800 801 801 801 801 801 801 801 801 801 801 801 802 802 802 803 803 803 803 803 803 FLOW DIAG COORD B-3 C-2 , it-2 C-18 E-2 E-1 H-2 I-10 K-10 E-1 F-1 H-l F-8 F-6 F-4 E-6 E-6 E-6 A-3 A-4 C-3 C-3 B-3 B-3 LINE NUMBER V500 V501 V502 V503 V526 V527 V528 P525 P526 P527 P528 P529 R528 R529 R530 V540 V541 V542 L500 L501 V504 V505 V506 V507 EXAM METHOD VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 RELIEF PROGRAM REQUEST Notes ISI-201 Rev.2 Page 34 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASiME  SECTION XI EDITION 80W81 CATEGORY:      B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM:          B7.70, Bolts, Studs and Nuts (Valves)
FLOW        FLOW SYSTEiM/          DIAGRAM      DIAG          LINE          EXAM    RELIEF    PROGRAM
~Con  onent      (2165-G)    COORD          NUMBER      METHOD    REQUEST      Notes RC              800        B-3          V500          VT-1 RC              800        C-2          V501          VT-1 RC              800      , it-2          V502          VT-1 RC              800        C-18          V503          VT-1 RC              801        E-2          V526          VT-1 RC              801        E-1          V527          VT-1 RC              801        H-2          V528          VT-1 RC              801        I-10          P525          VT-1 RC              801        K-10          P526          VT-1 RC              801        E-1          P527          VT-1 RC              801        F-1          P528          VT-1 RC              801        H-l          P529          VT-1 801        F-8          R528          VT-1 801        F-6          R529          VT-1 801        F-4          R530          VT-1 802        E-6          V540          VT-1 802        E-6          V541          VT-1 RC              802        E-6          V542          VT-1 CS              803        A-3          L500          VT-1 CS              803        A-4          L501          VT-1 CS              803        C-3          V504          VT-1 CS'S            803        C-3          V505          VT-1 803        B-3          V506          VT-1 CS              803        B-3          V507          VT-1 ISI-201 Rev. 2                                            Page 34 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-G-2, Pressure Retaining Bolting, 2" and Less in Diameter.ITEM: B7.70, BoLts, Studs and Nuts (VaLves)SYSTEM/~corn onent SI SI SI SI SZ SI SI SI SZ SI SZ SZ RH RH RH RH FLOW DIAGRAM (2165-G)808 808 808 808 808 808 808 808 809 809 809 809 809 809 810 810 810 824 824 824 824 FLOW DIAG COORD B-3 C-3 D-3 B-11 C-11 B-17 C-17 D-17 D-6 H-6 K-6 D-3 H"3 K-3 C-2 E" Z-E-2 L-4 L-3 I-4 I-3 LINE NUMBER V507 V508 V509 V510 V511 V512 V513 V5 14 V544 V545 V546 V547 V548 V549 V584 V585 V586 V503 V502 V501 V500 EXAM METHOD VT""1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT"1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 VT-1 RELIEF PROGRAM~RE UEET Nones ISI-201 Rev.2 Page 35 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN SUMHARY ASME SECTION XI EDITION 80W81 CATEGORY: B-H, Integral Attachments for Vessel.s ITEM:..B8.20, Integral.ly Welded Attachments SYSTEM/~Com onent FLOW DIAGRAH (2165-G)FLOW DIAG COORD LINE NUHBER EXAM RELIEF METHOD~RE HEST PROGRAM Notes PZR 801 J-6 Vol.or SurISI-201 Rev.2 Page 36 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:      B-G-2, Pressure Retaining Bolting, 2" and Less in Diameter
.ITEM:          B7.70, BoLts, Studs and Nuts (VaLves)
FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~corn  onent      (2165-G)    COORD      NUMBER      METHOD  ~RE UEET    Nones SI              808        B-3        V507          VT""1 SI              808        C-3        V508          VT-1 SI              808        D-3        V509          VT-1 SI              808        B-11        V510          VT-1 SZ              808        C-11        V511          VT-1 SI              808        B-17        V512          VT-1 SI              808        C-17        V513          VT-1 SI              808        D-17        V5 14        VT-1 SZ              809        D-6        V544          VT-1 SI              809        H-6        V545          VT-1 SZ              809        K-6        V546          VT"1 SZ              809        D-3        V547          VT-1 809        H"3        V548          VT-1 809        K-3        V549          VT-1 810        C-2        V584          VT-1 810        E" Z-      V585          VT-1 810        E-2        V586          VT-1 RH              824        L-4        V503          VT-1 RH              824        L-3        V502          VT-1 RH              824        I-4        V501          VT-1 RH              824        I-3        V500          VT-1 ISI-201 Rev. 2                                        Page 35 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUMHARY ASME SECTION XI EDITION 80W81 CATEGORY:     B-H, Integral Attachments for Vessel.s ITEM:       ..B8.20, Integral.ly Welded Attachments FLOW        FLOW SYSTEM/         DIAGRAH      DIAG        LINE            EXAM    RELIEF      PROGRAM
~Com onent     (2165-G)     COORD       NUHBER       METHOD     ~RE HEST     Notes PZR           801       J-6                   Vol. or Sur ISI-201 Rev. 2                                             Page 36 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.11, Circumferential Welds, nps>4" SYSTEM/~corn onent FLOW DIAC RAM (2165-G)FLOW DIAG COORD LINE NUMBER EXAM METHOD RELIEF PROGRAM REQUEST Notes RC RC Rc RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 800 801 801 801 801 801 801 801 801 801 E-1 K-1 E-19 G-7 J-7 G-14 D-6 L-7 C-14 J-4 G-6 D-8 L-6 F-ll C-11 G-8 D-8 I-9 L-9 G-10 E-10 C-6 M-5 M-6 I-9 H-8 H-6 H-5 H-3 J-12 K"11 I-7 RC31-2 RC31-5 RC31-8 RC29-1 RC29-4 RC29-7 RC27<-3 RC27<-6 RC27%-9 RC14-35 RC12-12 RC12-26 RC12-46 RC12-51 RC12-65 RC6-10 RC6-27 RC6-29 RC6-47 RC6-49 RC6-66 RC4-25 RC4-44 RC14-35 RC6-122 RC6-124 RC6-126 RC6-128 RC6-135 RC4-25 RC4-44 RC4-231 Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol"&Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur ISI-201 Rev.Page 37 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 74S75 CATEGORY:     B-J, Pressure Retaining Welds in Piping ITEM:         B9.11, Circumferential Welds, nps > 4" FLOW        FLOW SYSTEM/         DIACRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~corn onent     (2165-G)     COORD       NUMBER       METHOD   REQUEST     Notes RC             800       E-1       RC31-2      Vol    Sur RC            800        K-1       RC31-5      Vol    Sur Rc            800        E-19     RC31-8      Vol    Sur RC            800        G-7       RC29-1      Vol    Sur RC            800        J-7       RC29-4      Vol    Sur RC            800        G-14     RC29-7       Vol    Sur RC            800        D-6       RC27<-3      Vol    Sur RC            800        L-7       RC27<-6      Vol    Sur RC            800        C-14      RC27%-9     Vol    Sur RC            800        J-4      RC14-35     Vol    Sur RC            800        G-6      RC12-12     Vol    Sur RC            800        D-8      RC12-26     Vol    Sur RC            800        L-6      RC12-46     Vol    Sur RC            800        F-ll      RC12-51     Vol    Sur RC            800        C-11      RC12-65     Vol    Sur RC            800        G-8      RC6-10       Vol    Sur RC            800        D-8      RC6-27       Vol "& Sur RC            800        I-9      RC6-29       Vol    Sur RC            800        L-9      RC6-47       Vol    Sur RC            800        G-10      RC6-49       Vol    Sur RC            800        E-10      RC6-66       Vol    Sur RC            800        C-6      RC4-25       Vol    Sur RC            800        M-5      RC4-44       Vol    Sur RC            801        M-6      RC14-35     Vol    Sur RC            801        I-9      RC6-122     Vol    Sur RC            801        H-8      RC6-124     Vol    Sur RC            801        H-6      RC6-126     Vol    Sur RC            801        H-5      RC6-128     Vol    Sur RC            801        H-3      RC6-135     Vol    Sur RC            801        J-12      RC4-25       Vol    Sur RC            801        K"11      RC4-44       Vol    Sur RC            801        I-7      RC4-231     Vol   Sur ISI-201 Rev.                                             Page 37 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.11, CircumferentiaL Welds, nps>4" SYSTEM/~Com onent SI SI SI SI SI SI SI SI SI RH RH FLOW DIAGRAM (2165-G)808 808 808 808 808 808 809 809 809 824 824 FLOW DIAG COORD B-5 C"5 D-4 B-14 C"14 D-17 D-4 G-4 J-4 I-4 L-4 LINE NUMBER s SI6-272 SI6-271 SI6-270 516-81 SI6-80 SI6-314 SI12-161 SI12-162 SI12-163 RH12-39 RH12-38 EXAM METHOD Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol&Sur RELIEF PROGRAM~RE NEET Notes ISI-201 Rev.2 Page 38 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 74S75 CATEGORY:     B-J, Pressure Retaining Welds in Piping ITEM:         B9.11, CircumferentiaL Welds, nps > 4" FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~Com onent       (2165-G)     COORD      NUMBER  s    METHOD  ~RE  NEET      Notes SI              808       B-5       SI6-272      Vol  & Sur SI              808        C"5       SI6-271      Vol  & Sur SI              808        D-4       SI6-270      Vol  & Sur SI              808        B-14      516-81       Vol  & Sur SI              808        C"14      SI6-80       Vol  & Sur SI              808        D-17      SI6-314     Vol  & Sur SI              809        D-4      SI12-161     Vol  & Sur SI              809        G-4      SI12-162     Vol  & Sur SI              809        J-4      SI12-163     Vol  & Sur RH              824        I-4      RH12-39     Vol  & Sur RH              824        L-4      RH12-38     Vol & Sur ISI-201 Rev. 2                                           Page 38 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74575 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.21, Circumferential Welds, nps G.T.1" and L.T.4" SYSTEM/~Com onene RC RC RC RC RC RC RC RC RC RC RC RC CS CS CS FLOW DIAGRAM (2165-G)800 800 800 800 800 800 801 801 801 802 802 802 803 803 803 803 803 803 FLOW DIAG COORD D-2 D-3 E-8 M-7 M-2 C-18 H-2 F-2 E-2 B-14 B-14 B-14 A-3 A-3 C-3 G-9 G-9 G-9 LINE NUMBER RC3-21 RC3-23 RC3-28 RC3-45 RC3-40 RC3-61 RC3-139'C3-140 RC3-141 RC3-21 RC3-40 RC3-61 CS3-116 CS3-117 CS3-118 CS li~-1&CSl~<-17 CS1.4-18 EXAM METHOD Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur RELIEF PROGRAM REQUEST NotesISI-201 Rev.2 Page 39 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 74575 CATEGORY:     B-J, Pressure Retaining Welds in Piping ITEM:         B9.21, Circumferential Welds, nps G.T. 1" and L.T. 4" FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM  RELIEF    PROGRAM
~Com onene       (2165-G)     COORD      NUMBER          METHOD REQUEST    Notes RC              800       D-2       RC3-21            Sur RC              800        D-3       RC3-23            Sur RC              800        E-8       RC3-28            Sur RC              800        M-7       RC3-45            Sur RC              800        M-2       RC3-40            Sur RC              800        C-18     RC3-61            Sur RC              801        H-2       RC3-139          Sur RC              801        F-2               'C3-140 Sur RC              801        E-2       RC3-141          Sur RC              802        B-14     RC3-21           Sur RC              802        B-14      RC3-40            Sur RC              802        B-14      RC3-61           Sur CS              803        A-3      CS3-116           Sur 803        A-3      CS3-117           Sur 803        C-3      CS3-118           Sur 803        G-9      CS li~-1&         Sur CS              803        G-9      CSl~<-17         Sur CS              803        G-9      CS1.4-18         Sur ISI-201 Rev. 2                                         Page 39 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.31, Branch Pipe Connection Welds, nps>4" SYSTEM/~Com onent RC RC RC RC RC RC FLOW DIAGRAM (2165-G)800 800 800 800 800 800 FLOW DIAG COORD G-7 J-7 G-14 D-6 L-7 C-14 LINE NUMBER RC29-1 RC29-4 RC29-7 RC274"3 RC27<-6 RC27<-9 EXAM METHOD Vol&Sur Vol&Sur Vol&Sur Vol&Sur Vol.&Sur Vol&Sur RELIEF PROGRAM~RE VERT Notes ISI-201 Rev.2 Page 40 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 74S75 CATEGORY:      B-J, Pressure Retaining Welds in Piping ITEM:          B9.31, Branch Pipe Connection Welds, nps    >  4" FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE            EXAM    RELIEF      PROGRAM
~Com  onent      (2165-G)    COORD      NUMBER        METHOD      ~RE  VERT    Notes RC              800        G-7      RC29-1      Vol    &  Sur RC              800        J-7      RC29-4      Vol    &  Sur RC              800        G-14      RC29-7      Vol    &  Sur RC              800        D-6      RC274"3      Vol    &  Sur RC              800        L-7      RC27<-6      Vol.  &  Sur RC              800        C-14      RC27<-9      Vol    &  Sur ISI-201 Rev. 2                                              Page 40 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.32, Branch Pipe Connection Welds, nps G.T.1" and L.T.4" SYSTEM/~Com onent RC RC RC RC RC RC RC RC RC SI SI SI SlST FLOW DIAGRAM (2165-G)800 800 800 800 800 800 800 800 800 808 808 808 808 808 FLOW DIAG COORD E-1 K-1 E-19 G-7 J-7 G-14 D-6 L-7 C-14 B-5 C-5 D-4 B-14 C-14 LINE NUi IBER RC31-2 RC31-5 RC31-8'RC29-1 RC29-4 RC29-7 RC27g-3 RC27q-6 RC27<-9 SI6-272 SI6-271 SI6-270 SI6-81 SI6-80 EXAM METHOD Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur RELIEF PROGRAM RE<EUEST Notes ISI-201 Rev.2 Page 41 of 78


SHEARON HARRIS UNIT NO-1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 74S75 CATEGORY:      B-J, Pressure Retaining Welds in Piping ITEM:          B9.32, Branch Pipe Connection Welds, nps G.T. 1" and L.T. 4" FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE          EXAM    RELIEF    PROGRAM
~Com  onent      (2165-G)    COORD      NUi IBER    METHOD    RE<EUEST    Notes RC              800        E-1      RC31-2          Sur RC              800        K-1      RC31-5          Sur RC              800        E-19      RC31-8          Sur RC              800        G-7      'RC29-1          Sur RC              800        J-7      RC29-4          Sur RC              800        G-14      RC29-7          Sur RC              800        D-6      RC27g-3        Sur RC              800        L-7      RC27q-6        Sur RC              800        C-14      RC27<-9        Sur SI              808        B-5      SI6-272        Sur SI              808        C-5      SI6-271        Sur SI              808        D-4      SI6-270        Sur Sl              808        B-14      SI6-81          Sur ST              808        C-14      SI6-80          Sur ISI-201 Rev. 2                                        Page 41 of 78
 
SHEARON HARRIS UNIT NO- 1 PRESERVICE   INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM:B9.40, Socket Wel.ds, nps G.T.1" SYSTEM/~Com onent RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC RC CS SI SI SI SI SI SI SI SI SI SI SI SI-SI FLOW DIAGRAM (2165-G)800 800 800 800 800 800 800 800 800 800 801 801 801 802 802 SU2 802 802 802 803 808 808 808 808 808 808 808 808 808 808 808 808 808 FLOW DIAG COORD G-6 D-5 D-3 C-3 J-6 L-4 M"3 F"14 D" 18 C" 16 H-l,0 K-11 J-12 A-14 A-14 A-17 A-17 A-18 A-18 C-2 C-3 C-6 D-4 D-7 D-5 D-8 C-12 C-14 C-13 C-13 D-16 D-16 D-14 LINE NUMBER RC2-16 RC2-24 RC2-71 RC2-22 RC2-34 RC2-43 RC2-41 RC2-55 RC2"63 RC2-64 RC2-123 RClg-284 RC1<-285 RC2-16 RC2-24 RC2-34 RC2-43 RC2-55 RC2-64 CS2-658 SI2-18 SI2-63 SI2-22 SI2-59 SI2-26 SI2-55 SI2-36 SI2-69 SI2-40 SI2-73 SI2-78 SIZ-77 SI2-43 EXAM METHOD Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur RELIEF PROGRAM~RE UEST Motet ISI-201 Rev.2 Page 42 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION  XI EDITION 74S75 CATEGORY:    B-J, Pressure Retaining Welds in Piping ITEM:        B9.40, Socket Wel.ds, nps G.T. 1" FLOW        FLOW SYSTEM/        DIAGRAM      DIAG        LINE          EXAM    RELIEF      PROGRAM
~Com  onent      (2165-G)    COORD        NUMBER        METHOD    ~RE  UEST    Motet RC            800        G-6        RC2-16          Sur RC            800        D-5        RC2-24          Sur RC            800        D-3        RC2-71          Sur RC            800        C-3        RC2-22          Sur RC            800        J-6        RC2-34          Sur RC            800        L-4        RC2-43          Sur RC            800        M"3        RC2-41          Sur RC            800        F"14      RC2-55          Sur RC            800        D" 18      RC2"63          Sur RC            800        C" 16      RC2-64          Sur RC            801        H-l,0      RC2-123        Sur RC            801        K-11      RClg-284        Sur RC            801        J-12      RC1<-285        Sur 802        A-14      RC2-16          Sur 802        A-14      RC2-24          Sur SU2        A-17      RC2-34          Sur RC            802        A-17      RC2-43          Sur RC            802        A-18      RC2-55          Sur RC            802        A-18      RC2-64          Sur CS            803        C-2        CS2-658        Sur SI            808        C-3        SI2-18          Sur SI            808        C-6        SI2-63          Sur SI            808        D-4        SI2-22          Sur SI            808        D-7        SI2-59          Sur SI            808        D-5        SI2-26          Sur SI            808        D-8        SI2-55          Sur SI            808        C-12      SI2-36          Sur SI            808        C-14      SI2-69          Sur SI            808        C-13      SI2-40          Sur SI            808        C-13      SI2-73          Sur SI            808        D-16      SI2-78          Sur SI-            808        D-16      SIZ-77          Sur SI            808        D-14      SI2-43          Sur ISI-201 Rev. 2                                            Page 42 of  78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: B-K-1, Integral Attachments for Piping, Pumps, and Valves ITEM: B10.10, Integrall.y Welded Attachments SYSTEM/~com onent RC RC RC RC RC SI Sl SI SI SI RH FLOW DIAGRAM (2165-G)800 801 801 801 801 808 808 808 808 808 824 FLOW DIAG COORD M-5 H-6 F-2 H-2 E-2 D"4 C-5 B-5 C-14 B-14 L-4 LINE NUMBER RC4"44 RC6-126 RC3-140 RC3-139 RC3-141 S16-270 SI6-271 SI6-272 SI6-80 SI6-81 RH12-38 EXAM NETHOD Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur RELIEF PROGRAM~RE DENT NotesISI-201 Rev.2 Page 43 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 74S75 CATEGORY:    B-K-1, Integral Attachments for Piping, Pumps, and Valves ITEM:        B10.10, Integrall.y Welded Attachments FLOW        FLOW SYSTEM/        DIAGRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~com  onent      (2165-G)    COORD        NUMBER      NETHOD  ~RE  DENT    Notes RC            800        M-5      RC4"44          Sur RC            801        H-6      RC6-126        Sur RC            801        F-2      RC3-140        Sur RC            801        H-2      RC3-139        Sur RC            801        E-2      RC3-141        Sur SI            808        D"4      S16-270        Sur Sl            808        C-5      SI6-271        Sur SI            808        B-5      SI6-272        Sur SI            808        C-14      SI6-80          Sur SI            808        B-14      SI6-81          Sur RH            824        L-4      RH12-38        Sur ISI-201 Rev. 2                                          Page 43 of  78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: B-L-1, Pressure Retaining Welds in Pump Casing ITEM:B12.10, Pump Casing Welds SYSTEM/~Com onene RCP RCP RCP FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD C-3 L-3 C-17 LINE NUMBER 1A 1B 1C EXAM METHOD Vol Vol Vol RELIEF PROGRAit REQUEST Notes ISI-201 Rev.2 Page 44 of 78


SHEARON f{ARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION  XI EDITION 74S75 CATEGORY:      B-L-1, Pressure Retaining Welds in    Pump Casing ITEM:        B12.10,  Pump Casing Welds FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE            EXAM  RELIEF    PROGRAit
~Com  onene      (2165-G)    COORD      NUMBER        METHOD  REQUEST    Notes RCP            800        C-3          1A          Vol RCP            800        L-3          1B          Vol RCP            800        C-17          1C          Vol ISI-201 Rev. 2                                          Page 44 of 78
 
SHEARON f{ARRIS UNIT NO. 1 PRESERVICE   INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: ITEM'-L-2, Pump Casing and Valve Bodies B12.20, Pump Casing SYSTEM/~Con onene RCP RCP RCP FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD C-3 L-3 C-17 LINENUMBER 1A 1B 1C EXAM METHOD VT-3 VT-3 VT-3 RELIEF PROGRA f REQUEST Notes ISI-201 Rev.2 Page 45 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE.INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 74S75 ITEM'-L-2, CATEGORY:            Pump Casing and B12.20, Pump Casing Valve Bodies FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM    RELIEF      PROGRA f
~Con onene       (2165-G)   COORD        NUMBER      METHOD    REQUEST      Notes RCP            800       C-3           1A          VT-3 RCP            800        L-3           1B           VT-3 RCP            800        C-17          1C          VT-3 ISI-201 Rev. 2                                           Page 45 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE .INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-M-2, Pump Casing and VaLve Bodies ITEM: B12.50, Valve Body G.T.4" nps.J SYSTEM/~Com onent RC RC RC SI SI SI SI SI SI SI SI SI SI SI SI SI SI SI SI SI RH RH RH RH FLOW DIAGRAM (2165-G)801 801 801 808 808 808 808 808 808 808 808 809 809 809 809 809-809 810 810 810 824 824 824 824 FLOW DIAG COORD F-8 F-6 F-4 B-3 C-3 D-3'-ll C-ll B-17 C-17 D-17 D-6 H-6 K-6 D-3 H-3 K-3 C-2 F-2 E-2 I 3 I-4 L-3 L-4 LINE NUMBER R528 R529 R530 V507 V508 V509 V510 V511 V512 V513 V514 V544 V545 V5,46 V547 V548 V549 V584 V585 V586 V500 V501 V502 V503 EXAM RELIEF.PROGRAM METHOD REQUEST Notes VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT"3: ISI-201 Rev.2 Page 46 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     B-M-2, Pump Casing and VaLve Bodies ITEM:         B12.50, Valve Body G.T. 4" nps FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM    RELIEF  . PROGRAM
  ~Com onent       (2165-G)     COORD        NUMBER      METHOD    REQUEST    Notes RC              801       F-8         R528          VT-3 RC              801        F-6         R529          VT-3 RC              801        F-4         R530          VT-3 SI              808        B-3         V507          VT-3 SI              808        C-3         V508          VT-3 SI              808        D-3'-ll     V509          VT-3 SI              808                    V510          VT-3 SI              808        C-ll         V511          VT-3 SI              808        B-17         V512          VT-3 SI              808        C-17         V513          VT-3 SI              808        D-17         V514          VT-3 SI              809        D-6         V544          VT-3 SI              809        H-6         V545          VT-3 SI              809        K-6          V5,46         VT-3
.J      SI SI SI 809 809-809 D-3 H-3 K-3 V547 V548 V549 VT-3 VT-3 VT-3 SI              810        C-2          V584          VT-3 SI              810        F-2          V585          VT-3 SI              810        E-2          V586          VT-3 RH              824        I 3         V500          VT-3 RH              824        I-4          V501          VT-3 RH              824        L-3         V502          VT-3 RH              824        L-4          V503          VT"3 ISI-201 Rev. 2                                           Page 46 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: B-Q, Steam Generator Tubing ITEM:.B16.20, U-Tube Steam Generator Tubing SYSTEM/~corn oncet S/G S/G'/G FLOM DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD E-3 H-3 E-1"7 LINE NUMBER 1A 1B 1C EXAM HETHOO Vol Vol Vol RELIEF PROGRAM~E(EUEST Notes ISI-201 Rev.2 Page 47 of 78 I
 
APPENDIX B CLASS 2 INSPECTION PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:         B-Q, Steam Generator Tubing ITEM:         . B16.20, U-Tube Steam Generator   Tubing FLOM      FLOW SYSTEM/             DIAGRAM    DIAG        LINE          EXAM  RELIEF      PROGRAM
~corn oncet         (2165-G)   COORD      NUMBER      HETHOO    ~E(EUEST    Notes S/G                800       E-3         1A          Vol S/G                800      H-3         1B          Vol
          '/G 800      E-1"7       1C           Vol ISI-201 Rev. 2                                         Page 47 of 78
 
I APPENDIX B CLASS 2 INSPECTION PLAN  


==SUMMARY==
==SUMMARY==
ISI-201 Rev..2 Page 48 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ISI-201 Rev..2                         Page 48 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: C-A, Pressure Retaining Welds in Pressure Vessels ITEM: C1.10, Shell Circumferential Welds SYSTEM/~Com onent S/G S/G S/G X.L.Ht Xchg RHR Ht Xchg RHR Ht Xchg FLOW DIAGRAM (2165-G)042 042 042 803 824 824 FLOW DIAG COORD E-1 I-1 L-1 D-ll C-14 E-14 LINE NUMBER 1A 1B lc 1A 1B EXAM METHOD Vol Vol Vol Vol Vol Vol RELIEF PROGRAM~RE VEST Notes0 ISI-201 Rev.2 Page 49 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     C-A, Pressure Retaining Welds in Pressure Vessels ITEM:         C1.10, Shell Circumferential Welds FLOW      FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM    RELIEF      PROGRAM
  ~Com onent       (2165-G)    COORD      NUMBER        METHOD  ~RE VEST    Notes S/G             042      E-1          1A          Vol S/G             042      I-1          1B          Vol S/G             042      L-1          lc          Vol X.L. Ht   Xchg       803      D-ll                      Vol RHR Ht Xchg           824      C-14        1A          Vol RHR Ht Xchg           824       E-14         1B           Vol 0
ISI-201 Rev. 2                                         Page 49 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: C-A, Pressure Retaining Welds in Pressure Vessels ITEM:.C1.20, Head Circumferential Welds SYSTEM/~Com onent S/G S/G S/G Rgn Ht Xchg X.L Ht Xchg B.I.T.RHR Ht Xchg RHR Ht Xchg FLOW DIAGRAM (2165-G)042 042 042 803 803 808 824 824 FLOW DIAG COORD E-1 I-1 L-1 C-8 D-11 J-3 C-14 E-14 LINE NUMBER 1A 1B 1C 1A 1B EXAM METHOD Vol Vol Vol Vol Vol Vol Vol Vol RELIEF PROGRAM RE(EUEST Notes ISI-201 Rev.2 Page 50 of 78 I J t SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     C-A, Pressure Retaining Welds in Pressure Vessels ITEM:   . C1.20, Head Circumferential Welds FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM    RELIEF      PROGRAM
~Com onent       (2165-G)    COORD      NUMBER        METHOD  RE(EUEST    Notes S/G             042        E-1          1A          Vol S/G             042        I-1          1B          Vol S/G             042        L-1          1C          Vol Rgn Ht Xchg         803        C-8                      Vol X.L Ht Xchg         803        D-11                      Vol B. I.T.             808        J-3                      Vol RHR   Ht Xchg       824        C-14        1A          Vol RHR   Ht Xchg       824       E-14         1B           Vol ISI-201 Rev. 2                                         Page 50 of 78
 
I J
t
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: C-A, Pressure Retaining Welds in Pressure Vessels ITEM: C1.30, Tubesheet-To-Shell Welds SYSTEM/~Com onent S/G S/G S/G Rgn Ht Xchg FLOW DIAGRAM (2165-G)042 042 042 803 FLOW DIAG COORD E-1 I-1 L-1 C-8 LINE NUMBER 1A 1B 1C EXAM METHOD Vol Vol Vol Vol RELIEF PROGRAM RE<EUEST Notes ISI-201 Rev.,2 Page 51 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE IHSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     C-A, Pressure Retaining Welds in Pressure Vessels ITEM:         C1.30, Tubesheet-To-Shell   Welds FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM    RELIEF    PROGRAM
~Com onent       (2165-G)     COORD      NUMBER        METHOD    RE<EUEST    Notes S/G            042       E-1           1A          Vol S/G            042        I-1           1B          Vol S/G            042        L-1           1C          Vol Rgn Ht Xchg          803        C-8                       Vol ISI-201 Rev.,2                                           Page 51 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE IHSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITIOH 80W81 CATEGORY:-ITEM: C-B, Pressure Retaining Nozzle Welds in Vessels C2.21, Nozzle to Shell (or Head), Meld, Nozzles without Reinforcing Plate in Vessels G.T.<" nom.Thickness SYSTEM/~Con anent B.I.T.S/G.S/G S/G FLOW DIAGRAM (2165-G)808 800 800 800 FLOW DIAG COORD J-3 E-1 I-1 L-1 LINE NUMBER 1A 1B 1C EXAM RELIEF NETEOD~RE UEST Vol&Sur Vol&Sur Vol&Sur Vol&Sur PROGRAM NotesISI-201 Rev.2 Page 52 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITIOH 80W81 CATEGORY:      C-B, Pressure  Retaining Nozzle Welds in Vessels
- ITEM:          C2.21, Nozzle to Shell (or Head), Meld, Nozzles without Reinforcing Plate in Vessels G.T. <" nom. Thickness FLOW      FLOW SYSTEM/            DIAGRAM    DIAG        LINE          EXAM    RELIEF      PROGRAM
  ~Con  anent      (2165-G)    COORD      NUMBER        NETEOD    ~RE UEST    Notes B.I.T.                808      J-3                    Vol & Sur S/G  .                800      E-1          1A        Vol & Sur S/G                    800      I-1          1B        Vol & Sur S/G                    800      L-1          1C        Vol & Sur ISI-201 Rev. 2                                          Page 52 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: C-B, Pressure Retaining Nozzle Welds in Vessels ITEM: 92.31, Reinforcing Plate Welds to Nozzle and Vessels in Vessels G.T.<" nom.Thickness SYSTEM/C~om onent RHR Ht Xchg RHR Ht Xchg FLOW DIAGRAM (2165-G)824 824 FLOW DIAG COORD C-14 E-14 LINE NUMBER 1A 1B EXAM RELIEF PROGRAM METHOD REQUEST Notes Sur Sur ISI-201 Rev.2 Page 53 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAH PLAN SUHHARY ASHE SECTION XI EDITION 80W81 CATEGORY: C-B, Pressure Retaining Nozzle Welds in Vessels ITEH:.C2e32, Nozzle to Shell in Vessels G.T.<" nom.Thickness, Inside of Vessel Inaccessible SYSTEH/~corn onene RHR Ht Xchg RHR Ht Xchg FLOW DIAG RAH (2165-G)824 824 FLOW DIAG COORD C-14 E-14 LINE NUMBER 1A 1B EXAH RELIEF PROGRAH HETHOD REQUEST Notes VT" 2 VT-2 ISI-201 Rev.2 Page 54 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:    C-B, Pressure  Retaining Nozzle Welds in Vessels ITEM:        92.31, Reinforcing Plate Welds to Nozzle and Vessels in Vessels G.T. <" nom. Thickness FLOW      FLOW SYSTEM/        DIAGRAM    DIAG        LINE          EXAM  RELIEF    PROGRAM C~om onent      (2165-G)    COORD      NUMBER      METHOD    REQUEST    Notes RHR  Ht Xchg        824      C-14        1A            Sur RHR  Ht Xchg        824      E-14        1B            Sur ISI-201 Rev. 2                                        Page 53 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAH PLAN SUHHARY ASHE SECTION XI EDITION 80W81 CATEGORY:      C-B, Pressure Retaining Nozzle Welds in Vessels ITEH:      . C2e32, Nozzle to Shell in Vessels G.T. <" nom. Thickness,  Inside of Vessel Inaccessible FLOW      FLOW SYSTEH/          DIAG RAH    DIAG        LINE          EXAH    RELIEF      PROGRAH
~corn onene      (2165-G)    COORD      NUMBER      HETHOD    REQUEST      Notes RHR  Ht Xchg        824      C-14        1A          VT"2 RHR  Ht Xchg        824      E-14        1B          VT-2 ISI-201 Rev. 2                                        Page 54  of  78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: C-C, Integral Attachments for Vessels, Piping Pumps, and Valves ITEM:.C3.10, Integrally Welded Attachments for Pressure Vessels SYSTEM/~Com onent FLOW FLOW DIAGRAM DIAG (2165-G)COORD LINE NUMBER EXAM iMETHOD RELIEF PROGRAM~RE UEST Notes Regenerative Ht Xchg B.I.T.Accuml Accuml Accuml RHR Ht Xchg RHR Ht Xchg 803 808 809 809 809 824 824 C-8 J-3 C-11 F-11 I-11 C-14 E-14 1A 1B 1C 1A 18 Sur Sur Sur Sur Sur Sur SurISI-201 Rev.2 I Page 55 of 78 SHEAROH HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN SUMifARY ASME SECTION XI EDITION 80W81 CATEGORY: C-C, Integral Attachments for Vessels, Piping Pumps, and Valves ITEM: C3.20, Integrally Welded Attachments for Piping SYSTEM/~Con onene MS MS MS FW FW AF AF CT CT CT CT CT CT CS CS CS FLOW DIAGRAM (2165-G)042 042 042 044 044 044 044 050 050 050 050 050 050 050 050 803 805 805 805 FLOW DIAG COORD G-1 K-1 D" 1 iaaf-1 iaaf-1 C-6 if-5 K-13 if-10 F-14 J-16 F-8 K-8 F-2 K-2 D-9 J-12 J-11 I-12 LINE NUMBER MS32-2 MS32-3 MS32-1 FW16-69 FW16-67 AF6-59 AF6-60 CT12-3 CT12-7 CT12-4 CT12-6 CT8-10 CT8-15 CT6-60 CT6-62 CS12-721 CSS-282 CSS-284 CSS-281 EXAM METHOD Sur Sue Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur RELIEF PROGRAM REQUEST Notes ISI-201 Rev.2 Page 56 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTTON PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:    C-C,  Integral Attachments for Vessels, Piping Pumps, and Valves ITEM:      . C3.10,  Integrally Welded Attachments for Pressure Vessels FLOW      FLOW SYSTEM/          DIAGRAM      DIAG        LINE          EXAM    RELIEF        PROGRAM
~Com onent      (2165-G)      COORD      NUMBER      iMETHOD  ~RE  UEST      Notes Regenerative Ht Xchg              803      C-8                      Sur B.I.T.                808      J-3                      Sur Accuml                809      C-11        1A          Sur Accuml                809      F-11        1B          Sur Accuml                809      I-11        1C          Sur RHR Ht Xchg          824      C-14        1A          Sur RHR Ht Xchg          824      E-14        18          Sur ISI-201 Rev.
I 2                                          Page  55 of  78
 
SHEAROH HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUMifARY ASME SECTION XI EDITION 80W81 CATEGORY:      C-C,  Integral Attachments for Vessels, Piping Pumps,  and Valves ITEM:          C3.20, Integrally Welded Attachments for Piping FLOW      FLOW SYSTEM/          DIAGRAM    DIAG          LINE          EXAM  RELIEF      PROGRAM
~Con  onene      (2165-G)    COORD          NUMBER      METHOD  REQUEST      Notes MS              042      G-1          MS32-2          Sur MS              042      K-1          MS32-3          Sue MS              042      D" 1        MS32-1          Sur FW              044      iaaf-1      FW16-69        Sur FW              044      iaaf-1      FW16-67        Sur AF              044      C-6          AF6-59          Sur AF              044      if-5        AF6-60          Sur CT              050      K-13        CT12-3          Sur CT              050      if-10        CT12-7          Sur CT              050      F-14        CT12-4          Sur CT              050      J-16        CT12-6          Sur CT              050      F-8          CT8-10          Sur CT              050      K-8          CT8-15          Sur 050      F-2          CT6-60          Sur 050      K-2          CT6-62          Sur 803      D-9          CS12-721        Sur CS              805      J-12        CSS-282        Sur CS              805      J-11        CSS-284        Sur CS              805      I-12        CSS-281        Sur ISI-201 Rev. 2                                          Page 56  of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTTON PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASilE SECTION XI EDITION 80W81 CATEGORY: C-C, Integral Attachments for Vessels, Piping Pumps, and Valves ITEM: ,C3.20, Integrally Welded Attachments for Piping SYSTEM/~Con onenn SI SI SI SI SI SI SI SI SI RH RH RH-FLOW DIAGRAM (2165-G)809 809 810 810 810 810 810 810 810 824 824 824 824 824 FLOW DIAG COORD D-8 K-8 if-7 C-5 E-4 E-6 B-4 C-2 E-3 I-6 L-6 I-12 E-9 C-8 LINE NUMBER SI12-223 SI12-225 SI14-254 SI10-309 SI10-258 SI10-257 SI10-264 SI6-269 SI6-283 RH12-6 RH12-1 RH10-8 RH10-9 RH10-4 EXAM.RELIEF HETHOO RE<EUEST Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur PROGRAif Notes ISI"201 Rev.2 Page 57 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASilE SECTION XI EDITION 80W81 CATEGORY:      C-C,  Integral Attachments for Vessels, Piping Pumps,  and Valves ITEM:        ,C3.20, Integrally Welded Attachments for Piping FLOW      FLOW SYSTEM/          DIAGRAM    DIAG        LINE          EXAM . RELIEF      PROGRAif
  ~Con  onenn      (2165-G)    COORD        NUMBER      HETHOO  RE<EUEST    Notes SI              809      D-8        SI12-223        Sur SI              809      K-8        SI12-225        Sur SI              810      if-7      SI14-254        Sur SI              810      C-5        SI10-309        Sur SI              810      E-4        SI10-258        Sur SI              810      E-6        SI10-257        Sur SI              810      B-4        SI10-264        Sur SI              810      C-2        SI6-269        Sur SI              810      E-3        SI6-283        Sur RH              824      I-6        RH12-6          Sur 824      L-6        RH12-1          Sur RH RH              824      I-12      RH10-8          Sur 824      E-9        RH10-9          Sur 824      C-8        RH10-4          Sur ISI"201 Rev. 2                                        Page  57 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE     INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: C-F, Pressure Retaining Welds in Piping ITEM:..C-5.11, Circumferential Welds, Th<<" Nom.SYSTEM/~Com onent CS CS CS CS CS CS CS CS CS CS SI SI SI SI SI SI SI SI FLOW DIAGRAM (21,65-G)805 805 805 805 805 805 805 805 805 805 809 809 809 810 810 810 810 810 810 810 810 810 810 810 FLOW.DIAG COORD K-12 K-ll K-13 J-12 J-12 I-12 J-ll H-10 J-10 K-10 D-10 H-10 , K-10 M-4 M-7 M-11 N-4 N-8 N-11 E-6 B-4 C-5 E-4 B-5 LINE NUMBER CS8-320'S8-302 CS8-327 CS8-282 CS8-321 CSB-281 CS8-284 CS6-285 CS6-288 CS6-290 SI12-158 SI12-159 S1.12-160 SI14-251 SI14-254'I14-256 SI14-252 SI14-253 SI14-255 SI10-257 SI10-264 SI10-309 SI10"258 SI8-265 EXAM METHOD Sur" Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur RELIEF PROGRAM REiEUEST Notes ISI"201 Rev.2 Page 58 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 74S75 CATEGORY:      C-F, Pressure Retaining Welds in Piping ITEM:      .. C-5. 11, Circumferential Welds, Th < <" Nom.
FLOW        FLOW  .
SYSTEM/          DIAGRAM      DIAG            LINE                  EXAM  RELIEF      PROGRAM
~Com  onent      (21,65-G)    COORD          NUMBER                METHOD REiEUEST    Notes CS              805        K-12        CS8-320                  Sur" CS              805        K-ll                        'S8-302 Sur CS              805        K-13        CS8-327                  Sur CS              805        J-12        CS8-282                  Sur CS              805        J-12        CS8-321                  Sur CS              805        I- 12      CSB-281                  Sur CS              805        J-ll        CS8-284                  Sur CS              805        H-10        CS6-285                  Sur CS              805        J-10        CS6-288                  Sur CS              805        K-10        CS6-290                  Sur SI              809        D-10        SI12-158                  Sur 809        H-10        SI12-159                  Sur 809      , K-10        S1.12-160                Sur 810        M-4        SI14-251                  Sur 810        M-7        SI14-254'I14-256 Sur 810        M-11                                  Sur 810        N-4        SI14-252                  Sur SI              810        N-8        SI14-253                  Sur SI              810        N-11        SI14-255                  Sur SI              810        E-6        SI10-257                  Sur SI              810        B-4        SI10-264                  Sur SI              810        C-5        SI10-309                  Sur SI              810        E-4        SI10"258                  Sur SI              810        B-5        SI8-265                  Sur ISI"201 Rev. 2                                                  Page  58 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: C-F, Pressure Retaining Welds in Piping ITEM: C-5.11, Circumferential Welds, Th<4" Nom.SYSTEM/~Com onent RH RH RH RH RH RH RH RH RH RH RH RH MS MS MS iMS MS AF AF AF AF AF AF CT CT CT CT CT CT CT CT CT CT FLOW DIAGRAM (2165"G)824 824 824 824 824 824 824 824 824 824 824 824 042 042 042 042 042 044 044 044 044 044 044 050 050 050 050 050 050 050 050 050 050 FLOW DIAG COORD L-9 J-8 L-6 I-6 I-16 C-8 I-12 E-9 C-13 E-14 E"12 G-11 C-8 J-7 G-7 K-7 H-7 C-6 H-4 M-5 M-1 M-1 M-1 F-14 J-16 K-13 M-10 F-8 K-8 F-5 F-3 L-4 K-3 LINE NUMBER RH14-2 RH14-7 RH12-1 RH12-6 RH10-3 RH10-4 RH10-8 RH10-9 RH8-20 RH8-5 RH8-33 RH8-10 MS8-107 MS8-109 MS8-108 MS6-57 MS6-56 AF6-59 AF6-7 AF6-60 AF6-93 AF6-92 AF6-91 CT12-4 CT12-6 CT12-3 CT12-7 CT8-10 CT8-15 CT6-14 CT6-163 CT6-19 CT6-162 EXAM METHOD Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur Sur RELIEF PROGRAM RE(EHEET Notes ISI-201 Rev.Page 59 of 78  
 
ASME SECTION XI EDITION 74S75 CATEGORY:     C-F, Pressure Retaining Welds in Piping ITEM:         C-5.11, Circumferential Welds, Th < 4" Nom.
FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~Com   onent     (2165"G)     COORD        NUMBER      METHOD  RE(EHEET      Notes RH            824       L-9       RH14-2          Sur RH              824        J-8       RH14-7          Sur RH              824        L-6       RH12-1          Sur RH              824        I-6       RH12-6          Sur RH              824        I-16       RH10-3          Sur RH              824        C-8       RH10-4          Sur RH              824        I-12       RH10-8          Sur RH              824        E-9       RH10-9          Sur RH              824        C-13       RH8-20          Sur RH              824        E-14       RH8-5          Sur RH              824        E"12       RH8-33          Sur RH              824        G-11       RH8-10          Sur MS              042        C-8       MS8-107        Sur MS              042        J-7       MS8-109        Sur MS              042        G-7       MS8-108        Sur iMS            042        K-7       MS6-57          Sur MS              042        H-7       MS6-56        Sur AF              044        C-6       AF6-59        Sur AF              044        H-4       AF6-7          Sur AF              044        M-5       AF6-60        Sur AF              044        M-1       AF6-93        Sur AF              044        M-1       AF6-92        Sur AF              044        M-1       AF6-91        Sur CT              050        F-14      CT12-4         Sur CT              050        J-16      CT12-6         Sur CT              050        K-13      CT12-3         Sur CT              050        M-10      CT12-7         Sur CT              050        F-8        CT8-10         Sur CT              050        K-8        CT8-15         Sur CT              050        F-5        CT6-14         Sur CT              050        F-3        CT6-163       Sur CT              050        L-4        CT6-19         Sur CT              050        K-3        CT6-162       Sur ISI-201 Rev.                                             Page 59 of 78
 
)
)
SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN SUHMARY ASHE SECTION XI EDITION 74S75 Quality Group B CATEGORY: C-F, Pressure Retaining Welds in Piping ITEM: '-5.11, Circumferential Weld SYSTEM/~Com onent MS HS MS HS HS HS MS MS HS HS HS MS HS HS MS FLOW DIAGRAM (2165-G)042 042 042 042 042 042 042 042 042 042 042 042 042 042 042=FLOW DIAG COORD J-3 J-4 J-5 J"6 J-6 C-3 C-4 C-6 C-5 C-6 G-3 G-4 G-5 G-6 G-6 LINE NUMBER HS8-72 MS8-73 MS8-74 HS8-75 MS8-76 MS8-62 MS8-63 HS8-65 MS8-64 MS8-66 HS8-67 HS8-68 HS8-69 MS8-70 MS8-71 EXAM METHOD SUR SUR SUR SUR SUR SUR SUR SUR SUR SUR SUR SUR SUR SUR SUR RELIEF~RE VEST PROGRAM Notes 4 4 4 4 4 4 4 4 4 4 4 4 ISI-201 Rev.2 Page 60 of 78  
SHEARON HARRIS UNIT NO. 1 PRESERVICE   INSPECTION PROGRAM PLAN SUHMARY ASHE SECTION XI EDITION 74S75 Quality   Group   B C-F, Pressure Retaining     Welds in Piping ITEM:   '-5.11, CATEGORY:
Circumferential   Weld FLOW        FLOW SYSTEM/           DIAGRAM      DIAG        LINE          EXAM    RELIEF        PROGRAM
~Com onent       (2165-G)     COORD        NUMBER        METHOD  ~RE  VEST      Notes MS              042       J-3       HS8-72          SUR                      4 HS              042        J-4       MS8-73          SUR                      4 MS              042        J-5       MS8-74          SUR HS              042        J"6       HS8-75          SUR                      4 HS              042        J-6       MS8-76          SUR                      4 HS              042        C-3       MS8-62          SUR                      4 MS              042        C-4        MS8-63          SUR                      4 MS              042        C-6       HS8-65          SUR                      4 HS              042        C-5       MS8-64          SUR                      4 HS              042        C-6       MS8-66          SUR                      4 HS              042        G-3        HS8-67          SUR                      4 MS              042        G-4        HS8-68          SUR                      4 HS              042        G-5        HS8-69          SUR HS              042        G-6        MS8-70           SUR MS              042=      G-6        MS8-71           SUR                       4 ISI-201 Rev. 2                                             Page 60 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: C-F, Pressure Retaining Welds in Piping ITEM: C-5.12, Longitudinal Welds, Th<<" Nom.SYSTEM/~Com onent SI SI RH RH RH RH FLOW DIAGRAM (2165-G)810 810 824 824 824 824 FLOW DIAG COORD N-8 M-7 L-9 J-8 I-6 L-6 LINE NUMBER SI14-253 SI14-254 RH14-2 RH14-7 RH12-6 RH12-1 EXAM RELIEF PROGRAM METHOD RE(EHEST Notes Sur Sur Sur Sur Sur Sur ISI-201 Rev.2 Page 61 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 74S75 CATEGORY:     C-F, Pressure Retaining Welds in Piping ITEM:         C-5.12, Longitudinal Welds, Th < <" Nom.
FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM    RELIEF      PROGRAM
~Com onent       (2165-G)     COORD      NUMBER      METHOD    RE(EHEST      Notes SI              810       N-8       SI14-253        Sur SI              810        M-7       SI14-254        Sur RH              824        L-9       RH14-2          Sur RH              824        J-8       RH14-7          Sur RH              824        I-6       RH12-6         Sur RH              824        L-6       RH12-1         Sur ISI-201 Rev. 2                                         Page 61 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 74S75 CATEGORY: C-F, Pressure Retaining Welds in ITEM: C5.21, Circumferential Welds, Th Piping<<" Nom.SYSTEM/~Con onent CS SI SI SI SI SI SI SI SI SI SI HS HS MS MS~HS MS FW FW FW FW FW FW FLOW DIAGRAM (2165-G)803 808 808 808 809 809 809 810 810 810 810 810 810 810 042 042 042 042 042 042 042 042 042 P44 P44 044 044 044 P44 FLOW DIAG COORD D-9 C-ll C-11 B-10 D-8 H-8 K-8 B-2 C-3 E-3 C-2 E-2 E-3 F-1 D-7 C-5 K-5 D-l G-1 K-1 D-8 H-8 K-8 B-6 G-6 L-6 H-1 H-1 i'-1 LINE NUMBER CS12-721 SI10-304 SI6-27 SI6-28 SI12-223 SI12"224 SI12-225 SI10-304 SI10-308 SI10-303 SI6-269 SI6-267 SI6-283 SI6-268 HS34-235 MS34-236 MS34-237 MS32-1 MS32-2 MS32-3 iMS12-122 HS12" 123 HS12-124 FW16-13 FW16-15 FW16-17 FW16-67 FW16-68 FW16-69 Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&"Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur&Sur EXAM METHOD RELIEF PROGRAM~RE UEST NonesISI-201, Rev.2 Page 62 of 78 APPENDIX C CLASS 3 INSPECTION PLAN  
 
ASME SECTION XI EDITION 74S75 CATEGORY:     C-F, Pressure Retaining Welds in Piping ITEM:         C5.21, Circumferential Welds, Th < <" Nom.
FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE            EXAM    RELIEF      PROGRAM
~Con onent       (2165-G)     COORD      NUMBER        METHOD    ~RE UEST    Nones CS              803       D-9       CS12-721      Vol  &  Sur SI              808        C-ll     SI10-304      Vol  &  Sur SI              808        C-11     SI6-27        Vol  &  Sur SI              808        B-10     SI6-28        Vol  &  Sur SI              809        D-8       SI12-223      Vol  &  Sur SI              809        H-8       SI12"224      Vol  &  Sur SI              809        K-8       SI12-225      Vol  &  Sur SI              810        B-2       SI10-304      Vol  &  Sur SI              810        C-3       SI10-308      Vol  &  Sur SI              810        E-3       SI10-303      Vol  & "Sur SI              810        C-2       SI6-269      Vol  &  Sur 810        E-2       SI6-267      Vol  &  Sur 810        E-3       SI6-283      Vol  &  Sur 810        F-1       SI6-268      Vol  &  Sur 042        D-7       HS34-235      Vol  &  Sur 042        C-5       MS34-236      Vol  &  Sur 042        K-5       MS34-237      Vol  &  Sur HS              042        D-l       MS32-1       Vol  &  Sur HS              042      G-1       MS32-2        Vol  &  Sur MS              042      K-1       MS32-3        Vol  &  Sur MS              042      D-8      iMS12-122     Vol  &  Sur
  ~
HS              042      H-8      HS12" 123     Vol  &  Sur MS              042      K-8      HS12-124     Vol  &  Sur FW              P44      B-6      FW16-13       Vol  &  Sur FW              P44      G-6      FW16-15       Vol  &  Sur FW              044      L-6      FW16-17       Vol  &  Sur FW              044      H-1      FW16-67       Vol  &  Sur FW              044      H-1      FW16-68       Vol  &  Sur FW              P44      i'-1      FW16-69       Vol & Sur ISI-201, Rev. 2                                           Page 62 of 78
 
APPENDIX C CLASS 3 INSPECTION PLAN  


==SUMMARY==
==SUMMARY==
ISI-201 Rev.2 Page 63 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAi't PLAN  
ISI-201 Rev. 2                        Page 63 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE   INSPECTION PROGRAi't PLAN  


==SUMMARY==
==SUMMARY==
ASNE SECTION XI EDITIOH 80W81 CATEGORY: D-A, Systems in Support of Reactor Shutdown Function ITEN: D1.20, D1.30, D1.40, D1.50, and D1.60;Integral Attachments SYSTEM/~Com anent MS MS ifS MS MS ilS MS i~tS AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF AF CE CE CE CE CE CE CE FLOW DIAGRAit (2165-G)042 042 042 042 042 042 042 042 p44 p44 p44 044 p44 p44 044 044 044 044 044 044 044 044 044 044 044 044 044 044 044 045 045 045 045 045 045 045 045 045 FLOW DIAG COORD if-3 it-3 N"2 L-2 H-3 L-5 M-2 H-1 iN-9 M-9 N-5 H-4 N-9 i'-8 N-9 J-7 J-5 E-6 I-7 I-11 N-ll D"6 D-11 I-7 H"7 H-13 D-12 I-12 L-13 8-6 8-6 D-7 J-9 H-7 H-8 J-9 B-7 B-7 LINE NUMBER MS16-185 MS16-238 ifS8-230 i4IS6-223 MS6-59 NS6-60 i4iS6-130 MS6-166 AF6"8 AF6-16 AF4-76 AF4-6 AF4-10 AF4-11 AF4-9 AF4-78 AF4-5 AF4-94 AF4-55 AF4-3 AF4-74 AF4-2 AF4-1 AF4-4 AF4-77 AF3-15 AF2-1.2 AF2-13 AF2-14 AF3-120 AF2-119 CES-38 CES-41 CE6-39 CE6-40 CE6-196 CE8-97 CE8-98 EXAM itETHOD VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT"3 VT-,3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT"3 VT-3 VT-3 VT-3 RELIEF PROGRAM REiEUEsT Moses ISI-201 Rev.Page 64 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAit PLAN  
ASNE SECTION XI EDITIOH 80W81 CATEGORY:      D-A, Systems in Support of Reactor Shutdown Function ITEN:          D1.20, D1.30, D1.40, D1.50, and D1.60; Integral Attachments FLOW        FLOW SYSTEM/          DIAGRAit    DIAG          LINE            EXAM    RELIEF      PROGRAM
~Com  anent      (2165-G)    COORD        NUMBER        itETHOD  REiEUEsT    Moses MS              042        if-3      MS16-185          VT-3 MS              042        it-3      MS16-238          VT-3 ifS              042        N"2        ifS8-230          VT-3 MS              042        L-2        i4IS6-223          VT-3 MS              042        H-3        MS6-59            VT-3 ilS              042        L-5        NS6-60            VT-3 MS              042        M-2        i4iS6-130          VT-3 i~tS            042        H-1        MS6-166            VT-3 AF              p44        iN-9      AF6"8              VT-3 AF              p44        M-9        AF6-16            VT-3 AF              p44        N-5        AF4-76            VT-3 AF              044        H-4        AF4-6              VT-3 AF              p44        N-9        AF4-10            VT-3 AF              p44        i'-8      AF4-11            VT-3 AF              044        N-9        AF4-9              VT-3 AF              044        J-7        AF4-78            VT-3 AF              044        J-5        AF4-5              VT-3 AF              044        E-6        AF4-94            VT-3 AF              044        I-7        AF4-55            VT-3 AF              044        I-11      AF4-3              VT-3 AF              044        N-ll      AF4-74            VT-3 AF              044        D"6        AF4-2              VT-3 AF              044        D-11      AF4-1              VT-3 AF              044        I-7        AF4-4              VT-3 AF              044        H"7        AF4-77            VT-3 AF              044        H-13      AF3-15            VT-3 AF              044        D-12      AF2-1. 2          VT"3 AF              044        I-12      AF2-13            VT-,3 AF              044        L-13      AF2-14            VT-3 AF              045        8-6        AF3-120            VT-3 AF              045        8-6        AF2-119            VT-3 CE              045        D-7        CES-38            VT-3 CE              045        J-9        CES-41            VT-3 CE              045        H-7        CE6-39            VT-3 CE              045        H-8        CE6-40            VT"3 CE              045        J-9        CE6-196            VT-3 CE              045        B-7        CE8-97            VT-3 CE              045        B-7        CE8-98            VT-3 ISI-201 Rev.                                                Page 64 of  78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAit PLAN  


==SUMMARY==
==SUMMARY==
ASi4lE SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments SYSTEM/~Com onent SW SW SW SW SW SW SW SW SW SW SW SW SW SM SM SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW SW FLOW 0 IAGRAi t (2165-G)047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 FLOW DIAG COORD'D-5 G-l C-5 G-2 I-1 I-2 M-9 L-15 L-13 L-6 H-5 H-13 L-13 H-4 H-12 H-13 H-6 F"5 E-6 G-7 H-14 F-14 F-14 F-13 H-7 G-12 G-5 G-14 I-5 H-7 I-11 K-11 D-6 D-7 E-8 LINE NUBBER SM30-2 SW30-3 SM30-5 SW30-6 SW30-10 SW30-11 SW30-25 SW30-99 SW30-146 SW24-67 SW24-66 SW24-72 SW24-73 SM20-8 SW18-22 SW16-7 SW14-26 SW14-27 SW14-28 SW14-39 SM14-45 SW14-46 SW14-47 SW14-53 SW14-343 SW14-345 SW12-410 SW12-411 SW12-83 SW12-84 SW12-85 SW12"86 SW10-31 SW10-33 SW10-36 EXAM i4IETHOD VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 RELIEF RE<EUEST PROGRAM Notes ISI"201 Rev.Page 65 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASi4lE SECTION XI EDITION 80W81 CATEGORY:     D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM:         D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW        FLOW SYSTEM/         0 IAGRAit    DIAG          LINE          EXAM  RELIEF      PROGRAM
~Com onent       (2165-G)     COORD          NUBBER      i4IETHOD RE<EUEST    Notes SW              047       'D-5         SM30-2          VT-3 SW              047        G-l         SW30-3          VT-3 SW              047        C-5         SM30-5          VT-3 SW              047        G-2         SW30-6          VT-3 SW              047        I-1         SW30-10        VT-3 SW              047        I-2         SW30-11        VT-3 SW              047        M-9         SW30-25        VT-3 SW              047        L-15       SW30-99        VT-3 SW              047        L-13       SW30-146        VT-3 SW              047        L-6        SW24-67        VT-3 SW              047        H-5         SW24-66        VT-3 SW              047        H-13        SW24-72        VT-3 SW              047        L-13       SW24-73        VT-3 SM              047        H-4        SM20-8          VT-3 SM              047        H-12        SW18-22        VT-3 SW              047        H-13        SW16-7         VT-3 SW              047        H-6         SW14-26        VT-3 SW              047        F"5        SW14-27        VT-3 SW              047        E-6        SW14-28        VT-3 SW              047        G-7         SW14-39        VT-3 SW              047        H-14        SM14-45         VT-3 SW              047        F-14        SW14-46         VT-3 SW              047        F-14        SW14-47        VT-3 SW              047        F-13        SW14-53        VT-3 SW              047        H-7        SW14-343        VT-3 SW              047        G-12        SW14-345        VT-3 SW              047        G-5        SW12-410        VT-3 SW              047        G-14        SW12-411        VT-3 SW              047        I-5        SW12-83        VT-3 SW              047        H-7        SW12-84        VT-3 SW              047        I-11        SW12-85        VT-3 SW              047        K-11        SW12"86        VT-3 SW              047        D-6        SW10-31        VT-3 SW              047        D-7        SW10-33        VT-3 SW              047        E-8        SW10-36        VT-3 ISI"201 Rev.                                               Page 65 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE   INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
.ASME SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments SYSTEM/~Com onent SW SW SW SW'W SW SW SW SW.SW SW SW SW SW SW SW SW SW EA EA EA EA FLOW DIAGRAM (2165-G)047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 047 133 133 133 133 FLOW DIAG COORD F-10 E-11 D-13 E-13 I-7 D-14 I-10 B-l J-9 H-10 L-14 K-14 I-8 I-14 H"9 J-10 J-8 E-1 D-4 8-2 M-16 M-16 J-1 G-3 G"3 G-5 G-5 LINE NUMBER SW10-38 SW10-52 SW10-54 SW10-57 SW10-68 SW10-297 SW10-74 SW10-752 SW8-81 SWB-87 SWB-88 SWB-122 SW8-128 SW8-165 SW8-338 SW6-80 SW6-82 SW6-749 SW6-750 SWB-751 SW30-97 SW36-96 SW36-316 EA24-1 EA24-2 EA24-3 EA24-4 EXAM METHOD VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3.VT-3 VT-3 RELIEF PROGRAM REQUEST Notes ISI-201 Rev.Page 66 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
                              .ASME SECTION XI EDITION 80W81 CATEGORY:     D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM:         D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM    RELIEF    PROGRAM
~Com onent     (2165-G)     COORD        NUMBER        METHOD    REQUEST    Notes SW            047       F-10       SW10-38        VT-3 SW            047        E-11       SW10-52        VT-3 SW            047        D-13       SW10-54        VT-3 SW            047        E-13       SW10-57        VT-3
  'W              047        I-7        SW10-68        VT-3 SW            047        D-14       SW10-297        VT-3 SW            047        I-10       SW10-74        VT-3 SW            047        B-l        SW10-752        VT-3 SW            047        J-9        SW8-81          VT-3
  . SW            047        H-10      SWB-87          VT-3 047        L-14      SWB-88          VT-3 047        K-14      SWB-122        VT-3 047        I-8        SW8-128        VT-3 047        I-14      SW8-165        VT-3 047        H"9        SW8-338         VT-3 SW            047        J-10      SW6-80         VT-3 SW            047        J-8        SW6-82          VT-3 SW            047        E-1       SW6-749        VT-3 SW            047        D-4       SW6-750        VT-3 SW            047        8-2        SWB-751        VT-3 SW            047        M-16      SW30-97        VT-3 SW            047        M-16      SW36-96        VT-3 SW            047        J-1        SW36-316        VT-3 EA            133        G-3       EA24-1          VT-3 EA            133        G"3       EA24-2          VT-3 EA            133        G-5        EA24-3         .VT-3 EA            133        G-5        EA24-4          VT-3 ISI-201 Rev.                                             Page 66 of 78
 
SHEARON HARRIS   UNIT NO. 1 PRESERVICE     INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: '2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments SYSTEM/~Com onent CC CC CC CC CC CC CC CC CC CC CC CCCC CC CC CC CC.gC CC CC CC CC CC CC FLOW DIAGRAM (2165-G)819 819 819 819 819 819 819 819 819 820 820 820 820 821 821 821 821 821 821 821 821 822 822 822 822 819 FLOW DIAG COORD F-6 E-8'"13 K-4 L-11 H-8 H-9 K-13 G"5 B-12 A-3 M-12 L-3 D-1 B=16 B-11 E-1 G-1 G-12 D-12 D-2 M-8 F-5 F-13 M-14 I-6 LINE NUMBER CC18-2 CC18-3 CC18-4 CC18-5 CC18-6 CC18-18 CC18-19 CC18-7 CC18-16 CC12-12 CC12-13 CC12-14 CC12-15 CC8-10 CC8-1.46 CC6-145 CC6-147 CC6-149 CC6-195 CC6-201 CC6-130 CC20-254 CC20-1.1 CC18-251 CC18-252 CC18-17 EXAM HETHOD VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 RELIEF PROGRAM REQUEST Notes ISI-201 Rev.2 Page 67 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:      D-B, Systems  in Support of      ECCS,  Containment Heat Removal, Atmosphere ITEM:    '2.20,Cleanup, and  RHR D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW        FLOW SYSTEM/          DIAGRAM      DIAG          LINE          EXAM    RELIEF    PROGRAM
~Com  onent      (2165-G)    COORD          NUMBER        HETHOD    REQUEST    Notes CC              819        F-6        CC18-2            VT-3 CC              819        E-8'"13 CC18-3            VT-3 CC              819                    CC18-4            VT-3 CC              819        K-4        CC18-5            VT-3 CC              819        L-11        CC18-6            VT-3 CC              819        H-8        CC18-18          VT-3 CC              819        H-9        CC18-19          VT-3 CC              819        K-13        CC18-7            VT-3 CC              819        G"5        CC18-16          VT-3 CC              820        B-12        CC12-12          VT-3 CC              820        A-3        CC12-13          VT-3 CC              820        M-12        CC12-14          VT-3 CC              820        L-3          CC12-15          VT-3 821        D-1          CC8-10          VT-3 821        B=16        CC8-1.46        VT-3 CC              821        B-11        CC6-145          VT-3 CC              821        E-1          CC6-147          VT-3 CC              821        G-1          CC6-149          VT-3 CC              821        G-12        CC6-195          VT-3
    .gC              821        D-12        CC6-201          VT-3 CC              821        D-2          CC6-130          VT-3 CC              822        M-8          CC20-254        VT-3 CC              822        F-5          CC20-1.1          VT-3 CC              822        F-13        CC18-251          VT-3 CC              822        M-14        CC18-252          VT-3 CC              819        I-6          CC18-17          VT-3 ISI-201 Rev. 2                                              Page 67 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE     INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments SYSTEM/~Com anent CH CH CH CH CX CX CX CX CH CX CX SWEW SW SW CH CH CH CX CX CX CH CX CX SW SW SW SW FLOW DIAGRAM (2168-G)498 498 498 498 498 498 498 498 498S02 498S02 498S02 498S02 498S02 498S02 498S02 498S02'99 499 499 499 499 499 499S02 499S02 499S02 499S02 499S02 499S02 499S02 FLOW DIAG COORD B-2 B-5 B-11 D-4 iN-5 M-7 J-6 K-10 G-14 H-6 K-8 F-6 E-7 E-11 E-8 F-6 B-14 B-11 B-10 L-16 L-12 K-10 G-14=-L-12 H-6 E-7 E-11 D-8 F-6 LINE NUMBER CH10-91 CH8-208 CH6-205 CH6-194 CX10-118 CX8-201 CX6-187 CX6-200 CH10-91 CX10-168 CX10-118 SW10-938 SW8-800 SW8-801 SW6-875 SW10-938 CH10-50 CH8-51 CH6-72 CX1G-68 CX8-69 CX6-116 CH10-50 CX10-68 CX10-172 SW8-804 SW8-805 SW6-876 SW10-939 EXAM METHOD VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT;3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 V,T-3 VT-3 VT-3 RELIEF REIEVEST PROGRAM Notes ISI-201 Rev.2 Page 68 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
ASME SECTION XI EDITION 80W81 CATEGORY:      D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM:          D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW        FLOW SYSTEM/          DIAGRAM      DIAG          LINE          EXAM    RELIEF      PROGRAM
~Com  anent      (2168-G)    COORD          NUMBER        METHOD    REIEVEST    Notes CH              498        B-2          CH10-91        VT-3 CH              498        B-5          CH8-208        VT-3 CH              498        B-11        CH6-205        VT-3 CH              498        D-4          CH6-194        VT-3 CX              498        iN-5        CX10-118        VT-3 CX              498        M-7          CX8-201        VT-3 CX              498        J-6          CX6-187        VT-3 CX              498        K-10        CX6-200        VT-3 CH            498S02      G-14        CH10-91        VT-3 CX            498S02      H-6          CX10-168        VT-3 CX            498S02      K-8          CX10-118        VT-3 SW            498S02      F-6          SW10-938        VT-3 EW            498S02      E-7          SW8-800        VT-3 498S02      E-11        SW8-801        VT;3 SW            498S02      E-8          SW6-875        VT-3 SW            498S02      F-6          SW10-938        VT-3 CH            '99        B-14        CH10-50        VT-3 CH              499        B-11        CH8-51          VT-3 CH              499        B-10        CH6-72          VT-3 CX              499        L-16        CX1G-68        VT-3 CX              499        L-12        CX8-69          VT-3 CX              499        K-10        CX6-116        VT-3 CH            499S02      G-14  =-
CH10-50        VT-3 CX            499S02      L-12        CX10-68        VT-3 CX            499S02      H-6          CX10-172        VT-3 SW            499S02      E-7          SW8-804        VT-3 SW            499S02      E-11        SW8-805        V,T-3 SW            499S02      D-8          SW6-876        VT-3 SW            499S02      F-6          SW10-939        VT-3 ISI-201 Rev. 2                                              Page 68 of  78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments SYSTEM/~Com onent CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC CC FLOW DIAGRAM (2165-G)822S01 822S01 822S01 822S01 822S01 822S01 822 822 822 822 822 822 822 822 819 819 819 819 819 819 819 819 819 819 819 FLOW DIAG COORD C-6 H-5 C-2 D-2 G-4 J-5 L-4 M-12 G-4 G-11 K-12 H-2 F-9 H-4 F-1 K-2 I-18 F-4 G"5 K-4 J-5 E-18 L-16 H-4 H"3 LINE NUMBER CC14-281 CC14-282 CC14-411 CC14-412 CC14-413 CC14-414 CC6-275 CC8-544 CC6-274.CC6-255 CC6-256 CC6-652 CC8-250 CC8-653 CC12-678 CC12-684 CC12-687 CC18-679 CC18-681 CC18-683 CC18-685 CC18-686 CC18-689 CC18-690 CC18-691 EXAM METHOD VT-3 VT-3 VT"3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-i VT-$VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 RELIEF PROGRAM~RE VEST Notes ISI-201 Rev.2 Page 69 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM:         D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM  RELIEF      PROGRAM
~Com onent       (2165-G)     COORD        NUMBER      METHOD  ~RE  VEST    Notes CC            822S01       C-6       CC14-281        VT-3 CC            822S01      H-5       CC14-282        VT-3 CC            822S01      C-2       CC14-411        VT"3 CC            822S01      D-2       CC14-412        VT-3 CC            822S01      G-4       CC14-413        VT-3 CC            822S01      J-5       CC14-414      VT-3 CC              822        L-4       CC6-275        VT-3 CC              822        M-12      CC8-544        VT-3 CC              822        G-4        CC6-274        VT-3 CC              822        G-11    . CC6-255         VT-3 CC              822        K-12      CC6-256       VT-3 822        H-2        CC6-652       VT-3 822        F-9        CC8-250       VT-3 822        H-4        CC8-653       VT-3 CC              819        F-1        CC12-678       VT-i CC              819        K-2        CC12-684       VT- $
CC              819        I-18      CC12-687       VT-3 CC              819        F-4        CC18-679      VT-3 CC              819        G"5        CC18-681      VT-3 CC              819        K-4        CC18-683      VT-3 CC              819        J-5        CC18-685      VT-3 CC              819        E-18      CC18-686      VT-3 CC              819        L-16      CC18-689      VT-3 CC              819        H-4        CC18-690      VT-3 CC              819        H"3       CC18-691      VT-3 ISI-201 Rev. 2                                           Page 69 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
ASME SECTION XI EDITION 80W81 CATEGORY: D-C, Systems in Support of Residual Heat Removal from Spent Fuel Storage Pool ITEM: D3.20, D3.30, D3.40, D3.50 and D3.60, Integral Attachments SYSTEM/~Com onent SF SF SF SF SF SF SF SF SF SF SF SFSF SF SF SF SF SF SF SF FLOW DIAGRAM (2165-G), 305 305 305 305 305 305 305 305 305 305 305 305 305 305 305 305 305 305 305 305 305 FLOW DIAG COORD E-15 E-16 H"ll=J-11 G-10 J-10 H-5 K-5 B-3 A-3 G-8 J-7 I-6 H-l 1 J-11 F-14 F-13 B-7 C-6 G-15 I-7 LINE NUMBER SF16-1 SF16"2 SF16"7 SF16-8 S F14-283 SF14-284 SF12-3 SF12-4 SF12-5 SF12-6 SF12-9 S F12-10 SF12-11 SF12-12 SF12-14 SF 12-171 SF12-174 SF12-176 S F12-179 SF12-82 SF12-150 EXAM RELIEF PROGRAM HETHDD~RE UEST Notes VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 VT-3 ISI-201 Rev.2 Page 70 of 78  
 
ASME SECTION XI EDITION 80W81 CATEGORY:     D-C, Systems in Support of Residual Heat   Removal from Spent Fuel Storage Pool ITEM:         D3.20, D3.30, D3.40, D3.50 and D3.60,   Integral Attachments FLOW        FLOW SYSTEM/           DIAGRAM      DIAG          LINE        EXAM    RELIEF        PROGRAM
~Com onent       (2165-G),   COORD          NUMBER      HETHDD    ~RE  UEST      Notes SF              305       E-15       SF16-1          VT-3 SF              305        E-16       SF16"2          VT-3 SF              305        H"ll       SF16"7          VT-3 SF              305      =J-11       SF16-8          VT-3 SF              305        G-10       S F14-283      VT-3 SF              305        J-10       SF14-284        VT-3 SF              305        H-5       SF12-3         VT-3 SF              305        K-5        SF12-4          VT-3 SF              305        B-3        SF12-5          VT-3 SF              305        A-3        SF12-6        VT-3 SF              305        G-8       SF12-9          VT-3 SF              305        J-7        S F12-10       VT-3 SF               305        I-6        SF12-11        VT-3 305        H-l 1      SF12-12        VT-3 SF              305        J-11      SF12-14        VT-3 SF              305        F-14      SF 12-171      VT-3 SF              305        F-13      SF12-174      VT-3 SF              305        B-7        SF12-176      VT-3 SF              305        C-6        S F12-179      VT-3 SF              305        G-15      SF12-82        VT-3 SF              305        I-7        SF12-150      VT-3 ISI-201 Rev. 2                                             Page 70 of 78


APPENDIX D AUGMENTED COMPONENTS INSPECTION PLAN  
APPENDIX D AUGMENTED COMPONENTS INSPECTION PLAN  


==SUMMARY==
==SUMMARY==
ISI-201 Rev.2 Page 71 of 78


SHEARON HARRIS UNIT NO.1, PRESERVICE INSPECTION PROGRAM PLAN  
ISI-201 Rev. 2                        Page 71 of 78
 
SHEARON HARRIS UNIT NO. 1, PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
CATEGORY: Reg.Guide 1.14 ITEM: RCP Flywheel Keyway and Bore Areas SYSTEM/~Com onent FLywheel Flywheel Flywheel FLOW DIAGRAM (2165-G)800 800 800 FLOW DIAG COORD C-3 L"3 C" 17 LINE NUMBER 1A 1B 1C EXAM METHOD Vol Vol Vol RELIEF PROGRAM REQUEST Notes ISI-201 Rev.2 Page 72 of 78 1 a SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
CATEGORY:   Reg. Guide 1. 14 ITEM:       RCP Flywheel Keyway and Bore Areas FLOW        FLOW SYSTEM/         DIAGRAM      DIAG        LINE          EXAM  RELIEF    PROGRAM
~Com onent       (2165-G)     COORD      NUMBER      METHOD  REQUEST    Notes FLywheel            800       C-3         1A          Vol Flywheel            800        L"3         1B          Vol Flywheel            800        C" 17       1C           Vol ISI-201 Rev. 2                                       Page 72 of 78
 
1 a
 
SHEARON HARRIS       UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
CATEGORY: ITEM: Reg.Guide 1.14 Flywheel Exposed Surface SYSTEM/.~Com onent Flywheel Flywheel Flywheel FLOW DIAGRAM (216'-G)800 800 800 FLOW DIAG COORD C-3 L-3 C-17 LINE'UBBER 1A 1B 1C EXAM METHOD Vol&Sur Vol&Sur Vol&Sur RELIEF PROGRAM~E<EUEST Notes iISI-201 Rev.2 Page 73 of 78


SHEARON HARRIS UNIT NO.PRESERVICE INSPECTION PROGRAM PLAN  
CATEGORY:    Reg. Guide 1.14 ITEM:        Flywheel Exposed Surface FLOW      FLOW SYSTEM/.        DIAGRAM    DIAG        LINE                EXAM    RELIEF      PROGRAM
  ~Com onent      (216'-G)    COORD            'UBBER METHOD    ~E<EUEST    Notes Flywheel            800      C-3          1A            Vol  &  Sur Flywheel            800      L-3          1B            Vol  &  Sur Flywheel            800      C-17          1C            Vol  &  Sur i
ISI-201 Rev. 2                                                Page 73 of 78
 
SHEARON HARRIS UNIT NO.
PRESERVICE   INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
CATEGORY: Augmented Piping WeldsSYSTEM/~corn orient MS MS MS MS HS MS MS MS MS MS HS MS MS iHS MS MS MS MS iMS MS MS MS MS HS MS MS MS MS MS MS MS MS MS MS MS FW FW FW AF AF AF AF AF AF FLOW DIAGRAM (2165-G)042 042 042 042 042 042 042 042 042 042 042 042 042 042 042 042 042 042 042 042 042 042 042$42 042 042 042 042 042 042 042 042 042 042 042 044 044 044 044 044 044 044 044 044 FLOW DIAG COORD D-8 H-8 K-8 D-7 G-5 K-5 F-10 C-13 C-12 D-9 G-9 K-9 C-8 G-8 J-7 C-3 C-4 C-5 C-6 C-6 G-3 G-4 G-5 G-6 G-6 J-3 J-4 J-5 J-6 J-6 H-7 K-7 D-8 H-8 K-8 B-6 G-6 L-6 C-6 H-4 M-5 J-6 C-5 E-5 LINE NUMBER MS 12-122 MS12-123 MS12-124 MS34-235 MS34-236 HS34-237 MS50-7 HS44-8 HS44-9 HS32-4 HS32-5 MS32-6 MSS-107 MSS-108 MS8-109 HS8-62 MS8-63'S8-64 MS8-65=HSS-66 MSS-67 MS8-68 MS8-69 HSS-70 MS8-71 MSS-72 MSS-73 HSS-74 HS8-75 HS8-76 MS6-56 MS6-57 MS3-116 MS3-117 HS3-118 FW16-13 FW16-15 FW16-17 AF6-59 AF6-7 AF6-60 AF4-98 AF4-95 AF4-75 EXAM METHOD Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol VoL Vol Vol Vol Vol Vol Vol VoL Vol Vol Vol VoL Vol Vol Vol Vol VoL VoL Vol VoL Vol-Vol Vol Vol VoL Vol Vol Vol Vol Vol Vol RELIEF~E<EUEST PROGRAM Notes 2,4 2,4 2,4 1,2,4 2,4 2,4 2,4 2,4 2,4 2,4 2,4 2,4 2,4,7 2,4 2,4 2,4 2,4 1,2,4 1,4 1,4 1,4 114 1,4 ISI-201 Rev.Page 74 of 78 SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
 
CATEGORY:       Augmented Piping Welds FLOW        FLOW SYSTEM/           DIAGRAM      DIAG          LINE          EXAM    RELIEF      PROGRAM
~corn   orient     (2165-G)     COORD        NUMBER        METHOD  ~E<EUEST      Notes MS              042       D-8       MS 12-122        Vol                    2,4 MS              042        H-8       MS12-123        Vol                    2,4 MS              042        K-8       MS12-124        Vol                    2,4 MS              042        D-7       MS34-235        Vol                  1,2,4 HS              042        G-5       MS34-236        Vol MS              042        K-5       HS34-237        Vol MS              042        F-10       MS50-7          Vol MS              042        C-13       HS44-8          Vol                    2,4 MS              042        C-12       HS44-9           Vol                    2,4 MS              042        D-9       HS32-4          Vol                    2,4 HS              042        G-9        HS32-5          Vol                    2,4 MS              042        K-9        MS32-6           Vol                    2,4 MS              042        C-8        MSS-107          Vol                    2,4 iHS              042        G-8        MSS-108          VoL                    2,4 MS              042        J-7       MS8-109          Vol                    2,4 MS              042        C-3        HS8-62          Vol                  2,4,7 MS              042        C-4        MS8-63          Vol MS               042        C-5               'S8-64 Vol iMS              042        C-6        MS8-65=         Vol MS              042        C-6        HSS-66           Vol MS              042        G-3        MSS-67           VoL MS              042        G-4        MS8-68           Vol MS              042        G-5        MS8-69           Vol HS              $ 42      G-6        HSS-70           Vol MS              042        G-6        MS8-71           VoL MS              042        J-3        MSS-72           Vol MS              042        J-4        MSS-73           Vol MS              042        J-5        HSS-74           Vol MS              042        J-6        HS8-75           Vol MS              042        J-6        HS8-76           VoL MS              042        H-7        MS6-56           VoL MS              042        K-7        MS6-57           Vol                    2,4 MS              042        D-8        MS3-116         VoL                    2,4 MS              042        H-8        MS3-117         Vol                    2,4 MS              042        K-8        HS3-118       -
Vol                    2,4 FW              044        B-6        FW16-13         Vol                  1,2,4 FW              044        G-6        FW16-15         Vol FW              044        L-6        FW16-17         VoL AF              044        C-6        AF6-59           Vol AF              044        H-4        AF6-7           Vol                    1,4 AF              044        M-5        AF6-60           Vol                    1,4 AF              044        J-6        AF4-98           Vol                    1,4 AF              044        C-5        AF4-95           Vol                    114 AF              044        E-5        AF4-75           Vol                   1,4 ISI-201 Rev.                                               Page 74 of 78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
CATEGORY: Augmented Piping Welds SYSTEM/~Com onent AF AF AF FW FW FW FW FW FM FW FW FW FW FW FW FW FW FW CT CT CT CT CT CT CT CT BD BD BD CS CS CS CS CS CS CS CS CS-CS CT CT FLOW DIAGRAM (2165-G)044 044 044 044 044 044 044 044 044 044 044 044 044 044 044 044 044 044 050 050 050 050 050 050 050 050" 051 051 051 803 803 803 803 803 803 803 803 805 805 050 050 FLOW DIAG COORD H-5 iN" 6 N-6 G-19 G-19 G-19 G-19 G-19 G-19 B-8 G-8 K-8 E-19 E-19 E-19 E-19 E-19 E-19 F-16 H-16 G-15 H-16 G" 15 G-16 F-8 K-8 D-5 I-4 N-5 A-14-B-17 A-10 A"11 A-12 J-3 J-3 J-3 H-6 H-8 K-3 F-3 LINE NUHBER AF4-96 AF4-97 AF4-85 FW3-83 FW3-82 FW3-84 FM3-85 FW3-86 FW3-87 FW16-12 FW16-14 FW16-16 FW6-78 FW6-76 FW6-80 FW2-129 FW2-130 FW2-131 CT24-1 CT16-8 CT14-79 CT14-9 CT8-65 CTB-77 CT8-10 CTB-15 BD4-3 BD4-7 BD4-11 CS3-96 CS3-95 CS2-138 CS2-91 CS2-92 CS ling 19 CSI<-20 CS1<-21 CS4-300 CS3-294 CT6-162 CT6-163 EXAM METHOD Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Sur Sue'ur Sur Sur Sur Sur Sur Su@'ol Sur+Vol Sue+Sue Sue Sue Sue Vol Sue Sur Sur Sue Sur Sur Vol Vol Vol Vol RELIEF REQUEST PROGRAM!Notes 1,4 1,4 1,4 2,4 2,4 2,4 2,4 2,4 2,4 2,4 2,4 2,4 2,4',4 2,4 2,4 2,4 2 7%5 5 5 5 5-.5 5 5 3,4 3,4 3,4 3,4 1,4 3,4 3,4 3,4 3,4 3,4 3,4 5 5 5 5 ISI-201 Rev.Page 75 of 78


SHEARON HARRIS UNIT NO.1 PRESERVICE INSPECTION PROGRAM PLAN  
CATEGORY:    Augmented Piping Welds FLOW        FLOW SYSTEM/        DIAGRAM      DIAG          LINE        EXAM      RELIEF      PROGRAM!
~Com  onent      (2165-G)    COORD        NUHBER      METHOD      REQUEST      Notes AF            044        H-5        AF4-96          Vol                      1,4 AF            044        iN"6      AF4-97          Vol                      1,4 AF            044        N-6        AF4-85          Vol                      1,4 FW            044        G-19      FW3-83          Vol                      2,4 FW            044        G-19      FW3-82          Vol                      2,4 FW            044        G-19      FW3-84          Vol                      2,4 FW            044        G-19      FM3-85          Vol                      2,4 FW            044        G-19      FW3-86          Vol                      2,4 FM            044        G-19      FW3-87          Vol                      2,4 FW            044        B-8        FW16-12        Vol                      2,4 FW            044        G-8        FW16-14        Vol                      2,4 FW            044        K-8        FW16-16        Vol                      2,4 FW            044        E-19      FW6-78          Vol                      2,4',4 FW            044        E-19      FW6-76          Vol FW            044        E-19      FW6-80          Vol                      2,4 FW            044        E-19      FW2-129        Sur                      2,4 FW            044        E-19      FW2-130        Sue'ur                  2,4 FW            044        E-19      FW2-131                                  2 7%
CT            050        F-16      CT24-1          Sur                        5 CT            050        H-16      CT16-8          Sur                        5 CT            050        G-15      CT14-79        Sur                        5 CT            050        H-16      CT14-9          Sur                        5 CT            050        G" 15      CT8-65          Sur                        5 CT            050        G-16      CTB-77          Su@'ol                    -.5 CT            050        F-8        CT8-10      Sur  +                        5 CT            050"      K-8        CTB-15      Sue +      Vol                  5 BD            051        D-5        BD4-3          Sue                      3,4 BD            051        I-4        BD4-7          Sue                      3,4 BD            051        N-5        BD4-11          Sue                      3,4 CS            803        A      CS3-96          Sue                      3,4 CS            803        B-17      CS3-95          Vol                      1,4 CS            803        A-10      CS2-138        Sue                      3,4 CS            803        A"11      CS2-91          Sur                      3,4 CS            803        A-12      CS2-92          Sur                      3,4 CS            803        J-3        CS ling 19      Sue                      3,4 CS            803        J-3        CSI<-20        Sur                      3,4 CS            803        J-3        CS1<-21        Sur                      3,4 CS-            805        H-6        CS4-300        Vol                        5 CS            805        H-8        CS3-294        Vol                        5 CT              050        K-3        CT6-162        Vol                        5 CT              050        F-3        CT6-163        Vol                        5 ISI-201 Rev.                                                Page  75 of  78
 
SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN  


==SUMMARY==
==SUMMARY==
CATEGORY: Augmented Piping Welds SYSTEM/~corn onenn CS CS RH RH RH RH SI SI SI SI SI SI.SI SI SI SI SI SI SI SI SI SI SI SI Sj SI SI SI SI SI SI SI SI FLOW DIAGRAM (2165-G)805 805 824 824 824 824 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 808 FLOW DIAG COORD K-7 J-7 L-6 I-6 L-9 J-8 K-13 M-13 J-13 M-14 M-11" M-6 M-5 L-3 K-3 H-3 F-2 K-12 H-13 F-11 F-14 E-3 E-4 E-5 E-14 D-15 E-8 E-7 E-6 F-16 E-13 D-14 D-12 LINE MEMBER CS3-337 CS3-292 2RH12-1 2RH12-6 2RH14-2 2RH14-7 SI4-32 SI4-1 SI4-47 SI4-84 SI3-2 SI3-4 SI3-45 SI3-44 SI3-410 SI3-11 SI3-12 SI3-3 SI3-49 SI3-50 SI3-51 SI2-17 SI2-21 SI2-23 SI2-68 SI2-72 SI2-52 SI2-58 SI2-60 SI2-76 SI2-39 SI2-29 S12-33 EXAM METHOD Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Vol Sur Sur Sue Sue Sue Sui.Sur Sur Sur Sur Sur Sur RELIEF PROGRAM RE(EUEST Mores 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5'5 5 5 5 5 5 5 5 5 5 5ISI"201 Rev.2 Page 76 of 78 APPENDIX E PERSONNEL QUALIFICATION PROGRAN FOR AUSTENETIC WELD INSPECTION ISI-201'Rev.
2 Page 77 of 78


QUALIFICATION PROGRAil (1)CP&L or their agent will prepare a QualiEication Program Plan to assure the Eollowing: (a)The techniques applied are effective for the detection, characterization, sizing, and evaluation of service induced defects.(b)Personnel.
CATEGORY:      Augmented  Piping Welds FLOW        FLOW SYSTEM/          DIAGRAM      DIAG        LINE          EXAM    RELIEF      PROGRAM
performing the examinations, including detection, characterization, and sizing are capable of carrying out these procedures.(c)That performance of examinations in the plant reflect the capabilities demonstrated in the qualification program (1)(a)and (b)above.(2)The Qualification Program Plan shall address the following: (a)Procedure and equipment requirements.(b)The description of the test parts including number of cracks, geometrical reflectors, and samples containing no defects.The suitabil.ity of these samples to demonstrate the objectives of the Qualification Program Plan.(c)Criteria for acceptance of the demonstration for, both procedures and personnel.(d)Period for which qualification is valid as well as conditions which require requalification.(e)The components to which the qualification applies.(E)Documentation of the qualification results.(3)The Qualification Test Program shall be reviewed by the Authorized Nuclear Inservice Inspector.
~corn  onenn      (2165-G)    COORD      MEMBER      METHOD    RE(EUEST    Mores CS              805        K-7      CS3-337        Vol                      5 CS              805        J-7      CS3-292        Vol                      5 RH              824        L-6      2RH12-1        Vol                      5 RH              824        I-6      2RH12-6        Vol                      5 RH              824        L-9      2RH14-2        Vol                      5 RH              824        J-8      2RH14-7        Vol                      5 SI              808        K-13      SI4-32          Vol                      5 SI              808        M-13      SI4-1          Vol                      5 SI              808        J-13      SI4-47          Vol                      5 SI              808        M-14      SI4-84          Vol                      5 SI              808        M-11"    SI3-2          Vol                      5 SI .            808        M-6      SI3-4          Vol                      5 SI              808        M-5      SI3-45          Vol                      5 SI              808        L-3      SI3-44          Vol                      5 SI              808        K-3      SI3-410        Vol                      5 SI              808        H-3      SI3-11          Vol                      5 SI              808        F-2      SI3-12          Vol                      5 SI              808        K-12      SI3-3          Vol                      5 SI              808        H-13      SI3-49          Vol                      5 SI              808        F-11      SI3-50          Vol                      5 SI              808        F-14      SI3-51          Vol                      5 SI              808        E-3      SI2-17          Sur                    '
ISI-201 Rev.2 Page 78 of 78}}
SI              808        E-4      SI2-21          Sur                      5 SI              808        E-5      SI2-23          Sue                      5 Sj              808        E-14      SI2-68          Sue                      5 SI              808      D-15      SI2-72          Sue                      5 SI              808        E-8      SI2-52          Sui.                    5 SI              808      E-7      SI2-58          Sur                      5 SI              808      E-6      SI2-60          Sur                      5 SI              808      F-16      SI2-76          Sur                      5 SI              808      E-13      SI2-39          Sur                      5 SI              808      D-14      SI2-29          Sur                      5 SI              808      D-12      S12-33          Sur                      5 ISI"201 Rev. 2                                          Page 76 of  78
 
APPENDIX  E PERSONNEL QUALIFICATION PROGRAN FOR AUSTENETIC WELD INSPECTION ISI-201'Rev. 2                        Page 77 of 78
 
QUALIFICATION PROGRAil (1) CP&L or their agent will prepare       a QualiEication Program Plan to assure the Eollowing:
(a) The techniques     applied are effective for the detection, characterization,     sizing, and evaluation of service induced defects.
(b) Personnel. performing the examinations, including detection, characterization, and sizing are capable of carrying out these procedures.
(c) That performance of examinations in the plant reflect the capabilities demonstrated in the qualification program (1) (a) and (b) above.
(2) The Qualification Program Plan shall address         the following:
(a) Procedure and equipment requirements.
(b) The   description of the test parts including number of cracks, geometrical reflectors, and samples containing no defects.     The suitabil.ity of these samples to demonstrate the objectives of the Qualification Program Plan.
(c) Criteria for     acceptance   of the demonstration for, both procedures   and personnel.
(d) Period for which qualification is valid as well         as conditions which require requalification.
(e) The components     to which the qualification applies.
(E) Documentation of the     qualification results.
(3) The Qualification Test Program shall be reviewed by the Authorized Nuclear Inservice Inspector.
ISI-201 Rev. 2                                             Page 78 of 78}}

Latest revision as of 18:21, 3 February 2020

Rev 2 to Inservice Insp Program ISI-201, ASME Preservice Insp Program Plan (Except Reactor Vessel).
ML18019A392
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/30/1985
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18019A390 List:
References
ISI-201, NLS-85-327, NUDOCS 8509260087
Download: ML18019A392 (114)


Text

Attachment 1 to NLS-85-327 CAROLINA POWER & LIGHT COMPANY SHEARON HARRIS NUCLEAR POWER PLANT PLANT OPERATING MANUAL VOLUME 6 PART 7 PROCEDURE TYPE: INSERVICE INSPECTION PROGRAM (ISI)

NUMBER: 'SI"201 PROCEDURE TITLE: ASME PRESERVICE INSPECTION PROGRAM PLAN (EXCEPT REACTOR VESSEL)

REVISION 2 APPROVED: g -Zo -85 Signature Date TITLE: lV) C ~ ~~+ SUT P'di~~

1 9,.'.;

\

aSOmeoOm SSoma .

PDR, ADOCK 05000400

.PDR I

Page 1 oE 78

I t 0

List of Effective Pa es

~Pa e Revision 1-78 2 ISI-201 Rev. 2 Page 2 of 78

Table of Contents Page 1.0 Introduction 4 2.0 Requirements for Preservice Inspection 5 3.0 Exemptions 5 4.0 Exceptions 7 5.0 QuaLity Assurance 8 6.0 Examination Procedures 8 7.0 Ultrasonic Testing 9 8.0 EvaLuation Criteria 11 9.0 Records and Reports 12 10.0 Personnel Qualification 12 11.0 Pre-examination Requirements 12 12.0 Program Plan Notes 13 Table 1 14 Figure 1 15 Appendix A 16 Appendix B 47 Appendix C 63 Appendix D 71 Appendix E 77 ISI-201 Rev. 2 Page 3 of 78

1.0 INTRODUCTION

This Program PLan has been prepared to fulfiLL the remaining Preservice Inspection (PSI) requirements for Shearon Harris NucLear Power Plant. The reactor pressure vessel preservice program pLan was previously submitted on March 14, 1983. This Program Plan has been written to meet the requirements specified by the Code of Federal ReguLations 10 CFR 50.55a. The Program Plan has been expanded to include augmented inservice inspection requirements which comply with the following'.

A. U.S. Nuclear Regulatory Commission Standards Review Plan, Section 3.6.1 "Plant Design for Protection Against Postulated Piping Failures in Fluid Systems Outside Containment" (NUREG 75/087 Updated to NUREG-0800, 1981).

B. U.S. Nuclear Regulatory Commission Standard Review PLan, Section 6.6 "Inservice Inspection of Class 2 & 3 Components" (NUREG-0800, 1981) .

C. U.S. Nuclear Regulatory Commission Regulatory Guide 1.14 "Reactor Coolant Pump Fl'ywheeL Integrity."

D. Request for additional information from NRC to CP&L by Letter dated October 11, 1983.

In addition to the above, the Program PLan also incorporates the SHNPP FSAR commitments on Preservice/Inservice Inspection.

The scope of examinations, procedures and acceptance criteria meet the requirements outlined in Section XI of the ASNE Boiler and Pressure VesseL Code, "Rules for lnservice Inspection of NucLear Power PLant Components," 1980 Edition, with addenda through Minter 1981. Accordingly, aLL class 1, 2, and 3 pressure retaining components and their supports as defined by 10 CFR 50 and NRC Regulatory Guide 1.26, will be examined to comply with ASiME Code Section XI requirements to the extent practicable within the limitations of the component, or system portion, design and geometry.

ALL Class 1, 2, and 3 water, steam, air and other fluid systems within the scope of ASME Section XI are listed in Table 3.2.2-1 of the FSAR.

Several piping systems will receive augmented inspections for protection against postulated piping failures as outlined in Section 3.6.1 and 6.6 of the Standard Review Plan. The extent of examinations to those piping systems is defined by Shearon Harris Nuclear Power Plant FSAR Section 6.6.8. Augmented examinations will also be performed on the flywheel of the Reactor Coolant pumps in accordance with Regulatory Guide 1.14. Augmented components and examinations are Listed in Appendix D.

ISI-201 Rev. 2 Page 4 of 78

2.0 RE VIREMENT FOR PRESERVICE INSPECTION The Preservice Inspection requirements stipulated by 10 CFR 50.55a(g)(3) estabLish the applicabLe Edition of Section XI of the ASME Code for the components of a facility whose construction permit was issued after July 1, 1974.

The safety classification system for radioactive water/steam-containing components important to the safety of water-cooled nuclear power plants is discussed in FSAR Section 3.2.

2.2 Definition of Owner Intent In accordance with the requirements set forth by 10 CFR 50.55a, the Shearon Harris PLant must comply with the requirements of the 1974 Edition of Section XI, with addenda through Summer 1975 as modified by Appendix III of Winter 1975 Addenda. However, in order to comply with a more recent code and addenda, Carolina Power & Light has elected to comply with the 1980 Edition of Section XI, with addenda through Winter 1981 and Code Case N-335.

The extent of examination seLection of Class 1 and Class 2 piping has been determined by the requirements of the 1974 Edition of Section XI with Addenda through Summer 1975 as allowed by 10 CFR 50.55a (b)(2).

In addition, this Program Plan includes Augmented Inspections from NUREG 75/087, "Plant Design f'o r Protection Against Postulated Piping Failures in Fluid Systems Outside Containment" and Regulatory Guide 1.14, "Reactor Coolant Pump Flywheel Integrity."

Additional inspections will be performed on certain to satisfy NRC questions submitted during the FSAR systems'equired review.

3.0 EXEMPTIONS The following exemptions from examination requirements are applicable to CLass 1, 2, and 3 piping', components and their supports.

In Appendices A and B of this Program Plan under Code categories B-J for Class 1 and C-F for CLass 2 piping welds, the specific L'ine number identified and the corresponding examination method required is applicable to all circumferential welds located on that portion of pipe. Realizing this is a conservative basis for

. weld selection for Class 2 piping PSI, this approach will not only enhance system reliability but will consequentially establish superior baseline information for future Code examination

. requirements.

ISI-201 Rev. 2 Page 5 of 78

3.1 Class 1 Components except. piping will be exempted in accordance with IWB-1220 (1980 Edition thru and including Minter 1981 Addenda) from the volumetric and surface examination requirements of IWB-2500.

Category B-J components will be exempted in accordance with IWB-1229 (1974 Edition thru and including Summer 1975 Addenda) from the voLumetric and surface examination requirements of IWB-2500.

In A Code Categories B-L-2 and B-M-2 a VT-3 examination is required. It is CP&L's position that this is an Inservice requirement and does not appLy to Preservice.

Class 1 nonexempt components and examination requirements are Listed in Appendix A.

3.2 Class 2 Components except piping will be exempted in accordance with IWC-1220 (1980 Edition thru and including Winter 1981 Addenda) from the volumetric and surface examination requirements of IWC-2500.

Category C-F components wilL be exempted in accordance with IMC" 1220 (1974 Edition thru and including Summer 1975 Addenda) from the volumetric and surface examination requirements of IWC-2500.

The control of water chemistry to minimize stress corrosion described in Paragraph 1WC-1220(c) is not used as a basis for exempting components.

The current PSI Program for CLass 2 piping system welds subject to examination encorporates a significant number of surface examinations because of design waLL thickness.

LOCFR50.55a(b)(2)(iv) requires that ASHE Code Class 2 piping welds in the Residual Heat Removal (RHR) Systems, Emergency Core Cooling (ECCS) Systems,.pnd Containment Heat Removal (CHR) Systems be examined. These systems were exempted by Section XI exclusion criteria in IWC-1220. To satisfy regulatory inspection requirements CP&L implemented an augmented program (Appendix D, Note 5) of inspection to perform a volumetric and/or surface examination on a Large representative sample of welds in these systems. The same criteria of Paragraph 2 of Section 3.0 has also been appLied for weld selection where all of the circumferential welds on the Line listed are to be examined. The lines selected for augmentation are in areas that CP&L evaluated to be service sensitive.

Mithin the scope of the PSI Program Plan there are no Code Category C-0 or C-G components subject to inspection requirements of Table IWC-2500-1.

Class' nonexempt components and examination requirements are listed in Appendix B.

ISI-201 Rev. 2 Page 6 of 78

3.3 Class 3 Integral attachments of supports and restraints to components wiLL be exempted in accordance with IWD-1220 (1980 Edition thru and including Winter 1981 Addenda) from the visual examination VT-3, except that all Auxiliary Feedwater integral attachments on piping greater than 1" nominal pipe size will,receive a VT-3 visual examination.

Class 3 nonexempt components and examination requirements are listed in Appendix C.

3.4 Com onent Su orts Component supports selected for examinati'on will be the supports of those components greater than one inch in diameter that are required to be examined under IWB, IWC, and IWD. In addition, the examination requirements shall apply to the component support types identified in IWF-1210.

Preservice inspection shall be performed by the required examinations listed in Table IWF-2500-1. All required VT-3 examinations will commence upon completion of Final System Turnover on a system as described in the Harris Plant Start-up

,Manual.

ALL snubbers vill receive a preservice inspection and functionaL test prior to the commencement of hot functionaL testing of completed systems. Manufacturers test data may be used to satisfy the Preservice testing requirements.

3.5 Exem t Com onents All Class 1, 2 and 3 components exempted from Prqpervice examination requirements will have undergone the system hydrostatic test when the system has been completed as required by ASHE Section III. Preservice hydrostatic testing is not required by Section XI, IWA-5215.

4.0 EXCEPTIONS Exceptions to Code required examinations may be authorized by the regulatory authority, as aLLowed by 10 CFR 50.55 a(a)(2), provided that design fabrica'tion, installation, testing and inspection performed in compLiance with Codes and Section XI requirements would resuLt in hardship without a compensating increase in the level of quality and safety, or provided that the proposed alternative.,examination will provide an acceptable level of quaLity and safety.

Detailed descriptions and justifications for exceptions taken wilL be submitted when needed by a Request for Relief. Relief Requests when identified during PSI will be categorized as to type identifying where the code requirements cannot be met and a ISI-201 Rev. 2 Page 7 of 78

4.0 EXCEPTIONS (continued) supportin'g technical justification wiLL be submitted""6 (six) months prior to anticipated fueL Loading'here applicabLe. The specific components that faLL into CP&L's categories for Request for, Relief will be submitted at least 3 (three) months prior to anticipated fuel Loading.

5.0 QUALITY ASSURANCE The PSI Program PLan will be performed, in accordance with the requirements of the CP&L Quality Assurance Manual 'which is in compliance with Appendix B of 10 CFR 50.

6.0 EXAMINATION PROCEDURES SubarticLe IWA-1400 of Section XI requires the development and preparation of written examination procedures necessary for the conduct of the nondestructive examinations associated with PSI operations. The written procedures for the performance of visual, surface, and vol'umetric examinations are provided by the NDE Contractor and wiLL be reviewed an'd approved by CP&f. prior to use.

Methods, techniques, and procedures for the preservice inspections are titled visual, surface, and volumetric. Each term describes a, generaL method permitting a selection of different techniques and procedures restricted to that method to accommodate varying degrees of accessibility and radiation Levels.

A visual examination is employed to provide a report of the general condition of the part, component, or surface to be examined, incLuding such conditions as scratches, wear, cracks, corrosion or erosion on the surfaces; misalignment or movement of the part of component; or evidence of leaking. Visual examina-tions are applicable to welds, support members, v'alves, pumps, fasteners, cladding, etc. Visual examination procedure is based on the requirements of IMA-2210 of Section XI of the ASME Code.

I A Liquid penetrant examination is specified as the surface examination method to delineate or verify the presence of cracks or discontinuities open to the examination surface. Liquid penetrant examination procedure is in compliance with the requirements of Article 6 of Section V of the ASME Code, as required, by Section XI IMA-2222. As a substitute to liquid penetrant, SHNPP can utilize'a magnetic particle examination to satisfy surface examination requirements.

The ultrasonic pulse echo examination is selected as the volumetric examination method to indicate the presence of subsurface discontinuities by examining the entire volume of metaL contained beneath the surface to be examined. Ultrasonic examination is in compliance with Appendix III of Section XI (or Articles 4 and 5 of.Section V, as applicable) of the ASME Code, as required by Section XI IWA-2232 and including Code .Case N-335 as

-2'Page amended in Section 7.0. Radiography may be used as a substitute for ultrasonic examination when access to,welds is restricted.

ISI-201 Rev. 8 of 78

7.0 ULTRASONIC TESTING The calibration standard design drawing is part of the PSI Program Plan and shown in Figure 1. Table 1'ists all UT Calibration Standards required to perform the UT examinations. All calibration standards are retained on site.

The UT examination calibration standard design and material selection are in accordance with Subarticle III-3400 of Appendix III to Section XI 1980 Edition including Winter 81 addenda. In addition to the required notches, drilled holes have been installed as additional reflectors in accordance with the provisions of Article 5 of Section V of the Code. These additional reflectors are allowed by Subarticle III-3400 of Appendix III of Section XI.

A. In addition to this requirement it is CP&L's intent to perform ultrasonic examinations on austenitic stainless steel piping utilizing ASHE Boiler and Pressure Vessel Code Case N-335 with the following input:

L. Personnel and procedures used to perform the examinations shall be qualified in accordance with a program described in Appendix E. The J. A. Jones EPRI NDE Center IGSCC Training/Qualification Program may be used in Lieu of or integral to this program.

2. Level I examiners will not be used to monitor the ultrasonic instrument during examinations.
3. The typical calibration block design to be utilized is shown in Figure 1. CP&L reserves the right to change segments of piping used dependent upon pipe size, (e.g.,

small diameter piping ( 4 in may be 360 degree sections). Calibration reflectors shalL be instalLed as follows:

a. For calibration blocks with pipe waLL nominal thicknesses of one (1) inch and greater Paragraph A.4 below applies.
b. 'or calibration blocks with pipe thickness Less than one (1) inch waLL nominal to and including 0.5 inch a single side drilLed hole (SDH) will be installed at 1/2t. Notches wiLL be staggered at the I.D. and O.D. Locations.

c ~ For calibration blocks with pipe wall nominaL thickness less than 0.5 inch no SDH wilL be installed. I.D. and O.D. notches will be staggered to prevent interference during calibration.

ISI-201 Rev. 2 Page 9 of 78

J 7.0 ULTRASONIC TESTING (continued)

4. 'or angle beam calibration Subparagraph 3.2.2(d), of Code Case N-335 is revised to read as follows:

a ~ "Where the caLibration is Limited to the haLf V path due to material attenuation or examination technique selection, side drilled holes shaLL be used to obtain the slope and shape of the DAC curve. A minimum of two holes, each of the same diameter and Located at 1/4t and 3/4t, shaLL be placed in the calibration bLock. The diameter of the holes shalL be in accordance with Fig. T-546.1 of Article 5 oE Section V. The holes shaLL be perpendicular to the examination beam direction.

The minimum hoLe Length shaLL be L< inches.

Calibration shall be accomplished by constructing a DAC curve from the side drilled holes so that the maximum amplitude point is at 80% FSH. Once the shape and slope are determined and marked on the screen, the curve shall be extrapolated 1/4t to cover the full examination thickness'ext, establish the sensitivity Erom the inside diameter (I.D.) surface notches by setting the indication amplitude at the Level of the DAC curve."

5. Recording requirements of Subparagraph 4.5.1, Code Case N-335 will be amended to read:

a 0 The following indications shall be recorded and investigated by a Level II or LeveL III examiner to the extent necessary to determine the shape, type, and Location of the reflector.

1) An indication of a suspected flaw originating in the HAZ or adjacent base metal regardless of ampLitude.
2) Any indication 20% of DAC or greater other than those from geometric or metallurgical origin.
b. Indications 50% of DAC or greater from geometric or metallurgical origin shall be recorded.

Criteria to record geometric and metaLLurgicaL ultrasonic indications is described as amended above.

These indications will not be reported, they will be recorded for the record and for future correlation to similar indications during Inservice Inspection.

Ambiguous responses from geometry will be evaluated and characterized on a case basis using multiple ultrasonic techniques and correlation to radiographic results.

ISI-201 Rev. 2 Page 10 of 78

7.0 ULTRASONIC TESTING '(continued)

6. 'ince Supplement 7 of Code Case N-335'ill be applied to SHNPP austenitic piping weLds, concerns regarding Supplement 7 in Appendix III of Section XI do not apply. This position is taken as a result of the major

, improvements preferred in N-335.

B. The investigation, evaluation, or corrective measures taken as a result of indications recorded during piping ultrasonic examinations shalL be based up A.5. above. It. is CP&L's belief that in amending N-335, Paragraph 4.5.1 with more stringent requirement in A.5 above will ensure adequate evaluation and, if necessary, corrective action for disposition of any indication investigated and found to be other than geometric or metallurgical in nature.

C. Cast austenitic stainless steel fittings, nozzles, and other piping components will be ultrasonically examined using state-, of-the-art techniques, eg. duaL search units, etc.

Technique Limitations due to material attenuation, noise, and access wiLL be documented in the record. Capabilities to examine cast austenitic stainLess steel ultrasonically is a function of the thickness involved. Cast main Loop piping, cast-to-cast fitting welds or assembLies are recognized uninspectable. Thinner wall cast piping, fittings or assemblies as in the pressurizer surge Line are inspectable in most cases using conventional UT techniques. Cast to wrought stainless steel welds wiLL be examined from the.

~rought side, the cast side wiLL be examined if it is determined that the results are meaningfuL. The examination record will reflect all scanning Limitations.

NOTE: On November 2, 1984, a technical meeting was hgld with CP&L in the NRC Region LI Office for the purpose of providing an opportunity to demonstrate the capabilities of CP&L's ultrasonic examination procedure and equipment to detect actual flaws and artificial reflectors in Region II's Centrifugally Cast Stainless Steel test specimens'P&L's.ultrasonic procedure IST-501, and equipment demonstrated conservative detection capability. The report in totaL is contained in NRC Report No. 50-400/84-40.

8.0 EVALUATION CRITERIA Evaluation of., any indications detected during PSI shall be made in accordance with IWA-3000 of Section XI. Indications detected may be evaluated by other nondestructive methods, where practical, to assist in the determination of size, shape, location, and orientation before final disposition is made.

ISI-201 Rev. 2 Page 11 of 78

9.0 RECORDS AND REPORTS A system of records of the Preservice Inspection, plans, schedules, and calibration standards; the examination results and reports, the corrective action required and taken, will be developed and maintained at the site in accordance with IWA-6000 of Section XI.

10.0 PERSONNEL. QUALIFICATION PersonneL performing nondestructive examination operations shall be qualified with procedures prepared in accordance with SNT-TC-1A, 1980 Edition, for the applicable examination technique and methods as required by IWA-2300 of Section XI. All examinations shalL be performed and the results evaluated by qualified nondestructive examination personnel.

For those nondestructive examination methods not covered by SHT-TC-1A documents, qualification will be based on the particular method involved. Such qualification provides for uniform programs of training, evaluation, and certification of personnel. For personnel performing ultrasonic inspections the additionaL requirements of Section 7.0 will be required.

11.0 PRE-EXAMINATION RE UIREMENTS General provisions for accessibility have been defined by IWA-1500 of Section XI of the ASME Code.

l. To the maximum extent possible, systems and components that require inspection in accordance with the requirements of ASME Section XI will be designed with adequate physical access to allow the required inspection.

Requests for relief, from ASME Code Requirements, wiLL be submitted when plant design does not allow the necessary access for inspections.

2. It is intended that piping systems requiring ultrasonic inspection will. be designed so that aLL welds requiring inspection are physicaLLy accessible for inspection with ultrasonic equipment.

A. Access wilL be provided by Leaving adequate space around pipes at these welds and by means of'emovable insuLation and shielding as required.

B. Pipes welded to fittings will be designed to permit

=meaningfuL examination by avoidance of irregular surface geometries.

C. The surface of welds will be smoothed and contoured to permit effective use of ultrasonic transducers or surface examination indicators.

ISI-201 Rev. 2 Page 12 of 78

11.0 PRE-EXAMINATION RE UIREMENTS (continued)

D. Piping systems requiring surface or visual examination will be .designed to aLlow access and visibility adequate for performance of such examination.

12.0 PROGRAM PLAN NOTES NOTE 1. Augmented Program FSAR Section 6.6.8.b NOTE 2. Augmented Program FSAR Section 6.6.8.c NOTE 3. Augmented Program FSAR Section 6.6.8.d NOTE 4. Augmented Program FSAR Section 6.6.8.e NOTE 5. Augmented Program Review of the FSAR and request for additional information regarding Preservice (PSI)/Inservice (ISI) Program, Section 250.1 paragraph 2 NOTE 6. ISI Requirement Only (Not Required for PSI)

NOTE 7. No circumferential weld on this Line.

ISI-201 Rev. 2 Page 13 of 78

TABLE 1 CALIBRATION BLOCKS Piping Calibration Piping Cal.

Blocks Haterial Block Number 3 lit 2.5'W SA351 CR.CF8A UT-6 31" 2.5" HW A508 CL2 UT-7 II 29 2.33 HW SA376 TP304N UT-8 2t~t I sch 80 (XS) A106 GR.B UT-10 II 3 sch 40S (STD) A312-304 UT-11 3ll sch 80 (XS) A106 CR.B UT-l,2 3ll sch 160 A106 GR.B UT-13 3ll sch 160 A376-304 UT-14 4 II sch 40 (STD) A106 GR.B UT-15 4ll sch 80 (XS) A106 GR.B UT-16 4ll sch 160 A376-304 UT-17 I UT-18 6 sch 80 (XS) A106 GR.B 6lt sch 120 A106 GR.B UT-19 I

6 sch 160 A376-304 UT-20 8lt sch 40S (STD) A312-304 UT-21 8ll sch 80 (XS) A106 GR.B UT-22 1 0ll sch 140 (XXS) A376-316 UT-23 1Z" sch 40S (STD) A312-304 UT-24 12ll sch 60 A106 GR.B UT-25 II 1Z sch 140 A376-304 UT-26 II 14 sch 40 A358-304 UT-27 14ll sch 160 A376-316 UT-28

.668" HW A106 GR.B UT-29 16" 1.006" HW A106 GR.B UT-30 32lt 1.051" MW A106 GR.C. UT-31 34ll 2.0" HW A106 GR.C. UT-32 Deleted and replace d by UT41 44" 1.447" HW A106 GR.C. UT-33 50" 3.Z79 HW A155 KC 70 UT-34 50" 1..700 HW A155 KC 70 UT-35 UT-36 Deleted 14" sch 160 SA106-304 UT-37 UT evaluation blocks A516 Gr. 65 UT-38 UT evaluation blocks SA240-304 UT-39 6" sch 160 SA376-316 UT-40 30" sch NA A106 Gr. B UT-41 10" sch 140 SA376-304 UT-42 Vessel Cal.ibration

  • Blocks Pressurizer Shel.l SA533 CRA, CL2 UT-50 S/G Channel Head (PRI) SA533 CRBt CL1 UT-51 S/G Secondary Shell SA533 CRA, CL2 UT-52 Regenerative HT EX SA351 CF8 UT-53 RHR HT EX SA515 70 UT-54 BIT Shell SA351 CF8A UT-55 BIT Head SA240 Type 304 UT-56 ISI-201 Rev. 2 Page 14 of 78

0 0

~ ~

~ ~ ~

' ~ ~ ~

~

APPENDIX A CLASS 1 INSPECTION PLAN

SUMMARY

ISI-201 Rev. 2 Page 16 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUiMMARY ASME SECTION Xr EDITION 80W81 CATEGORY: B-B, Pressure Retaining Welds in Vessels other than Reactor Vessel.s ITEM: B2.11, Circumferential Welds FLOW FLOW SYSTEM/ DIAGRAM - DIAG LINE EXAM RELIEF PROGRAM

~Cofs onent (2165-G) COORD NUNEER HETHOU RE(EUEST Notes PZR 801 J-6 Vol ISI-201 Rev. 2 Page 17 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-B, Pressure Retaining Welds in Vessels other than Reactor Vessels ITEM: B2.12, Longitudinal Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD ~RE UEST Notes PZR 801 J-6 Vol ISI-201 Rev. 2 Page 18 of 78

SHEARON HARRIS UNIT NO.

INSPECTION PROGRAM PLAN

SUMMARY

1'RESERVICE ASME SECTION XI EDITION 80W81 CATEGORY: B-B, Pressure Retaining Welds in Vessels other than Reactor Vessel ITEM: B2.40, Tubesheet-to-Head Weld (Primary Side)

FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onene (2165-G), COORD NUMBER METHOD REQUEST Notes S/G 800 E-4 1A Vol S/G 800 H-4 1B'C Vol S/G 800 E-17 Vol ISI-201 Rev. 2 Page 19 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-D, Full Penetration Welds of Nozzles in Vessels Inspection Program B ITEM: B3.110, Nozzle to Vessel Welds

  • FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER 'METHOD REIEUEST Notes PZR 801 J-6 Vol ISI-201 Rev. 2 Page 20 of 78

SHEARON HARRIS UNIT NO. 1.

PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-D, FuLL Penetration Welds of Nozzles in Vessels Inspection Program B ITEM: B3.120,.Nozzle Inside Radius Section FLOW FLOW SYSTEM/ DIAGRAM DIAG LINK EXAM RELIEF PROGRAM

~corn onenr. (2165-.G) COORD NUMBER METHOD RE(EUEST Notes PZR 801 J-6 Vol ISI-201 Rev. 2 Page 21 of 78

SHEARON HARRIS UNIT,NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-D, Full. Penetration Welds of Nozzles in Vessels Inspection Program B ITEM: B3.130, Nozzle-to-Vessel Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~con onent (2165-G) COORD NUMBER METHOD RE<EUEST Notes S/G 800 E-4 lA Vol S/G 800 H-4 1B Vol S/G 800 E-17 1C Vol ISI-201 Rev. 2 Page 22 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: . B-D, Full Penetration Welds of Nozzles in Vessels - Inspection Program B ITEM: B3.140, Nozzle Inside Radius Section FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onenn (2165-G) COORD NUMBER METHOD ~RE UEST Nonce S/G 800 E-4 1A Vol S/G 800 H-4 1B Vol S/G 800 E-17 1C Vol ISI"201 Rev. 2 Page 23 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-E, Pressure Retaining Partial Penetration Welds in Vessels ITEM: 84.20, Heater Penetration Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD REQUEST Notes PZR 801 J-6 VT-2 ISI-201 Rev. 2 Page 24 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION BOW81 CATEGORY: B-F, Pressure Retaining Dissimilar Metal Welds ITEM: B5.40,. Nozzle-to-Safe End Butt Welds, nps > 4", Pressurizer FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD REIEUEST Noces RC 801 M-6 RC14-35 Vol & Sur RC 801 H-8 RC6-124 Vol & Sur RC 801 H-6 RC6-126 Vol & Sur RC 801 H-5 RC6-128 Vol & Sur RC 801 H-3 RC6-135 Vol & Sur RC 801 I-7 RC4-231 Vol & Sur ISI-201 Rev. 2 Page 25 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-F, Pressure Retaining Dissimilar Welds ITEM: 65.70, Nozzle-to-Safe End Butt Welds, nps > 4", Steam Generator FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAi1 RELIEF PROGRAM

~Com onent (2165"G) COORD NUiMBER METHOD RE<EUEST Motet RC 800 E-1 RC31-2 Vol & Sur RC 800 K-1 RC31-5 Vol & Sur RC 800 E-19 RC31-8 Vol & Sur RC 800 G-7 RC29-1 Vol & Sur RC 800 J-7 RC29-4 Vol & Sur RC 800 G-14 RC29-7 Vol & Sur ISI-201 Rev. 2 Page 26 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-G-l, Pressure Retaining BoLting, Greater than 2" in Diameter ITEM: B6.180, BoLts and Studs FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (216S-G) COORD NUMBER NETHOD ~RE HEST Notes RCP 800 C-3 1A Vo1 RCP 800 L"3 1B Vol RCP 800 C-17 1C Vol ISI-201 Rev. 2 Page 27 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-G-1, Pressure Retaining BoLting, Greater than 2" in Diameter ITEM: B6.190, F1ange Surface FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~corn onent (2165-G) COORD NUMBER METHOD ~E<EUEST Notes RCP 800 C-3 lA VT-1 RCP 800 L"3 1B VT-1 RCP 800 C-17 1C VT-1 ISI-201 Rev. 2 Page 28 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-G-1, Pressure Retaining Bolting, Greater than 2" in Diameter

'TEM: B6.200, Nuts, Bushings and Washers FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM C~om anent (2165-G) COORD NUMBER METHOD REQUEST Notes RCP 800 C-3 1A VT-1 RCP 800 L-3 1B VT-1 RCP 800 C-17 lc VT-1 ISI-201 Rev. 2 Page 29 of 78.

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM: B7.20, Bolts, Studs and Nuts FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD RE(EVERT Motet PZR 801 J-6 VT-1 ISI-201 Rev. 2 Page 30 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM: B7.30, Bolts, Studs and Nuts (Vessels)

FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Con onent (2165-G) COORD NUMBER METHOD RE<EUEST Notes Stm Gen 800 C-3 1A VT-1 Stm Gen 800 L-3 1B VT-1 Stm Gen 800 C-17 lc VT-1 ISI-201 Rev. 2 Page 31 oE 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-G-1, Pressure Retaining Bolting, 2" and less in Diameter ITEM: B7.60, Bolts, Studs and Nuts FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD REQUEST Notes RCP 800 C-3 1A VT-1 RCP 800 L-3 1B VT-1 RCP 800 C-17 lc VT"1 ISI-201 Rev. 2 Page 32 of 78

HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUMiMARY Oi ITEM'HEARON ASME SECTION XI EDITION 80W81 CATEGORY: B-,G-2, Pressure Retaining Bolting, 2",and less'n Diameter B7.50, Bolts, Studs and Nuts (Piping)

FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE RELIEF PROGRAM

~Com onent ,(2165-G) COORD NUMBER METHOD RE(EUEST . Notes CS 803 G-9 CS1<-16 VT-1 CS 803 G-9 CSl<-17 VT-1 CS 803 G-9 CS1~<-18 VT-1 Rc 802 B-14 RC3-21 VT-1 .

Rc 802 B-14 RC3-40 VT-1 Rc 802 B-14 RC3-61 VT-1 Rc 802 A-14 RC2-24 VT-1 Rc 802 A-14 RC6-128'XAM RC2-43 VT-1 RC 802 A-14 RC2-64 VT-1 Rc 801 H-8 RC6-124 VT-1 Rc 801 H-6 RC6-126 VT-1 Rc 801 H-5 VT-1 ISI-201 Rev. 2 Page 33 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASiME SECTION XI EDITION 80W81 CATEGORY: B-G-2, Pressure Retaining Bolting, 2" and less in Diameter ITEM: B7.70, Bolts, Studs and Nuts (Valves)

FLOW FLOW SYSTEiM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Con onent (2165-G) COORD NUMBER METHOD REQUEST Notes RC 800 B-3 V500 VT-1 RC 800 C-2 V501 VT-1 RC 800 , it-2 V502 VT-1 RC 800 C-18 V503 VT-1 RC 801 E-2 V526 VT-1 RC 801 E-1 V527 VT-1 RC 801 H-2 V528 VT-1 RC 801 I-10 P525 VT-1 RC 801 K-10 P526 VT-1 RC 801 E-1 P527 VT-1 RC 801 F-1 P528 VT-1 RC 801 H-l P529 VT-1 801 F-8 R528 VT-1 801 F-6 R529 VT-1 801 F-4 R530 VT-1 802 E-6 V540 VT-1 802 E-6 V541 VT-1 RC 802 E-6 V542 VT-1 CS 803 A-3 L500 VT-1 CS 803 A-4 L501 VT-1 CS 803 C-3 V504 VT-1 CS'S 803 C-3 V505 VT-1 803 B-3 V506 VT-1 CS 803 B-3 V507 VT-1 ISI-201 Rev. 2 Page 34 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-G-2, Pressure Retaining Bolting, 2" and Less in Diameter

.ITEM: B7.70, BoLts, Studs and Nuts (VaLves)

FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~corn onent (2165-G) COORD NUMBER METHOD ~RE UEET Nones SI 808 B-3 V507 VT""1 SI 808 C-3 V508 VT-1 SI 808 D-3 V509 VT-1 SI 808 B-11 V510 VT-1 SZ 808 C-11 V511 VT-1 SI 808 B-17 V512 VT-1 SI 808 C-17 V513 VT-1 SI 808 D-17 V5 14 VT-1 SZ 809 D-6 V544 VT-1 SI 809 H-6 V545 VT-1 SZ 809 K-6 V546 VT"1 SZ 809 D-3 V547 VT-1 809 H"3 V548 VT-1 809 K-3 V549 VT-1 810 C-2 V584 VT-1 810 E" Z- V585 VT-1 810 E-2 V586 VT-1 RH 824 L-4 V503 VT-1 RH 824 L-3 V502 VT-1 RH 824 I-4 V501 VT-1 RH 824 I-3 V500 VT-1 ISI-201 Rev. 2 Page 35 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUMHARY ASME SECTION XI EDITION 80W81 CATEGORY: B-H, Integral Attachments for Vessel.s ITEM: ..B8.20, Integral.ly Welded Attachments FLOW FLOW SYSTEM/ DIAGRAH DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUHBER METHOD ~RE HEST Notes PZR 801 J-6 Vol. or Sur ISI-201 Rev. 2 Page 36 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.11, Circumferential Welds, nps > 4" FLOW FLOW SYSTEM/ DIACRAM DIAG LINE EXAM RELIEF PROGRAM

~corn onent (2165-G) COORD NUMBER METHOD REQUEST Notes RC 800 E-1 RC31-2 Vol Sur RC 800 K-1 RC31-5 Vol Sur Rc 800 E-19 RC31-8 Vol Sur RC 800 G-7 RC29-1 Vol Sur RC 800 J-7 RC29-4 Vol Sur RC 800 G-14 RC29-7 Vol Sur RC 800 D-6 RC27<-3 Vol Sur RC 800 L-7 RC27<-6 Vol Sur RC 800 C-14 RC27%-9 Vol Sur RC 800 J-4 RC14-35 Vol Sur RC 800 G-6 RC12-12 Vol Sur RC 800 D-8 RC12-26 Vol Sur RC 800 L-6 RC12-46 Vol Sur RC 800 F-ll RC12-51 Vol Sur RC 800 C-11 RC12-65 Vol Sur RC 800 G-8 RC6-10 Vol Sur RC 800 D-8 RC6-27 Vol "& Sur RC 800 I-9 RC6-29 Vol Sur RC 800 L-9 RC6-47 Vol Sur RC 800 G-10 RC6-49 Vol Sur RC 800 E-10 RC6-66 Vol Sur RC 800 C-6 RC4-25 Vol Sur RC 800 M-5 RC4-44 Vol Sur RC 801 M-6 RC14-35 Vol Sur RC 801 I-9 RC6-122 Vol Sur RC 801 H-8 RC6-124 Vol Sur RC 801 H-6 RC6-126 Vol Sur RC 801 H-5 RC6-128 Vol Sur RC 801 H-3 RC6-135 Vol Sur RC 801 J-12 RC4-25 Vol Sur RC 801 K"11 RC4-44 Vol Sur RC 801 I-7 RC4-231 Vol Sur ISI-201 Rev. Page 37 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.11, CircumferentiaL Welds, nps > 4" FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER s METHOD ~RE NEET Notes SI 808 B-5 SI6-272 Vol & Sur SI 808 C"5 SI6-271 Vol & Sur SI 808 D-4 SI6-270 Vol & Sur SI 808 B-14 516-81 Vol & Sur SI 808 C"14 SI6-80 Vol & Sur SI 808 D-17 SI6-314 Vol & Sur SI 809 D-4 SI12-161 Vol & Sur SI 809 G-4 SI12-162 Vol & Sur SI 809 J-4 SI12-163 Vol & Sur RH 824 I-4 RH12-39 Vol & Sur RH 824 L-4 RH12-38 Vol & Sur ISI-201 Rev. 2 Page 38 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74575 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.21, Circumferential Welds, nps G.T. 1" and L.T. 4" FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onene (2165-G) COORD NUMBER METHOD REQUEST Notes RC 800 D-2 RC3-21 Sur RC 800 D-3 RC3-23 Sur RC 800 E-8 RC3-28 Sur RC 800 M-7 RC3-45 Sur RC 800 M-2 RC3-40 Sur RC 800 C-18 RC3-61 Sur RC 801 H-2 RC3-139 Sur RC 801 F-2 'C3-140 Sur RC 801 E-2 RC3-141 Sur RC 802 B-14 RC3-21 Sur RC 802 B-14 RC3-40 Sur RC 802 B-14 RC3-61 Sur CS 803 A-3 CS3-116 Sur 803 A-3 CS3-117 Sur 803 C-3 CS3-118 Sur 803 G-9 CS li~-1& Sur CS 803 G-9 CSl~<-17 Sur CS 803 G-9 CS1.4-18 Sur ISI-201 Rev. 2 Page 39 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.31, Branch Pipe Connection Welds, nps > 4" FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD ~RE VERT Notes RC 800 G-7 RC29-1 Vol & Sur RC 800 J-7 RC29-4 Vol & Sur RC 800 G-14 RC29-7 Vol & Sur RC 800 D-6 RC274"3 Vol & Sur RC 800 L-7 RC27<-6 Vol. & Sur RC 800 C-14 RC27<-9 Vol & Sur ISI-201 Rev. 2 Page 40 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.32, Branch Pipe Connection Welds, nps G.T. 1" and L.T. 4" FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUi IBER METHOD RE<EUEST Notes RC 800 E-1 RC31-2 Sur RC 800 K-1 RC31-5 Sur RC 800 E-19 RC31-8 Sur RC 800 G-7 'RC29-1 Sur RC 800 J-7 RC29-4 Sur RC 800 G-14 RC29-7 Sur RC 800 D-6 RC27g-3 Sur RC 800 L-7 RC27q-6 Sur RC 800 C-14 RC27<-9 Sur SI 808 B-5 SI6-272 Sur SI 808 C-5 SI6-271 Sur SI 808 D-4 SI6-270 Sur Sl 808 B-14 SI6-81 Sur ST 808 C-14 SI6-80 Sur ISI-201 Rev. 2 Page 41 of 78

SHEARON HARRIS UNIT NO- 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: B-J, Pressure Retaining Welds in Piping ITEM: B9.40, Socket Wel.ds, nps G.T. 1" FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD ~RE UEST Motet RC 800 G-6 RC2-16 Sur RC 800 D-5 RC2-24 Sur RC 800 D-3 RC2-71 Sur RC 800 C-3 RC2-22 Sur RC 800 J-6 RC2-34 Sur RC 800 L-4 RC2-43 Sur RC 800 M"3 RC2-41 Sur RC 800 F"14 RC2-55 Sur RC 800 D" 18 RC2"63 Sur RC 800 C" 16 RC2-64 Sur RC 801 H-l,0 RC2-123 Sur RC 801 K-11 RClg-284 Sur RC 801 J-12 RC1<-285 Sur 802 A-14 RC2-16 Sur 802 A-14 RC2-24 Sur SU2 A-17 RC2-34 Sur RC 802 A-17 RC2-43 Sur RC 802 A-18 RC2-55 Sur RC 802 A-18 RC2-64 Sur CS 803 C-2 CS2-658 Sur SI 808 C-3 SI2-18 Sur SI 808 C-6 SI2-63 Sur SI 808 D-4 SI2-22 Sur SI 808 D-7 SI2-59 Sur SI 808 D-5 SI2-26 Sur SI 808 D-8 SI2-55 Sur SI 808 C-12 SI2-36 Sur SI 808 C-14 SI2-69 Sur SI 808 C-13 SI2-40 Sur SI 808 C-13 SI2-73 Sur SI 808 D-16 SI2-78 Sur SI- 808 D-16 SIZ-77 Sur SI 808 D-14 SI2-43 Sur ISI-201 Rev. 2 Page 42 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: B-K-1, Integral Attachments for Piping, Pumps, and Valves ITEM: B10.10, Integrall.y Welded Attachments FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~com onent (2165-G) COORD NUMBER NETHOD ~RE DENT Notes RC 800 M-5 RC4"44 Sur RC 801 H-6 RC6-126 Sur RC 801 F-2 RC3-140 Sur RC 801 H-2 RC3-139 Sur RC 801 E-2 RC3-141 Sur SI 808 D"4 S16-270 Sur Sl 808 C-5 SI6-271 Sur SI 808 B-5 SI6-272 Sur SI 808 C-14 SI6-80 Sur SI 808 B-14 SI6-81 Sur RH 824 L-4 RH12-38 Sur ISI-201 Rev. 2 Page 43 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: B-L-1, Pressure Retaining Welds in Pump Casing ITEM: B12.10, Pump Casing Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAit

~Com onene (2165-G) COORD NUMBER METHOD REQUEST Notes RCP 800 C-3 1A Vol RCP 800 L-3 1B Vol RCP 800 C-17 1C Vol ISI-201 Rev. 2 Page 44 of 78

SHEARON f{ARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 ITEM'-L-2, CATEGORY: Pump Casing and B12.20, Pump Casing Valve Bodies FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRA f

~Con onene (2165-G) COORD NUMBER METHOD REQUEST Notes RCP 800 C-3 1A VT-3 RCP 800 L-3 1B VT-3 RCP 800 C-17 1C VT-3 ISI-201 Rev. 2 Page 45 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE .INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-M-2, Pump Casing and VaLve Bodies ITEM: B12.50, Valve Body G.T. 4" nps FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF . PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD REQUEST Notes RC 801 F-8 R528 VT-3 RC 801 F-6 R529 VT-3 RC 801 F-4 R530 VT-3 SI 808 B-3 V507 VT-3 SI 808 C-3 V508 VT-3 SI 808 D-3'-ll V509 VT-3 SI 808 V510 VT-3 SI 808 C-ll V511 VT-3 SI 808 B-17 V512 VT-3 SI 808 C-17 V513 VT-3 SI 808 D-17 V514 VT-3 SI 809 D-6 V544 VT-3 SI 809 H-6 V545 VT-3 SI 809 K-6 V5,46 VT-3

.J SI SI SI 809 809-809 D-3 H-3 K-3 V547 V548 V549 VT-3 VT-3 VT-3 SI 810 C-2 V584 VT-3 SI 810 F-2 V585 VT-3 SI 810 E-2 V586 VT-3 RH 824 I 3 V500 VT-3 RH 824 I-4 V501 VT-3 RH 824 L-3 V502 VT-3 RH 824 L-4 V503 VT"3 ISI-201 Rev. 2 Page 46 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: B-Q, Steam Generator Tubing ITEM: . B16.20, U-Tube Steam Generator Tubing FLOM FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~corn oncet (2165-G) COORD NUMBER HETHOO ~E(EUEST Notes S/G 800 E-3 1A Vol S/G 800 H-3 1B Vol

'/G 800 E-1"7 1C Vol ISI-201 Rev. 2 Page 47 of 78

I APPENDIX B CLASS 2 INSPECTION PLAN

SUMMARY

ISI-201 Rev..2 Page 48 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: C-A, Pressure Retaining Welds in Pressure Vessels ITEM: C1.10, Shell Circumferential Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD ~RE VEST Notes S/G 042 E-1 1A Vol S/G 042 I-1 1B Vol S/G 042 L-1 lc Vol X.L. Ht Xchg 803 D-ll Vol RHR Ht Xchg 824 C-14 1A Vol RHR Ht Xchg 824 E-14 1B Vol 0

ISI-201 Rev. 2 Page 49 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: C-A, Pressure Retaining Welds in Pressure Vessels ITEM: . C1.20, Head Circumferential Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD RE(EUEST Notes S/G 042 E-1 1A Vol S/G 042 I-1 1B Vol S/G 042 L-1 1C Vol Rgn Ht Xchg 803 C-8 Vol X.L Ht Xchg 803 D-11 Vol B. I.T. 808 J-3 Vol RHR Ht Xchg 824 C-14 1A Vol RHR Ht Xchg 824 E-14 1B Vol ISI-201 Rev. 2 Page 50 of 78

I J

t

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: C-A, Pressure Retaining Welds in Pressure Vessels ITEM: C1.30, Tubesheet-To-Shell Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD RE<EUEST Notes S/G 042 E-1 1A Vol S/G 042 I-1 1B Vol S/G 042 L-1 1C Vol Rgn Ht Xchg 803 C-8 Vol ISI-201 Rev.,2 Page 51 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE IHSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITIOH 80W81 CATEGORY: C-B, Pressure Retaining Nozzle Welds in Vessels

- ITEM: C2.21, Nozzle to Shell (or Head), Meld, Nozzles without Reinforcing Plate in Vessels G.T. <" nom. Thickness FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Con anent (2165-G) COORD NUMBER NETEOD ~RE UEST Notes B.I.T. 808 J-3 Vol & Sur S/G . 800 E-1 1A Vol & Sur S/G 800 I-1 1B Vol & Sur S/G 800 L-1 1C Vol & Sur ISI-201 Rev. 2 Page 52 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: C-B, Pressure Retaining Nozzle Welds in Vessels ITEM: 92.31, Reinforcing Plate Welds to Nozzle and Vessels in Vessels G.T. <" nom. Thickness FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM C~om onent (2165-G) COORD NUMBER METHOD REQUEST Notes RHR Ht Xchg 824 C-14 1A Sur RHR Ht Xchg 824 E-14 1B Sur ISI-201 Rev. 2 Page 53 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAH PLAN SUHHARY ASHE SECTION XI EDITION 80W81 CATEGORY: C-B, Pressure Retaining Nozzle Welds in Vessels ITEH: . C2e32, Nozzle to Shell in Vessels G.T. <" nom. Thickness, Inside of Vessel Inaccessible FLOW FLOW SYSTEH/ DIAG RAH DIAG LINE EXAH RELIEF PROGRAH

~corn onene (2165-G) COORD NUMBER HETHOD REQUEST Notes RHR Ht Xchg 824 C-14 1A VT"2 RHR Ht Xchg 824 E-14 1B VT-2 ISI-201 Rev. 2 Page 54 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: C-C, Integral Attachments for Vessels, Piping Pumps, and Valves ITEM: . C3.10, Integrally Welded Attachments for Pressure Vessels FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER iMETHOD ~RE UEST Notes Regenerative Ht Xchg 803 C-8 Sur B.I.T. 808 J-3 Sur Accuml 809 C-11 1A Sur Accuml 809 F-11 1B Sur Accuml 809 I-11 1C Sur RHR Ht Xchg 824 C-14 1A Sur RHR Ht Xchg 824 E-14 18 Sur ISI-201 Rev.

I 2 Page 55 of 78

SHEAROH HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUMifARY ASME SECTION XI EDITION 80W81 CATEGORY: C-C, Integral Attachments for Vessels, Piping Pumps, and Valves ITEM: C3.20, Integrally Welded Attachments for Piping FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Con onene (2165-G) COORD NUMBER METHOD REQUEST Notes MS 042 G-1 MS32-2 Sur MS 042 K-1 MS32-3 Sue MS 042 D" 1 MS32-1 Sur FW 044 iaaf-1 FW16-69 Sur FW 044 iaaf-1 FW16-67 Sur AF 044 C-6 AF6-59 Sur AF 044 if-5 AF6-60 Sur CT 050 K-13 CT12-3 Sur CT 050 if-10 CT12-7 Sur CT 050 F-14 CT12-4 Sur CT 050 J-16 CT12-6 Sur CT 050 F-8 CT8-10 Sur CT 050 K-8 CT8-15 Sur 050 F-2 CT6-60 Sur 050 K-2 CT6-62 Sur 803 D-9 CS12-721 Sur CS 805 J-12 CSS-282 Sur CS 805 J-11 CSS-284 Sur CS 805 I-12 CSS-281 Sur ISI-201 Rev. 2 Page 56 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTTON PROGRAM PLAN

SUMMARY

ASilE SECTION XI EDITION 80W81 CATEGORY: C-C, Integral Attachments for Vessels, Piping Pumps, and Valves ITEM: ,C3.20, Integrally Welded Attachments for Piping FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM . RELIEF PROGRAif

~Con onenn (2165-G) COORD NUMBER HETHOO RE<EUEST Notes SI 809 D-8 SI12-223 Sur SI 809 K-8 SI12-225 Sur SI 810 if-7 SI14-254 Sur SI 810 C-5 SI10-309 Sur SI 810 E-4 SI10-258 Sur SI 810 E-6 SI10-257 Sur SI 810 B-4 SI10-264 Sur SI 810 C-2 SI6-269 Sur SI 810 E-3 SI6-283 Sur RH 824 I-6 RH12-6 Sur 824 L-6 RH12-1 Sur RH RH 824 I-12 RH10-8 Sur 824 E-9 RH10-9 Sur 824 C-8 RH10-4 Sur ISI"201 Rev. 2 Page 57 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: C-F, Pressure Retaining Welds in Piping ITEM: .. C-5. 11, Circumferential Welds, Th < <" Nom.

FLOW FLOW .

SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (21,65-G) COORD NUMBER METHOD REiEUEST Notes CS 805 K-12 CS8-320 Sur" CS 805 K-ll 'S8-302 Sur CS 805 K-13 CS8-327 Sur CS 805 J-12 CS8-282 Sur CS 805 J-12 CS8-321 Sur CS 805 I- 12 CSB-281 Sur CS 805 J-ll CS8-284 Sur CS 805 H-10 CS6-285 Sur CS 805 J-10 CS6-288 Sur CS 805 K-10 CS6-290 Sur SI 809 D-10 SI12-158 Sur 809 H-10 SI12-159 Sur 809 , K-10 S1.12-160 Sur 810 M-4 SI14-251 Sur 810 M-7 SI14-254'I14-256 Sur 810 M-11 Sur 810 N-4 SI14-252 Sur SI 810 N-8 SI14-253 Sur SI 810 N-11 SI14-255 Sur SI 810 E-6 SI10-257 Sur SI 810 B-4 SI10-264 Sur SI 810 C-5 SI10-309 Sur SI 810 E-4 SI10"258 Sur SI 810 B-5 SI8-265 Sur ISI"201 Rev. 2 Page 58 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: C-F, Pressure Retaining Welds in Piping ITEM: C-5.11, Circumferential Welds, Th < 4" Nom.

FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165"G) COORD NUMBER METHOD RE(EHEET Notes RH 824 L-9 RH14-2 Sur RH 824 J-8 RH14-7 Sur RH 824 L-6 RH12-1 Sur RH 824 I-6 RH12-6 Sur RH 824 I-16 RH10-3 Sur RH 824 C-8 RH10-4 Sur RH 824 I-12 RH10-8 Sur RH 824 E-9 RH10-9 Sur RH 824 C-13 RH8-20 Sur RH 824 E-14 RH8-5 Sur RH 824 E"12 RH8-33 Sur RH 824 G-11 RH8-10 Sur MS 042 C-8 MS8-107 Sur MS 042 J-7 MS8-109 Sur MS 042 G-7 MS8-108 Sur iMS 042 K-7 MS6-57 Sur MS 042 H-7 MS6-56 Sur AF 044 C-6 AF6-59 Sur AF 044 H-4 AF6-7 Sur AF 044 M-5 AF6-60 Sur AF 044 M-1 AF6-93 Sur AF 044 M-1 AF6-92 Sur AF 044 M-1 AF6-91 Sur CT 050 F-14 CT12-4 Sur CT 050 J-16 CT12-6 Sur CT 050 K-13 CT12-3 Sur CT 050 M-10 CT12-7 Sur CT 050 F-8 CT8-10 Sur CT 050 K-8 CT8-15 Sur CT 050 F-5 CT6-14 Sur CT 050 F-3 CT6-163 Sur CT 050 L-4 CT6-19 Sur CT 050 K-3 CT6-162 Sur ISI-201 Rev. Page 59 of 78

)

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN SUHMARY ASHE SECTION XI EDITION 74S75 Quality Group B C-F, Pressure Retaining Welds in Piping ITEM: '-5.11, CATEGORY:

Circumferential Weld FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD ~RE VEST Notes MS 042 J-3 HS8-72 SUR 4 HS 042 J-4 MS8-73 SUR 4 MS 042 J-5 MS8-74 SUR HS 042 J"6 HS8-75 SUR 4 HS 042 J-6 MS8-76 SUR 4 HS 042 C-3 MS8-62 SUR 4 MS 042 C-4 MS8-63 SUR 4 MS 042 C-6 HS8-65 SUR 4 HS 042 C-5 MS8-64 SUR 4 HS 042 C-6 MS8-66 SUR 4 HS 042 G-3 HS8-67 SUR 4 MS 042 G-4 HS8-68 SUR 4 HS 042 G-5 HS8-69 SUR HS 042 G-6 MS8-70 SUR MS 042= G-6 MS8-71 SUR 4 ISI-201 Rev. 2 Page 60 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: C-F, Pressure Retaining Welds in Piping ITEM: C-5.12, Longitudinal Welds, Th < <" Nom.

FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD RE(EHEST Notes SI 810 N-8 SI14-253 Sur SI 810 M-7 SI14-254 Sur RH 824 L-9 RH14-2 Sur RH 824 J-8 RH14-7 Sur RH 824 I-6 RH12-6 Sur RH 824 L-6 RH12-1 Sur ISI-201 Rev. 2 Page 61 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 74S75 CATEGORY: C-F, Pressure Retaining Welds in Piping ITEM: C5.21, Circumferential Welds, Th < <" Nom.

FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Con onent (2165-G) COORD NUMBER METHOD ~RE UEST Nones CS 803 D-9 CS12-721 Vol & Sur SI 808 C-ll SI10-304 Vol & Sur SI 808 C-11 SI6-27 Vol & Sur SI 808 B-10 SI6-28 Vol & Sur SI 809 D-8 SI12-223 Vol & Sur SI 809 H-8 SI12"224 Vol & Sur SI 809 K-8 SI12-225 Vol & Sur SI 810 B-2 SI10-304 Vol & Sur SI 810 C-3 SI10-308 Vol & Sur SI 810 E-3 SI10-303 Vol & "Sur SI 810 C-2 SI6-269 Vol & Sur 810 E-2 SI6-267 Vol & Sur 810 E-3 SI6-283 Vol & Sur 810 F-1 SI6-268 Vol & Sur 042 D-7 HS34-235 Vol & Sur 042 C-5 MS34-236 Vol & Sur 042 K-5 MS34-237 Vol & Sur HS 042 D-l MS32-1 Vol & Sur HS 042 G-1 MS32-2 Vol & Sur MS 042 K-1 MS32-3 Vol & Sur MS 042 D-8 iMS12-122 Vol & Sur

~

HS 042 H-8 HS12" 123 Vol & Sur MS 042 K-8 HS12-124 Vol & Sur FW P44 B-6 FW16-13 Vol & Sur FW P44 G-6 FW16-15 Vol & Sur FW 044 L-6 FW16-17 Vol & Sur FW 044 H-1 FW16-67 Vol & Sur FW 044 H-1 FW16-68 Vol & Sur FW P44 i'-1 FW16-69 Vol & Sur ISI-201, Rev. 2 Page 62 of 78

APPENDIX C CLASS 3 INSPECTION PLAN

SUMMARY

ISI-201 Rev. 2 Page 63 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAi't PLAN

SUMMARY

ASNE SECTION XI EDITIOH 80W81 CATEGORY: D-A, Systems in Support of Reactor Shutdown Function ITEN: D1.20, D1.30, D1.40, D1.50, and D1.60; Integral Attachments FLOW FLOW SYSTEM/ DIAGRAit DIAG LINE EXAM RELIEF PROGRAM

~Com anent (2165-G) COORD NUMBER itETHOD REiEUEsT Moses MS 042 if-3 MS16-185 VT-3 MS 042 it-3 MS16-238 VT-3 ifS 042 N"2 ifS8-230 VT-3 MS 042 L-2 i4IS6-223 VT-3 MS 042 H-3 MS6-59 VT-3 ilS 042 L-5 NS6-60 VT-3 MS 042 M-2 i4iS6-130 VT-3 i~tS 042 H-1 MS6-166 VT-3 AF p44 iN-9 AF6"8 VT-3 AF p44 M-9 AF6-16 VT-3 AF p44 N-5 AF4-76 VT-3 AF 044 H-4 AF4-6 VT-3 AF p44 N-9 AF4-10 VT-3 AF p44 i'-8 AF4-11 VT-3 AF 044 N-9 AF4-9 VT-3 AF 044 J-7 AF4-78 VT-3 AF 044 J-5 AF4-5 VT-3 AF 044 E-6 AF4-94 VT-3 AF 044 I-7 AF4-55 VT-3 AF 044 I-11 AF4-3 VT-3 AF 044 N-ll AF4-74 VT-3 AF 044 D"6 AF4-2 VT-3 AF 044 D-11 AF4-1 VT-3 AF 044 I-7 AF4-4 VT-3 AF 044 H"7 AF4-77 VT-3 AF 044 H-13 AF3-15 VT-3 AF 044 D-12 AF2-1. 2 VT"3 AF 044 I-12 AF2-13 VT-,3 AF 044 L-13 AF2-14 VT-3 AF 045 8-6 AF3-120 VT-3 AF 045 8-6 AF2-119 VT-3 CE 045 D-7 CES-38 VT-3 CE 045 J-9 CES-41 VT-3 CE 045 H-7 CE6-39 VT-3 CE 045 H-8 CE6-40 VT"3 CE 045 J-9 CE6-196 VT-3 CE 045 B-7 CE8-97 VT-3 CE 045 B-7 CE8-98 VT-3 ISI-201 Rev. Page 64 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAit PLAN

SUMMARY

ASi4lE SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW FLOW SYSTEM/ 0 IAGRAit DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUBBER i4IETHOD RE<EUEST Notes SW 047 'D-5 SM30-2 VT-3 SW 047 G-l SW30-3 VT-3 SW 047 C-5 SM30-5 VT-3 SW 047 G-2 SW30-6 VT-3 SW 047 I-1 SW30-10 VT-3 SW 047 I-2 SW30-11 VT-3 SW 047 M-9 SW30-25 VT-3 SW 047 L-15 SW30-99 VT-3 SW 047 L-13 SW30-146 VT-3 SW 047 L-6 SW24-67 VT-3 SW 047 H-5 SW24-66 VT-3 SW 047 H-13 SW24-72 VT-3 SW 047 L-13 SW24-73 VT-3 SM 047 H-4 SM20-8 VT-3 SM 047 H-12 SW18-22 VT-3 SW 047 H-13 SW16-7 VT-3 SW 047 H-6 SW14-26 VT-3 SW 047 F"5 SW14-27 VT-3 SW 047 E-6 SW14-28 VT-3 SW 047 G-7 SW14-39 VT-3 SW 047 H-14 SM14-45 VT-3 SW 047 F-14 SW14-46 VT-3 SW 047 F-14 SW14-47 VT-3 SW 047 F-13 SW14-53 VT-3 SW 047 H-7 SW14-343 VT-3 SW 047 G-12 SW14-345 VT-3 SW 047 G-5 SW12-410 VT-3 SW 047 G-14 SW12-411 VT-3 SW 047 I-5 SW12-83 VT-3 SW 047 H-7 SW12-84 VT-3 SW 047 I-11 SW12-85 VT-3 SW 047 K-11 SW12"86 VT-3 SW 047 D-6 SW10-31 VT-3 SW 047 D-7 SW10-33 VT-3 SW 047 E-8 SW10-36 VT-3 ISI"201 Rev. Page 65 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

.ASME SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD REQUEST Notes SW 047 F-10 SW10-38 VT-3 SW 047 E-11 SW10-52 VT-3 SW 047 D-13 SW10-54 VT-3 SW 047 E-13 SW10-57 VT-3

'W 047 I-7 SW10-68 VT-3 SW 047 D-14 SW10-297 VT-3 SW 047 I-10 SW10-74 VT-3 SW 047 B-l SW10-752 VT-3 SW 047 J-9 SW8-81 VT-3

. SW 047 H-10 SWB-87 VT-3 047 L-14 SWB-88 VT-3 047 K-14 SWB-122 VT-3 047 I-8 SW8-128 VT-3 047 I-14 SW8-165 VT-3 047 H"9 SW8-338 VT-3 SW 047 J-10 SW6-80 VT-3 SW 047 J-8 SW6-82 VT-3 SW 047 E-1 SW6-749 VT-3 SW 047 D-4 SW6-750 VT-3 SW 047 8-2 SWB-751 VT-3 SW 047 M-16 SW30-97 VT-3 SW 047 M-16 SW36-96 VT-3 SW 047 J-1 SW36-316 VT-3 EA 133 G-3 EA24-1 VT-3 EA 133 G"3 EA24-2 VT-3 EA 133 G-5 EA24-3 .VT-3 EA 133 G-5 EA24-4 VT-3 ISI-201 Rev. Page 66 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere ITEM: '2.20,Cleanup, and RHR D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER HETHOD REQUEST Notes CC 819 F-6 CC18-2 VT-3 CC 819 E-8'"13 CC18-3 VT-3 CC 819 CC18-4 VT-3 CC 819 K-4 CC18-5 VT-3 CC 819 L-11 CC18-6 VT-3 CC 819 H-8 CC18-18 VT-3 CC 819 H-9 CC18-19 VT-3 CC 819 K-13 CC18-7 VT-3 CC 819 G"5 CC18-16 VT-3 CC 820 B-12 CC12-12 VT-3 CC 820 A-3 CC12-13 VT-3 CC 820 M-12 CC12-14 VT-3 CC 820 L-3 CC12-15 VT-3 821 D-1 CC8-10 VT-3 821 B=16 CC8-1.46 VT-3 CC 821 B-11 CC6-145 VT-3 CC 821 E-1 CC6-147 VT-3 CC 821 G-1 CC6-149 VT-3 CC 821 G-12 CC6-195 VT-3

.gC 821 D-12 CC6-201 VT-3 CC 821 D-2 CC6-130 VT-3 CC 822 M-8 CC20-254 VT-3 CC 822 F-5 CC20-1.1 VT-3 CC 822 F-13 CC18-251 VT-3 CC 822 M-14 CC18-252 VT-3 CC 819 I-6 CC18-17 VT-3 ISI-201 Rev. 2 Page 67 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com anent (2168-G) COORD NUMBER METHOD REIEVEST Notes CH 498 B-2 CH10-91 VT-3 CH 498 B-5 CH8-208 VT-3 CH 498 B-11 CH6-205 VT-3 CH 498 D-4 CH6-194 VT-3 CX 498 iN-5 CX10-118 VT-3 CX 498 M-7 CX8-201 VT-3 CX 498 J-6 CX6-187 VT-3 CX 498 K-10 CX6-200 VT-3 CH 498S02 G-14 CH10-91 VT-3 CX 498S02 H-6 CX10-168 VT-3 CX 498S02 K-8 CX10-118 VT-3 SW 498S02 F-6 SW10-938 VT-3 EW 498S02 E-7 SW8-800 VT-3 498S02 E-11 SW8-801 VT;3 SW 498S02 E-8 SW6-875 VT-3 SW 498S02 F-6 SW10-938 VT-3 CH '99 B-14 CH10-50 VT-3 CH 499 B-11 CH8-51 VT-3 CH 499 B-10 CH6-72 VT-3 CX 499 L-16 CX1G-68 VT-3 CX 499 L-12 CX8-69 VT-3 CX 499 K-10 CX6-116 VT-3 CH 499S02 G-14 =-

CH10-50 VT-3 CX 499S02 L-12 CX10-68 VT-3 CX 499S02 H-6 CX10-172 VT-3 SW 499S02 E-7 SW8-804 VT-3 SW 499S02 E-11 SW8-805 V,T-3 SW 499S02 D-8 SW6-876 VT-3 SW 499S02 F-6 SW10-939 VT-3 ISI-201 Rev. 2 Page 68 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: D-B, Systems in Support of ECCS, Containment Heat Removal, Atmosphere Cleanup, and RHR ITEM: D2.20, D2.30, D2.40, D2.50 and D2.60, Integral Attachments FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD ~RE VEST Notes CC 822S01 C-6 CC14-281 VT-3 CC 822S01 H-5 CC14-282 VT-3 CC 822S01 C-2 CC14-411 VT"3 CC 822S01 D-2 CC14-412 VT-3 CC 822S01 G-4 CC14-413 VT-3 CC 822S01 J-5 CC14-414 VT-3 CC 822 L-4 CC6-275 VT-3 CC 822 M-12 CC8-544 VT-3 CC 822 G-4 CC6-274 VT-3 CC 822 G-11 . CC6-255 VT-3 CC 822 K-12 CC6-256 VT-3 822 H-2 CC6-652 VT-3 822 F-9 CC8-250 VT-3 822 H-4 CC8-653 VT-3 CC 819 F-1 CC12-678 VT-i CC 819 K-2 CC12-684 VT- $

CC 819 I-18 CC12-687 VT-3 CC 819 F-4 CC18-679 VT-3 CC 819 G"5 CC18-681 VT-3 CC 819 K-4 CC18-683 VT-3 CC 819 J-5 CC18-685 VT-3 CC 819 E-18 CC18-686 VT-3 CC 819 L-16 CC18-689 VT-3 CC 819 H-4 CC18-690 VT-3 CC 819 H"3 CC18-691 VT-3 ISI-201 Rev. 2 Page 69 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

ASME SECTION XI EDITION 80W81 CATEGORY: D-C, Systems in Support of Residual Heat Removal from Spent Fuel Storage Pool ITEM: D3.20, D3.30, D3.40, D3.50 and D3.60, Integral Attachments FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G), COORD NUMBER HETHDD ~RE UEST Notes SF 305 E-15 SF16-1 VT-3 SF 305 E-16 SF16"2 VT-3 SF 305 H"ll SF16"7 VT-3 SF 305 =J-11 SF16-8 VT-3 SF 305 G-10 S F14-283 VT-3 SF 305 J-10 SF14-284 VT-3 SF 305 H-5 SF12-3 VT-3 SF 305 K-5 SF12-4 VT-3 SF 305 B-3 SF12-5 VT-3 SF 305 A-3 SF12-6 VT-3 SF 305 G-8 SF12-9 VT-3 SF 305 J-7 S F12-10 VT-3 SF 305 I-6 SF12-11 VT-3 305 H-l 1 SF12-12 VT-3 SF 305 J-11 SF12-14 VT-3 SF 305 F-14 SF 12-171 VT-3 SF 305 F-13 SF12-174 VT-3 SF 305 B-7 SF12-176 VT-3 SF 305 C-6 S F12-179 VT-3 SF 305 G-15 SF12-82 VT-3 SF 305 I-7 SF12-150 VT-3 ISI-201 Rev. 2 Page 70 of 78

APPENDIX D AUGMENTED COMPONENTS INSPECTION PLAN

SUMMARY

ISI-201 Rev. 2 Page 71 of 78

SHEARON HARRIS UNIT NO. 1, PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

CATEGORY: Reg. Guide 1. 14 ITEM: RCP Flywheel Keyway and Bore Areas FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (2165-G) COORD NUMBER METHOD REQUEST Notes FLywheel 800 C-3 1A Vol Flywheel 800 L"3 1B Vol Flywheel 800 C" 17 1C Vol ISI-201 Rev. 2 Page 72 of 78

1 a

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

CATEGORY: Reg. Guide 1.14 ITEM: Flywheel Exposed Surface FLOW FLOW SYSTEM/. DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~Com onent (216'-G) COORD 'UBBER METHOD ~E<EUEST Notes Flywheel 800 C-3 1A Vol & Sur Flywheel 800 L-3 1B Vol & Sur Flywheel 800 C-17 1C Vol & Sur i

ISI-201 Rev. 2 Page 73 of 78

SHEARON HARRIS UNIT NO.

PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

CATEGORY: Augmented Piping Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~corn orient (2165-G) COORD NUMBER METHOD ~E<EUEST Notes MS 042 D-8 MS12-122 Vol 2,4 MS 042 H-8 MS12-123 Vol 2,4 MS 042 K-8 MS12-124 Vol 2,4 MS 042 D-7 MS34-235 Vol 1,2,4 HS 042 G-5 MS34-236 Vol MS 042 K-5 HS34-237 Vol MS 042 F-10 MS50-7 Vol MS 042 C-13 HS44-8 Vol 2,4 MS 042 C-12 HS44-9 Vol 2,4 MS 042 D-9 HS32-4 Vol 2,4 HS 042 G-9 HS32-5 Vol 2,4 MS 042 K-9 MS32-6 Vol 2,4 MS 042 C-8 MSS-107 Vol 2,4 iHS 042 G-8 MSS-108 VoL 2,4 MS 042 J-7 MS8-109 Vol 2,4 MS 042 C-3 HS8-62 Vol 2,4,7 MS 042 C-4 MS8-63 Vol MS 042 C-5 'S8-64 Vol iMS 042 C-6 MS8-65= Vol MS 042 C-6 HSS-66 Vol MS 042 G-3 MSS-67 VoL MS 042 G-4 MS8-68 Vol MS 042 G-5 MS8-69 Vol HS $ 42 G-6 HSS-70 Vol MS 042 G-6 MS8-71 VoL MS 042 J-3 MSS-72 Vol MS 042 J-4 MSS-73 Vol MS 042 J-5 HSS-74 Vol MS 042 J-6 HS8-75 Vol MS 042 J-6 HS8-76 VoL MS 042 H-7 MS6-56 VoL MS 042 K-7 MS6-57 Vol 2,4 MS 042 D-8 MS3-116 VoL 2,4 MS 042 H-8 MS3-117 Vol 2,4 MS 042 K-8 HS3-118 -

Vol 2,4 FW 044 B-6 FW16-13 Vol 1,2,4 FW 044 G-6 FW16-15 Vol FW 044 L-6 FW16-17 VoL AF 044 C-6 AF6-59 Vol AF 044 H-4 AF6-7 Vol 1,4 AF 044 M-5 AF6-60 Vol 1,4 AF 044 J-6 AF4-98 Vol 1,4 AF 044 C-5 AF4-95 Vol 114 AF 044 E-5 AF4-75 Vol 1,4 ISI-201 Rev. Page 74 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

CATEGORY: Augmented Piping Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM!

~Com onent (2165-G) COORD NUHBER METHOD REQUEST Notes AF 044 H-5 AF4-96 Vol 1,4 AF 044 iN"6 AF4-97 Vol 1,4 AF 044 N-6 AF4-85 Vol 1,4 FW 044 G-19 FW3-83 Vol 2,4 FW 044 G-19 FW3-82 Vol 2,4 FW 044 G-19 FW3-84 Vol 2,4 FW 044 G-19 FM3-85 Vol 2,4 FW 044 G-19 FW3-86 Vol 2,4 FM 044 G-19 FW3-87 Vol 2,4 FW 044 B-8 FW16-12 Vol 2,4 FW 044 G-8 FW16-14 Vol 2,4 FW 044 K-8 FW16-16 Vol 2,4 FW 044 E-19 FW6-78 Vol 2,4',4 FW 044 E-19 FW6-76 Vol FW 044 E-19 FW6-80 Vol 2,4 FW 044 E-19 FW2-129 Sur 2,4 FW 044 E-19 FW2-130 Sue'ur 2,4 FW 044 E-19 FW2-131 2 7%

CT 050 F-16 CT24-1 Sur 5 CT 050 H-16 CT16-8 Sur 5 CT 050 G-15 CT14-79 Sur 5 CT 050 H-16 CT14-9 Sur 5 CT 050 G" 15 CT8-65 Sur 5 CT 050 G-16 CTB-77 Su@'ol -.5 CT 050 F-8 CT8-10 Sur + 5 CT 050" K-8 CTB-15 Sue + Vol 5 BD 051 D-5 BD4-3 Sue 3,4 BD 051 I-4 BD4-7 Sue 3,4 BD 051 N-5 BD4-11 Sue 3,4 CS 803 A CS3-96 Sue 3,4 CS 803 B-17 CS3-95 Vol 1,4 CS 803 A-10 CS2-138 Sue 3,4 CS 803 A"11 CS2-91 Sur 3,4 CS 803 A-12 CS2-92 Sur 3,4 CS 803 J-3 CS ling 19 Sue 3,4 CS 803 J-3 CSI<-20 Sur 3,4 CS 803 J-3 CS1<-21 Sur 3,4 CS- 805 H-6 CS4-300 Vol 5 CS 805 H-8 CS3-294 Vol 5 CT 050 K-3 CT6-162 Vol 5 CT 050 F-3 CT6-163 Vol 5 ISI-201 Rev. Page 75 of 78

SHEARON HARRIS UNIT NO. 1 PRESERVICE INSPECTION PROGRAM PLAN

SUMMARY

CATEGORY: Augmented Piping Welds FLOW FLOW SYSTEM/ DIAGRAM DIAG LINE EXAM RELIEF PROGRAM

~corn onenn (2165-G) COORD MEMBER METHOD RE(EUEST Mores CS 805 K-7 CS3-337 Vol 5 CS 805 J-7 CS3-292 Vol 5 RH 824 L-6 2RH12-1 Vol 5 RH 824 I-6 2RH12-6 Vol 5 RH 824 L-9 2RH14-2 Vol 5 RH 824 J-8 2RH14-7 Vol 5 SI 808 K-13 SI4-32 Vol 5 SI 808 M-13 SI4-1 Vol 5 SI 808 J-13 SI4-47 Vol 5 SI 808 M-14 SI4-84 Vol 5 SI 808 M-11" SI3-2 Vol 5 SI . 808 M-6 SI3-4 Vol 5 SI 808 M-5 SI3-45 Vol 5 SI 808 L-3 SI3-44 Vol 5 SI 808 K-3 SI3-410 Vol 5 SI 808 H-3 SI3-11 Vol 5 SI 808 F-2 SI3-12 Vol 5 SI 808 K-12 SI3-3 Vol 5 SI 808 H-13 SI3-49 Vol 5 SI 808 F-11 SI3-50 Vol 5 SI 808 F-14 SI3-51 Vol 5 SI 808 E-3 SI2-17 Sur '

SI 808 E-4 SI2-21 Sur 5 SI 808 E-5 SI2-23 Sue 5 Sj 808 E-14 SI2-68 Sue 5 SI 808 D-15 SI2-72 Sue 5 SI 808 E-8 SI2-52 Sui. 5 SI 808 E-7 SI2-58 Sur 5 SI 808 E-6 SI2-60 Sur 5 SI 808 F-16 SI2-76 Sur 5 SI 808 E-13 SI2-39 Sur 5 SI 808 D-14 SI2-29 Sur 5 SI 808 D-12 S12-33 Sur 5 ISI"201 Rev. 2 Page 76 of 78

APPENDIX E PERSONNEL QUALIFICATION PROGRAN FOR AUSTENETIC WELD INSPECTION ISI-201'Rev. 2 Page 77 of 78

QUALIFICATION PROGRAil (1) CP&L or their agent will prepare a QualiEication Program Plan to assure the Eollowing:

(a) The techniques applied are effective for the detection, characterization, sizing, and evaluation of service induced defects.

(b) Personnel. performing the examinations, including detection, characterization, and sizing are capable of carrying out these procedures.

(c) That performance of examinations in the plant reflect the capabilities demonstrated in the qualification program (1) (a) and (b) above.

(2) The Qualification Program Plan shall address the following:

(a) Procedure and equipment requirements.

(b) The description of the test parts including number of cracks, geometrical reflectors, and samples containing no defects. The suitabil.ity of these samples to demonstrate the objectives of the Qualification Program Plan.

(c) Criteria for acceptance of the demonstration for, both procedures and personnel.

(d) Period for which qualification is valid as well as conditions which require requalification.

(e) The components to which the qualification applies.

(E) Documentation of the qualification results.

(3) The Qualification Test Program shall be reviewed by the Authorized Nuclear Inservice Inspector.

ISI-201 Rev. 2 Page 78 of 78