082 POEM MO. 88-8.1 (RRV. 6)

COL SHEARON HARRIS NUCr.ne HNZR PLANT START-UP HANUAL INSTRUCTION/PROCEDURE SUH VOLUHE VI NO.

1-9103-S-27 TITLE TURBINE OVERSPEED TRIP TEST APPROVED BY DATE REV APPROVED BY DATE APPROVED BY:

DATE Vol. VI

0 t

s'r

ADVANCE CHANCE FORM Rev.

0 Change 0

~f.9fd9 i.

(2)

Title rhine er e

vari fat r

(3) Reason For the Change yg] g, Ada g JJ i i

)

4 W f pi 4'uJl/

(4)

Description of the Change fn)))s@'

26

~dh rc /at (9)

(5)

Additional pages Attached 0 of Pages 5

(6)

Prepared by

~ 4~@'1N Name Title Date fa-2i~ Pd (6a) Verify Tech Spec.

Cross Reference reviewed if procedure is used to satisfy Tech.

Spec. Surveillance Requirements.

g Afire Preparer (7)

Recommended for approval:

g N/g /pg 1st. Technical Reviewer Signature Title

/i'r cDn W..,

'echnical Reviewer Signature Title Date SO-O' Date ld 4~gd'ate

/a-Zo-8&

(8)

SAFarr RRVZaW TMo qualified safety reviews are required prior to Final Approval.

Attach'uclear Safety Review Checklist in Accordance with AP-Olla (9)

Agaga concurren iE applicable Signature Date Il ZO "~~

(10) Fire Protect Signature

) gSignature ence if applicable Date l/ ie) cC Date (12) FINAL APPROVAL orio,'M Approved by J-L Harnror u to gc'ame Title Date (Form AP-07-4-4)

I

OS2

~

~

~

roc. No. 1-9103"S-27 issue:

Rev.

0 List of Effective Pa es

~Pa e

1-12 Revision 0

Ac ol<

AG l0.P, Vol. VI 2

OS2 Proc.

No. 1-9103-S-27 Issue:

Rev.

0 Table of Contents Section

~Pa e

1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 PURPOSE AND OBJECTIVE PREREQUISITES AND INITIALCONDITIONS PRECAUTIONS REFERENCES TEST EQUIPMENT TEST INSTRUCTIONS ACCEPTANCE CRITERIA FIGURES TABLES DATA SHEETS ELECTRICAL LINEUP SHEETS VALVE LINEUP SHEETS 4

4 5

5 5

5 9

10 10 10

-12 12 Vol. VI

OS2 Proc.

Ho. 1"9103-S-27 Isaac l Rev.

0 1.0 Pur ose and Ob ective The purpose of this procedure is to verify the on-line operation of the Turbine Mechanical Overspeed Protection Mechanism.

2.0 Prere uisites and Initial Conditions Initials/Date 2.1 Initial Criticality and Low Power Physics testing plateau is complete per 1-9100-S"01.

2.2 Reactor power is less than 20Z.

2.3 The Turbine-Generator has been at

> 10Z Load (95 145 MW) for eight (8) hours or more.

2.4 All test personnel have been briefed on their responsibility during the test by the Po~er Ascension Lead Test Engind'er.

2.5 An operator is standing by the trip lever at the Governor

Pedestal, in contact with the Control Room.

2e6 Communications have been established.

2.7 A frequency counter has been installed at the Governor Pedestal to allow the operator to see the speed locally.

(Spare speed pickup, terminal Box "A", TB1, points 40,41 and 42 GRND) 2.8 The operational status of the unit will allow the test plant prerequisites to be established and performance of the test to occur without violation of Technical Specifications or creation of conditions adverse to safe operation.

2.9 The Shift Foreman has granted permission to perform this test by

~si nin in the space provided heiov.

Shift Foreman)

Vol. VI

~

~

OS2 Proc.

No. 1-9103-S-27 Issue:

Rev.

0 3.0 Precautions 3.1 The Turbine speed should not be allowed to exceed 2010 RPM (111.6Z)

~ If the unit has not tripped when this speed is

reached, the turbine is to be tripped manually.

3.2 Should bearing vibration levels increase past the alarm point of 7 mils awhile above 1800 rpm, this test should proceed only with the approval of the Manager-Operations.

3.3 All work and testing will be performed in accordance with the CP&L Safety Manual.

4.0 References e

s 1

~Dreviu S

N/A

4. 2 Miscellaneous 4.2..'team Turbines Vol I, Operation and Control, Tab 36-9, Rev. 4, Westinghouse File 0 16-5005 PO NY001.

4.2.2 1-9100-S-01, Power Ascension Test Program " Power Escalation 4.2.3 CP&L Start"up Manual, Chapter 22 4.2.4 GP-006, Normal Plant Shutdown from Po~er Operation to Hot Standby 4.2.5 Regulatory Guide 1.68, Appendix A, 4K 4.2.6 CM-M0164, Mechanical Overspeed Trip Calibration 5.1 Frequency Counter Fluke 1900A or equivalent CP&L ID f Cal Due Date 6.0 Test Procedure 6.1 Pre are for Overs eed Test Initials/Date 6.1.1 Remove the Generator Load in accordance with applicable portions of GP"006 (normal plant shutdown to hot standby).

6.1.2 Establish communications between operator at the governor pedestal and the operator at the MCB.

Vol. VI

OS2

~

~

roc. No. 1-9103-S-27 I~Iuc:

Rev.

0 Initials/Date 6.1.3 gite the RPM indications on the HCB DEH panel and the frequency counter used in Section 5.0, Record any difference in Section 10.1.2.

6.2 Oil Pressure Test of Tri Mechanism 6.2.1 Hold speed at 1800 RPM.

This portion of the test will be performed at the Governor Pedestal of the Turbine.

6.2.2 Move the lever marked 'Test'nd 'Normal'o the 'Test'osition and hold it there for the duration of this section.

6.2.3 6.2.4 NOTE:.

Slowly open the valve marked

'Overspeed Test'(il ofgj)l g/f/'ggh)Q) o L t pressure gauge Pr-4i8O

/

frow R.4fR Record the pressure<on Data Sheet 10.1 when the 'Reset'ever drops to the 'Trip'osition for baseline data purposes.

/

This p'ressure has no set value for acceptance, but is pdp/Irt]y))g) to speed at the trip point, and so can be used to verify proper operations during regular operational.

testing.

(Baseline Data)

Ac kg 6.2.5 Still holding the 'Test'ever over, close the hand valve marked

'Overspeed Test'ightly.

6.2.6 Hold the 'Reset'ever in the 'Reset'osition long enough so that it will only return to 'Normal'osition, not 'Trip'.

Vol. VI

OS2 Proc.

No. 1-9103-S-27 Issue'Rev.

0 Initials/Date 6.2.7 Once the 'Reset's in the 'Normal'osition, the 'Test'ever may be released.

6.2.8 Defeat the electrical overspeed protection by turning the

'Overspeed Trip'eyswitch {on the trip test panel) to the

'Inhibit'osition 6.2.9 Defeat the DEH protection by turning the 'OPC'eyswitch

{on the manual DEH panel) to the

'Overspeed Test Permissive'osl'tlon

~

6.3 Press 'REF'n the turbine operator's

panel, and enter a speed reference of 2015 RPM {1)2X speed).

'Hold'ill light.

Run fl

/

Run R2

/

Run R3

/

6.4 Press

'ACCEL RPM/MIN'utton and enter a rate of 50 {fifty)

RPM/MIN.

Run Rl

/

Run g2

/

Run g3

/

6.5 Notify the operator at the turbine to watch the digital counter carefully, and to trip the unit at 2010 RPM.

Run Rl

/

Run f2

/

Run g3

/

6.6 Assign test personnel to watch

~onl the digital speed indicator on the operator's panel.

Run Rl

/

Run $ 2

/

Run g3

/

6.7 Press

'GO'.

When the turbine trips, log the speed from both indicators on Data Sheet 10.1 Run fl

/

Run

$2

/

Run g3 6.8 Let the speed decrease to below 1700 RPM and relatch the turbine from the valve test and latch panel.

Run Rl

/

Run R2

/

Run g3 6.9 Press

'REF'nd enter a speed of 1700 RPM, Press

'GO'.

Run Rl

/

Run R2

/

Run R3 Vol. VI

OS2

~

~

x'oc. No. 1-9103-S-27 Issue:

Rev.

0 Initials/Date 6. 1 0 %hen turbine speed reaches 1 700, pre s s 'rans fer TV'o return to Covernor Valve Control.

Verify 'V'xtingui shes and 'V' 1 luminates.

Runnel

/

Run $2

/

Run $ 3

/

6'1 Press

'ACCEL RPM/MIN'nd verify the rate is still 50 RPM/MIN.

Run Rl

/

Run 22

/

Run R3

/

6.12.1 If the turbine tripped itself in Step 6'f within 1962 to 1998 RPM (1980 + LX), then repeat Steps 6.3 through 6.11 twice

more, 4c y(E 8w

/o-zan%

6 ~ Lg.2 If the turbine does not trip between 1962 to 1998 RPM, notify Maintenance to perform CM-M0164, Mechanical Overspeed Trip Calibration. )Py'gppzfytut' gypgQ gQ/p Qg]gp ),g, ku n/X So-z~gb 6.19 On the Emergency Trip System Panel, take the Overspeed Tx'ip keyswitch to the INSERVICE position.

6.1$

On the operator's panel on the MCB, take the OPC keyswitch to the INSERVICE position.

AC o(C Q-6 pp AG c<C As(

AC oil 4g e->~4 Vol. VI

e

~

~

~

0$ 2

~

~

~

oc.

Noe 1-9103-$ -27 Zssse:

Rev.

0 7.0 Acce tance Criteria Initials/Date Level Z.

None Level II 7.1 The mechanical overspeed trip mechanism has successfully tripped three (3) times consecutively at speeds between 1962 and 1998 RPM (llOZ + 1Z).

See '3ga,5hgf g,g 1

I Level III None Acceptance Criteria Approved Power Ascension Lead Test'Engineer Date Vol. VI

OS2 Proc'o.

1-9103"S-27 Issue:

Rev.

0 8.0

~Fi ures N/A 9s0 Tables N/A 10.0 Data Sheets 10.1 Turbine Overspeed Trip Test Vol. VI 10

<>

OS2 Proc Ho. 1-9103-S-27 Zeeee:

Rev.

0 10.1 Turbine Overs eed Tri Test Initials/Date Oil Pressure. obtained during Step 6.2.4 Base one Data Mechanical Tri s

~DEB S eed ~(Criteria 7.1)

Run fl Run f2 Run f3 IE unit did not trip on first attempt(ghyglt NIP>N)4(I>44S&04k$

)'il pressure Erom Step 6'.4 (second attempt)

/

Recorded by 10.1 ~ 2 Test Comments Time Date Vol. VI

r s

S

~

. ~

OS 2 Proc.

No. 1-9103-S-27 Issue:

Rev.

0 11.0 Electrical Lineu N/A N/A Vol. VI 12