ENCLOSURE 1 TO SERIAL: HNP-98-157 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 RETYPED TECHNICALSPECIFICATION PAGE FOR AUXILIARYFEEDWATER SYSTEM SURVEILLANCEREQUIREMENTS LICENSE AMENDMENTREQUEST RETYPED TECHNICALSPE IFICATI N PA E 3/47-5 98i2i50i26 9'8i207 PDR ADQCK 05000400 P PDR

PLANT SYSTEMS AUXILIARY FEEDWATER SYSTEM SURVEILLANCE RE(UIREMENTS (Continued)

2. Demonstrating that the steam turbine - driven pump satisfies performance requirements by either:

NOTE: The provisions of Specification 4.0.4 are not applicable for entry into MODE 3.

a) Verifying the pump develops a differential pressure that (when temperature - compensated to 70'F) is greater than or equal to 1167 psid at a recirculation flow of greater than or equal to 81 gpm (40.5 KPPH) when the secondary steam supply pressure is greater than 210 psig, or b) Verifying the pump develops a differential pressure that (when temperature - compensated to 70'F) is greater than or equal to 1400 psid at a flow rate of greater than or equal to 430 gpm (215 KPPH) when the secondary steam supply pressure is greater than 280 psig.

3. Verifying by flow or position check that each valve (manual, power operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position; and Verifying that the isolation valves in the suction line from the CST are locked open.
b. At least once per 18 months by:
1. Verifying that each motor-driven auxiliary feedwater pump starts automatically, as designed, upon receipt of a test signal and that the respective pressure control valve for each motor-driven pump and each flow control valve with an auto-open feature respond as required; Verifying that the turbine-driven auxiliary feedwater pump starts automatically, as designed, upon receipt of a test signal. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3; and
3. Verifying that the motor-operated auxiliary feedwater isolation valves and flow control valves close as required upon receipt of an appropriate test signal for steamline differential pressure high coincident with main steam isolation.

SHEARON HARRIS - UNIT 1 3/4 7-5 Amendment No.