ML18016A657

From kanterella
Jump to navigation Jump to search
Corrected TS Pages 6-5 & 6-27 Re 970612 Request for Amend to License NPF-63 Re Proposed Changes to TS 6.0.Original Submittal Contained Editorial Errors
ML18016A657
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/28/1998
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML18016A655 List:
References
NUDOCS 9811030158
Download: ML18016A657 (3)


Text

c e TABLE 6. 2-1 MINIMUM SHIFT CREW COMPOSITION NUMBER OF INDIVIDUALS REQUIRED TO FILL POSITION POSITION MODE 1, 2, 3, or 4 NODE 5 or 6 S-SO SRO None RO AO 2 STA 1 None S-SO Superintendent-Shift Operations with a Senior Operator license on Unit 1 SRO Individual with a Senior Operator license on Unit 1 RO Individual with an Operator license on Unit 1 AO Auxiliary Operator - license not required STA Shift Technical Advisor The shift crew composition may be one less than the minimum requirements of Table 6.2-1 for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected absence of on-duty shift crew members, provided immediate action is taken to restore the shift crew composition to within the minimum requirements of Table 6.2-1. This provision does not permit any shift crew position to be unmanned upon shift change due to an oncoming shift crewman being late or absent.

During any absence of the Superintendent-Shift Operations from the control room while the unit is in MODE 1, 2, 3, or 4, an individual (other than the Shift Technical Advisor) with a valid Senior Operator license shall be designated to assume the control room command function. During any absence of the Superintendent-Shift Operations from the control room while the unit is in )

MODE 5 or 6, an individual with a valid Senior Operator license or Operator license shall be designated to assume the control room command function.

The STA position shall be manned in MODES 1, 2, 3, and 4 unless the Superintendent-Shift Operations or the individual with a Senior Operator license meets the qualifications for the STA as required by the NRC.

98ii030i58 98i028 PQR P

ADQCK

'DR OS000400:

SHEARON HARRIS - UNIT 1 6-5 Amendment No. 83

ADMINISTRATIVE CONTR HIGH RADIATION AREA Continued locked except during periods of access by personnel under an approved RWP which .shall specify the dose rate levels in the immediate work areas and the maximum allowable stay time for individuals in that area. In lieu of the stay time specification of the RWP, direct or remote (such as closed circuit TV cameras) continuous surveillance may be made by personnel qualified in radiation protection procedures to provide positive exposure control over the activities being performed within the area. During emergency situations that involve personal injury or actions taken to prevent major equipment damage, continuous surveillance and radiation monitoring of the work area by a qualified individual may be substituted 'for the routine RWP procedure.

For accessible individual high radiation areas, with radiation levels of greater than 1000 mR/h, that are located within large areas, such as PWR containment, where no enclosure exists for purposes of locking and where no enclosure can be reasonably constructed around the individual area, that individual area shall be barricaded and conspicuously posted, and a flashing light shall be activated as a warning device.

6. 13 PROCESS CONTROL PROGRAM PCP Changes to the PCP:
a. Shall be documented and records of reviews performed shall be retained as required by Specification 6. 10.3p. This documentation shall contain:
1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and
2) A determination that the change will maintain the overall conformance of the solidified waste product to existing requirements of Federal, State, or other applicable regulations.

b, Shall become effective after review and acceptance by the PNSC and the approval of the Plant General Manager.

6. 14 OFFSITE DOSE CALCULATION MANUAL ODCM Changes to the ODCM:
a. Shall be documented and records of reviews performed shall be retained as required by Specification 6. 10.3p. This documentation shall contain:
1) Sufficient information to support the change together with the appropriate analyses or evaluations justifying the change(s) and SHEARON HARRIS - UNIT 1 6-27 Amendment No. 83 )