ENCLOSURE 1 TO SERIAL: HNP-98-071 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR EXIGENT LICENSE AMENDMENT TECHNICALSPECIFICATION TS 3/4.3.2 PAGE CHANGE INSTRUCTIONS Inserted Pa e 3/4 3-25 3/4 3-25 3/4 3-26 3/4 3-26 Page E1-1 f'DR 9805200290 9805i5 PDR ADGCK 05000400

ENCLOSURE 2 TO SERIAL: HNP-98-071 SHEARON HARRIS NUCLEAR POWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR EXIGENT LICENSE AMENDMENT TECHNICALSPECIFICATION TS 3/4.3.2 TECHNICALSPECIFICATION PAGES Page E2-1

TABLE 3.3-3 Continued ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION MINIMUM TOTAL NO. CHANNELS CHANNELS APPLICABLE FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE ROBES ACTION

8. Containment Spray Switch-over to Containment Sump (Continued)
b. RWST--Low Low See Item 7.b. above for all RWST--Low Low initiating functions and requirements.

Coincident With Containment See Item 2 above for all Containment Spray initiating functions Spray and requirements.

9. Loss-of-Offsite Power
a. 6.9 kV Emergency Bus-- 3/bus 2/bus 2/bus 1, 2, 3, 4 15a*

Undervoltage Primary

b. 6.9 kV Emergency Bus-- 3/bus 2/bus 2/bus 1, 2, 3, 4 >>a* I Undervoltage Secondary
10. Engineered Safety Features Actuation System Interlocks
a. Pressurizer Pressure.

P-11 3 2 2 1. 2, 3 20 Not P-11 3 2 2 1,2',3 20

b. Low-Low TB g P 12 3 2 2 1, 2. 3 20
c. Reactor Trip, P-4 'f 2 2 2 1, 2, 3 22
d. Steam Generator Water P-14 Level, See Item 5.b. above foj'll P-14 initiating functions and requirements.

SHEARON HARRIS - UNIT 1 3/4 3-25 Amendment

TABLE 3.3-3 Continued TABLE NOTATIONS

,*The provisions of Specification 3.0.4 are not applicable.

gTrip function may be blocked in this MODE below the P-11 (Pressurizer Pressure Inter lock) Setpoint.

~During CORE ALTERATIONS or movement of irradiated fuel in containment, refer to Specification 3.9.9.

  • ~Trip function automatically blocked above P-ll and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.

ACTION STATEMENTS ACTION 14- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />; however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1, provided the other channel is OPERABLE.

ACTION 15- With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed until performance of the next required CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.

ACTION 15a- With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperab1e channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. With less than the minimum channels OPERABLE, operation may proceed provided the minimum number of channels is restored within one hour, otherwise declare the affected diesel generator inoperable. When performing surveillance testing of either primary or secondary undervoltage relays, the redundant emergency bus and associated primary and secondary relays shall be OPERABLE.

ACTION 16- With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the Minimum Channels OPERABLE requirement is met. One additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1.

ACTION 17- With less than the Minimum Channels OPERABLE requirement, operation may continue provided the Containment Purge Makeup and Exhaust Isolation valves are maintained closed while in MODES 1, 2, 3 and 4 (refer to Specification 3.6. 1.7). For MODE 6, refer to Specification 3.9.4.

ACTION 18- With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SHEARON HARRIS - UNIT 1 3/4 3-26 Amendment

4, 4