ENCLOSURE 1 TO SERIAL: HNP-98-071 SHEARON HARRIS NUCLEARPOWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR EXIGENTLICENSE AMENDMENT TECHNICALSPECIFICATION TS 3/4.3.2 PAGE CHANGE INSTRUCTIONS 3/4 3-25 3/4 3-26 Inserted Pa e
3/4 3-25 3/4 3-26 Page E1-1 9805200290 9805i5 PDR ADGCK 05000400 f'DR
ENCLOSURE 2 TO SERIAL: HNP-98-071 SHEARON HARRIS NUCLEARPOWER PLANT NRC DOCKET NO. 50-400/LICENSE NO. NPF-63 REQUEST FOR EXIGENTLICENSE AMENDMENT TECHNICALSPECIFICATION TS 3/4.3.2 TECHNICALSPECIFICATION PAGES Page E2-1
TABLE 3.3-3 Continued ENGINEERED SAFETY FEATURES ACTUATION SYSTEM INSTRUMENTATION FUNCTIONAL UNIT 8.
Containment Spray Switch-over to Containment Sump (Continued) b.
RWST--Low Low Coincident With Containment Spray 9.
Loss-of-Offsite Power a.
6.9 kV Emergency Bus--
Undervoltage Primary b.
6.9 kV Emergency Bus--
Undervoltage Secondary 10.
Engineered Safety Features Actuation System Interlocks a.
Pressurizer Pressure.
P-11 Not P-11 b.
Low-Low TB g P 12 c.
Steam Generator Water Level, P-14 TOTAL NO.
OF CHANNELS CHANNELS TO TRIP MINIMUM CHANNELS APPLICABLE OPERABLE ROBES ACTION 3/bus 3/bus 2/bus 2/bus 2/bus 2/bus 1, 2, 3, 4 1, 2, 3, 4 15a*
>>a*
I 3
2 2
- 1. 2, 3
3 2
2 1,2',3 3
2 2
1, 2.
3
'f 2
2 2
1, 2, 3
See Item 5.b.
above foj'll P-14 initiating functions and requirements.
20 20 20 22 See Item 7.b.
above for all RWST--Low Low initiating functions and requirements.
See Item 2 above for all Containment Spray initiating functions and requirements.
SHEARON HARRIS - UNIT 1 3/4 3-25 Amendment
TABLE 3.3-3 Continued TABLE NOTATIONS
,*The provisions of Specification 3.0.4 are not applicable.
gTrip function may be blocked in this MODE below the P-11 (Pressurizer Pressure Inter lock) Setpoint.
~During CORE ALTERATIONS or movement of irradiated fuel in containment, refer to Specification 3.9.9.
- ~Trip function automatically blocked above P-ll and may be blocked below P-11 when Safety Injection on low steam line pressure is not blocked.
ACTION STATEMENTS ACTION 14-ACTION 15-ACTION 15a-ACTION 16-ACTION 17-ACTION 18-With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />;
- however, one channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1, provided the other channel is OPERABLE.
With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed until performance of the next required CHANNEL OPERATIONAL TEST provided the inoperable channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperab1e channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
With less than the minimum channels OPERABLE, operation may proceed provided the minimum number of channels is restored within one hour, otherwise declare the affected diesel generator inoperable.
When performing surveillance testing of either primary or secondary undervoltage
- relays, the redundant emergency bus and associated primary and secondary relays shall be OPERABLE.
With the number of OPERABLE channels one less than the Total Number of Channels, operation may proceed provided the inoperable channel is placed in the bypassed condition within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and the Minimum Channels OPERABLE requirement is met.
One additional channel may be bypassed for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing per Specification 4.3.2. 1.
With less than the Minimum Channels OPERABLE requirement, operation may continue provided the Containment Purge Makeup and Exhaust Isolation valves are maintained closed while in MODES 1, 2,
3 and 4 (refer to Specification 3.6. 1.7).
For MODE 6, refer to Specification 3.9.4.
With the number of OPERABLE channels one less than the Minimum Channels OPERABLE requirement, restore the inoperable channel to OPERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SHEARON HARRIS - UNIT 1 3/4 3-26 Amendment
4, 4