{{#Wiki_filter:NINEMILEPOINT2CASELOADFORECASTPANELSITEVISITCurrentStatusInformationonMeetingAgendaItemsPreparedbyNiagaraMohawkPowerCorporationOctober,19848411150106841109PDRADDCK05000410~ljPoa
{{#Wiki_filter:NINE MILE POINT 2 CASELOAD FORECAST PANEL SITE VISIT Current Status Information on Meeting Agenda Items Prepared by Niagara Mohawk Power Cor poration October, 1984 841109 8411150106 05000410 PDR ADDCK                  ~l Poa          j


forwardTheenclosedinformationisprovidedasbackgroundandcurrentstatusofitemsfordiscussionbetweenNiagaraMohawkPowerCorporationandtheNuclearRegulatoryComnission'sCaseloadForecastPanel,Eachsectioncontainsonemeetingagendaitemandthebackgroundinformationassociatedwiththattopic.Anyomissionsorincompleteitemsaretheresultofthetimelimitationforcompilingthisinformation.Additionalinformationwillbeavailableduringthemeeting.  
forward The enclosed  information is provided as background and current status of items for discussion between Niagara Mohawk Power Corporation and the Nuclear Regulatory Comnission's Caseload Forecast Panel,     Each section contains one meeting agenda item and the background information associated with that topic.
Any omissions or incomplete items are the result of the time limitation for compiling this information. Additional information will be available during the meeting.


TABLEOFCONTENTSAendaItem10121314151617DescritionOverviewofProjectConstructionandPreoperationalTestingScheduleCurrentStatusofDesignandEngineeringCurrentStatusofProcurementActivitiesActualandProposedCraftWorkForceCurrentStatusofLargeandSmallBorePipeHangersReviewofCriticalPathItemsCurrentStatusofBulkguantitiesCurrentStatusofPreoperationalandStartupActivitiesEffectsofNUREG0737onScheduleImpactoflOCFR50.55(e)onScheduleEffectsofManagementOrganizationChangesonConstruction,PreoperationalTestingandStartupCurrentConstructionandStartupManagementOrganizationReviewandCurrentStatusofDesignEngineeringandConstructionReviewofRoom/AreaTurnoverScheduleProjectedRequestsforRelieffromIncompleteItemsReviewofPunchListItemsStatusandScheduleforSeismicII/IReviewTab01012141718192021CurrentStatusofPowerAccessionTestingProceduresandOperatingProceduresCurrentStatusofPermanentStationandSupportStaffingCurrentStatusofWorkAssociatedwiththeCATAuditSITETOUR20
TABLE OF CONTENTS A enda Item                Descri tion                Tab 0 Overview  of Project Construction    and Preoperational    Testing Schedule Current Status of Design and Engineering Current Status of Procurement Activities Actual and Proposed Craft Work Force Current Status of Large and Small Bore Pipe Hangers Review  of Critical Path Items Current Status of Bulk guantities Current Status of Preoperational        and Startup Activities Effects of    NUREG  0737 on Schedule 10      Impact of  10CFR50.55(e ) on  Schedule    10 Effects of    Management Organization Changes  on  Construction, Preoperational Testing and Startup 12      Current Construction and Startup              12 Management Organization 13      Review and Current Status      of Design Engineering and Construction 14      Review  of  Room/Area Turnover Schedule      14 15      Projected Requests for Relief from Incomplete Items 16      Review  of  Punch List  Items 17      Status and Schedule for Seismic      II/I  17 Review 18      Current Status of Power Accession Testing Procedures    and Operating Procedures 19      Current Status of Permanent Station and Support Staffing 20      Current Status of    Work Associated with  20 the CAT Audit 21      SITE  TOUR


AGENDAITEM¹1ITEM'verviewof'projectconstructionandpreoperationaltestingschedule,-includingprogressandmajormilestonescompleted,currentproblemsandanyanticipatedproblemareasthatmayimpactthecurrentprojectedfuelloaddate.CURRENTSTATUS:SeefollowingpagesforcombineddataforItems¹1,¹6and¹14.(RefertoItem¹8formoredetail.)  
AGENDA ITEM ¹1 ITEM'verview of 'project construction and preoperational testing schedule,-
including progress and major milestones completed, current problems and any anticipated problem areas that may impact the current projected fuel load date.
CURRENT STATUS:
See following pages  for combined data for Items ¹1, ¹6 and ¹14.
(Refer to Item ¹8 for more  detail. )


NRCCASELOADSiteVisitNineMilePoint2Planning&SchedulingCONTENTSSECTIONOverviewofSchedulingSystemStatusofProject&MilestoneSummaryScheduleMajorMilestoneStatusAttachmentsMilestoneSchedule-AArea/SystemScheduleBThirteenWeekLookAheadSchedule---CWeeklyWorkPlanSchedule---=-------DTestingDetailSchedule-----------E-IIIIV
NRC CASELOAD Site Visit Nine Mile Point  2 Planning  & Scheduling CONTENTS                                            SECTION Overview of Scheduling System Status of Project &
Milestone Summary Schedule Ma j or  Milestone Status                          -
III Attachments                                            IV Milestone Schedule                      -A Area/System Schedule                      B Thirteen  Week Look Ahead  Schedule ---C Weekly Work Plan Schedule    ---=-------D Testing Detail Schedule  -- -------E


SECTIONI-OVERVIEWOFSCHEDULINGSYSTEMTheProjectControlProgramatNineMilePointUnit2providesdynamicinsightastostatusoftheprojectbyuseofasystematicallydevelopedseriesofscheduleswhichenablemanagementtodirectandcoordinatethevariousprojectorganizationstowardsacommongoal.ThebasicschedulingtoolsaretheMilestone,CommodityRoll-Up,Area/System,ThirteenWeekLookAhead,WeeklyworkPlanandtestingSchedules.TheMilestoneSchedulesareanoverviewofthestatusoftheproject.ThesenetworksprovidegoalorientedinformationforConstructionaswe11asthetestorganization.TheCommodityRoll-UpSchedulesarethecommoditiesrequiredtobeperformedasrepresentedbytheMilestoneSchedules,andmaybefoundelsewhereinthisreport.Area/SystemSchedulesaredevelopedbyconstructiontoprovideforcontrolofworkwithinaphysicalareaoftheplant,(i.e.,building,elevation,cubicle,etc.).TheseschedulesareorganizedtoprovideinformationonthestatusofsystemcompletionwithinthatareaandtheymustmeettherequirementsoftheMilestoneSchedules.ThirteenWeekLookAheadSchedules(TWLAS)areproducedassystemcompletiondrawsnear.Theyprovideatooltofocusattentionontheparticularproblemsandoverallstatusofasystem.TheTWLASaredevelopedtomeettherequirementsoftheMilestoneandArea/SystemSchedules.WeeklyWorkPlans(WWP)aredevelopedastheforemenlevelworkingtool.Thescheduleindicateswhichspecificcommoditiesmustbeinstalledduringthesubjectweek.TheWWP'saredevelopedfromtheArea/SystemSchedulesandtheTWLAS,withthepriorityitemsbeingselectedfromtheTWLAS.TheTestSchedulesprovidecontroloftheprojectpreliminaryandpre-operationaltesting.TheseschedulesareproducedatvariouslevelsofdetailandaredevelopedinconjunctionwiththeoverallgoalsasprovidedforintheMilestoneSchedules.SampleofthesescheduleareattachedinSectionIV.Asdifficu'Itareasareencountered,specialschedulesareproduced,examplesareasfollows:1.DieselGeneratorMilestone2.ControlRoom3.HainSteamSystem4.SuppressionPoolFill,etc.  
SECTION    I - OVERVIEW OF SCHEDULING SYSTEM The  Project Control Program at Nine Mile Point Unit 2 provides dynamic insight as  to status of the project by use of a systematically developed series of schedules which enable management to direct and coordinate the various project organizati ons towards a common goal . The basi c schedul ing tool s are the Mil estone, Commodity Roll-Up, Area/System,         Thirteen  Week  Look Ahead, Weekly work Plan and testing Schedules.
The    Milestone Schedules are an overview of the status of the project. These networks      provide goal oriented information for Construction as we11 as the test organization.           The Commodity Roll-Up Schedules        are the commodities required to be performed as represented by the Milestone Schedules, and may be found elsewhere in this report.
Area/System Schedules are developed by construction to provide for control of work within a physical area of the plant, (i.e., building, elevation, cubicle, etc.). These schedules are organized to provide information on the status of system completion within that area and they must meet the requirements of the Milestone Schedules.
Thirteen    Week Look Ahead Schedules      (TWLAS) are produced as system completion draws near.       They provide a tool to focus attention on the particular problems and overall status          of a system. The TWLAS are developed      to meet the requirements of the Milestone and Area/System Schedules.
Weekly Work Plans        (WWP) are developed as the foremen level working tool.       The schedule      indicates which specific commodities must be installed during the subject    week . The WWP's are developed    from the Area/System Schedules    and the TWLAS,   with the priority items being selected from the      TWLAS.
The      Test Schedules        provide control of the project preliminary and pre-operational testing. These schedules are produced at various levels of detail and are developed in conjunction with the overall goals as provided for in the Milestone Schedules.
Sample    of these schedule are attached in Section IV.
As  difficu'It    areas  are encountered, special  schedules  are produced, examples are as follows:
: 1. Diesel Generator Milestone
: 2. Control    Room
: 3. Hain Steam System
: 4. Suppression Pool    Fill, etc.


SECTIONII-STATUSOFPROJECTTheprojectispresentlyonscheduleforaFebruary1986FuelLoadDate,andisanestimated81.5%completeasofSeptember30,1984.The4160Nilestone,althoughbehindschedule,hasseven(7)oftheeight(8)bussesenergized.Thetestingprioritieshavebeenestablishedtosupportcriticaltestingrequirementswhichhasresultedinadelayofthe4160Nilestonecompletion;thereshouldbenoeffeettoanycriticaltestactivities.TheProjectsDieselGeneratorScheduleattainsoperationaldieselgeneratorssevenmonthspriortothefirstmandatoryoperationalperiod.Theconstructionprogressisslightlybehindthisaggressiveschedule.TheIntegratedFlushMilestonefallsonthecriticalpathoftheproject.Thirty-oneFlushPathshavebeenreleasedtoStart-Up8Test,withseveralaheadofschedule.OneFlushPathisdelinquentasof12Oct.1984.ThemajorconcernwiththeIntegratedFlushScheduleisthelargenumberofreleasespermonthtoStart-Up8Test.Start-Up5Testinconjunctionwithconstruction,willdevelopworkaroundplansasrequired.TheimaediateconcernistheaggressivenessoftheProjectSchedules.Theinstallationratesofcableandpipesupportshavenotmetplannedrates.Therateofreleaseofsystemsfortestingisgreaterthantheprojectspreviouslyachievedrates.Effortsareinprogresstoimprovethecablebacklogformoreefficientpullingandredirectionofthepipingworkforcetoallowforgreaterproductionontheprioritysystems.Theeffortstoincreasetheproductionratesaswellastheworkaroundplanspreviouslystated,shouldallowtheprojecttomeettherequiredschedules.TheprimefutureconcernfortheconstructionschedulesistheresultofthedesignreconciliationeffortnowongoinginEngineering.Thedesignreconciliationisnowintheprocessofbeingscheduledbytheproject,aswellasthesupportmodificationsastheyareidentified.Preliminaryresultsofthatprocessshownoimpacttothefuel.loaddate.ThefollowingMi'1estoneSummaryScheduleindicatesthegeneraloverallstatusoftheproject.  
SECTION    II -   STATUS OF PROJECT The    project is presently    on schedule for a February 1986 Fuel Load Date, and is  an  estimated 81.5% complete as of September 30, 1984.
The 4160 Nilestone, although behind schedule, has seven (7) of the eight (8) busses energized.         The testing priorities have been established to support critical testing requirements which has resul ted in a delay of the 4160 Nil es tone compl eti on; there shoul d be no e ffeet to any cri ti cal test activities.
The Projects Diesel Generator Schedule          attains operational  diesel generators seven      months    pri or to the      first  mandatory  operational  period. The construction progress is slightly behind this aggressive schedule.
The    Integrated Flush Milestone falls on the critical path of the project.
Thir ty-one Flush Paths have been released to Start-Up 8 Test, with several ahead of schedule.         One Flush Path    is delinquent as of 12 Oct. 1984. The major concern wi th the Integrated Flush Schedul e is the large number of releases per month to Start-Up 8 Test. Start-Up 5 Test in conjunction with construction, will develop work around plans as required.
The    imaediate concern is the aggressiveness of the Project Schedules.             The installation rates of cable and pipe supports have not met planned rates. The r ate of release of systems      for testing is greater than the projects previously achieved rates.       Efforts are in progress to improve the cable backlog for more efficient pulling and redirection of the pi ping work force to allow for greater production on the priority systems.             The efforts to increase    the production rates as well as the work around plans previously stated,             should allow the project to meet the required schedules.
The prime      future concern for the construction schedules is the result of the design      reconciliation    effort now on going in Engineering. The design reconciliation is now in the process of being scheduled by the project, as well as the support modifications as they are identified. Preliminary results of that process show no impact to the fuel .load date.
The    following Mi'1estone  Summary Schedule  indicates the general overall status of the project.


198419851986JULAUGSEPOCTNOVDECJANF'EBMARAPRMAYJUNJULAUGSEPOCTNOVDECJANSTARTUPTESTING4160F'EBMAROCTMILESTONESCHEDULEDCOMPLETIONIIII'rICONSTCOMPLDKSELGENERATOCONSTRUCTIONCOMPLETETURBINESTARTUPTESTING-DIESELGENERATORMILESTONESTARTUPTESTINGINTEGRATEDFLUSHCOMPLCTENSSSSTARTUPTESTNGCONSTCOMPLFLUSHPATHSYSTEMSCONSTRUCTIONCOMPLCTESTARTUPTESTING-TURBINEGENERATORMLESTONCCOMPTESTING.FORECCS/'OPIIIIIII96COLOFIPK1KNALTESTNGPOWERASCENSIONTESTING1)4160VENERGIZATION2)DIESELGENERATION3)INTEGRATEDFLUSH''RPVHYDRO4)TURBINE,GENERATIONVACUUMPULL5)VENTILATION6)INTEGRATEDLEAKRATETEST7)RADWASTESYSTEM8)FUELRECEIPTANDTRANSFER9)LOSSOFPOWER/'CCS10)FUELLOAD21AUG8406APR8511MAR8501APR8512SEP8514NOV8506DEC8520OCT8507NOV8508NOV8524FEB86STARTUPTESTING-RADWASTEMILESTONECONSTCOMPLRADWASTESYSTEMSSTARTUPTESTING-FUELRECEIPTMLESTONEIII8I11)FUELLOADTOC.O.01OCT86LEGENDQPRELIMINARYTESTINGQCONSTRUCTIONSTARTUPTESTING-VENTILATIONMILESTONEICONSTCOMPLHVACSTSTCMSJULAUGSEPOCTNOVDECJANF'EBMARAPRMAYJUNJULAUGSCPOCTNOVDECJAN19841985FFBMAROCT1986STATUSASOFOCT15,1984MILESTONESUMMARYSCHEDULENIAGARAMOHAWKPOWERCORPORATIONSTONE8cWEBSTERENGINEERINGCORP.J.O.12187REVISIONSORIGINALISOCT84
1984                                          1985                                        1986 JUL AUG SEP    OCT NOV DEC JAN F'EB MAR APR MAY JUN          JUL AUG SEP  OCT NOV DEC JAN F'EB MAR              OCT STARTUP                                                                                                                                                SCHEDULED TESTING                                                                                                                      MILESTONE              COMPLETION 4160
: 1) 4160 V                    21 AUG 84 I    I                                                                                                                ENERGIZA TION I
: 2) DIESEL GENERATION 06 APR 85 I                                                                                                            3) INTEGRATED FLUSH'' 11 MAR 85 STARTUP TESTING-TURBINE GENERATOR MLESTONC                                                          RPV HYDRO                01 APR 85
: 4) TURBINE, GENERATION        12 SEP    85 VACUUM PULL CONSTRUCTION COMPLETE TURBINE                                                  I I                5) VENTILATION                14  NOV 85
          'r        STARTUP TESTING-DIESEL I
I          GENERATOR MILESTONE                                              COMP          I                6) INTEGRATED LEAK            06 DEC 85 TESTING.        I                      RATE TEST FOR  ECCS/'OP      I CONST COMPL                                                                                          I                7) RADWASTE SYSTEM            20 OCT 85 DKSEL GENERATO 9      6                          8) FUEL RECEIPT              07 NOV 85 POWER            AND TRANSFER COLO    ASCENSION STARTUP TESTING                                                  FIPK 1 KNAL INTEGRATED FLUSH          COMPLCTE NSSS STARTUP TESTNG                TEST NG      TESTING      9) LOSS OF    POWER/'CCS 08 NOV 85
: 10) FUEL LOAD                24 FEB 86 CONST COMPL FLUSH PATH SYSTEMS        CONSTRUCTION COMPLCTE
: 11) FUEL LOAD TO C.O.       01 OCT 86 STARTUP TESTING-RADWASTE MILESTONE LEGEND I
CONST COMPL RADWASTE SYSTEMS                                                  I                Q    PRELIMINARY TESTING I
8              I                Q    CONST RUCTION STARTUP TESTING-FUEL RECEIPT MLESTONE STATUS AS OF        OCT 15, 1984 MILESTONE


SECTIONIII-MAJORMILESTONESTATUSMILESTONECOMPLETIONDATE>>SetupperContainmentCone>>CompleteConcrete,PrimaryContainmenttoEL.326-10"A07May81A120ct81*SetFuelPoolLinerinplace.*SetMainPGCCConsole.*Readytoenergize115-KVswitchyardA18Aug82A25Mar83A01Aug84"ReactorBuildingPolarCraneOperational,A29Apr83"MakeupDemineralizercompleteandreadyforinitialtest.A19Mar84*ReactorBuildingEnclosed.A19Dec834160VEnergizationDieselGeneratorsIntegratedFlush/RPVHydroTurbineGenerator/VacuumPullVentilationIntegratedLeakRateTestRadwasteFuelReceiptandTransferLossofPower/ECCSFuelLoadFuelLoadtoC.O.Aug84Apr85Mar85/Apr85Sep85Nov85Dec85Oct85Nov85Nov85Feb86,Oct86NOTES:A~ActualCompletionDate>>=ContractMilestone
==SUMMARY==
SCHEDULE STARTUP TESTING-VENTILATION MILESTONE NIAGARA MOHAWK POWER CORPORATION I
STONE 8c WEBSTER ENGINEERING CORP.
CONST COMPL HVAC STSTCMS J.O. 12187 REVISIONS JUL AUG SEP    OCT NOV DEC JAN F'EB MAR APR MAY JUN          JUL AUG SCP  OCT NOV DEC JAN FFB MAR              OCT                                    ORIGINAL 1984                                          1985                                        1986                                            IS OCT 84


THIRTEENWEEKiOOKAHEADSCHEDULEE5C,RIP7IONLAGEBORE.PPG.ITEMQTY123457891011121314151a1'I$819LARGEBOREHGRSPH3OSMALLBOREPPG'ODE99HGPSL.B.5hAALLBORE.PPG.SMALLBOREHGRSMECHANICALEQUIPME.NT'hISTALLINSTRUMENTSL.F.INSTALLTUBINGPRESSURETFSTELECTRICALE,QUIPMENTCOMPLETE,RACEWAYCABLEPULLSHOOFHO.OFNo.OFTERMINATION'5PGCCI-IEATTRAC,IlICPAINTIHGINSULATlOHTRlhhITEMSTC)SUPPORTJCIRESPAPAPAP-1ARARATAQI28o8v~EO5rarusIl27ZSIO912.0IIMlO/0lOsSolozI647IPToeaaPROQIt<vusiq(,Rout'isoIlIS'YSDESCRIPTION'-SEViEr5<5QFS'LGNATLON-SwPFLUSHPACKAGENO.MFII.OSTATUSASOl:.I%I,-'80TURNOVF.RDh,lE:5/VPLAN<FR:~INOTES:QTYRemainingquantitytobeRESP=ContractorCodeinstalledgmAcI-Ige~tC.SA~pLEQ<s~er~~HE+LooKp,QEADSMEpJL.E.
SECTION  III -  MAJOR MILESTONE STATUS MILESTONE                          COMPLETION DATE
    >>Set upper Containment Cone            A 07May81
    >>Complete Concrete,   Primary          A 120ct81 Containment to EL. 326-10"
    *Set Fuel Pool Liner in place.           A 18Aug82
    *Set Main    PGCC Console.               A 25Mar83
    *Ready to energize    115-KV            A 01Aug84 switchyard "Reactor Building Polar Crane            A 29Apr83 Operational, "Makeup Demineralizer complete          A 19Mar84 and ready for initial test.
    *Reactor Building Enclosed.             A 19Dec83 4160  V Energization                      Aug84 Diesel Generators                          Apr85 Integrated Flush/RPV Hydro                Mar85/  Apr85 Turbine Generator/Vacuum Pull              Sep85 Ventilation                                Nov85 Integrated Leak Rate Test                  Dec85 Radwaste                                    Oc t85 Fuel Receipt and Transfer                  Nov85 Loss  of  Power/ECCS                        Nov85 Fuel Load                                  Feb86 Fuel Load to C.O.                         ,Oc t86 NOTES:   A ~ Actual Completion Date
              >> = Contract Milestone


.~aaao==-=--"t-=a=aaaaaaaIIIIGAINNELLI.F'.I.fORLt1ANSWEEKLYWORKF'LANISCHEDULERg.+hRA.SIISUPERINtENOFNT//HrNS'IYISED.FOREMANg.0COACTORIIFceEttnt4g+u~~nlsnIIP~SIDF'4lISOttoITENIDIFIOF2Ileigig4ISHEETDATEISSUEDAREAWc~R'/3-/cioi:-HSsQTYDIIeNsLRLloIItaaaII'gp//pe(ear~)''X''/a/'8'/:A-/>:SZ-rs~K'/AZd4-24'EZ-7/ASr'/.m/83xIo'Z-/37$D(arzr)P'gZ'-H'BZ-'/gb:r85:4-/Tsz-7/62X'3/4o/cQX'X.uw'gl.uo/F'3/~I8re'42'-45'sz-7/xc.A/g-/osz-/sAzX2X/8/A-5/EF-7j'dn//x'6-/3'z"-7/A68'3'/I8''/X'3l.n/$/AM/d/'-/0'-/38%'/4/-'$4-37'P-7/4F:g-7:az-a8o'Z'Zx3'.co/5~/I/8/'./'f'-7/ZW/')'3/.NlI/HI'(-/5'P-7/WD''/x'/oo/II-IlaZx~~~~~~~...,,I/~ZXg/co/I----x-~-aaaaaaaIIC'oufIITll?SWEEKNEXTI'lEEKPROJ.WEEK======.-.====aaaaaaaaaaaaaaaI+4)E'0//0+sv/4/o'/l7tg/f/b/Zg+N-lIThF'O'TIW'S'tfFtfTWSxaaaaaaaaaaaaaaaI+','.:'.'+:'.:'.:'i'.ItIII+gSSS+~~s~~~4'~~~~~4o~I~II+2I-.-U----------UU--I~~~~~e<sl~~s~>eIIooI+yI-N-.I'------NNI~~~~~~~~~~~~~~~~~+~~~~o~~~~~~~~t~~O~~I+.-D-"-------D-9IlI~~sA------------A-------------A--I~~~~~~~~~~~~~~+,;,...so....,e+~IYY-Y---I~~~~~~~~~~~~~~~s,,I+~SS+~UUU--INN-N----II~to~~~~~~~~~~~~~~~~~+DI+',lsl+~lll<''le+-""A------nA--I+-Y-'VVIAToAcHwaarD.u~~PLF-Wt'-lQ-0@oleicFLAPSPR6.F-/FiootoooI<<D-"-t
THIRTEEN WEEK iOOK AHEAD SCHEDULE ITEM  QTY            E 5C,R I P 7 ION            RESP                8 o 8            IO  91      lO      /0    lOsS    o          lo z  I 1            LA GE BORE. PPG.                     AP                I 2                      2.0 2            LARGE BORE HGRS P   H 3  3O        SMALL BORE PPG                      AP 4             TRlhh ITEMS        TC)  SUPPORT JCI AP 5          'ODE      99    HGPS        L.B.     -1                                      I 5 hAALL BORE. PPG.                                                           I M          64  7 7             SMALL BORE HGRS 8            MECH ANICAL EQUI PME.NT
              'hISTALL INSTRUMENTS                        v ~EO  5 ra r us    l2I 7ZS 9
L. F.                                                                                                               I PT  oeaa PROQI t<
10            INSTALL TUBING                      AR                                                                          vusiq(, Rout'iso I
11            PRESSURE TF ST                      AR HO OF 12            E LECTRICAL E,QUIPMENT HO. OF 13            COMPLET E, RACE WAY                                                                                          l No. OF                                                                                                                            I 14            CABLE PULLS 15            TERMINATION'5 1a              PGCC 1'I            I-IE AT T RAC, I l IC                AT
$8              PA INTIHG 19            INSULAT l OH                        AQ S'YS 5<5 DESCRIPTION SE Vi E QF S'LGNATLON-r SwP FLUSH PACKAGE NO.
MF        II. O TURNOVF.R Dh,lE:
5 /V STATUS AS Ol:.I%I,-'80 PLAN<FR:      ~           I NOTES:      QTY      Remaining    quantity to  be installed                                      gmAcI-I g e~t C.
RESP = Contractor        Code SA~pLE Q<s~er~ ~HE+
LooK p,QEAD            SMEpJL.E.


eaamaaaaaaIISCHEDULER/~46'542'4'ISLN'ERINIENOVNT/.SEE'PLYI8ENI=OREVANf.0Cpa/40@ItFCNEVAI4gRQDZu/SK[IaaaaaazlaaaRIPy8IDF'AsISOttsITENIDoQTYsIF~~aaaaIP'I]4'=:N-2Z:yZ-preI:bb-j3:aZ-7jA~A'Io'gZ-/f7<(gwrZ)IIIIGRINNELLI.F'.I.fORE:MANSWEEKLYWORKF'LANAREAQ.Ca&WXPQCO47./tsU--.N--~~~~s~~~~s~'8Z-7/AExIoI'g/.~p'7-~'g~I~I57-/0~'/-9pp7QZx~p~~Y--~~~~~~~~~~SHEETZOF2IIDATEISSUED/D/g/gfIIIITHISIPEEKNEXTHEEKPROJ.I'IEEK---========caaaaaaaaaaaaaaaIXlPII''+++N-1ILI'LlolEsN>ThFoHoTsg.Sob+TgFl)]Tgg~'Th.pffLIN$8+CIaaaaaaaaaaaaaaaI~X-SSS--I2X'/r2)/g~~s~~--------UU---I~~oIIIoI++I.-"----t4N--I~~+/--D-.---------"-LI.DIssoooos+essoos<ooIoII+QI..AAA---I~~~~~~~w~~~~~~e~~~~~~s~~~~~~~~~~~~~~~'L~YYY~~~,~~~~~~~~~~~~~~~~~'os+sss~~s>~~~~~~+~ISS-S--I~~~~~~~~~~~~~~.-~/gooss+~~~~~~II+I/AUUP~a0--I~~~~~~s'isIZg)>o.>ifrtQN-N-------------N--I~~~~~~~~~~~~)~~~~~~~~<~o~~~~~~+/Q~ov/F0EIE65p~~~~~~~~~~~~~I~~~~~I+I~~~sss~~~~~~~~~~o~--"A.AA----I~s~~~~~~~~~~~~+~~~~s~~~~>~~~~~I+IVVIs4TTAc4PfEPITl3~~~~~~~s~ooIso-UNI--IIISAM~REEKY~.~s4--sPA+F2ofZ.I~IIsa=.-~~~~~~~~~~~~~~~~~~'~~~~~~~g.-'IIQssaaaalC~
    .    ~                                                                                                                                                                             -=a=aaaaaaa t aaao==-=--"                                                                                                                                                                                                    I I SCHEDULER            g. +hRA.S                                I I I GA INNELL              I . F'.       I.                                   SHEE      T                                      OF        2    I I
I SUPER      IN t ENOFNT //Hr NS'IY                      f ORLt1AN S WEEKLY WORK F'LAN                                                          DATE ISSUED                          lei gi                  g4  I I
ISED. FOREMAN              g. 0  COACTOR                      AREA      Wc      ~R'/ uf    C'o                                                                                                                I I
I I FceEttnt4          g +u~~nlsn                            3-     /ci  oi:-HS                    Tll?S          WEEK                    NEXT I'lEEK                          PROJ.
                                                                                                                                                = === ==..= = ==aaaaaaaaaaaaaaa WEEK I
I IP~SI DF'4        l    ISOtt  o      ITEN ID          sQTY                          DII      +          4)E'0//0                  +     sv/4      /o'/l7          t        g/f        /b/Zg            +N- l I ThF'O'TIW'S'tf I F I taaa I                      'g p//pe        (ear~)'
s
                                                                'X' LRL lo I I e        N
                                                                                                +    ',      '.: '.'+:              S F    tf T W    S
                                                                                                                                                                'i  S xaaaaaaaaaaaaaaa
                                                                                                                                                                            '. I  t      I    I    I S
                                                                                                                                                                                                              +g I
I
      '8'/:            A-/>:SZ- rs~K                  '                      '/a/             +    ~       ~   s   ~   ~   ~
                                                                                                                          -. -U--
4'
                                                                                                                                            ~
                                                                                                                                                -------U
                                                                                                                                                  ~  ~    ~    ~      4    o    ~  I     ~   I    I U
                                                                                                                                                                                                              +2 I
I
                                                                                                                                                                                                              +
            /AZ        d4-24 'EZ- 7/ ASr                                      '/.m/8                ~      ~  ~    ~  ~    e
                                                                                                                              -N-.
                                                                                                                                      <  s I'-- ----N l    ~   ~   s    ~     >    e     I  I      o    o    I N
y    I I
I      o                        'Z- /37    $ D(arzr)                  3x                      +    ~
                                                                                                      ~
                                                                                                            ~
                                                                                                            ~
                                                                                                                ~
                                                                                                                ~
                                                                                                                      ~
                                                                                                                      ~
                                                                                                                          ~
o
                                                                                                                                ~
                                                                                                                                ~
                                                                                                                              .-D-"
                                                                                                                                      ~ ~
                                                                                                                                        ~
                                                                                                                                              ~
                                                                                                                                              ~
                                                                                                                                                  ~   ~
                                                                                                                                                -------D-
                                                                                                                                                  ~  ~
                                                                                                                                                          ~
                                                                                                                                                            ~
                                                                                                                                                                ~
                                                                                                                                                                ~       t  ~
                                                                                                                                                                            ~
                                                                                                                                                                                  ~
                                                                                                                                                                                  ~
                                                                                                                                                                                      ~
O
                                                                                                                                                                                              ~
                                                                                                                                                                                              ~
                                                                                                                                                                                                  ~
                                                                                                                                                                                                  ~   I 9
                                                                                                                                                                                                              +
                    '-H 'BZ-'/gb                                                                                                                                                                              ~~
I
      'gZ s,,                                                                    I l    I
                                                                                '3/4o/                                                    -- --------A-------------A s
P
:  r85: 4-/T sz-7/6                                r    e 2X QX      'X.u w c
                                                                                                                      ~   ~   ~
Y
                                                                                                                                      +,;,...
A--
                                                                                                                                        ~   ~   ~   ~   ~     ~
Y so....,
                                                                                                                                                                              ~     ~   ~     ~   ~
e
                                                                                                                                                                                                        -Y--  +~I I
        '42 '-45'sz-                  7/xc.                          zX        'gl.uo/F
                                                                                                                      ~   ~   ~
S
                                                                                                                                        ~   ~   ~   ~     ~   ~
S I    ~     ~   ~     ~   ~   ~
                                                                                                                                                                                                              +~
A/          g-/o      sz- /sA                              2X        '3/~I 8                                                                                                                      +~
U                                U                                    U        I
          /8/          A-5/      EF- 7j'dn/                          /x                                                                                              N-                                   N----I
                    '6-/3 'z"-                                                                                        ~           N
                                                                                                                                      ~~~~~~
                                                                                                                                                                                                              +
                                                                  '/X          '3'/I          I                                                                        ~
                                                                                                                                      +~ -----n
                                                                                                                                                                                    ~   ~     ~       ~
8'            ~     t    o            ~                           ~     ~           ~                     ~
7/ A68                                                                                      D                                                                                I
                                                                                                                                                                                '        '                  +
          /d/              /0        /3 8%                /    AM            '3l.n/$        +      ',    l  s
                                                                                                                          -  ""A-l                    l    l    l      <                          l  e A  I
        '/4/ '$4-37'P- 7/4F
                -                                       'Z        'Zx            3'.co/5                                        -Y-                                 'V                                    V
                                                                                                                                                                                                              +
I I/8/
g
                    './'f
                          - 7:
az- a 8o              ~
                                                            /
                                                              /    ')            '3/.Nl AToAc H waar
                                                                                                                                        ~~PLF- Wt'-lQ-0 @oleic D
i 7/ ZW                                                                                      .u                                                              FLAPS I/HI      '(-/5 'P-7/          WD
                                                        '          '/x          '/oo/                                                              PR6.F-              /        F
                                                                                                  ~...,,
I                                                                                                                t                                                                                                I I-                                                                  Zx                                o    o        o  o    o
                                                                                                                                <<D-                                                                              "-t I
g/ co/I
                                                                                                                            ~     ~
                                                            /
                                                                                                        ~     ~   ~   ~
I la
                                                                    ~
ZX                                                                                                        - ---x-~           -aaaaaaa        I


AGENDAITEM82ITEM:getaiIedreviewandcurrentstatusofdesignandengineeringeffort(bXmajordiscipline),inclodinganypotentialproblemsthatmayarisefromnecessaryrework.CURRENTSTATUS:Seefollowingpages.  
e I SCHEDULER ISLN'ERINIENOVNT
                    /  ~46'5
                            /.
42'4' SEE'PLY I I I GRINNELL f ORE:MAN      S WEEKLY WORK F'LAN I.F'. I.                                            SHEET DATE ISSUED a
Z a
                                                                                                                                                                                                /D/
OF maaaaaa I g / gf 2    I I
I I
I 8EN      I=OREVAN      f. 0    Cpa/40@                    AREA Q.Ca&WXPQ CO47.                                                                                                                                      I I                                                                                                                                                                                                                      I t FCNEVAI4 I aaaaa ga  RQDZu/SK[
zlaaaR THIS      IPEEK                      NEXT---====    HEEK
                                                                                                                                                                    =
PROJ.
                                                                                                                                                                        ===caaaaaaaaaaaaaaa I'IEEK I
IPy8I        DF'A s    ISOtt  s      ITEN ID        o QTY    s    X      l    P I I''  +                                  +                                                                                  +N-1 I I    F                                              ~        ~
LI'Llol Es          N    >ThF    oH oT  sg .S    ob+Tg            Fl    )] T g g~'Th.p                                  ff LI N $ 8+ C I aaaaaaaaaaaaaaa aaaa                                                                                                                                                                                                                  I I
I P'I  ]4'=: N-2Z:yZ- pre                          /t  s
                                                                  ~X                                                  -S                                            S                                        S  I bb-j3:aZ-      7j A~A'                    2X      '/r2)/g                                                            ------- -U                                                      U--
                                                                                                ~  ~  s  ~  ~
U--                                                                                          I I        o
                              'gZ-  /f 7<  (gwrZ)
                                                                                                ~  ~
                                                                                                    ~
                                                                                                        ~
s  ~  ~
                                                                                                                      . N--                .  -" -- -t4 o      I    I  I    o    I N
                                                                                                                                                                                                                  ++I  I I
                              '8Z-  7/ AEx
                                                                                                ~
                                                                                                ~
                                                                                                    ~
s
                                                                                                        ~
                                                                                                        ~
                                                                                                            ~  ~
                                                                                                                    - - D-.  - - - - - - - - " - LI.                                                          D
                                                                                                                                                                                                                +/      I I        o                                                                  s                  s  o  o  o  o      s      +    e    s      s      o  o    s        <      o      o    I  o    I    I    +Q A--  I  I
                                                                                                                    ..A                                            A
                                                                                            ~  ~  ~  ~  ~  ~      ~    w    ~    ~    ~      ~  ~      ~        e      ~      ~    ~    ~    ~
                                                                                                ~  s  ~  ~  ~      ~          ~    ~    ~      ~  ~      ~                ~      ~    ~    ~    ~
                                                                            'L    ~
Y                                        Y                                          Y
                                                                                                ~  ~
                                                                                                    ~
                                                                                                        ~,'
                                                                                                        ~
                                                                                                            ~  ~
o
                                                                                                                        ~
s    +    ~
s
                                                                                                                                        ~
s
                                                                                                                                              ~
s
                                                                                                                                                      ~
                                                                                                                                                      ~  ~
                                                                                                                                                          ~    ~
s S-
                                                                                                                                                                                  ~
                                                                                                                                                                                  ~
                                                                                                                                                                                          ~
                                                                                                                                                                                          ~
                                                                                                                                                                                              ~
                                                                                                                                                                                              ~
                                                                                                                                                                                                  ~
                                                                                                                                                                                                  ~
                                                                                                                                                                                                        ~
                                                                                                                                                                                                        ~
                                                                                                                                                                                                            ~
                                                                                                                                                                                                            ~    +~I S
            /.~p  '7-~        'g~                        I  'g          ~  .     ~/g
                                                                                        /A
                                                                                            ~  ~
o
                                                                                                    ~
o
                                                                                                        ~
s
                                                                                                            ~
s
                                                                                                                ~      ~
S U
                                                                                                                              +    ~
                                                                                                                                  ~    ~
                                                                                                                                        ~    ~
                                                                                                                                              ~
                                                                                                                                                      ~
                                                                                                                                                      ~
                                                                                                                                                          ~
                                                                                                                                                          ~
                                                                                                                                                                ~
                                                                                                                                                                ~
U I
P~a I
0
                                                                                                                                                                                                                  +
I I
I
                                                                                                                                                                -N -f------------N i s s
I
          ~                                                                                      ~  ~  ~    ~  ~      ~
I                    57-/0                                      Zg          )> o.>i                                                                                          rtQ
                                                                                                                                                                                                                    / I I                                                                                                                          N
                                                                                                    ~  ~  ~  ~      ~          ~    ~    ~      ~    ~    ~
                                                                                                                                                                          )        ~      ~
                                                                                                                                                                                                                  +
ov/ F
                                                                                                ~
                      ~'/-9 p p      7Q                          Zx            Q  ~
                                                                                                ~  ~  ~  ~  ~      ~
0
                                                                                                                                  ~    o    ~      ~    ~    ~
EI      E6 5
                                                                                                                                                                                  ~      ~
p
                                                                                                                                                ~      ~  ~      ~
I      ~      ~    ~  ~    ~
                                                                                                                                                                                                                  +
A----II
                                                                                                                                          ~
                                                                                            ~  ~
                                                                                                  ~
                                                                                                      ~
                                                                                                      ~
                                                                                                          ~
                                                                                                          ~
                                                                                                              ~
s
                                                                                                                  ~
s
                                                                                                                        ~
s    ~    ~
                                                                                                                                    ~    ~    ~      ~    ~    ~                ~      ~    ~  o    ~    I
                                                                                                                -    -"A                                            .A
                                                                                          +      ~
                                                                                                  ~  ~
s  ~
                                                                                                          ~
                                                                                                              ~
                                                                                                              ~
                                                                                                                  ~
s
                                                                                                                          ~
p      ~    ~
                                                                                                                                                ~
                                                                                                                                                ~
                                                                                                                                                      ~
                                                                                                                                                        ~  ~
                                                                                                                                                            ~
                                                                                                                                                                  ~
                                                                                                                                                                  ~        >
                                                                                                                                                                                    ~
                                                                                                                                                                                    ~
                                                                                                                                                                                          ~
                                                                                                                                                                                          ~
                                                                                                                                                                                                ~
                                                                                                                                                                                                ~
                                                                                                                                                                                                    ~
                                                                                                                                                                                                    ~
                                                                                                                                                                                                        ~
                                                                                                                                                                                                        ~    I    +      I Y--                                      V                                        V        I 4 TTAc4PfEPI T l3
                                                                                                  ~  ~    ~  ~  ~
                                                                                                  ~  ~    ~  ~  ~
s
                                                                                                                                                                                                  .  ~s4                I
                                                                                                  ~  ~  ~  ~  ~
                                                                                                  ~  ~  s  ~
                                                                                                                        -U        SAM~                        REEKY~                                                -s I
N                  PA+F                        2          of      Z.                    -I o  o  I  s  o                                                                                                      I I
II
~                                                                                                ~  ~  ~  ~          ~                                                                                        ~
I                                                                                              ~
                                                                                                                  ~
                                                                                                                  ~      ~          ~    ~      ~      ~  ~      ~
                                                                                                                                                                                  ~      ~  ~  ~    ~    ~
I sa=.-
                                                                                                      ~  ~  ~
g C    ~
                                                                                                                                                    .                         '                          Qssaaaal


2.GeneralMostdivisionsareexperiencinginvolvementincalculationfinalization,equipmentqualification,andspecialmultidisciplineeffortssuchasfloodingevaluationresolutionandthetechnicalsupportcenter.DivisionalAdvisor0erationsThisdivisioncontinuesasignificanteffortindevelopingloopcalibrationreports.ControlsEffortscontinueincompletionofsetpoints,supportofpaneldeliveries,preparationofcontrolpanelmodificationpackages,andprocesscomputersupportactivities.ElectricalCablerouting,cablepulltickets,andfrom/toconduiteffortscontinue,andalternateaccesspointsecuritydesigneffortsaregettingunderway.EnineerinMechanicsEffortsforthisdivisionwillbefocusedonengineeringreconciliationofCategoryIlargeboreas-builtdrawings,completionofN-5signoffs,CategoryIIsupportreconciliation,penetrationanalysis,piperupturerestraintstructuralloadverification,andjetimpingementevaluation.EnineerinServicesThisgroupwillcontinueitseffortsinthespecificationandprocurementofspareparts.~LicensinThisgroupcontinuestosupportfinalsafetyanalysisandenvironmentalreportmilestoneswhileaddressingadditionalNRCquestions.NuclearTechnoloSignificanteffortwillberequiredbythisgroupinmoderateenergylinecrackanalysis,leakdetection,andALARAwalk-downsandcalculations/problemresolutions.  
AGENDA ITEM 82 ITEM:
getaiIed review  and  current status of design and engineering effort (bX major discipline),    incloding any potential problems that may arise from necessary rework.
CURRENT STATUS:
See following pages.
: 2. General Most divisions are experiencing involvement in calculation finalization, equipment qualification, and special multidiscipline efforts such as flooding evaluation resolution      and the technical support center.
Divisional Advisor    0  erations This division continues a      significant effort in developing loop calibration reports.
Controls Efforts continue in completion of setpoints, support of panel deliveries, preparation of control panel modification packages, and process    computer support  activities.
Electrical Cable routing, cable pull tickets, and from/to conduit efforts continue, and alternate access point security design efforts are getting underway.
En  ineerin    Mechanics Efforts for this division will be focused on engineering reconciliation of Category I large bore as-built drawings, completion of N-5 signoffs, Category II support reconciliation, penetration analysis, pipe rupture restraint structural load verification,   and  jet impingement evaluation.
En  ineerin    Services This group    will continue its efforts in    the specification and procurement    of  spare parts.
        ~Licensin This group continues to support final safety analysis and environmental report milestones while addressing additional NRC  questions.
Nuclear Technolo Significant effort will be required by this group in moderate energy line crack analysis, leak detection, and ALARA walk-downs and  calculations/problem resolutions.


PowerThisgroup'seffortwillbespreadoveranumberofareasincludingdiagramupdatesforsystemturnover,PIlIOdevelopment,stressreconciliation,preoptestprocedurereview,pipingcomponentprocurement,IEbulletinassessment,andMSIVproblemresolution.Structural1Thisdivisionwilldevoteitselftofinalloadverification,embedmentplateloadverification,anddoorreviewandrelease.  
Power This group's effort will be spread over a number of areas including diagram updates for system turnover, PIlIO development, stress reconciliation, preop test procedure review, piping component procurement, IE bulletin assessment, and MSIV problem resolution.
Structural 1
This division  will  devote itself to final load verification, embedment  plate load verification, and door review and release.


DRAWINGSISSUEDFORCONSTRUCTIONWITHLATEISSUEDATESPRIORTOSEPTENBER30,1984D~iscilineArchitectureTotalNo.DrawingsEstimated108TotalNo.DrawingsScheduled108TotalNo.DrawingsIssuedForConstructionOfThoseScheduled108TotalNo.DrawingsIssuedat90$OfThoseScheduledForConstruction108TotalNo.DrawingsIssuedforConstructionForTotalProect108TotalNo.DrawingsIssuedat90%ForConstructionForTotalProect108BuildingServiceLB418418418418418418Concrete*ElectricalFieldErectionInstrumentationSmallBoreDksHachineLocationPipingLB*SmallBoreDBs*SmallBoreDPsSteelUesselCivil8432,161251851,7491226153221,65446550868~~8432,153251851,7431126073221,642464508558432,153251851126073221,642464508558432,153251851,7431126073221,642464508558432,153251851,7431126073221,6424645085584321153251851,7431126073221,64246450855PipeSupportsTOTALSC3/12177/480/5Y1[5399,782539917245399,7245399,7249,7245399,724*Statusofprawingsarebasedonbaselinedesignasitexiofconduitsma11borepipingandtubinaddedbn'nthisreport.uingaeyEngineeringChangeNoticesarenotstatused.'  
DRAWINGS ISSUED FOR CONSTRUCTION WITH LATE ISSUE DATES PRIOR TO SEPTENBER            30, 1984 Total    No.                   Total No.             Total  No. Drawings  Total  No. Drawings  Total    No. Drawings Drawings          Total  No. Drawings Issued      Issued at 90$        Issued    for          Issued at 90%
Es tima ted      Drawings      For Construction      Of Those Scheduled    Construction          For Construction D~isci line                          Scheduled    Of Those Scheduled    For Construction      For Total Pro ect      For Total Pro ect Architecture            108            108                108                  108                    108                  108 Building Service  LB    418            418                418                  418                    418                  418 Concrete                843            843              843                  843                    843                  843
*Electrical          2,161            2,153            2,153                2,153                  2,153                21153 Field Erection          25              25              25                    25                      25                  25 Instrumentation        185            185                185                  185                    185                  185 Small Bore Dks      1,749    ~
1,743                                  1,743                  1,743                1,743
                                  ~
Hachine Location        122            112              112                  112                    112                  112 Piping  LB            615            607                607                  607                    607                  607
*Small Bore  DBs        322            322                322                  322                    322                  322
*Small Bore  DPs      1,654          1,642            1,642                1,642                  1,642                1,642 Steel                  465            464              464                    464                    464                  464 Uessel                  508            508              508                  508                    508                  508 Civil                    68              55                55                    55                      55                  55 Pipe Supports          539            539              539                  539                                          539 TOTALS              9,782          91724            9,724                9,724                  9,724                9,724 C3/12177/480/5Y1[
* Status of pr awings are based on baseline of conduit sma11 bore                        design as it exi this report.         piping and tubin u ing aadded e b y Engineering n        Change  Notices are not statused
                                                                                      'n


2;POTENTIALREWORKa.ReworkAssociatedWithStructuralLoadVerificationTheoriginaldesignofstructuralsteelmembersandtheircon-nectionsutilizedhypotheticalloadallowancesbeforeactualloadswereknownfromsystemattachments(suchaspiping,cabletrays,=conduits,ducts,etc).Thefinalloadverificationprogramwilldemonstratestructuraladequacyforthesesystemloads.Thescopeofreworkisexpectedtobelimitedtoprimarycontain-mentsteelsincethisisthemostheavilyloadedareaandstructuralsteelbeamsarenotembeddedinconcrete.ForotherremainingCategoryI.structures,thescopeofreworkwillbeminimal.Attachment1showsthescopeofexpectedreworkandstatusofSeptember24,19S4,forprimarycontainmentsteel..b.ReworkAssociatedWithAs-BuiltStressReconciliationC.Modificationsareanticipatedasaresultoffinalizationof~designinputsandconsiderationforthecumulativeeffectoffieldchanges.Forlargebore,theonlysignificantissuesareincor-porationoffinalfluidtransients,hazardsanalysis,andcumulativefieldchanges..Allpressure,temperature,seismic,hydrodynamicandbuildingsettlementconditionsareincorporatedinthecal-culationsand,exceptinisolatedcases,arebeingfinalizedwithminorchanges.Forsmallbore,theonlysignificantissueisthecumulativeeffectoffieldchanges.'xceptforisolatedcasesalldesigninputsarebeingfinalizedwithminorchanges.Estimatedimpactsare10percentforlargeboreandlessthan5percentforsmallbore.EUIPMENTUALIFICATIONThepotentialexiststhatenvironmentalequipmentqualificationcouldeffectschedule.Forexample,ifcertainequipmentisnotcapableofbeingqualifiedtothedesignenvironmentidentifiedthreeoptionsexisttocorrectthediscrepancy.1.Relocatetoalesssevereenvironment2.Redesigntheequipmentortheparamenters3.ReplacewithotherequipmentWehaveidentifiedsomeequipmentwhichdoesnotmeetqualificationrequirements(see10CFR50.55{e)list).However,theprogramissetuptoalleviatepotentialscheduleimpacts,and"isplannedtobecompleteasdescribedin131.  
2;                               POTENTIAL REWORK
: a. Rework  Associated With Structural Load Verification The  original design of structural steel    members and their con-nections    utilized hypothetical  load allowances before actual loads were known from system attachments (such as piping, cable trays,
        =conduits, ducts, etc). The final load verification program will demonstrate structural adequacy for these system loads.
The scope    of rework is expected to be limited to primary contain-ment  steel since this is the most heavily loaded area and structural steel beams are not embedded in concrete. For other remaining Category I.structures, the scope of rework will be minimal.
Attachment    1  shows  the scope of expected rework and status of September 24, 19S4,     for primary containment steel.
.b. Rework Associated With      As-Built Stress Reconciliation Modifications are anticipated as a result of finalization of
      ~
design inputs and consideration for the cumulative effect of field changes. For large bore, the only significant issues are incor-poration of final fluid transients, hazards analysis, and cumulative field changes. .All pressure, temperature, seismic, hydrodynamic and building settlement conditions are incorporated in the cal-culations and, except in isolated cases, are being finalized with minor changes.       For small bore, the only significant issue is the cumulative effect of field changes. 'xcept for isolated cases all design inputs are being finalized with minor changes.
Estimated impacts are 10 percent      for large  bore and less than 5 percent for small bore.
C.       E  UIPMENT    UALIFICATION The potential exists that environmental equipment qualification could effect schedule.       For example, if certain equipment is not capable of being qualified to the design environment identified three options exist to correct the discrepancy.
: 1. Relocate to a less severe environment
: 2. Redesign the equipment or the paramenters
: 3. Replace with other equipment We  have  identified  some equipment which does not meet qualification requirements    (see 10CFR50.55{e) list). However, the program is set up to alleviate potential schedule impacts, and "is planned to be complete as described in 131.


-STRUCTURALLOADVERIFICATION{ASOF9/24/84)'f'I.PRIMARYCONTAINMENTFLOORFRAMINGELEVATIONMEMBERSPERCENTAGEHARDWAREFIXESREMARKS222'47'61'78'88'05'0180320460140110ANTICIPATED20%20%15'/o.10%10o/o7o/oACTUAL4%1BEAM,2CONN.TQTALS980II.CONTROLBUILDINGFLOORFRAMINGLOADVERIFICATIONACTIVITYFORFLOORELEVATIONS237'c261'OMPLETEDANDNOHARDWAREFIXESWEREREQUIRED
f '
STRUCTURAL LOAD VERIFICATION
{AS OF 9/24/84)
I. PRIMARY CONTAINMENTFLOOR FRAMING PERCENTAGE ELEVATION      MEMBERS      HARDWARE FIXES          REMARKS ANTICIPATED    ACTUAL 20%          4%    1 BEAM, 2 CONN.
180      20%
320 222'47'61'78'88'05'0      15'/o.
460      10%
140      10o/o 110        7o/o TQTALS            980 II. CONTROL BUILDING FLOOR FRAMING LOAD VERIFICATION ACTIVITYFOR FLOOR ELEVATIONS 237'c 261'OMPLETED AND NO HARDWARE FIXES WERE REQUIRED


S(ICOOASCt>Y~)f,>attEO(f(PMCNTCf)SL)P)CATIONPf)SCAA))(NONTNLTSTATUS+E~>EO(OLPLPP(AOOIT(O))Sc>A>r>f>(seewagonA'wAHItI4vAAAtateaIt>Aw4'Iltocteorc)ccYavt(4saaaAtlawe>4TOPNf)AO)gfa(NT)L14I~>~'III>~I>VnlIl>14II>ch4(Vl'4~VcltIVI'callt>1>1~~>AleaIawl1>lt~mrf>ACO(Nfc>>ASEOO(>CCS(C)SL)fKOOtI>EY(f(TSSPEC)CYOI(CtfttftIaf(OYCC(ATTNV(NOCCLCOO)MENT4(VIEWLOCAI.ICAC)CSIA4>~O>44~A>~A>I(Al))AL4>~A>Ica>~cr~O>st~>ca(V10>~H>>>1Er1aalH~IIO>VtI(IaIANEflelAHn>tcve<<CniIta~W'4<<~II14av<<4AaiWlfllCIW~tea)Ca<<e<<SaaWaa<<4aan>DWIca>C(alI~e>4r>~~<<c~>a>svrnw>>INNIwwAcvla>IACTAI~>laawtMK>sI~DES(ttcav/cs>eftrw1cctctahl>NacaIe~v>l<<1n>wosanell,~WNI~)a>DE~,~vH0cc>WSAS1ta)(n~TANcli~co(Ilac\>ol~IINH(L)tt4>~'I(Vli4>IIO>la(V>lIVIIA>lln>4(I>>1A>NVillevil~~>wawNa~eaeacceLwwNw~cca(VI'I(VV)(Ivel>414falseV(i>(VAInaa1st>>14GCSOOTY(O((CAM(ACT)V)ttLCCiOID)S>g>FLOOSECOIErON(MTS~PANELS4COO>fNTNTCLOOYL-OMOCINTLD(O(A)t>CI(TOA)f>CCSGf(AYYLCSvCA%VALVES0YV)LNA)>DLOlSTOCACC(OLEYMCNTO>CSCLjGENUa1OCIve))aenn>14(VDAI~IIrEIHND~1>Owl1O>aelcln>at>at(I~cal'eIl'VIII>VS(SDOO>VN'I~AHwvwewe~emW~I~>wtsvNIcvrtaleeasnwarQVNDTAtwg>ta~e>W>(IINNNleac>ACNVODlaltD4(vale(114>IAEAeK>I>(OONIEWS)NcgwInca>tvNllsl(E>VCCA>ls>lcwwga(ala1~e~sswwwar\<<>VANga>v~v(SettHefaaIVVI>DAD>V)HCS'tl~II~tvwINMIoarnateonJca~~~Oea1lit1IVAN>(VvltI4VCCl>afl~I<<was~a.>Wcewttaaws~cvwAatwolaleeverwnvel\4>~AW>WNaw.rawrac~ww>~>wvrw~~C~~f>~toavWCArwaroaWHEH<<H~~vve>~w~>ewwsIwCwvas~~wws~IrsENiiifglerlIlla>W~VW>wc<<w/>HrwA~swa~awL~~I)e)T)4C)CS(NECCl)CSWOAAP).ANAOO>TIO)eS:wwcaawwQNIOfP$]SftfOOSE-)CONT)(L()T)>gCOIELYStACL>M>>(SAY'((~NTEAOCCTNP)CA>>SENTf>00>f>(AtCC(SXCV>CEVELTECO'(ST(/r>HA)AMCICfcOO(P)(ACONT)OLPst(LIaOOif>CATIONff(C/4(CSTEIESr>EJcPGCCMOO>P()PIC>(AGESTOvGfCO)Ay)~Aalvrsrwtrarwwnvwa'4IN~~WW)NWr<<aoeaaaaewfwcwlNawwgrr)%etewntewtr,~HJltfT>llwP>WNrCrrr~~nccess~Ice<<a>~(VAAH>wwacwvwtwrWa~~~~A~s~w~ww>awEcrwwww>waavweaACcwL1Ev~wc>~t>avI~>H>~>Cl>Istile444>>~4>vII>aoOil\~(I>V>frIII(CIW(I>nIIIsa(lllln)wIS'IIIw>saaLacer>aeII~>I(N>eWa~I(rewiregva,411>4>44toast'low)Ical>\Irw(7ewHvea>satwaaw~LN>ertwawswcrw1Hwal,eseerwAHavAAAv>vrNLwwwor<<44~VWWC~>Wa>>>WCVHW(4>raHW~CstoaN<<WEa<<esgvrcwvIl>t'1s~>4>Ir>IIsewse>etC'ew~>WWC>EWWAaaWVNWWe>VWWtvaweewwea~wweelvatlIwwwww>tcwv4fl'>Ce4IA>\4AHA>telassVCONTCOLSnwaCIW4>E)erawaorsaa~aww>Lwrwaarvaenwcwscvwawa~Vr4PO)>(ACace>ran>~>cwrw<<4Ai>lCliel)CteAllES(a>LIale)4W41~NIw~>swf(OC44)ff()(OOOOOOO(ANEO~w~ewlaww>~~srACH)Ct>AH<<AHOlts.
S(ICO    OASC  t>Y ~ ) f,>att                                                        EO(f(PMCNT                Cf)SL)P)CATION                    Pf)SCAA)) (NONTNLT STATUS                              +   E~         >EO(OL      PLPP(     AOOIT(O))S c>A>r>f >(see                                                                                                                                                                                                                                                >4 wagon    A'w      AH      I  t I4        v AA            Ata                                tea          I  t>A              w4              'Ilt        oct                eor          c)cc            Yav              t(4        saaa        Atl        awe TOP                                                            I~ > ~ 'I          II> ~ I         >Vnl            Il> 14            I I >ch4       (Vl'4           ~ Vclt          IVI'           callt           >1>1 ~ ~       >A  lea        Iawl        1>lt ~
tC F04'IsPa>CCIRLY)TATV)Ot(054061>RTRIN<sWORTt>IAN(OTVQl44LTIAN+AOC(TCR<)CAPVCSIH0NMI<<)AA<<IMM~C0<IAAaI4>>atJ<A<<ELPIC,tae~44NMHaaleIAHCIJL><<V%t(rt>Ct<Owit~450'II~C~~<A<<rv>>40~I4PU~i~'I4IUO~(~INAIHW~Nl0V<<rettNJ(1<<are(eMopa<<<<tea>>a~4<p>>t<I40,4<oeNN~'ati>>'ll<elWI'eilA,10I<~V~~<IIA>>(Sl(Sl~I>>'AtICOI~ne<Cts~00>~a>0>>>><<~10>>a~V>>lt~AalH~Ao<<4>>eNa~~~<0<N(NHH>>N4HPINt>NVI>((NAII)I<<AVIV<<4as(VHI<<WN'VVI0~~I<<H<<0AS(UII144(1>>I~IAl(NosJll<a>>eNatoAlt1Te~~~NI<<lw00>PleaIt>>rt04Ns0%00~0>~attf<0<~ICNOAIC<OH%(A(OVIC~%4>AA>>l01st~pl<4th>tIQVC,'fNNNs<CV4I40~>>~~<<aro<<Aot$>>.~AN~w<>>~i<VNUIHA00~VVI4V~~4SNWI<~~'4'>><<<HOMIIIHie<tttstON0MH<<Irirl,ANAN<41Ki<<<<pto<<~II>>e>>>>I~<V4<s>>IaMHl~IiWU4N4<<<<>>seH>><>>At4~A<~4UANN(riseNtat4HIIV<WC<4<0<II~MaCerateeioaI/OttAst>IA0"4ksor\0oieaa'<4~<<AH<cp<<AA<TNNPS<<lI~~<A<soitf<AH<ONNVhosae>>aI~lN\st%I<Vleaa>>W~<re14~iPlea>><<0HIE>>M4HAA<C>>arevefCattCI'CLittgIt<A<ra%~41117>IO>VM>>r((%<AI044~~40~NNAie(N~<>>es<N~<el%1~r>>1EI~4~~W\~INWINN<SAA<NMVN<<N4Ioar%>>H(VHHHII<~<sl>,IsATla<11~VA(ai~Hit>(NooESIHM<OI~(4(I>~III0eAUe(4%1Pl~4I~4'>>(ItaHsaNle~~I>>NU~>>IHi>>('etl<Ne<<N(PHCs<<h<<~i<>>'>>4p<r<UAl~sNlTa0<owsrr\\~a<N>>rsI<>><AHNINHMaeIta'O'r>NAI~(0NViH<HTelapta~~I4004<M4((Ha]t40I'II4UIPsnseelEtrllf4Qe&tft4E>>l(4'e(eat~I<4A(4.11I~Aa(%>Ns4<<<<i~~0<~El<N~NH1HVN~NN>>0<<<<AM0ANia>>IH>>0ieNIH<<WieVetNVTI)A55Irl4crel<<sar>><tI'llMaP>vt<<rl~<~IIAWM'I<AaIA~~1I,,IAer<<S440<>><4VIV~~IIP>>>>N<Sa~J~UAI0'I~11VNMVN<HVNMV4<aMAriesJ<AaN4AWN<AW~<~l(tHA>>0AiSWwi~otSILIH4<aM<<>>o<4I~ha<eas>>al~IN<wioaNawQlv>>NN<HPleatv(II<<a><sa4NIIH~VVHTH~>>4Arei>><4F>ONTOCL>OAT)4tlICINC>CO(AT<(Ittt>at~>IA<ItAl,~<44<i(4Nls>>HolII4oA\HiIAAUaoepv4PIW>>w<<H>>>>>>OANss<<iVe~~AN>>orNaASS<<e>>l<\AiIts~~lta~<>>I~I<H'III~~(N4>t~poe<4S<<rIt<~U~INe.~<Iawt.l~>>Nc4<<<<4>>sI~iH~Nt<ITN<I~<~Ilt<AIIC~tls(trl<Sl(IP<el<a(4<altPtt<CO<TIE<LIt(ON(IONRICV<tt$tttttA4<t(CLTSSCON(VIVIN410>>etrCgattOI.INTA1<Ct(CITEONPLNTLOtuett<5$(I>NELOIOVtt<fCATIONLOOPLIL<ORITC>I05PORT)OarsNIIVIIVr1045t>>rHVt<~>HEt~(li4<NN~~~I~IHN~NNINWl>(SIN~~4~<~~(ai'I<N~(4Nea<<<I~'te~~<~~~Ne(<I><4~<~I'Ialso141~Ha<HaI1<NlI<ANHiI~N'>>iWN'I<I>>Iei~~Nl>>aN<AANI~INI>>re(>>INCPIN~NA<111~I~111<S<%HIHNV<IN~IVIIWW(IVHNIew~~Hl(il'I'IN>IC(alI~II~tlU1NItlAll<>WIIIIN~(I(SI>>>>INNII~I%1HIN~~i<~ti<<<~~4<~H<I~UA~I~HMINioia4TNIN>II<NNINlIt~~IMVIe\'lln>I<I~O'Alt4<~<HIII~~ela<A\I<VH(V<NiltttH~Nr>><Nal~IN~I~IN>>o'>><<M<<Nvhsac~lerlaasar%0isNNNI(tasse(NHCOrsea<<<<SNI<4NIIP>Nle>llIeaa~i~<>>N0>>~~WAAUQHISN<4~PAN<Nil<4tlA4~PUACV~'I<VH<V4As>>lierat<N44seatNHNAIPv<1sees>>%I"eawa%(savaa01NI~NHNIIWe~\4W1044CNOINCCR<NOVOOCPLAN(Or<ON444PEAI~AOR<TON5>~NPM<441ITR04)ON!tL))(<5<448<IH<siNh4<14let<IIVI~AiN0<A>lll411<iCefWN1hill(4<Hest>hitce~~4NHI>>00t<<HIIata>>o0440t>044N>(CT0444(NO(OVNVV~aIooowIN>>iANA<AOrl~stoa<1NIs(>>NAPV<AA>Cat(ltrillthI
Nf)AO)gfa(NT)L              14                                                                                                                              H      ~
A>    I      (Al ))             ~ >ca          H>> >1                I I
4> ~           O>4                4  ~           A> ~             O>st              0> ~            O>V            ANE            4> ~ 'I        4> I I          (V>l            IVII          A>ll      n>4 mrf>ACO(N                                                                                                                                                                                                                                                                      ~        ~ >wa      Na fc>>ASE                                                          AL                ca> ~           cr ~                             Er  1                t                                                                                                                        Lww wNw        ~ e aeacce
                                                                                                                                                                                                                                                                                                                  ~    cca I
4> ~          A>I                                                  (V1              aal          (Ia I            flel            ( Vli          O>la            (I>>1          A>N            Vill      evil                    (V I 'I AH            WS                AS 1            ta)              (n ~
T n>t          cve            AN                cli ~          co(I            lac\              >ol ~         IINH              (L)tt          (VV)          (Ivel            >414          false            V(i>     (VAI          naa1      st>>14 OO(>CCS (C)SL)f KO                IA Ot I>EY(f(TS                                                        <<C              ni I            ta  ~           W'4               <<     ~
I I
14            av                <<4              Aai SPEC
          )CYOI( Ctfttft Wl              fll CI          W~               tea)             Ca<<e             <<Sa aW              aa              <<4                aa              n>D Ia f(OYCC(ATTN WI                        ca>C             (al I ~         e >4            r> ~ ~           <<c ~               >a V(NOCCL                                                                              >svr            nw>             >INN            Iww COO)MENT 4(VIEW                                    A                      rw1              cc      tc      ta  hl          >Naca                  Ie ~      0 c c>
cvla >I ACTA I~ >laaw LOCAI.                      tM K>s I~ DES(ttcav/cs>eft                                  v>l<<1      n>w osa          nell, ICAC)CS
                                                                                                                                              ~ WN I ~
                                                                                                    )a>DE     ~,             ~       vH GC SOOT Y(O((CAM(ACT)V)ttLCCiOID)
S>g>F LOOSE                                                                                    1>Owl 1 O>aelcln>at>at(I COIEr ON(MT S                                                                                              ~      c    al      'e                                                                Q    VND TAtwg>ta
    ~               4 Il'VI        'III>VS (SDO ~ O>VN AH
                                                                                                                                                                                                                ~ e>W>(IINN Nleac>ACNV PANELS COO>f N TNT                                                                                                  wv                  w              ewe                                            O Dlalt D4(vale(114>I
                                                                                                                                                    ~ em W~
  -  O CLOOYL MOCINTLD I ~ >wt          svNI cvrt alee asn                                                AEAeK>I>(OON IEW S (O(A)t>CI(T                                                                                                          war                                                                              )Ncgw  Inc  a>tv Ive))aen    n>14      (VDA OA)f>CCS                                                      I~ I I r EIHND~
Nl lsl        (E>VC          CA> ls>l Gf(AYYLCS                                                                cwwga IVVI >DAD         >V)H CS'tl ~
v    CA%VALVES                                                                                                                                        I I ~                 t 0                                                                          (ala    1                                                                vw YV)L NA)>DLO                                                                                                          (Sett          INMI oar nate on l STOCACC                                                                                                                                                                                                        Oea1      lit 1 (Vvlt (OLEYMCNT                                                                                                                                                                                                              IVAN>                              I 4 VC
                                                                                        ~e H ef aa          J ca Cl>afl                                           ~ I <<was cvw war\                                                          ~    ~        ~
                                                                                                                                                                                            ~ a. >Wcew      ttaaws                    ~              Aa two la
                                                                              ~ ssww
                                                                                                                <<>VAN                                                                      leeverwnv              el\ w 4> ~         AW>     W Naw.ra          wrac O>CSCL                                                                                                                                                                                ~ ww>       ~       >     vrw          ~ ~C ~     ~ f> ~ to av v
j    GENUa1OC                                                                    ga>v          ~
W CA                                                              rwa r oa                        H EH<< H               ~   ~                                                                 vve>     ~     w~>eww                        sI W
w Cw      vas~~w ws                  ~
I rs W
c<<w                  VW
                                                                                                                                                      >w
                                                                                                                                                                      ~
                                                                                                                                                                                />Hr      w                A E
Niii fglerl Illa>                                                                                                                                                I
                                                                                                                                                                          ~         sw
                                                                                                                                                                                          ~
a aw L        ~~
wwca aww
                                                                                                                                              )e)T)4      C)CS(NEC Cl)CS WOAA                P).AN AOO>TIO)eS:
                                                                                      ~  Aal QNIOfP                                vr srwt rarwwnv                            wa          '4 IN
$- ] CONT)(L()T)>g O'(ST(/r>
Sftf    OOSE                                        ~~
W W)NW
    )     COIELYS                                                                                              r<<aoeaaaaewfwcwlN awwgrr)% etewn tewtr,
                                                                              ~HJltf~           T>
nc ~ cess              Ice<<
llw                      P>W Nr Crrr a> ~
tAC  L> M >> (SAY                  (VAAH >w        wac  wvwtwr              Wa ~ ~
                                                                                          ~
                                                                                            ~   ~ A
                                                                                                                        ~
s               ~w   ~   ww>a w Ecrwwww >waa
    '((~N        TEAOCC                                              vw TNP )CA>>SENT f>00>f>(At CC(S XCV>CE VELTEC waaw
                                                ~
                                                  ~L N>ert VW WC ~
w aw swcrw1 W      a>>
rw
                                                                                                >WCV        HW (4 >ra HW ~ C (7 ew Hvea>sat Hwal,eseerw AH avAAA stoa v N >vrNL    <<WE ww wo r<<44 a<<es                    gvr            cwv Il>t t>av I
                                                                                                                                                                                                                                  '1 HA)AMCIC                                                                                            eaAC cw L 1 Ev                          ~ wc>                                           ~
                                                                                                                                                                                                        ~ >H> ~ >
fcOO(P )(A                                                                                                                                                       ~     (I V> fr I                                                                 s ~ > 4>I I
I stile            II ao          (CIW              II Isa        n)w              r> I I             et CONT)OL      Pst(L                                                    Cl>I                 44          4>> ~             4>v Oil\          (I> n            (ll ll        IS'I II          sew se>
C'ew              ~ >WWC>     EWWA aa WVNW We>VWW tvawe                ew wea r>
IaOOif >CATION                                                                                                                                                                                                                                              ~ wwe    el va  tl Iw    w www >t ff(C/4( C STEIES                                  w>saa Lacer>ae            I            I ~ >I           (N >e                             Wa ~                 I EJ c    PGCC MOO>P                                                (rewire      gva              ,4   11        >4>44
() PIC>(AGES TO                                                                                                            toast      'lo v Gf CO)Ay)                                                                                    w )I          cal  >\I c      wv4                      fl'>Ce 4    IA>\4 AHA>tel ass V nwa CONT COLS                                                                                  CIW4>E)                                                                                                                                                                            aors aa era              w                                                                                                                                                                                           ~a    w w>L wrwa arva en wc ws cv wa wa
                                                                                                                                                                                                                                                                                        ~ Vr 4 ace>ra    n> ~       Ai>l           Cliel                                                                                                                                                                                                      ~ N  Iw        ~ >sw PO)>(AC                                                                                                ) CteAllES                                                                                                                                                            f(OC 4 4)ff() (OOOOO OO(ANEO
                                        >cwrw    <<4                         (a>L            Ial e)4           W 41                                                                                                                                                                        ~ ~ewl aww ~         >
                                                                                                                                                                                                                                                                                                            ~ srA CH)C t>AH<< AH Ol ts.


AGENDAITEM03ITEN:Detailedreviewandcurrentstatusofprocurementactivities,includingvalves,pipe,instruments,cable,majorcomponents,spareparts,etc.CURRENTSTATUS:Seefollowingpages.
t C


lNINENILEPOINTNUCLFARSThTION-UNIT2FI'ectricalDisciplineCableProcurementStatusOrderedasofSetember181984ToBeOrderedCa~LeTaCeEstiaatedPurchaseDeliveredBalanceDeliveryTotalOrder{asofDue{asofDatenuantituQuant~lt~9I(1I'I>>lnltt)~latent)ExpectedhnticipatedOrderDateEsti3aatedRequiZDeliveryDate15-kVPoverCable{E023h)5-kVPowerCable{E0238)44865070,05044,65070005045,91171,094NoneHone6AA-VPowerCable(EA23C)1000-VControlCable(ED24h)600-VControlCable(IncludesLiphtingandCollaounicationCables){E024B)1,222,5001,22",5001,166,57449,3901,452,0001,452,0001,358,058115,0006,621'486,409,7486,678,232220,33910/12/84None9/22/84.est.None9/21/84212,0009/28/8412/7/84300-VInstru-mentCable{E024P)1,452,0001,452,0001,489,2384,79910/1/84est.NoneYhermocoupleCable{R024R)371,00037't,000385,13912/7/8492,143'st.NoneCoaxialCables{En24aF0906)TOMLS3t5000315000~28848~i00)],548'4811,336,948llew462,684436,17710/1/84.est.None212,000 I
F 04'Is  Pa                                                                                >CCIRLY )TATV) Ot(054061>RTRIN<s                                        WORT t>IAN(OTVQl44L TIAN+AOC(TCR<) CAPVCSIH0NMI<<)
1STATUSOFINSTRUHEMTSSUPPLIESBVCSD,10/17/84SecificatioaRo.C001CC002CC002DC002VC011NCOllNC012DC012JC012MC012NC012RC012SC021LC022FC022LC022RC022SC022UC032GC0328C032NC032RC042DC042DSecificationTitleHydrogenGasAnalyzersThrbineGeneratorHydrogenNonitoringSystole~LDevpointAnalyzersHoistureTransaittersPipeInsert-TypeVenturiFlovSectionsOrificePlatesSightF}owGlassRotaaetersPipeInsert-TypeandPressureRetaining-TypeVenturiFlovSectionsOrificePlatesAnnubarFlovElementsPositiveDisplaceaentFlmceetersLevelSvitchesLevelGlassesLevelSvitchesElectronicLevelTransmitters(DisplacerType)PneumaticLevelTransmittersUltrasonicLevelTransmittersKanoeetersPressureIndicatorsDifferentialPressureIndicatingSvitchesandIndicators-CategoryIIBPressureSvitches-CategoryIIBResistanceTemperatureDetectorsandTheraovellsResistanceTemperatureDetectorsvithThermovellsandTestVallsTotalInstrumentsonPurchaseOrdertoDate30411248155821161434853826183294423952170267180284AnticipatedQuantitycInstrumentstobeAdde1(10/30C3/12177/486/5TH
                                  <<I MM AA
~i ScificationNo.SecificationTitleTotalinstrumentsonPurchaseOrdertoDateAnticipatedQuantityofIastruacotstobeAddedC042EC042XC042VC051AC051GC051HC052hC0528C052NC0616C061PC062CC062PC062VC071AC071LC0715C011VC071WC072LC0725C072PC0720C072VC072MC012XC072YC072ZC073UC074KC151BC151CTheraocouplesandTbermovellsBimetallic-TypeThermometersvithThermove1IsTemperatureSvitchesSafetyandReliefValvesRuptureDischsseabliesAStKCode,SectionIII;Classes2and3SpecialServiceControlValvesAQKCode,SectionIII,Classes2and3SafetyandReliefValvesControlValvesSpecialServiceControlValvesControlPanelsLocal.Instr~at.RacksControlPanelsLocalinstrumentRacksLiquidRadvasteControlSystemHeating,Ventilating,andAirConditioningInstrumentationControlRoomInstrumentationandRacksElectronicTransmittersFlexibleNetalHosehcousticSRVPositionMonitoringSystemControlRooaInstrumentationandRacksElectronicTransmittersInstrumentAirDryersVibrationNonitoringSystemPneuaaticinstrumentsLoosePartsNonitoringSystemElectronicTransmittersvithDiaphragmSealsandAccessoriesRadvasteSaaplePanelsHeating,Ventilating,andAirConditioninginstrumentsFireandSmokeDetectionSystemsI.evelDifferInstrumentValvesExcessFlovCheckValves73305221302572932525812953949760126810111*157740664189~13117692625141659<<+296726852521(11/15/8420(1)/15/843(10/30/84,12(10/30/81(10/30/8C3/12171/486/5YH 4
                                                            ~ C 0              <IAA              a I  4>>at                                  J<A<              <EL                                                                    PIC,        tae            ~ 44        NM        Ha        ale      I  AH        CIJL
SecificationNo.SeciEicationTitleTotalInstrumentsonPurchaseOrdertoDateAnticipatedentityofInstrunent.stobeAddedP272VP281FN070hSajaplePanelsandhnalyxingEquipmentDigitalRadiationNonitoringSystemMaterialSpec10265473013,957200(12/30/84237'aOMLY18hClllhLEQUIPtQNTIDNOS.~NLY75hCDJALKglJIBKNTIDNOS.C3/12177/486/5%i  
                                                ~  <A<<r            v>>40 W
  ><<V%          t(rt                                                                          ~   Nl 0        V<<re
                                                ~ I 4 PU            ~ i 'I 4 I tt NJ(1
                                                                          ~
( ~    IN
                                                                                        <<are(e 40, 4
                                                                                                  ~              Mop 4 <p>>t<I a<<<<tea>>a
                                                                                                                                                                                                                                                                                      >>>><< ~ 10>>a      V>>lt~         Aal H I'e il
                                                                                                                                                                                                                                                                                                      ~            ~
UO  ~            AIH                  <oe                                                                          NN                                                                                                            ~ Ao  <<4>>e    Na
    >Ct <Owit                  I      ~
                                                                                                                                                                                                                                                                                                            ~
                                                    ~                i>>'ll                                    W                                            A
                                                      'at            <el                                      ,10                  I< ~              V    ~                                          COI ~      ne<          Cts ~        00> ~        a>0                ~      <0<N      (NH              H                    >>N
    ~4    50'I                  C      ~
                                                        ~          <I    I              A>>                  ( Sl                (Sl    ~                            I>>'            At I
4 H PIN                  <<4 'VVI as(VH  <<H<<0          AS                                  >>I                    ~ I              Al t>N VI>(              <<WN I
(NAII                                                                      (Nos Jll<a>>e                                Na        to Alt 1 Te                                                    Plea                    0%00        ~0>      ~
I<<AVIV                    0    ~
  )                                                                                 ~  ~
I<<lw                                            ~  N
                                ~      I (UII 14 4(1                                                                                           00 >                                  I    t>>rt      04 Ns 0
attf <0< ~        I
                                                                              >>    ~      ~ <<a ro<<                    Aot          $ >>        .~  AN
                                                                                                                                                          ~
                                                                                                                                                                            ~ w<                              WU 4 N
                                                                                                                                                                                                              >><>>At 4<<<<>>s 4 A<~
eH
                                                                                                                                                                                                                                                ~  4  U  AN N( rise 4                                                                                    i
                                                        >>                                                      ~
CNOAIC<OH                                        <VNU                IHA              00      ~            VVI                                    4 V~                                            ~ 4SN                                  V<WC                                    4HI I                              Ntat
  %(A(OVIC W      I< ~  ~'                                            4'>>      <<<HO M I II Hi                e<tttstON 0 MH                    Irirl,
                                                                                                                                                                              << ANAN                      1K Plea>> <<0 HIE>>M                                      reve        <4<0< I I ~      Ma                      Cerate eioa I/O
        ~ %4>A A>>l 01st pl<4th>
                                                                                                                                                                                                    <4                                      4HAA<C>>a                      tt Ast>    IA 0"4 ks                          or\0 oi eaa <4
                                                                                                                                                                                                                                                                                                                          ~ <<AH< cp<<AA< TN NPS<<l I ~
  ~
  'f t IQVC, NNNs<CV                  I      4
                                                                                                                  <s>>      Ia M Hl          I I>>e>>>>i<<<<pI~
                                                                                                                                                ~          I    i to<<
                                                                                                                                                                                <V4
                                                                                                                                                                                          ~
                                                                                                                                                                                                                                                                                                        ~ <A<so    it f<AH<ONN Vhosae>>a        Ii
                                                                                                                                                                                                                                                                                                        ~ lN \st%I< Vleaa>>W ~ <re 14 ~
                                                                                                                                                                          <SAA                                      <<  ~ i I NW I 4
                                            ~ 40                                                  ~
0      4
                                                                                                                                                <N    M                                      oar                                        4 p<r
                                                ~  NN                                                    INN                      VN                <<N                            %>>H              (VH f      Catt Aie (N ~                                Hi>>                ('etl
                                                                                                                ~~              I>>N
                                                                                                                                <Ne U
                                                                                                                                                    <<N
                                                                                                                                                        ~
(PH
                                                                                                                                                                          >>I Cs<<h C I'C      Litt        4      ~
                                                <>>es                      <el        HH                  la< 11              ESI    H            M<O                    I~      (4
                                                <N ~                                I I< ~              ~ VA g ~It<A<ra%
4111        7>                          EI ~                                  <sl >                (ai ~                (I> ~
III 4    ~
                                                                ~  W\                , Is AT            Hit>
IO>VM>
      >r((% <AI                                                        %1 ~            0e (Noo Pl ~              4I    ~                          4'>>
                                                                                                                                                                                                                              <>> '>>          <U  Al
                                                                                                                                                                                                                                                              ~a
                                                                                                                                                                                                                                                              ~s    Nl  Ta  0<ow srr\\
                                                                                                                                                                                                                                                                            <N>>rs I <>><AH NIN H Mae A
r>>1               Ue                  (4%1               (Ita                H sa              Nle Ita                                                                              Vi                    H<HT ela pta
          'O'r>NA                                                                                            ~~          I4 004<M I ~            (0 N I'I  I4                            ns eel Etrllf 4 Qe&tft UI Ps                                4 E>>l 4((Ha                                                                                                                                      (4 'e            (eat          (4.11            I~ Aa    (%>Ns        4<<<                  1H                                              N>>0 <<<<AM 0AN
]t                                                                                                                                                      ~I            <4A            <i  ~
H>>0                      IH        <<W        ie V
                                                                                                                                                                                            ~        0< ~        El< N      ~ NH              VN          ~ N        ia>>I                  ie N 4      0 etN
                                                                                                << rl~                      IIA                                      WM 55 VT I)A Irl4crel
      <<sar>><t P>vt                'I  <Aa IA ~ ~
0<>><        4  VIV 1          I,,   < ~
I  Aer<<                    S        4 4
                                                                                                                    ~ ~
I                                                                                      I P>>>>N<S              a ~
I                                                                                                                                                        J
                                                                                                                    ~    U A                                                            I 4<aM            Aries              J<AaN              4 AW                  N<AW                  0'I ~ 11          VNM            VN<H          VNM        V ll    Ma HA>>0                                                    w i~ ot                SILIH                4<aM              <<>>o<            4
                                                                                                                                                                                                                                                                                      ~V    VHTH ~
                                                                                                                                                                                                                                                                                          >> 4 A rei        >><4 I
Ai SW                ~ ha                <eas>>                al ~ IN              <wioa              Naw              Qlv>>          NN<H            Pleat        v(II<<      a><sa        4NIIH l(t F>ON TO
                            ~< ~
                                              <4  S<<r I~ i H                ~
It<~
Nt U ~ IN
                                                                                    <I TN e
                                                                                                          <I
                                                                                                                .~
                                                                                                                ~<
                                                                                                                    <Ia        wt.l
                                                                                                                                    ~ Ilt
                                                                                                                                            ~            >>Nc
                                                                                                                                                    <AIIC~
4<<<<4>>s tls(trl        <Sl(IP          <el<a    (4<alt
                            >at     ~ >I CL>OAT)                                                          A<It            Al,     ~          <44<i I4          (4 Nl              s>>H                ol I            ~ lta ~(N4>t  <>>I ~ I<H 'III~
oA\ Hi I              4    AAU                  aoe            pv                                  ~
                                                                                                                                                                                        ~          poe P
I  W 4    tlIC INC>                                                                                                                      >>w<<H>>>>>>                          O CO(AT<(                                                      Ve ~        ~        AN>>o r AN                ss<<i                                i I ttt                                                                        Na          ASS<<e>>l<\                          A ts ~          I Ptt<
CO<TIE
<LI  t(ON(ION R
ICV<tt
$    tttttA                                                                                                41    0>>etr 4<    t(CLTSS CON(V                                                IVIN I                                                                    ela                                                                            A4 I                                                  <A \ I CgattOI.                                       (li4            <NN                                      I ~I              HN                    NN              INN              I            HIN        <VH          (V            <Nil INTA 1<
I    N            Wl>
                                                                                    ~~
(SIN
                                                                                                        ~
(ai    'I        (4      N
                                                                                                                                                ~
                                                                                                                                                  <<<  I~                ~~
                                                                                                                                                                                    ~    %1 tt t Ct (CITE ON PLNTL
                                                  ~ ~            4      ~          <  ~  ~            <N ~                        ea                te'              i< ~                                    ~ i                          ~ <>>
Otuett<5$                                      ~    ~                                                    (<I>              <~  I 'I                              i<<                t                                                                      N 0>> ~      ~ WAA U      Q (I>NE LOIO H
                                                < ~ ~                              ~ Ne                <4 ~                also                                  < ~  ~        4< ~                        H            ISN            <4 ~          PAN          <Nil        <4  tl    H          ~ PUA          CV
                                                                                                                                                                                                                                                                                                                                        ~ 'I  <VH<
Vtt<fCATION                                                                                                                                                                                                                                                                                                                              V4 141                                                      Hi I                WN                    ei ~            Alt            4
                          <~>      Et ~
                                          ~ Ha<Ha                I 1< Nl          I <AN              ~  N '>>i              'I < I>>I          ~ Nl>>a          < ~  <H      III    ~  ~    H< I ~                  ~ Nr>>          <Nal ~        IN ~ I ~        IN>>o '>> <<M <<N LOOP III            IN ~ (I                      >>>>                                                                                                                        vhsac ~ lerla asar%0 LIL<ORITC>I                                                        All<>          W                                          (SI                                  UA ~ I ~      H MI                                                                        is NNNI (tasse( NHC                              As>>lie rat < N 44seat 05 PORT)                                                                                                                                                                                                                                                     Or sea<<<                                          NHNAIP v<1 sees>>%
Oars                                      N <AAN                I>>re            (>>INC              A<111 ~                  <S<  %HI              HN          Nioia          4    TN I"ea          wa  %(savaa 01NI N IIVIIVr                                      I ~ IN              PIN                ~  N            I~    111            V<    IN          ~  IVII            IN>II        <NNI              n  >I<    <SNI        <4NI                                                                              ~  NHN II We 1 045                                    WW                HN                                    (   il'I'            (al    I~ I      U1                Nl    I      t  ~  ~
                                                                                                                                                                                                                                                                                                    ~ \    4 W t>>r H Vt                                      (IV              Iew              ~~    Hl            IN>IC                I~      tl          N Itl            IMV          Ie\'ll          I ~ O'    IP>N          le>ll          Ieaa                                                    1044 CNOINCCR<NO VOOC PLAN
( Or<ON444 PEAI ~ A OR< TON 5 >
~ NPM <441
                                                <4 4              <si Nh            let<I                IVI ~                <A>    lll        WN1              (4<H          est>                                                                                                                        t>04 4 N>(CT 0444(NO (OVNVV ITR 04)ON!t 8< I H          4<14                                    AiN                  4 11              hill              hit            ce    ~
NHI>>00 t<<HII ata>>o 0440                                                                        ~ a Ioo ow IN>>i L))(<5                                                                                                   0                    <i Cef                                ~  4                                                                                                                                                  ANA<AO        rl
                                                                                                                                                                                      ~  stoa  <1  N Is(>>NAP      V<AA  >Cat                                                                                            (ltr ill th I


LARGEBOREPIPESPOOLSTATUSCURRENTASOFOCTOBER11984TotalEstimatedScopeDeliveredthroughOctober1,1984EstimatedforCompletion11,16ZSpools11,149Spools13SpoolsStatusofRemaininSoolsInFabrication13Spools e
AGENDA ITEM 03 ITEN:
e~~YalvesAllvalvesidentifiedasrequiredforNMP2areordered.Atotalof12,950valvesarecurrentlyrequired.(10,800smallboreand2.150largebore).ThemajorityofthesevalveshavebeenshippedPresently148manualsmallborevalves(23n,andsmaller)arenotdelivered.ThelastvalvewillbeshippedbyMarch1985.Inadditionapproximately20miscellaneouslargeboreorsmallboreactuatedvalveswillbeshippedbyFebruary1985.  
Detailed review and current status of procurement activities, including valves, pipe, instruments, cable, major components, spare parts, etc.
CURRENT STATUS:
See following pages.


AGENDAITEMNITEM:Actualandproposedcraftworkforce(bymajorcraft),craftavailability,productivity,potentiallabornegotiationsandproblems.CURRENTSTATUS:Seefollowingpages.  
l NINE NILE POINT NUCLFAR SThTION            -  UNIT 2 FI'ectrical Discipline Cable Procurement Status Ordered as of Se tember 18          1984                  To Be Ordered Estiaated  Purchase      Delivered        Balance            Delivery                  Expected  Esti3aated RequiZ Total      Order          {as of          Due {as  of      Date        hnticipated  Order    Delivery Date Ca~Le TaCe        nuantitu    Quant~lt      ~9I(1 I'I>        >lnltt)           ~latent)                  Date 15-kV Pover Cable {E023h)      448650      44,650        45,911                                            None 5-kV Power Cable {E0238)      70,050      700050          71,094                                          Hone 6AA-V Power Cable (EA23C)      1,222,500  1,22",500      1,166,574        49,390            10/12/84    None 1000-V Control                                                                    9/22/84 Cable (ED24h)      1,452,000  1,452,000      1,358,058        115,000          . est.         None 600-V Control Cable (Includes Liphting    and Collaouni ca t ion Cables) {E024B)    6,621 '48  6,409,748      6,678,232        220,339            9/21/84      212,000      9/28/84  12/7/84 300-V Instru-                                  llew ment Cable                                                                        10/1/84
{E024P)            1,452,000    1,452,000      1,489,238          4,799            est.        None Yhermocouple                                                                        12/7/849 Cable {R024R)      371,000    37't,000          385,139        2, 143        'st.            None Coaxial Cables
{En24a                                                                            10/1/84 F0906)            3t5 000    315 000        ~288    4 8      ~i00          . est.        None TOMLS              )],548 '48  11,336,948          462,684    436,177                        212,000


NINEMILEIICRAFTSMENOCTOBER12F1984CRAFTAsbestosWorkersBoilermakersBricklayersCarpentersCementFinishersElectriciansZronworkersLaborersMillwrightsOperatingEngrs.PaintersPipefittersRoofers,SheetmetalWorkersSurveyors,TeamstersSprinklerfittersLinemenPlasters.1st64 21430760123332618378159861495279161222nd 10 2913580 4013304 3015  3rd     20 49 15 >>0    0>> TOTAL74 243399151304616191190261498298161223665672884425
I 1
STATUS OF INSTRUHEMTS SUPPLIES BV CSD,                   10/17/84 Total Instruments on  Anticipated Quantity c S ecificatioa  Ro. S ecification Title                        Purchase Order to Date Instruments to be Adde C001C              Hydrogen Gas Analyzers                                  30 C002C              Thrbine Generator Hydrogen Nonitoring                    41 Systole          ~ L C002D              Devpoint Analyzers                                      12 C002V              Hoisture Transaitters                                    4 C011N              Pipe Insert-Type Venturi Flov Sections                    8 COllN              Orifice Plates                                          155 C012D              Sight F}ow Glass                                          8 C012J              Rotaaeters                                              21 C012M              Pipe Insert-Type and Pressure                            16 Retaining-Type Venturi Flov Sections C012N              Orifice Plates                                          143 C012R              Annubar Flov Elements                                    48 C012S              Positive Displaceaent Flmceeters                          5 C021L              Level Svitches                                          38 C022F              Level Glasses                                            26 C022L              Level Svitches                                          183 C022R              Electronic Level Transmitters                            29 (Displacer Type)
C022S              Pneumatic Level Transmitters                            44 C022U              Ultrasonic Level Transmitters                            23 C032G              Kanoeeters                                                9 C0328              Pressure Indicators                                    521 C032N              Differential Pressure     Indicating                    70 Svitches and Indicators Category IIB C032R              Pressure Svitches - Category IIB                        267 C042D              Resistance Temperature Detectors                        180 and  Theraovells C042D              Resistance Temperature Detectors                        284                        1 (10/30 vith Thermovells and Test Valls C3/12177/486/5TH


JULAUGSEPTOCTHOYDECJAHFEBHARAPRIIAYJUNJULAUGSEPOCTNOYDECJAHFEBHARAPRMAYJUHJULAUGSEPOCTCLASSIFICATIONPERIOD6/187/168/209/1710/1511/19IZ/17I/212/183/184/155/206/177/158/'l99/'16~10/14'll/1812/16I/202/173/'l74/165/196/167/Zl8/189/157/158/'l99/l610/l411/1812/16I/202/173/174/145/196/167/148/189/'IS10/1311/1712/151/192/163/164/155/186/157/208/179/1410/11HEEKS454454544454454454544454544PlpefittersElectrlclansTotalCrafts19001900150011007506506005004503503002502001751501351251007550259009009007006506005004504003002252001501251008575605030151045004500400030002500200017501450115087575067557552542532524018514510060453525
~ i Total instruments on  Anticipated Quantity of S  cification  No. S  ecification Title                    Purchase Order to Date Iastruacots to be Added C042E              Theraocouples      and Tbermovells                      73 C042X              Bimetallic-Type Thermometers vith                    305 The rmove 1 I s C042V              Temperature Svitches                                    22 C051A              Safety and Relief Valves                              130                      1  (11/15/84 C051G              Rupture Disc hsseablies AStK Code,                        2 Section  III;  Classes 2 and 3 C051H              Special Service Control Valves AQK                      57 Code, Section    III,  Classes 2 and 3 C052h              Safety and Relief Valves                            293 C0528              Control Valves                                      252 C052N              Special Service Control Valves                          58 C0616              Control Panels                                        129                    20  (1)/15/84 C061P                Local. Instr~at. Racks                                53 C062C                Control Panels                                        94 C062P                Local instrument Racks                                97 C062V                Liquid Radvaste Control System                        60 C071A                Heating, Ventilating, and Air                        126 Conditioning Instrumentation C071L                Control Room Instrumentation and Racks              810 C0715                Electronic Transmitters                              111                      3  (10/30/84, C011V                Flexible Netal Hose                              *1577 C071W                hcoustic SRV Position Monitoring System                40 C072L                Control Rooa Instrumentation and Racks              664 C0725                Electronic Transmitters                              189 C072P                Instrument Air Dryers                              ~
13 C0720              Vibration Nonitoring System                          117 C072V                Pneuaatic instruments                                  69 C072M                Loose Parts Nonitoring System                          26 C012X              Electronic Transmitters vith Diaphragm                  25 Seals and Accessories C072Y                Radvaste Saaple Panels                              141 C072Z                Heating, Ventilating, and Air                        659 Conditioning instruments C073U              Fire and Smoke Detection Systems                <<+2967 C074K              I.evel Differ                                            2 C151B                Instrument Valves                                    685                    12  (10/30/8 C151C                Excess Flov Check Valves                            252                      1  (10/30/8 C3/12171/486/5YH


CASELOADFORECASTCRAFTAsbestosWorkersBoilermakersBricklayersCRAFTAVAILABILITYPoor(AtPeakManload)ExcellentExcellentElectriciansIronworkersLaborersOperatingEngineersPaintersPipefittersSheetmetalWorkersTeamstersGoodExcellentExcellentExcellentExcellentPF-FairtoGoodWelders-PoorGoodExcellentCarpenters/MillwrightsExcellent/GoodEXPIRATIONDATE4/30/859/30/865/31/855/31/857/31/855/31/865/31/855/31/856/30/856/30/856/30/855/31/85COMMENTSPROBLEMSNoProblemsNoProblemsNoProblemsNoProblemsNoProblemsNoProblemsNoProblemsNoProblemsNoProblemsNoProblemsNoProblemsNoProblems e
4 Total Instruments on  Anticipated  entity  of S  ecification  No.      S eciEication Title                    Purchase Order to Date Instrunent.s to be Added P272V                      Sajaple Panels and hnalyxing Equipment          1026 P281F                      Digital Radiation Nonitoring System              547 N070h                      Material Spec                                      30                      200 (12/30/84 13,957                      237
PRODUCTIVITY(AsofSet.1984)ITEMSWEC-SmallBorePipePLAN(UR)4,95ACTUAL(UR)4.94SWEC-SmallBorePipeSupports40.4140.75LKC-Conduit1.101.08LKC-ConduitSupports17.1817.13LKC-CableTermination0.961.09LKC-CablePulling0.120.12JCI-SeismicSupports67.7860.64JCI-InstrumentTubing1.731.75ITT-LargeBorePipeSupports179.93197.30
  'aOMLY 18  hClllhL EQUIPtQNT ID NOS.
~NLY 75      hCDJAL KglJIBKNT ID NOS.
C3/12177/486/5%i


AGENDAITEM&#xb9;5ITEN:Detailedreviewandcurrentstatusofalllargeandsmallborepipehangers,restraints,snubbers,etc.,includingdesign,rework,procurement,fabrication,deliveryandinstallation.CURRENTSTATUS:Seefollowingpage.(Wewillbepreparedtodiscusssnubbersatthemeeting.InformationonrestraintsisinItem&#xb9;7).
LARGE BORE PIPE SPOOL STATUS CURRENT AS OF OCTOBER 1  1984 Total Estimated Scope                                11,16Z Spools Delivered through October 1,   1984                  11,149 Spools Estimated  for Completion                                13 Spools Status of Remainin  S  ools In Fabrication                                            13 Spools


1.AR(:1ANDSi1Ai.LBORi.PIPEHA4CERSTATUSA.Design-EssentiallyallinitiaiLargeBorehangerdesignsarecomplete.Thereare495CatIand405Cat11andSmallBorehangerdesignslefttobecompleted.Revisionstobothl,argeandSmallBorehangersmayresultduetofinalstressverification.B.Hanger-Thecurrentstatusofhangerinstallationisasfollows:L.B.Hangers-CatIQCAccepted2,838ToGo1,9554,793CatII&IIICompleted10,924ToGo2.51413,438S.B.HangersCat1QCAccepted743ToGo6,0516,794CatII&IIICompleted14,990ToGo8.50723,497Themanhourstodatetocompletehangershasbeen50mh/eaforCatILargeBore,25mh/eaforCatII&IIILargeBore,0.50mh/eaforCatISmallBoreand2mh/eaforCatII&III.SmallBore.Usingthetodateexperienceresultsinanestimateofapproximatelyl80,000ofreworkwillberequiredtocompletehangerinstallationsafterinitialconstructionreportedcompletion.Alsoasstatedabove,changesduetofinalstressverificationswillberequired.Hangermaterialsareprocuredanddelivereddirectlytothesite.Thehangersarethenfabricatedtotheextentpossibleanddeliveredtothefield.Theprocurementstatusforallremaininghangermaterialisasfollows:LargeBore-Therearecurrentlyatotalof70shopordersatthistime,ofwhichtwenty-six(26)aredesignatedasprioritytocompletetheprimarycontainment.PriorityordersareprojectedtobecompletebyNovember15,1984andthebalanceoforderscompletebyJanuary31,1985.Currentlythereare259hangersidentifiedasbeingshortofmaterial.SmallBore-Atotalof2,200supportsand250specialpipeclampsremaintobedeliveredonopenpurchaseorders.CompletionofshipmentsisprojectedtobeDecember15,1984.  
e e
~ ~
Yalves All valves identified as required for NMP2 are ordered. A total of 12,950 valves are currently required.   (10,800 small bore and 2.150 large bore). The majority of these valves have been shipped Presently  148 manual small bore valves (2 3n, and smaller) are not delivered. The last valve will be shipped by March 1985.
In addition approximately 20 miscellaneous large bore    or small bore actuated valves will be shipped by February 1985.


AGENDAITEM86ITEM:Detailedreviewofprojectscheduleidentifyingcriticalpathitems,nearcriticalitems,amountoffloatforvariousactivities,thecurrentcriticalpathtofuelloading,methodsofimplementationofcorrectiveactionforanyactivitieswithnegativefloat,andprovisionsforcontingencies.Theestimatedprojectpercentcompleteasof~3etether30,1984.CURRENTSTATUS:SeedataforItem81.  
AGENDA ITEM  N ITEM:
Actual and proposed  craft work force (by major craft), craft availability, productivity, potential labor negotiations and problems.
CURRENT STATUS:
See following pages.


AGENDAITEMk'7ITEM:Detailedreviewandcurrentstatusofbulkquantities,includingcurrentestimatedquantities,quantitiesinstalledtodate,quantitiesscheduledtodate,currentpercentcompleteforeach,actualversusforecastinstallationrates,incubicyards/mo.,linearfeet/mo.,ornumber/mo.,andbasis.forfigures.AlsoindicatewhatpercentagehasbeengAinspectedandaccepted.a.Concrete(CY)b.ProcessPipe(LF)-LargeBorePipe(21/2"andlarger)-SmallBorePipe(2"andsmaller)c.YardPipe(LF)d.LargeBorePipeHangers,Restraints,Snubbers(ea)e.SmallBorePipeHangers,Restraints(ea)f.CableTray(LF)g.TotalConduit(LF)h.TotalExposedMetalConduit(LF)i.Cable(LF)-Power-Control-Security-Instrumentation-PlantLightingj.Terminations(ea)-Power-Control-Security-Instrumentation-PlantLightingk.ElectricalCircuits(ea)-Power-Control-Security1.Instrumentation(ea)CURRENTSTATUS:Seefollowingpages.
NINE MILE  II CRAFTSMEN OCTOBER 12F  1984 CRAFT              1st          2nd            3rd  TOTAL Asbestos Workers                              Boilermakers        64            10              74 Bricklayers                                  Carpenters          214          29              243 Cement  Finishers    30                            39 Electricians        760          135            20  915 Zronworkers        123                          130 Laborers            332          80            49  461 Millwrights          61                        61 Operating Engrs. 83          40            15 Painters            78          13              91 Pipefitters        1598          304            >>0  1902 Roofers                6                        6
, Sheetmetal Workers  149                      149 Surveyors,           52          30              82 Teamsters            79          15                  98 Sprinklerfitters    16                        16 Linemen              12                      0>>  12 Plasters.             2                         2 3665          672            88  4425


Item7ThefollowingcurvesandtheProductionReportarebasedupontheEngineersConstructionManagementSystem(CMS)whichisthesystemusedtocollectandtabulateinstalledquantities.SinceNMP3J/2isasub-contractedprojectnotallprojectcommoditiesareshown.Also,curvesareprovidedtoshowcompletevisabilityastotheplan,however,thetogoplannedratepermonthshownontheproductionistheaveragerateofplannedinstallationfromnowuntilthecommodityreaches90%complete.
JUL                      HOY  DEC  JAH  FEB  HAR  APR  IIAY  JUN  JUL  AUG  SEP    OCT    NOY  DEC    JAH  FEB  HAR  APR  MAY  JUH  JUL  AUG  SEP  OCT AUG  SEPT  OCT CLASSIFICATION PERIOD 6/18 7/16  8/20  9/17 10/15 11/19 IZ/17  I/21 2/18 3/18 4/15  5/20  6/17  7/15 8/'l9 9/'16 ~
10/14 'll/18 12/16  I/20 2/17 3/'l7 4/16 5/19 6/16 7/Zl 8/18 9/15 7/15 8/'l9 9/ l6 10/ l4 11/18 12/16 I/20  2/17 3/17 4/14 5/19  6/16  7/14  8/18 9/'IS 10/13  11/17 12/15 1/19    2/16  3/16  4/15  5/18  6/15  7/20  8/17  9/14 10/11 HEEKS  4    5    4      4      5    4    5    4    4    4    5    4    4    5    4      4      5      4    5    4    4    4    5    4    5    4    4 1100  750  650  600  500                                                135  125  100    75    50    25 Pl pe fitters                                1900  1900 1500                              450  350  300    250    200    175    150 Electrlclans                                  900    900  900  700  650  600  500  450  400  300  225    200    150    125  100    85    75    60    50    30    15    10 Total Crafts                                  4500  4500 4000  3000 2500 2000 1750  1450  1150  875  750    675    575    525    425  325  240  185  145    100    60    45    35    25


24PLANVSACTLBWELDS-RPLANACT-2221~n201918171618-Dec18-Mar17-Jun16-Sep16-Dec17-Mar19841985QuantitiesarereportedasinstalledtoCMSuponcompletionoftheweld.Quantitiesareverifiedbycomparingactualquantitiesreportedvs.iso-metricdrawingtakeoffs.TheL.B.WeldsmadebytheNSSSerector,TurbineGeneratorerectorandFireProtectionerectorarenotincluded.Theestimatedpercentcompleteis95%.
CASELOAD FORECAST CRAFT              EXPIRATION  COMMENTS CRAFT                  AVAILABILITY              DATE    PROBLEMS Asbestos Workers      Poor (At Peak            4/30/85  No Problems Manload)
Boilermakers          Excellent                9/30/86  No Problems Bricklayers            Excellent                5/31/85  No Problems Carpenters/Millwrights Excellent/Good          5/31/85  No Problems Electricians          Good                    7/31/85  No Problems Ironworkers            Excellent                5/31/86  No Problems Laborers              Excellent                5/31/85  No Problems Operating Engineers    Excellent                5/31/85  No P robl ems Painters              Excellent                6/30/85  No Problems Pipefi tters          PF - Fair to Good        6/30/85  No Problems Welders  - Poor Sheetmetal  Workers  Good                    6/30/85  No Problems Teamsters              Excellent                5/31/85  No Problems


19PLANVSACTLB.PIPESPTS(POS)18-RPLAN1716gCOo$5I-s15-ACT131218-Dec18-Mar17-Jun16-Sep16-Dec17-Mar1984,1985Quantitiesarereportedasinstalleduponcompletionofconstructioninstallation.FinalQCinspectionandsignoffisconsidered100%completeandisalsotracked.Quantitiesareverifiedbycomparingactualreportedquantitiesvs.iso-metricdrawingtakeoffs.L.B.PipeSupportsinstalledbytheVASSSerector,Turbineerector,FireProtectionerectorandMechanicalerectorarenotincluded.Theestimatedpercentcompleteis90%.  
e PRODUCTIVITY (As of Se t. 1984)
ITEM                        PLAN (UR)              ACTUAL (UR)
SWEC-Small Bore Pipe              4,95                    4.94 SWEC  - Small Bore Pipe Supports          40. 41                  40.75 LKC  - Conduit                1.10                    1.08 LKC  - Conduit Supports                    17.18                    17.13 LKC  - Cable Terminati on                  0.96                    1.09 LKC  - Cable Pull ing                      0.12                    0.12 JCI  -   Seismic Suppor  ts                  67.78                    60.64 JCI  - Instrument Tubing                        1.73                    1.75 ITT - Large Bore Pipe Supports              179.93                  197.30


200PLANVSACTSBPIPE190180170160~c150gOwI6oo1401301201101009018-Dec18-Mar17-Jun16-Sep16-Dec17-Mar19841985QuantitiesarereportedinstalledtoCMSwhensatisfactorilysupportedinplace.Quantitiesareverifiedagainstiso-metricdrawingtakeoffsandphysicalfieldaudits.TheS.B.PipeinstalledbytheNSSSerector,TurbineGeneratorerectorandFireProtectionerectorarenotincluded.Theestimatedpercentcompleteis84%.  
AGENDA ITEM  &#xb9;5 ITEN:
Detail ed review    and  current status    of all large and small bore pi pe hangers,    restraints,    snubbers,    etc.,    including desi gn,  rework, procurement, fabrication, delivery    and  installation.
CURRENT STATUS:
See  following page.
(We  will  be  prepared  to discuss  snubbers  at the meeting. Information on restraints is in Item &#xb9;7).


PLANVSACTS9PIPESPTS(POS)30282624222018~c<~w18I-1210RPLAN--ACT018-Dec18-Mar17-Jun16-Sep16-Dec17-Mar'19841985Quantitiesarereportedasinstalleduponcompletionofconstructioninstallation.FinalQCinspectionandsignoffisconsidered100%completeandisalsotracked.Quantitiesareverifiedbycomparingactualreportedouantitiesvs.iso-metricdrawingtakeoffs.S.B.PipeSupportsinstalledbytheNSSSerector,Turbineerector,FireProtectionerectorandMechanicalerectorarenotincluded.Theestimatedpercentcompleteis69%.  
1.AR(:1  AND Si1Ai.L BORi. PIPE HA4CER STATUS A. Design  Essentially all initiai Large Bore hanger designs are complete. There are 495 Cat I and 405 Cat 11 and Small Bore hanger designs left to be completed.        Revisions to both l,arge and Small Bore hangers may result due to final stress verification.
B. Hanger  - The  current status of hanger installation is    as follows:
L.B. Hangers-             Cat  I            Cat II III QC  Accepted  2,838      Completed  10,924 To Go          1,955      To Go        2.514 4,793                  13,438 S.B. Hangers              Cat  1            Cat II & III QC Accepted      743      Completed  14,990 To Go          6,051      To Go        8.507 6,794                  23,497 The manhours    to date to complete hangers has been 50 mh/ea for  Cat I Large Bore, 25 mh/ea for Cat    II III
                                                      &    Large Bore, 0.50 mh/ea for Cat I Small Bore and 2 mh/ea for Cat        II III
    . Small Bore.
Using the to date experience results in an estimate of approximately l80,000 of rework will be required to complete hanger installations after initial construction reported completion. Also as stated above, changes due to final stress verifications will be required.
Hanger  materials are procured and delivered directly to the site. The hangers are then fabricated to the extent possible and delivered to the field. The procurement status for all remaining hanger material is as follows:
Large Bore  There are currently a total of 70 shop orders at this time, of which twenty-six (26) are designated as priority to complete the primary containment. Priority orders are projected to be complete by November 15, 1984 and the balance of orders complete by January 31, 1985.
Currently there are 259 hangers identified as being short of material.
Small Bore  A total of 2,200 supports and 250 special pipe clamps remain to be delivered on open purchase orders.
Completion of shipments is projected to be December 15, 1984.


850PLANVSACTKEYINDICATORCONDUIT800RPLAN-750~>700Uc<oI-sOvOOh.~65060055050018-Dec18-Mar17-Jun16-Sep16-Dec17-Mar16-Jun15-Sep19841985Theconduitincludedonthisgrapharesegregatedfromtotalconduitinthatitrepresentsmorethan90%ofthetotalprojectconduitestimatedmanhours.Typesofconduitincludedarepower,control,instrument,lighting,securityandsomecommunications(RSC).QuantitiesarereportedasinstalledtoCHSwhensecurelyinplaceandverifiedthroughphysicalauditsandthroughtheengineersconduitidentificationsystem.Theestimatedpercentcompleteis89%.  
AGENDA ITEM 86 ITEM:
Detailed review of project schedule identifying critical path items, near critical items, amount of floa t for vari ous activities, the current cr itical path to fuel loading, methods of impl ementation of corrective action for any activities with negative float, and provisions for contingenci es.     The estimated    project percent  compl ete as  of
    ~3e tether 30,  1984.
CURRENT STATUS:
See data  for Item 81.


PLANVSACTSCHEDULEDCABLEPULLlNG-RPLANSCHCABLE18-Dec18-Mar17-Jun16-Sep16-Dec17-Mar16-Jun15-Sep1985Includedonthisgrapharepower,control,instrumentandsignalcableswhicharespecificallyidentifiedintheengineerscabletrack-ingsystem.QuantitiesarereportedasinstalledtoCMSwheninitialinstallationiscomnlete.Quantitiesareverifiedthroughtheuseofcablereelcards.Finalverificationisperformedthroughtheuseoftheengineerscabletrackingsystem.Theestimatedpercentcompleteis72%.  
AGENDA ITEM k'7 ITEM:
Detailed review and current status of bulk quantities, including current estimated quantities, quantities installed to date, quantities scheduled to date, current percent compl ete for each, actual versus forecast installation rates, in cubic yards/mo., linear feet/mo., or number/mo.,
and basi s . for fi gures.          Al so indicate what percentage has been gA inspected and accepted.
: a. Concrete (CY)
: b. Process Pipe (LF)
          -Lar ge Bore Pipe (2 1/2" and larger      )
          -Small Bore Pipe (2" and smaller)
: c. Yard Pipe (LF)
: d. Large Bore Pipe Hangers, Restraints,        Snubbers (ea)
: e. Small Bor e Pipe Hangers,      Restraints (ea)
: f. Cable Tray (LF)
: g. Total Conduit (LF)
: h. Total Exposed Metal Conduit (LF)
: i. Cable (LF)
          -Power
          -Control
          -Security
          -I ns trumen ta ti on
          -Plant Lighting
: j. Terminations (ea)
          -Power
          -Control
          -Security
          -Ins trumen tati on
          -Plant Lighting
: k. Electrical  C ircui ts (ea )
          -Power
          -Control
          -Security
: 1. Instrumentation (ea)
CURRENT STATUS:
See  following pages.


2.52.42.32.22'.1PLANVSACTUNSCHEDULEDCABLEPULLING1.91.8O~170=1.61.51.4-RPLANUNSCHCABLE1.2-ACT0.918-Dec18-Mar17-Jun16-Sep16-Dec17-Mar16-Jun15-Sep1984.1985Lightingwire,communications,securityandmisc.powercablesarereportedintoCMSwheninstallationfrompointoforigintoitsfinaldestinationhasbeencompleted.Quantitiesareverifiedthroughauditsofthecablereelcardswhichindicatethequantityanduseofeachcablepulledfromthereel.Theestim'ted.percentcomplete.'s46%.  
Item  7 The  following curves and the Production Report are based upon the Engineers Construction  Management System (CMS) which is the system used to collect and tabulate installed quantities. Since NMP3J/2 is a sub-contracted project not all project commodities are shown. Also, curves are provided to show complete visability as to the plan, however, the to go planned rate per month shown on the production is the average rate of planned installation from now until the commodity reaches 90% complete.


300PLANVSACTCABLETERM280260240220200180z~160Oan5;t4O120-ACT10080604020018-Dec18-Mar17-Jun16-Sep16-Dec17-Mar16-Jun15-Sep19841985Power,Control,Instrument,CommunicationsandSecurityTermina-tionsarereportedascompleteafterinitiallandingoftheterminallugsandtheproperpaperworkhasbeencompletedandturnedovertoprojectqualitycontrol.Quantitiesarecollectedin'heconstructionmanagementsystem(CMS)andverifiedthroughtheEngineersTerminationProgram.Theestimatedpercentcompleteis48%.
PLAN VS ACT L B WELDS 24
0 240230220210200190180170I-nOgo150Oo1401301201101009080PLANVSACTINST.TUBING-ACT.7018-Dec18-Mor17-Jun16-Sep16-Dec17-Mor16-Jun19841985CopperandStainlessSteelTubingisreportedinstalledtoCMSwhensatisfactorilysupportedinplace.Quantitiesareverifiedbyphysicalwalkdownaudits.Theestimatedpercentcompleteis63%.  
                                                        -R  PLAN ACT-22 21
~n 20 19 18 17 16 18-Dec      18-Mar      17-Jun      16-Sep    16-Dec      17-Mar 1984          1985 Quantities are reported as installed to CMS upon completion of the weld. Quantities are verified by comparing actual quantities reported vs. iso-metric drawing takeoffs. The L.B. Welds made by the NSSS erector, Turbine Generator erector and Fire Protection erector are not included. The estimated percent complete is 95%.


NMP82MONTHLYPRODUCTIONREPORTPeriodEnding10/07/84COMMODITYU/MESTIMATEINSTALLEDTODATESCHTODATEPHYSICALTOGO1984TODATEFINALgAPLA%1EnRATEACTUALCAT1COMPLETE(TO90%COM)RATEXACCEPTED1.ConcreteCY*7.S.B.Hangers8.CableTray9.KeyIndicatorConduitLFLF2.LargeBorePipeLF3.S.B.PipeLF4.PipeWhipRestraintUN5.LargeBoreValvesEA*6.L.B.HangersEA270,258228,260198,33117,3332,20018,23130,291119,286842,716268,258N/A12,5132,01116,39820,798116,444N/AN/A16,99221,259N/A751,369739,783225,510225,275166,126166,63399.26%N/AN/A99.80%N/A8376/6600/MO2500/MO7100/MO72.19%91.78%N/AN/AN/AN/A89.94%400/MO68.66X1,440/MO375/MO1090/MO97.62XN/A.N/A89-16X26000/MO25i600/MO100XN/AN/AN/AN/A59.90X8.02X88.20%44.26X10.TotalConduitLF990,676871,423N/A,87.96XN/AN/AN/A13.CableTerminationsEA14.InstrumentTubingLF276,663231,85411.ScheduledCableLF7,065,66012.UnscheduledCableLF2,473,1985,118,2435,342,1871,130,9581,170,467132,862149,808144,984150,89762.53%11,400/MO6,900/MO72.44%240,000/MO266,300/MO45.73X166,000/MO18,100/MO48.02X23,200/MO10,600/MO29.78XN/A27.79X0.57%*IncludesfinalgAbyContractoronly.  
PLAN VS ACT L B.PIPE SPTS(POS) 19 18
                                                          -R  PLAN 17
                                                  -ACT 16 gC Oo
$5 sI- 15 13 12 18-Dec      18-Mar      17-Jun      16-Sep      16-Dec      17-Mar 1984,             1985 Quantities are reported as installed upon completion of construction installation. Final QC inspection and signoff is considered 100% complete and is also tracked. Quantities are verified by comparing actual reported quantities vs. iso-metric drawing takeoffs. L.B. Pipe Supports installed by the VASSS erector, Turbine erector, Fire Protection erector and Mechanical erector are not included. The estimated percent complete  is  90%.


1.ConcretePlacingofstructuralconcreteisessentiallycomplete.Theremainingplacementsareforequipmentpads,blockoutsetc.QuantitiesarereportedwhenplacementsaremadeandverifiedthroughdailyconcretepourticketsassubmittedtoFQC.Thecoolingtower,stackandintake&dischargetunnelconcretequantitiesarenotincluded.2.~L.B.PieIncludedisalllargeborepipe2Q"orgreaterexceptforcastironpipeandlargeborepipeerectedbytheNSSSin-staller.andtheTurbineGeneratorinstaller.Quantitiesarereportedonapipespoolpercentcompletebasisaseachactivityduringinstallationiscompleted.Quantitiesareverifiedbycomparingactualreportedvs.iso-metricdrawingtakeoffs.4.~PLeWhiRestraintsThepipewhiprestraintssupportstructureiscompletelyinstalled.Thesecondphaseofinstallation,thecrushablesectionsetc.isongoing.ThisactivityisreportedonapercentcompletebasisaseachrestraintiscompletedandacceptedbyFQC.5.LareBoreValvesQuantitiesarereportedonapercentcompletebasispervalve.Quantitiesareverifiedbycomparingactualreportedvs.iso-metricdrawingtakeoffs.CableTrayisessentiallycompletewithworkremainingbeingcleaning,markingandcovering.Theseactivitiesareongoingtosupportcablepulling.QuantitiesarereportedwhenthetrayissatisfactorilysupportedawaitingfinalQCacceptance.Quantitiesreportedareverifiedthroughredliningofdrawingsandthroughuseoftheengineerscabletraytrackingsystem.10.TotalConduitIncludesallkeyindicatorconduitplusallPVCconduitandallothercommunicationconduit(EHT).Quantitiesarereportedthesamewayasthekeyindicatorconduit.  
PLAN VS ACT S B PIPE 200 190 180 170 160
~c 150 gO w I6 oo 140 130 120 110 100 90 18-Dec      18-Mar    17-Jun      16-Sep      16-Dec    17-Mar 1984          1985 Quantities are reported installed to CMS when satisfactorily supported in place. Quantities are verified against iso-metric drawing takeoffs and physical field audits. The S.B. Pipe installed by the NSSS erector, Turbine Generator erector and Fire Protection erector are not included. The estimated percent complete is 84%.


AGENDAITEMg8ITEN:Detailedreviewandcurrentstatusofpreparationofpreopandacceptancetestprocedures,integrationofpreopandacceptancetest,activitieswithconstructionschedule,systemturnoverscheduleidentifyingeachsystemandstatus,preopandacceptancetestsscheduleidentifyingeachtestandstatus,currentandproposedpreopandacceptancetestsprogrammanpower.a.Totalnumberofproceduresrequiredf'rfuelload.b.Numberofdtaftproceduresnotstarted.c.Numberofdraftproceduresbeingwritten.d.Numberofproceduresapproved.e.Numberof-proceduresinreview.f.Totalnumberofpreopandacceptancetestsrequiredforfuelloadidentifyingeach.g.Numberofpreopandacceptancetestscompletedidentifyingeach.h.Numberofpreop.andacceptancetestscurrentlyinprogressidentifyingeachandstatus.i.Numberofsystemsand/orsubsystemsturnedovertostart-upidentifyingeach.j.Numberofsystemsturnedovertooperationsgroupidentifyingeachandoutstandingopenitemsforeachsystem.k.Numberofretestsexpected,ifany,identifyingeachandcauseforretest.CURRENTSTATUS:Seefollowingpages.  
PLAN VS ACT S 9 PIPE SPTS(POS) 30 28 26 24                                    R PLAN-22
                                                  -ACT 20 18
~c
<~w  18 I-12 10 0
18-Dec      18-Mar    17-Jun      16-Sep      16-Dec    17-Mar
                                '1984            1985 Quantities are reported as installed upon completion of construction installation. Final QC inspection and signoff is considered 100% complete and is also tracked. Quantities are verified by comparing actual reported ouantities vs. iso-metric drawing takeoffs. S.B. Pipe Supports installed by the NSSS erector, Turbine erector, Fire Protection erector and Mechanical erector are not included. The estimated percent complete is 69%.


AnswertoQuestionf/8DetailedReviewProcessforPrearationofPrep&AccetanceProcedures.SeeAttachment8lCurrentStatusofPrearationofPrep&AccetanceProcedures.SeeAttachment~J2foroverviewSeeAttachmentf/3forindividualdetailedInterationofPrep&AccetanceTestActivitieswiththeConstructionSchedule.SeeAttachmentfJ4TheConstructionScheduleisintegratedtotheStartup6TestOperationsNetworkSchedulebytyingaconstructioncompletionactivity'A'elease(Attachmentft4)ontheConstructionScheduletothestartofPreliminarytestingontheStartup6TestOperationsNetworkSchedule.SstemTurnoverScheduleSeeAttachment85Preop&AccetanceTestScheduleSeeAttachment/I6CurrentandProosedPrep&AccetanceTestProramManowerSeeAttachmentff7&+~its~Ig) 0 TotalNumberofProceduresReuiredforFuelLoadAttachment&#xb9;3qumberofDraftProceduresNotStartedAttachment&#xb9;3NumberofDraftProceudresBeingWrittenAttachment&#xb9;3TNumberofProceduresArovedAttachment&#xb9;3NumberofProceudresinReviewAttachment&#xb9;3TotalNumberofPrepandAccetanceTestsRuiredforFuelLoadAttachment&#xb9;6NumberofPrepAccetanceTestsColetedZeroNumberofPrepandAccetanceTestsCurrentlinProressZeroNumberofSstemsTurnedOvertoStart-U(AOD)SeeAttachment/l5Zero 0
PLAN VS ACT KEY INDICATOR    CONDUIT 850 R  PLAN-800 750
NumberofSstemsTurnedOvertoOerationsGrouZeroNumberofRetestsExectedZero
~> 700 Uc
<o I-s Ov OO h.~ 650 600 550 500 18-Dec  18-Mar 17-Jun        16-Sep    16-Dec 17-Mar 16-Jun      15-Sep 1984            1985 The  conduit included on this graph are segregated from total conduit in that  it represents more than 90% of the total project conduit estimated manhours. Types of conduit included are power, control, instrument, lighting, security and some communications (RSC). Quantities are reported as installed to CHS when securely in place and verified through physical audits and through the engineers conduit identification system. The estimated percent complete  is 89%.


,'!<<e0e!QN",~err'eeee~&P,'~.!!e,"4eVr"~w*4K;re<<,~PtI-Iee.i~*f~ppr,~.v~tg~gIes~~er,@PPr'.rvrg.er,IPterI''mr",r-*PP~"P.~ve~
PLAN VS ACT SCHEDULED CABLE PULLlNG
                                            -R  PLAN SCH CABLE 18-Dec    18-Mar 17-Jun      16-Sep  16-Dec 17-Mar 16-Jun        15-Sep 1985 Included on this graph are power, control, instrument and signal cables which are specifically identified in the engineers cable track-ing system. Quantities are reported as installed to CMS when initial installation is comnlete. Quantities are verified through the use of cable reel cards. Final verification is performed through the use of the engineers cable tracking system. The estimated percent complete is  72 %.


rPREOPERATIONAL/ACCEPTANCEPROCEDUREDEVELOPNENTREVIEWCYCLEIO/I7/84PREOPTESTSCHEDULEDSTARTDATEDEVELOPPROCEDURES.TECHNICALREVIEWPROCESS20INCORPJTCCOMMENTSMTGANDREVRETYPEPROCAPPVINCORPCOMMENTSRETYPEPROCAND1SSUENRCREV1EM
PLAN VS ACT UNSCHEDULED CABLE PULLING 2.5 2.4 2.3 2.2 2'.1 1.9 1.8 O~
0= 17 1.6
                                                    -R  PLAN 1.5 1.4                                            UNSCH CABLE 1.2
                                            -ACT 0.9 18- Dec 18-Mar 17-Jun        16-Sep    16-Dec    17-Mar 16-Jun      15-Sep 1984        .      1985 Lighting wire, communications, security    and misc. power cables are  reported into  CMS  when installation  from point of origin to its final destination has been completed. Quantities are verified through audits of the cable reel cards which indicate the quantity and use of each cable pulled from the reel. The estim 'ted .percent complete.'s 46%.


OOOQCOQO4IW'IA>IJICbIIIIMVVVV4000PREOPAHO.PTANCEPROCEDURES0000000SThl'USsSOF15OCtS400000ORAF'tStARTEOHDtALNQ.PRXE.QBDl35DM'F'tNOl5MGEDDMTMARIE.D'9INTECHREVIEW2lPIIKDUREREADYFORQTGIQDTtAPPRDVEQ.+PRlXEDUREUNXRfKVI'10'Fo25X000000040004000040000000000~0400OOOO0000000040OOO400000000000OO0DRAFtNOTSTARtD00~~00~0040000000300021~74XOP00000000000006900$000OX0000000~~~~~~~~~~~~~~0000000~~00~00~~~~00~0~~~OOOO~~~~00READYFORJTG0~~~000OO~~~4~~000~2~QOX~0000~40~0~000~~2090X0~00000~~~~0PROCUNDERREV0000021'000001S022X~00JTGAPPROVEO00000400000000~0000000OI000040000OOOO0~04000000000000000000000000lRTECHREVUE'V
PLAN VS ACT CABLE TERM 300 280 260 240 220 200 180 z~
Oa 160 n
5; t4O
                                          -ACT 120 100 80 60 40 20 0
18- Dec 18-Mar 17-Jun        16-Sep    16-Dec  17-Mar 16-Jun        15-Sep 1984                1985 Power, Control, Instrument, Communications and Security Termina-tions are reported as complete after    initial  landing of the terminal lugs and the proper paperwork has been completed and turned over to project quality control. Quantities are collected    in'he construction management  system (CMS) and verified through the  Engineers Termination Program. The estimated percent complete is 48%.


OOOOOOOOSfAR14PANOfFSf0000000000PAEDPANDACCEPTANCEPROCEDURES0IOI0000000SORTEDBYSTATUS000000000000000StATUSASOF15OCT8400000PRocFDURENUHUF.APROCEDURCIIILt.STATUSTESTDACEACCEPtPREOP7~I7o4)30o34'4)o>)4lo46~53oC54>~A56%4)61~C6207bo7579o80>>SJ~9lo92'92>>O92~C94'bo))96o97o95o101~AIOl~0I05~112~39o40~A42~47o52~53~A5Jot)69o7ao9J~100~A104~3o5~20~24~27~29~A29~>34J~64o>)4>6~>)RSINDICATIONNt'.NTINGFEEDVA'CERCONTHO).qYSfcHPOS'TACCI)>tNlSAHPLINGSYSfENCONTROL)40uORIVE4)Yu>4AULICSAUTOHATICDEPRESSU)4IIA'fit)NSYSCEHkhorASTfPkt)CESSCOW>uffkSOLIDRADVASTESYSIf>4FIREPROTFC114)N)ihLONCONTROLROUNPkfSSUREIEbfHAOVASTEBUILDINGVfkfLLAfIONRADVASTEHLOtPkfSSU)41lF).OVICSCSECONDARYCANT~LtAKILSf04)A~)YDkuGc'N)4LC))H>>I))fRSCAfIONAt>OEHEAGENCYLIGNCIMGREHOTCSi)UCDDVHAREARADIACIUNNONITURINGPkl)CESSAHOAIRBORNERADIACIONNONIT0PkINARYCONCAINHCNTISOLATIONPROCESSCo)4PUlERSOURCERAHGENONIfBRING\INffAHcDIAffRANGEHuklfORlNGAVERAGEV))efRRANGEHDNITORINCTRANSVERSfNGINCUREPROBEkoosF44UCNcfcuklkut.RfACTOkNANUALCDNIRUL5ROOPOSIfit)NABACTORPAOTLCfIUNlukBINEGENEHACOkPk>)TECfluNTURBINEBLDGCRANERADVAStfULDGCkhNEGffARSSfRUCfU)4ALItsl8GkITYLILAfFUCLHANDLING6ktAClokSERVICEEILUIPL14uluRAD'VASffSYb1c)4OFFGASSYbTL.HSHOKEFLAN)=.CIF)4PtRA1UAEOf'fECTIONREAC10144)I.DGo4)VACCuklkOLUUIL>ING)IVACCONTHUIBLDGCt)ILLt0vACcH")45KVfRANSF4)RNFRPLANTCDHHUNICATIDNSRuu4)LUCKHONICDALNGDIVISIONIDlt54'LGfkt>4ATDkSICESFCU)ITYCONDENSAlESYStFHCONDENSATEOFNINSIALSINREGENoBREAlNLNGAlkGFNEAATOR154)LATEDPt)ASEBUSOUCfCOOLGfNFHAIuk442CCU2SYS'fEHREACtORRCCIHC~SYSTEHkfAClokRECIRC~ILOVCONTROLSYSTEHFIREPftotfCTIONvAfCkfURULNcBUILUINGFLI)OAORAtNSHAINCHANSFORHI.)4hl>fhullhlNSDRAFtNOTSfhktfoDRAFtNotSTARtFDURAFfNOTSfARTFODRAFTNOTSTARTCODRAFTNof'STARfFDDRAFTNofSthktEDDRAFTNOTS'fhklfDuRAFtNotSTA)41EDDRAFfNOI'StARCEODRAFTNOTSTAAIED*DRAFTNofSTARIEDDRAF1NOTSTARTf0DRAFTNOTSfARtEODRAFfNOTSTARtf0DRAFTNOTSTARTEDDRAFI'OTSTAklED'RAFTNolSlAkfEODRAFCNofSTARTEDDRAFTNolStARfEODAAFfHofSfhATEODAAFfNOTSTARTEDDRAFTNOTSTARTEDDRAFTNotS'CAkfFOOAAFTNOfSIAkfEDDRAFTNOTSfARfEODRAFTNofSTARTEDOAAFtHOTSTARtEDOAAFfNOTSfhkffoOHAFfNofSTARffoDRAFTNOTSTARTFDDRAFTSfARCEDOAAFfSfAR'ffoDAAFfStARTEDORAFTSTAR~'CF0DRAFTSfARCEDOAAFf5'fARfEODRAFISTARTEDORAFTSTARff0DRAFtSTARTEuDRAFTSfARCEDOkAFTSI'A)4TEOURAFCSTARTEDLSTORAFfFINISHED1STDRAFfFINISHEDLSTOAAF'1FINIS)4COISfDRAFtFINL5)4601STORAF1FINIS)lf0IsTDRAFTFINIs)4f0ISfORAFfFINI5)460ISfORAt:TFIHISt)FD151ORAFfFINISHI.D15fOkAFfFINIS)tt'0ISJUL198>>12AUG19$b22JUL1985I3JUO.I9S50IJUNI9$5210Cf1955I5OCf1985ISNOV194)bI60C1I<>5516uciI98515SEP195505NOVL955ISOCf198504UCT195527HAY195515JUL198527NAY1985040CTL98512AUG1985I2AUGL98512AUG198512AUG198524JUNL95524JUNL95b27HAY198bLSOCCL9850IDEC1985LSOCI'195b040CTI98505NOVI9S529APRI>)85IISfP198515DCT19S526JUL195503JULL98bI2HAY195b25APR19$517JUNI98512JUN495524JUN194)507ht>>kl95551APkI>)5>>09HAR19$523FI0195'>>LbUCTL95bI2JUL19551LSCP19>)5I4JUN195>>I4JUN19>)b57JUN194)529HARI94)'i045fP)95>>>PPPPPPPPPPPPPPPPPPPPPPPPP'AAPPPPPPPI>Pa4'>nPAPPAAAPP4~A
0 PLAN VS ACT INST. TUBING 240 230 220 210 200 190 180 170 I-n Ogo Oo  150
                                                -ACT 140 130 120 110 100 90 80
    .70 18- Dec    18-Mor      17-Jun      16-Sep    16-Dec  17-Mor    16-Jun 1984                    1985 Copper and Stainless Steel Tubing is reported installed to CMS when satisfactorily  supported in place. Quantities are verified by physical walkdown audits. The estimated percent complete is 63%.


OOOOOOOOTAMTUPANDTESfOOOOOOOOO0PAEOPAtfoACCEPTANCEPROCEDURES0OOOOOOOOSORTEDBYSTATUS000000000004400STATUSASOF15OCT5400000PROCEDURENUMBERPAUCEOUMETITLLSTATUSTESTDATEACCEPfPREOP640Cd6~E660J660K~bio$1~82~900100off1020I1005408bioh950AI~100Al10LthItoC22'23'8031~32~33~3b036~3to3S0450dl~Adl08Si~S50SS~106~S~90490C100ACI7~Ife.1905260450490tf490nlbo19~A2bo49~A.IIIQH1stDRAFTFIHISHED1STDRAFTFINISHED1stORAFTFIHISHEDISI'MAFCFINISHED1STDRAFTFINISHEDISTORAFfFINISHEDLSTORAFfFINISHED1STDRAFTFINISHEDIStORAFfFIN!SHEDLSTDRAFTFINISHEDLS'CDRAFfFINIStIFD1STOMAFCFINISHEO6TEANREVLEVCEAHREVIEV2IKIDRAFTSTARCEO2NOAR*FCSTARTFO2NODRAFtSTARTED2NDORAFfSTARTED2NDDRAFTStAftfFO2NOORAFfSTARTED2NDORAFI'TARTED2NDDRAFTSTARIEO2NODRAFTSTARTFO2NDDRAFTSTARTED2NDLIMAFTSfARTEO2NODRAFfSTART'EO2NDDRAFTSf*RfEO2NOARAFTSTARTFO2NDDRAFfSTARfEO2NODRAFT5'fARfF.D2NDORAFfSTARfED2NDORAFTSTARCEO2NODRAFTSTARfEO2NODRAFfSTARTEO2HODRAFTSTARIEO2HODRAFTSTARTED2NDDRAFT'FIHISHFD2NOOAAITFINISHED2NOORAFCFINISHED2HODRAFTFINISHED2NOORAFfFINISHEDCTESTENGINEERCHECKTESTEHCINEERCHECKTEStENGINEERCHECKTESTENGINCERCHECKTESTENGINEERCHECKQkJig~ENGINEERCHECK+toFORlECHRtVIEVDMTFORTECHREVIEvOLPFOR'fECHREVIEVFOACECIIAEVIEVOUTFDMTECHRLIVIEVNALTESfSATEATIONDIESELCENERATIIMIILDCIFLUOkDkAINSSERVICEBUILDINGOMAINbHAIHSTACKPRALNSMFACtOABUILDINGkhtOftAINSORYVELLEOJIPktNIANDFLOORORAINSCONTAINHEHCLEAKAGEMANIfAMINCCONTAIHHENI'TNOSPIIEMtNONICUAINCSYSTENStISHICHOHItORINCDIVISIOH2OIFSELCotNFMAfARDCCONTANINAtlONSYSfFHLOSSOFOFFSlff'DVERCtSC/ECCSFUNCTIOLIfHIUHBROMIDECHLLLEOVACEMTUMIIltIE.BLOCFQUIPf)MAINSRODVORtHHINIWLCEMHAINCAUX0STEANCIRCULATINCVATEMSYSTFNSEMVICEVAtERCURBINEPLANTSAHPLINCRADVASTEPLANTSAHPLINGTURBINEGENERATARLUOEOILTUkBINEt0H0C0NJCLEARIIAILtRINSfkUIIENTATIONRESIDUALIIEACREMOVALSYbtENLAWPRtSSUIIECOMESPRAYHIGttPRESSURECOMESPRAYMFACCARCoktISOLACIUNCOOLINCSYSTEMSTANDSYLIIIUIDCONIAOLkEACTORVAfEMCLt'AIIUPSYSTt.kFUELPOOLCOOLINI0AHDCLEANUPFtHEPROtECCIONCD/PRINAkYCOIIIALNHtNCPURCtSfANOAYCASTREACHI!NCREACTORUUILllINCPOLARCIIANIIkEACfokCOOLANTANOECCSLSAKDETFCfIONCONTAINMENTINERTINCSYSTEMM6DUNOANTMEACTIVITYCUIIIMDLFEtorAftkHEATEkSCIIXCMACTIUNSTCAMCONDENSERAIRREMOVALMADVASTEBLDGHOCVATEIICGLYCOLDIVISION3DIESELGtNEMAfORMEACfOMfILANI'AHPLINGFEtDVhttRSYSftkLOSSOFPLANTAIR/N2TURBINEGENEMAtARSfAIURCOOLINGVATERAUXILIARYtIQILCRtukAINEBLOCHutVATFR6GLYCOLREACTORBLOCHDTVATI!A6GLYCOLNAKEUPVAft'RtfIEATINGINSTRUMENTCSFRVICEAIMSYSTFHCLEANSTEANAEBOLLEM6AUXILIAILYCONDENHOTVATFMHEATINCISYS'ftIHAUX0SI.MVLCEBLOC011I;CfUHHLLSVtNtIL.INtYPINGINfYPINC06SEIIl94506SEP194$OdSEP194$065tPI985I3HAY1985LOHAY19$5ITHARI95509AUC195509AUC19SS20FE519$601APR195515HAY19$52ILJUN19$b01APM195525NAYI9$528JUNI9$529NAYL95509AUG19550SHAYI9$bL2JULL95525AUG19$b14AUCI985ITNAYL9$504OCC19$515ACT19$515JUL19SSIdSEPI9S523AUG19Sb02JUL19SS24HAM195530AUC19$5LTHAYIQSb15JULI9551dAUCL9$b26FEtSL'f5505JUN195510JUN1055OLIIOV1984LSJULL955IIAPM1955O'IJUNI'ISbIIIJULIIt5524JUL194504ACTL94$LSOCtl94506SEPI94531HARI945LSHARL94$15SEP19$$01AUGL9$529HAkl9$524JUN1955APPPPPAPAPPPPAPPPPPPPPPPPftPPPPPAPPPPAhAAhPAAf'
NMP82                                  Period Ending 10/07/84 MONTHLY PRODUCTION REPORT INSTALLED            SCH    PHYSICAL      TO GO    1984 TO DATE      FINAL gA TO                TO              PLA%1En RATE      ACTUAL          CAT 1 COMMODITY              U/M  ESTIMATE        DATE            DATE    COMPLETE  (TO 90 % COM)      RATE          ACCEPTED X
: 1. Concrete            CY    270,258        268,258          N/A      99.26%      N/A            N/A                100X
: 2. Large Bore Pipe      LF    228,260        225,510      225,275        99.80%      N/A      2500/MO              N/A
: 3. S.B. Pipe            LF    198,331        166,126      166,633      83 76/  6 600/MO      7100/MO              N/A
: 4. Pipe Whip Restraint  UN    17,333          12,513          N/A      72. 19%      N/A            N/A              N/A
: 5. Large Bore Valves    EA      2,200          2,011          N/A       91.78%      N/A            N/A              N/A
*6. L.B. Hangers        EA    18,231          16,398      16,992      89.94%    400/MO        375/MO              59.90X
*7. S.B. Hangers              30,291          20,798      21,259      68.66X  1,440/MO      1090/MO              8.02X
: 8. Cable Tray          LF    119,286        116,444          N/A      97.62X      N/A          .N/A            88.20%
: 9. Key  Indicator      LF    842,716        751,369      739,783      89-16X  26 000/MO    25i600/MO            44.26X Conduit
: 10. Total Conduit        LF    990,676        871,423          N/A,      87.96X      N/A            N/A              N/A
: 11. Scheduled  Cable    LF 7,065,660      5,118,243    5,342,187        72.44%  240,000/MO  266,300/MO            29.78X
: 12. Unscheduled  Cable  LF 2,473,198      1,130,958    1,170,467        45.73X  166,000/MO    18,100/MO            N/A
: 13. Cable Terminations  EA    276,663        132,862      149,808      48.02X  23,200/MO    10,600/MO            27.79X
: 14. Instrument Tubing    LF    231,854        144,984      150,897      62.53%  11,400/MO      6,900/MO            0.57%
                            *Includes final gA by  Contractor only.
: 1. Concrete Placing of structural concrete is essentially complete.
The remaining placements      are for equipment pads, blockouts etc. Quantities are reported when placements are made and verified through daily concrete pour tickets as submitted to FQC. The cooling tower, stack and intake & discharge tunnel concrete quantities are not included.
: 2. ~L.B. Pi  e Included is all large bore pipe 2Q" or greater except for cast iron pipe and large bore pipe erected by the NSSS in-staller.and the Turbine Generator installer. Quantities are reported on a pipe spool percent complete basis as each activity during installation is completed. Quantities are verified by comparing actual reported vs. iso-metric drawing takeoffs.
: 4. ~PL e Whi      Restraints The  pipe whip restraints support structure is completely installed.      The second phase of installation, the crushable sections etc. is ongoing. This activity is reported on a percent complete basis as each restraint is completed and accepted by    FQC.
: 5. Lar  e  Bore Valves Quantities are reported on a percent complete basis per valve. Quantities are verified by comparing actual reported vs. iso-metric drawing takeoffs.
Cable Tray is essentially complete with work remaining being cleaning, marking and covering. These activities are ongoing to support cable pulling. Quantities are reported when the tray is satisfactorily supported awaiting final QC acceptance.      Quantities reported are verified through red lining of drawings and through use of the engineers cable tray tracking system.
: 10. Total Conduit Includes all key indicator conduit plus all PVC conduit and all    other communication conduit (EHT). Quantities are reported the same way as the key indicator conduit.


00000000SfAATUPANDTEST000000000OPRFI)PANDACCCPTANCEPAQCEDURFS000000000SORTEDt)YSTATUS000000000OO0OO0STAfU5AsOF15OCT8400000PL)OCEDUkfNVHBER60'6'2013~L4~22mB22+Ciio54~A55~58oh58AC63'63'7I~E-2ltof365~66oH4~Io.nLOoC16~50~Sr.66+A66+012~71~F-I73'73oo66'lioA74mBri.CPROCEDVAC1ICL8ORYVELLCOOLINGCONTROLBUILDINGDRAINS)IOCSTUREStPAHAIORS/HFHt:ACEHSVENTSCD(IAINSREACfORBUILDINGCI.I)SFULO()PCOOLING'VATER1UABLHEBUILDINGCLOS('0LOUPCOOLINGVATEACUkt)IHELUBEDILCONDIIII)NCR6VASTEOllGFNEAATOASEALI)ILSYSTE)4FIREPAOTECICONFOAHNOAHALSVITCHGEAABULL()INGVEttfILATIONTV(4OCNEt)LOGEVftiflLAfIONSCIIEENVCLLCIDltSttFlkLIIN(PII;HISCVENTAVX~tk)ltF(46CHILLEHHLUGVft4CILAfIUNACACCOH84(ILDINGfIIULPRENfDAALMSkFACCUH4)ULLOINGFL(tu(tD(4AINSVPS2VBi)-UPS2AJUUPS2VBA-UPS3A38HADVASTF.BUILDINGBRAINSCONOENSAIfSTORAGtTANKIIUILDtNGDRAINSCONDCNSATESfORAGtIXFtkACIDTHEATHENTSYSCIIiIIYPUCHLDAICFSY5lfNHAKEUPVAfEA5CAAA(ifCTIIANFfkDDHE51ICVhfckDIESELGLNL'HAI'I)kBUILULN(Vt441ILATIONRESERVLTRANSFI)kkc(4AktADRAINSSCHEENVFLLBUILDINGI)(tAI)4TRAVELINGVAlfkSCuECNSCVASHDISPOSALUPS2VHI)-VPSIAIBLGICt()125VNUkHALUCDIS'Ckl(IUCLON24/44)VI)LfDCOlSfstl((UfIUNAUXILIARYI(OILCAt(UILI)INGI)RAINS125VEH(HGLNCYDCt)lSfttIUUCtUNDIVIl25VEHEHGCNCY()CDlSfklt(UCIONOIV2125VENfkGC'NCYDCDISCILUUCIONDIVSI'ATUSOUfFORI'ECHREVIEvOUTFO(4fECHIlEVIEVINC(&#xc3;)PORATIN(iCOHHENTSINCORPUAAfINGCOHHtNTSINCORPOAACLNGCOHHENTSINCORPURAfINGCOHW:NfSINCORPOAACINGCC)HHENTSINCORPORAfIHGCOHNCHTSINCORPORATIN(iCOHHCNfSINCOHPORATLNGCOHHI:NTSINCORPORAfINGCDHH(.Nf5INCORPORATINSCOH)4t;4415INCOAPQAACINGCONN(:NT5INCORPORATINGCOHHENCSINCOAPOR*ftNGCOHHCNfSCNCORPORATINGCOHHENfSAEAOYFDAJTGAPPROVAL6tNTYPINGREAD'YFOHJfiiAPPROVALCINfYPINGHEADYFORJTGAPPROVALREADYFOAJTGAPPROVALkfADYFORJTGAPPRUVALRFADYFORJTILAPPROVALREADYFOAJfGAPPROVALHEADYFOAJTGAPPROVALREADYfORJfGAPPROVALREADYFOAJTG)LPPROVALJTGAPPADVtDJTGAPPROVEDJTGAPPROVEDJ'TGAPPRDVtDPROCEDUREUNDfRAEVISIONPROCEDUREUNDERREVISIONPROCEDUREUNDERAEVISIONPROCEOVE(4UNDERREVISII)NftSfDAft01NnvIo8506SFPI90$26JAN198$14JUN198$IlDECI98401JANI98520FEBL98528JUN19850IAUGL98$otncft985LSFC.81985I8JULI98524JULI98524JULI985OLDEC198124DECL98401SEPL98506SEPI985300fCI98425DEC198423JANI985I5NOVI98501JANL')86IlHA(t198506SI;PI985OSOCfI98526I)ECI98406JULL98S01JULL985LSJUNIVI(506SEPI')I(5ITHARI985I7HAHI985LOHAHL')85ACCFPTPREOPPAAP*AAPPPPPPPPPPPPAAPAPA*APPPPPPP
AGENDA ITEM g8 ITEN:
Detailed review    and current status of preparation of preop and acceptance test    procedures,  integration of preop and acceptance test, activities with construction schedule, system turnover schedule identifying each system and status, preop and acceptance tests schedule identifying each test and status, current    and proposed  preop and acceptance      tests  program manpower.
: a. Total number of procedures required      f'r fuel    load.
: b. Number  of dtaft procedures not started.
: c. Number  of draft procedures being written.
: d. Number  of procedures approved.
: e. Number of- procedures  in review.
: f. Total number of preop and acceptance        tests required for fuel load identifying  each.
: g. Number  of preop  and acceptance  tests completed identifying each.
: h. Number  of  preop . and acceptance      tests    currently    in progress identifying  each and status.
: i. Number  of systems    and/or    subsystems    turned  over  to  start-up identifying  each.
: j. Number of systems turned over to operations          group  identifying  each and outstanding open items for each system.
: k. Number  of retests expected,    if any,  identifying    each and cause    for retest.
CURRENT STATUS:
See  following pages.


RODE0/I'0E5CRIPII0NACfIVITYDUH5IAHTSCII~OIIEP<0Sa)HTCCODESt:START4DATADATEl0/03/84PACF3FINI5HSCII~0RLatoARFLEASE021000I34444230EVFHI6/02/85881ARt:LEASE02ct~000I34444I950EVSNI3/lu/55800AHt.LEASE02V~000I3144419u*HfLFARI.030000I34441I91AHFLEASE03l~000I31444I99LVI.N'fi.VINfEVI.Nf1/I4/d55352/I0/551124/28/55819AHILEASI.'32F000I34444209ARELEASE033+000I3441420I0EVa.NTEVFNT2/Id/551804/I4/55835AHFLfASL034~000I3144423lEVENT3/24/85ttI4AHFLEASE03bou00I344112020EVINf4/28/55549AHFLEASL0360000l.)4414203ARt'LEASE031~000I34441204AHFLFASt035~000I31444205CAHELEASI:039~000l344442320EVFNIEVFNIEVENfEVENT4/25/558196/09/dhS9I3/0I/55193I2/I6/54ll6AHFLEASL040F000l34444233AHFLEASE04la000l$4444234ARFLEASE042~000l344442350EVENfEVENTEVENf3/I0/558006/30/859I2I/?1/85158
Answer to Question    f/ 8 Detailed Review Process for Pre aration of Prep        & Acce tance Procedures.
See  Attachment  8  l Current Status of Pre aration of Prep      & Acce tance Procedures.
See  Attachment  ~J  2 for overview See  Attachment  f/ 3 for individual detailed Inte ration of Prep      & Acce tance Test Activities with  the Construction Schedule.
See  Attachment  fJ  4 The  Construction Schedule is integrated to the Startup 6 Test Operations Network Schedule by tying a construction completion activity 'A'elease (Attachment ft 4) on the Construction Schedule to the start of Preliminary      testing on the Startup 6 Test Operations Network Schedule.
S stem Turnover Schedule See  Attachment  8 5 Preop  &  Acce tance Test Schedule See  Attachment  /I 6 Current and Pro osed Prep      & Acce tance Test Pro ram Man ower See  Attachment  ff 7 &+~ its~      Ig)


HOOEc-I)/FEACTIVITVIo0E5CHIPTII)NSOHIECPPtStSTARTenuHSTAHTSCNcPHEMI)PATAPATELO/03/ts4PAGt44eFINISciSCcc~0HOP~0CAHFLFASE043F000,134444236EVENT4/0J/85825ARFLEASL.044e000I34444231AHELFASt045~500I3144423csEVENTEVtNTI0/24$/54C6rII/04/846F4AHELFASL04bo000)34444239AHELFASE042o000134444240LVtNTEVENI8/II/559545/L9/858TO*HELEASt04ue000134444241ARFLEASE049o000I34114242ARELEASE050ec)00134444213EVENTEVENTEVENT9/09/54blcl12/23/I$4723.9/30/55\004AHFLEASE051F000134444320*RELEASF.042o000134444245ARELEASE053e000134444246A.RFLEASt0540000I'14414247EVENI'VC:NItVFNTEVI.NT5/31/555523/31/85821L/2V/851585/31/85852AHELEASEOSSo000)34444245ARELEASE05bo000134144249EVENTEVENT12/09/51T094/I4/85835AHCLEASE05le000134444250AHFLFASE05de000134414251EVENTEVgNT10/14/8465$II/2b/84695
0 Total  Number  of Procedures  Re uired for Fuel  Load Attachment &#xb9; 3 qumber  of Draft Procedures    Not Started Attachment &#xb9;3 Number  of Draft Proceudres Being Written Attachment &#xb9;3 T
Number  of Procedures  A  roved Attachment &#xb9;3 Number  of Proceudres in    Review Attachment &#xb9;3 Total  Number  of  Prep  and Acce tance Tests    R  uired for Fuel Load Attachment &#xb9;6 Number  of Prep    Acce tance Tests Co    leted Zero Number  of Prep    and Acce tance Tests    Currentl    in Pro ress Zero Number  of S  stems Turned Over    to Start-U    (AOD)
See  Attachment /l5 Zero


HDDf0/FfACTIVITY0ESCHIPIICSNDUH5I*HTSCNtnScEP~ISSURIECDDhSF.STARTtDATAI)ATE10/O.S/4$4ltACrh5FINISHSCIIillREPIDAHELEASE059rAOOI'11411318fVt'.NT12/$0/84l30AHFLEASh05'Sru00134444IllF.VI-NII/I3/85l44AHELEASh059+I:Ou134444316EVENT12/I6/81libAH&LFAshuoo~uouI31441261AitfLEASt;OOlruoo1344442550hvcNtEVLNI4/2IS/tc5ts4s3/10/ts5800AHf.LEASE062~00013141425OAHFLCASh063r00013111425lAHEIEASE0640000I314I125CSEVI'.NTEVENTFVLNT3/10/8580011/18/8148clI/2l/8.~l58AHELfAShOabiu00I)1141259ARFLEAShunnr000131444260EVI.NtEVLNI11/Itl/84688rl/0l/859)'IARELEASEObl~000131111261~AHt'LEASEDOCS~000I34444314AKELFASL069r000134444312AIttLF.ASEUlue000I344442610FVENThVENTEVENTfvftctIt/18/cS16883/Il/ISSjul5/12/85ISO3S/2o/81404AHf'LEASL'lI~AOOIS4444310FvhNTII/18/8468SAHtLI-AShOllruOU1344442660fVESSf,irc~r'/09/84bltl
0 Number of S stems Turned Over to O erations Grou Zero Number of Retests Ex ected Zero


)IDOE=U/FEDt:5CAIPIIUNACYIVITYtSI)RlICODEStESTAR'ItI)L)RSIAHSCttADHFPLUDAlAQAlf-10/03/84PAGE6FI)LISHSCIL~UHLP~0tAkf:LEASC072~Oou134444319EVENI'/I1/84b26AHfLEASE013Oou13444426t)0t;VINl5/04/844>>)0AHELEASI'14~000L34444269EVI.Nl6/25/8454?AHILf:.ASF.ulb>>uooI34444270AACLI-ARSEulb.oooI344442710LVI.NlFVFNI3/24/85~)144/0?/>>)5t)23ARFLFASF017>>000134444306BVIHl4/2d/dSt)4')ARl:LEASE078~uoo134444273EVCNI6/09/85t)VIAHf:LFASC:079~OouI34444214AHELFASE080~uoa)134444275AHFLEASC081~uoo134444216AAELLASEOd?>>000I344442710L.VI.NIEVCNlEVI:Nl.EVCHl3/)7/85t)013/I1/t)5801')/?6/tt5dlb3/II/85doIAHCLEASI-udge>>uooI34444218EVI'NI'/21/d5dlrCARFLEASC084>>00013444427')Akt'LFASt.Od'>>F0001344442tloEVL'NlFVCN13/I7/85t)01II/II/84ba)AttlLFASfudCa~oou1344442810EVENf6/05/85ddlAHFLEASEutt7~oou134444304$FVENCI/23/c)5154
    ,'! <<e 0 e !
QN", ~err e
e
                              ~
ee P,'
                                              ~
                                                . .   ~
tI  I ee i *f~ppr,~. v ~tg~gIe s~
vr
                                                                            ~er,  @PPr
: g. er,
                                                                                        '. r IP
                                  !!                        t e
                                "4 e
e        Vr                                    r
                          "~w*
4 K;re<<, ~
P I''
mr",r-*
P P
                                                    ~ "P. ~
ve ~


NODE=0/FC0ESCRIPfI0NACTIVIIYOuRSIARISCIIIDIIEP~0SABIRTECIIDCSLSIARIeFIHI5CII~0DA'IAOAIEI0/0IIN4PAGE75ItRLV~DAHFLFASE088F000I;$14442dIEVINI3/17/d5I$07*HFLEASE090~000134444285evtNI7/07/NS919ARELI'ASt09I~000I314442$$6EVI'lI1/10/84466AHt-l.fASI-092OOOI$4444?NI0f.VINI5/76/N5dtlARFLEASt;093F000I314412NdEVINf4/24/NSd45AHf'LEASI094~0001344442890I.VI'NI6/II/NS89IAHELEASt.09be000134444290ARELEASE094F000$3444429$AHELFASE097~000I34114292EVINILVENIFVI.'HI1/24/HSt$4I4/14/NSH35?/II/d5779AHt.LFASE09N~0001344442930dVI:Nf8/15/NS95dARELEASE100~AOO01VI1314142110EVFHI8/22/84600ARELFASI:100aAOODIV?1.$1441212AHfLfASE100~IIOOtlPCS1341442100EVENTFVENfer2?.rd460010/I3/d1652AHt'.LEASE101~000I34144294AHtLfASL'02~000134444295CVEHCLVLN'I8/Id/d596112/I6/I$4lI6AHlLfAS@10I~000131414$2/EVEIIf$0/I6/d328'I
r PREOPERAT I ONAL/ACCEP TANCE PROCEDURE DEVELOPNENT                          IO/I7/84 REVIEW CYCLE PREOP  TEST SCHEDULED START DATE INCORP INCORP  JTC COMMENTS COMMENTS  MTG  RETYPE AND  REV  PROC TECHNICAL REV I EW  RETYPE      AND PROCESS            PROC  APPV 1SSUE          NRC REV 1 EM 20 DEVELOP PROCEDURES.


MOOET0/FEACJIVIIY.40E5CRIPfI0N5IARISCN~0REPROSORf8COOFSE5'fARfOAfAOAfE10/03/84PAGE844OURFINI5HSCN~ORC'I<0ARELEASE1040000!34444296EVENII/27/85f58CARELEASE.105+00013444429fARFLEASEIOda0001344442VeEVI.NfEVeNf7/Of/85BIO5/05/HS856CARlLFASI'0I~000I34444321EVLNI2/Of/06II34
OOOQCOQO    4IW      'I  A>IJ ICb I      IIIMVVVV400 0  PREOP AHO            .PTANCE PROCEDURES                0 000000    SThl'US sS OF 15 OCt S4 00000 00000004000400004000000 0000                            ~         0400 OOOO                                                      000 0000                                                              040 OOO                                                                        40 000                                                                              00 000                                                                                    00 OO                                                                                            0      DRAFt NOT STARtD 00                                                ~  ~                                          00
                                ~
0                                                                                                      0 4
00                                                                                                              0 00                                                                                                                  0 0                                                                                30                                    0 0                                                                                  21 ~ 74X                              OP 00                                                                                                                            0 0                                                        0                                                                    0 00                                                                                                                                0 ORAF't StARTEO    0                                                                                                                                00 0                  69                                                                                                              0 0                  $ 000OX                                                                                                          0 0                                                                                                                                  0 0                                                                                                                                  0 0                                                              0  ~  ~    ~  ~    ~  ~  ~  ~  ~  ~  ~  ~  ~  ~  0  0  0 0                                                                                                                                  0 0                                                        0  ~~00~
0                                                              0  ~~    ~  ~                    10                                0 0                                                                  ~0    ~    ~  ~              'Fo 25 X                      OO OO                                                                  ~      ~  ~    ~  0                                      0  READY FOR JTG 0                                                                    ~  ~    ~          0  0                              0 OO                                                                        ~      ~~    4        ~ ~   0                  0 0                                                                                      ~2~  QOX          ~  0        00 0                                                                          ~  4      0  ~                    0~    0 00                                          ~~                                  2090X        0~                    0 00                                                                                                              0 0                                                                              ~~                ~  ~    0    PROC    UNDER RE V HD tAL NQ. PRXE.QBD        l35                0                                                                                                    00 00                                              21 '                              0            00 DM'F't NOl 5MGED DMT    MARIE.D          '9                    00 000 000 000 0
1S 022X                              ~0 00 00 04 0    JTG APPROVEO IN TECH REVIEW              2l                            0000
                                                                                ~0 OI0 0 0040                                                    000 PIIKDURE    READY FOR QTG IQ                                      OOOO      0 ~                              0400
                              +                                         00000000000 00000000000 DTt  APPRDVEQ        .
lR  TECH REVUE'V PRlXEDURE UNXR fKV I  '


RUNGATE15OCfS4L000IUISIIuHKING'5CNIlUULeSURfI:Cl)OESI.STARTPHOJECtBIGPUSNCONStRUCTIONHtLEASEFURtCSTIHGPROJCCtSfARTI/01/53ORIGINALCOHPL~3/07/56DATAOATC10/03/54PAGFIe4llOOEaO/FEACTIVII74OESCRIPTI4)NOUR5TAHTSCIL~0RFP~I)FINI5HSCNIOREPIOAHELEASE00Ie0001)4444L80EVeNT3/I7/85507ARELEASE002~000I34144214EVENTII/18/84688ARELFASE003F000134444151EveNfLL/LO/84680AHFLEASE001~000134444IS3EVFNTII/18/84685-.ARELEASE005e000I34444I54AHFLFASE006~000131444155ARELEASE007F000131414215AHELEASC00css000I31444216AHELEASE009+000I31444217FveNTEVENTEVLNTEVI:NtEvENtI/I3/557443/17/8550710/2I/846606/30/859126/23/85905AHFLFASE010'00L34444190ARELEASE010~000134444155*HFLEASE010eC00I34114189E.VI.NTEVENTEVENT3/10/558007/0I/54548II/23/84693ARELEASEOlla000I34141182AH>>LEASL012~000L34444L91EVENT0I/20/5575111/25/81695
OOOOOOOO      Sf AR 1 4P ANO fFSf 000000000 0  PAEDP AND ACCEPTANCE PROCEDURES        0 IOI0000000    SORTED BY STATUS 000000000 000000    StATUS AS OF 15 OCT 84      00000 PRocFDURE    PROCE DURC    I I IL t.                                              STATUS                        TEST DA CE      ACCEPt NUHUF. A                                                                                                                            PRE    OP 7~          FEEDVA'CER CONT HO). qYS c H    f                                    DRAF  t NOT  Sfhktfo          ISJUL198>>          P I 7o4)    POS'T ACCI)>t Nl SAHPLING SYSfEN                                      DRAF  t Not STARtFD            12AUG19$ b        P 30o        CONTROL )40u OR IVE 4)Yu>4AUL ICS                                    URAF  f NOT Sf ART FO          22 JUL1985        P 34    '    AUTOHATIC DEPRESSU)4        II A'fit)N SYSCEH                        DRAFT  NOT STARTCO            I 3 J UO. I 9 S5    P
: 4) o>)  khorASTf Pkt)CE SS COW>uf k        f                                DRAF T  Nof 'STARf FD          0 I JUNI 9$ 5      P 4  lo      SOLID RADVASTE SYS >4      If                                        DRAFT  Nof SthktED            210C f 1955        P 46 ~        FIRE PROTFC114)N )ihLON                                              DRAFT  NOT S'fhklfD          I 5OCf 1985        P 5 3oC      CONTROL ROUN Pkf SSURE I Ebf                                          uRAF  t Not STA)41ED          ISNOV194)b          P HAOVASTE BUILDING VfkfLLAfION                                        DRAF  f NO I'StAR CEO          I 60C 1 I <>55    P 54> ~ A 56%4) 61 ~ C RADVASTE HLOt Pkf SSU)41 SECONDARY CANT ~ Lt AK ILS f l F).OV ICSC                      DRAFT DRAFT NOT STAAIED*
Nof STARIED 16uci I 985 15SE    P1955 P
P 620        04)A ~ )YDkuGc'N )4LC))H>>I ))fR                                      DRAF 1  NOT START 0  f        05NOVL955          P 7bo        SCAf ION At>O EHEAGENCY LIGNCIMG                                      DRAFT  NOT SfARtEO            I SOCf 1985        P 75        REHOTC Si)UCDDVH                                                      DRAF  f NOT STAR    tf0      04UCT1955          P 79o        ARE A RADIAC IUN NONI TURING                                          DRAFT  NOT STARTED            27HAY 1955        P 80>>        Pkl)CESS AHO AIRBORNE RADIAC ION NONIT0RS                            DRAFI'OT STAklED              15JUL1985          P SJ ~       Pk I NARY CONC A INHCNT I SOLAT I ON                                          Nol SlAkfEO      'RAFT 27NAY 1985        P 9lo        PROCESS Co)4PUlER                                                    DRAFC Nof STARTED              040CTL985          P 92    '    SOURCE RAHGE NON I BRINGf                      \                      DRAFT Nol StARfEO              12AUG1985          P 92>>O        INffAHcDIAffRANGE HuklfORlNG                                          DAAFf Hof SfhATEO              I 2AUGL 985        P 92 ~ C      AVERAGE V))ef R RANGE HDNI TOR INC                                    DAAFf NOT STARTED              12AUG1985          P 94          TRANSVERSfNG INCURE PROBE                                            DRAFT  NOT STARTED            12AUG1985          P
        'bo)) koo sF44UCNcf cuklkut.                                                DRAFT  Not S'CAkfFO          24JUNL955          P 96o        Rf ACTOk NANUAL CDNIRUL 5            ROO POSI    fit)N  INDICATION  OAAFT    STAR SIAkfED NOf                  24JUNL95b          P 97o        ABACTOR PAOTLCf IUN                                                  DRAFT  NOT  SfARfEO          2 7HAY198b          P' 95o        lukBINE GENEHACOk Pk>)TECfluN                                        DRAFT  Nof STARTED            L SOC C L 9 85 101 ~ A    TURBINE BLDG CRANE                                                    OAAFt HOT STARtED              0 IDEC1985          A I Ol ~ 0  RADVAStf ULDG CkhNE                                                  OAAFf NOT Sfhkffo              LSOCI'195b          A I 05 ~     Gf f ARS                                                              OHAFf Nof STARffo              040CTI985          P 112 ~      Sf RUCf U)4AL I tsl 8 Gk I TY L ILA    f                            DRAFT NOT STARTFD              05NOVI9S5          P 39o        FUCL HANDLING 6 kt AClok SERVICE EILUIPNt'.N T                        DRAFT Sf ARCED                29APRI>)85          P 40 ~ A                          f L14ulu RAD'VASf SYb1c)4                                              OAAF f Sf AR'ffo              I I Sf P 1985      P 42 ~       OFF GAS SYbTL.H                                                      DAAF f StAR TED                15DCT 19S5          P 47o        SHOKE FLAN)=. C IF)4Pt RA1UAE Of 'f ECTION                            ORAF T        'CF 0          26 JUL1955          P 52 ~        RE AC1014 4)I.DGo 4)VAC                                              DRAFT Sf ARCED                0 3JULL 98b        P 53 ~ A      CuklkOL UUIL >ING )IVAC                                              OAAF f 5'f AR f EO              I 2HAY195b          I>
5Jot)      CONTHUI BLDG Ct)ILLt0 vACcH                                          DRAFI STARTED                  25APR19$ 5          P 69o        ")45KV fRANSF4)RNFR                                                  ORAF T STARff0                  17JUNI985          a 7ao        PLANT CDHHUNICATIDNS                                                  DRAFt STARTEu                  12JUN4955          4'>
9J ~      Ruu 4)LUCK HONICDALNG                                                DRAF T  Sf AR CED            24JUN194)5          n 100 ~ A    DIVISION I Dlt 54'L Gfkt >4ATDk                                      OkAFT SI'A)4TEO                0 7ht>>kl 955        P 104 ~      SICE SFCU)ITY                                                        URAF C STARTED                5  1 APk I  >)5>>   A 3o        CONDENSAlE SYS tFH                                                                f LST ORAF FINISHED            09HAR19$ 5          P 5~         CONDENSATE OFNINS I ALS IN REGENo                                                f 1ST DRAF FINISHED            23FI 0195'>>        P 20 ~      BREAlNLNG Alk                                                          LST OAAF'1 FINIS)4CO          LbUCTL95b          A 24 ~      GFNEAATOR 154)LATED Pt)ASE BUS OUCf COOL ING                                      t I Sf DRAF F INL5)46 0          I 2 JUL 1955      A 27 ~      Gf NFHAI uk 442 C CU2 SYS'f EH                                        1ST ORAF 1 FINIS)lf0          1 LSC P19>)5      A 29 ~ A    REACtOR RCCIHC ~ SYSTEH                                                IsT DRAFT F INIs)4f 0          I 4 JUN195>>
29 ~ >3    kf AClok RECIRC ~ I LOV CONTROL SYSTEH                                I          f Sf ORAF F INI5)46 0          I 4 JUN19>)b      P 4J ~      F I RE Pftotf CT I ON vA Ckf                                          I Sf ORAt: T FIHISt)FD        5 7 JUN 1 94)5      P 64 o>)      fURUL Nc BU ILUING FLI)OA ORAt NS                                                f 151 ORAF FINISHI.D            29HAR I 94)'i      4~
4> 6 ~ >)  HAIN CHANSFORHI.)4 hl>f h ullhlNS                                      15f  OkAF f  FINIS)tt'0      045f P)95>>>          A


sscHOOFz0/FEDESCRIPII0NACTIVITYsARFLEAbt013~000134144192DVH5TAkSCIC~DHFP~I)cEVENTSDRI'CUOESESTARTscDATADATEI0/03/c)4PAGE2FINlS5CII~0ICI.P)D4/I1/IS5835AHFLFAsE014auooI34444193AHELFASFUISoUOU134444218AHFLFAStOlneyunu13444419800tVENIEVENTCVI.III8/2')/846013/18/84443II/II/IS4681ARELEASEOlr~UOU134444219AHFLFASHOlc)~c)0013444429')AHELFASLOIVe000I34444194LVLNTI:VENTEVONT6/0')/85891II/I'/81hnl2/Il/cs5ll9ARELFASE02ui0001344442?lARELIASL021~UOO1344443000EVINTEVINT5/I2/858655/I9/C158lI)ARFLFASI!022~AOU1344442230F.VLNT10/14/84h53ARELE*St022~IIOI)~34444224EVFNT8/30/c14608ARFLFASF022~COO1344442?5CVLNT6/29/84546AkfIIASF.0?3~c)0013444422hLV<NT12/23/84l23AHELFASE0+4~UOOI3444422r0EVCNT5/12/85863ARFLFASE026F0001344142?d0IVENTI/06/85l3l*kfIf*SI:026~0001.141112?9EVENTn/I6/cS5cs9cs
OOOOOOOO      TAMTUP AND TESf OOOOOOOOO 0  PAEOP Atfo ACCEPTANCE PROCEDURES          0 OOOOOOOO    SORTED BY STATUS 000000000 004400 STATUS AS OF 15 OCT 54 00000 PROCEDURE        PAUCEOUME    TI TLL                                          STATUS                                  TEST DATE      ACCEPf NUMBER                                                                                                                                PRE  OP 640C          DIESEL CENERATIIM IILDCI FLUOk DkAINS                        1st  DRAFT FIHI SHED                    06SEIIl 945 d6 ~ E        SERVICE BUILDING OMAINb                                      1                I ST DRAF T F IN SHED                  06SEP194$
660 J          HAIH STACK PRALNS                                            1st ORAF T F IHISHED                    OdSEP194$
660K        ~ MFACtOA BUILDING kht OftA INS                                ISI'MAFC F INISHED                      065tPI985          A bio            OR YVELL EOJ I Pkt NI AND FLOOR OR A INS                      1ST DRAFT FINISHED                      24JUL1945          P
  $1  ~         CONTAINHEHC LEAKAGE MANI fAMINC                              IST ORAFf FINISHED                      04ACTL94$          P 82 ~           CONT A IHHENI'TNOSPIIEMt NONI CUA INC SYSTEN                            f LST ORAF F INI SHED                    LSOCtl945          P 900            St I SHIC HOHI tOR INC                                        1ST DRAFT FINISHED                      06SEPI945          P 1 00    off  DIVISIOH 2 OIFSEL Cot NFMAfAR                                I St ORAF f F IN! SHED                  31HARI945          P 1020          DCCONTANINAtlON SYSfFH                                        LST DRAFT FINISHED                      LSHARL94$          A I 100        LOSS OF OFF Sl ff'DVER CtSC/ECCS FUNCTIONAL TES f            LS'C DRAF f F INIStIFD                  15SEP19$ $        P 5408          LI fHIUH BROMIDE CHLLLEO VACEM                                1ST OMAFC F INISHEO 6 IN      t YP ING 01AUGL 9$ 5        A bioh          TUMIIltIE. BLOC FQUIP f)MAINS                                TEAN REVLEV                            29HAkl9$5 950A          ROD VORtH HINIWLCEM                                          CEAH REVIEV                            24 JUN 1 955 I~             HA IN C AUX0 STEAN                                            2IKI DRAFT STARCEO                      I 3HAY1985        P 100A          CIRCULAT INC VATEM SYSTFN                                    2NO AR*F C STARTFO                      LOHAY19$5          P l1 0          SEMVICE VAtER                                                          t 2NO DRAF STARTED                        I THAR I 955 Lt      h    CURBINE PLANT SAHPLINC                                        2ND ORAFf STARTED                      09AUC1955          P I toC          RADVASTE PLANT SAHPL ING                                      2ND  DRAFT  StAftfFO                  09AUC19SS          P 22  '        TURBINE GENERA T AR LUOE OIL                                  2NO  ORAF f  STARTED                    20FE519$ 6        A 23                        t TUkBINE 0H0C0                                                2ND  ORAFI'TARTED                      01APR1955          P
      '80 NJCLEAR IIAILtR INSfkUIIENTATION                              2ND  DRAFT STARIEO                      15HAY19$ 5        P 31  ~        RESIDUAL IIEAC REMOVAL SYbtEN                                2NO  DRAFT STARTFO                      2ILJUN19$ b        P 32    ~        LAW PRtSSUIIE COME SPRAY                                      2ND  DRAFT STARTED                      01APM1955          P 33 ~           HIGtt PRESSURE COME SPRAY                                    2ND  LIMAFT SfARTEO                    25NAYI9$5          P 3b0            MFAC CAR Cokt I SOLAC IUN COOL INC SYSTEM                    2NO  DRAFf START'EO                    28JUNI9$ 5        P 36 ~           STANDSY L IIIUID CONIAOL                                      2ND  DRAFT  Sf*RfEO                    29NAYL955          P 3to            kE ACTOR VAfEM CLt'AIIUP SYSTt.k                              2NO  ARAF T  STARTFO                    09AUG1955          P 3S0            FUEL POOL COOL INI0 AHD CLEANUP                              2ND  DRAF f  STAR fEO                  0 SHAY I 9$ b      P 450            F tHE PROtECC ION CD/                                         2NO  DRAFT  5'fARfF.D                  L2JULL955          P dl ~ A        PRINAkY COIIIALNHtNC PURCt                                    2ND  ORAF f  STAR fED                  25AUG19$ b        P dl 08          SfANOAY CAS TREACHI!NC                                        2ND  ORAF T  STAR CEO                  14AUCI985          ft Si ~           REACTOR    UUILllINC POLAR CIIANII                            2NO  DRAFT  STARfEO                    ITNAYL9$5          P S50            kEACfok    COOLANT ANO ECCS LSAK DETFCf ION                  2NO  DRAF f  STAR TEO                  04OCC19$ 5        P SS  ~         CONTAINMENT INERT INC SYSTEM                                  2HO  DRAFT  STARIEO                    15ACT19$ 5        P 106      ~     M6DUNOANT MEACTI VI TY CUIIIMDL                              2HO  DRAFT  STARTED                    15JUL19SS S~             FEtorAftk HEATEkS C IIXCMACTIUN STCAM                        2 ND DRAFT  'F I HI SHF D                I dSEP I 9S5      P 90            CONDENSER AIR REMOVAL                                        2NO  OAAI T  FINISHED                  23AUG19Sb          P 490C          MADVASTE BLDG HOC VATEII C GLYCOL                            2NO  ORAF C  F INISHED                  02JUL19SS          A 100 AC        DIVISION 3 DIESEL GtNEMAfOR                                  2HO  DRAFT  FINISHED                  24HAM1955          P I 7 ~ If      MEAC f OM fILANI'AHPLI NG                                    2NO  ORAFf FINISHED      C IN fYP INC  30AUC19$ 5        P
: e.            FEtDVhttR SYSftk                                              TEST ENGINEER CHECK                    LTHAYIQSb          P 1905          LOSS OF PLANT AIR/N2                                          TEST EHCINEER CHECK                    15JULI955          P 260            TURBINE GENE MAtAR Sf AIUR COOLING VATER                      TESt ENGINEER CHECK                    1dAUCL 9$ b        A 450            AUXILIARY tIQ ILCR                                            TEST ENGINCER CHECK                    26FEtSL 'f55      h 490tf          tukA INE BLOC Hut VATFR 6 GLYCOL                              TEST ENGINEER CHECK                    05JUN1955          A 490n          REACTOR BLOC HDT VATI!A 6 GLYCOL                        Qk Jig~ENGINEER CHECK                        10JUN1055          A lbo          NAKEUP VAft'R tfIEATING                                      +to FOR lECH RtVIEV                    OLIIOV1984        h 19 ~ A        INSTRUMENT C SFRVICE AIM SYSTFH                              DMT FOR  TECH    REV IEv              LSJULL955          P 2bo            CLEAN STEAN AEBOLLEM 6 AUXILIAILY CONDEN SATE                OLP FOR 'f ECH    REV IEV                I IAPM1955        A 49 ~ A        HOT VATFM HEAT INCI SYS'ftIH                                      FOA CECII    AEV IEV              O'I JUN I 'ISb    A
  .IIIQH        AUX0 SI.MV LCE BLOC 0 11 I;C f UHHLLS Vt Nt IL. ATION        OUT FDM TECH      RLIVIEV              I II JUL I It55    f'


fcuNDA'fF.15OCT841549tlkSI)kKIN85CnFt)clLEPHOJECt4)IGPUStcSYSTLI)cAVAILAULEI-UlcIuf/A.ftFStlNE'HE)JECTSfAkfI/OI/elkOklGINALCDHPL~3/07/86SL)lcfI:CODEStLSTARTUACAOA'CE10/0)/84PAGEI4HOOEt)/FEOFSCRIPTIE)NACTIVICYCD0E5TAkSCncOHFPADFINI5nSCtl40HEP4OCSYSftkfukwuvt8t.UHPDt/A~f~11?~)34444044)I)I:VtNfII/07/85I042'SYSTFHfukNOVLkFclccPDT/AeTe001~I)444404110000L)0EVINf5/12/85863SYSCIkfUk'IDVELE~lIUlttct)I/Aof~nc)Z~134444012?0000000t.VtNI'/?5/t)5756SY5CI')4TUHNDVE44I.IlkPD1/A~C~003~134444013Jooonnot:VENT3/04llc)519tlsYSft:HTUHNoaekFc)kPUC/Aditiooi.I3114101140000000CVr44f12/15/8471SSY5TCHTUHNDVERFokPDT/A~Ta005m1341440455000000EVENf?/22/4)5184"YSTENTURNOVERI'Ilktct)t/AI006~I34444046Gnooooo0EVI'HT5/I44/8'5861SYStFIIfUkNOVERFOHPOC/AaT~007~134444041rooooonEVENT1/I4/8S926SYSTI.NTURNDVFk@OHPOC/Aef~004)~I3444104ctt)00004)0SYSTt'H'fURNUVEHI'l)kPOC/AoTo04)')oI314140194000000EVI.I4TFVENT9/15/85989tl/22/85965SYSCLHTukNOVFHFntcPOC/A~I~014)~AI)4414050totooonoEVL:Nt5/09/85860SYSTENTURNOVERFORPDC/A.f.Oio.tlI')111405110200000EVENTI2/21/Si724SYSTCHTUIINDVEHIUE4PDT/AI~010CI3144105210.)000000EVCHlI/22/85153SYSttHfUHNOVEE4FU)4PDC/A~T~0111314410'53I1000000EVEHt3/I6/85806SYSTIkTUHNUVFHFOI4POf/A~T~01J~I)44440'54412000000FVENT12/25/8472S
00000000  SfAATUP AND TEST 000000000 O  PRFI)P AND ACCCPTANCE PAQCEDURFS      0 00000000 SORTED t)Y STATUS 000000000 OO0OO0  STAfU5 As OF 15 OCT 84 00000 PL)OCE DUkf PROCE DVAC    1 I CL 8                                    SI'ATUS                                  ftSf DAft      ACCFPT NVHBE R                                                                                                                      PRE OP 60        ORYVELL COOLING                                          OUf FOR I'ECH REVIE v                    0 1 Nnv I o 85  P
      '6 CONTROL BUILDING DRAINS                                  OUT FO(4  f ECH IlEVIEV                  06SFP I 90$      A 20        )IOCSTURE StPAHAIORS/HFHt:ACEHS VENTS C D(IAINS          INC(&#xc3;)PORAT IN(i COHHENTS                26JAN198$        A 13 ~      REACfOR BUILDING CI.I)SFU LO()P COOLING 'VATER            I NC ORPUAA f I NG COHHt N TS            14JUN198$        P L4 ~      1 UABLHE BUILDING CLOS('0 LOUP COOL ING VA TEA            INCORPOAAC LNG COHHE NTS                I lDEC I 984
* 22mB      CUkt)IHE LUBE DIL COND I I II)NCR 6 VASTE Oll            INCORPURAf ING COHW:NfS                  01 JANI 985      A 22+ C      GFNEAATOA SEAL I)IL SYSTE)4                              I NCORPOAAC ING CC)HHE NTS              20FEBL985        A iio        FIRE PAOTECICON FOAH                                      INCORPORAf IHG COHNCHTS                  28JUN1985        P 54  ~A    NOAHAL SVITCHGEAA BULL()ING VEttf ILATION                I NCORPORAT IN(i COHHCNf S              0 I AUGL 98$    P 55 ~       TV(4OCNE t)LOGE      VftiflLAfION                        I NCOHPORAT LNG COHHI:NTS                otncft985        P 58oh      SCIIEENVCLL C I Dlt Stt F lkL I IN(PI I; H ISC VENT      I NCORPORAf ING CDHH(.Nf5                LSFC.81985      P 58 AC      AVX~ tk)lt F(4 6 CHILLEH HLUG Vft4C ILAfIUN              I NCORPORA TINS COH)4t;4415              I 8 JUL I 985    P 63  '                            f ACAC COH 84(ILDI NG IIULPRE Nf DAALMS                    INCOAPQAAC ING CONN(:NT5                2 4 JUL I 985    P 63  '     kFACCUH 4)ULLOING FL(tu(t D(4AINS                        INCORPORATING COHHENCS                  2 4 JUL I 985    P 7 I ~ E-2 VPS 2VBi)-UPS 2A JU                                      INCOAPOR*ftNG COHHCNfS                  OLDEC1981        P lt of  3 UPS 2VBA-UPS 3A 38                                        CNCORPORAT    I NG COHHE N fS            24DECL984        P 65 ~       HADVASTF. BUILDING BRAINS                                AEAOY FDA    JTG APPROVAL 6 tN TYPING  01SEPL985        P 66oH      CONOENSAI  f  STORAGt TANK IIUILDtNG DRAINS            READ'Y FOH    Jfii APPROVAL C IN f YPING 0 6SE P I 985    P 4~        CONDCNSATE SfORAGt I XFtk                                HEADY FOR    JTG APPROVAL              3 00f C I 984    P Io.n      ACID THEATHENT SYSCI Ii                                  READY FOA    JTG APPROVAL              25DEC1984        A LOoC      IIYPUCHLDAI CF SY5 N  lf                                kf ADY FOR    J TG APPRUVAL                      I 2 3 JAN 985      A 16 ~     HAKEUP VAfEA 5CAAA(if      C TIIAN Ffk                  RFADY FOR    JTIL APPROVAL              I 5NOV I 985      P 50 ~       DDHE5 1 I C Vhfck                                        READY FOA    JfG APPROVAL              01 JANL')86      A Sr.        DIESEL GLNL'HAI'I)k BUILULN( Vt 441 ILATION              HEADY FOA    JTG APPROVAL              I lHA(t1 985      P 66+A       RESE RVL TRANSFI)kkc(4 Akt A DRAINS                      READY fOR    JfG APPROVAL                06SI;P I 985      A 66+0      SCHEENVFLL BUILDING I)(tA I)4                            READY FOA    JTG )LPPROVAL              OSOC f I 985
* 12 ~       TRAVELING VAlfk SCuECNS C VASH DISPOSAL                  JTG APPADVtD                            26I)EC I 984      A 71 ~ F-I  UPS 2VHI)-VPS IA IB LG IC t()                             JTG APPROVED                            06JULL98S        P 73    '   125V NUkHAL UC DIS'Ck l(IUCLON                          JTG APPROVED                            01JULL985        P 73oo      24/44) VI)Lf DC Ol Sfstl ((Uf IUN                        J'TG APPRDVtD                            LSJUNIVI(5        P 66    '  AUXILIARY I(OILCA t(UILI)ING I)RAINS                      PROCEDURE UNDfR AEVI SION                06SE P I ')I(5    P lioA      125V EH( HGLNCY DC t)l Sftt I UUC tUN DIV I              PROCEDURE UNDER REVISION                I THAR I 985      P 74mB      l25V EHEHGCNCY ()C Dl Sfklt(UC ION    OIV 2            PROCEDURE UNDER AEV IS ION              I 7 HAH I 985    P ri.C      125V ENfkGC'NCY DC DISC ILUUCION      DIV              PROCEOVE(4 UNDER REV IS II)N              LOHAHL')85      P


54$RlCCODESCSTAktDATADATE10/03/84PAGE2fNODE<0/PE.0ESCftIPtI4$NACTIVITYC4$DE4OUA5TAR'tSCH40REPS0FINI5HSCHMOREP4DSYSlFNTURHOVEkFftkPOT/At01I~I3444405513000000SYSTCNfUAHDVEkFOkPOT/AoTe011'3444405oL1000000EVF.NTfVC'Nf6/I3/85895I?/I6/4$1216SY5TCNfUAHOVCAFUAPOT/Aofe0Isa13444405115000000SYSTt:NTURNOVERFflftPOT/AtiOIC.~13411405816000000EVENlCVI;NfLO/3I/Si610II/I4/851040SYSTt.NTU44HOVFkF044POf/A~t~0ItoA131111060L1000000SYS'TEN'TUAHOVFAFOAPOT/A~T~017~SI3144105VIt000000C.vt:NfEVE.NfS/08/85'>51S/29/4$5972SYSTCNTURHOVEkFOkPOT/A~f~OIS~13444432818000000EVcNtI/10/85f41SYSTt:NTUAHOVE44134444062SYSTENTURHOVER134444063FOA'POT/Aire019+AI4$000000FOH$40t/Aors020'0000000EVENTEVENt7/14/85~4$2610/I4/4$51018SYSTCNfURHOVE41IIlkPOT/A~f021e000I'$444430121000000EVfNTS/II/85954SYSTCNTURHOVEHFDAPIIT/A~T~82?A13444406522100000SYSTENTUAHOVEAFORPfll/Af022fl13411406622200000SYSTCN'TURNOVERFtlkPOt/A~fe022oCI3411406422300000SYSTCNTUAHQVE41FORPOT/A'f023~I3441406T23000000EVFNTEVFNfFVF.NlEV4;Nt2/19/85TSL12/31/SiTLI?/19/85tsI3/31/854121SYSTINfURNOVEIIO'OkPOl/A~l~024~I31441064$24000000SYsrtftTUAHovckI:okPflt/A.r.025.134444060'5000000EVCNTEVENf7/II/859234/I4$/S5S31
Sa)HT  CCODES      t: START                  DATA DATE l0/03/84PACF 3 4
RODE 0/I'            0  E 5 C R I P I I 0 N    DUH        5  I  A H T        F I N I 5 H ACf I VI TY                                    SCII ~ O      IIEP <0 SCII ~ 0  RLato A RFLEASE    021 000                                  EVFHI              6/02/85 I34444230                                                                881 A Rt:LEASE 02ct ~ 000                        0        EVSNI              3/lu/55 I 34444 I 95                                                            800 A Ht. LEASE  02V ~ 000                                LVI.N'f            1/I 4/d5 I 31 444 19u                                                            535
* Hf LFARI. 030 000                                    i.VI Nf            2/ I 0/55 I34441I91                                                                112 A HFLEASE    03l ~ 000                                EVI.N f            4/28/55 I 31444 I 99                                                            819 A HILEASI.'32F 000                                    EVa.NT            2/Id/55 I34444209                                                                180 A RELEASE    033+000                        0        EVFNT              4/I 4/55 I 3441420 I                                                              835 A HFLf ASL 034 ~ 000                                  EVENT              3/24/85 I 3144423 l                                                              tt I 4 A HFLEASE    03bou00                        0        EVI Nf            4/28/55 I34411202                                                                549 A HFLEASL    0360000                        0        EVFNI              4/2 5/55 l.)4414203                                                              819 A Rt'L EASE 031 ~ 000                                  EVFNI              6/09/dh I 34441204                                                              S9  I A HFLFASt    035~000                                  EVEN f            3/0 I/55 I 31444205                                                              193 C  A HELEASI: 039 ~ 000                                  EVENT            I2/I6/54 l34444232                                                                ll6 A HFLEASL 040 F 000                                    EVENf              3/ I 0/55 l34444233                                                                800 A HFLEASE    04l a000                                EVENT              6/30/85 l$ 4444234                                                              9I2 A RFLEASE    042 ~ 000                      0        EVENf              I/? 1/85 l34444235                                                                158


S(IR'fECODUSFSfA>tfI>ACADAftI0/03/H4PA(it.3I(DOED/FF.ACTIVETYJ0ESCkIPfI>INCODE4Ouk5IAkSCtt)OkFP>OJFINISHSCII>0REPIOSvSCIwfuktOVEkFokIOfrA.C.oar.)344140102(>uonouutVI.NI8/I5/85958SYSTtkTURNOVtkFnkPnf/A~C~02(~I34444UfI2?uoooo>JEVIttl9/sz/859dt>SY'Sfl.kfURNOVI'kFnkPDT/A~C~02tt~13444407228000000EVIHf5/II>/85de)SVSCINfukNOVIkF(litI>(If/A~fe02<)~A$344440)429>)noounSY'5fl:kCURNOVtkF<skPDC/AoI~0)nol34414UTS3nuooouuIIVIttfEVIHfI>/II/d5<I<)57/?I/HS'I3ISYSTI>NCURNOVtkFO'II>OT/Aal~03!~I3444401(>3(uounooI.'Vt.NIer?rrHSVnJSV5(t.t(rukt>OYENFDwu(tr/A.f032.I344440ff32uuuouoCYST>.'JITURNOVEIIIIlkI>ttf/A~f~03)eI$444401u$)onunnuI.V(HrtvtNr4/?I/dbtlat?5/24/d5I)ISSYST(NfuktlOVCIII'OkPDI/A~Ce034eI3114401<I'$4unuountvt.ttCrrszrdeI24IYST(NCUI>NOVEkII)kPtlfrA.C.0>,.I$1444080$5oououuUV>.N'C6/2J/'$5<J0')SY5ftJIIUkt>OVt>tFO>IPI>~(/Ar~03>.~$$4444U8$Jeaoouun'bbfI>N'I>INN(JVFttI-OkPttf/A~(o0lieIJ4444082IfnnuuonLVIHCLVI:NI5/2d/85dl.l8/od/d595ISVSTEIIIURNDVEttFQkI>O'(/A~f~0$>II'$444408.l3doououu(:SY'if>-kCUIINOV('.kFORP(tf/A~I0I'J~l344440843900ununEVENTEVFNfsro2/dst>534/2d/>$5848'pvSIIHCUkNOVENFt)kPUC/A+I~040~IIl344440(IS40ouuoooEVcNf5/31/<IbUH2>YSCLkTukNOVF>IIOt>P(lf/AC~040~Al$4444udt>40uounnotVtNTUrIu/<$5984
SOHI  ECPPtS    t    START                    PATA PATE LO/03/ts4PAGt 4 o                                  e      4                      e HOOEc-I)/FE          0  E  5 C H I P  T I I) N  nuH        S    T A H    T          F I N I S ci ACTIVITV                                          SCNcP            HEMI)    SCcc ~ 0  HOP  ~ 0 I
C A HFLFASE      043 F 000,                                  EVENT                  4/0 J/85 134444236                                                                        825 A RFLE ASL. 044 e 000                                  EVENT                I 0/24$ /54 I 34444231                                                                        C6r A HELF ASt    045 ~ 500                                  EVtNT                II/04/84 I 314 44 2 3cs                                                                  6 F4 A HELFASL 04bo000                                          LVtNT                  8/ I I/55
    )34444239                                                                        954 A HELF ASE 042o000                                        EVENI                  5/L9/85 134444240                                                                        8TO
* HELEASt 04ue000                                          EVENT                  9/09/54 134444241                                                                        bl cl A RFLEASE      049o000                                    EVENT                12/2 3/I$ 4 I 34114242                                                                        72 3.
A RELEASE      050ec)00                                    EVENT                  9/ 30/55 134444213                                                                      \004 A HFLEASE 051      F 000                                                          5/31/55 134444320                                              EVENI'VC:N               552
* RELEASF. 042o 000                                                  I           3/31 /85 134444245                                                                        821 A RELEASE      053e000                                    tVF NT                L/2V/85 134444246                                                                        158 A.RFLEASt 0540000                                          EVI.N T                5/31/85 I'14414247                                                                        852 A HELEASE      OSSo000                                    EVENT                12/09/51
      )34444245                                                                        T09 A RELEASE      05bo000                                    EVEN T                4/ I 4/85 134144249                                                                        835 A HCLEASE      05le000                                    EVENT                10/14/84 134444250                                                                        65$
A HFLFASE 05de000                                          EVg NT              I I /2b/84 134414251                                                                        695


Suktc.Cuf>USt:GTAHTDATADATI:10/oy/UIPAGFtNDDE=U/FEDEACTIVITYI5Cf4IPIIIINCODEDURSIA>4tSC))auHEPautFINISNSCN'DHLP>D4SYSTE>tTURNDVE>4FukPOT/A~T~041~I344440HTIIOOOOUAEVI.NT10/20/t)51024SYSft>4TUH>>OVERFu>4PDT/A~f~04?~I344440UU424)00000EvtNr10/I4/H5IOI0csvstrNTUHNOVFHI:ultpot/AIn4).13444405')430000000KvtNT6/otIHS4)SHSYStt'Nfuk>>OVISt>4)~IPOT/A~To044~I)444409044000000I.V>'NI6/2I/445')095'Vof4,NIUIINUVF>tI-ultP(lt/A~fo04'SeI344440')I45000000Evl:Nt?/II/HS923SYSTE>tIUHNOVFHFt)ltPDTIA~Ta046o134444092.46000000C.VLNT10/ITlt)510?I'SYSfl.NTUI4NUVEIIIukPf)f/A~T~Ahle13444409347000000SYSfLNTURNOVC>4It)RPut/A~T~04H~134444U94441900000SYSTLNTURNOVE>4FOllPOT/A+tv04~)~A1344440964>>000000EvtNtE,VENTFVENT?I?"/HS931?/?S/tlS141I6/04/U5at)6SVSfCHtuHNOVFHFnkPAI/At.04).DI34444>)94)4900000>)~SY'LHfukNOVEHFukfOl/A1049~u13444409I49OOOuooUVSft:HTUHNDVEltI'ul4Puf/A~I~049~C134444096I')4)000000FVLNTEVI.NtEVI.NtI>/0I/HSUH66/09/85H917/0I/t)5SYSTCNIURNOVE>tFOltIOfIA~I~OSA13444409')60000000EVI.'NT12/'3I/851096SYS'llHIUHNOVFHFOHl>l>t/A~t~OSI~OUAI3IIII)?351000000rvtNI5/31/HSUH2SYSTCHTultNOVFltFOilPOT/A~I~OS?~I14441100S?000000Evl:Nt?/02/05914SYSTIVTURNOVERIu>44>uf/*~f~053~III)444410153000000EVENTI/2Tl>>SUIU
SURI  ECDDhS    F. START                            DATA I)ATE 10/O.S/4$ 4ltACrh 5 t
HDDf  0/Ff              0  E S C H I P I I CS N    DUH        5  I
* H T             F I N    I S H ACTIVITY                                            SCNtn          ScEP ~ IS  SCII  ill      REPI D A HE LEASE        059r AOO                                    fVt'.NT              12/$ 0/84 l30 I '11411 318 A HFLEASh        05'Sru00                                    F.VI-NI                  /
I I  3/85 134444      Ill                                                                    l44 A HELEASh        059+I:Ou                                    EVENT                12/I 6/81 134444316                                                                          lib A  H&LFAsh uoo ~ uou                                          hvc Nt                4/2IS/tc5 I 31441261                                                                          ts4 s A itfLEASt; OOlruoo                                0        EVLN I               3/10/ts5 134444255                                                                          800 A Hf.LEASE        062 ~ 000                                  EVI'.NT              3/10/85 13141425O                                                                          800 A HFLCASh        063r000                                    EVENT                11/18/81 13111425      l                                                                    48 cl A HEI EASE        0640000                                    FVLNT                  I /2 l/8.  ~
I 31 4 I 1 25 CS                                                                  l58 A  HELfASh Oabiu00                                            EVI.Nt              11/ I tl/84 I )114 1259                                                                        688 r
A  RFLEASh        unnr000                                    EVLN I                l/0 l/85 131444260                                                                          9) 'I A RELEASE        Obl ~ 000                                  F VENT              I t /18/cS1 131111261                                                                          688
  ~ A Ht'LEASE        DOCS ~ 000                                  hVENT                  3/ I l/ISS I 34444314                                                                        jul A  KELFASL 069r000                                  0        EVENT                  5/12/85 134444312                                                                          ISO 3 A  Itt LF.ASE Ulue 000                                      fvftct                S/2o/81 404 I 34444261 Hf'LEASL'lI ~ AOO                                                              I I/18/84 r'/0 A                                                           FvhNT I S4444310                                                                        68S A Ht    LI-ASh 134444266 OllruOU                          0        f VESS f, irc  ~
9/84 bl tl


HOOE-0/FEDESCAIPfIONACTIVIfYcnoEsuRf0OURtCODESt:START5TAHSCN40HEP44)UAfADATE10/03/84PAGE5FINISNSC1440REPinSYSTEl4TURNOVER134444L02SYSTE)4fUHNQVFHI34444103IOHPOT/Aif~05IA53000000FOHPnf/A~f~OSI~C5300@0090LVt:Nl'YENI5/II/854)62II/14/851049SVSTLHTURNOVERFukPof/A~7~nS4~AI3444410154000000LV(14T7/31/85943SVSfEHIukNQVI;KF~)kPnf/AI051~uI34414105S4000000'sfEHTUHNAVEHI'ilkI'nf/A~I~Ob'~134411LOOS5000000SYsfrHTUHNOYEHI'olt.POT/A~f~056~AL34144L0756000000(.VINII.VLNIf.VEltf7/11/I$59439/50/tj51004I0/15/851019SYSTEHfukknvEkI.ukpor/A.r.Osc.uI31444172S6000000t:Vt'Nf10/15/8'51019SYSTLllTURNOVEHI'QkIAT/Aef~057I)1444I04)sfununuuEvtNf3/I6/c$5t)06SVSf4l4IUHllnVEHFl)HPUI/A~f~nukeI1141412')58000000EVtNf12/20/84720svsffllTUANOvEHFnlPnr/A.f.nu~).AI144141115'l$00000EVLNf3/?8/854)I44SYSTI'HfUHNnvtkI4)kI'uf/*~T~alu9~HI34444104S9200000LVLNf4/ub/us827SVSfLHTUANOVEHInkPu'f/A~Ten>vsCI$144411059sounnuIVLNT7/I7/85929CSVSffkTUANUVEAFnltPof/A~f~Onus134411112400000unE.VL'Nr10/31/851015SYSTIHTUANOVEkFnkPnf/A~'faOut~I)1.1441411IalnnuunuSYSTEHTUHNOVEHI'nkPDI/A~f~OdleA1.34144I1161000000EVrNfEVENf8/I3/4)59568/27/t)5970'SYSTI-HTukt<OVEHI')litPnf/A~'faOnloCI~1144403041000000EveNr9/I7/859'1I
STAR'I SI)Rl    I CODES      E                            DAlA    QA lf- 10/03/84PAGE 6 t              t
)IDOE= U/F E            Dt:    5 CA I PI I UN    I)L)R          S  I  A H              F  I)LISH ACY IVI TY                                        SCtt  AD      HFPLU    SCIL ~ U    HL P ~ 0 t                                                t A  kf:LEASC 072 ~ Oou 134444 319 EVENI'/I            b26 1/84 A Hf LEASE    013 Oou                        0            t;VI Nl            5/04/84 13444426t)                                                                    4>>) 0 A HELEASI'     14 ~ 000                                  E VI. Nl          6/25/84 L34444269                                                                    54?
A HI Lf:.ASF. ulb>>uoo                                      LVI.Nl            3/24/85 I 34444270                                                                    ~ )14 A ACLI-ARSE    ulb.ooo                        0            FVFNI              4/0?/>>)5 I 34444271                                                                    t)2 3 A  RFLFASF 017>>000                                          BVI Hl            4/2d/dS 134444306                                                                    t)4')
A Rl:LEASE    078 ~ uoo                                    EVCNI              6/09/85 134444273                                                                    t)VI A Hf:LFASC:    079 ~ Oou                                    L. VI.NI          3/)7/85 I 34444214                                                                    t)0  1 A HELFASE      080 ~ uoa)                     0            EVCNl              3/ I 1/t)5 134444275                                                                    801 A HFLEASC udge>>uoo 081 ~ uoo                                    EVI: Nl            ')/? 6/tt 5 134444216                                                                    dlb A AELLASE Od?>>000                                        .EVCHl              3/ I I /85 I 34444271                                                                  do I A HCLEASI-I 34444218 EVI'NI'/21/d5        dlr C  A RFLEASC      084>>000                                      EVL'Nl            3/I 7/85 13444427')                                                                   t)0 1 A  kt'LFASt. Od'>> F 000 1344442tlo F VCN1          I I/II/84 ba)
A ttl LF ASf udCa ~ oou                      0            EVENf              6/05/85 134444281                                                                    ddl A HFLEASE      utt 7 ~ oou                                  FVENC              I /2 3/c)5 134444  304$                                                                  154


HOOE=O/FEACfIVIfr0FSCHIVCI0NCI)utAuk5CAHSCII>AHFP)OSi)RfECOOESfSfAkl'ACAAACElo/0.$/t)1PAUL4~FINI5IISCHWAHEPTASYSTI!HTURNOVFHO'AkPO'f/A~T~06?~1.$4444I1562000000Evt.NtII/01>CC$51042SYSTEHTUHNAVEHFC)kPOT/AT~06IA13444411)63000000EvtNT7/23/d59$5SYSTCHtc)RNOVE>4Il)kPnf/A~f~daI~III3444>4IIa4300000>IIvtNC7/23/t)593'5SYift.kTU>C)>AVI:ICICI>4Puf/Asto061occ1.$44441ldC>4000000LV>;Nf3/?II/d5t)l0SYitt.kTUICCCOVEICFCIHVt)t/Ail'U1.AI3I414II')c>4000000FVINC3/2II/05I)I>ISYS'fLHTURNAVEI4FUICPnf/A~t~065~I$4444120c>5000000SYSTEHTURNOVEHFnttPOC/AoT~oan>CI34414I22acooooooEvc,NTEVENTtl/31/d5~))49/05/859r9SYStt:HTuttNOVEHFAHVnt/At~obcNI34444121an000000FV(.NC9/05/85)r)Jr5'fCHCUICNOVEHI')ttPOT/A~I~0an>II131441121c4OOOOOASYSfEHTUHNOVEI4FOHPuf/AoT~ohn+K131141130ac>0000ouiEVI.NCEVF.N'C9/05/c)5c)l)9/05/d5>))')SYSTLHTURtIOVLHI'u>CIAC/A~t~064>~tI.'$1444I2bCaOOOOOOFVCNCc)/05/d59)')SY5Tt.kTURNOVFHI'OHt>t)C/A~t~OC>nA134444123ccuoooooSYSfEHTUHNOVEHFAI4Vt)f/Aefooha~G134444L24>44000000SYSft>CTUHNAVFkFc)HPAC/Af~0463434414124aaooooonSYSTI.HTUHNOVEHFukVut/AeT~046oLI34144I24$'600000000Evc:NtEVENfEvc:44tEvt:NT9/0>/d59199/05/059799/05/0597i)9/05/05979SYStt-:HTUIINOVEHFnkIOT/A.f.044.nL3444112966000000EVENT10/04/4$5Iooct
SABIR T ECIIDCS    L SIAR I                        DA'IA OA IE I 0/0 IIN4PAGE 7 e
NODE=0/FC            0  E  S C R  I P f I 0 N    OuR        S  I  A R  I            F  I H I 5 It ACTIVIIY                                            SCIIID      IIEP ~ 0  5 CI I ~ 0    RLV~D A HFLFASE    088 F 000                                      EVI NI              3/17/d5 I;$ 14442d I                                                                    I$ 0 7
* HF  LEASE 090~000                                          evt NI              7/0 7/NS 134444285                                                                        919 A RELI'ASt 09 I ~ 000                                        E VI'lI            1/10/84 I 314442$ $ 6                                                                    466 A Ht-l.fASI- 092    OOO                          0        f.VI NI            5/76/N5 I $ 4444?NI                                                                      dtl A RFLEASt; 093 F 000                                        EVI  Nf            4/24/NS I 314412Nd                                                                      d45 A Hf'LEASI    094 ~ 000                            0        I.VI'NI            6/ I I /NS 134444289                                                                        89 I A HELEASt. 09be000                                        EVI  NI            1/24/HS 134444290                                                                        t$ 4 I A RELEASE    094 F 000                                      LVENI              4/14/NS
    $ 3444429$                                                                      H35 A HELF ASE    097 ~ 000                                      FVI.'HI            ?/I I/d5 I 341 14292                                                                      779 A Ht.LF ASE 09N ~ 000                              0        dVI:Nf              8/15/NS 134444293                                                                        95d A RELEASE    100 ~ AOO 01  V  I                   0        EVFHI              8/22/84 131414211                                                                        600 A RELFASI: 100aAOO        DIV  ?                            EVENT              er2?.rd4 1.$ 1441212                                                                      600 A Hf LfASE 100 ~ IIOO tlPCS                        0        F VENf            10/ I 3/d1 134144210                                                                        652 A Ht'.LEASE 101    ~ 000                                    CVEHC              8/ I d/d5 I 34144294                                                                      961 A Ht  LfASL'02 ~ 000                                        LVLN'I            12/ I 6/ I$ 4 134444295                                                                        lI 6 A Hl  LfAS@  10 I ~ 000                                    EVE  IIf          $ 0/ I 6/d 3 131414  $ 2/                                                                   28'I


HQDE>O/I'0AcfIVIIVCRIPIII)confSI)RttcouisIsfAHTOUR5TANTSCII~I)HfP~I)4OAIAOATELo/0I/81PAGEFINISHscn)nRL.I)nsvsttHTUHNUVLHFodpot/Af~oui.I34411I.)I6700(000tViNT7/23/dS93SSYST).NTUBNOVfkPOT/A~T068~000I34111)ISlo80000uuSVSftNfuHN()VIkPI)t/AotouueoodI341443)369000000C'SY)lftHIUHNOVIItt'I)etPut/Aet~0lo~I.')4114I)2100000000FVI.NILVI.NfLvtHT9/I2/ds'Jdu7/ll/ds9233/01/d6II62SvsftHfUkNOVI'llPI)f/A~I0ll~AouI34444LlI1LL00000L'VIIIfI/I1/)5lidSYsfhNIURNOVLHFOHPOT/*~T~01l~III311113271IdouoooIVI.HTI/L3/85744SYSfLNTURHOVEkIOkPI)f/A~f~012~I3444432612000000I.VI.IIfII/)6/d4b86svsrtkru)tkovt)tFnkpot/A.r.oil.nI34114I3u13000000EVENrh/)4/dsI)9uSvSIt.HTUHNOVtHI'nkI'0t/A~T~013AI31114I131loouoootvuHr6/lu/d54)2svsrt:.HruktovfkFn)>>por/A.r.oil.cI)4444I3114uooouotvtNT3/Oc)/8579')SYSTL.HluHNI)VEHFukVOI/A~I~nil.AI34141I3')14000000LVLNI3/I6/85806SYSTENtUHNOVFHI'IlkPOT/Aet~011~III)4144)38lloouuooCSYSTCH'fUHNOVtkFOllI~I)f/AeT~01'seI34441llo15000unuSVSTFHTURNOVERFnltPuf/A~fidla~I31141I4I76000000EVLHI'VFNTEvaHr3/l6/85808IO/Ll/dsI02I5/II/ds893SYSf)NTUHI<OVLttPl)f/Aot011~000I3141430111000000svsrt'.HruHNovfkFukPor/*.r.nfl.Il4444)421duoooooFvtNTE%>T6/27/db909I0/0I/ds)007
SORf  8 COOFS    E  5'fARf                  OAfA OAfE 10/03/84PAGE 8 4                      4 MOO ET 0/F E        0 E 5 C R I P f I 0 N  OUR        5  I A R  I         F I N I 5 H RC'I <0 ACJ IVI IY                                  SCN ~ 0      REPRO  SCN~O
            .4 A RELEASE    1040000                                EVENI            I /2 7/85
      !34444296                                                            f58 C  A RELEASE .105+000                                  EVI.Nf            7/Of/85 13444429f                                                            BIO A RFLEASE    IOda000                                EVe  Nf          5/0 5/HS 1344442Ve                                                            856 C  A Rl LFASI'0 I ~ 000                                EVLNI            2/Of/06 I 34444 321                                                          II 34


NOAE=A/FFACTIVlfY065CRIlitIAIcCIAJF.sSc)ATI:CADASI:STAAfJOUA5TAkSCII~UAEP~IJssOAf*OATC10/03/cciVA468ssFINI5NSCCAul.PEI)SYSfl'kTUICNOVENFc)NPOT/A~fo019~13444414379000000tvfNf5/26/85SYSTCSCTUANC)VFICFC)u'IOt/*t~nc)Q.I34444141cl000clc)000hvfNt7/I4/8597ccCSYSTINTUICNOVEICFkuPOT/A~I~onl~I31444115810000004VINf10/0I/nbton1CSYSTI.N'IUfcNAVLIIIl)uPc)T/At082I34444I4cc8/onooooSYSTLNTUIINovl:clIl)lcPllt/A~T~08I~1,3444403983000000C'SY.'iTLVfURNOVFiCFO,CPO'f/Af~084~13441414784000000FV..NTCVFNIIVINfI0/I1/IS5I0/I5/2Cc/c)58115/I6/85861CSYSTJellTURNOVERFf)kIOf/A~t~Onb~I31414I4cl85000000FVCNTI0/03/c)5lon7SYStf:NTURNOVERFI)kI'Af/A~T~086~1311~1119cl4000000QVINf9/05/c)5SYSTI:NTURNOVflcPUI/A~T081~00013444430c)cl7000000CYSTLSCfUANAVFi)1UkPAf/A~f~On)i~I34444150niloocJoooSY'Sf1.kTURNOVFAFc)lclikf/A~f~oils)~I31414151'JQQQQQQQCJVINtFVLNrLANt3/'P4/c)5III1IQ/14/85101cs9/05/85979CSYSTI:sctUANAVFNFfIcePAT/AI~0JI.AI34444)bIJ100normSYSTUJCTUAICIJVFJCFf)kPI)TIAeI~092+CI34144154J2ooooon'iYSILllfUANOVINFOAPOT/A~1~O'Jtell134444155'J7000000CcVINfC.VLHTCVI.NT10/03/cl510018/II/859548/11/c)5954SYSTLNIUANOVEAFO'IPkf/AeI~O'J2~AI344141569RQOQQQOCvaNtJl/11/85954SYSICNTUANOVEICFANIskt/A~Ie0JI~I)4111151~Isoooono"Vf'-M"')ofI'/PI/c)59O'.i
RUN GATE            f 15OC S4    L000IUIS                II u H K I N G    '5 C N  Il U U    L e                            PROJCC t Sf ART  I/01/53 PHOJECt      BIGPUSN        CONStRUC TION HtLEASE FUR tCST IHG                                                          ORIGINAL COHPL ~   3/07/56 SURf      I:Cl)OES      I. START                      DATA OA TC  10/03/54PAGF    I e                                  4 llOOEaO/FE              OE SCRIPT I 4)N                           OUR            5    T A H T             F I N I 5 H ACTI VI I 7                                                        SCIL ~ 0      RFP ~ I)     SCNIO      REPIO 4
A HE LEASE 00 I e  000                                                    EVeNT                  3/ I 7/85 1)4444L80                                                                                        507 A RELEASE    002 ~ 000                                                    EVENT                I I/18/84 I 34144214                                                                                        688 A RELFASE    003 F 000                                                    Eve Nf              LL/LO/84 134444 151                                                                                        680 A HFLEASE    001 ~ 000                                                    E VFNT              I I/18/84 134444 IS 3                                                                                      685
  -. A RELEASE    005e000                                                      FveNT                  /
I I 3/55 I 34444 I 54                                                                                      744 A HFLFASE 006~000                                                          EVENT                3/17/85 131444155                                                                                        507 A RELEASE    007 F 000                                                    EVLNT                10/2 I /84 131414215                                                                                        660 A HELEASC    00css000                                                      EVI:N t              6/30/85 I 314442 16                                                                                      912 A HELEASE    009+000                                                      EvENt                  6/2 3/85 I 3144421  7                                                                                    905 A HFLFASE 010    '00                                                      E.VI.NT                3/10/55 L34444190                                                                                        800 A RELEASE    010~000                                                      EVENT                  7/0 I /54 134444155                                                                                        548
* HFLEASE 010eC00                                                          EVENT                I I/23/84 I 34114 189                                                                                      693 A RELEASE    Olla  000                                                    EVENT                  I/20/55 I 34141182                                                                                        751 A H>> LEASL    012 ~ 000                                                                0        11/25/81 L34444L91                                                                                        695


~~sukraconrs=srAkrOATAOATS'0/0I/SIPAO>F-ttHOOF=0/FL'escuIprIAcJIVITYCIIOtt~SYSTLHTURNOVI:kFukPof/A~ToU')4~I3444115d940000IJOOIJk05rARrSCN>ORLP>utavcNrFINISNSCNinAt.l'IoN/II/ds954SYSTCHtuktn)VIktnWPot/A~f0I~>.AI)114116095000000I:VI!NlI/25/NS~>Jonsvstt.tttuktUvekFt)kPor/A.r.n'J'>ll1341441599500000ut.VIHf6/?3/)5905SYSTI'.HTUANOVf:>IFl)kPof/AoloO'Jh~1314411619hnouooU"SYSTt'HTUANOvtkI'I)ltPnf/Aoto09?~1.54411I629foquoooI:V>.HfI't:Hr4/?I/d5Ou'>5/26/d5dlISYSTC)tfukNOVI;kFnkPI)f/A~t09d~1344441hJ'J>)0000>)0EvtHr10/14/15I0Ic)SYSTLlHTUkt>OVI!kFnkI'I)f/Aof~I00~AOSL3L34144164100100000CVI.Hf3/)ul>)5N7.0'SYSTIHfURNOVFktO>tPnf/AofoIunoAl)SLI134414166IonloonuuCVINr1/06/t)5SYSTEHTURNOVERFokI>of/A~fIunUOSL2I51411L6t>100>ouoUUUVLHf3/23/dsI)I3SYSTt.ktURNOVFIItOkPOT/Aololul~ISI34441IhdIolonuounFVINtIo/II/d51071SYSTIHtUANI)VFkI-OIII>lll/A~toluloiI3114114IIulonouunLVI,NfII/Sulds106>SY'll:ItTUANOVI.kt'l)kPOT/A~rI).~I3141416'JIu?uuuuouiV.".Itt3/IT/>SSI)07SY5TEHTURNS)VFkIt)kPOT/AoToIu1~uunI)414452'.>103000000I:Vt:Hf0/II/ds954SYS'llHlUANOVCk)=OkPOT/A~TIU1oI)44411?UI01000000EVI'.tlI3/11/db.U21SYSft'HTUIINOVERFokPOT/Aol~Iu'>I$4444142105000000F.VI:HI'o/05/dhInnrSY'sttHTUIIHOVC>IFnkPOT/AT106')4444IJIluhuuuoUOFtIrhNf.'/14/ds926 4
SDRI'CUOES      E  START                          DAT A DATE I 0/0 3/c)4PAGE 2 HOOF z 0/FE s
SOI)1E.CUOI'5F.5SAIITDAtADAYQl0/Oi/84PAGF.l0)IOOF.=II/FCACT!VI)YDL'CHlPiII)NC:)Ol.DU)I5lAII)SCNI0IIFPIOFINI511SCII~OIIrV<OCSYSCt'HCUIINOVEIIFUkPOT/Aaf~l01~000l)4444424LO'F000000L'VFNT2/0r/I)6l134
ACTIVITY D E S s
C R I P c
I I 0 N  DVH s
5 SCIC ~ D T
c A k HFP ~ I)
F 5CII ~ 0 IN l S ICI.P)D s                                      c A   RFLEAbt 01 3 ~ 000                                    EVENT                4/ I 1/IS5 134144192                                                                    835 A HFLFAsE        014auoo                          0        tVEN I              8/2')/84 I 34444 193                                                                  60  1 A   HELF ASF UI So UOU                            0        EVENT              3/18/84 134444218                                                                    443 A  HFLFASt Olney unu                                      CVI. III          I I/I I/IS4 134444198                                                                    681 A RELEASE        Olr ~ UOU                                  LVLNT              6/0')/85 134444219                                                                    891 A  HFLFASH Olc) ~ c)00                                    I:VENT                /
I I I' /81 13444429')                                                                  hnl A HELFASL        OIVe000                                    EVONT              2/ I l/cs5 I 34444 194                                                                  ll9 A RELFASE      02ui000                                    EVI NT              5/ I 2/85 1344442?l                                                                    865 A RELI ASL 021      ~ UOO                      0        EVI NT              5/ I 9/ C15 134444300                                                                    8l I)
A  RFLFASI! 022 ~ AOU                          0        F.VL N T          10/14/84 134444223                                                                    h53 A   RELE*St 022 ~ IIOI)                                    EVFNT              8/30/c14
        ~ 34444224 608 A   RFLFASF 022 ~ COO                                      CVLNT              6/29/84 1344442?5                                                                    546 A   kf I I ASF. 0? 3~ c)00                                LV<NT            12/2 3/84 13444422h                                                                    l23 A HELF ASE      0+4 ~ UOO                        0        EVCNT              5/12/85 I 3444422  r                                                                863 A RFLFASE        026 F 000                        0        I VENT              I /0 6/85 1344142?d                                                                    l3l
* kfI f*SI:     026 ~ 000                                  EVENT              n/ I 6/cS5 1.141 11 2? 9                                                                cs9  cs


RUNDATEISDCts40740HRsvuuKLNGSCHtou)6SURtECDOCSESTARl4PAOJECfQIGPUSHPRCOPANOACCEVTANCtlEStINGSCHCDa)LERRI)JEC1SfARfI/Ol/53ORIGINALCOHPL~3/07/86DATADAfE10/03/54VAGEINODE=0/FEDESCRItatIONACTIVITY4aDUR5fAR'fSCH)DREPROaFINI5HSCH)DREPROICCOLOFUNCf)ANALtSfOPS)IASILRlaUNI.HLI5'1129977001CIDtVRIHAHY.CDNTAINHENTLEAKRAll;TfSfCSl71129997400163I2/06/5S107125II/Od/55.10432/Od/86113312/05/551070PAFDVHAINLAUXSftAH00100095725001A<<t<<HOISfUAE.SEPERATDRREHEATVCNt5DAAIN002~75748001215/IJ/5586425I/26/557576/07/I)a5542/22/55784Vkt-I)PCONT)iNSAfCSYS00I~00098651001213/09/857993/29/85819POfCONDSTURAGF.4XFt'R004000286260OL2L1,2/16/I)4716I/05/85736VO'fCDNI)FNSAf8DCHIN'5CACSINHEIsfN005<<00097090001142/23/557853/0as/d5r98PACDPFEEDVATEHSYS006<<0009865$001PHCDVFtl'0VATCHCI)NtHUL001~Oa)09al849001PutFFIDrATfHl)EATEASGCXTRACILDN005.0))0ra)790001VOfCONI)a":NSCHAIRHE)LOVAI009~000139090001VATCIRCULATINGvAftk010<<AOOI3571400121142114215/Ir/ISS868r/15/ds9279/16/559908/2J/d59665/I0/55861-4/06/855857/25/5594010/06/55LOLO9/05/d59795/30/55dd1A<<t<<ACIDTHCAfHEAT10<<O255940011412/25/5472$I/07/85738ACCFPTTESfHYIDCHLuk1ttSYS0I0COOIIl)71600114I/23/857542/05/85r47PDIsflavlCI.vATEH01I<<000'%IIIII700I-S/Ir/855075/II/a)5862
fcuN DA'fF. 15OC T84 1549tlkS PHOJECt        4)IGPUStc      SYSTLI)c  AVAILAULE I-Ulc    I uf  / A.f tFStlNE'HE)JECT I) k K I N 8    5 C  n F t)   cl  L  E                                  Sf Akf OklGINAL CDHPL ~
I/OI/elk 3/07/86 SL)lcf  I:CODES    L START                      UACA OA'CE 10/0 )/84PAGE    I t                                                          4 HOOE  t)/FE            OFSCR          I  PT    I E)N                                    5  T  A  k            F I N I 5 n ACT IVI CY                          CD 0E                                      SCncO          HFP AD  SCtl 40    HEP4 O C  SYSftk fukwuvt 8          t.UH  PDt/A ~ f~ 11?~                                          I:Vt  Nf        I I /0 7/85
      )34444044)                                     I)                                                         I 042
    'SYSTFH fukNOVLk Fclcc PDT/Ae Te 001                ~                                  EVI    Nf          5/12/85 I )4444041                          10000L)0                                                              863 SYSCI  k f Uk'IDVELE lIUlt tct)I/A o f ~
                            ~                      nc)Z ~                      0            t. Vt N I'            /?5/t)5 134444012                            ?000000                                                                756 SY 5 CI')4  T UHNDVE44  I.Ilk PD 1/A ~  C ~ 00 3 ~                                   t:VENT              3/04llc)5 134444013                            Jooonno                                                                19 tl sYSft:H TUHNoaek Fc)k PUC/Aditi ooi.                                        0            CVr 44 f          12/15/84 I 31141011                            4000000                                                                71S SY5 TCH TUHNDVER Fok PDT/A ~ T a 005                m                                  EVEN f              ?/22/4)5 134144045                            5000000                                                                184 "YSTEN TURNOVER          I'Ilk tct)t/A I     006 ~                       0            EVI'H T            5/ I 44/8'5 I 34444046                            Gnooooo                                                                861 SYStFII f UkNOVER        FOH POC/Aa      T ~ 007 ~                                    EVENT              1/ I 4/8S 134444041                            rooooon                                                                926 SYSTI.N TURNDVFk          @OH  POC/Aef      ~ 004) ~                                  EVI.I4T            9/15/85 I 3444 1 04 ct                        t)00004)0                                                             989 SYSTt'H 'fURNUVEH        I'l)k POC/Ao To 04)')o                                        F VENT              tl/22/85 I 31414019                            4000000                                                              965 SYSCLH TukNOVFH Fntc POC/A ~ I ~ 014) ~ A                                                EVL:Nt              5/09/85 I )4414050                          totooono                                                                860 SYSTEN TURNOVER FOR            PDC/A.f. Oio.tl                                          EVENT            I 2/21/Si I ')1114051                        10200000                                                                724 SYSTCH TUIINDVEH I UE4 PDT/A I ~ 010                  C                    0            EVCHl              I/22/85 I 31441052                          10.)00000                                                                153 SYStt H f UHNOVEE4        FU)4 PDC/A ~ T ~ 011                                          EVEHt              3/ I 6/85 1314410'53                          I 1000000                                                              806 SYSTI k TUHNUVFH FOI4          POf/A ~ T ~ 01 J ~                                      F VENT            12/25/84 I )44440'544                        12000000                                                                72S


~LOOF=0/FEACT/VIIY$0ESCRIPfI0NSa)RTOURI:LUOFSESTART5TAHTSCH$nHEPJOOAfhOATEI0/03/84PAGE2FINI5llSCH~0HE$~$n1PUTfHAVH205CREL'NSANJ)'WASHl)lSl~0I2~0003877000IPOTHl)CLCle0I3~0006826800lPOIf8fIUHlllNGCOHPONLTCOOl.INGWATl'40l4~0001'$42400Il4I2/26/841266/$4/85896.I?/I7/cS47I1I/nI/851326/21/85909I/)0/c$576$ACCflI'fl.SIHAACUPWA'IERtRFATING'SYS0)ze000I3861600I2ILI/0I/8461$II/2$/4$469lPOTNAKEUPWtHSfOHAliFCTRANSFER0lh~OT)0?895800$28LI/IS/4$5f050I2/I2/)$5L017POtPR)JCESSSAHPLINGIfaA68)0800l288/09/859>29/05/SS979POTPO'itACCIOENtSAHPLINCI1~I)I.1998400IL48/30/85'739/I2/85986PeIEAPLNSTHUHENTCSERVICI'.AIHl9~A9899800I2l1/LS/859?18/04/85911POfLOSSOFPLANIAIHl9~l)l34414002ACCEf~fANCF.fLSI'$QEAtillNGAt4020~0009NL1l00lAoT~GFNf.HATURSEALUIL22eCI34444IJOIfuR$GCNflAf))HI.u)Rn)L2.81'JII100I4%I~TURL)INCLUOEUILCONDLILl)NLHI,WASIL(JIL0279$2600)287/I5/859212/20/85182l42/20/$$'i7$$2I/Ol/85732I4I0/I5/85L0I'I8/II/85954lor28/85l0323/05/851953/05/851)5I/l4/85745PRJ:l)PNC5YSTIH0)13~000793l000I564/0I/a$58225/26/85811A~f~GcNISOPHASEHUSOUCfCU$)LING021+000l29I7000I7rl2/Ss9247/I8/85930A~f~CLEAN5TFAHHEJ)l)ILERS25)'l'JLanaaIl44/II/85$$$21/24/l)5S1.'i
54$ Rl  CCODES    C  STAkt                        DATA DATE 10/03/84PAGE 2 f
NODE<0/PE.          0  E S C ft    I  P  t  I  4$         N          OUA        5 T A R 't            F I N    I 5  H ACTIVITY                        C4$ DE                                  SCH40        REPS 0  SCHMO            REP4D 4
SYSlFN TURHOVEk Fftk POT/A t 01 I ~                                               EVF.NT          6/I 3/85 I34444055                      13000000                                                          895 SYSTCN fUAHDVEk FOk POT/AoTe 0 11                                                f VC'N f        I? / I 6/4$ 1 L1000000      '3444405o 216 SY5TCN    f UAHOVCA  FUA POT/A of e 0 Isa                                        EVEN  l        LO/3 I/Si 134444051                      15000000                                                          610 SYSTt:N TURNOVER Fflft POT/A          ti  OIC. ~                               CVI;Nf              /
I I I 4/85 134114058                      16000000                                                        1040 SYSTt.N TU44HOVFk F044      POf/A ~ t ~     0 I toA                              C.vt:Nf          S/08/85 131111060                      L  1000000                                                        '>51 SYS'TEN 'TUAHOVFA FOA POT/A~ T ~ 01 7 ~ S                                        EVE.N  f          S/29/4$ 5 I 3144105V                      I t000000                                                          972 SYSTCN TURHOVEk FOk POT/A~f~ OIS~                                                 EVcNt            I /10/85 134444328                      18000000                                                            f41 SYSTt:N TUAHOVE44 FOA 'POT/Aire            019+A                                EVENT            7/14/85      ~
134444062                      I4$ 000000                                                        4$ 26 SYSTEN TURHOVER FOH        $ 40t/Aors 020                                        EVENt          10/I 4/4$ 5 134444063                                        '0000000                                      1018 SYSTCN      fURHOVE41 I Ilk POT/A~ f 021 e 000                                    EVf NT            S/II/85 I '$4444 301                  2 1000000                                                          954 SYSTCN TURHOVEH FDA        PIIT/A~ T ~ 82?                    A                  EVFNT            2/19/85 134444065                      22100000                                                            TSL SYSTEN TUAHOVEA FOR        Pfll/A f 022 fl                                      EVFNf          12/31/Si 134114066                      22200000                                                            TLI SYSTCN 'TURNOVER      Ftlk POt/A ~ f e 022oC                                      FVF.Nl            ?/19/85 I 34114064                    22300000                                                            ts I SYSTCN TUAHQVE41 FOR POT/A 'f               023        ~                         EV4;N t          3/31/85 I 3441406T                    23000000                                                          4121 SYSTI N fURNOVEII O'Ok    POl/A ~ l~ 024              ~                         EVCNT            7/ I I /85 I 31441064$                   24000000                                                            923
                    '5000000 SYsrtft TUAHovck I:ok 134444060 Pflt/A.r.        025.                                  EVEN  f          4/ I /S5 S31 4$


HUOE>0/FEACTSVITYOESCRIPfIUNfARTSCHI0REP$0SllRTECUOESLSfARTOAfAOATE10/03/84PAGEOURFINISHSCHMORE.P$0AefotdsftURBGENERSfAfORCOULIN4WT$$026~000790760018/1drl$59598/29/Bs972AT~CENERATORH2CC02SYS027~0007906800$219/I3/8598110/03/851007aaEnrNUCLEAHilntLERINSt028.00098848001sr17rSs8685/23/85874POlkXRTCIRCSYS89~A6819$$0016/14/85896dr27/us909POTRXkECIRCFLUXC'fRL29~813'4444016216/14/858967/01/85916PRFOPCROHYl$RAULICS030~00098372012PofRESIOUALIIFAfkEHOVAL031DDO68302001357/22/859346/2ll/s59108/25/859688/01/l$5914POTLPCS032e0006856000I4/22/85$$134/28/85849POTHPCS033a00068528001POTAUTOHATICOEPRESSURICATION0310001387d6001POTRCIC036+00068104001VnfStlllttLIOlltOCTRL036*00068432001POtRXVATLRCLEANUP037~00068463001POtFULLPOOLCOOLIN4381187.'$100tClnfRXHLOOSRVf.FUELHANOLINGEOUIP03900011$$221001POtRAUOASttCOHPUTER40~$$1$144401I14211421145/26/$58767/13/859256/28/859105/29rBs8808/09/859525/0I/858514/29/858506/01/858836/07/l$58898/09/859527/I8/859306/II/858938/22/8596S5/23/85S745/19/l$58706/I4/85896
S(IR'f ECODUS    F    Sf A>t f              I>A CA DA f t I 0/0 3/H4PA(it. 3 I(DOE D/FF.             0  E S C  k I    P   f I >I N      Ouk        5 I A k              F I N I S H ACTIVE TY                        CODE                      SCtt)O          kFP>O SCII >0    REPIO J                            4                                    J SvSCI w    fukt OVEk Fok    I OfrA.C. oar .                        tVI.NI            8/ I 5/85
      )34414010                      2(>uonouu                                          958 SYSTtk TURNOVtk Fnk Pnf/A ~ C ~ 02( ~                              EVI ttl          9/s z/85 I 34444 U f I                  2?uoooo>J                                          9dt>
SY'Sf  l.k f URNOVI'k Fnk    PDT/A ~ C ~ 02tt ~                     EVI    Hf        5/I I>/85 134444072                      28000000                                            de)
SVSCI N fukNOVI k F(lit      I>(If/A~ f e 02<) ~ A                  IIVI ttf          I>/I I/d5
      $ 344440)4                      29>)nooun                                          <I<)5 SY'5  fl:k  CURNOVtk F<sk PDC/A o I ~ 0 )no                        EVI    Hf          tlat?I /HS 7/?
l34414UTS                      3nuooouu                                            'I 3 I SYSTI>N CURNOVtk FO'I I>OT/Aa l ~          03!  ~                I.'Vt. N I        er?rrHS I 344440    1(>                3(uounoo                                            Vn  J SV5(t.t( rukt>OYEN FDw      u(tr/A.f 032.
PI>                                    I.V( Hr          4/? I/db I344440ff                      32uuuouo CYST>.'JI  TURNOVEII I  Ilk I>ttf/A~ f ~  0 3)e                  tvt Nr            5/24/d5 I $ 444401u                      $ )onunnu                                          I)IS SYST( N fuktlOVCII I'Ok      PDI/A ~ Ce 034 e                      tvt.tt  C        rrszrde I 311440    1 <I                '$4unuoun                                            I24 IYST(N CUI>NOVEk      II)k PtlfrA.C. 0>,.                        UV>.N'C          6/2 J/'$5 I $ 1444080                      $ 5oououu                                          <J 0')
SY 5 ft JI I Ukt>OVt>t  FO>I    (/A r ~   0 3>. ~                LVI HC            5/2d/85
      $ $ 4444U8$                     Jeaoouun                                            dl.l
    'bbfI>N 'I>INN(JVFtt I-Ok Pttf/A ~ (o 0 lie                        LVI:NI            8/od/d5 IJ4444082                        Ifnnuuon                                          95 I SVSTEII    I URNDVEtt FQk I>O'(/A ~ f ~ 0 $ >I                    EVENT            sro2/ds I'$444408.l                    3doououu                                            t>5 3
(:  SY'if k CUIINOV('.k
          >-              FOR  P(tf/A ~ I    0 I'J ~                EVF Nf            4/2 d/>$ 5 l34444084                      3900unun                                            848
    'pvSII H CUkNOVEN Ft)k PUC/A+I ~ 040 ~ II                           EVcN f            5/31/<Ib l344440(IS                      40ouuooo                                            UH2
    >YSC Lk TukNOVF>I I Ot>      P(lf/A    C ~ 040  ~ A              tVtNT            Ur I u/<$ 5 l$ 4444udt>                    40uounno                                            984


Si)RILcnotsESTAAft)ATAIJATt10/03/84PAGE4NOOEAO/Ft~ACTIVITY4OFSCIIIPfIONOUR5fARISCH)nHEP)l)FINI5HSCHMOHFP)nPOf4ti)UIDHAOIIASTESYS40+AI08084001PAtOPSOLI0HAOS*SIF,041~000IndisanoI'I/II/Ss98542Io/21/85I025I0/I5/851019I2/0I/sslocapt)foFFGAsoizaoon13'Jod?001li10/Is/ssIOLIJ10/28/db1032CPATI'IHE'PHI)tECtII)Nwhtt'R04)000129015001216/01/858896/21/85909PofFOANFlktPusttctLON044~00019046001146/28/ss91'/II/85923pntcn2FIREpuatcctloNois.ooo8955200I141/12/859241/25rss'JI1POTIIAFPRI)TECfIONHALI)N0460008905100128I0/18/851022II/I4/85104'9PnfFIHEOtftCTIUNCCONPUTEH41~0I2')02I00IATAU)IHULL.FR4S.O8852000IAof~TUR')INEBLOGHofVATFH4GLYCOL4I~II13444402bA~'1~HI)1IIATtAHEAfINGO')ehddlboooIAfR)IULUGII>)IVhtEACGLYCOL49~I)I3444407114141/2erds93d2/26/Ss1Sd6/nb/ds88la/Ob/dbsar6/lnrd5d92I0/I1/8510213/II/858016/I8/sS900errb/8'b9014/23/ds900h1~HAI)llhsttULOGH()tVATFRG4LYCIJL49.CI34444026ACCLVtOOHESflCwhfEA050~00013Ndrroo)14rro2rss914I/01/de10911/15/ds921I/I4/deLLLOPI)IAtACfOIISLOGVI.Nf052~0008916200IV<)tCtktIILU4CHILI.EDSAfER53~III.)444402914'141/os>85)lb4/28/SsS491/I6/859285/II/8'5862
Sukt  c.Cuf>US    t: GTAHT                      DATA DATI: 10/oy/UIPAGF t
NDDE=U/FE            D E  5      C  f4 I P    I I  II N        DUR          S  I  A  >4 t          F I  NI  SN ACTI VI TY                        CODE                          SC))au        HEP  au  SCN'D        HLP>D I                                                                         t                      4 SYSTE>t TURNDVE>4    Fuk POT/A ~ T ~ 041 ~                              EVI.NT            10/20/t)5 I 34444 0HT                        I  I OOOO UA                                            1024 SYSft >4 TUH>>OVER    Fu>4      PDT/A ~ f ~ 04?    ~                    Evt Nr            10/I 4/H5 I 344440UU                        424)00000                                                IOI 0 c  svstrN    TUHNOVFH  I:ult      pot/A I n4).                0          Kvt NT              6/ot IHS 13444405')                         4  3000000                                                4)SH SYStt'N fuk>>OVI St  > 4) ~ I  POT/A ~ To 044    ~                     I. V>'N I          6/2 I/445 I )4444090                        44000000                                                  ')09 5'Vof4,N IUIINUVF>t I-ult        P(lt/A ~ f o 04'Se                      Evl:Nt              ?/I I/HS I 344440') I                      45000000                                                  923 SYSTE>t IUHNOVFH Ft)lt PDTIA ~ Ta            046  o                    C.VLN T            10/ I Tl t)5 134444092.                         46000000                                                10? I
  'SYSfl.N TUI4NUVEII I uk        Pf)f/A ~ T ~ Ah le                      Evt Nt              ? I? "/HS 134444093                          47000000                                                  931 SYSfLN TURNOVC>4 I t)R          Put/A ~ T ~  04H ~                      E,VENT              ?/? S/tlS 134444U94                          441900000                                                  141 I SYSTLN TURNOVE>4 FOll POT/A+              tv 04 ~
                                                      )~A                    FVENT              6/0 4/U5 134444096                          4>>000000                                                  at)6 SVSfCH tuHNOVFH Fnk              PAI/A    t. 04).D          0          FVL NT              I>/0 I/HS I 34 444>) 94)                    4900000>)      ~                                        UH6 SY'LH      fukNOVEH Fuk f Ol/A 1 049 ~ u                                  EVI. Nt            6/09/85 13444409I                          49OOOuoo                                                  H91 UVSf t:H TUHNDVElt I'ul4        Puf/A ~ I ~ 049 ~ C                      E  VI. N t          7/0 I /t)5 134444096                          I')4) 00000 SYSTC N IURNOVE>t FOlt I Of IA ~ I ~ OSA                                  EVI.'N T          12/'3 I /85 13444409')                         60000000                                                1096 SYS'll H IUHNOVFH FOH l>l>t/A~ t ~ OSI              ~  OUA                rvt NI              5/31/HS I 3 IIII )? 3                      5 1000000                                                UH2 SYSTCH TultNOVFlt FOil POT/A ~ I ~ OS?~                                  Evl:Nt              ?/02/05 I 14441100                        S?000000                                                  914 SYSTI V TURNOVER      I u>4      4>uf/* ~ f ~ 053 ~ II                   EVENT              I/2 Tl>>S I )4444101                        53000000                                                  UIU


aaHOSE>0/I'.I:OF.5CHIPI'UNACT!VIfYTaaPorCraaL)SLOG<<VACS3~A13444402tssuRtLcoot."5aOUH215/12/AS56.$SfARTSTARSC<<at)REPRODATASATEIo/03/84PAGE5~aFINISHSCHaoREP)0a6/01/55dd3PnfCTkLRkPRF.SSU<at:TSt51C8ts85205I14Il/15/551050II/?as/85IO63A~f~t<U)t<aLSVCOLDGHVAC54~A89307001145/0I/55944ta/14/5<3951Af~LIlta)ukilltnkluf545I34444Q.sa)PnTIUklsOLO4VI.NT055~000$852200121S/0I/559442510/0I/t)5I0058/?I/85964lo/2d/d51032pntHA))dAstEa'la.oGpRcSSU)IF,tFsT5nHI~i4444031PnfHAUVASffHVACnb+A5511500114Lo/L6/55I02<)1410/16/a)5I02l)10/?<)/5510$)LO/29/851033pntusLGENERATORtavAc051ooot)912000IPOI'UXSSHVICt.OLOGCELCCTUNNa.L)IVAC55~t)SA900001HIPS059+ASI2~S9ea)0I2POTPR))cfAURf;05douoo21283/I7/555011/Itl/559304/06/555278/14/559574~ToSckka)LLCDSLlLRLPHPCHISCVlNi'ta<S~Asasdn2001Pl)fPR))cFoukt05)s~Aoolsd001-3~59co2~c04-con)2I2/07/551692/21/55789AeT~AUXf)UILEHCC)tLLLEHULOG<<VACndecAHSV000IrufPRtlccnukio55.cool59.col,5).codl71/15/859307/?4/8593hCPntOl<Y))ELLCOOLLNG(<0~0daaonl00I1411/nl/551036II/I4/t)51049ra)tPk)HAHYCONTALNHLNTPUH4561.stSSOituOIpofsT*kl)BYGAsT<ILAfHENTnlA5<s02n00314ls/14/s595)a5/2ti/559718/21/859709/I7/559<)Il<a)I"tCa)<)OARYcnklAINHLNtLC'AKTC5In)CI.)~a0<<700I14')/I5/5599210/0I/db100<
suR f t CODES    t: START                    UAfA DATE 10/03/84PAGE 5 0
HOOE-0/F E          DESCA        I  P  f I ON          OUR        5 T A H                F I N I S N ACT IV I f Y                  cnoE                        SCN40        HEP44)  SC1440      REPin SYSTEl4 TURNOVER I OH      POT/Aif ~ 05      I   A      0        LVt: Nl'           5/I I /85 134444L02                      53000000                                              4)62 SYSTE)4 fUHNQVFH FOH        Pnf/A ~ f ~  OS I ~ C                      YEN I        I I/14/85 I34444103                      5300@009                                              1049 SVSTL H TURNOVER    Fuk Pof/A ~ 7 ~ nS4        ~ A                LV( 14T            7/31/85 I 34444 101                    54000000                                              943 SVSfEH IukNQVI;K F~)k      Pnf/A I      051 ~ u                    (. VI NI          7/ 11/I$ 5 I 34414105                    S4000000                                              94    3
  'sf134411 EH TUHNAVEH LOO I'ilk I'nf/A~ I ~
S5000000 Ob'    ~                   I. VLNI            9/50/tj5 1004 SYsfrH    TUHNOYEH  I'olt. POT/A ~ f ~ 056 ~ A                      f. VElt f        I 0/15/85 L  34144L07                    56000000                                              1019 SYSTEH    fukknvEk I.uk    por/A.r.      Osc    .u                  t:Vt'Nf          10/15/8'5 I 314441 72                    S6000000                                              1019 SYSTLll TURNOVEH I'Qk I AT/Aef~ 057                                  Evt Nf            3/ I 6/c$ 5 I ) 1444 I 04)                 sfununuu                                              t)06 SVSf4 l4 I UHllnVEH Fl)H PU    I/A~ f ~ nuke                        EVt  Nf        12/20/84 I 11414 12')                   58000000                                              720 svsffll    TUANOvEH  Fnl Pnr/A.f. nu ).A    ~
EVL Nf            3/?8/85 I 14414111                    5'l $ 00000                                            4) I 44 SYSTI'H    fUHNnvtk I 4)k  I'uf/*  ~T ~ alu9 ~ H                  LVLNf              4/ub/us I 34444 104                    S9200000                                              827 SVSfLH TUANOVEH I nk Pu'f/A ~ Te n>vsC                              I  VLNT            7/ I 7/85 I $ 1444 110                  59sounnu                                              929 C SVSffk    TUANUVEA  Fnlt Pof/A ~ f ~ Onus                          E.VL'Nr          10/31/85 134411112                      4 00000un                                            10 15 SYSTI H TUANOVEk Fnk        Pnf/A ~ 'f a Out ~ I)                   EVr Nf            8/ I 3/4)5 1.1441411 I                    a lnnuunu                                              956 SYSTEH TUHNOVEH      I'nk PDI/A ~ f ~ Odl eA                        EVEN    f          8/2 7/t)5 1.34144 I 11                  61000000                                              970
  'SYSTI-H Tukt<OVEH  I')lit Pnf/A ~ 'f a Onl    oC                  Eve  Nr          9/I 7/85 I 11444030
      ~                           4 1000000                                              9'1 I


NODE=A/Ff0f:5CR'IPIIIINACTINITY5:)HlFCDDESCSTARt1OUR5TAHI'Ctt~DIIEP~IS1oAtADArE10/Q.S/e1PAGEcFINI5HSCIStAHEPt0POfUAA<12Ht.'CDHUINER062000Sttl58001POfIIX<SLAGFLtIAHDRAINS63~tt<tttu1200.$11II/0<t/tt51013217/<>I/O'iVlbII/2I/8510'idtt/II/dbVSdPATHXILDt>ttt'JIPttR*IHS63~AVd012001PAlfURISINt'SLUGF<lttlt~DRAINSn1~A7tt01600I21I/29/tt5510127/71/tt'>9Jo0/Q,S/tt5V771/15/85810PATTUNISINE;ttLDGFLOORIIHAINS615I'11111032213/29/855191/Itl/8553VPRIS)PHVULDGDRAINS065~0001093I76001219/01/85.V7>9/21/85095A~lHESERVEt>IANSFARttt'HAHFADRAINS6bAItl017001PAlCANDENSAffSlARAGEALDGDRAINS6btt2tt3v7Q0I9/Qd/859809/al/tlatVdtt9/IV/d59939/IV/859<13Aof~ASIX5OILERUIIAINS6heG850070019/06/db9509/I9/ISS993PATISSLGtHFltATAttFLOORDRAINS6n.C100170010/06/85vtt0'9/I9/tt5VQSAe7eHX<SATIIRAIN'i66+KV+3600019/Qa/859tttt0/10/SS903AoI'C<INfRDLISLDG>fUNHI,LISRAINSdnItt>t017001A~fettAIHTHAN'iFSSRHEIIAHCAtt>IAIHSt>n<tt12<SOIVQQI110/06/85Vtt00/06/859509/I9/db9039/19/d5993A~l~S>EIIVICI'.BLDGUHAINS6haLd<S3070019/06/ts59ttu9/IV/85903PDfHAIN5'TACKDRAINS66~J58717001Ae'f~SCMFENI>ELLtSLDGDRAINS66eDlttdh70010/06/d598010/QS/8510009/IV/8590II0/IIS/051022
Si)Rf Auk ECOOES    f 5 C A H Sf Akl'ACA      F    I N I 5 II AACE 4
lo/0.$ /t)1PAUL
                                                                                                                                ~
HOOE=O/FE                  0 F S C H    I V    C  I 0 N ACf IVI fr                        CI)ut                    SCII>A       HFP)O  SCHWA            HEPTA SYSTI!H TURNOVFH O'Ak PO'f/A ~ T ~ 06?              ~                 Evt.Nt          I I /01>CC$ 5 1.$ 4444 I 15                    62000000                                          1042 SYSTEH TUHNAVEH FC)k POT/A                T ~ 06 I    A              Evt NT            7/23/d5 1344441 1)                        63000000                                              9$ 5 SYSTCH tc)RNOVE>4          I l)k Pnf/A ~ f ~ da I ~ II                I vtNC            7/2 3/ t)5 I 3444>4 I I a                    4300000>I                                            93'5 SY  ift.k    TU>C)>AVI:IC I CI>4 Puf/As to 061    occ                LV>;N f          3/? II/d5 1.$ 44441    ld                  C>4000000                                            t)l 0 SY  itt.k    TUICCCOVEIC FCIH    Vt)t/Ail'U1.A                        FVI NC            3/2 II/05 I 3 I 4 1 4 I I ')                c>4000000                                            I) I >I SYS'fLH TURNAVEI4          FUIC  Pnf/A ~ t~ 065 ~                     Evc,NT            tl/31/d5 I $ 4444120                      c>5000000                                            ~
                                                                                                ))4 SYSTEH TURNOVEH Fntt POC/Ao                T~   oan>C                  EVENT            9/05/85 I 34414 I 22                      acoooooo                                              9r9 SYStt:H TuttNOVEH FAH            Vnt/A t ~    obc    N              F V(. N C        9/05/85 I 34444 121                      an000000                                                )r)
Jr 5'f CH    CUICNOVEH    I')tt  POT/A ~ I ~ 0 an > II                EVI.NC            9/0 5/c)5 131441121                        c 4OOOOOA                                            c)l )
SYSfEH TUHNOVEI4 FOH              Puf/Ao T ~ ohn+K                    EVF.N'C          9/05/d5 131141130                        ac>0000 oui                                          >) )')
SYSTLH TURtIOVLH I'u>C I AC/A ~ t ~ 064>            ~ t              F VCNC            c) /0 5/ d5 I .'$1444 I 2b                    C aOOOOOO                                            9)')
SY5Tt.k TURNOVFH I'OH t>t)C/A ~ t ~ OC>n               A    0        Evc:Nt            9/0 >/d5 134444 123                        c c uooooo                                            919 SYSf EH TUHNOVEH FAI4 Vt)f/Ae f o oha                ~G                EVEN f            9/0 5/05 134444L24>                        44000000                                              979 SYSf t>C TUHNAVFk Fc)H PAC/A                f ~ 046    3                Evc:44t          9/05/05 434414124                        aaooooon                                            97 i)
SYSTI.H TUHNOVEH Fuk I 34144 I 24$    '6000000  Vut/Ae T ~ 046oL          0          Evt:N T          9/0 5/05 979 SYStt-:H TUIINOVEH Fnk I          OT/A.f. 044.n                        EVENT          10/04/4$ 5 L  34441 129                      66000000                                          I ooct


HaoF=O/FFACTI'gITYOFSCNIPfIQNSORTFCOOESESfARf~stOURSIAkTSCHJOREMI>OAfAOATCIo/03/54PAGE7ttFINI5HSCHtnRFPJOPREOPORYVEJIFLf,E4JDRAINS06100097056OOI141/?4/85936$/ocras949CPJJTLOP/CCCSFUNCTLONAI070000I?9975001POTUPS2A,tl71E-21295600012110/18/$515221412/OI/4$4701LI/01/85104212/I4/4$4714PnfUPS3A~t$7I~5-I129ih0003I4L2/24/4$4124I/06/85737POT4JPSIA~tltC4040'ILEI12956ooas147roerds9t4$7/19/ds931Por'448vocOAfrEHY73~4$1.19252oaI214/Isrds5977/05/ss917Pnf125VJJATTCRY73+AI'JlsooolPttrOIV3JJATTEHY14~C134444004POTOIVIu*frERY14.A19040001POTOIV2IJAfTERY14~tl134444003CPnfTAftONANOENtttCit.NCYLIattfIN4'15000L29LS200LPOTJ4LNTCOJ444UNICATION016~000l?d?12001cpo'IkcttorF.5HUfaovNpANtt.old0001288.$0003PnfAREANADIAfIONHONIf4JRIN<7'I0IL9370001pnrpRtlcEssRAOxoNlroktNOodo.oooI15061001CPttEOPCJINfLEAKNONIIORINO081~000Vd7d?00128frolrds4JI33/IO/85440014I/I1/85501143/I1/85tl01216/I2/4155941410/04/55load21425/21/ds57d7/I5/559273510/04/88%100521LO/18/5510227/2tt/d59403/23/4$58133/30/8582a3/30/85tt20II/07/ds10427/02/415914I0/I1/8510216/Ierds$9d8/25/55965IIrnfrds1042
SI)Rt  t couis      I  sfAHT                        OAIA OATE Lo/0 I/81PAGE HQDE> O/I'             0      C R  I P I I I)            OUR          5 T    A N T            F  I N I S H Acf IVI IV                    conf                        SCII ~ I)      f H P ~ I)  scn)n          RL.I )n 4
svstt    H TUHNUVLH    Fod  pot/A f ~ oui.                        tViNT                7/2 3/dS I 34411 I.) I                6 700(000                                                93S SY ST).N TUBNOVf k    POT/A ~ T 068 ~ 000                          FVI.NI                9/I 2/ds I 34111)IS                    lo80000uu                                                'J du SVSftN fuHN()VI k PI)t/Ao t ouueood                      0          LVI.Nf                7/ll/ds I 341443) 3                  69000000                                                923 C  'SY)lftH IUHNOVI It t'I)et  Put/A e t ~    0 lo ~                  Lvt HT                3/01/d6 I.')4114 I )2                  10000000                                              I I62 Svsft H f UkNOVI'll PI) f/A~ I    0  ll  ~ Aou                      L'VI II f            I/I 1/ )5 I 34444 Ll I                  1LL00000                                                lid SYsfhN I URNOVLH      FOH  POT/* ~ T ~ 0 1l ~ II                  I VI.HT              I/L 3/85 I 31111327                    1 I douooo                                              744 SYSfLN TURHOVEk I Ok        PI)f/A~ f ~ 012    ~                 I.VI.IIf            I I/)6/d4 I34444326                      12000000                                                b86 svsrtk ru)tkovt)t      Fnk  pot/A.r. oil.n                        EVENr                h/)4/ds I 34114 I 3u                  13000000                                                I)9u I
Sv S t. H TUHNOVtH    I'nk I'0 t/A ~ T ~ 0 1 3    A                t vuHr              6/ lu/d5 I 31114 I 13                  1 loouooo                                              4)2 svsrt:.H rukt    ovfk Fn)>>  por/A.r. oil.c                        tvtNT                3/Oc)/85 I )4444I 31                    14uooouo                                                79')
SYSTL.H luHNI)VEH    Fuk VOI/A~ I ~ nil.A                        LVLNI                3/ I 6/85 I 34141 I 3')                  14000000                                                806 SYSTEN tUHNOVFH        I'Ilk POT/A et ~ 011 ~ II                                          3/l6/85 I )4144) 38                    lloouuoo                        EVLHI'VFNT              808 C  SYSTC H 'fUHNOVtk FOll I ~ I)f/Ae      T ~  01'se                                      IO/Ll/ds I 34441llo                    15000unu                                              I 02 I SVSTFH TURNOVER Fnlt        Puf/A ~ fi dla~                        EvaHr                5/II/ds I 31141I4 I                    76000000                                                89  3 SY Sf)  N TUHI<OVLtt  Pl)f/Ao t 011 ~ 000                          Fvt NT              6/27/db I 31414301                    11000000                                                909 svsrt'.H ruHNovfk Fuk      Por/*.r. nfl.                          E%>T              I 0/0  I/ds I  l4444)42                    1duooooo                                              )00 7


NOOEiO/FEOESCRIPtIO)tACTIVITYSORTCCOOCSDUH5'IART5fAIt'TSett)OHEP~O4I)A'fADATEI0/03/54PAG'E8FINISttSC)ttOREP)DCPRLOPCOttfATNOSP)ILRCNONITORLNGSYSOc)2~00099405001anfPRINARYCONTAINNC)ttISOLAtIONNSSSS03c)862d00535IO/15/5510225/27/8587HII/21/5510566/II/8559t)CPHEOPPOLAkCt)ANC081+00059017001145/17/85ttt)55/3u/55551CPIIFOPLEAKOtcTt.'CfIONUc)S~000970C)400I35IU/04/Hb1008IImr/851042POTVIUNONITURINGHPV056m699cc5011149/06/859509/19/c)5993PHIOPCONTAIN)tCNT6INE)tIINGSYSOt)8~00899297001POTSEISNICNONITOHINGSYS090m00013900HOOI1410/IS/55101979/06/t)598010/28/8510329/12/85986CPOfPRI)CCSSCOHPUtCR91~A959940018110/01/55LUOH12/26/c)51091POTAPttttS')2eC13950400LP!)TSRNS92~A134414c)10POfIHNS92e5131444011anrRnoRLUCKNONIfOHING093~000L3937400IPI)tfIPSY5091~000L3869000I141414145/12/ci59558/L2/85956c)/I2/859%56/21/85906c)/I2/5c>9558/25/559688/25/559h58/25/859687/07/859199/Oe/t)5982POTttOUWORTtiNLNINICI.Rc)6eAllc)469001216/24/559067/14/85926POTHOI)SEc)UENCECTIIL95+5I34441U33216/21/559067/14/8592tcanftcnuInslflt)NINDICATION6H)tNNLCTRL0')600I3841900128b/24/559067/at/55933
Sc)AT  I:CADAS    I: STAAf                        OAf* OAT C 10/03/cciVA46 8 J                                                s                    s NOAE=A/FF            0 6 5    C R  I li t I          A Ic      OUA        5 T A k                F    I N I 5 N ACTI Vl fY                      CIAJF.                          SCII ~ U      AEP ~ IJ  SCCA          ul.PE I) s                          s              s SYSfl'k    TUICNOVEN Fc)N    POT/A ~ f o 019          ~                   tvf Nf              5/26/85 134444143                      79000000 SYSTCSC    TUANC)VFIC FC)u 'I  Ot/* t    ~   nc)Q.            0          hvf Nt              7/ I 4/85 I 34444141                      cl 0 0 0 cl c) 0 0                                            97cc C  SYSTIN TUICNOVEIC Fku POT/A ~ I ~ onl                  ~                  4 VI  Nf          10/0 I/nb I 31444 115                    8 1000000                                                    ton 1 C  SYSTI.N 'IUfcNAVLII I l)u Pc)T/A        t      082                        FV..NT            I 0/I 1/IS5 I 34444 I 4 cc                  8/onoooo                                                    I 0/ I SYSTLN TUIINovl:cl    I l)lc Pllt/A~ T ~ 08 I ~                            CVFN I              5/2 Cc/ c)5 1,34444039                      83000000                                                      811 C  'SY.'iTLV  fURNOVFiC  FO,C  PO'f/A f ~ 084            ~                   I VI Nf              5/ I 6/85 134414 147                      84000000                                                      861 C  SYST Jell TURNOVER Ff)k I      Of/A ~ t ~      Onb ~                      FVCNT              I 0/0 3/c)5 I 31414 I 4 cl                  85000000                                                    lon7 SYStf:N TURNOVER FI)k        I'Af/A~ T ~ 086 ~                            QVI  Nf            9/0 5/c)5 1311 ~ 1119                    cl4000000 SYSTI:N TURNOVf lc PU      I/A~ T  081 ~ 000                              CJVI  Nt            3/'P 4/c)5 13444430c)                     cl7000000                                                    III 1 CYST LSC  f UANAVFi) 1 Uk PAf/A ~ f ~         On)i ~                     FVL Nr            IQ/14/85 I 34444 150                    niloocJooo                                                  101  cs SY'Sf 1.k TURNOVFA Fc)lc      likf/A f ~
                                          ~        oils) ~                    LANt                9/05/85 I 31414151                      'JQQQQQQQ                                                      979 C SYSTI:sc tUANAVFN Ff Ice PAT/A            I ~ 0 JI.A                        CcVI N  f          10/0 3/cl5 I 34444)b I                      J  100 norm                                                1001 SYSTUJC    TUAICIJVFJC Ff)k PI) TI Ae I ~ 092+C                            C.VLHT              8/I I/85 I 34144154                        J2ooooon                                                    954
    'iYS ILll f UANOVI N  FOA POT/A ~ 1      ~    O'Jt ell                    CVI.NT              8/11/c)5 134444155                      'J7000000                                                      954 SYSTLN I UANOVEA FO'I        Pkf/Ae I ~        O'J2    ~A                  Cva  Nt            Jl/11/85 I 34414156 I'/P 9RQOQQQO                                                      954 SYSIC N TUANOVEIC FAN        Iskt/A~ I e      0  J  I~                  "Vf'-M"')of                I/c)5 I )4111151                      ~ I soooono                                                    9O'.i


NODE>0/FE~ACTIVITY40DESCRIPfInSORtECUOSSESTARto4DUR5IARsckinkFpi0DATADATE10/03/84PAGE9FINISHSCOLDm.P~0PnfRXPROTECTION097+000I2890400I2L5/27/858re8/I0/85898A~f~fURUINFGI.NI.HATOHPROTECTION9807933000II4.10/15/d510IVI0/28/851032POTSTOOYI)SLGFNFRATOHDIV2100eA49147001303/31/858214/29/05850PnfSTORYDSLCI'NFRTATOHDIVI100~A49147003JO4/07/858/d5/06/85857PnfNPCSOSlDIV3100eN4'J30400128I/24/858144/?0/85841AetoRAOVAStF.BI.OGCRANE101oB1344440354~f~TUROLNEOI.OGCkANE.101~AI34444034Ao'toACCFPTOECONTANINATION102e000I189220141410/Ld/0510221412/01/85I0083/Id/85808IQ/31/851035I?/I4/8510793/11/85821AefaSlTESECURLTYSYS104a0L3827600L4/01/858224/28/85849CPntGFTARS105.134444015PREOPHFOUNDANfHFACfIVItYCNTLSYS106000994840012LLO/04/851008287/15/8592710/24/8510288/IL/85954 ra REPORtStOHANACERSHOUNONORCANI(Af(ONCHARfFOROAILTO(RECIIONSTARTUPANDTESTORGANIZATIONSIAR(IHIPHANACER~tt((vfaoeNHP2SIASUPt~attotl10/04/84DATE/.k!TZ5flttvtMCC'I~8CEOPSHCRtot(f5SR~ADHINAlOENHP2OPERAIICNSORCANI2(IICN(SEEOPSORCCHAR(I~wssratlcvsvtftl~tcvccvloaffere.l./<rSvfcta(acctaDIlsottceslvc(RDifffCHIKCRASSletII5TCHELEC(tvtl5NHPCI/OtlANACER(SUPTIESIINC),TCHHECHSLACvsvaePAECARI(t0~IvtlCILLavcfVial(4LEADIKCIRMERLEADELECT<<CISVCRlea(ITAUCNNASICRINT(ESTCOOROSRASSMDLEADSECHR(5TICAASStPAE1AOCLICSAesIetTEUoe(514SICCAKRIIALVMDI$$tatesv(NIN115ICDCL10IAIC<<<<($5<<ALITAV10CI(I<<OCAI41ICSCCORCCCRVIat.sl11114(SILO~~5$.<<~SUAvIvaCL5~.$1.~1SNDCNMCR55.II.I~VIliC~M(R~OLD(eICSRUILCOCCIELCfleTS.T4.IAvVf4R(lo4$~4$DCICRI5~~ICSLMCIVOCfEfuv(tRVRtf(SMCCTlLLCSVALfoela<<flLf4'le5I(TERcoaltIIESTCOOID(CStCltleCvatcv<<<<elfe~AINCSVITAtUce10.4~~5.44CNIDIUDale<<ave~I4$~I1el(soePLANTHLfPLANIHAINt(KCSUPTELECTCATO(v(ella(INfEafefSlLOVCSC~I105AC~SC~It.40Maoflle0O(CSOIVALDTCSCNMtatICS5IOCMANTE(EClat(Sf5CLM(coot11ICCVLLOVCN5Joeesoe~CNEVNAI44tat(Lts.ttTEIPNILIIAOATISCNIICCRSRlL51ttNalvcvos1511OCTANI'IDovesLfoovs11aUlI~OLII0(tISOVALf10.11~ILOVTO(IIIMflRD~1~4Eta54$ToefaI~Lfalefes~1CRATCALLvt5ICSLfef1(CS4lINISOTAILtoltOtlL4~101vcfesltIESURI115AIDI~<<14TIIICLS(e1.1Iala(A1TOst(~CCA1~ICTA'Ce15.SIICLL$$5(NIAIDv(VILLMil100ta'ICfitV(IaCONStSUPTELECILave(TCCOPLAN(HA(NttCSHECHCttstfECovlttaftNIOROClfICLAACNIDROOONCRI0INIORDICONIORDttILL<<IIDROe(CCN11$CILLISVLVSNNICVSTI.44NCAS~Sevtt(RSMlCTICLLO10$.01CffsltCCR'CtfIVOOCtvttICStEROLOO$1ICVRAIMlNAVSlfTRICD$0TaLAES$4NatCI~SIASIATIlfEtEIELfvls10=INAC<<<<LOItetcootaololCeaafl~I~t(0001$40MMI~5~5MOCTIONI0lIRvle15'4SC've(IDEA$4~Ctvlt1$Tvav<lsfCR$5<<Ctatfe<<$1tlALUS'C$$VILLIS$4tl(RLINCSltvCLCNM$1~aatSCNI~.'5051tav't(tE104aCONSIICSfCStCSSUPTto<<COICCVICI<<foe<<SAI($ttlMtttfPLANN('ICULOIACIIIERSSRDCROILMCfAeleCtRA1ICRIott1IfCMO~CtSCNVARII'TCNCLLCRRAttCeIAIRNOYERNALCtceaeAOIIINSvttORI5(ottNOVESN(11AftstDsttEVSVISOTKCCLITCAIROICVINALTULLCRCLERICALCvteffLCCCNILLCR(001CRICDERefhtstOV5ITERSSINK5'Iae(C<<CTOACOSIACalet(LLOILS(atRof5IVRIKfACC('ICCNILIOe<<CCMKSIC(ACRCHOCACOv($IOeCNOCICIICeclvcasI@jgg@0106-0~XvaBe618OaAperheegaza
sukr  aconrs      =  srAkr                          OAT A  OATS'0/0 I/SIPAO>F-
~~ty(~(l,fal AGENDAITEM89ITEM:DetaileddiscussionofpotentialschedularinfluenceduetochangesattributedtoNUREG-0737andotherrecentlicensingrequirements.CURRENTSTATUS:NUREG0737,ATWSandAppendixRrequirementshavebeenincorporatedintheprojectschedule.Theresolutionofsomelicensingopenitemsmayresultinadditionaldesignorconstructionwork.'penitemsthatcouldhaveanimpactare:a.DieselGeneratorAirDriersb.Break-exclusionzoneforReactorMaterClean-upSystempiping.(SeeItem813a5bformoredetail)
            ~            ~                                                                                   t                      t HOOF=0/FL'              e s c u I p r I                      OIJk        5 r A R      r          F I N      I S N Ac JIVI TY                      CIIOt                        SCN>O          RLP>u    SCNin            At.l'Io t            ~                                                         t SYSTLH TURNOVI:k Fuk        Pof/A ~ To      U')4  ~        0          avcNr                N/ I I /ds I 3444115d                      940000IJO                                                  954 SYSTCH    tuktn)VI k t nW  Pot/A ~ f       0 I >.A
                                                  ~
I: VI!Nl              I /2 5/NS I )1141 160                    95000000                                              ~     >Jon svstt.tt tukt Uvek    Ft)k  Por/A.r.       n'J'>  ll                t.VI Hf              6/? 3/   )5 134144159                      9500000u                                                    905 SYSTI'.H TUANOVf:>I Fl)k    Pof/Aol o      O'Jh  ~                    I:V>.H f              4/? I/d5 131441 161                      9hnouooU                                                    Ou'>
  "SYSTt'H TUANOvtk I'I)lt    Pnf/Aoto 09?          ~                    I't:Hr                5/26/d5 1.5441 1 I 62                  9 foquooo                                                  dl I SYSTC)t fukNOVI;k Fnk      PI)f/A~ t      09d  ~                    Evt Hr              10/14/15 1344441hJ                      'J >)0000 >)0                                            I 0 I c)
SYSTLlH TUkt>OVI!k    Fnk I'I) f/Ao f ~ I 00 ~ A OSL  3              C  VI.H f            3/)ul>)5 L 34144164                    100100000                                                    N7.0
  'SYSTI H  f URNOVFk t O>t  Pnf /Ao f o I unoA l)SL I                  CVI    Nr            1/06/t)5 134414 166                    I onl oonuu SYSTEH TURNOVER Fok        I>of/A~ f      I un U OSL 2              UVLHf                3/2 3/ds I 51411L6t>                  100 >ouoUU                                                    I) I 3 SYSTt.k tURNOVFII t Ok POT/Aolo lul ~ IS                              FVI Nt              Io/I I/d5 I 344 41 I hd                I o lonuoun                                                1071 SYSTI H tUANI)VFk I-OII    I>lll/A~ to lul oi                        LVI,Nf              I I/ Sulds I 31141 14 I                  Iulonouun                                                  106    >
SY'll:It  TUANOVI.k t'l)k POT/A ~ r I ).        ~                   iV.".Itt              3/ I T/>SS I 3141416'J                  I u?uuuuou                                                    I)0 7 SY5TEH TURNS)VFk I t)k POT/Ao To Iu 1 ~ uun                            I:Vt:Hf              0/I I/ds I )4144 52'.>                103000000                                                    954 SYS'll H lUANOVCk    )=Ok  POT/A ~ T      IU1 o                      E VI'.tl I            3/11/db.
I )44411 ?U I $ 4444142 I 01000000 SYSft'H TUIINOVER Fok POT/Aol ~ Iu'>
105000000 F.VI:H  I'o/0          U21 Inn r 5/dh SY'stt H TUIIHOVC>I Fnk POT/A T 106'
        )4444 I JI                  luhuuuoUO Ft Irh N f. '/14/ds    926


AGENDAITEM510ITEN:Discussionofschedularimpact,ifany,regardingpotentialdeficienciespepoptedinaccordancewith10CFR~O~~'tej.CURRENTSTATUS:Seefollowingpages.
4 SOI) 1 E.CUOI'5    F. 5 SAII T                DAtA DAYQ l0/Oi/84PAGF. l0
)IOOF.= I I/F C    D L'  C  H l P  i  I I) N    DU)I          5  l A II  )    F  I N I 5  11 ACT!VI)Y              C:) Ol.                    SCNI0        IIFPIO SCII ~O     IIrV<O C  SYSCt'H CUIINOVEII FUk  POT/Aaf ~ l 01 ~ 000                L'VF NT        2/0 r/I)6 l)4444424              LO'F000000                                        l 134


10.50.55(e)Teems,Reorted'oTheNRC;HavinPotentialForSchedularIact.1.MainSteamIsolationValve-PWHTQualification2.HydrogenRecombinersQualification3.ImpactTestingofCheckValvesSuppliedbyAnchorDarlingCompany4.PGCCElectricalSeparation5.FeedvaterBlockValvesSuppliedbyVelanValveCorporation.
RUN DATE      ISDCts4 0740HRs                                vuuK      LNG      SC  Htou)        6                          RRI) JEC 1 Sf ARf  I/Ol/53 PAOJECf      QIGPUSH          PRCOP    ANO ACCEVTANCt        lESt ING  SCHCDa)LE                                            ORIGINAL COHPL ~      3/07/86 SURt    ECDOCS      E STARl                  DATA DAfE    10/0 3/54VAGE    I 4
NODE= 0/FE                DESCR          I  tat  I ON                          DUR            5 f A R 'f        F I N I 5 H ACTIVITY                                                                          SCH)D      REPRO    SCH)D      REPRO 4                                            a                        a                    I C        COLO FUNCf )ANAL        tSf    OPS )IASILR laUNI.H  LI 5'1        63    I2/06/5S                2/Od/86 129977001                                                                        1071                  1133 C  I Dt VRIHAHY. CDNTAINHENT LEAK                RAll; Tf Sf  C  Sl 7 112    25    I I/Od/55.             12/05/55 99974001                                                                      1043                  1070 PAFDV HAIN L AUX            SftAH 001 000                                  21      5/ I J/55              6/07/I)  a 95725001                                                                        864                    554 A<< t<<HOISf UAE.         SEPERATDR REHEAT VCNt 5 DAAIN 002              ~    25      I/26/55               2/22/55 75748001                                                                        757                    784 Vkt-I)P    CONT)i NSA f C  SYS 00    I ~ 000                              21      3/09/85                3/29/85 98651001                                                                        799                    819 POf    COND STURAGF. 4 XFt'R          004 000                            2L    1,2/16/I)4              I /05/85 286260OL                                                                        716                    736 VO'f CDNI)FNSAf8 DCHIN'5            C  ACSIN HEIsf N 005<<000              14      2/2 3/55              3/0 as/d5 97090001                                                                        785                    r98 PACDP FEEDVATEH SYS              006<<000                                    21      5/I r/ISS            -4/06/85 9865$ 001                                                                      868                    585 PHCDV      Ftl'0    VATCH CI)NtHUL 001 ~ Oa)0                              14      r/15/ds                7/25/55 9al849001                                                                      927                    940 Put FFI DrATfH          l)EATEAS    G  CXTRACI LDN 005.0))0                21      9/16/55              10/06/55 ra)790001                                                                      990                  LOLO VOf CONI)a":NSCH AIR HE)LOVAI 009 ~ 000                                      14    8/2 J/d5              9/05/d5 139090001                                                                        966                    979 VAT CIRCULATING            vAftk    010<<AOO                                21      5/ I 0/55              5/30/55 I 35714001                                                                        861                    dd1 A<< t <<ACID THCAfHEAT 10<<O                                                  14  12/25/54                I /0 7/85 25594001                                                                        72$                    738 ACCF PT      TESf    HYI DCHLuk1    tt  SYS 0 I 0 COO                      14    I /23/85              2/05/85 I Il)716001                                                                      754                    r4 7 PD  I sflavlCI. vATEH        01 I <<000                                            -S/Ir/85              5/I I /a)5
        '%IIIII 7 00 I                                                                  507                    862


ITEMnSte~sMinSteamIsolationValve(MSZV)-PWHTgualification(55.55(e)No.T8.3.2.115)PROBLEMMateriaitestspecimenforthebodyofoneMSIV,markNo.2MSSNYVIAoasnotsubjectedtosimulatedpostweldheattreatment(PWHT)priortotestingasre-quiredbytheapplicableASMECode.ThisproblemwasreportedtotheNRCunder10CFR50.55(e)onJune15,1984.EUIPMENTSUPPLIERGulf&Western/FluidSystemsDivisionPROPOSEDSOLUTIONEngineeringevaluation,justifyingtheuseofMSIVasis,hasbeendeveloped.NMPCisinformallydiscussingitwiththeNRC.NRC'sinformaldecisionisexpectedbyOctober15,1984.However,contingencyplanhasbeendevelopedincasetheNRCdoesnotconcurwithourjustification.Thisplanwouldcausehardshipbuttheexistingvalvecanbereplacedwithoutaffectingthefuelload.RESPONSIBLEENGINEERJ.T.Sullivan/T.B.Madden 0
Sa)RT  I:LUOFS            E START                    OAfh    OA TE I 0/03/84PAGE 2
ITENHydrogenRecombinersgua1.ificationPROBLEMjnfrjsjjyvariouscosponsorsorhydrogenrecombjnersfajjedcoPassqualificationtests.Subsequently,vendorindicatedthathedoesnothaveadequatedocumentationforallthecomponentsoftheequipmentTheproblemwasreportedtotheNRCunder10CFR50.55(e)byNMPConAugust9,1983.ThevendoralsoreportedproblemswiththecomponentstotheNRCunder10CFR21.'EUIPMEHTSUPPLIERRockwellInternationalPROPOSEDSOLUTIONThevendorhasindicatedthattheequipmentwillbequalifiedtoIEEE323-1974bymid-1985.
~ LOOF =0/FE                0 E  S C R  I  P  f  I 0    N                          OUR              5    T A H T        F I N I 5 ll ACT/VI I Y                                                                                SCH$    n      HEPJO  SCH ~ 0        HE$ ~$ n
                $                                                                                                                        1 PUT    fHAV      H20 5CREL'NS ANJ) 'WASH          l)l Sl~  0 I 2 ~ 000                I2/26/84                        I /n I /85 3877000I                                                                                126                          132 POT Hl)CLCle 0 I 3 ~ 000                                                            l4    6/$ 4/85                    6/2 1/85 6826800l                                                                                896    .                     909 POI    f8 f I UHlllNG      COHPONL T COOl. I NG WAT l'4 0            l4 ~ 000          I?/I 7/cS4                    I/)0/c$ 5 1'$42400 I                                                                              7I1                          76$
ACCfl I 'fl.SI HAACUP WA'IER tRFATING                      'SYS    0) ze000        2I  L I /0 I /84                I I/2$ /4$ 4 I 3861600 I                                                                              61$                          69l POT      NAKEUP WtH SfOHAliF            C    TRANSFER 0        lh ~ OT)0            28  LI/IS/4$5                    I 2/ I 2/ )$ 5
          ?895800$                                                                              f050                        L017 POt PR)JCESS          SAHPLING I faA                                              28    8/09/85                      9/0 5/SS 68)0800l                                                                                9>2                          979 POT    PO'it      ACC I OEN t  SAHPL INC    I 1~ I)                               L4    8/30/85                    9/ I 2/85 I .1998400 I                                                                                        '73 986 PeIEAP      LNSTHUHENT        C  SERVICI'. A IH      l9 ~ A                        2l    1/LS/85                    8/04/85 9899800 I                                                                              9?  1                      91 1 POf LOSS          OF  PLANI AIH    l9 ~ l)                                       28    7/ I 5/85                    8/I I/85 l34414002                                                                                921                          954 ACCEf~fANCF. LS      f I'$QEA tillNG      At4    020 ~ 000                        I4  I 0/I 5/85                    lor28/85 9NL 1l 00l                                                                            L0 I'I                      l 032 Ao T ~    GFNf.HATUR SEAL        UIL 22eC                                                2/20/85                      3/05/85 I 34444    IJO  I                                                                        182                          195 fuR GCNf lAf))H I.u)R n)L
                    $                                2    .8                            l4    2/20/$ 'i  $                3/05/85 1'J  I I 100 I                                                                          7$ $ 2                      1)5 4% I~    TURL)INC LUOE        UIL  CONDL I Ll)NLH I, WAS IL            (JIL 02          I/Ol/85                      I/l4/85 79$ 2600)                                                                              732                          745 PRJ:l)P      NC 5 YST I H 0)13  ~ 000                                            56    4/0 I /a$ 5                  5/26/85 793 l 000 I                                                                            822                          811 A~ f~    Gc N    I SO PHASE HUS OUCf          CU$ )L ING    021 +000                    7rl2/Ss                      7/I 8/85 l29I7000I                                                                                924                          930 A~ f~    CLEAN 5 TF AH HEJ)l) ILERS 25                                            l4    4/I I/85                    1/24/l)5
        ) 'l'J Lanaa I                                                                            $$  $2                      S1.'i


ITEMtTestingofCheckValvesSuppliedbyAnchorDarlingValveCompany.pROBLEMialtestsp'ecimensforvariouscomponentsofthesubjectvalveswereMateresnotimpacttestedasrequiredbytheapplicableASMECode.ThisproblemwasreportedbyNMPCtotheNRCunder10CFR50.55(e)onSeptember7,1984.PROPOSEDSOLUTIONThematterisstillbeinginvestigated.Atthispointitisnotknownifthevendorhasmaterialspecimensorthenumberofvalves,ifanyBthatwouldhavetobecutout/replaced.RESPONSIBLEENGINEERJ.McDonough/T.B.Madden
SllRT  ECUOES      L Sf ART                    OAfA OATE 10/03/84PAGE HUOE>0/FE              OESCR      I  Pf    I  UN                OUR            f A R T        F    I N I S H ACT SVI TY                                                        SCHI 0      REP $ 0  SCHMO        RE.P$ 0 Ae fo    tdsf    tURB GENER SfAfOR COUL IN4WT$$ 026 ~ 000          8/1 drl$ 5              8/29/Bs 79076001                                                        959                      972 A T~    CENERATOR H2 C C02 SYS        027 ~ 000              21  9/ I 3/85              10/03/85 7906800$                                                        981                    100  7 aaEnr    NUCLEAH    ilntLER INSt 028.000                          sr17rSs                  5/2 3/ 85 98848001                                                        868                      874 POl kX RTCIRC SYS 89~A                                              6/14/85                  dr27/us 6 819$ $ 001                                                    896                      909 POT    RX kEC IRC FLUX C'fRL    29 ~ 8                        21  6/14/85                  7/01/85 13'4444016                                                        896                      91 6 PRFOP CRO HYl$RAULICS 030 ~ 000                                    7/22/85                  8/25/85 98372012                                                        934                      968 Pof    RES IOUAL    IIFAf kEHOVAL 031      DDO                35  6/2 ll/s5                8/0 1/l$ 5 68302001                                                        910                      914 POT LPCS        032e000                                              4/22/85                  4/28/85 6856000 I                                                      $$ 13                    849 POT HPCS      033a000                                        14  5/26/$ 5                6/0 7/l$ 5 68528001                                                        876                      889 POT AUTOHATIC OEPRESSUR ICATION 031              000              7/13/85                  8/09/85 1387d6001                                                        925                      952 POT RCIC      036+000                                        21  6/28/85                  7/ I 8/85 68104001                                                        910                      930 Vnf Stllltt LIOlltO      CTRL 036*000                          14  5/29r Bs                6/I I/85 68432001                                                        880                      893 POt RX VATLR CLEANUP 037~000                                        8/09/85                  8/22/85 68463001                                                        952                      96S PO t  FULL POOL COOL I N4 38                                      5/0 I/85                5/2 3/85 1187.'$100t                                                      851                      S74 C  l nf  RX HLOO SRV f. FUEL HANOLING          EOUIP 039 000    21  4/29/85                  5/19/l$ 5 11$ $ 22 1001                                                    850                      870 POt RAUOAStt COHPUTER 40 ~ $ $                                  14  6/01/85                  6/ I 4/85 1 $ 144401    I                                                  883                      896


ITEMSPGCCElectricalSeparationPROBLEMp>>dsiinsdidnotcondonetothedivisionalandsnbdivisi'onalsepatationcriteriaofRegGuide1'5A5055(e)finalreportwassubmittedby~CtotheNRConAugust9,1984.PROPOSEDSOLUTIONThecorrectiveactionarescheduledforcompletionbyDecember31,1984.RESPONSIBLEENGINEERKeVaradara)an
Si)R I  Lcnots      E STAAf                      t)AT A IJA Tt 10/03/84PAGE 4 NOOEAO/Ft          ~      OFSCII      I P  f I ON                  OUR            5  f A R I          F  I N I 5  H ACTIVITY                                                              SCH)n    HEP)l)  SCHMO        HFP)n 4
POf 4 ti)UID HAOIIASTE SYS 40+A                                          'I/II /Ss            I 0/ I 5/85
                                                                                '/I I 08084001                                                            985                  1019 PAtOP SOL I 0 HAOS*S IF, 041 ~ 000                              42    Io/21/85              I 2/0 I /ss Indi    sano  I                                                    I 025                  loca pt)f oFF 13'Jod?001 GAs    oizaoon                                    li    10/ Is/ss IOLIJ 10/28/ db 1032 C  PAT    I'IHE'PHI)tECt II)N whtt'R 04) 000                      21      6/0 1/85              6/2 1/85 129015001                                                              889                  909 Pof    FOAN F      lkt Pusttct  LON 044 ~ 000                  14      6/28/ss                      I/85 19046001                                                            91                    923 pnt cn2 FIRE puatcctloN ois.ooo                                  14      1/12/85                1/25rss 8955200 I                                                            924                  'J  I1 POT I      IAF PRI)TECf ION HALI)N 046 000                        28    I 0/1 8/85                /I I I 4/85 89051001                                                          1022                  104'9 Pnf FIHE Ot ftCT IUN          C  CONPUTE H 41 ~ 0                      1/2erds              I 0/ I 1/85 I 2')02 I 00 I                                                        93d                  1021 A T      AU)I HULL.FR    4S.O                                          2/26/Ss                3/I I/85 8852000 I                                                            1Sd                  801 Ao  f~    TUR')INE BLOG Hof VATFH 4 GLYCOL 4 I ~ II              14      6/nb/ds                6/ I 8/sS 13444402b                                                              88l                  900 A~ '1 ~  HI) 1 IIATtA HEA f ING O')eh                                  a/Ob/db                errb/8'b ddlbooo I                                                            sar                  901 A  f      R )I ULUG II>) I Vh t EA C GLYCOL 49 ~ I)              14      6/lnrd5                4/23/ds I 34444 07 1                                                            d92                  900 h 1~      HAI)llhst  t UL OG H() t VA TFR  G 4LY CIJL 4 9. C    14      rro2rss                1/15/ds I 34444026                                                            914                  921 ACCL    Vt OOHESflC whfEA 050~000                                        I /01 /de              I/I4/de 13Ndrroo)                                                            1091                  LLLO PI) I At ACf OII SLOG VI.Nf 052 ~ 000                            14      1/os> 85              1/I 6/85
                                                                              )lb 8916200 I                                                                                  928 V<)t    Ctkt      IILU4 CHILI.ED SAfER 53 ~ II                  14      4/28/Ss                5/I I/8'5 I.)4444029                                                            S49                  862


ITENFeedwaterBlockValvesSuppliedbyVelanValveCorporation.PROBLEMMaterialtestspecimensforthevalvewerenotsub]ectedtosimulatedpost-weldheattreatment(PWHT)priortotestingasrequiredbytheapplicableASMECode.AninterimreportwassubmittedbyNMPCtotheNRCunder10CFR50.55{e)onJuly6,1984.PROPOSEDSOLUTION1.AcontractisbeingnegotiatedwithPowerCuttingCorporationtoremovematerialfromthe,bottomofthevalvesfortesting.CameronIronworks,forgingsuppliertovelanwillperformtesting.TestingisexpectedtobecompletedbyDecember1984.2.Ifthetestresultsfrom(1)abovearefoundtobeunsatisfactory,thevave1willhavetobereplaced.Replacementofthevalvewithanewt1bevalvemaybecompletedbyDecember85.However,anattemptwtlemadetolocateanacceptablevalvealreadyfabricated,inwhichcasethereplacementcouldbeaccomplishedbyFebruary1985.RESPONSIBLEENGINEERJ.Ventre/T.B.Madden
suR t  Lcoot."5      SfART                  DATA SATE Io/03/84PAGE 5 a                              a                        a                                          ~          a HOSE> 0/I'.I:                OF.5CH          I P I'    UN            OUH            S  T A R          F I N I S H ACT!VIf Y                                                              SC<<at)      REPRO  SCHao        REP)0 a              a                                                            a T
Por      CraaL )SLOG <<VAC S3 ~ A                                    21    5/12/AS              6/01/55 13444402ts                                                              56.$                  dd3 Pnf CTkL Rk              PRF.SSU<at:    TSt 51    C                  14  Il/15/55               I I/?as/85 8 ts 8 5 2 0 5  I                                                  1050                  IO63 A~  f~      t<U)t<aL SVC      OLDG HVAC 54 ~ A                      14    5/0 I/55              ta/14/5<3 89307001                                                              944                    951 A    f ~ LI lta)uk illtnkluf 54            5                        21    S/0 I/55              8/? I /85 I 34444      Q.sa)                                                    944                    964 Pn  T    I Ukls OLO4 VI. N T 055        ~ 000                      25  10/0 I/t)5            lo/2d/d5
          $ 8522001                                                          I 005                  1032 pnt HA))dAstE            a'la.oG  pRcSSU)IF,   tFsT 5n    H        14  Lo/L 6/55              10/? <)/55 I~i4444031                                                            I 02<)                  10$ )
Pnf HAUVASff HVAC nb+A                                              14  10/16/a)5            LO/29/85 55115001                                                            I 02l)                  1033 pnt usL            GENERATOR tavAc        051 ooo                  21    3/I 7/55              4/06/55 t) 91    2000 I                                                      501                    527 POI'UX            SSHVICt. OLOGCELCC TUNNa.L )IVAC 55 ~ t)          28    1/I tl/55              8/14/55 SA900001                                                              930                    957 HIPS 059+AS I 2 ~ S9e a)0 I 2 POT PR))cf AURf; 05douoo 4 ~ To Sckka)LLCDSL              l LRL PHPCHI SC Vl Ni'ta<S ~ A    2I    2/0 7/55              2/2 1/55 sasdn2001                                                            169                    789 Pl)f PR))cFoukt 05)s ~ Aoolsd 001-3 ~ 59 co2 ~ c04-con)
Ae T ~      AUX    f)UILEH    C  C)tLLLEH  UL OG  <<VAC ndec        7  1/15/85                7/? 4/85 AHSV000 I                                                            930                    93h ruf      PRtlccnuki        o55.cool59.col,5).codl C  Pnt      Ol<Y))ELL COOL LNG (<0~0                                  14  11/nl /55                  /I I I 4/t)5 daaonl 00 I                                                        1036                    1049 ra)t Pk)HAHY CONTALNHLNT PUH45 61.st                                14    ls/14/s5              8/2 1/85 SSOit uOI                                                            95 )a                  970 pof sT*kl)BY            GAs T<ILAfHENT        nl  A                      5/2ti/55              9/I 7/55 5<s02n003                                                            971                    9<) I l<a) I    "
t Ca)<)OAR Y  cnklAINHLNt LC'AK        TC 5 I n) C    14    ')/ I 5/55          10/0 I/db I .) ~ a 0<< 700 I                                                      992                  100  <


AGENDAITEMIllITEN:Adetaileddiscussionoftherecentmanagementorganizationchangesandimpactonconstruction,pre-optestingandstartup.Includediscussionofhowthemanagementorganizationwillbechangedfortheoperationalperiodandeffectonstartup.DiscussinterfacesbetweenMAC,NMPCandSMEC.fCURRENTSTATUS:Theprojectreorganizationwasbasicallycompletedduringthefirstquarterofthisyear.Thecurrentprojectorganizationchartisattached.Thegoalofthereorganizationwastoimprovethemanagementofconstructionandstartupactivities.Therehasbeennosignificantchangetoouroperatingorganization,otherthantheassignmentofMr.HootenandMr.Perry.NiagaraMohawkbelievesthatthesemanagementorganizationchangeshavehadapositiveimpactontheconstructionandstartupschedules.ThesemanagementchangeshaveresultedinNiagaraMohawkexercisingmoredirectcontrolofprojectactivities,althoughStoneMebsterisstillthearchitect/engineerandconstructionmanagerandisresponsibleforday-to-daydirectionoftheproject.TheMACindividualsassignedtotheprojectactasNiagaraMohawkpersonnelandfillpositionsintheNiagaraMohawkorganization.ExceptforMr.HootenandMr.Perry,therearenoMACpersonnelfillingpositionsintheoperatingorganization.AdditionalinformationontheoperatingorganizationcanbefoundinFSARChapter13,andadditionalinformationonthestartupprogramcanbefoundinFSARChapter14.  
5:)Hl  FCDDES      C  STARt                      o At A DA r E 10/Q.S/e1PAGE c 1
NODE=A/Ff                  0 f: 5  C R  'I P  I  I II  N            OUR          5  T A H              F I N I 5 H ACTINI TY                                                                  ~ D    IIEP ~ IS I'Ctt SCIS  tA    HE P t 0 1
POf UAA <12 Ht.'CDHUINER 062 000                                    11  I I/0<t/tt5                I I/2 I/85 Sttl 58001                                                          101 3                        10'id POf IIX      <SLAG    FLtIAH DRAINS 63 ~ tt                        21    7/< >I/O'i                  tt/I I/db
        <tttu1 200.$                                                        V lb                        VSd PAT HX        ILDt> t tt'J  IP ttR*IHS 63 ~ A                      12    7/71/tt'>                  0 /Q,S/ tt5 Vd012001                                                            9 Jo                        V77 PAl fURISINt          'SLUG  F<lttlt DRAINS n1 ~ A
                                        ~
21    I /29/tt 5                  1/15/85 7 tt01600 I                                                          51  0                      810 PAT TUNIS INE; ttLDG FLOOR IIHAINS 61 5                            21    3/29/85                    1/I tl/85 I '11111 0 32                                                            519                        53V PRIS)P HV ULDG DRAINS 065 ~ 000                                    21  9/01/85.                     9/21/85 1093I76001                                                              V7>                          095 A~ l      HE SERVE t>IANSFARttt'H AHFA DRAINS              6b  A        9/Qd/85                      9/ I V/d5 Itl017001                                                            980                          993 PAl CANDENSA            ff SlARAGE      ALDG DRAINS      6b tt          9/al /tlat                  9/I V/85 2 tt 3v 7 Q 0 I                                                      Vdtt                        9<1 3 Ao f ~ ASIX        5OILER UIIAINS 6heG                                  9/0 6/db                    9/ I 9/ISS 85007001                                                            950                          993 PAT ISSL GtHFltATAtt FLOOR DRAINS                  6n.C                0/06/85                      '9/I 9/tt5 1001 7001                                                            v tt 0                      VQS Ae 7 e HX        <SAT  IIRA IN'i 66+K                                    9/Qa/85                      0/10/ SS V+360001                                                            9tt tt                      903 Ao I'    C<INf RDL      ISLDG> f UNHI,L  ISRA INS  dn I          11  0/06/85                      9/I 9/db tt>t01 7001                                                          Vtt0                        903 A~ f e ttAIH        THAN'iFSSRHEII AHCA tt>IA IHS t>n<tt                0/06/85                      9/19/d5 12<SO    IVQQ I                                                        950                          993 A~ l  ~  S>EII VICI'. BLDG UHAINS 6haL                                9/0 6/ ts5                  9/IV/85 d<S307001                                                            9ttu                        903 PDf HAIN 5'TACK DRAINS 66 ~ J                                            0/06/d5                    9/IV/85 58717001                                                              980                        90 I Ae 'f ~  SCMFENI>ELL tSLDG DRAINS 66 eD                                10/QS/85                    I 0/ I IS/05 lttdh7001                                                          1000                        1022


W.J.DONLONOIECUTIVEERECTORHVCLEARQKRATK2ISILG.HOOTENVICEPRfSIDEHTHVCLEARRAT)OHT.E.LEMPCESCDCBAL6LfKRHTEMXHTIIAXEARQ3CRATKWT.J.PERKINSSfCRfTlRYE.OAVESPROJECTORfCTOR~2D.L.OUAMMEASSISTAHTTOPROJECTONECTORM.J.Rh'IINYSEG)VICEPRESeEHTHVCLEAREHCIHffRIHC4LICEHQHCC.V.IlANCAN)SHEET3)ERECTORDUALITYASSURAHCEJ.PERRYORECTORCORPORATESfCVRITYJ.J.SIPISERS4PKHWTOOPITIOCLEARSECIJIITYR.F.ORRSTATIONSOU)HTEMXHTMP2R.ABBOTTNAHACER~2LICEHSHCA.F.ZAI.LNICKNAHACERCONPLMHCE*VERONICATIOHJ.J.BEBKONAHACEROAHVCLEARC.BECKHAMISHEET)3,14)NAHACfROAIOCLEAROPfRATIOHSD.R.PALMER)QUETIS)TAHTSQKBtPEMX)ITHVCLEARSECLRITYJ.P.BERATTANAHACERMLOfHCIHEERIHGNAHAGERSTARTVP4TESTW.TAEGERG.AFFLERBACKIS%ET2))SHEETS)NAHAGERCOHTRACTzNATfRIALSNAHAGENEHTSfHIORNAHAGERCONSTRUCTIOHVAICACfRfHCRIEERIHCJ.THOMASJ.NIEZABTTOWSKIJ.P.PTAK)SHEET4)I%%ET7)ISHEET5)NAHACfRPROJECTCOHTROLR.GIBSONISHEETlllMANACERPROSTSfRWCfS/ADQH5TRATIOHA.P.BALENOISHEETB,Q.IO)SfCtl)ITTHVESTICATORILG.CHRISTIANSENI&%ET12)PROJECTDIRECTIONFUNCTIONALDRECTIONOHLTLOCATK)NKEYLESSOTHERWISENOTED-NMP2QTECHOC-CHERR+~~IN.J.)OPERATIONSCENTERCCiMI)A.~Q7CHIAPPROVDA'IEIOELLEPONTH)CLEARSTATK)NIPKT-2NIACARALIOHAWKPOWERCORPORATIONNINELIILEPOINTUNITt2PROJECTORGANIZATIONCHARTMANAGELKNTDATE10/1/84SPIOF15
SORT  FCOOES      E SfARf                  OAfA OATC Io/03/54PAGE 7
                                                              ~              st                    t        t HaoF=O/FF              OFSCN          I P  f I QN        OUR          S  I  A k T        F I N I 5 H ACTI'gITY                                                  SCHJO      REMI>  SCHtn        RFPJO PREOP ORYVEJ I        FL f,  E4J  DRAINS 061 000      14    1/?4/85                $ /ocr as 97056OOI                                                  936                      949 C  PJJT  LOP/CCCS FUNCT LONAI 070 000                    21  10/18/$ 5              L I/01/85 I? 9975001                                                1522                    1042 POT UPS      2A,tl 71E-2                                14  12/OI/4$ 4              12/ I 4/4$ 4 129560001                                                  701                      714 Pnf    UPS 3A ~ t$  7I ~5- I                          I4  L 2/24/4$ 4              I /06/85 129 ih0003                                                  124                    737 POT 4JPS    IA~ tltC4040 'I LE I                      14    7roerds                7/19/ds 12956ooas                                                  9 t 4$                  931 Por'4      48 v oc OAfrEHY 73 ~ 4$                    21    4/I srds                7/05/ss 1.19252oa I                                                597                      917 Pnf 125      V JJATTCRY    73+A                        28    frolrds                7/2tt/d5 I'Jlsoool                                                4JI 3                    940 Pttr OIV 3 JJATTEHY        14 ~ C                            3/IO/85                3/2 3/4$ 5 134444004                                                  4400                    813 POT    OIV I u*frERY 14.A                              14    I/I 1/85                3/30/85 19040001                                                501                      82a POT    OIV 2 IJAf TERY    14 ~ tl                    14   3/I 1/85                3/30/85 134444003                                                  tl 0 1                  tt2 0 C  Pnf      TAf tON ANO ENt ttCit.NCY L Iattf IN4'15 000  21  LO/18/55                II/07/ds L29LS200L                                                1022                    1042 POT    J4LNT COJ444UNICAT ION      016 ~ 000          21    6/ I 2/415              7/02/415 l?d? 12001                                                594                      914 c  po'I kcttor F. 5HU faovN pANt t.       old 000        14  10/04/55                I 0/I 1/85 1288.$ 0003                                              load                    1021 Pnf AREA NADIAfION            HONI f 4JRIN<  7'I 0    21    5/21/ds                6/I erds I L 93 70001                                              57d                      $ 9d pnr pRtlcEss        RAO  xoNlroktNO odo.ooo            42    7/ I 5/55              8/25/55 I 15061001                                                927                      965 C  PttEOP CJINf LEAK NONI IORINO 081 ~ 000                  35 10/04/88%              I I rn fr ds Vd7d?001                                                1005                    1042


AGENDAITEM0'12ITEM:Overviewofcurrentconstructionandstartupmanagementorganizationshowinginterfacesbetweenthetwo.CURRENTSTATUS:Seefollowingpage.  
SORT  CCOOCS          5'I ART                      I)A'fA DATE I 0/03/54PAG'E 8 NOOEiO/FE              OESCR      I  Pt  I O)t                DUH Sett)O 5  f A  It'T        F    I N I S  tt ACT I VI TY                                                                      HEP ~ O  SC)ttO        REP)D 4
C  PRLOP COttf ATNOSP)ILRC NONI TORLNG SYS Oc)2~000              35  IO/15/55                    I I/21/55 99405001                                                      1022                        1056 anf    PRINARY CONTAINNC)tt ISOLAt ION NSSSS    03              5/27/85                      6/I I /85 c)8 62 d 0 0 5                                                  87H                          59 t)
C PHEOP POLAk Ct)ANC          081+000                            14  5/17/85                      5/3u/55 59017001                                                        ttt)5                        551 C PIIFOP LEAK OtcTt.'C f ION Uc)S ~ 000                          35  IU/04/Hb                    I I mr/85 9 70C)400 I                                                  1008                        1042 POT    VIU NONI TURING HPV 056m                              14  9/06/85                      9/19/c)5 699cc501 1                                                      950                          993 PHI OP CONTAIN)tCNT 6 INE)t I ING SYS Ot)8 ~ 008              14  10/IS/55                    10/28/85 99297001                                                    1019                          1032 POT      SEISNIC NONI TOHING SYS 090m 000                        7  9/06/t)5                    9/12/85 13900HOOI                                                        980                          986 C  POf PRI)CCSS COHPUtCR 91        ~ A                          81  10/01/55                    12/26/c)5 95994001                                                    LUOH                          1091 POT    APttttS ')2 eC                                        14  5/12/ci5                    8/25/55 13950400L                                                        955                          968 P!) T SRNS 92 ~ A                                            14  8/L2/85                      8/2 5/ 55 134414c)10                                                        956                          9h5 POf IHNS 92e5                                                  14  c) / I 2/ 85                  8/25/85 131444011                                                        9%5                          968 anr Rno        RLUCK NONI fOHING 093  ~ 000                  14  6/21/85                      7/0 7/85 L 3937400 I                                                        906                        919 PI) t    f I P SY5 091 ~ 000                                      c) /  I 2/5c>                9/Oe/t)5 L 3869000 I                                                      955                          982 POT ttOU WORT ti NLNINICI.R c)6e A                            21  6/24/55                      7/14/85 llc)469001                                                        906                          926 POT HOI) SEc)UENCE CTIIL      95+5                          21  6/21/55                      7/14/85 I 34441U33                                                        906                          92 tc anf      tcnu  Inslflt)N  INDICATION 6 H)t NNL CTRL 0')6 00  28  b/24/55                      7/at/55 I 384 19001                                                      906                          933


CONSTRUCTIONANDSTARTUPNANAGEMENTORGANIZATIONINTERFACEIO/17/84PROJECTOIRECTORSTARTUPMANAGERNMPCCONSTSrNANAGERHG1HEERlHGNAHAGERTESTGROUPMANAGERHIIIIIIICONSTSUPVMECHTESTGROUPMANAGERICCTESTGROUPMANAGERELECTCONSTSUPVELECTMANAGERPROJECTAOVISORVENGlNEERNMPCTURNOVERMANAGERMANAGERCONSTCOMPLETIIIIIIIIIIIIIIIIIIISWECCONSTT/0SUPV
NODE>                                              SORt    ECUOS S    E STARt                DATA DATE 10/03/84PAGE 9 0                  o            4 0/F E  ~      D E S C R    I  P  f  I n    DUR          5  I A R          F I N I S H ACT IVI TY                                              sckin    kFpi 0  SCOLD    m.P ~ 0 4
Pnf RX PROTECTION 097+000                        2L      5/2 7/85              8/ I 0/85 I2890400I                                                8re                  898 A~ f ~ f URUINF  GI.NI.HATOH PROTECT ION 98 0    I4  . 10/15/d5              I 0/28/85 7933000 I                                            10 IV                1032 POT STOOY I)SL GFNFRATOH        DIV 2 100eA      30      3/31/85              4/29/05 49147001                                                821                  850 Pnf  STORY DSL CI'NFRTATOH      DIV I 100 ~ A  JO      4/07/85              5/0 6/85 49147003                                                8/d                  857 Pnf  NPCS OSl DIV      3 100eN                  28      I/2 4/85              4/?0/85 4'J304001                                              814                  841 Ae to RAOVAS tF. BI.OG CRANE 101 oB            14    10/Ld/05              IQ/31/85 134444035                                              1022                  1035 4~ f~  TUROLNE OI.OG CkANE. 101      ~ A        14    12/01/85              I?/ I 4/85 I 34444034                                            I 008                1079 Ao'to ACCFPT OECONTANINATION 102e000                      3/I d/85              3/ 11/85 I 18922014                                              808                  821 Ae fa  Sl  TE SECURL TY SYS 104a0                        4/01/85              4/28/85 L3827600L                                                822                  849 C  Pnt  GFTARS    105.                              2L    LO/04/85              10/24/85 134444015                                              1008                  1028 PREOP HFOUNDANf HFACf IVI tY CNTL SYS 106 000    28      7/15/85              8/I L/85 99484001                                                927                  954


AGENDAITEM813ITEN:entailedreviseandcurrentstatusofdesign,engineeringandconstructioneffectincludingquantities,work-offrates,currentstatusandscheduleforcompletionfor:a.ATWS-3ADesignChangesb.AppendixRDesignImplementationc.NSSSLoadsAdequacyEvaluationd.High,EnergyLineBreak(HELB)e.ModerateEnergyLineBreaks(MELB)f.ControlRodDriveSystemg.PrimallyandSecondaryContainmenth.ControlRoomPanelModifications(PGCC)i.PipeStress(as-build)j.N-StampCertificationProgramk.UpdatingDrawingsandSpecificationstoas-BuildConditionl.EnvironmentalgualificationofSafety-RelatedEquipmentm.SeismicgualificationofSafety-RelatedEquipmentn.HangerReconciliationProgramCURRENTSTATUS:Seefollowingpages.  
ra (IHIP STARTUP AND TEST ORGANIZATION 10/04/84 NHP2    SIA REPORtS          tO HANACER                                                                                                                                                                                                                                      SUPt  ~
SHOUN ON ORCANI(Af(ON                                                                                                                                                                                                                                            attotl CHARf FOR OAILT O(RECIION                                                                                                                                                                                                                                                                                                                                        5flttvt M  CC'I                    DATE I
S AR
                                                                                                                                                                                                                ~
HANACER tt((vfaoe                                                                                                                                                        ~8
                                                                                                                                                                                                                                                                                                                                                                                    ~ ws sratlcv svtftl ~ tcvccvl
                                                                                                                                                                                                                                                                                                                                                                                                                    /.k!TZ oaff NHP2 OPERAIICNS SR ~ ADHIN CE                                                                                    ORCANI 2(I ICN OPS HCR tot(f5 AlOE (SEE OPS ORC CHAR(I                                                                                                          ere            .l./<r IvtlC Svfc ta(acct aDIlsott ceslvc(R      Diff NHPC                                                              TCH                                                                              PAE fCH                                                                                        TCH                                                                  I/O ELEC(                                                                                                                                  HECH IKC                                                                                                                                                          tlANACER                                                                                                                                            CARI(t RASS  let II 5                                                                                tvtl5                                                                (SUPT SLACvsvae IESIINC),
0      ILLavcf Vial (4 LEAD IKC IRMER LEAD ELECT
                                                                                                                                                                      <<CISVC Rlea(ITAUCN NASI CR INT (EST COORO SRASSMD LEAD SECH R(5TICA ASSt PAE 1 AOCL ICS Aes I et TE Uoe(5 14 ICS CCORCC CRVI    at.sl ICS RUILCOCC IE LCfle TS.T4 ICS L MCIVOC fuv(t fE (CS tCltleC vatcv<<<<elf e fE afef Sl 0PLANT HAINt (KC CATO(
HLf SUPT v(ella(IN O
PLANI ELECT (CS OIVALD TE Clat(Sf  5 TCS CNM tat (E
CLM(coot 11 ICS 5 I OCMAN TE IPNILIIA            TAIL ICS Lfef1 (CS 4l I NISO IE SURI 11 CONSt SUPT ELECI Lave(TCC  O  PLAN(
HA(N t HECH Cttst tCS fE Covlt taft NIORO ICS tE ROLOO $ 1 a        ICS to<<CO fE Lfvls 10  =    IRvle fCS ICCVICI<<foe tE 15 '4 tCS
                                                                                                                                                                                                                                                                                                                                <<SAI($
IE Tvav<lsf CR
                                                                                                                                                                                                                                                                                                                                            $5 CONS SUPT I
ttlMtttf PLANN('IC ULOIAC IIIERS SRDCR OIL MCf A eleC tRA1ICR Iott1 I f CMO ~ Ct IAIRNOYER NALC tce ae AOII IN SvttOR I 5(ott NOVES N(11Aftst DsttEVSV I SOTKC CLITCAI ROICVINAL TULLCR CLERICAL fACC('IC CNILI Oe
                                                                                                                                                                                                                                                                                                                                                                                                <<CCM K SIC(ACR CHOC ACO v($ IOe CNOC  ICII Ceclvcas Clf ICLAAC      ICVRAIMlNAV                  It    SC've(IDEA $ 4  <<Ctatfe<<$ 1                  SCNVARII'TC            Cvteff SICCAKR    II    11114(SILO          . I AvVf4        RVRtf(          ~A INC          LOVCSC                                      ICCVLLOVCN      CNEVNAI 44                          toltOtlL 4    ~ 5AID    I~ <<14                                        NIDRO INAC<<<<LO NCLLCR                  LCCC ALVMDI $ $
                          ~ ~ 5$ . << ~
SUA v I v a CL        R(lo  4$ ~ 4$  SMCCTlL        SVITA
                                                                                                  ~ I 105 Joeesoe  ~
5 tat(L  ts.tt OAT  IS vcfes  lt 101  TI I ICLS(e                                  OONCR  I0 I    Slf  TRICD $ 0    et coot ao lol    ~ Ctvlt 1$    tlALUS'C $ $                RAttC e                NILLCR (001 CR 5 ~ . $ 1. ~ 1                                  tUce 10.4 ~
AC ~ SC ~  It. 40                          Lfalefes      1 CRATCALL    vt5 CNIICCRS ala(A    1 TO 1.1 I ICO NIORD NIORD    TaLAES $ 4        C  eaafl ~ I ~                  VILLIS $ 4                                          I CDER efhtstOV tates  v(N I N    SNDCNMCR              DCICRI 5 ~  ~      LCS        ~ 5.44          Maof lle
                                                                                                                                                  ~
ICTA'Ce 15.                                  ttILL <<IIDRO 11              II I
: 55. . ~
VALfoe          CNIDIU                                                      RlL51  tt        OCTAN  I'I Doves st( ~ CCA  1~                                                e(CCN 11$      NatC  I~          t(000 1$    40  tl(RL INC Sl  tvCLCNM $ 1                                          5 I TERS SINK 5 5ICDCL 10        V I liC                                                                                                                                            Lfoovs      11 a                                                                  CILLIS VLVSN
                    ~ M(R                                la<<flLf 4'le    Dale<<ave  ~ I                                              Nalvcvos 15 Ul I  ~ OL  II                      SIICLL $ $
NI CVSTI. 44    SIASIAT  Il          MMI ~    5~  ~ aatSCN I ~ .
                                                                                                                                                                                                                                                                                                                        '50 51tav't(tE
                                                                                                                                                                                                                                                                                                                                                                                  'Iae(C<<CTO ACOSI A IAIC<<<<($                                                                4$ ~ I1                                                                11                    0(t ISOVALf                          5(NI A I Dv(                                      NCAS ~
Sevtt(RS                        5 MOCT ION                                104                                      Calet(LL 5<<ALITAV 10      ~ OLD(e 5 I(TER coal I EST tCOOID I          el(soe                                                                                  10.11 ~ ILOV TO(I I                              VILLMil 100                                  MlCTICLLO                                    I 0l                                                                      OILS(at Rof 10$ .01C C I(I<<OCAI 41                                                                                                                                                      IMflRD ~ 1      ~ 4                  ta'I C                                              ffsl                                                                                                              5IVRIK tC CR'Ctf I Eta 5 4$                            fit (I a V                                        VOOCtvtt Toe f a I ~
I@ jgg@0106-0
                                                                                                                                                                                                                                                                                                                                              ~        XvaBe618 Oa Aperhee gaza


13a.ATMS-3A1entationoftheASS-3AupgradeconsistsofninespTheNMP2impemensystemmodificationsasfollows:'tandbyLiquidControlSystem86GPMcapacityupgradeb.RedundantReactivityControlSystemadditionc.AlternateRodInjectiond.RecirculationPumpTripe.FeedwaterRunbackf.AutomaticStandbyLiquidControlInjectiong.AveragePowerRangeMonitorDownscaleTriph.ReactorMaterClean-upIsolationi.'NuclearBoilerInstrumentationTransmitterReplacementEngineeringandConstructionrequirementshavebeenincorporatedintotheSWECandGEdocumentsneededtosupportconstruction.Allmajorequipmentisdeliveredandinplace.Installationoftherequireddesignchangesiscontinuinginaccordancewiththeapplicablesystemcompletionschedule.
            ~ ~
ty
(~
(l, f
al


AendixR13b.ThestatusoftheNineMilePointNuclearStation-Unit2AppendixRimplementationisasfollows:AllchangesresultingfromtheAppendixRevaluationhavebeenagreedtobyNiagaraMohawkPowerCorporation.Themostsignificantchangeswhichhavetobemadeinvolvethecontrolroomfire.Thedescriptionandscheduleforaccomplishingthesechangesarelistedbelow.1.Modificationstothecontroldesignoftheremoteshutdownpanel2CES*PNL405areinprocessandscheduledtobecompletedbyOctober26,1984forinputtoElectrical.2.MarkupsofSWECelementarydiagramsareinprocessandscheduledtobecompletedbyOctober19,1984.DraftingofthecompletedSWECelementarymarkupsareinprocessandscheduledtobecompletedbyOctober26,1984.AllSWECelementariesarescheduledtobeissuedbyNovember2,1984.4,5.Designofthetwodisconnectpanels2CES*PNL415and2CES*PNL416isinprocessandscheduledtobecompletedbyNovember21984.TheGEelementarieswhichrequirechangeshavenotbeenmarked.up.However,theseelementariesarescheduledtobecompletedbyOctober26,1984,fortransmittaltoGE.ECNsimplementingallchangesresultingfromAppendixRareinprocessandscheduledforcompletionbyOctober19,1984.AppendixRECNsarescheduledtobesignedoutbyOctober26,1984.6.Engineeringdesignfortheemergencylightingis:inprocessandscheduledtobecompletedbyFebruary28,1985.7.8.Thesafeshutdownproblemcableshavebeenreroutedandareintheprocessofbeinginstalled.CablechangesresultingfromtheAppendixRControlRoomFireStudywillberoutedassoonastheESKsarereissued.
AGENDA ITEM 89 ITEM:
i1 13c.NSSSNEVLOADSADEUACYEVALUATIONTheNSSSNewLoadsAdequacyEvaluationprovidesanevaluationofNSSSsafetyzelatedequipmentsub]ectedtohydrodynamicloadsasrequizedbyNUREG0808.Twophasesofthisevaluationhavebeendefined.2.DynamicAnalysis-DevelopmentofloadingsonRPVandequipmentduetohydrodynamicloads.CEquipmentAdequacyEvaluation-Assessmentofeachpieceofsafetyrelatedequipmentsadequacywhensub-)ectedtotheloadsdevelopedinthefirstphase.STATUS1.DynamicAna1ysis-Complete2.EquipmentAdequacyEvaluationA.ReactorPressureVesselEvaluationcomplete.Nohardwaremodificationsre-quired.Adequacyhasbeenassured,however,useofnewozificedfuelsupporttestingresultsisre-quired.B.OtherEquipmentThirtyitemsrequiredevaluation.Finaladequacyevaluationfozequipmentiscompleteexceptfor:ItemComletionScheduledECCSPumpsSLCTankHCURCICTurbineFuelPrepMachine*Recirculation"PipingAnalysisReport10/26/8410/26/8411/30/8411/30/8410/17/8412/31/843/1/85Minorphysicalchangestothefuelprepmachinewillberequired.  
Detail  ed  discussion    of potential    schedul ar in fl uence due to changes attributed to    NUREG-0737 and  other recent licensing requirements.
~'
CURRENT STATUS:
HIGHENERGYLINEBREAKSSystems,szucturesandcomponentsrelatedtosafetyhavebeenprotectedfromtheunrestrainedmotionofpipe,]etimpingementandtemperature/pressureeffectsofhighenergylinebreaks(HELB).STATUS1.EngineeringA.Identificationofsystems,structuresandcomponentsaffectedbyHELBs-CompleteB.Designforpressure/temperatureeffects-CompleteC.PipeRuptureRestraintDesign-CompleteVerification-12/85D.JetImpingementEvaluation1.Structures-Complete2.Piping-10/85507Complete3.Equipment-6/8560XComplete2.ConstzuctionPi,peRuptureRestraintsandJetShieldInstallationRestzaintSupports-CompleteRestraints-6/85100XFabricated20XInstalledJetShields-6/85100XFabricatedOXInstalled
NUREG  0737,   ATWS and Appendix R requirements have been incorporated  in the project    schedule. The resolution of some licensing open items may  result in additional design or construction work.'pen items that could have          an impact are:
: a. Diesel Generator Air Driers
: b. Break-exclusion zone for Reactor Mater Clean-up System piping.
(See  Item 813  a 5 b  for more  detail)


HighEnergyLineBreakAllhighenergybreakshavebeenpostulatedatfittingsandhighstresspoints.190pipewhiprestraintshavebeendesignedandmosthavebeeninstalled.Structureshavebeendesignedtowithstandsprays.Equipmenttargetshavebeenidentifiedand2shieldshavebeendesigned.Wearecurrentlyidentifyingothertypetargets;tubing,smallborepipe,andconduit.ThiswillbecompletebyFebruary,1985.Analysiswillthenproceedtoevaluatewhetheranyofthetargetsmustbeprotected.Weexpectnomorethan8additionalshields.IftheyarerequiredtheywillbedesignedandinstalledbySeptember,1985.  
AGENDA ITEM  5 10 ITEN:
Discussion  of schedular impact, if any,   regarding potential deficiencies pepopted in accordance with 10 CFR ~O ~~'te  j.
CURRENT STATUS:
See  following pages.


13e.MODERATEENERGYLINEBREAKSMELBinestudyoftheeffectsofModerateEnergyPipingBreak(<<)wascompletedinJuyresuingJ11984ltinginthepreparationofFSARsections3C.4and3C.5-Thebaselinesuy1tdyresultedin~7Cat.Izonesbeingidentifiedasrequiringflooddetectioncapability,sprayshieldsand/orothegrchanestoassuresaesu'''fhtdowncapabilityismaintainedcoincidentwithamoderateenergylinecrack.FSARsections3C.4anresolutionofthesedeficiencies.Ouetolicensingscheduleconstrains,thebaselinestudyusedconservativeandsimplifyingassumptions.Theextentofidentifieddesignchangesneedstobereviewedaccountingforrealisticconditionsandminimizingimpact,ontheexistingcompletionschedule.The47Cat.Izonesrequiringfurtherevaluationarecontainedinsevenareas(ControlBldg.,ReactorBldg.,NorthAux.Bay,SouthAux.Bay,ScreenwellBldg.,DieselGeneratorBldg.andtunnels).Morksheetshavebeendevelopedtoassuredocumentationofandconsistencyintheevaluationprocess.Thespeciiczoneevaua'f'luationsarescheduledtocommenceinlateOctober1984withanaverageof15zonestobeaddressedeachmonththereater,frthereviewofzoneswillrequireabouttwomonthstocomplete.Identificationofrequiredfixesforthefirstgroupofzones(ControlBldg.)isscheduledi.formid-December1984andallfixesbymid-February1985.  
orted
: 10.           'o The50.55(e) Havin NRC; Teems, Re Potential  For Schedular  I  act.
: 1. Main Steam Isolation Valve - PWHT Qualification
: 2. Hydrogen Recombiners Qualification
: 3. Impact Testing of Check Valves Supplied by Anchor Darling Company
: 4. PGCC Electrical Separation
: 5. Feedvater Block Valves Supplied by Velan Valve Corporation.


13f.EnineerinAndConstructionStatusForControlRodDriveHdraulicSstem.Asu@naryoftheEngineeringandConstructionstatusthroughAugust1984,forthecontrolroddrivehydraulicsystem(CROHS)isshownbelow:XCOMPXCOMPXCOMPDESCRIPTION'NG'RGCONSTRAS-BUILTInsideContainmentEnterprise90o270oPipingUnderVesselSP5toContain.SupportsSlidingConn.SupportsSP35SP4OutsideContainmentMulti-function90'70oIntermediateSupportsIIIMPiping90o270'umptoContr.Sta.ControlSta.SupplyLinesVentLinesDrainLinesScramHdrs.ScramDropsScramTank100100100100100100959510010010010010010010095100'00959595100951001009595909595858570006010700000000000ThescheduledcompletiondatesforEngineering,ConstructionandAs-Bui1tVerificationareasfollows:InsideContainmentOutsideContainmentCOMPENG'RG11/84COMPCONSTR11/843/84COMPAS-BUILT5/859/85' 0
ITEM M      S t e ~ Isolation inn Steam    s        Valve  (MSZV) - PWHT gualification (55.55(e) No. T8.3.2.115)
13g,PRIMARYANDSECONDARYCONTAINMENTDesignengineeringandconstructionactivitiesforprimarycontainmentandcondarycontainmentarecomplete.EngineeringforthesestructuresisnowongoingtoverifydesignadequacyvithactualsystemloadsSTATUSSTRUCTUREPrimaryContainmentWall'econdaryContainmentWallPedestal6DryvellFloorBiologicalShieldWallCOMPLETE10/791/8012/799/79COMPLETE10/8112/829/807/80COMPLETE5/842/854/846/85ORIGINALDESIGNCONSTRUCTIONLOADVERIFICATIONSTATUSOFVERIFICATION100X40X100XOXPrimaryContainmentLinerEquipmentHatchReactorMatlPoolAreaPrimaryContainmentSteelSecondaryContainmentSteel11/769/7712/736/826/819/8110/816/772/832/826/8311/8412/842/847/854/856/8510XOX100X33X5XDesignandconstructionoftheabovestructures,is100Zcomplete.  
PROBLEM Materiai test specimen for the body of one MSIV, mark No. 2MSS NYVIA oas not subjected to simulated postweld heat treatment (PWHT) prior to testing as re-quired by the applicable ASME Code. This problem was reported to the NRC under 10CFR50.55(e) on June 15, 1984.
E UIPMENT SUPPLIER Gulf  &  Western/Fluid Systems Division PROPOSED    SOLUTION Engineering evaluation, justifying the use of MSIV as is, has been developed.
NMPC  is informally discussing    it with the NRC. NRC's informal decision is expected by October 15, 1984.
However, contingency plan has been developed in case the NRC does not concur with our    justification. This plan would cause hardship but the existing valve can be replaced without affecting the fuel load.
RESPONSIBLE ENGINEER J. T. Sullivan/T. B. Madden


13h.ControlRoomPanelModificationsPGCCThePowerGenerationControlComplex(PGCC)isaseriesofGeneralElectricfinishedcontrolpanelsthatwhenassembledprovideallthecontrolroomfunctions.PHASEIStartofPGCCMid1973toAril1979ThiswasconsideredthebasePGCC.ThisphaseincorporatedfireprotectionandseparationrequirementsforallpanelsexceptP606,P608andP633fortheReactorProtectionandNeutronMonitoringSystems.SWECissedthe"G"seriesdrawingsforfabricationofthebaselinePGCCdesignfreeze.PHASEIIAril1979toAril1982GEreconstructedandcompletedthePhaseIwork.FourdesignpackageswereissuedinDecember1981tomodifythePGCC;specificdesignchangeswereissuedfromDecember1981toApril1982toincorporateadditionalPGCCfeatures.ThisphaseincorporatedmostTMIitemsonabesteffortbasisandrepresentswhatwasdeliveredinJanuary1983.SWECissuedDesignChangeNoticestothebasePGCCdesign.PHASEIIIAril1982toPresentThisrepresentstheworkperformedinthefieldfromDesignChangeNotices.(PhaseIIIA4/82-12/6/83)ContinuedimplementingSWECdesignchangestothebasePGCCdesign.(PhaseIII812/7/83-3/1/84)IncorporatedspecificSWECdesignchangesintothebasePGCCdesign.(ECN-CCP-008,016(ECN-HVP-014ECN-EGS-002)ECN-CCL-OO9)
0 ITEN Hydrogen Recombiners      gua1.ification PROBLEM jn fr jsj jy various cosponsors or hydrogen recomb jners fa jjed co Pass qualification tests. Subsequently, vendor indicated that he does not      have adequate documentation for all the components of the equipment      The problem was reported to the NRC under 10CFR50.55(e) by NMPC on August 9,      1983.
The vendor also reported problems with the components to the NRC under 10CFR21.
'E  UIPMEHT SUPPLIER Rockwell International PROPOSED    SOLUTION The vendor has    indicated that the equipment will be qualified  to IEEE 323-1974 by mid    - 1985.


(PhaseIIIC3/I/84-6/I/84)MergedthebasePGCCfabrication("G"series)drawingsandSWECdesignchangesintoonesetofSWECProjectdrawings.SWECissued6000and7000seriesDesignChangeNoticesforadditionaldesignchanges.(PhaseIIIO6/I/84-9/I/84)ReviewedSWECandGEdrawingsfordesignconsistency(8oundaryIdentificationPackage)andissuedresultingdesignchanges.(PhaseIIIE6/1/84-Present,80Ponly)IssuedpastPhaseIIICchangestothebalanceofplantpanels.(PhaseIIIF9/I/84-Present,NSSSonly)Nochangesimplemented.AlldesignchangesareminimalandwillbeimplementedbyPhaseIIIEorIIIF.  
ITEM t Testing of Check Valves Supplied by Anchor Darling Valve  Company.
pROBLEM Mater ial test es sp'ecimens for various components of the subject valves were not impact tested as required by the applicable ASME Code. This problem was reported by NMPC to the NRC under 10CFR50.55(e) on September 7, 1984.
PROPOSED  SOLUTION The matter is  still being investigated. At this point it is not known if the vendor has material specimens or the number of valves,  if anyB that would have to be  cut out/replaced.
RESPONSIBLE ENGINEER J. McDonough/T. B. Madden


I~II9S4IWQ6JLIHQUIAUbMP~TNOV'''~',',FEISTMARPALMA/JUt4&PAQATION~cLO0IFICATLCIN5ALA~ZTILEP5LAM1Q.8IO-I9~10-3LQ,.OlHCRPANELi4)CeFLCATLON5(m-.SPAmTICN)A.6FIAMELIA;P2,5,BA,%-BOI$NSSLO.eLO-L9C.66PI5NW5g50-NG~S0WRM<HATIO54CA&lruCT5Zr.LNIPEILSTL2-2Q121512-LQ'l-rO;(imppZ-L5p31p4.-1p+-I3gIt4&ALI.ATION(NILK-PAPAWFIRE.PANEtTIOH-LIALGe4S/STEM<IIL>I(ORNA);.11.15(IAAF)3.IS4.1~O-~Q-Il55CAaeQEt4uIN6EAHA~Y-.CCPSMLCTioN'uKCIC~CICI~CLICCVCPGCCSTATUSCIWCCaPICCCCcacacaaacecaCHIC~CCC~I~CI~aSTONEGWEBSTERENGINEERINGCORP.naswseaYOWG.NO.05GICCIIXOIYcaccIav
ITEMS PGCC  Electrical Separation PROBLEM p>>d si ins did not condone to the divisional and snbdivisi'onal sepatation criteria of Reg Guide 1'5 A 50 55(e) final report was submitted by ~C to the  NRC  on August 9, 1984.
PROPOSED  SOLUTION The  corrective action are scheduled for completion by December 31, 1984.
RESPONSIBLE ENGINEER KeVaradara)an


13i8nPieStressAs-BuiltandHanerReconciliationProramAnas-builtreconciliationprogramandengineeringworkplanhasbeendevelopedtoperformthefinalstressandsupportreconciliation,basedonfieldverificationoftheas-builtconfigurationoftheCategoryIpipinginstallations.Thelargebo'reportionofthiseffortinvolves330Axstressanalysisforthe20pipingsystemstobequalified.Fieldsubmittalofas-builtdatacommencedinJuly1984,andengineeringcompletionofthereconciliationeffortisscheduledfortheendofAugust)985.Thestatusandscheduleforcompletionofthiseffortisindicatedontheattachment.AsofSeptember28,)984;twentypercentofthereconciliationefforthasbeeninitiatedwith3percentbeingcompleted.  
ITEN Feedwater Block Valves Supplied by Velan Valve Corporation.
PROBLEM Material test specimens for the valve were not sub]ected to simulated post-weld heat treatment (PWHT) prior to testing as required by the applicable ASME Code. An interim report was submitted by NMPC to the NRC under 10CFR50.55{e) on July 6, 1984.
PROPOSED    SOLUTION
: 1. A contract is being negotiated with Power Cutting Corporation to remove material from the, bottom of the valves for testing. Cameron Iron works, forging supplier to velan will perform testing. Testing is expected to be completed by December      1984.
: 2. If the    test results from (1)   above are found to be unsatisfactory, the va 1 ve  will have  to be replaced. Replacement of the valve with a new valve may be completed by December 85. However, an attemptt wtl1 bee made to locate an acceptable valve already fabricated, in which cas e the replacement could be accomplished by February 1985.
RESPONSIBLE ENGINEER J. Ventre/T. B. Madden


350300250X2000O<50R-10050~~I,'Ir~~rrrI*~,;SCHIrrr4~~hCg',.''.:::~r~rr",,',':r4~ACTUALr''~I~p1'EDULE::::::::::::::'::..'::::.::::.::..hI,,':.--;:.SCHEOUiEII~'1ENGlNEERfNQ:-.'.':-:COMPLEnON-'.:;-:,.;;.r'IIIIIIIIIII(IIIfIIIIeII0l~I~I~llIIIIUlIUIIIIIIIIIIIIIIIIII20~.10.~GJULAUGSEPrOCT.-NOV:OEC't984"."::-f~JANFEBMARAPRMAY-JUN.JUL-AUGSEPOCTNOV".1985~~h
AGENDA ITEM  Ill ITEN:
A  detailed discussion of the    recent management    organization changes and impact on construction, pre-op    testing  and startup. Include discussion of how the management organization    will be changed for the operational period and effect on startup. Discuss  interfaces between MAC, NMPC and SMEC.
f CURRENT STATUS:
The  project reorganization was basically compl eted during the first quarter of this year.         The current project organization          chart is attached. The goal of the reorganization was to improve the management of construction and startup activities. There has been no significant change to our operating organization, other than the assignment of Mr. Hooten and Mr. Perry.     Niagara Mohawk believes that these management organization changes    have had a positive impact on the construction and startup schedules. These management changes have resul ted in Niagara Mohawk exercising more direct control of project activities, although Stone Mebster is still the architect/engineer and construction manager and is responsible for day-to-day direction of the project. The MAC individuals assigned to the project act as Niagara Mohawk personnel and        fill positions in the Niagara Mohawk organization. Except for Mr.       Hooten  and Mr. Perry, there are no MAC personnel            filling positions      in the operating organization. Additional information on the operating organization can be found in FSAR Chapter 13, and additi onal in formation on the startup program can be found in FSAR Chapter 14.


g-StamCertificationProramTheSWECgualityAssuranceandControlManual-ASMESectionIIIestablishestheprojectrequirementsfortheASMEIIIN-StampCertificationProg'ram.Currentlythereare31ASMEIIIsystemsrequiringN-Stampcertification,asindicatedonAttachment1.ThescheduleforcompletionoftheN-5datareportsassociatedwiththe20majorsystems'sindicatedon'Attachment2.Theadditional11ASMEsystems,notshown,requirealessextensiveeffort(i.e.,contractor-designedsystems,penetrations,smallboreonly).ThefirstN-5datareportisscheduledtobesignedoutinFebruary1985.  
W.J. DONLON OIECUTIVE ERECTOR HVCLEAR QKRATK2IS ILG. HOOTEN VICE                                                                          VICE PRESeEHT PRf SIDEHT                                PROJECT                                                                              ERECTOR                            OREC TOR HVCLEAR ORfC TOR HVCLEAR RAT)OH
                                                      ~2                                    EHCIHffRIHC LICEHQHC 4                              DUALITY ASSURAHCE CORPORATE Sf CVRITY T.E. LEMPCES                              D.L. OUAMME                                C.V. IlANCAN                                J. PERRY                        J.J. SIPISER
                                                                                                      )SHEET 3)
ASSIS TAHT CDCBAL                SfCRf TlRY                        TO PROJECT 6LfKRHTEMXHT                                                    ONECTOR                                                                                          S4PKHWTOOPIT IIAXEAR                                                                                                                                                          IOCLEAR E. OAVES                      M.J. Rh'I INYSEG)                                                                                          SECIJIIT Y Q3CRATKW T.J. PERKINS                                                                                                                                                        R.F. ORR NAHACER                  NAHACER NAHACfR NAHACER STATION SOU)HTEMXHT
                                                                                      ~2 LICE HSHC CONPLMHCE
* OA OA IOCLEAR TAHT SQKBtPEMX)IT VERONICA TIOH        HV CLEAR MP2                                                                                                                                  OPfRA TIOHS                HVCLEAR A.F. ZAI.LNICK            J.J. BEBKO        C. BECKHAM          D.R. PALMER              SECLRITY R. ABBOTT                                                                                                          ISHEET )3,14)          )QUET IS)            J.P. BERATTA SfCtl)ITT HVES TICATOR NAHAGER                                                        MANACER NAHAGER                NAHACER VAICACfR        COHTRAC Tz SfHIOR                NAHACfR PROST MLO                                                                                                                                ILG. CHRISTIANSEN STARTVP 4  TEST            f HCIHEERIHG fHCRIEERIHC        NATfRIALS NAHAGER CONS TRUCTIOH PROJECT COHTROL SfRWCfS/                                  I&%ET 12)
NAHAGENEHT                                                    ADQH5 TRA TIOH G. AFFLERBACK            W. TAEGER      J. THOMAS    J. NIEZABTTOWSKI          J.P. PTAK              R. GIBSON      A.P. BALENO IS%ET 2)              )SHEET S)      )SHEET 4)        I%%ET 7)              ISHEET 5)              ISHEET  lll    ISHEET B,Q.IO)
IOE LLE PONT H)CLEAR STATK)N IPKT-2 NIACARA LIOHAWK POWER CORPORATION NINE LIILE POINT UNIT t2 PROJECT PROJECT DIRECTION                                                                                                                                    ORGANIZAT ION CHART FUNCTIONAL DRECTION OHLT LOCATK)N KEY                                                                                                                                            MANAGELKNT LESS OTHERWISE NOTED NMP2 QTE CHOC  CHERR+~~      IN.J.) OPERATIONS CENTER                                                                                                    DATE    10/1/84      SP        I OF 15 APPROV                          DA'IE C Ci    MI)A.~Q7CHI


MAJORSYSTEMS:,-SMALLBOREONLYCONTRACTORDESIGNEDPENETRATIONS20TOTALFORN-5
AGENDA ITEM 0'12 ITEM:
Overview of current construction      and  startup management organization showing interfaces between the two.
CURRENT STATUS:
See following page.


350300250~+2OOQ150.100ACTUAL1~~I'1IIIllII.I)tgttttl~.r/l~tI~~l~l~l~tlIIIIIItItltlIItULE:.:.:SCHEDj~'','r:.~~'7\~~~I~~II'-'"<~~'~~~~~~~~r~II'~.r.,'*~r~II,~I'I~('~~I*00~...-~....,.'..-..N-5:-','.;:-.SCHEDULErrENGlNEERlNG.:'"".,COMPLETlON.'-.:.'+-.,":;,,-,,l'l~'.1'.'I'~-~,'~I'~V20~oo0ZJANFEB,.MARAPR.MAYJUN.JULAUGSEPOCTJULAUGSEP~OCTNOV.DEC-':.:-"19&5't984NOV
CONSTRUCTION AND STARTUP NANAGEMENT ORGANIZATION                        IO/17/84 INTERFACE PROJECT OIRECTOR NMPC STARTUP                                              HG 1 HEERlHG CONST              NAHAGER MANAGER                          SrNANAGER MANAGER              MANAGER CONST TEST    TEST          TEST                                COMPLET GROUP PROJECT GROUP                GROUP                                    I MANAGER      MANAGER AOVISORV                        I MANAGER H    ICC        ELECT  ENGlNEER                        I I
I I
I                                                          I I
I                                                          I I
I                                                          I I
I                                                          I I
I                                                           I I
I                                                           I I
I                                                           I SWEC CONST                CONST    NMPC CONST SUPV                  SUPV  TURNOVER MECH                  ELECT    MANAGER T/0 SUPV


As-BuiltOrawinsComnitmenttoas-builtdrawingsanddocumentsisaddressedinProjectGuideline22(SMECDrawings/Documents)andprojectGuideline46(GE-NSSSDrawings/Documents).Thesedocumentsarecurrentlyinthereviewandsignout.cycle.Insummary,,theas-builtdrawingpolicyisasfollows.Updatedocumentsinthreephases:atstartofpreoperationaltesting{systemturnoverupdate-STU);priortofuelload(fuelloadupdate-FL);andafterplantturnover(plantturnoverupdate-PT).Theas-builtupdatesconsistofincorporationofissuedchangedocuments(E&OCR,N80,ACNs,etc)intothebasedocument.ForSTUthescopeofdocumentupdateappliesessentiallytokeyengineeringdiagrams.TheFLupdatescopeappliestoallgACategoryIandCategoryIISeismicDesigndrawings(exceptBZs).ThePTupdateaddressesthebalanceofdrawings/documentsatthediscretionofNNPC.SchedulingoftheSTUupdatehasbeencompletedandisinthe1985workplan.Thebalanceoftheas-builtdrawingeffortisintheprocessofbeingscheduled.  
AGENDA ITEM 813 ITEN:
entailed revise and current status of design, engineering and construction effect including quantities, work-off rates, current status and schedule for completion for:
: a. ATWS-3A Design Changes
: b. Appendix  R Design Implementation
: c. NSSS  Loads Adequacy  Evaluation
: d. High, Energy Line Break (HELB)
: e. Moderate Energy Line Breaks (MELB)
: f. Control Rod Drive System
: g. Primally and Secondary Containment
: h. Control Room Panel Modifications (PGCC)
: i. Pipe Stress  (as-build)
: j. N-Stamp  Certification  Progr am
: k. Updating Drawings and Specifications to as-Build Condition
: l. Environmental gualification of Safety-Related Equipment
: m. Seismic guali fication of Safety-Related Equipment
: n. Hanger Reconcil iati on Progr am CURRENT STATUS:
See following pages.


13.18mEnvironmental5SeismicgualificationEnvironmental4SeismicequalificationcontinuestoproceedinaccordancewiththerequirementsofthemajorE9milestoneschedule(AttachmentA).Progressismonitoredonanindividualspecificationbasisand,moremeaningfully,bytotalcomponentcountofcomponentsactuallyqualifiedversuscomponentsrequiredtobequalified;AttachmentBshowsthatstatusasofAugust1,1984.AttachmentCshowstheSWECtargetplanversusNRCcomponentquantityrequirements.SupportiveoftheNRCauditofEl},itisnecessarytodemonstratecapabilitytobe85percentcompletewithinstallationofcomponentsrequiringEg.EngineeringiscurrentlyinterfacingwithConstructiontoassessanacceptablemethodofstatusingcompletionofequipmentinstallationfromanEgstandpoint.Thepotentialexiststhatseveralcomponentsmaynothavetheirqualificationprogramscompletedbyfuelload,anditisexpectedthattheseitemswillbeaddressedbyuseofjustificationforInterimOperationprocess.  
13a.                                 ATMS-3A entation The NMP2 imp 1 emen        of the ASS-3A  upgrade consists of nine sp system modifications as    follows:
          'tandby Liquid Control    System 86GPM capacity upgrade
: b. Redundant  Reactivity Control  System addition
: c. Alternate Rod Injection
: d. Recirculation Pump Trip
: e. Feedwater Runback
: f. Automatic Standby Liquid Control Injection
: g. Average Power Range Monitor Downscale Trip
: h. Reactor Mater Clean-up Isolation
: i.  'Nuclear Boiler Instrumentation Transmitter Replacement Engineering and Construction requirements have been incorporated into the SWEC  and GE documents needed to support construction.
All major  equipment  is delivered and  in place.
Installation of the required design changes is continuing in accordance with the applicable system completion schedule.


~*sEQUIPMENT;:.QUALIFICATION"SUMIN'ARY;.',-;.:::'':.-',"',",:.":,ll:-"::.':,."'.::::-",",".'';SCHEDULE<@".I"IJ't<f;:@I";:.""!'!Vj':.',"-.'i',-',"::::;:"".:j'SEISMICREPORTSEISMICPROGRAM,,AND~,70SPECSI3000ITEMS"MASTERUSTr.r"~:''".r.'!';.,.:..'.6"",(,:.'>>ltI'',->>Fr<<h'-us~@,...thg,".Ipsb.~.I1>>.ihh.'>>ckr.j..I..>>'."l.,11.:.,.,-.1,",:.hI)>>>>srr.,rrrbi.bsr.5.',l;;1!,:,r.brlbr'."....)-';>>!gWr..;:-,:.--;4:..l;;Pq>>t>>S~"..'.!.1<<ssV>><M84REPORTMEkPROGRAM"'',r.tIANDsu<<40SPECSI3200ITEMS'MASTERUST+1'-."--"EOUlp.dUAt'<-'i':".1''-i'I'"1--:'.hob;,.,t>>.,REMAINING10%..pfll<<lt'>>stb~">>-~NRCOVERVIEWMEETINOWt!2tI!i11~0,',>>1'-"1'<<<'i~t~>><<>><<I~IHlIIS-!I1..'-'a<<'V.;rl.II1IPj'-:<<"4"s'slI"-"~<<I'1.<<1fg@45$)I4SUSMITFSARAMEND.I>>;~j',.'.~"..:.'."'':.<~.".Ig:j,'l,",ag"."',S.',~tI~Q;.;jtFP~gANDMASTERLIST:.',>>''.".;.",>>.'.,s>>l..s.I'.!'...'5r'',".''.=..S>>I<<,'r>'>>,'.>>,t,jOEPREPE4DLDCN4MASTERL)ST')Qfgh'UBMITFSAIIAND~'"i'I(;$."gfCOMPLETEgt'qrj..<<<s,E406%NRCAUDIT<<'<jt,e)I,~MASTERLISTUPDAr'p>)f'.,>>)5t(jib>>~EOUlp,0616',g.,'.,"'),"PLUsscEwsHEETs)I.:..~trt'<<KC)INsTALLED1PlREvIEwFsARs>>$fg~.4I'ppp:ts,.'j'.".~'1'v~>sHEETssEOD;~.~5+fogy++AMN',S,:jy>.f~g$jig,'<<jan"gpj"S".,")',IIt't)1>>)h;.'2>>uMASTERUSTi(gga."gI)~JID'Q95rgb);>>1,tt;COMPLETE'.I~BIO-6S.s>>>)s,sh''1~"..":..".-..".'1~."."'t~ltS/0$""..".:;;>>'O'I15)JS:"'.':I'-'&agP.'.IISSUETONRC'"-~sI.'.""'yI~f~NRCSELECT:'..:-';>>SWECIOEPREPARE~>>,;II.y0tr~t<.j'4'.-~gIq,'~'1;..".t~.,<'-.",:.,;.,...EOUIP.FORAUDIT:',.:'I'.",.~DOCUMENTATION',.:I'."".'-.'"..-.:,':",'".-~S~~~~1.>>l..I.\s,>>..Is~,1.zI,,'<<h,.S>>w>>'s+Pet.~.lbtrt'tt""':j""''h'"ss"")+f4'""/~)'r".Ib<<<<':Ilrll'sf>>Is>>,,iL~~p1srrsrss;"':137">>I:,grvgrlg..sill>>1J",sr>>Is>>;It>le)lh:bsjljsslr/'srgrss",'.Sb7t~hh~I~,~*'1:S.>>~.IFIRSTREFUEUNO)."!:.-.'...OUTAGE-Ed100%".<<".-gCOMPLETE,.t:,.:.''~etcf'
13b.                             A  endix  R The  status of the Nine Mile Point Nuclear Station - Unit        2 Appendix R implementation is as follows:
All  changes  resulting from the Appendix    R  evaluation have been agreed to by Niagara Mohawk Power    Corporation. The most  significant changes which have to be made involve    the control  room    fire. The description and schedule for accomplishing these changes are listed below.
: 1. Modifications to the control design of the remote shutdown panel 2CES*PNL405 are in process and scheduled to be completed by October 26, 1984 for input to Electrical.
: 2. Markups  of SWEC elementary diagrams are in process and scheduled to  be completed by October 19, 1984.       Drafting of the completed SWEC elementary markups are in process and scheduled to be completed by October 26, 1984. All SWEC elementaries are scheduled to be issued by November 2, 1984.
Design  of the  two disconnect panels 2CES*PNL415 and 2CES*PNL416 is in process  and scheduled to be completed by November 2 1984.
4,   The GE elementaries which require changes have      not been marked
          .up. However, these elementaries are scheduled        to be completed by October 26, 1984, for transmittal to GE.
: 5. ECNs implementing all changes resulting from Appendix R are in process and scheduled for completion by October 19, 1984.
Appendix R ECNs are scheduled to be signed out by October 26, 1984.
: 6. Engineering design for the emergency lighting is:in process and scheduled to be completed by February 28, 1985.
: 7. The safe shutdown problem cables have been      rerouted and are  in the process of being installed.
: 8. Cable changes resulting from the Appendix R Control Room Fire Study will be routed as soon as the ESKs are reissued.


tI'""t:"'')WMa/JCPPQA/7hc/48&rAgquufZ~),,;.'.t',:.i<''.-.",~.'.-..'~~~Ffdw'w'AHAB/krC~ri~.VaMww7iuiVgl:3>jP~,I'",4vAA~~r~gAAI';)',7g!fry~.~E~~g.ttl)l:,EL,~~pa.'Ig)'-)t'IAp)~Ilia~.1tCI~~'gVpt'llrrvJvo~r.":rrwooorraoroIrt4hlr)IC).o,()J1~"~.~~~"~Co,ethel~'ut'C':.::1~I~~~'1~r~~,II~'-.)II1);I~oE~'I~t)tIi:)tt"~IIilIlla+ItCjok,f(;~I',1.!PILI:..~~CjaflI'rt~Ctt"Sta))"I.ptttllIS~oI.i!c-!:'.ti~vvru6'.:..D>&PIE(,-l/~ASS.27daZ5na2/onZM9~~o~Ioo~Jrr)L)'(7~a)~.'(~Jwt1fl:r.I'~'woof1$<A..1,).~~'','I)PPE~.Iottt.I,~I'liooa~I~P;;1)1.'!ola''.WI~ol1~+gt)8C.~1J.CIoooJ.~o,~@gal;~:)ol'I.I,.vt~~ota~oalr)f1l)I:.)ao'Pa'lIICo'ota.Cj.IE',~<<oo)opo'gto'N)>>M'1Pt,~.ICI'.f'r,.~p))'t)"j~loto.1f,la'J~gylepI)~--'jC)JIIttPo)~*r,.',y,'Igrr"')o)'(I,'~:If'tI)o'Ij;Jgt11I/~Q~~oo)~aP,',a',y'];qIIII";)[!,:I)t.'j!4',5oWAw~Iov,i(;,r~"C,ll'4J~A'~'jlpP,jo'I'Plgli!Vlt~IfCt"~.;,j>y,ri"P,,'.'~f'-t'kg>fh)fl$Vrt1th4.'tott''P~'ffkfafaf)f)<;i'\lIE4I~tVI-izt.,".'-'.Cfl.paog.),.<I,)I)"IE'z-'))SIP%Coralta.~''f,.i,".i,'-))lr'.Cgq)QCEEoo.El'."II'".I'I'~~v..il~~~I't.'~)'C':l::/doaa'I.IC,P'r'I".~~I4"II:tr)Ila)attoJ,'llL.'Itl."';IIr)vIill.IogI'~I'II'-/dnA~'I~~''..A!o.I'.'DO'~ltP)oV~Ann:)).-'4'oo".$,'3ooI)IllP~o~~~I~o1<<'y%g::>:-".i'-<<'-,".X,.~..s~~~II~I',~I~I,I><)t)C);!r.I.U)I,';:!,'l!+'a~a)o":g:.:'.1I)''Ifll'j)Q~lq'~4l..x+~Ct'BCD
i1 13 c.               NSSS  NEV LOADS ADE UACY EVALUATION The NSSS New Loads Adequacy        Evaluation provides an evaluation of NSSS safety  zelated  equipment    sub]ected to hydrodynamic loads as requized by NUREG  0808. Two phases    of  this evaluation have been defined.
Dynamic Analysis      - Development of loadings on    RPV and equipment due to hydrodynamic loads.
C
: 2. Equipment Adequacy Evaluation - Assessment of each piece of safety related equipments adequacy when sub-
            )ected to the loads developed in the        first  phase.
STATUS
: 1. Dynamic Ana1ysis    -   Complete
: 2. Equipment Adequacy Evaluation A. Reactor Pressure Vessel Evaluation complete. No hardware modifications re-quired. Adequacy has been assured, however, use of new ozificed fuel support testing results is re-quired.
B. Other Equipment Thirty items required evaluation. Final adequacy evaluation foz equipment is complete except for:
Item                Com letion  Scheduled ECCS Pumps                          10/26/84 SLC Tank                            10/26/84 HCU                                  11/30/84 RCIC  Turbine                        11/30/84 Fuel Prep Machine*                  10/17/84 Recirculation"Piping Analysis                      12/31/84 Report                          3/1/85 Minor physical        changes  to the fuel prep machine    will be required.


AGENDAITEM814ITEN:Detailedreviewofroom/areaturnoverscheduleandstatus.CURRENTSTATUS:SeedataforItemtl.
~


AGENDAITEM815ITEM:Projectedrequestsforreliefofincompleteitems,systems,ortestcompletionsatthetimeofUnit2licensing,identifyingeach.'CURRENTSTATUS:Atthistime,thereisnoprojectionforrequestsforreliefofsystemsortestcompletionsatthetimeofUnitt2licensing.Inregardstoincompleteitems,atthecompletionofthetestprogrampriortolicensingtherewillbealistofincompleteanddeficientconditionswith'theplantssystems/equipment.TheseitemswillbemaintainedandstatusedontheMasterWorkListwiththeirrequiredcompletiondate/milestone.TheseitemswillbenegotiatedwithNRCRegionIandResidentInspectorsandwillbecomeanattachmenttothelicense.  
HIGH ENERGY LINE BREAKS Systems,   s zu ctures  and components      related to safety have been protected from the unrestrained motion of pipe, ]et impingement and temperature/
pressure effects of high energy line breaks (HELB).
STATUS
: 1. Engineer ing A. Identification o f      systems, s truc tures and components affected by    HELBs    -  Complete B. Design    for pressure/temperature        effects - Complete C. Pipe Rupture Restraint Design          - Complete    Verification - 12/85 D. Jet Impingement Evaluation
: 1. Structures    Complete
: 2. Piping  -  10/85      507 Complete
: 3. Equipment    -  6/85      60X Complete
: 2. Const zuc t ion Pi,pe Rupture    Restraints    and  Jet Shield Installation Restzaint Supports        -  Complete Restraints    -  6/85      100X  Fabricated    20X  Installed Jet Shields    -  6/85    100X  Fabricated    OX  Installed


AGENDAITEM816ITEM:Reviewofopenpunchlistitemsbycategoryidentifyingeachandwork-offratevsaddonrate.CURRENTSTATUS:Seefollowingpages.(hardware/paperwork)
High Energy Line Break All high  energy breaks have been postulated at  fittings and high  stress points.
190  pipe whip restraints have been designed and most have been installed.
Structures have been designed to withstand sprays.
Equipment  targets have been identified  and 2 shields have been designed.
We  are currently identifying other type targets; tubing, small bore pipe, and  conduit. This will be complete by February, 1985.
Analysis will then proceed to evaluate whether any of the targets must be protected.
We  expect no more than 8 additional shields. If they are required they  will be designed and installed by September, 1985.


APROVEDEXCEPTIONSasof10/1581HipsOV(NEDBYAOD69OI-Qrw(0~U~.C~Q(04Oo0I-GlX09f'109i179r2410/'110'10i15TOTALQQSOFTWAREONLYg7gNEEDSIGNNEWOFFKQNEEDgggCOMPLETEDISPOSITION
13e.              MODERATE ENERGY      LINE BREAKS  MELB ine study was completed of the effects of in Ju J 1y 1984 resu  lting Moderate Energy Piping Break ing in the  preparation  of FSAR
(<<
sections
                                                                                        )
3C.4 and 3C.5-The baseline 1      t s u dy y resulted in ~7 Cat. I zones being identified as requiring flood detection capability,
                                      '        spray shields
                                                      '       and/or
                                                                  '   othe r chan g es to assure sa fe s h u tdown capability is maintained coincident with a moderate energy line crack. FSAR sections 3C.4 an resolution of these deficiencies. Oue to licensing schedule constrain s, the baseline study used conservative and simplifying assumptions.              The extent of identified design changes        needs  to be reviewed accounting for realistic conditions and minimizing impact, on the existing completion schedule.
The 47 Cat. I zones requiring further evaluation are contained in seven areas (Control Bldg., Reactor Bldg., North Aux. Bay, South Aux. Bay, Screenwell Bldg., Diesel Generator Bldg. and tunnels). Mor ksheets have been developed to assure documentation of and consistency in the evaluation process.
The speci ic zone eva ua 'f'luations are scheduled to commence in late October 1984 with  an average of 15 zones to be addressed each month therea ter, the  f r review of zones will require about two months to complete. Identification of required fixes for the      first  group of zones (Control Bldg.) is scheduled
. for mid-December i              1984 and all fixes by mid-February 1985.


.:A.PP:IiOVEI)EXCEPTIONSa.'.!of.10/I')PCCC(BIP103.001}~.6-0.8-0.6-0.4-0.2 Fl"79/109r'"410/810/2t7r']TOT[~CLEZDSP~i,~jNEWCOlvlP
13f.                 En  ineerin  And  Construction Status For Control  Rod Drive    H draulic  S  stem.
A su@nary      of the Engineering and Construction status through August 1984, for  the control rod drive hydraulic system (CROHS) is shown below:
DESCRIPTION      'NG'RG              X COMP              X COMP CONSTR X COMP AS-BUILT Inside Containment Enterprise 90o                              100                  95 270o                            100                  95 Piping Under Vessel                    100                100 SP5    to Contain.             100                  95 Supports Sliding    Conn.               100                100 Supports SP3 5      SP4          100                100 Outside Containment Multi-function 90'70o 95                  95 95                  95 Intermediate Supports            100                  90 I II M Piping 90o                              100                  95          0 270'ump 100                  95          0 to Contr. Sta.         100                  85          0 Control Sta.                     100                  85          0 Supply Lines                    100                  70          0 Vent Lines                      100                  0          0 Drain Lines                      95                  0          0 Scram Hdrs.                     100                  60          0 Scram Drops                                          10          0
                                          '00 Scram Tank                        95                  70          0 The scheduled      completion dates    for Engineering, Construction  and  As-Bui1t Verification are      as  follows:
COMP                COMP        COMP ENG'RG              CONSTR      AS-BUILT Inside Containment                                      11/84      5/85 Outside Containment                  11/84              3/84        9/85


1PL'OTDATETOTALNEWNEEDDISPOSITIONNEEDSIGNOFFCONPLETEDTOTALBIPSOWNEDSOFTWAREONLY9/1060502017111821157517369/176'212971841310757619779/2463811032~41~05~18478202210/16288ill23012182677919~110/861441271186.~4281189210/1563473932641167266811914
0 13g,                                  PRIMARY AND SECONDARY CONTAINMENT Design engineering and construction activities for primary containment and condary containment are complete. Engineering for these structures is now ongoing to verify design adequacy vith actual system loads STATUS ORIGINAL DESIGN    CONSTRUCTION    LOAD VERIFICATION  STATUS OF STRUCTURE                    COMPLETE          COMPLETE          COMPLETE    VERIFICATION Primary Containment Wall                  10/79              10/81              5/84          100X Containment Wall
                            'econdary 1/80              12/82              2/85          40X Pedestal  6  Dryvell Floor                12/79              9/80              4/84          100X Biological Shield Wall                      9/79              7/80              6/85            OX Primary Containment Liner                  11/76              10/81              11/84          10X Equipment Hatch                            9/77                                12/84            OX Reactor Mat                                12/73              6/77              2/84          100X l Pool  Area                          6/82              2/83              7/85 Primary Containment Steel                  6/81              2/82              4/85          33X Secondary Containment Steel                9/81              6/83              6/85            5X Design and construction of the above        structures, is 100Z  complete.


AGENDAITEM817ITEM:StatusandscheduleforSeismicII/Ireview.CURRENTSTATUS:.Seefollowingpages.  
13h.              Control  Room  Panel Modifications      PGCC The Power    Generation Control Complex      (PGCC)  is a  series of General Electric finished control panels that          when assembled      provide all the control room functions.
PHASE    I Start of    PGCC  Mid 1973 to  A  ril 1979 This was considered the base PGCC. This phase incorporated fire protection and separation requirements for all panels except P606, P608 and P633 for the Reactor Protection and Neutron Monitoring Systems. SWEC issed the "G" series drawings for fabrication of the baseline PGCC design freeze.
PHASE    II A  ril  1979  to  A  ril 1982 GE  reconstructed and completed the Phase I work.
Four design packages were issued in December 1981 to modify the PGCC; specific design changes        were issued from December 1981 to April 1982 to incorporate additional        PGCC features. This phase incorporated most TMI items on a best effort basis and represents what was delivered in January 1983. SWEC issued Design Change Notices to the base PGCC design.
PHASE    III A  ril  1982  to Present This represents      the work performed in the    field  from Design Change Notices.
(Phase  IIIA 4/82 - 12/6/83)
Continued implementing    SWEC  design changes to the base      PGCC design.
(Phase  III8  12/7/83 - 3/1/84)
Incorporated specific    SWEC  design changes    into the  base  PGCC design.
(ECN-CCP-008, 016        ECN-EGS-002)
(ECN-HVP-014            ECN-CCL-OO9)


17.CATEGORYIIOVERCATEGORYIrhNMlepoint2ProJectestablishedapol1cyofseismlcal]yanalyzingandsuportingnon-safetyrelatedcomponents1nnuclearsafety-re1atedareasbackinMay(975.AdecisionwasmadeinJune1977thatalllargeborepiping>nethPrimaryandSecondaryContainmentwouldbedesignedasseismicayAdditionally,componentsinothersafety-relatedareawouldbeevaluatedtodetermineiftheycouldpresentahazardtoy-safet-relateditems.ThispolicywasformallydocumentedviatheissuanceofProjectProcedure84inMarch1983andsubsequentlyrevisedinJune1984.Theprocedure;2.Definestheboundariesofthesafety-relatedareasnListsthevarioustypesofcomponentswhosefailuremustbeconsidered3.Describesfailuremethodsandassumptions4.Establishesamethodofdocumentingevaluationsresultinginnon-seismicdesign5.Establishesacheck-listofcomponentsversusbuildingsandthecorrespondingdetermination'6.Providesforamethodoffinalverificationofas-builtdesignsagainstseismic/non-seismicdesignsNotalltypesofcomponentsineachareaareseismicallypre-designed.Incertaincases,forexample,sprinklerpiping,sanitaryandplumbingsystems,etc.,adecisionismadetoperformawalkthroughofthebuildingtodetermineifseismicsupportsand/orrestraintsshouldbeadded.Thesesystemscannotbeeconomicallyinitiallydesignedseismicallybecausethecontractorsaregenerallyresponsibleforthefinalroutinginthefieldandchangesgenerallyoccurduringconstruction,testingandInspectionAgencies'eviews.Thefinal.walkthroughshavebeeninitiated;theywillbecompletedpriortobuildingturn'oversinthelastquarterof1985.Thislatefinalizationisnecessarytoensurenonon-seismicdesigncomponentsareintroducedintosafety-relatedareaswithoutanevaluationbeingmade.  
(Phase    I I IC 3/I/84 - 6/I/84)
Merged the base PGCC fabrication ("G" series) drawings and SWEC design changes        into one set of SWEC Project drawings.
SWEC    issued 6000 and 7000 series Design Change Notices for additional design changes.
(Phase    I I IO 6/I/84 - 9/I/84)
Reviewed      SWEC  and GE  drawings for design consistency (8oundary Identification      Package)  and issued resulting design changes.
(Phase  IIIE 6/1/84 - Present,       80P  only)
Issued past Phase      IIIC  changes  to the balance of plant panels.
(Phase  IIIF 9/I/84 -      Present,   NSSS  only)
No  changes    implemented.
All design      changes    are minimal and    will be  implemented by Phase IIIE or I I IF.


PPghRevisionlPage6ofl5AttachnentATTACllHEHTICKHERALSEISNICDESICNAPPROACHfORCATECORIESIIANDIIICOHPOHENTSINSAFETY-RELATEDAREASCadeau'-SefsnlcDesignorEvaluatedE-EvaluatelaterHANotAlicablcPrinaryCuntajnnentReactorBuildingandAusBasControlDieselRoonGeneratorBIldlgBuildlnScreen-'uellSulldlng(SeeAttach-nents5and6ServiceMaterTunnelsALLINaln-SteanTunnelsElectTun-nelsandAuslllaryServiceBui)dingBelou26l'tandbyCa~TreatnentBulidiog(httach-nentSHainStackTurbBldgPortionofel(2)7'-6")Slab(seeAttach-uent2)LargeBorePlplngSFireProtectlon-SHainsandNoseStationsFireProtection-sSprinklerPipingFireProtecLlon-HACOtorltalonPipingDonestleMaterandHhSanitaryPipingHAKAHAHAFloorandEqulpnentDrainageSRoofDrainagePipingHAHhNA
I                              ~  I I9 S4 JLIH      QUI      AUb      MP  ~T        NOV
                                                                                  '    '                  '~              ', ',  FEIST        MAR IWQ 6 PAL          MA/    JUt4
        &PAQATION ALA~ Z TILE    P5LAM 1Q. 8          IO-I9
          ~ cLO0IFICATLCIN5
                                                                        ~  10-3L Q,. OlHCR PANEL i4) CeFLCATLON5 (m-.SPA      mTICN)
A.6F  I AMELIA;P 2,5,BA,                                    LO.e
          %-BOI      $ NSS LO-L9 C. 66 PI5NW5                                                                                    L2-2Q g 50-NG~S                                                                                                                                      p  4.-1 0  WRM<HATIO54                                                                          12  15 CA&lruCT5                                                                                                              p Z-L5 12-LQ p +-I Zr. LNIPE  I LST
                                                                                      'l-rO; (imp p  31 3g  It4&ALI.ATION(
NIL K-PAPAW                                                            <IIL>
(ORNA);.
I 11.15                                                (IAAF)
                                                                                                                                                ~O 3.IS    4.1 l55CAae
                                                                                                                                                                                ~ Q-I FIRE. PANEtTIOH-LIALGe4  S/STEM Q
Et4uIN6EAHA ~Y-   .
PGCC STATUS
                                                                                            ~ CICI~ CL ICCVC CCPSMLCTioN 'uKCIC W
CI                                                                                  ICCCC            ~ CCC ~ I ~ CI ~ a          caca caaa ceca CHIC CC STONE G WEBSTER ENGINEERING CORP.
aP OWG.
NO.
naswse aY                05GIC  CIIXO IY


PPB4Revision1Pagelof15Attac11%cntCodes:S-SelsalcDesignorEvaluatedK-EvaluateLaterX~BXt6llBlPrlaaryContsinncntReactorBuilding~adAuxbaysScreen-vellBulldlnb(SeeControlDieselAttach-RooaGeneratorsentsB~ttdtnBlldl65nd6ServiceMaterTunnelsAttlMaln-StcaaTunnelsKlcct'Tun-nelsandAuxiliaryServiceBui1dingBelou261'tandbyGasTrcstnentBulldint(Attacb-sentb)HainStad:kTurbb)dgPortionufel(2ll'-6")Slab(seeAttach-ent~2SnailborePlplngdSTublngdandConduit5SSSSanpllabSysteaTubingNAP-AurbaysKbalanceNANhDuctvorkaSIKSHangingKquipaent,Scj~uni'theaters~lightedcoolersCableTraysTnstrunentPanelsandSRacksNANANAStucturslCosdponcnts,Sc.g.dplatforusdceilingedpartitioned'alls,laddersFloor-NountedKquip-S~Cnt~e.b.dPudsta~ta0ks~1ITKXCIIRS~11CCs~SMGRISS'INAeS-KsstoflrnpingeoentMallC3/12)77/84A/SYPP
13 i8n Pi e Stress    As-Built  and Han er  Reconciliation Pro ram An  as-built reconciliation program and engineering work plan has been developed to perform the final stress and support reconciliation, based on field verification of the as-built configuration of the Category I piping installations.
The  large bo're portion of this effort involves 330 Ax stress analysis for the 20 piping systems to be qualified. Field submittal of as-built data commenced in July 1984, and engineering completion of the reconciliation effort is scheduled for the end  of August )985.
The  status  and schedule for  completion of this  effort is indicated  on the attachment. As  of September 28, )984; twenty percent of the reconciliation    effort has been initiated with 3 percent being completed.


AGENDAITEM818ITEN:Detailedreviewandcurrentstatusofpoweraccessiontestingproceduresandoperationalprocedures.A.Powerascensiontestproceduresincludingsafety-relatedandnonsafety-related.1.Numberrequired2.Numbernotstarted3.Numberinpreparationandapprovalprocess4.Numberapproved.B.Operatingproceduresrequiredforfuelloading:includingstationadministrative,stationoperational,surveillance(e.g.,technical'pecification),maintenanceandemergencyprocedures.l.2.3.4NuaberrequiredNumbernotstartedNumberinpreparationandapprovalprocessNuoherapprovedCURRENTSTATUS:Seefollowingpages.  
                        ~          ~
I,
                                            'I                                                                ~ ~  r r
r                    r                            I I *      ~
I I
r
                                                    ,;SCH EDULE::::::::::::::'::..'::::.::::.::
h
                                                                                                                                  ..     I I
I I
I r r    4 ~                                                                                                  I I
350                                                                                          I I
(I        20
                        ~ h fIII 300                                                          Cg',. ''.:::                                                            I
: r
                                                  ~r~r r ",,', '
I I eI I
250                                                                                                                                    0 l~
I~
                                                                                                    ,,':.--;:.SCHEOUiE                  I~
ll X  200                                                                                                                                  I IIUl I
I        ~
IU 0                                                                            '
I 10.
                                                                                                                                                      ~
II
                                                                          ~
1 O  <50 I            G R
ENGlNEERfNQ:-                .'.'               I I
100
:-:  COMPLEnON -'.:;-:,                   .;;.      I I
I I
I
                                                                                                  'I          r                          I I
50                          r''      ~
I 4  ~                                          I                                                                      I
                                                          ~
p I
ACTUAL                          1 I
I I
JUL AUG SEP  r    OCT.- NOV: OEC          JAN          FEB        MAR APR        MAY - JUN              . JUL  - AUG  SEP OCT      NOV
                  't984"."::-                                                                    ".1985                ~ ~
h f      ~


QUESTION18APOWERASCENSIONTESTPROCEDURES-STATUSProcedureTeNSSS-StartupTestProc..No.Reuired126No.NotStarted116No,InPre/Arov.10No.ArovedBOP-StartupTestProc'ipingVib/ThermExpansionProc.20200
g-Stam    Certification    Pro ram The  SWEC  guali ty Assurance and Control Manual - ASME Section III establishes the project requirements for the ASME III N-Stamp Certification    Prog'ram.
Currently there are 31 ASME      III systems  requiring  N-Stamp certification, as indicated      on Attachment 1. The schedule for completion of the    N-5 data  reports associated  with the 20 major systems's indicated on 'Attachment 2.       The additional  11 ASME  systems,  not  shown,  require  a less extensive  effort (i.e., contractor-designed systems, penetrations, small bore only). The first N-5 data report is scheduled to be signed out in February 1985.


QUESTION18BOPERATIONALPROCEDURESSTATUSProcedureTeNo.ReuiredNo.NotNo.InStarted're/Arov.No.ArovedChemAnalysisProcedure3429InstrumentProcedure20CountingRm.ProcedureComputerOper.ProcedureElectricalMaint.Procedure4040ElectricalP/MProcedure55ElectricalSurv.Procedure1010FuelHandlingProcedure1515RxAnalysisProcedure2222IgCSurv.Procedure780780OperSurv.Procedure225225InServiceInsp.Procedure150150AdministrativeProcedure3331Tech.Dept.ProcedureISI3028StartupAdmin.Procedure2924
20 MAJOR SYSTEMS:,-
SMALL BORE ONLY CONTRACTOR DESIGNED P ENETRATIONS TOTAL FOR N-5


QUESTION18BOPERATIONALPROCEDURES-cont.ProcedureTeNo.ReuiredNo..NotStartedNo.InPre/Arov.No.ArovedOfficeInstructions30DocumentCntrl.Instructions1818DocumentCntrl.ComputerProc.TrainingAPNs1716OperatingProcedures1001387Emerg.Oper.Procedures2322Op'sFireProt.ProceduresEmerg.PlanProc.14140Rad.ProtectionProceduresRad.Tech.Procedures55EquipOper5CalibrationProc.Envir.Proc.16FireProt.DetectionProc.5854Inst.Maint.Procedure2519Proc.Surv.Procedure
1 I'                ~ ~
                                                  .:.:        SCHED ULE:                                                              '
j  ~
1 I
I I
                          ','r:.    ~                                                                                                                        l l
                            \  ~
                                                      ~
7
                                                                                                              <    ~ ~    '                                  I
                                                              ~        ~                                        ~
                                                                                                                              ~ ~
                                                                                                                                ~ ~
I.
350                                                          I  ~                                                                                        I I          )t      20
                                                        ~ I I'-                                                                                             gt t
300
* 00                                t t
                                    ~    ~
l~
                                ~
250                                                                                                                                                          .
                                                                                  ...       ....,.'..                 -..N-5:-','.
                                                                                                                                                      /r r
                                                                              ~
                                                                                        - ~
                                                                                                                    ;:-. SCHEDULE                              l~
t
~+  2OO                          r        ~
                                                                                                                                                          ~
I~
l~
Q                                                                                                                                                r            l~
l~
150                                                                                                                                                      tl
                                                                                                                                                                      ~o o
II'                                                                                                                            I        0 r .r .,'*  ~
                                                                      ~
ENGlNEERlNG I
I Z
                                                                                    .: '" ".,COMPLETlON.'-.:.'+-.,":;,,-,,                                    I
                                              ~    I          I,                                                                                            I 100                                ~  I                                                                                                                  I t
I t
                        ~    ('
I                  l                                                              l
                          ~            ~                                                            'l        ~
                                                                                                                                    '.1  '  .'              t I    '  ~ -  ~,'      ~                  I'                      l I
ACTUAL                                                                            ~V                                                          I t
JUL AUG SEP  ~
OCT              NOV. DEC        JAN            FEB,. MAR APR . MAY JUN                              . JUL        AUG  SEP  OCT    NOV
                  't 984                                                                          -      ':.:-"19&5


QUESTION18BOPERATIONALPROCDURES-cont.ProcedureT)'No.ReuiredNo~NotStartedNo.InPre/Arov.No.ArovedSamplingProcedure.Maint.Proc.Prev.Maint.Procedure111356035551000'aint.Surv.Procedure1513
As-Built Orawin  s Comnitment to  as-built drawings  and documents is addressed in Project Guideline 22 (SMEC Drawings/Documents) and project Guideline 46 (GE-NSSS Drawings/Documents). These documents are currently in the review and signout.cycle.
In summary,,the  as-built drawing policy is  as follows.
Update documents  in three phases: at start of preoperational testing {system turnover update - STU); prior to fuel load (fuel load update - FL); and after plant turnover (plant turnover update - PT).
The  as-built updates consist  of incorporation of issued change documents (E&OCR, N80, ACNs, etc) into the base document.
For STU the scope of document update applies essentially to key engineering diagrams. The FL update scope applies to all gA Category I and Category  II Seismic Design drawings (except BZs). The PT update addresses the balance of drawings/documents at the discretion of  NNPC.
Scheduling of the STU update has been completed and    is in the 1985 workplan. The balance of the as-built drawing    effort is in the process of being scheduled.
: 13. 1 8 m Environmental  5  Seismic  gualification Environmental 4 Sei smi c equal i fi ca ti on continues to proceed in accordance    wi th the requirements          of the major E9 mil es tone schedule (Attachment A).
Progress  is monitored    on  an  individual specification basis and, more  meaningfully, by    total  component count of components actually qualified versus    components    required to  be qualified; Attachment  B shows  that status as of August 1, 1984. Attachment C shows the SWEC  target plan versus NRC component quantity requirements.
Supportive of the NRC audit of El},        it  is necessary to demonstrate capability    to be 85 percent complete with installation of components requiring Eg.           Engineering is currently interfacing with Construction to assess an acceptable method of statusing completion of equipment installation from an Eg standpoint.
The  potential exists that several components may not have their qualification programs completed by fuel load, and it is expected that these items will be addressed by use of justification for Interim Operation process.


AGENDAITEMfigITEM:Detailedreviewandcurrentstatusofpermanentstationandsupportstaffing,trainingandlicensing.a.StaffingforUnit2operation,includingpresentlyemployed,projectedandauthorizedforeachgroupreportingtotheVicePresidentNuclear.b.StaffingofNineMilePoint(Unit2)stationorganizationincludingpresentlyemployedorcontracted,projected,andauthorizedforeachorganizationalsubgroup.C.d.Trainingprogr'am:outstandingtrainingcoursesrequiredpriortofuelload;identifyingjobtitles,numbersofpersonnel,andprojectedcompletion.Operatorandsenioroperatorlicensespresentlyonsite,contracted,projected,andrequiredforfuelloading.CURRENTSTATUS:Seefollowingpages.  
                                                                                                                        ~
* s Sb7t              ~ h h ~
I EQUIPMENT;:.QUALIFICATION"SUMIN'ARY;.',-;.:::'
                                          ':.-',"',",:.":,ll: -"::.':,." '.::::-",",".'';                                                                                    <@".I" IJ't<f;:@I";:.""!'!Vj':.',"-.'i',-',"::::;:"
SCHEDULE r.r"~    :''".r.'!            '; ., .:..'.
6"",                                      ~,    ~
                                                                                                                                                                                                                                  '>>lt I(,:.'
                                ".:j'SEISMIC REPORT                                            ',->>Fr<<h'-us~@,...thg,".Ip sb.                                                        ~  .I 1>>. ihh. '>>ck5                  r. j..                    '.
SEISMIC PROGRAM,, AND~,                                            I
                                                                    .',l;; 1!,:, r.br l
                                                                                      .. >>'." l .,11.:.,.,
br'."
                                                                                                                                        -.1,",:.h
                                                                                                    ....)-';>>!gW r..;:-,:.- -;4:..l;;Pq>>t >>S I)>>>> srr.,r  rrb    i  . bsr.
70 SPECSI3000 ITEMS "MASTER UST
                    ~
MEk
                      "..'. ! . 1<<ssV>><    M84 REPORT PROGRAM "'',r. t I AND su <<
40 SPECSI3200 ITEMS 'MASTER UST                    +1'-."- -" EOUlp.dUAt'< -'i':".1''-i'I'"1--:'.hob;,.,t>>., REMAINING 10%                                                                  .. pfll<<lt'>>stb~">>
11  ~
0,',>>  1
                            '-"1 '<<<'i~t~>><<>><<I~IHlIIS-            ! I .. '-'a<<'V.;rl. II 1IPj'-:<<
1                                "4 "s'slI" -"~ <<I'1.<<1                fg@45$ )I 4 1
SUSMIT FSAR AMEND. I>>;~j',.'. ~ "..:.'."'': . <~ .". I g:j,                            '    l,",ag "."', S.',~tI~Q;.;j t FP~g                                                                                                            : S.>>      .I
                                                                                                                                                                                                                                                                              ~
  - ~ NRC OVERVIEW AND MASTERLIST:.', >>''1. .".;.",>>.'.,s>>l..s                          .I'.!'...'5r                      ''.=..
zI,, '<<h,. S>>
I<<,'r>'>>,'.>>, t, s,                                              S>>w>>'s +Pe t. ~.l MEETINO Wt!2tI!i t
1srrsrss;"
                                                                                  \
btrt't ""':j""''h'"ss"")+f4'""/~)'r". I
                                                                        >>l.. I.                >>..I      s      ~,1    .
                                                                                    ':13 7">>I:,gr vgrlg.. sill>>1 J",sr>>Is>>;                                                                It>le        )lh:bsjljsslr/'srgrss",
FIRST REFUEUNO )." !:.-.'...
OUTAGE Ed 100%".<<".- g t:,.:.''
b<<<<':Ilrll'sf>>Is>>,,iL~~p COMPLETE, .
                                      ')Qfgh'UBMITFSAII AND ~'"i 'I(;gt
                                                                                                    '          qrj..
                                                                                                                      "gfCOMPLETE
                                                                                                                              <<<s, E406%                                NRC AUDIT<<                                  ~ JID    'Q tt;COMPLETE'.
95 r'p>)f'.,              $>>)5t.
                                      '<j  t,e)I,~ MASTER LIST UPDA                                                    (jib>>~ EOUlp, 0616                                                                                    I~ BIO-6S
                                    ',g.,'.,"')," PLUsscEwsHEETs                        ) I.:  ..          ~trt    '<<KC)INsTALLED                                                                                                    s,sh' '
1  Pl                                                                                                                                                                                  .s>>>)
j                          REvIEw FsAR          s>>$ fg        ~ .4I'ppp:ts,.'j'.".~'1            '            v~ >sHEETss EOD;                                          ~ .~5            +  fogy        ++ rgb);>>1, OE PREP E4D              AM N        ',  S,:jy>    . f~g$jig,'<<jan"gpj"S".,"      )',I      It't)1>>)h;.'2>>uMASTERUST                                          i(gga    .
                                                                                                                                                                                    "g I)
LDCN 4 MASTER L)ST                                                                                                                                                                                                                                            ~
                                  ~  "..":..". -..". '1 .". "'t~ltS/0$ ""..".:;;>> 'O'I15) JS:
                                                          ~                                                                        "'.':I '-'&agP.'.I ISSUE TO NRC'"-~sI.'." "'yI
                                                                                                                                                                                                                                      ~  f ~
et NRC    SELECT:'..: -';>>                                    SWECIOE PREPARE~>>,;II .y0tr~t<. j'4'.-~ gIq,'~'1;..".                                          t~.,<'-.",:.,;.                                                       cf'
                                        ,... EOUIP. FOR      AUDIT: ',.:                  '      I'.",. ~    DOCUMENTATION ',.:I '."".'-.'".. - .:, ': ", '".
                                                                                                                                                                                                                -  ~
S 1
                                                                                                                                                                                                      ~
                                                                                                                                          ~ ~
                                                                                                                                                                        ~


NuclearEngineeringandLicensinq-StaffingforUnit2operation,includingpresentlyaaployed,projectedandauthorized.Presentlythereareapproximatelyninety(90)full-tineengineersemployedbyNiagaramohawkthatareassignedtothedesign,licensingconstructionandstartupofNineMilePointUnit2.Astheneedforthissupporttapersoff,nestoftheseengineerswillbetransferredtotheEngineeringDepartnantorOperationsDepartmentforpermanentresponsibilitiesinsupportofUnit2operation.Acomprehensive10yearplanhasalsobeendevelopedforexpandingtheNuclearEngineeringandLicensingDepartmentstaffforUnit2operationsupport.Theplanistobuildupourin-houseengineeringstafftosupport30percentoftheUnit2projectm>rkloadby1988and50percentby1993.ThisplanisapprovedbyNiagaraMohawktopmanagent.ThecapabilityoftheEngineerinqstaffforUnit2operationwillmverthefullspectrumofdisciplinesincludinglicensing,fuels,operationsassessment,scheduling,costcontrol,projectmanage>rent,healthphysicsandseniorengineeringspecialistsofvariousdisciplines.Asubstantialdesigngroupisalsoplannedandwillincludemulti&isciplinedgroupsofengineers,designersanddraftingtechnicians.Asinthepast,NiagaraMohawkwillcontinuetheuseofoutsideconsultantsandarchitect/engineeringfirmstosupplementthein-housestaffasr~edtosupportUnit2operations.  
hc/48& r t
I'""t:"'                    ')            WMa/JCPPQA/7                                                                  AHAB/krC ~ ri~.V AgquufZ~ ),,;.'. t',:.i<''.-.", ~.'.-..'~~~Ffdw'                                                                                                w'                aMww7iuiVgl:3>jP~,I'",4                                                r.":g  Vpt'll rrv                    Jvo  ~
rrwooorraoro                          t vAA~~r ~gAA                                                                                                          I
                                                                                                                      ';) ',7g!                                                                                                                            hlr)IC).o,() J 1 I
                                                                                                                                                                                                                                                                                              ~    "      ~ .~    ~    ~"                ~
r Co,                        4 fry ~ .
ethel ~'ut                            'C':.::
                                                                                                                                ~        E ~
                                                                                                                                                                                                                              ~g.t tl)l:,                                                                                                          1 EL,  ~
                                                                                                                                                                                                                                                                                                                                                                        ~ I
                                                                                                                                                                                                                                                                                                                              ~ ~  ~
                                                                                                                                                                                                                                                                                                  '1 a.
I  ~                                                                                                                                                    'Ig)'-)t' I p    ~
r
                              ~ '
C Ap )~
Ilia ~  .1  t
                                                                                                                                                                                                                                                                                              ~
                                                                                                                                                                                                                                                                                                                                                  ,I
                                                                                                                                                                                                                                                                                                                                                          ~ ~
I II il
                                                                                                                                                                                                                                                                      ~ ~
                                                                                                          ~
t)t                                                                                                                                      Cjaf      l I'rt
                            '-.)II I  ~
1                                            ~
                                                                                                                                                ~
                                                                                                                                                                                        +It                                                                        ~        C
                                                  )                                                                                                                                        Cj                                                          t t"Sta))" I.                    ~ vv
                                ;I    ~
o E I  i:)tt"                                                k,f(;
o
                                                                                                                                                                                              .!PILI:..                                                ptttll I S~o ru6'.:..
I',1 D>&PIE(
                                                                                                                                                                                      ~
I.i    !
Illa c-!:'.ti                                                                                ,-     l/~ASS.
                                                                    .I,                                                                                                                                            ~
I ov E4 l I
                                                                                                                                                                                                                                                                  '\                  I'I'v
                                                                                                                                                                                                                          ,i(
                                                                          ~                                                                                                                                                                                                                      ~
                              .'                                  .Iottt                                                                                ~ lo                                                                                                                          ~
                            ~              ~  J                    I  '                                                                                to                                                                                                                                      ~  ~
(
27da          ~    ~    wt                1                                              .                a Co'ot
                                                                                                                        ~ <<o                                                  ~ oo)    ~a liooa        ~I ~        vt    ~ ~ ota                                                                                              .'j!4',5o                                                          I~
                                                                                                                                                                                                                ;,r~"C,ll'4J f l:r.
I'                ~
P;;1
                                                                  )1.            ~  oalr) f1  l)                              o)opo'gto'N
                                                                                                                                                                                                              ~ A'~'jl                                          t      VI            ..il                                      ~I        -/dn A '                  ~
I
                                                                                                            .C
: j.                                                                                                                                        -iz                                                      I'                                ~            ~
Z5na                                                                                                                                                                                                                                                      '-'                                              ~
t.'
                                                                          '!ola a'l I                                                                                      WAw                                                    t.,".
                                                                                                                                                                                                                                                                                                                                                '..              A!o. I
                                                                        ''.                                                                                                                                                                          .Cfl. paog.
P, ',a',
WI                                            I        IE',                                                                                                                                                                                      ~
                                                        ~ ol1      ~
                                                                                                                                                                                                                                                                ),
                            'woof1$ <A.
I:.)                                                    .1 gyle f,la'J~
p I)
                                                                                                                                                              ~
                                                                                                                                                                ,.',y,'Igrr"                                                                                                          )'C':l::                  ~  ~
                                                                                                                                                                                                                                                            .<I,) I)                                                  I
                                                                                                                                                                                                                                                                                        /do                                                                                lt
                                                                                                                                                                                                                                                                                                                                                                              '.'DO'~
                                                                                                                                          )
jC) JI        I
                            .1,).                                                ao'P
                                                                                                                      >>M '1P                                    '                                                                                                      "IE'z-'))SIP%                                                    'I                        P)o V o ~
                                                                                                                                                                    )o)'(I                                                                                                            aa'      I. I I      ~            ~
kfafaf)f) <;i                                                            C,P'r'I"                                    I' Ann:) ).
oo ~
                                            '','I)PP
                                                          )ol'I.I,
                                                        +gt)8C.
t''P~'ff
                                                                                                                                                                                                                                                                                                                                              ~
2/on                                                                                                                                                                                                                                                                              4"II:tr)I Jrr)L)'                                                                                                                                                                                                                          '                                                                  i      l ri"P,,'.
la)atto    J, ZM9
                                                        ~1 J.                                                                                                                                                                                      ~
Coral t                                                            -'4'oo".$ ,
: a.  ~
                                                                                                                                                                                                                                                                                        'll          'I          l. I I CI'.f'r,                                    ,'
pP,j                                                  ''f,.i,".i,'-
tl."';
L.
I                                    '3 oo ttP  o)~*                    ~
Ir)v I                                                        I J.
:If't o        o, ~
CI  oo      ~
r                                              o'I'Plgli!
                                                                                                                    .~p))'t)"j                                                                                    I          f'- t'kg>                                                                                                                )I    ll t,
Vlt~
P~            o
                                                      @gal;~:
                                                                                                                                    ~  .
I) o'I j;Jgt  y'];qII                                          fh)fl $                                                  og  I                                                      ~
( 7~a)
                                                                                                                                                                                                                                                                                                                                                              ~  ~
Vrt 1th I~o 11            II";)[!,:I)t                                    4.'tot                ))lr '.Cg EE  oo I/~Q~                                f Ct"~.;,j>y,                          q)QC E        ~                                                                                                                                                                                                  .El'."I I'".
I
                                                                                                                                                                                                                                                    .I.U) I,';:,
1
                                                                                                                                                                                                                              ><)t)C);!r I',  ~                                                    ~    I
                                                                                                                                                                                                                                                                                                                          )Q
                                                                                                                                                                                                                                                                                                                                  ~
lq'                    Ct
                                        <<'y%g                                                                                                                                    I
                                                                                                                                                                                      !,'l!+'a~a)o ":                      g:.:      '.1        I)''Ifll'j                                                                          ~4l ..                '
:: >:-".i'-<<
                                            ".X,. .. s          ~                                                                                                                                                                                                                                                                      x+      ~
B CD
                                                                      ~        ~  ~            II  ~


NULLIAkt.L'IIAIIOH~IATIOH'-SIAIUSAsofVClvltkI954~AU.SVIAIXIDCDE&#xc3;ItktcLEARStcktfakfACttINISTMIIVEASSISIANIAtttlNISTMTIVEASSISTANTVXIIllSt,fkos,OttllISiiliCNUtilltti~1SutlkVISCRtLNATI~etc(I)iA5$1TOtttVROtlkl(l)IsuresRAIAASILtlkailcas(l)IassisutvkkalatasfolilaiioNS(i)0AS51satlkOIIMIICNS(2)2SIAIIOtSkillutlRvisok\o)14551$141IONSkillSUTVR(10)5CRS(54)10i(Q~ICALSVt(AIXIIttDINIISVtlRINlfXDISICNNICALsires(l)($Isurllvilok(l)IIAXDNaIIOL(sSiftSutlRTISCRaivtINIsfsafivtsave())sLissfsurvkSRVCI(2)(5)ilSVWIIC(2)~e~2assfUNIIsufr/till(l)"e1IIXSI4Ctsti(I)i'xNplkalck($)IACILCR(t4)($)45CI2XXS(4S)(5)41IatotltCCOOkDINAIIR(I)~IASSItIAIOIICCOOkDINATCR(2)eISltfkVILctstiCALurtokf(i)(s)Iassfsuw.(s)'1ECN'5'UIICkl(l)ISLNIOIILCNA$5ISTattf(4)(5)IgLcttklCALASSIS'IAXI())(5)JVNiok1ICXASSISTAXI(4)aelee4DCItttik(5)COOtSfutD'l(2)2EknctIXsrtcnkklulIRINIDIDDtf(I)eiUNITSUtulsl(1)e0llkVICEi&#xc3;St.Sttoe()NS)SUWRIIREmtcTIDN())(s)$1SVTVRlitttkof(2)ee1liltlCNftRS(54)2le$2ElecSuttaCtkttSTIRttk4NAIA(INS)IASSISuttaCCNtt04N(I)(5)0SNILOtASSI(1)(5)5ILANASSIcvtttoriao)(s)I'ILOIASSILutttHalll($)($)5ICXttic(4)(5)4suI)NvIsokAXALV$1(i)15utikIXTDODtf(I)(5)Dti$111/IADIAIIONICISuttkCNOtlsfklMDIATIONlkOI(l)IsuttIksfk.cvtfcafO)(5)0~lfSltrtCXOI(2)eeeTECHStECCNIX(l)0(1k11SUITRAD(lieee2TECHStECRAD(l)eoECtotICIAtts(44)44SurfRADIOIOCICALsurPT(1)(s)IDtIRCDtcfLAXNIICCOOk(l)(5)IASSTDtlktii&#xc3;kllCCOCO(I)(5)0Dttit(SUNXTALOfttlIONCOI(l)(5)IislfDtrof501~~(1)(S)0IXEIRTCOUROf($)STDOSCoekD(i)(S)~tikaftaftkmtnitktcoca(i)(s)kiDloiOCICALINCIREIR(1)(S)ICXRD(I)(5)ITECNSTECA!AM/)($)5I1CNilDtANCEVflkIXIDODtf(5)(I)Si'IEELECIklcaLiNIsurf(I)(s)ISottELEClNAINI(2)eeeIELECTttAI&#xc3;fDCINta(2)~-I4551survRtlECTNAINI(2)eee2tLECI11CIAXI(54)(5)12INXACEXIXT(2)~e~2CLIRIS(24)24sfsurf(S)TRAINIICtate(IhSurIRVISOR~'TMikitCNVC(f)4asstsUwkIRAINuCNUC(24)l)fMINIICa5ttCIALIST(5)($)5SVWRVISIR5DktLASR(l)eISUTIRVISORrlkaftoks(I)IASSI10svrvaorck(l)iQUWRkADNasl~Orfk(I)IA551SUITEMDUisftOt(l)ISIsutVRortRATIONS(2)2~ATIONSHIITUrtknsca(T)T511ENECNANICALINTSufi(5)I~SVIVHECHHA(HI(2)~eeIXECHNAIXIDCINEI(I)($)I51SutVRNECNNLIHI(4)lee5ttaINTtttck(tT)(s)1'tJANIIORS01)(5)ioIDOLCUSTODIAN(l)(5)IUIILllTICS(4)(5)4tottkASCIR51551~INEERS(1)~(csco.)ASSISTARTIasNSUTT(O)IRATORS(kt)1tIIIIIsutIRVISCRliNC(l)I1151COORDINAICI(I)ITESTINECRS(li)22surtRVISORtLQWIMSCNEINLIIC(I)IIasstsurvltaxaitcIIANDSCNEtktLIIC(I)ITtckttICALA55TTESTIIC(1)1AISICXED10CIAkfurokcANBlfiok(4)XeaaevIateceatkeei~aeaeeeeCecveecAecllocleeateelcleea~N~FaaCIafeteaAeefaaeaeteeCecveatStallSuffkI(5)SutIRIXIDIDIIOtlfllSfillokININCICC(l)(5)VtlRIXIDtDDtf~NANACEXDtf(I)UNITSUTVkaXRD5Slee~aktuCallI~eCtTall1~eeeIaerateIfetran2UNllSVWItacfokAXALTST(I)e'eII~ICIASS($)($)~oCDt.Dsk(f)(5)I I
AGENDA ITEM 814 ITEN:
I.SUPIXIHTENDIHT-NUCLEARSKCRKIAMTADHIHISIRAT1VKASSISIAMTADHINISIRAIIVEASSISTANTUNITIISttROSPROJECIGIhsQF'12/UNITISIAIICHSuFIXIMILMDINIASSOCCINoIJLCIMIAR(I)SUtlXV1SCRPIRAIIORSNC(l)TEQDLICALSUtlRINIINDBLISUPIXINTENDEMIICALSRVCS(1)(5sutlkvlsoa(l)IILSIANDCONTROL($SITESUFKRVISNHISIRATIVESRVC(1)5ASSTSutVRAIMLINSRVCS(2)(5)ASSIIOsutVROPIXS(I)SQPVRRAIALASIEPIRAIIOMS(1)NITSUPVIIC(2)a~aASSTUM11uPVaICC(3)aaaINST6COMI(1)IMAIN(5)CLBLRS(39)(5)AssiSUPVRRADMASIOPIXAIINS(1)AsSISupvaOtlkhlluis~(2)ACTECH(54)(5)SUPRVTEQLMICALUPPORI(1)(s)IIAMM]HCCOORDINATOR(1)~ASSIPIAMHINCCOORDIHAIOR(2)aSlhlluaSMIF1UFIXVISN(b)ASSISIAIlohSNIFTsutta(10)OPIRAINS(56)SKNINIMLASS151ANI(6)(5)IKCILMICALA55151AMI(3)(5)UMIISUPVlsl(2)aa1NSERVICEIHst.stlc.(3)(s)JUNIORIMLSutvkFIREASSISIAHI(6)ha2aaOIECTION(1)(5)ENGINEER(5)COOP-SIUDBLI(3)SUPVRCOLLPUIIXOPBL6HAIHI(1)(S)ASSISUPVRPIREPROT(2)aaaFIREFICUTBLS21>>2)aaASSTSUPL2COMP04IL(1)(5)-JrCanEnbr1SaTECHhssI(3)(s)TECHASSTCOMPOPIX(I)($)TLCNASSICOMPHAIMI(i)(5)-IKCHMICIALLS(10)(5)SUPERVISORaxAMALISI(I)UMllSUPVllhCIOlAMALVSI(2)a~~ITKQLNIChLLLS(IO)(5)JkCBL.MXo(2)(S)ASSISUPV(5)IMSBLVICK1HSFKCIIORTECHSUPFCRT(2)SUPERINTENDENT(I)aSUPERINTENDENI(1)(5)QLBLISIRT/RADIATIOMHCISUPVRCNBLISIRY6RADIAIIONPROT(l)SUPVIHSIRsuttoaT(1)(s)TECHSPECIHSIXsuppoaI(I)-UNITSUPTQIBL(2)aaaTECH)PECCHBL(2)aUNITSUPVRAD(2)a'aTECHSPECRAD(1)aITECHNlchLMS(63)SUPVRADIOLOCICALsuppoaI(l)(s)IAMNINCCOOR(l)(5)ASSTDIERPIAHNINCCOOl(1)(5)BLVIROMNENTALOIECIIOHCool(1)(5)ASST.INVPROTCOORD(1)(5)SINEIRTCOOK(1)(S)ASSTDOSCOND(1)(5)RESPIRAIORVPROTECTIONCON(1)($)RADIOIOCICALBLCIMKIX(1)(5)COURD(1)(5)SPECAlhlh(2)(S)5IIKHAINIENANCEutxallTEMDBLI(s)(I)RECNDHANACBLBLT(1)UNITSUPTRECORDBLBLT(2)aaaICLIRS(44)IMINCHUC(1)(5)SUtlRINIIMDBITSITEELECIRICALA551SUPt(5)IRAINIMCNUC(1)SUPIXVISORIRAIMINCHuc(I)ASSTSUPVRIRAININCNUC(19)12AINIHCPKCIPJIST(7)(s).SQPIXVISNSBLUIAIN(l)aQTILlnMECHANICS(3)5UFIRVISOkfBLATIDMS(1)IMISUPI(1)(5)SUIV.ELECTASSITOsutvaOPER(I)SUPVlRADHASTEOPIX(1)HhlNI(2)aaaEUCTNAINIBIGIHEIR(2)aaaASSTSUPVRKLICTHAINT(2)aaa-EUXIRICIAMS(lb)(5)ASSTSUPVRkhDMASTFOt(1)STSUPVROPIXATIDMS(2)STATIONSHIFTUPIRVISN(9)SITEHECHANICALHAINISUPI(S)ASSISTANT5TA5Hsupv(9)OPERATORS(bl)SUI'VILECHHAI'LI(2)aaaMECHHAINIBLCINElk(1)(SLASSISUPVRHELMHAINI(6)3a3aaHh:JITHKQL(106)(5)-JANIIORS(11)(S)TOOLCUSIODIAH(1)(5)ILxnHBTIANlcsOI)(s)IIILSQPBLVISOkISIIMC(1)IITESTIMATN(l)ITISCIMFERS(33)ISUPBLVISOR'PIAMNIHC5CPFDULIM(I)IASSISUPVPIAHMINCAHD5CHEDULINC(1)ITECIQIICALlSTTESTING(3)ASSICHKDTOSTARIUtORGANIIATION5Sita~kWL'nlL~W''nLL~aanInLL'nlLI2~LL'nil2SUPBLIMTBeBLT(5)SUPIXINIBeBITUNIT11sTATloN 0
Detailed review of room/area turnover schedule and status.
NUCLIAKI.L(TALION~LILT(ONSTALUSASOrVCIOILRIlls~mu.svrnlvloeaa-WCLIARSICRKTAAYAIYILNLSLRATLYKlSSISTNaNIILNLSTRATLYCASSISTNaUNITllSt,rsos.VNIIISlllLIWVtLRLNltnIALI(Q~LCALSYILRLNLBlDLLaA5$OCCIR.LNCLMLR(L)ISutLRVLQR~IAAIL~Wc(l)ISUtLRLNLBOLILQNILCALstrcs(L)($Isurclflsol(l)IIAIO(OSIIOL($5IIKSUtERYISCRALSILNISTRATLYCSRYCtf)$LASSTsvrrsSRTCS(2)(5)A5$110vtVAOYICS(I)I5VtVRRALSASLLttLRAILSOS(L)l~5'Sl5VIYARAS4$1otnAILONS(L)oS1$5tlsotLAAILCNS(2)ISTALLONSNLLIUIIRYLSOIt0)IA551SIAIIONSRLIISurYR(to)0(54)50LLCltcv(LI)($)SYSUINVTIQNLCAL=uttcaf(l)($)IASSISVIY.(5)1CQISUIICRL(l)ISLNLOIILCRASSI5IANL(l)($)2)LCIOILCALA$51$1ANL())(5)JIDILORILLNASSLSTANL($)4<<ls~KWINLLA(5)CootKIND;L(s)ILAIOILNCCXNDLMTIRtl)sI$1tLANNLNCCOCRDLNAT(R(2)~211TLCELNstCCTLnrnlNTTXDDa(L)slVNLTSurfIsl(l)s0!LxsnrlcELNlt.STEC.())(5)SUIIRtLRROTKCTLON($)(5)$1SUTYRIIRKTROT(2)ssoIsutvRcclrsftsrniNALLY(L)(s)IASSISutrsCNIt0lIXL)($)0SRILCNAssi(1)(l)5ILANASS'ICVNtOttl(L)($)IILQIASSLI.VNtNALSI(g)(5)TIC&#xc3;ILCISS(4)($)sutlxflsoaANALYSI(l)IL$EIICNTns(SL)2I52IlssITSurfLLC(I)2AsstDullSVtrlIll(1)sssILNSIlCNI(1)l'LLRIS(49)(S)pOOkPLMLIR($)sutnuaBeDa(L)(s)OIL$11T/RADIATIONNCTSutYRCNLNLSLITRADIATIONIQa(l)IsurfINSLR.suttORT0)(5)0~LTSutrQIDI(2)sssITMIStCCCNLN(l)soUNIT5utT~AD(2Isss2~)rtc~(l)soKCNNLCIANS(AS)slsutfRADLOIOCLCALsurpf(l)ts)LBIERCINCYLANNLNCCOOR(l)($)IASSTOlntlANNLICCOOI(l)(5)0IROTKCTICNCXR(L)(S)IASSTletKOT(LNS)0~LNCLRYCXRO~($)SfDOSCXRD(()(5)RsstLAATINTtROTCCILONCOOK(l)(5)LOLOCLClLKNCLRKLR(l)($)ICXRD(1)(5)ITCCNSICCALARAg)($)511KNilnANCKutl1LNTBIDDa($)(I)~NANACSIDa(I)UNITsutvEWARTLNLNcwc(l)(s)UrnuaDeDaSITCELECTRICALLNISufi(l)($)ISutr.KLKCIHllNT(2)sssIELECTNAINTBCLNtn(2)sssIl5$fSutYRELECTNllvf(I)~ssIELECTRICIANS(IA)(5)11SLTKNKQIANICALLNTSUtl($)IINMCtNnf(I)sosCLncs(25)STsutT(5)TRAINLDCWC(l)LSUtLRTISOIos~TRALNLNCWc(f)SASSTSUTYRTRAINLNCWC(ll)ILTRAINLNCStCCIALLST(5)(5)5SvtnYLSIRsLNULATIN(1)~ISurnfl501tlRATLONS(l)IASSI10svrrlorn(I)LQurrRRADNA$1[Ott1(1)IAsstSVTYRRADVASICOt(1)ISISutrlOtnATLONS(2)2~ATIONSNLITVtnftea(f)5.QltfNtCNNllla(2)sssIHEQINANtnctvtn(L)(s)ISTsutYRNCCNvilla(4)155NAINTNCCN(ft)(5)ltJANITORS(tl)(5)10TOOLCvsfoollv(1)($)IUILLLTTlcs(l)(5)tovnAscINsl15$1SWLNCCRS(5)~(csco.)ASSLsfiNITASNSurf(0)0IRATORS(52)15r-IIIIIIIISVtLRTLSCRTLNC(l)ITtsICXRDLMTCR(l)ITCSTLNCCRS(13)11sutEIVIIORttANNLWSQICWLLW(I)IIAssfsurVtLANILNClIANDSCNKVULINC(L)IITCCNNICALLASST1CSILIC(3)1AsslcvcDTosfiRIUroscNIl&flov(I)NoossrlorsrsorosoloAsoorsscorrsorAervorLocitoolslossNm4rootloDsroothootsAosorssCerrooc5sollSutIRI(5)SutnLNIDOOaVNLT115fifION5<<siss~<<DVfolrI~s<<gvtolrIsoo<<)orI'slrI2srr<<IIIVNIIQlfrIIACIORANlLTST(I)srsITLCWLCIASSI))($)CLN.BVR.(f)($)I
CURRENT STATUS:
See data for Item tl.


4).SUPHtINTBefsf-NUCLEARSECREIARZADMINISTRATIVEASSISTANTADttINISIRAIIVEASSISTANTUNIT11$PPROSIRQJECIEDASQf32/UNITISIAIICNSuPKRBtlIHDI&#xc3;lASSOCCENo~BtLIRO)SUtARVISCRPIHAIIQRSWC(1)TECHNICALSUNRIIIIEHDBIISUPIRIHTBeENIICALSRVCSO)(5SUPERVISORO)LN51ANDCNQROL(5SITESUPERVIStltNISIkhTIVESRVCO)$ASSTSUPVRADMINsaves(2)(s)HITSUPT14C(1ASSI10supYRoplas(1)SUPVkRAIAthslktlahlIONSO)ASSISUPVRRADHASIOPIRAIIOHS(1)ASSTSUPVROPIRAIIONS(2)SlhllttaSltlflUPIRVLSOR(a)ASSISlhliotaSNIPTSUPVR(10)-0PIRAItIS(34)ASSTUNITupvaItc(3)'<<INST6CONIO)IHAIOI($)6CTECH($4)(S)SUPRVTECHNICALUtPORI(l)(5)ASSISUPV.(5)TECHSUPP{HI(2)SENIORILCNASSISTANT(4)(S)TKCHNlCALASSISTANT{3)(5)($9)(5)UNNINCCOORDINAI{N{I)aASSIPUNNINGCOORDINATOR(2)aIHSERVICEINSPECTIONSUPERINTENDENT(I)aUNITSUPVISI(1)aaINSBtVICEINSPoSPEC{3)(S)EHCINK{a(5)cootSIUDBa(3)supvaCQMpuIIROPBt6MAIHIO)(s)AssTsuttaCOMP04ltO)($),SaTEOlAssi(3)(s)TLCNASSICQMPQPIAO)(s)TLCMASSICNtPMAINIO)($)'IKCMNICIAXSOO)(S)SUPBtVISORRRANALTSI{I)UNITSUPVRIACIORANALVSIO)aaaITKCNNICIANSOO)($)hssIsupvRAIREPROT(2)aaaPIREfICHTERS27a1laa-JrCananal1JRCEN.IWR{2)(S)JUNIORTEOtSUPVRfIREASSISTANT(6)4alaaOIECTION(1)(S)SUPBtIHIKNDEHIO)(S)CHEM{STET/RADIATIONMCISUPVRCHEMISTRT6RADIAIIONPROTO)SUPVINSTRSUPPORT(1)(s)TKCJSPECINSIRsuttoaIO)UNITSUPVCHEM(2)a<<TECllJPECCHIN(1)aUNITSUPTRAD(2)"aTECHSPECRAD(I)'TECHNICIANS(6$).SUPVRADIOIDCIchl.suppORT(l)(s)BtINCENCTUNHINCCOOK(l)($)ASSTBIERPUNNINGCO(R{I){5)BtVIRONMENIALOIECTIONCOOK{1){S)ASSTBIV.PROTCOCRD{1)($)SIHEIRTCookO)($)hssTDoscooaD(1)(s)RESPIRAIORTPROIKCTIONCOORO){$)khDIOLOCICALBICINEIR(I)(5)cocao(1)(s)IECNStECAURA(1){s)11llSTATIONUPBtINIENDBIISITEMAINTENANCEOPERII'TENDENI($)(I)IHIHcNuc(I)(s)sRECORDMANACBtB{I(I)UNITSUPTkECQRDBIBIT(1)aaaIC{JRKS(44)hssTsupr(s)TRAININCNUCO)supEkv1$0RIRAININCHUC(I)AssTsutvkIRAIHIHCNuc(19)TRAININCPKCIIJJST(f)($)SUPERVIQRSmUUI{a{I)aQTILITTINCHLNICS(3)SUPIRVISOkfIRAIIOSS(I)SIIEELECIRICALINISUPI(1)(5)SU{V.ELECTASSITosutvaQPIR(I)SUPVRkADHASTEOtsk(1)MAINI(2)aaaELfCTMAINTBIGIHEIR(2)aaaASSTSUPVRELPCTMAINT(2)aaaELIXIRICIANS(48)(S)ASSTSUPVRRADNhsffOt(1)STSUPVROP{RATIONS(2)STATIONSHIITUPIRVISOR(9)SIIENECHANICALMAIHIsutI(s)SUPVHECHMAI'tT(2)aaaltECHMAINIKNCINEER(1)(5>ASSISTANTSIASHSUPV(9)DPI%hicks{02)PSSTSUPVRME{MMAINT(6)33aaMh:JITMECH(106)(5)-JANITORS(II)(5)TOOLCUSTODIAN(1)(5)ILITTNEtlllNICS(11)(5)SUPERVISoklIINC(')IESTIMARI(i)TENCINEER5(33)SUPERVISORtlhNNINCSCHIDULIN",(I)IlssTsupvplhlotINOANDSCHKDULINC(1)IIIILTEOQIICALSTTKSTINC(3)ASSIGNEDTOSIARIUtQkCANIZATION55lta~S.ttt'nit~a~kitt'ntt5aa~~Iitt'nitI2itI'ntt2SUPIRINTBeBtT(s)SUPIRINIBeB{TUH i
AGENDA ITEM 815 ITEM:
QUESTION19CTRAININGPROGRAMSREUIREDFORFUELLOAD1.ReactorOperator/SeniorReactorOperatorLicensingProgramSeeQuestion19d.2,GeneralEmployeeTrainingGeneralEmployeeTraining(GET)willbeconductedforallsitepersonnelwhentheSiteSecurityPlan(extensionof9MPN1)isimplemented.Thedateofimplementationisnotyetdetermined.GETwillbeconductedforthosepersonnelwithaccesstonuclearfuelwhenitisdeliveredtotheSite(mid1985).3.FuelHandlingTraininga.Traininginfuelreceipt,inspectionandstoragewillbeconductedforMaintenancemechanics(approximately20)andRadiationProtectiontechnicians(approximately10)priortoreceiptofnuclearfuel.b.Traininginin-coredetectorinstallationandmaintenancewillbeconductedforInstrumentandControltechnicians(approximately35).Thescheduleforthistrainingisnotyetdetermined.C.TraininginfuelhandlingandloadingwillbeconductedforOperationspersonnelaspartofthelicensedoperatortrainingprogram.4.FireProtectionTrainingTheFireProtectiontrainingprogramcommencedinAugust1984andwillcontinuetoApril1985.Thisprogramisbeingconductedfor27nuclearfire-fighters,andincludesallaspectsof9MP2commitmentstoAppendixRtrainingrequirements.  
Projected reques ts for rel i ef of incompl ete i tems, systems,    or  test completions at the time of Unit 2 licensing, identifying each.
CURRENT STATUS:
At this time, there is no projection for requests for  relief of systems or test completions at the time of Unit t2 licensing.
In regards  to incomplete  items,  at the completion of the test program prior to licensing there will      be  a list of incomplete and deficient conditions  with 'the plants systems/equipment.     These  items will be maintained and statused on the Master Work List with their required completion date/milestone. These items will be negotiated with NRC Region I and Resident Inspectors and will become an attachment to the license.


QUESTION19~0CURRENTLYSCHEOUL[-0COLOLI~E:l~ECLAS4ESCLASSI-JA>4UARY1985REACTOROPERATOR1~[3RICHAR082~l4GAkPuS3~JBURR4~kGR++STR~VRRAY6~0~K[nlNc'Y7~FCONA>>AY8~4WITHR='LL9~Jh<CANQ+EW10MCHV[e[LLAI1RBERGE>4STOCK12RBIGELQ>>CS:3CS'3CS'3CSJCS.3C,SUCSQCS!3AQ4AOEAOEAOESl=4I~2~3~4~5~6~7~9~101112[OROPERAl3RAA40ERiENCOLO&',.3JONESJHELKFRJKIBBEDEGRACI4JCON@/AYHBARRETW03+>>SGWE[MFRJKALINSKI0WILSONSSSSSSOSASSSSSSSSS>XANALTECSERTECSERT.RA[4TRAINASSSAAh>'J'hhAJhAJCLASS2-JU'lE1995REAC1~R2~03~c4~R5~06~7~B9~9~10J11J12TOROPERATORSPOO4ERNFW<A4DAYI3iSVLLQCKLO'4[3ERHOLTTESORIERQCA:eSONCONW4YGPAFrLA+E~fNC.='JOVTFLLAOEAOEAOUAOFAQEAQEAOi=.QOcAOi=AQEAOBAOESENIOROPERAlOR1~FTOWNSEND2~GFOYER3~RGAYNE4~0T)PLEY5~89QUCIERJ3~AQENNY7~GSANFORD~~GCQRBIV9~0FITCH10<>3QQLEY11HCOLL[>4S12RSMITHSSSSSSAOSSSS'SSSASSSASSSTRAINTRAINTRAINTRAINRXANACLASS3-NQV'.vREie19[35REACT-R&#x17d;~F:WATOW1~GPlTT32~0RATH'RUNJ~SDAVISAC[3AOEAOESENIQR'3PEkATOR1~WOAVEY2~JMANCUSi3.3~JPQINQFXTER4~WWAMOSGAN~0CARON6~GRANALLI7~EGEi40VAdeKEQLLITSCH9~WPICCIRILLISSSATOSSSSAQSASSSASSSASSSTRAI4ASSShhAJ'hCURR=NTROLICENSt-NMPUNIT1CURRENTSROLICENSE'-N4PUt'llT4'ROCERTIFICATIONGE3WR<INI<U'V.>-QVIREOLICENSESFQRFUELLOAO-5SHIFTRQTATIONRO-10SRO-11
AGENDA ITEM 816 ITEM:
Review    of  open    punch listrateitems    by  category rate.
(h ar dware/paperwork )
identifying  each and work-off        vs add on CURRENT STATUS:
See  following pages.


AGENDAITEM820ITEM:DetailedreviewandcurrentstatusofworktobeperformedinresponsetotheCATauditconcerns(includeactionsinresponsetoORDER).CURRENTSTATUS:Seefollowingpages.  
APROVED EXCEPTIONS as                              of 10/15 81  Hips OV(NED BY AOD 69 O
I-Q  rw (0
~
~. C U
~ Q(0 4
Oo 0 I Gl X
0 9f'10    9i17    9r 24    10/'1  10'    10i15 TOTAL QQ  SOFTWARE ONLY    g7g  NEED SIGN OFF NEW KQ NEED DISPOSITION ggg COMPLETE


NRCCaseloadForecastAendaItem820-CATAuditI.ActionPlans-Licensee7A.AllActionPlans(i.e.Corrective/PreventiveAction)completedincluding:1.SpecificActionPlans(NRCIdentifiedItems)2.GenericActionPlans(NMPC/SWECManagement)3.ResponseCommitments4.Verificationsa.NMQAb.NMNCVB.Closure1.PreparationofDocumentationPackagestosupportNRCCATReportItembreakdown.a.,120issuesbeingtrackedbyNRCb.97packagesinpreliminaryformc.Workremaining1.Review/completepackages2.Evaluationandverificationasrequired.2.SubmittedtoNRCResidentInspectorforreviewandclosure.II.ActionsinResponsetoOrderA.(MAC)IndependentAssessment1.Threeinterimphasereportsissued.a.PhaseI-CATauditfindingsb.PhaseII-SALPReportfindingsc.PhaseIII-NMPCfindings
        .:A.PP:IiOVEI) EXCEPTIONS                a.'.! of. 10/I')
PC CC (BIP 103.001}
~ .6 0.8 0.6 0.4 0.2 0
Fl "7  9/10  9r'"4 1  0/8  1 0/ 2 t7 r']  TOT    [~  CLEZ          DSP      ~i,~j NEW        COlvl P


2.Finalreportdueonorbefore12/18/84.a.CompleteassessmentofeachphaseincludingPhaseIV-Contractorfindingsb.SumaryandConclusionstotiethefourphasestogether.3.AssessmentRatings/Statusa.Satisfactory-itemcomplete,nofurtheractivityrequired.b.SatisfactorywithRecommendations-itemcompletewithrecommendationsformoreeffectivecoursesofaction.c..Unsatisfactory-itemincompleteorcorrectiveactionineffective,andadeficiencydocumentissued.d.StatusTotal*ReviewedtodateSatSatwRec.UnsetPhaseI66/593817156PhaseIIViol.28CDR61251319120PhaseIII216/200169125404<<Actualtotal/numbertobereviewed-Certainitemsinthe"actualtotal"maybenon-safetyrelated,duplicatedbyorcombinedwithanotheritemandwillnotbereviewed.4.NMPCactivityrequired.a.Respondtorecommendationsmadeb.Trackresolutionofdeficiencydocuments(issuedbasedonUnsatisfactoryratings)c.'ncorporateresultsofa)andb)inDocumentationpackagesasappropriateforpresentationtoNRCResidentInspector(PhaseIandIIonly)5.Followuponareaswheresamplingfailed,;
1 PL'OT DATE        9/10    9/17    9/24    10/1    10/8    10/15 TOTAL                6050    '21    6381  6288    6144    6347 NEW NEED DISPOSITION 201 71 6
X B.gualityConstructionPerformanceMonitoring1.PG91drafted"gualityPerformanceManagementProgramImplementation"2.Programimplemented3.ProcessongoingC.IndependentThirdPartyAppraisal-Future  
297 184 103 2~4 ill 230 127    393 264 NEED SIGN OFF        1182    1310    1~05  1218    1186    1167 CONPLETED              115      75  ~  184    267    . ~42    266 TOTAL B I PS OWNED      75      76      78      79      81    81 SOFTWARE ONLY        1736    1977    2022  19~1    1892    1914
'  
 
}}
AGENDA ITEM 817 ITEM:
Status and schedule for Seismic II/I review.
CURRENT STATUS:.
See  following pages.
: 17.                    CATEGORY    II OVER CATEGORY  I rh  N      M  le point 2 ProJect established a pol 1cy of seismlcal]y analyzing and su porting non-safety related components 1n nuclear safety-re 1 ated areas back in May (975. A decision was made in June 1977 that all large bore piping >n th e Primary and Secondary Containment would be designed seismica y Additionally, components in other safety-related areaas would be evaluated to determine        if they could present a hazard to safet-  y-related items. This policy was formally documented via the issuance of Project Procedure 84 in March 1983 and subsequently revised in June 1984.
The procedure; Defines the boundaries    of the safety-related    areas n
: 2.      Lists the various types of      components whose  failure must be considered
: 3. Describes  failure  methods and assumptions
: 4.      Establishes a method of documenting evaluations resulting in non-seismic design
: 5. Establishes a check-list of components versus buildings        and the corresponding determination                  '
: 6.      Provides  for  a method  of final verification of as-built    designs against seismic/non-seismic designs Not  all types of components in each area are seismically pre-designed.
In certain cases, for example, sprinkler piping, sanitary and plumbing systems, etc., a decision is made to perform a walk through of the building to determine      if seismic supports and/or restraints should be added. These systems cannot be economically initially designed seismically because the contractors are generally responsible for the final routing in the field and changes generally occur during construction, testing and Inspection Agencies'eviews.            The final .walk throughs have been initiated; they will be completed prior to building turn'overs in the last quarter of 1985. This late finalization is necessary to ensure no non-seismic design components are introduced into safety-related areas without an evaluation being made.
 
PP gh Revision l Page 6 of l5 Attachnent ATTACllHEHT I CKHERAL SEISNIC DESICN APPROACH fOR CATECORIES  II AND III COHPOHENTS  IN SAFETY-RELATED AREAS Screen-                            Elect Tun-Cadeau'
  - Sefsnlc Design                  Reactor
                                                                        'uell Sulldlng (See        Service
                                                                                                                'tandby nels and Auslllary Service Ca ~
Treatnent Turb Bldg Portion of el (2)7'-6")
or Evaluated                    Building    Control    Diesel      Attach-      Mater      Naln-      Bui)ding    Bul  idio g              Slab E -  Evaluate  later  Prinary        and        Roon        Generator  nents        Tunnels    Stean      Belou        (httach-    Hain        (see Attach-HA    Not A  licablc Cuntajnnent    Aus Ba s    B Ildl g    Buildln    5 and 6        ALL I    Tunnels    26l          nent    S  Stack        uent 2)
Large Bore Plplng    S Fire Protectlon-      S                                                                                      HA Hains and Nose Stations Fire Protection-      s                                                                          KA Sprinkler Piping Fire ProtecLlon-      HA COt  or ltalon Piping Donestle Mater and    Hh                                    HA                                                                      HA Sanitary Piping Floor  and Equlpnent S Drainage Roof Drainage Piping  HA                                                Hh                      NA
 
PP B4 Revision    1 Page  l of  15 Attac11%cnt Screen-                      Klcct'Tun-vell                        nels and                              Turb b)dg Codes:                                                                                        Bulldlnb                    Auxiliary  Gas                        Portion uf S  - Selsalc Design or Evaluated Reactor Control Diesel (See Attach-Service Mater          ln-261'tandby Service Bui 1 ding Trcstnent Bulldint el (2ll'-6")
Slab Building                                        Ma K  -  Evaluate Later                              Prlaary        ~ ad    Rooa    Generator sents    Tunnels    Stcaa  Be lou    (Attacb-  Hain            (see Attach-X~BX        t  6                  ll  Bl        Contsinncnt    Aux bays B~ttdtn B lldl 6  5  nd 6    Att l    Tunnels            sent b)  Stad:k          e nt~2 Snail bore Plplngd                                  S                                                  5                  S          S        S Tublngd and Conduit Sanpllab Systea                                    NA      P-Aur bays                                  NA                  Nh Tubing                                                      K balance Ductvork                                                                                                          aSIK    S Hanging Kquipaent,                                  S                                                              NA      NA c  j uni't heaters
      ~
lighted coolers
                                              ~
Cable Trays                                                                                            NA Tnstrunent Panels and                              S Racks I
Stuctursl Cosdponcnts, partitioned'alls, S                                                  S
                                                                                                                'I S
c.g.d platforusd ceilinged ladders Floor-Nounted Kquip-                                S                                                              NA
~ Cnt ~    e.b.d                    Pudsta  ~
t a 0 ks ~  1 ITKX C IIRS ~                11CC s ~
SMGR eS    - Ksst of lrnpingeoent Mall C3/12)77/84A/SYPP
 
AGENDA ITEM 818 ITEN:
Detailed review and current status of power accession        testing procedures and operational procedures.
A. Power    ascension    test    procedures  including  safety-related                      and nonsafety-related.
: 1. Number  required
: 2. Number  not started
: 3. Number  in preparation and approval process
: 4. Number  approved.
B. Operating    procedures  required for fuel loading: including station administrative,    station    operational, surveillance (e.g.,
maintenance and emergency procedures.            technical'pecification),
: l. Nuaber required
: 2. Number  not started
: 3. Number  in preparation and approval process 4    Nuoher approved CURRENT STATUS:
See following pages.
 
QUESTION 18A          POWER ASCENSION TEST PROCEDURES - STATUS Procedure                  No.            No. Not        No,  In    No.
T  e                        Re  uired      Started        Pre /A rov. A  roved NSSS-Startup Test Proc..                    126            116              10 BOP-Startup Test                            20              20                        0 Proc'iping Vib/Therm Expansion Proc.
 
QUESTION 18B      OPERATIONAL PROCEDURES    STATUS Procedure T  e No.
Re  uired No. Not Started    're No. In
                                                        /A rov.
No.
A  roved Chem  Analysis Procedure                    34                            29 Ins trument Procedure                    20 Counting  Rm.
Procedure Computer Oper.
Procedure Electrical Maint.
Procedure                    40          40 Electrical    P/M Procedure                                55 Electrical Surv.
Procedure                    10          10 Fuel Handling Procedure                    15          15 Rx  Analysis Procedure                    22          22 I  g C  Surv.
Procedure                  780          780 Oper Surv.
Procedure                  225          225 In Service Insp.
Procedure                  150          150 Administrative Procedure                    33                            31 Tech. Dept.
Procedure ISI                30                            28 Startup Admin.
Procedure                    29                            24
 
QUESTION 18B    OPERATIONAL PROCEDURES - cont.
Procedure            No.            No..Not  No. In      No.
T  e                Re  uired      Started  Pre /A  rov. A  roved Office Instructions                30 Document  Cntrl.
Instructions                18          18 Document  Cntrl.
Computer Proc.
Training  APNs              17                                  16 Operating Procedures                100            13          87 Emerg. Oper.
Procedures                  23                      22 Op's Fire Prot.
Procedures Emerg. Plan Proc.            14          14          0 Rad. Protection Procedures Rad. Tech.
Procedures                                            55 Equip Oper  5 Calibration Proc.
Envir. Proc.                16 Fire Prot.
Detection Proc.              58          54 Inst. Maint.
Procedure                    25          19 Proc. Surv.
Procedure
 
QUESTION 18B  OPERATIONAL PROCDURES  - cont.
Procedure          No.            No ~  Not  No. In        No.
T)'                Re  uired      Started    Pre /A  rov. A  roved Sampling Procedure  .            11 Maint. Proc.          135            35        100 Prev. Maint.
Procedure              60            55 0'aint.
Surv.
Procedure              15            13
 
AGENDA ITEM fig ITEM:
Detail ed  review and    current status  of permanent stati on and suppor  t staffing, training and    licensing.
: a. Staffing for Unit 2 operation, including presently employed, projected and authorized for each group reporting to the Vice President Nuclear.
: b. Staffing of Nine Mile Point (Unit 2) station organization including presently employed or contracted, projected, and authorized for each organizational subgroup.
C. Training progr'am: outstanding training courses required prior to fuel load; identifying job titles, numbers of personnel, and projected compl eti on.
: d. Operator    and senior operator licenses presently  onsite, contracted, projected,    and required for fuel loading.
CURRENT STATUS:
See following pages.
 
Nuclear Engineering and Licensinq - Staffing for Unit 2 operation, including presently aaployed, projected and authorized.
Presently there are approximately ninety (90) full-tine engineers employed by Niagara mohawk that are assigned to the design, licensing construction and start up of Nine Mile Point Unit 2. As the need for this support tapers off, nest of these engineers will be transferred to the Engineering Departnant or Operations Department for permanent responsibilities in support of Unit 2 operation.
A comprehensive  10 year plan has also been developed for expanding the Nuclear Engineering and Licensing Department staff for Unit 2 operation support. The plan is to build up our in-house engineering staff to support 30 percent of the Unit 2 project m>rkload by 1988 and 50 percent by 1993. This plan is approved by Niagara Mohawk top manage nt.
The capability of the Engineerinq staff for Unit 2 operation will mver the full spectrum of disciplines including licensing, fuels, operations assessment, scheduling, cost control, project manage>rent, health physics and senior engineering specialists of various disciplines.
A substantial design group is also planned and will include multi&isciplined groups of engineers, designers and drafting technicians.
As in the past, Niagara Mohawk  will continue the use of outside consultants and architect/engineering firms  to supplement the in-house staff as r~ed      to support Unit 2 operations.
 
NULLIAk t.L'IIAIIOH        ~IATIOH'- SIAIUS As              of VClvltk I954
                                                                                                                                        ~AU. SVIAIStcktfakf  XI DCDE&#xc3;I      tktcLEAR ACttINISTMIIVEASSISIANI AtttlNISTMTIVEASSISTANT VXII        ll St,  fkos, Ottll  I SiiliCN Utilltti~1 i(Q~ICAL SV t(AIXIIttDINI 5utik IXTDODtf( I ) ( 5)
Dti$111/IADIAIION ICI 5 I1C V
Nil  DtANCE flkIXIDODtf(5) ( I )      ~
Suffk I          (5) SutIRIXIDIDII NANACEXDtf(I) IN INC ICC(l) (5) VtlRIXIDtDDtf ll Otlf Sfillok I
SV tlR INlfXDISI                          Sift SutlRTISCR                  Suttk CNOtlsfkl                                                      UNIT SUTV kaXRD CNNICAL        sires(l)($ aivtINIsfsafivt save())s                          MDIATION lkOI(l) I                                                INXACEXIXT(2)~ e ~
I                                                                                                                                  2 SutlkVISCR                    surllvilok(l) I                          Lissf      survk                sutt Iksfk.                      Si'IE ELECIklcaL                CLIRIS  (24)            sf surf    (S)        SUTIRVISOR tLNATI~ etc(I) i                  I AXD NaIIOL(s                                    SRVCI(2)(5)        cvtfcaf O)(5)                          iNI surf(I)(s) I                    24          TRAINIIC tate(Ih            rlkaf toks(I) I
                                                                                                          ~lf            0 Sltrt CXOI(2)eee            Sot  t  ELECl NAINI(2)eee I SurIR VISOR TMikitC NVC(f)4
                                                                                                                                                                                                                      ~ '        ASSI 10 svrva  orck(l)i il SVW IIC (2)                                                      TECH StEC CNIX        (l) 0 A5$1 TO
                                      ~ e~
assf UNII 2
(1k 1 1  SUIT ELECT  ttAI&#xc3;f DCINta(2) ~    -I                                  asst sUwk IRAINuC NUC(24)l)
QUWR kAD Nasl~  Orfk(I) I tttVR Otlkl(l) I            sufr/t ill(l)"e                                                        RAD(lieee      2                    4551 survR                                          fMINIIC      a            A551 SUITE 1          I                                                                                tlECT NAINI(2)eee 2                                5ttCIALIST(5)($)            MD Uisft      Ot(l) I sures RAIAASIL                IXSI    4  Ctsti(I)i                      CI2XXS(4S) (5)              TECH StEC RAD        (l)eo                                                                            5 tlkailcas(l) I                                    )    'xNplkalck($            41                                                        tLECI11C IAXI(54)(5)                              SVWRVISIR                      SI sutVR ECtotICIAtts (44)                                    12                              5 DktLASR(l)e                ortRATIONS(2)2 44                                                                                I assi sutvk kalatasf        IAC ILCR(t4)($)                          IatotltC COOkDINAIIR(I)~      Surf    RADIOIOCICAL              511E NECNAN ICAL                                                              ~ATION SHIIT olilaiioNS(i) 0                            45                                              I      surPT (1)(s)I                          INT Sufi(5) I                                                                      Urtknsca(T)      T tottk ASCIR5 AS51    satlk                          I SltfkV LctstiCAL                              ASSI tIAIOIIC I
DtIRCDtcf                              ~ SVIV HECH HA(HI(2)~ ee                          1551 ~INEERS      (1) ~            ASS  I START OIIMIICNS(2) 2              urtokf (i)(s)                                COOkDINATCR(2)e            LAXNIIC COOk(l)(5) I                                        I                            (cs co.)                            Ia  sN  SUTT(O)
I SIAIIOt Skill              assf suw. (s)                                Eknct IXsrtcnkk            ASST    Dtlk                        XECH  NAIXI                                                                            IRATORS(kt) utlRvisok\o)1            '1ECN '5'UIICkl(l)                          ulIRINIDIDDtf  (I)ei        tii&#xc3;kllC    COCO ( I ) (5) 0        DCINEI(I)($) I                                                                                    1t I                                                                                                                                                        I 4551 $ 141 ION            SLNIOI ILCN                              UNIT SUtu                Dttit(SUNXTAL                              51 SutVR                                                                    sutIRVISCR Skill SUTVR(10) 5      A$5 I ST attf (4) (5)
I                    l lsl (1)e      0                OfttlION COI(l)(5)I                  NECN  NLIHI(4)lee      5                                                            liNC(l) I CRS(54)          g LcttklCAL                                  llkVICE                    islf  ~  Dtro~ f501                ttaINT  tttck(t T)(s)                                              I              1151 10          ASSIS'IAXI())(5)                          i&#xc3;St. Sttoe()NS)                        (1)(S) 0                                  1't                                                                COORDINAICI(I) I I              TEST JVNiok 1ICX                              SUWR    IIRE                      IXEIRT COUR    Of($ )              JAN IIORS 01) (5) io                                                  I                    INECRS(li)
ASSISTAXI(4)aelee                          mtcTIDN())(s)                                                                                                                                                            22 4                                                                                                                                                            I              surtRVISOR tLQWIM I
DC Itttik (5)                                $1  SVTVR                    ST DOS    CoekD(i)(S)            IDOL                                                                                  SCNEINLIIC(I ) I COOt    SfutD'l(2) 2                      litt    tkof(2)ee 1                                                CUSTODIAN(l)(5)                                                                    asst surv    ltaxaitc      I I                                                                            SCNEtktLIIC( I)
Sutta ttk 4 CtkttSTIR NAIA(INS)I lilt 2 le lCNftRS (54)      ~tikaftaf tkmtnitkt coca(i)(s)
UIILllT                                                          I                AND Ttcktt ICAL
                                                                                                  $2                                                      ICS(4)(5)                                                I Elec                                                                        4                                                                      A55T TESTIIC(1)1 ASSI Sutta                                                          kiDloiOC ICAL                                                                                                      AISICXED 10 CIAkfur okcANBlfiok CCNtt  0  4  N(I)(5)                                                  INCIREIR(1)(S)        I 0
SN    ILOt                                                                    CXRD(I)(5)
ASSI (1)(5) 5                                                                          I I LAN ASSI                                                            TECN STEC      A!AM/)($)
cvttt oriao)(s)                                                                                                                                                                                      (4) Xeaaev Ia teceatkeei    ~ aeaeeee I                                                                                                                                                                                        Cecveec Aecllocleea  teelcleea
                                    'ILOI ASSI                                                                                                                                                                                            ~  N~F      aaC Ia feteaAeefa aeaetee Luttt Halll($)($ )                                                                                                                                                                                        Cecveat    Stall 5  ICXtti c(4 ) (5 )
4 su  I)N v Isok AXALV$  1(i)      1 UNll SVW Itacfok AXALTST (I) e'e I
I~ICIASS($)($ )
                                    ~  o  CDt. Dsk          ( ) (5 )
f 5          Slee I
  ~      a ktu Call  I
  ~e        Ct Tall  1
  ~ ee    e I aerate    I fetran    2
 
I I. SUPIXIHTENDIHT -  NUCLEAR                                  PROJECIGI hs  QF'12/
SKCRKIAMT ADHIHISIRAT1VKASSISIAMT ADHINISIRAIIVEASSISTANT UNIT    II St  tROS IIK HAINIENANCE            SUPBLIMTBeBLT (5) SUPIXINIBeBIT          UNIT 11 sTATloN UNIT  I SIAIICH                            TEQDLICAL                              SUPERINTENDENI(1)(5)
QLBLISIRT/RADIATIOMHCI 5
utxall TEMDBLI(s)(I)        RECND HANACBLBLT(1) IMINC HUC(1)(5)      SUtlRINIIMDBIT Su FIXIMILMDINI                            SUtlRINIINDBLI ASSOC CINo              SUPIXINTENDEMI                SITE SUFKRVISN              SUPVR CNBLISIRY                                              UNIT SUPT RECORD HISIRATIVE SRVC(1)5    6 RADIAIION PROT(l)                                                BLBLT(2)aaa IJLCIMIAR(I)                    ICAL SRVCS(1) (5 I
IHSIR                SITE ELECIR ICAL              CLIRS(44)          A551 SUPt (5)        5UFIRVISO k SUtlXV1SCR                sutlkvlsoa(l)                  ASST SutVR                  SUPV PIRAIIORS  NC(l)        IILSI    AND CONTROL($          AIMLIN SRVCS(2)    (5)        suttoaT (1)(s)                  IMI SUPI(1)(5)                                IRAINIMC NUC(1)      fBLAT I DMS(1)
TECH SPEC IHSIX                SUIV. ELECT                                    SUPIXVISOR            ASSI TO sup poaI  (I )                Hhl  NI(2)a a a                                IRAIMINC Huc(I)        sutva OPER(I)
                                                                                      -UNIT SUPT QIBL(2)aaa            EUCT NAINI                                    ASST SUPVR            SUPVl RAD BIG IHEIR(2) a a a                            IRAININC NUC(19)      HASTE  OPIX(1)
NIT  SUPV  IIC (2)                                    TECH )PEC CHBL    (2)a a~a                                                                                    ASST SUPVR                                    12AINIHC              ASST SUPVR KLICT HAINT(2)aaa                                PKCIPJIST(7)(s). khD MASTF    Ot(1)
ASSI IO                    ASST UM11                                                UNIT SUPV sutVR OPIXS(I)              uPVa ICC(3)aaa                                          RAD(2)a'a                    - EUXIRICIAMS(lb)(5)                            SQPIXVISN                ST SUPVR SBLUIAIN(l)a          OPIXATI DMS  (2 )
SQPVR RAIALASIE            INST 6 COMI(1)              CLBLRS (39)    (5)            TECH SPEC RAD    (1)a luis                                                                                                      SITE HECHANICAL                                  QTILln MECHANICS          STATION SHIFT PIRAIIOMS(1)                      IMAIN(5)                                              I                                                                                                  UPIRVISN(9)
TECHNlchLMS    (63)        HAINI SUPI(S)                                      (3)
SUPV RADIOLOCI CA L            SUI'V ILECH  HAI'LI(2)aaa                                                  ASSISTANT Assi SUPVR RADMASI        AC TECH(54)(5)          IAMM]HC COORDINATOR(1) ~
suppoaI  (l)(s)                                                                                          5TA 5H supv(9)
OPIXAIINS(1)
AsSI Supva Otlkhl      (2)
SUPRV TEQLMICAL UPPORI(1)(s)
I ASSI I COORD PIAMH INC HAIOR  (2) a        IAMNINC COOR(l ) (5)
MECH  HAINI BLCINElk(1)(SL OPERATORS(bl)
ASST DIER                      ASSI  SUPVR                                                          SQPBLVISOk Slhllua  SMIF1          ASSI    SUPV    (5)    IMSBLVICK 1HSFKCIIOR ISIIMC(1)              I UFIXVISN(b)            TECH SUPFCRT(2)          SUPERINTENDENT(I)a              PIAHN INC COOl(1) (5)          HELM  HAINI(6)3a3aa I
Hh:JIT HKQL(106) (5)                                                    TEST ASSI SIAI loh          SKNIN IML                  UMII SUPV                BLVIROMNENTAL IMATN(l)
SNIFT sutta(10)        AS S 151ANI  (6) (5)      lsl  (2)aa                  OIECIIOH Cool(1)(5)
I T
OPIRAINS(56)          IKCILMICAL                  1NSERVICE                    ASST. INV    PROT            -JANIIORS(11) (S)
ISCIMF ERS(33)
A55151AMI(3)(5)              IHst. stlc.(3)(s)            COORD  (1)(5)
I SUPBLVISOR 'PIAMNIHC JUNIOR      IML          Sutvk FIRE                      SINEIRT  COOK  (1)(S)        TOOL ASSISIAHI(6)ha2aa            OIECTION(1) (5)                                              CUSIODIAH(1)(5)                                                            5CPFDULIM  (I)
I ASST DOS  COND(1)(5)            ILxn                                                    I            ASSI SUPV PIAHMINC ENGINEER          (5)      ASSI SUPVR AHD 5CHEDULINC(1)      I COOP  -
SIUDBLI(3)          PIRE PROT(2)aaa                                              HBTIANlcsOI)(s)
I TECIQIICAL l
SUPVR COLLPUIIX                FIREF ICUT BLS            RESPIRAIORV                                                                                    I ST TESTING(3)
OPBL 6 HAIHI(1)(S)                21>>
2)aa PROTECTION    CON(1)($ )                                                                      L ASST SUPL2                                            RADIOIOCICAL                                                                                  ASSICHKD TO STARIUt ORGAN IIATION COMP 0 4 IL(1)(5)        Jr    Can  Enbr                  BLCIMKIX(1)(5) 1 Sa TECH                                                      COUR D(1) (5  )
hssI (3)(s)
TECH ASST                                                      SPEC  Alhlh(2)(S)
COMP    OPIX(I)($)
TLCN ASSI COMP    HAIMI(i)(5)
IKCHMIC IALLS(10)(5 )
SUPERVISOR ax AMALISI(I)
UMll    SUPV  llhCIOl                                                                                                                                                            5      Sita AMALVSI (2) a ~ ~                                                                                                                                                                      ~ kW L'nlL I                                                                                                                                                                            ~ W''nLL TKQLNIChLLLS(IO) (5 )                                                                                                                                                            ~ aa n I nL L'nlL I 2 ~L L'nil 2 Jk    CBL. MXo      (2)(S)
 
0 NUCLIAK I.L (TALION
                                                                                                                      ~LILT(ON STALUS AS Or VCIOILR Ills
                                                                                                                      ~mu.        svrnlvloeaa - WCLIAR SICRKTAAY AIYILNLSLRATLYKlSSISTNa NIILNLSTRATLYCASSISTNa UNIT          ll St,  rsos.
VNII I SlllLIW                              I(Q~LCAL                                  sutnuaBeDa(L)(s)                  511K  Nil  nANCK              SutIRI          (5) SutnLNIDOOa            VNLT 11    5fifION VtLRLNltnIAL                                SY ILRLNLBlDLLa                            OIL$11T/RADIATION NCT            utl1 LNT  BIDDa($ ) ( I )  ~        NANACSIDa  (I) LNLNc wc(l)(s)          UrnuaDeDa A5$OC CIR.                SUtLRLNLBOLIL                  5IIK SUtERYISCR              SutYR CNLNLSLIT                                                  UNIT sutv EWART LNCLMLR(L)I                QNILCAL strcs(L)($          ALSILNISTRATLYC SRYCtf)$          RADIATION IQa(l)        I                                    INMCtNnf  (I)sos I
SutLRVLQR                    surclflsol(l) I              LASST    svrrs                  surf  INSLR.                SITC ELECTRICAL                CLncs(25)              ST sutT (5)          Surnfl501
    ~ IAAIL~      Wc(l) I          I AIO (OSIIOL($                    SRTCS(2) (5)          suttORT    0)(5)                LNI Sufi(l)($ )    I                              TRAINLDC  WC(l)L        tlRATLONS(l)    I 0
                                                                                            ~LT Sutr      QIDI(2)sss        Sutr. KLKCI                                      SUtLRTISOI      os ~      ASSI 10 I                        HllNT(2)sss I                                    TRALNLNC  Wc(f)S          svrrl orn(I)L IT Surf  LLC  (I)                                    TMI StCC      CNLN  (l)so 2                                                                      ELECT NAINT                                      ASST SUTYR                QurrR    RAD BCLNtn(2)sss I                                    TRAINLNC WC(ll)IL 1[ Ott1(1) I NA$
A5$1 10                    Asst Dull                                                  UNIT 5utT vtVA OYICS(I) I            SVtrl Ill(1)sss                                            ~ AD(2Isss 2                    l5$ f SutYR                                        TRAINLNC                  Asst SVTYR 5VtVR RALSASLL tLRAILSOS(L)    l LNSI    l      I CNI(1)l pOOkPLMLIR($)
                                                          'LLRIS(49)(S)                      ~ )rtc ~          (l)so ELECT  Nllvf (I) ~ ss ELECTRICIANS(IA)(5)
I                        StCCIALLST(5) (5)
SvtnYLSIR 5
RAD VASIC Ot(1)
SI Sutrl I
(AS)                                                              sLNULATIN(1)~              OtnATLONS(2)2 t
KCNNLCIANS                                    11 sl                                                                          I
        ~ 5'Sl 5VIYA RAS4$ 1      LLC  ltcv(LI)($)          LAIOILNC CXNDLMTIRtl)s I
sutf  RADLOIOCLCAL            SLTK NKQIANICAL                                                            ~ATION SNLIT otnAILONS(L) o                        SY                                            surpf (l)ts)L                    LNT  SUtl($ ) I                                                                  Vtnftea(f )    5 tovn  AscINsl S1 $ 5tls            SUINV TIQNLCAL=                    $1 tLANNLNC              BIERCINCY                        .Qltf NtCN Nllla(2)sss                            15$ 1 SWLNCCRS (5) ~              ASS LsfiNI otLAAILCNS(2)    I        uttcaf(l)($ )                  COCRDLNAT(R(2) ~ 2          LANNLNC    COOR(l)($ ) I                              I                          (cs co.)                          TA SN  Surf(0)0 I
STALLON SNLLI            ASSI SVI Y. (5)              11TLCE LNstCCTLn              ASST  Oln                      HEQI  NANt                                                                            IRATORS(52)
UIIRYLSOIt 0)
A551 SIAIION I        1CQI SUIICRL(l)
SLNLOI ILCR I
rnlNTTXDDa(L)sl VNLT  Surf tlANNLIC COOI(l) (5) 0          nctvtn(L)(s) I ST sutYR r-          SV tLR TLSCR 15 I
SRLII SurYR(to) 0    ASS I5IANL(l)($ )            Isl (l)s    0              IROTKCTICN      CXR(L)(S) I        NCCN  villa(4)1    5    5                                      I                TLNC(l) I 2
(54)        )LCIOILCAL                !  LxsnrlcE                      ASST    le    tKOT            NAINT NCCN(ft)(5)                                                I              TtsI 50        A$51$ 1ANL())(5)            LNlt. STEC. ())(5)                    (LNS) 0                              lt                                                I CXRDLMTCR(l)      I      I TCST JIDILOR ILLN              SUIIR tLRR                  ~
LNCLRY  CXR O~($ )          JANITORS(tl) (5)                                                                                          I I                    LNCCRS(13)
ASSLSTANL($)4<<ls ~          OTKCTLON($) (5)                                                            10                                                                                  11 I            sutEIVIIOR ttANNLW SQICWLLW(I)          I KWINLLA          (5)          $ 1 SUTYR                      Sf  DOS  CXRD(()(5)          TOOL I
Coot KIND;L(s)        I    IIRK TROT(2)sso    I                                          Cvsfoollv(1)($ )                                                                  Assf surV tLANILNC      l I                                                    I                AND SCNKVULINC(L) cclrsfts                L$EIICNTns                                                                                                                                                        I rn i NALLY(L)(s)I su tvR                                          (SL)      RsstLAATINT                        UILLLTT 2I            52        tROTCCILON COOK(l ) (5)                  lcs(l) (5)                                                I                TCCNNICAL Ilss ASSI Sutrs                                                                                                                                                  L                ASST 1CSILIC(3)1 l
CNIt 0 IXL)($)
LOLOCLClL KNCLRKLR(l)($)    I                                                                                  AsslcvcD To sfiRIUr      oscNIl&flov 0
SR ILCN                                                          CXRD(1) (5)
Assi (1)(l) 5                                                            I I LAN ASS'I                                                TCCN SICC ALARAg)($)
CVNt    Ottl(L)($)                                                                                                                                                                (I) Noossr lo rsrsorosolo  Asoorss I                                                                                                                                                                    corrsor Aervor Loci tools loss ILQI ASSL                                                                                                                                                                            Nm4r oot lo Dsroothoots Aosorss I.VNt NALSI(g)(5)                                                                                                                                                                    Cerrooc  5soll TIC&#xc3;ILCIS S(4)($ )
sutlxflsoa ANALYS  I(l) I VNII Qlfr IIACIOR ANlLTST    (I) srs I
TLCWLCIASSI))($ )
CLN. BVR.      (f)($ )
5      <<siss                    I
  ~      <<DV folr I
  ~s      <<gvtolr I soo <<) or I'slr I 2 sr r<<II I
 
4). SUPHtINTBefsf    - NUCLEAR                                  IRQJECIED AS Qf        32/
SECREIARZ ADMINISTRATIVEASSISTANT ADttINISIRAIIVEASSISTANT UNIT 11 $ P    PROS UNIT I SIAIICN                                TECHNICAL                            SUPBtIHIKNDEHIO)(S)            SITE MAINTENANCE OPER II'TENDENI($) (I )
SUPIRINTBeBtT (s) SUPIRINIBeB{T          UH 11  ll STATION Su PKRBtl IHDI&#xc3;l                              SUNR IIIIEHDBII                      CHEM{STET/RADIATIONMCI                                      RECORD  MANACBtB{I(I) IHIHc Nuc(I)(s)    s UPBt INIENDBII ASSOC CENo              SUPIRIHTBeENI                  SITE SUPERVIStlt          SUPVR CHEMISTRT                                              UNIT SUPT kECQRD
~BtLIRO)                            ICAL SRVCSO) (5            NISIkhTIVE SRVCO)$  6 RADIAIION PROTO)                                                  BIBIT(1)aaa I
SUtARVISCR                SUPER    VISOR O)              ASST SUPVR                  SUPV INSTR                SIIE ELECIRICAL              C{JRKS(44)          hssT supr    (s)      SUPIRVISO k PIHAIIQRS WC(1)          LN51 AND CNQROL(5              ADMIN saves(2)    (s)      SUPPORT (1)(s)                INI SUPI(1)(5)                                TRAININC NUCO)          fIRAII    OSS  (I)
TKCJ SPEC INSIR              SU{ V. ELECT                                  supEkv1$ 0R              ASSI To suttoaI O)                    MA    HEIR(2 INI(2)  aaa                                IRAININC HUC(I)          sutva QPIR(I)
UNIT SUPV CHEM(2)a<<          ELfCT MAINT                                    AssT  sutvk              SUPVR kAD BIGI        )a a a                            IRAIHIHC Nuc(19)        HASTE    Otsk(1)
HIT  SUPT 14C  (1                                  TECll JPEC CHIN    (1)a ASST SUPVR                                      TRAIN INC                ASST SUPVR ELPCT MAINT(2)aaa                                PKCIIJJST(f)($ )        RAD  Nhsff Ot(1)
ASSI 10 supYR oplas(1)
ASST UNIT upva  Itc(3)'<<                                    RAD(2) a" UNIT SUPT ELIXIRI CIANS (48) (S)                        SUPERVIQR                  ST SUPVR SmUUI{a{I)a              OP{RATIONS(2)
SUPVk RAIAthslk              INST 6 CONIO)                      ($ 9)(5)            TECH SPEC RAD      (I)'
tlahl IONS O )                      IHAIOI($)                                                                SIIE    NECHANICAL                                QTILITT INCHLNICS          STATION      SHIIT TECHNICIANS    (6$ )      MAIHI    sutI(s)                                    (3)                        UPIRVISOR(9)
ASSI SUPVR RADHASI          6C TECH($ 4)(S)        UNNINC COORDINAI{N{I)a    . SUPV RADIOIDCIchl.            SUPV HECH    MAI'tT(2)aaa                                                    ASSISTANT OPIRAIIOHS(1)                                                                    suppORT    (l)(s)                                                                                            SIA    SH  SUPV(9)
ASST SUPVR              SUPRV TECHNICAL                ASSI PUNNING            Bt INC  ENCT                    ltECH  MAINI                                                                  DPI%hicks {02)
OPIRAIIONS(2)              UtPORI(l ) (5)              COORDINATOR(2) a          UNHINC COOK(l)($)              KNC  I NEER(1) (5 >
Slhl ltta Sltlfl          ASSI SUPV. (5)          IHSERVICE INSPECTION          ASST BIER                    PSST SUPVR                                                                SUPERVISok                l UPIRVLSOR(a)            TECH SUPP{HI(2)        SUPERINTENDENT(I)a            PUNNING CO(R{I){5)            ME{M MAINT(6)3 3aa                                                            IINC(')
ASSI Slhl iota        SENIOR ILCN                UNIT SUPV              BtVIRONMENIAL                    Mh:JIT MECH(106) (5)                                                      IEST SNIPT SUPVR(10)        ASSISTANT(4) (S)          ISI (1)aa                  OIECTION COOK{1){S)                                                                                                IMARI(i)
          -0 PIRAItIS (34)        TKCHNlCAL                  INSBtVICE                  ASST    BIV. PROT          -JANITORS(II)(5)                                                                T ASSISTANT {3)(5)            INSPo SPEC    {3)(S)      COCRD  {1)($)                                                                                            ENCI  NEER  5(33 )
JUNIOR TEOt              SUPVR  fIRE                  SIHEIRT Cook    O)($ )      TOOL                                                                    SUPERVISOR      tlhNNINC ASSISTANT(6)4alaa          OIECTION(1)(S)                                          CUSTODIAN(1) (5)                                                              SCHIDULIN",(I)
I EHC INK{a      (5)        hssI supvR                  hssT Dos cooaD(1)(s)            ILITT                                                    I            lssT supv plhlotINO coot SIUDBa(3)            AIRE PROT(2)aaa                                            NEtlllNICS(11)(5)                                                          AND SCHKDULINC(1 )
I I
supva      CQMpuIIR            PIREfICHTERS            RES PIRAIORT                                                                                  I              TEOQII CAL OPBt 6 MAIHIO)(s)                27a 1laa PROIKCTION COORO){$ )
L                ST TKSTINC(3)
AssT sutta                                          khDIOLOCICAL                                                                                  ASSIGNED TO    SIARIUt QkCANIZATION COMP 0 4 ltO)($ )      -Jr  Can  anal                BICINEIR(I)(5) 1
                              ,  Sa TEOl                                                      cocao(1)  (s)
Assi (3)(s)
TLCN ASSI                                            IECN StEC    AURA(1){s)
CQMP    QPIAO)(s)
TLCM ASSI CNtP MAINIO)($)
                                  'IKCMNICIAXSOO)(S      )
SUPBtVISOR RR ANALTSI{I      )
UNIT SUPV RIACIOR ANALVSI O) aaa                                                                                                                                                                      5      5lta I
                                                                                                                                                                                                                            ~ S.tt t'nit TKCNNICIANSOO)($ )                                                                                                                                                                ~a  ~  kit t'ntt 5 aa ~ ~  I it t'nit I JR    CEN. IWR      {2)(S)                                                                                                                                                                2 it I'ntt 2
 
i QUESTION 19C    TRAINING PROGRAMS  RE UIRED FOR FUEL LOAD
: 1. Reactor Operator/Senior Reactor Operator Licensing Program See  Question 19d.
2,  General Employee Training General Employee Training (GET) will be conducted for all site personnel when the Site Security Plan (extension of 9MPN1) is implemented. The date of implementation is not yet determined.
GET  will be  conducted  for those personnel with access to nuclear fuel  when  it is delivered to the Site (mid  1985) .
: 3. Fuel Handling Training
: a. Training in fuel receipt, inspection and storage will be conducted for Maintenance mechanics (approximately 20) and Radiation Protection technicians (approximately 10) prior to receipt of nuclear fuel.
: b. Training in in-core detector installation and maintenance will be conducted for Instrument and Control technicians (approximately 35)  . The schedule  for this training is not yet determined.
C. Training in fuel handling and loading will be conducted for Operations personnel as part of the licensed operator training program.
: 4. Fire Protection Training The  Fire Protection training program commenced in August 1984 and  will continue  to April 1985. This program is being conducted for 27 nuclear fire-fighters, and includes all aspects of 9MP2 commitments to Appendix R training requirements.
 
QUESTION            19 ~ 0 CURRENTLY SCHEOUL[-0 COLO    LI~E:l~E CLAS4ES CLASS I  J A>4UAR Y              1 985 REACTOR OPERATOR                                      Sl=    4 [OR OPERAl    3R AA 1 ~ [3 R I CHAR 08                      CS:3          I~      A  A40ER iEN            SSS 2  ~  l4  GAkPuS                      C S'3          2~          COLO&',.3            SSS      h    >'
3  ~  J  BURR                        CS'3          3~          JONES                OS 4  ~  k GR++                          CSJ            4~      J  HELKFR                ASSS J
ST R ~VRRAY                            C S.3          5~      J  KIBBE                SSS      'h  h 6 ~ 0 ~ K [nlNc'Y                      C,SU          6~          DEGRAC I 4            SSS
                                                                                        > X AN AL AJ 7 ~ F CONA>>AY                          CSQ            7  ~    J CON@/AY 8 ~ 4 W I TH R='LL                      CS!3                    H  BARRET                TECSER    h AJ 9 ~ J h<CANQ+EW                        AQ4            9~      W  03+>>S                TECSER 10    M  CHV[e [LLA                  AOE            10      G  WE[MFR                T.RA [ 4 I1    R BERGE>4S TOCK                  AOE            11      J KALINSK I              TRAIN 12    R  BI GELQ>>                    AOE            12 0 W I LSON                    ASSS CLASS 2  JU'lE            1995 REAC TOR OPERATOR                                      SEN I OR OPERA l OR 1 ~    R SPOO4ER                        AOE            1 ~      F TOWNSEND              SSS 2 ~ 0 NF W<A4                          AOE            2 ~ G FOYER                      SSS 3 ~ c DAY I 3                          AOU              3 ~    R GA YNE                AOS 4 ~ R iSVLLQCK                          AOF            4  ~    0  T )PLEY              SSS 5 ~ 0 LO'4[3 E R                        AQE            5  ~    8 9QUCIER              'SSS 6~        HOLT                        AQE            J3 ~    A  QENNY                ASSS 7 ~ B TE SOR I ERQ                      A Oi=.        7  ~    G  SANFORD              ASSS 9~        CA:e SON                    QOc            ~    ~  G  CQRBIV                TRAIN 9~        CONW 4 Y                    A Oi=          9  ~    0 FITCH                  TRA IN 10 J GP AFr                            AQE            1 0    < >3QQLE Y              TRAIN 11 J LA +E~f NC.=                    AOB            11 H COLL[>4S                    TRA IN 12        'JOVTFLL                    AOE            12      R  SMITH                RXAN A CLASS 3          -  NQV'. v REie    1 9[35 REACT-R '~F:WATOW                                      SE    NI QR '3PE kA TOR 1 ~    G Pl TT3                        AC[3            1 ~    W  OAVEY                  SSS        h h 2  ~  0 RA TH'RUN                      AOE            2  ~    J MA NCUSi3              ATOS J ~ S DAVIS                              AOE            .3 ~    J PQI NQF XTER          SSS AQS        AJ 4  ~    W WAMOSG AN                        'h
                                                            ~  0 CAR ON                  ASSS 6~      G  RANALLI                ASSS 7~      E GE i40V A              ASSS de      K EQLLI TSCH            TRAI 4 9~      W  PI CC IRILLI          ASSS CURR=NT RO L ICENSt-NMP UNI T 1 CURRENT SRO LICENSE'-N4P Ut'll T 4'RO                      I CERT IF CATI ON GE 3WR
<  IN I <U'V.  > -QV I REO  L ICENSES FQR FUEL LOAO  5        SH IFT  RQTAT I ON RO  10 SRO  1        1
 
AGENDA ITEM 820 ITEM:
Detailed review  and current status of work to be performed in response to the CAT  audit concerns (include actions in response to ORDER).
CURRENT STATUS:
See following pages.
 
NRC  Caseload Forecast A enda  Item 820 - CAT Audit I. Action Plans - Licensee 7
A. All Action Plans (i.e. Corrective/Preventive Action) completed including:
: 1. Specific Action Plans          (NRC Identified Items)
: 2. Generic Action Plans        (NMPC/SWEC Management)
: 3. Response    Commitments
: 4. Verifications
: a. NM QA
: b. NM NCV B. Closure
: 1. Preparation of Documentation Packages to support          NRC CAT  Report Item breakdown.
a.,  120 issues    being tracked by  NRC
: b. 97 packages    in preliminary form
: c. Work remaining
: 1. Review/complete packages
: 2. Evaluation and verification as required.
: 2. Submitted to    NRC  Resident Inspector  for review and  closure.
II. Actions  in Response to Order A.  (MAC)  Independent Assessment
: 1. Three  interim    phase  reports issued.
: a. Phase  I -  CAT  audit findings
: b. Phase  II  -  SALP  Report findings
: c. Phase  III -  NMPC  findings
: 2. Final report due on or before 12/18/84.
: a. Complete assessment      of each phase    including    Phase IV-Contractor findings
: b. Sumary and Conclusions to        tie  the four phases together.
: 3. Assessment  Ratings/Status
: a. Satisfactory - item complete,       no  further activity required.
: b. Satisfactory with      Recommendations    - item complete with recommendations    for  more  effective courses of action.
c.. Unsatisfactory -     item incomplete or corrective action ineffective, and    a  deficiency document issued.
: d. Status Total
* Reviewed    to date        Sat        Sat  w  Rec.       Unset Phase  I      66/59                  38                  17            15                6 Phase  II Viol. 28                  25                  19 CDR    61                  13                  12                            0 Phase  III    216/200              169                125            40              4
      <<Actual total/number to be reviewed          - Certain items in the "actual total" may be  non-safety related, duplicated by or combined with another item and  will not be reviewed.
: 4. NMPC activity required.
: a. Respond  to recommendations    made
: b. Track resolution of deficiency documents (issued based on Unsatisfactory ratings) c.'ncorporate results of        a) and b)   in Documentation    packages as appropriate for presentation to        NRC  Resident Inspector (Phase  I  and  II only)
: 5. Follow up on areas where sampling        failed,;
 
X B. gual ity Construction  Performance Monitoring
: 1. PG 91  drafted "guality Performance Management Program Implementation"
: 2. Program implemented
: 3. Process  ongoing C. Independent Third Party Appraisal - Future
 
'}}

Latest revision as of 16:29, 3 February 2020

Briefing Book:Caseload Forecast Panel Site Visit. Current Status Info on Meeting Agenda Items & Overhead Presentation Encl
ML18037A065
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 10/31/1984
From:
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17054B164 List:
References
NUDOCS 8411150106
Download: ML18037A065 (294)


Text

NINE MILE POINT 2 CASELOAD FORECAST PANEL SITE VISIT Current Status Information on Meeting Agenda Items Prepared by Niagara Mohawk Power Cor poration October, 1984 841109 8411150106 05000410 PDR ADDCK ~l Poa j

forward The enclosed information is provided as background and current status of items for discussion between Niagara Mohawk Power Corporation and the Nuclear Regulatory Comnission's Caseload Forecast Panel, Each section contains one meeting agenda item and the background information associated with that topic.

Any omissions or incomplete items are the result of the time limitation for compiling this information. Additional information will be available during the meeting.

TABLE OF CONTENTS A enda Item Descri tion Tab 0 Overview of Project Construction and Preoperational Testing Schedule Current Status of Design and Engineering Current Status of Procurement Activities Actual and Proposed Craft Work Force Current Status of Large and Small Bore Pipe Hangers Review of Critical Path Items Current Status of Bulk guantities Current Status of Preoperational and Startup Activities Effects of NUREG 0737 on Schedule 10 Impact of 10CFR50.55(e ) on Schedule 10 Effects of Management Organization Changes on Construction, Preoperational Testing and Startup 12 Current Construction and Startup 12 Management Organization 13 Review and Current Status of Design Engineering and Construction 14 Review of Room/Area Turnover Schedule 14 15 Projected Requests for Relief from Incomplete Items 16 Review of Punch List Items 17 Status and Schedule for Seismic II/I 17 Review 18 Current Status of Power Accession Testing Procedures and Operating Procedures 19 Current Status of Permanent Station and Support Staffing 20 Current Status of Work Associated with 20 the CAT Audit 21 SITE TOUR

AGENDA ITEM ¹1 ITEM'verview of 'project construction and preoperational testing schedule,-

including progress and major milestones completed, current problems and any anticipated problem areas that may impact the current projected fuel load date.

CURRENT STATUS:

See following pages for combined data for Items ¹1, ¹6 and ¹14.

(Refer to Item ¹8 for more detail. )

NRC CASELOAD Site Visit Nine Mile Point 2 Planning & Scheduling CONTENTS SECTION Overview of Scheduling System Status of Project &

Milestone Summary Schedule Ma j or Milestone Status -

III Attachments IV Milestone Schedule -A Area/System Schedule B Thirteen Week Look Ahead Schedule ---C Weekly Work Plan Schedule ---=-------D Testing Detail Schedule -- -------E

SECTION I - OVERVIEW OF SCHEDULING SYSTEM The Project Control Program at Nine Mile Point Unit 2 provides dynamic insight as to status of the project by use of a systematically developed series of schedules which enable management to direct and coordinate the various project organizati ons towards a common goal . The basi c schedul ing tool s are the Mil estone, Commodity Roll-Up, Area/System, Thirteen Week Look Ahead, Weekly work Plan and testing Schedules.

The Milestone Schedules are an overview of the status of the project. These networks provide goal oriented information for Construction as we11 as the test organization. The Commodity Roll-Up Schedules are the commodities required to be performed as represented by the Milestone Schedules, and may be found elsewhere in this report.

Area/System Schedules are developed by construction to provide for control of work within a physical area of the plant, (i.e., building, elevation, cubicle, etc.). These schedules are organized to provide information on the status of system completion within that area and they must meet the requirements of the Milestone Schedules.

Thirteen Week Look Ahead Schedules (TWLAS) are produced as system completion draws near. They provide a tool to focus attention on the particular problems and overall status of a system. The TWLAS are developed to meet the requirements of the Milestone and Area/System Schedules.

Weekly Work Plans (WWP) are developed as the foremen level working tool. The schedule indicates which specific commodities must be installed during the subject week . The WWP's are developed from the Area/System Schedules and the TWLAS, with the priority items being selected from the TWLAS.

The Test Schedules provide control of the project preliminary and pre-operational testing. These schedules are produced at various levels of detail and are developed in conjunction with the overall goals as provided for in the Milestone Schedules.

Sample of these schedule are attached in Section IV.

As difficu'It areas are encountered, special schedules are produced, examples are as follows:

1. Diesel Generator Milestone
2. Control Room
3. Hain Steam System
4. Suppression Pool Fill, etc.

SECTION II - STATUS OF PROJECT The project is presently on schedule for a February 1986 Fuel Load Date, and is an estimated 81.5% complete as of September 30, 1984.

The 4160 Nilestone, although behind schedule, has seven (7) of the eight (8) busses energized. The testing priorities have been established to support critical testing requirements which has resul ted in a delay of the 4160 Nil es tone compl eti on; there shoul d be no e ffeet to any cri ti cal test activities.

The Projects Diesel Generator Schedule attains operational diesel generators seven months pri or to the first mandatory operational period. The construction progress is slightly behind this aggressive schedule.

The Integrated Flush Milestone falls on the critical path of the project.

Thir ty-one Flush Paths have been released to Start-Up 8 Test, with several ahead of schedule. One Flush Path is delinquent as of 12 Oct. 1984. The major concern wi th the Integrated Flush Schedul e is the large number of releases per month to Start-Up 8 Test. Start-Up 5 Test in conjunction with construction, will develop work around plans as required.

The imaediate concern is the aggressiveness of the Project Schedules. The installation rates of cable and pipe supports have not met planned rates. The r ate of release of systems for testing is greater than the projects previously achieved rates. Efforts are in progress to improve the cable backlog for more efficient pulling and redirection of the pi ping work force to allow for greater production on the priority systems. The efforts to increase the production rates as well as the work around plans previously stated, should allow the project to meet the required schedules.

The prime future concern for the construction schedules is the result of the design reconciliation effort now on going in Engineering. The design reconciliation is now in the process of being scheduled by the project, as well as the support modifications as they are identified. Preliminary results of that process show no impact to the fuel .load date.

The following Mi'1estone Summary Schedule indicates the general overall status of the project.

1984 1985 1986 JUL AUG SEP OCT NOV DEC JAN F'EB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC JAN F'EB MAR OCT STARTUP SCHEDULED TESTING MILESTONE COMPLETION 4160

1) 4160 V 21 AUG 84 I I ENERGIZA TION I
2) DIESEL GENERATION 06 APR 85 I 3) INTEGRATED FLUSH 11 MAR 85 STARTUP TESTING-TURBINE GENERATOR MLESTONC RPV HYDRO 01 APR 85
4) TURBINE, GENERATION 12 SEP 85 VACUUM PULL CONSTRUCTION COMPLETE TURBINE I I 5) VENTILATION 14 NOV 85

'r STARTUP TESTING-DIESEL I

I GENERATOR MILESTONE COMP I 6) INTEGRATED LEAK 06 DEC 85 TESTING. I RATE TEST FOR ECCS/'OP I CONST COMPL I 7) RADWASTE SYSTEM 20 OCT 85 DKSEL GENERATO 9 6 8) FUEL RECEIPT 07 NOV 85 POWER AND TRANSFER COLO ASCENSION STARTUP TESTING FIPK 1 KNAL INTEGRATED FLUSH COMPLCTE NSSS STARTUP TESTNG TEST NG TESTING 9) LOSS OF POWER/'CCS 08 NOV 85

10) FUEL LOAD 24 FEB 86 CONST COMPL FLUSH PATH SYSTEMS CONSTRUCTION COMPLCTE
11) FUEL LOAD TO C.O. 01 OCT 86 STARTUP TESTING-RADWASTE MILESTONE LEGEND I

CONST COMPL RADWASTE SYSTEMS I Q PRELIMINARY TESTING I

8 I Q CONST RUCTION STARTUP TESTING-FUEL RECEIPT MLESTONE STATUS AS OF OCT 15, 1984 MILESTONE

SUMMARY

SCHEDULE STARTUP TESTING-VENTILATION MILESTONE NIAGARA MOHAWK POWER CORPORATION I

STONE 8c WEBSTER ENGINEERING CORP.

CONST COMPL HVAC STSTCMS J.O. 12187 REVISIONS JUL AUG SEP OCT NOV DEC JAN F'EB MAR APR MAY JUN JUL AUG SCP OCT NOV DEC JAN FFB MAR OCT ORIGINAL 1984 1985 1986 IS OCT 84

SECTION III - MAJOR MILESTONE STATUS MILESTONE COMPLETION DATE

>>Set upper Containment Cone A 07May81

>>Complete Concrete, Primary A 120ct81 Containment to EL. 326-10"

  • Set Fuel Pool Liner in place. A 18Aug82
  • Set Main PGCC Console. A 25Mar83
  • Ready to energize 115-KV A 01Aug84 switchyard "Reactor Building Polar Crane A 29Apr83 Operational, "Makeup Demineralizer complete A 19Mar84 and ready for initial test.
  • Reactor Building Enclosed. A 19Dec83 4160 V Energization Aug84 Diesel Generators Apr85 Integrated Flush/RPV Hydro Mar85/ Apr85 Turbine Generator/Vacuum Pull Sep85 Ventilation Nov85 Integrated Leak Rate Test Dec85 Radwaste Oc t85 Fuel Receipt and Transfer Nov85 Loss of Power/ECCS Nov85 Fuel Load Feb86 Fuel Load to C.O. ,Oc t86 NOTES: A ~ Actual Completion Date

>> = Contract Milestone

THIRTEEN WEEK iOOK AHEAD SCHEDULE ITEM QTY E 5C,R I P 7 ION RESP 8 o 8 IO 91 lO /0 lOsS o lo z I 1 LA GE BORE. PPG. AP I 2 2.0 2 LARGE BORE HGRS P H 3 3O SMALL BORE PPG AP 4 TRlhh ITEMS TC) SUPPORT JCI AP 5 'ODE 99 HGPS L.B. -1 I 5 hAALL BORE. PPG. I M 64 7 7 SMALL BORE HGRS 8 MECH ANICAL EQUI PME.NT

'hISTALL INSTRUMENTS v ~EO 5 ra r us l2I 7ZS 9

L. F. I PT oeaa PROQI t<

10 INSTALL TUBING AR vusiq(, Rout'iso I

11 PRESSURE TF ST AR HO OF 12 E LECTRICAL E,QUIPMENT HO. OF 13 COMPLET E, RACE WAY l No. OF I 14 CABLE PULLS 15 TERMINATION'5 1a PGCC 1'I I-IE AT T RAC, I l IC AT

$8 PA INTIHG 19 INSULAT l OH AQ S'YS 5<5 DESCRIPTION SE Vi E QF S'LGNATLON-r SwP FLUSH PACKAGE NO.

MF II. O TURNOVF.R Dh,lE:

5 /V STATUS AS Ol:.I%I,-'80 PLAN<FR: ~ I NOTES: QTY Remaining quantity to be installed gmAcI-I g e~t C.

RESP = Contractor Code SA~pLE Q<s~er~ ~HE+

LooK p,QEAD SMEpJL.E.

. ~ -=a=aaaaaaa t aaao==-=--" I I SCHEDULER g. +hRA.S I I I GA INNELL I . F'. I. SHEE T OF 2 I I

I SUPER IN t ENOFNT //Hr NS'IY f ORLt1AN S WEEKLY WORK F'LAN DATE ISSUED lei gi g4 I I

ISED. FOREMAN g. 0 COACTOR AREA Wc ~R'/ uf C'o I I

I I FceEttnt4 g +u~~nlsn 3- /ci oi:-HS Tll?S WEEK NEXT I'lEEK PROJ.

= === ==..= = ==aaaaaaaaaaaaaaa WEEK I

I IP~SI DF'4 l ISOtt o ITEN ID sQTY DII + 4)E'0//0 + sv/4 /o'/l7 t g/f /b/Zg +N- l I ThF'O'TIW'S'tf I F I taaa I 'g p//pe (ear~)'

s

'X' LRL lo I I e N

+ ', '.: '.'+: S F tf T W S

'i S xaaaaaaaaaaaaaaa

'. I t I I I S

+g I

I

'8'/: A-/>:SZ- rs~K ' '/a/ + ~ ~ s ~ ~ ~

-. -U--

4'

~


U

~ ~ ~ ~ 4 o ~ I ~ I I U

+2 I

I

+

/AZ d4-24 'EZ- 7/ ASr '/.m/8 ~ ~ ~ ~ ~ e

-N-.

< s I'-- ----N l ~ ~ s ~ > e I I o o I N

y I I

I o 'Z- /37 $ D(arzr) 3x + ~

~

~

~

~

~

~

~

~

o

~

~

.-D-"

~ ~

~

~

~

~ ~


D-

~ ~

~

~

~

~ t ~

~

~

~

~

O

~

~

~

~ I 9

+

'-H 'BZ-'/gb ~~

I

'gZ s,, I l I

'3/4o/ -- --------A-------------A s

P

r85: 4-/T sz-7/6 r e 2X QX 'X.u w c

~ ~ ~

Y

+,;,...

A--

~ ~ ~ ~ ~ ~

Y so....,

~ ~ ~ ~ ~

e

-Y-- +~I I

'42 '-45'sz- 7/xc. zX 'gl.uo/F

~ ~ ~

S

~ ~ ~ ~ ~ ~

S I ~ ~ ~ ~ ~ ~

+~

A/ g-/o sz- /sA 2X '3/~I 8 +~

U U U I

/8/ A-5/ EF- 7j'dn/ /x N- N----I

'6-/3 'z"- ~ N

~~~~~~

+

'/X '3'/I I ~

+~ -----n

~ ~ ~ ~

8' ~ t o ~ ~ ~ ~ ~

7/ A68 D I

' ' +

/d/ /0 /3 8% / AM '3l.n/$ + ', l s

- ""A-l l l l < l e A I

'/4/ '$4-37'P- 7/4F

- 'Z 'Zx 3'.co/5 -Y- 'V V

+

I I/8/

g

'./'f

- 7:

az- a 8o ~

/

/ ') '3/.Nl AToAc H waar

~~PLF- Wt'-lQ-0 @oleic D

i 7/ ZW .u FLAPS I/HI '(-/5 'P-7/ WD

' '/x '/oo/ PR6.F- / F

~...,,

I t I I- Zx o o o o o

<<D- "-t I

g/ co/I

~ ~

/

~ ~ ~ ~

I la

~

ZX - ---x-~ -aaaaaaa I

e I SCHEDULER ISLN'ERINIENOVNT

/ ~46'5

/.

42'4' SEE'PLY I I I GRINNELL f ORE:MAN S WEEKLY WORK F'LAN I.F'. I. SHEET DATE ISSUED a

Z a

/D/

OF maaaaaa I g / gf 2 I I

I I

I 8EN I=OREVAN f. 0 Cpa/40@ AREA Q.Ca&WXPQ CO47. I I I t FCNEVAI4 I aaaaa ga RQDZu/SK[

zlaaaR THIS IPEEK NEXT---==== HEEK

=

PROJ.

===caaaaaaaaaaaaaaa I'IEEK I

IPy8I DF'A s ISOtt s ITEN ID o QTY s X l P I I + + +N-1 I I F ~ ~

LI'Llol Es N >ThF oH oT sg .S ob+Tg Fl )] T g g~'Th.p ff LI N $ 8+ C I aaaaaaaaaaaaaaa aaaa I I

I P'I ]4'=: N-2Z:yZ- pre /t s

~X -S S S I bb-j3:aZ- 7j A~A' 2X '/r2)/g ------- -U U--

~ ~ s ~ ~

U-- I I o

'gZ- /f 7< (gwrZ)

~ ~

~

~

s ~ ~

. N-- . -" -- -t4 o I I I o I N

++I I I

'8Z- 7/ AEx

~

~

~

s

~

~

~ ~

- - D-. - - - - - - - - " - LI. D

+/ I I o s s o o o o s + e s s o o s < o o I o I I +Q A-- I I

..A A

~ ~ ~ ~ ~ ~ ~ w ~ ~ ~ ~ ~ ~ e ~ ~ ~ ~ ~

~ s ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

'L ~

Y Y Y

~ ~

~

~,'

~

~ ~

o

~

s + ~

s

~

s

~

s

~

~ ~

~ ~

s S-

~

~

~

~

~

~

~

~

~

~

~

~ +~I S

/.~p '7-~ 'g~ I 'g ~ . ~/g

/A

~ ~

o

~

o

~

s

~

s

~ ~

S U

+ ~

~ ~

~ ~

~

~

~

~

~

~

~

U I

P~a I

0

+

I I

I

-N -f------------N i s s

I

~ ~ ~ ~ ~ ~ ~

I 57-/0 Zg )> o.>i rtQ

/ I I N

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

) ~ ~

+

ov/ F

~

~'/-9 p p 7Q Zx Q ~

~ ~ ~ ~ ~ ~

0

~ o ~ ~ ~ ~

EI E6 5

~ ~

p

~ ~ ~ ~

I ~ ~ ~ ~ ~

+

A----II

~

~ ~

~

~

~

~

~

~

s

~

s

~

s ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ I

- -"A .A

+ ~

~ ~

s ~

~

~

~

~

s

~

p ~ ~

~

~

~

~ ~

~

~

~ >

~

~

~

~

~

~

~

~

~

~ I + I Y-- V V I 4 TTAc4PfEPI T l3

~ ~ ~ ~ ~

~ ~ ~ ~ ~

s

. ~s4 I

~ ~ ~ ~ ~

~ ~ s ~

-U SAM~ REEKY~ -s I

N PA+F 2 of Z. -I o o I s o I I

II

~ ~ ~ ~ ~ ~ ~

I ~

~

~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~

I sa=.-

~ ~ ~

g C ~

. ' Qssaaaal

AGENDA ITEM 82 ITEM:

getaiIed review and current status of design and engineering effort (bX major discipline), incloding any potential problems that may arise from necessary rework.

CURRENT STATUS:

See following pages.

2. General Most divisions are experiencing involvement in calculation finalization, equipment qualification, and special multidiscipline efforts such as flooding evaluation resolution and the technical support center.

Divisional Advisor 0 erations This division continues a significant effort in developing loop calibration reports.

Controls Efforts continue in completion of setpoints, support of panel deliveries, preparation of control panel modification packages, and process computer support activities.

Electrical Cable routing, cable pull tickets, and from/to conduit efforts continue, and alternate access point security design efforts are getting underway.

En ineerin Mechanics Efforts for this division will be focused on engineering reconciliation of Category I large bore as-built drawings, completion of N-5 signoffs, Category II support reconciliation, penetration analysis, pipe rupture restraint structural load verification, and jet impingement evaluation.

En ineerin Services This group will continue its efforts in the specification and procurement of spare parts.

~Licensin This group continues to support final safety analysis and environmental report milestones while addressing additional NRC questions.

Nuclear Technolo Significant effort will be required by this group in moderate energy line crack analysis, leak detection, and ALARA walk-downs and calculations/problem resolutions.

Power This group's effort will be spread over a number of areas including diagram updates for system turnover, PIlIO development, stress reconciliation, preop test procedure review, piping component procurement, IE bulletin assessment, and MSIV problem resolution.

Structural 1

This division will devote itself to final load verification, embedment plate load verification, and door review and release.

DRAWINGS ISSUED FOR CONSTRUCTION WITH LATE ISSUE DATES PRIOR TO SEPTENBER 30, 1984 Total No. Total No. Total No. Drawings Total No. Drawings Total No. Drawings Drawings Total No. Drawings Issued Issued at 90$ Issued for Issued at 90%

Es tima ted Drawings For Construction Of Those Scheduled Construction For Construction D~isci line Scheduled Of Those Scheduled For Construction For Total Pro ect For Total Pro ect Architecture 108 108 108 108 108 108 Building Service LB 418 418 418 418 418 418 Concrete 843 843 843 843 843 843

  • Electrical 2,161 2,153 2,153 2,153 2,153 21153 Field Erection 25 25 25 25 25 25 Instrumentation 185 185 185 185 185 185 Small Bore Dks 1,749 ~

1,743 1,743 1,743 1,743

~

Hachine Location 122 112 112 112 112 112 Piping LB 615 607 607 607 607 607

  • Small Bore DBs 322 322 322 322 322 322
  • Small Bore DPs 1,654 1,642 1,642 1,642 1,642 1,642 Steel 465 464 464 464 464 464 Uessel 508 508 508 508 508 508 Civil 68 55 55 55 55 55 Pipe Supports 539 539 539 539 539 TOTALS 9,782 91724 9,724 9,724 9,724 9,724 C3/12177/480/5Y1[
  • Status of pr awings are based on baseline of conduit sma11 bore design as it exi this report. piping and tubin u ing aadded e b y Engineering n Change Notices are not statused

'n

2; POTENTIAL REWORK

a. Rework Associated With Structural Load Verification The original design of structural steel members and their con-nections utilized hypothetical load allowances before actual loads were known from system attachments (such as piping, cable trays,

=conduits, ducts, etc). The final load verification program will demonstrate structural adequacy for these system loads.

The scope of rework is expected to be limited to primary contain-ment steel since this is the most heavily loaded area and structural steel beams are not embedded in concrete. For other remaining Category I.structures, the scope of rework will be minimal.

Attachment 1 shows the scope of expected rework and status of September 24, 19S4, for primary containment steel.

.b. Rework Associated With As-Built Stress Reconciliation Modifications are anticipated as a result of finalization of

~

design inputs and consideration for the cumulative effect of field changes. For large bore, the only significant issues are incor-poration of final fluid transients, hazards analysis, and cumulative field changes. .All pressure, temperature, seismic, hydrodynamic and building settlement conditions are incorporated in the cal-culations and, except in isolated cases, are being finalized with minor changes. For small bore, the only significant issue is the cumulative effect of field changes. 'xcept for isolated cases all design inputs are being finalized with minor changes.

Estimated impacts are 10 percent for large bore and less than 5 percent for small bore.

C. E UIPMENT UALIFICATION The potential exists that environmental equipment qualification could effect schedule. For example, if certain equipment is not capable of being qualified to the design environment identified three options exist to correct the discrepancy.

1. Relocate to a less severe environment
2. Redesign the equipment or the paramenters
3. Replace with other equipment We have identified some equipment which does not meet qualification requirements (see 10CFR50.55{e) list). However, the program is set up to alleviate potential schedule impacts, and "is planned to be complete as described in 131.

f '

STRUCTURAL LOAD VERIFICATION

{AS OF 9/24/84)

I. PRIMARY CONTAINMENTFLOOR FRAMING PERCENTAGE ELEVATION MEMBERS HARDWARE FIXES REMARKS ANTICIPATED ACTUAL 20% 4% 1 BEAM, 2 CONN.

180 20%

320 222'47'61'78'88'05'0 15'/o.

460 10%

140 10o/o 110 7o/o TQTALS 980 II. CONTROL BUILDING FLOOR FRAMING LOAD VERIFICATION ACTIVITYFOR FLOOR ELEVATIONS 237'c 261'OMPLETED AND NO HARDWARE FIXES WERE REQUIRED

S(ICO OASC t>Y ~ ) f,>att EO(f(PMCNT Cf)SL)P)CATION Pf)SCAA)) (NONTNLT STATUS + E~ >EO(OL PLPP( AOOIT(O))S c>A>r>f >(see >4 wagon A'w AH I t I4 v AA Ata tea I t>A w4 'Ilt oct eor c)cc Yav t(4 saaa Atl awe TOP I~ > ~ 'I II> ~ I >Vnl Il> 14 I I >ch4 (Vl'4 ~ Vclt IVI' callt >1>1 ~ ~ >A lea Iawl 1>lt ~

Nf)AO)gfa(NT)L 14 H ~

A> I (Al )) ~ >ca H>> >1 I I

4> ~ O>4 4 ~ A> ~ O>st 0> ~ O>V ANE 4> ~ 'I 4> I I (V>l IVII A>ll n>4 mrf>ACO(N ~ ~ >wa Na fc>>ASE AL ca> ~ cr ~ Er 1 t Lww wNw ~ e aeacce

~ cca I

4> ~ A>I (V1 aal (Ia I flel ( Vli O>la (I>>1 A>N Vill evil (V I 'I AH WS AS 1 ta) (n ~

T n>t cve AN cli ~ co(I lac\ >ol ~ IINH (L)tt (VV) (Ivel >414 false V(i> (VAI naa1 st>>14 OO(>CCS (C)SL)f KO IA Ot I>EY(f(TS <<C ni I ta ~ W'4 << ~

I I

14 av <<4 Aai SPEC

)CYOI( Ctfttft Wl fll CI W~ tea) Ca<<e <<Sa aW aa <<4 aa n>D Ia f(OYCC(ATTN WI ca>C (al I ~ e >4 r> ~ ~ <<c ~ >a V(NOCCL >svr nw> >INN Iww COO)MENT 4(VIEW A rw1 cc tc ta hl >Naca Ie ~ 0 c c>

cvla >I ACTA I~ >laaw LOCAI. tM K>s I~ DES(ttcav/cs>eft v>l<<1 n>w osa nell, ICAC)CS

~ WN I ~

)a>DE ~, ~ vH GC SOOT Y(O((CAM(ACT)V)ttLCCiOID)

S>g>F LOOSE 1>Owl 1 O>aelcln>at>at(I COIEr ON(MT S ~ c al 'e Q VND TAtwg>ta

~ 4 Il'VI 'III>VS (SDO ~ O>VN AH

~ e>W>(IINN Nleac>ACNV PANELS COO>f N TNT wv w ewe O Dlalt D4(vale(114>I

~ em W~

- O CLOOYL MOCINTLD I ~ >wt svNI cvrt alee asn AEAeK>I>(OON IEW S (O(A)t>CI(T war )Ncgw Inc a>tv Ive))aen n>14 (VDA OA)f>CCS I~ I I r EIHND~

Nl lsl (E>VC CA> ls>l Gf(AYYLCS cwwga IVVI >DAD >V)H CS'tl ~

v CA%VALVES I I ~ t 0 (ala 1 vw YV)L NA)>DLO (Sett INMI oar nate on l STOCACC Oea1 lit 1 (Vvlt (OLEYMCNT IVAN> I 4 VC

~e H ef aa J ca Cl>afl ~ I <<was cvw war\ ~ ~ ~

~ a. >Wcew ttaaws ~ Aa two la

~ ssww

<<>VAN leeverwnv el\ w 4> ~ AW> W Naw.ra wrac O>CSCL ~ ww> ~ > vrw ~ ~C ~ ~ f> ~ to av v

j GENUa1OC ga>v ~

W CA rwa r oa H EH<< H ~ ~ vve> ~ w~>eww sI W

w Cw vas~~w ws ~

I rs W

c<<w VW

>w

~

/>Hr w A E

Niii fglerl Illa> I

~ sw

~

a aw L ~~

wwca aww

)e)T)4 C)CS(NEC Cl)CS WOAA P).AN AOO>TIO)eS:

~ Aal QNIOfP vr srwt rarwwnv wa '4 IN

$- ] CONT)(L()T)>g O'(ST(/r>

Sftf OOSE ~~

W W)NW

) COIELYS r<<aoeaaaaewfwcwlN awwgrr)% etewn tewtr,

~HJltf~ T>

nc ~ cess Ice<<

llw P>W Nr Crrr a> ~

tAC L> M >> (SAY (VAAH >w wac wvwtwr Wa ~ ~

~

~ ~ A

~

s ~w ~ ww>a w Ecrwwww >waa

'((~N TEAOCC vw TNP )CA>>SENT f>00>f>(At CC(S XCV>CE VELTEC waaw

~

~L N>ert VW WC ~

w aw swcrw1 W a>>

rw

>WCV HW (4 >ra HW ~ C (7 ew Hvea>sat Hwal,eseerw AH avAAA stoa v N >vrNL <<WE ww wo r<<44 a<<es gvr cwv Il>t t>av I

'1 HA)AMCIC eaAC cw L 1 Ev ~ wc> ~

~ >H> ~ >

fcOO(P )(A ~ (I V> fr I s ~ > 4>I I

I stile II ao (CIW II Isa n)w r> I I et CONT)OL Pst(L Cl>I 44 4>> ~ 4>v Oil\ (I> n (ll ll IS'I II sew se>

C'ew ~ >WWC> EWWA aa WVNW We>VWW tvawe ew wea r>

IaOOif >CATION ~ wwe el va tl Iw w www >t ff(C/4( C STEIES w>saa Lacer>ae I I ~ >I (N >e Wa ~ I EJ c PGCC MOO>P (rewire gva ,4 11 >4>44

() PIC>(AGES TO toast 'lo v Gf CO)Ay) w )I cal >\I c wv4 fl'>Ce 4 IA>\4 AHA>tel ass V nwa CONT COLS CIW4>E) aors aa era w ~a w w>L wrwa arva en wc ws cv wa wa

~ Vr 4 ace>ra n> ~ Ai>l Cliel ~ N Iw ~ >sw PO)>(AC ) CteAllES f(OC 4 4)ff() (OOOOO OO(ANEO

>cwrw <<4 (a>L Ial e)4 W 41 ~ w ~ewl aww ~ >

~ srA CH)C t>AH<< AH Ol ts.

t C

F 04'Is Pa >CCIRLY )TATV) Ot(054061>RTRINIAN(OTVQl44L TIAN+AOC(TCR<) CAPVCSIH0NMI<<)

<<I MM AA

~ C 0 <IAA a I 4>>at J<A< <EL PIC, tae ~ 44 NM Ha ale I AH CIJL

~ <A<<r v>>40 W

><<V% t(rt ~ Nl 0 V<<re

~ I 4 PU ~ i 'I 4 I tt NJ(1

~

( ~ IN

<<are(e 40, 4

~ Mop 4

>t<I a<<<<tea>>a >>>><< ~ 10>>a V>>lt~ Aal H I'e il ~ ~ UO ~ AIH <oe NN ~ Ao <<4>>e Na >Ct <Owit I ~ ~ ~ i>>'ll W A 'at <el ,10 I< ~ V ~ COI ~ ne< Cts ~ 00> ~ a>0 ~ <0<N (NH H >>N ~4 50'I C ~ ~ > ( Sl (Sl ~ I>>' At I 4 H PIN <<4 'VVI as(VH <<H<<0 AS >>I ~ I Al t>N VI>( <<WN I (NAII (Nos Jll<a>>e Na to Alt 1 Te Plea 0%00 ~0> ~ I<<AVIV 0 ~ ) ~ ~ I<<lw ~ N ~ I (UII 14 4(1 00 > I t>>rt 04 Ns 0 attf <0< ~ I >> ~ ~ <<a ro<< Aot $ >> .~ AN ~ ~ w< WU 4 N >><>>At 4<<<<>>s 4 A<~ eH ~ 4 U AN N( rise 4 i >> ~ CNOAIC<OH <VNU IHA 00 ~ VVI 4 V~ ~ 4SN V<WC 4HI I Ntat %(A(OVIC W I< ~ ~' 4'>> <<<HO M I II Hi e<tttstON 0 MH Irirl, << ANAN 1K Plea>> <<0 HIE>>M reve <4<0< I I ~ Ma Cerate eioa I/O ~ %4>A A>>l 01st pl<4th> <4 4HAA<C>>a tt Ast> IA 0"4 ks or\0 oi eaa <4 ~ <<AH< cp<<AA< TN NPS<<l I ~ ~ 'f t IQVC, NNNs<CV I 4 > Ia M Hl I I>>e>>>>i<<<<pI~ ~ I i to<< <V4 ~ ~ <A<so it f<AH<ONN Vhosae>>a Ii ~ lN \st%I< Vleaa>>W ~ <re 14 ~ <SAA << ~ i I NW I 4 ~ 40 ~ 0 4 <N M oar 4 p<r ~ NN INN VN <<N  %>>H (VH f Catt Aie (N ~ Hi>> ('etl ~~ I>>N <Ne U <<N ~ (PH >>I Cs<<h C I'C Litt 4 ~ <>>es <el HH la< 11 ESI H M<O I~ (4 <N ~ I I< ~ ~ VA g ~It<A<ra% 4111 7> EI ~ <sl > (ai ~ (I> ~ III 4 ~ ~ W\ , Is AT Hit> IO>VM> >r((% <AI %1 ~ 0e (Noo Pl ~ 4I ~ 4'>> <>> '>> <U Al ~a ~s Nl Ta 0<ow srr\\ <N>>rs I <>><AH NIN H Mae A r>>1 Ue (4%1 (Ita H sa Nle Ita Vi H<HT ela pta 'O'r>NA ~~ I4 004<M I ~ (0 N I'I I4 ns eel Etrllf 4 Qe&tft UI Ps 4 E>>l 4((Ha (4 'e (eat (4.11 I~ Aa (%>Ns 4<<< 1H N>>0 <<<<AM 0AN ]t ~I <4A >0 IH <<W ie V ~ 0< ~ El< N ~ NH VN ~ N ia>>I ie N 4 0 etN << rl~ IIA WM 55 VT I)A Irl4crel <<sar>><t P>vt 'I <Aa IA ~ ~ 0<>>< 4 VIV 1 I,, < ~ I Aer<< S 4 4 ~ ~ I I P>>>>N<S a ~ I J ~ U A I 4<aM Aries J<AaN 4 AW N<AW 0'I ~ 11 VNM VN<H VNM V ll Ma HA>>0 w i~ ot SILIH 4<aM <<>>o< 4 ~V VHTH ~ >> 4 A rei >><4 I Ai SW ~ ha <eas>> al ~ IN <wioa Naw Qlv>> NN<H Pleat v(II<< a><sa 4NIIH l(t F>ON TO ~< ~ <4 S<<r I~ i H ~ It<~ Nt U ~ IN <I TN e <I .~ ~< <Ia wt.l ~ Ilt ~ >>Nc <AIIC~ 4<<<<4>>s tls(trl <Sl(IP <el<a (4<alt >at ~ >I CL>OAT) A<It Al, ~ <44>H ol I ~ lta ~(N4>t <>>I ~ I<H 'III~ oA\ Hi I 4 AAU aoe pv ~ ~ poe P I W 4 tlIC INC> >>w<<H>>>>>> O CO(AT<( Ve ~ ~ AN>>o r AN ss<<i i I ttt Na ASS<<e>>l<\ A ts ~ I Ptt< CO<TIE <LI t(ON(ION R ICV>etr 4< t(CLTSS CON(V IVIN I ela A4 I <A \ I CgattOI. (li4 <NN I ~I HN NN INN I HIN <VH (V <Nil INTA 1< I N Wl> ~~ (SIN ~ (ai 'I (4 N ~ <<< I~ ~~ ~ %1 tt t Ct (CITE ON PLNTL ~ ~ 4 ~ < ~ ~ <N ~ ea te' i< ~ ~ i ~ <>> Otuett<5$ ~ ~ ( <~ I 'I i<< t N 0>> ~ ~ WAA U Q (I>NE LOIO H < ~ ~ ~ Ne <4 ~ also < ~ ~ 4< ~ H ISN <4 ~ PAN <Nil <4 tl H ~ PUA CV ~ 'I <VH< Vtt<fCATION V4 141 Hi I WN ei ~ Alt 4 <~> Et ~ ~ Ha<Ha I 1< Nl I <AN ~ N '>>i 'I < I>>I ~ Nl>>a < ~ <H III ~ ~ H< I ~ ~ Nr>> <Nal ~ IN ~ I ~ IN>>o '>> <<M <<N LOOP III IN ~ (I >>>> vhsac ~ lerla asar%0 LIL<ORITC>I All<> W (SI UA ~ I ~ H MI is NNNI (tasse( NHC As>>lie rat < N 44seat 05 PORT) Or sea<<< NHNAIP v<1 sees>>% Oars N <AAN I>>re (>>INC A<111 ~ <S< %HI HN Nioia 4 TN I"ea wa  %(savaa 01NI N IIVIIVr I ~ IN PIN ~ N I~ 111 V< IN ~ IVII IN>II <NNI n >I< <SNI <4NI ~ NHN II We 1 045 WW HN ( il'I' (al I~ I U1 Nl I t ~ ~ ~ \ 4 W t>>r H Vt (IV Iew ~~ Hl IN>IC I~ tl N Itl IMV Ie\'ll I ~ O' IP>N le>ll Ieaa 1044 CNOINCCR<NO VOOC PLAN ( Or<ON444 PEAI ~ A OR< TON 5 > ~ NPM <441 <4 4 <si Nh let<I IVI ~ <A> lll WN1 (4<H est> t>04 4 N>(CT 0444(NO (OVNVV ITR 04)ON!t 8< I H 4<14 AiN 4 11 hill hit ce ~ NHI>>00 t<<HII ata>>o 0440 ~ a Ioo ow IN>>i L))(<5 0 <i Cef ~ 4 ANA<AO rl ~ stoa <1 N Is(>>NAP V<AA >Cat (ltr ill th I AGENDA ITEM 03 ITEN: Detailed review and current status of procurement activities, including valves, pipe, instruments, cable, major components, spare parts, etc. CURRENT STATUS: See following pages. l NINE NILE POINT NUCLFAR SThTION - UNIT 2 FI'ectrical Discipline Cable Procurement Status Ordered as of Se tember 18 1984 To Be Ordered Estiaated Purchase Delivered Balance Delivery Expected Esti3aated RequiZ Total Order {as of Due {as of Date hnticipated Order Delivery Date Ca~Le TaCe nuantitu Quant~lt ~9I(1 I'I> >lnltt) ~latent) Date 15-kV Pover Cable {E023h) 448650 44,650 45,911 None 5-kV Power Cable {E0238) 70,050 700050 71,094 Hone 6AA-V Power Cable (EA23C) 1,222,500 1,22",500 1,166,574 49,390 10/12/84 None 1000-V Control 9/22/84 Cable (ED24h) 1,452,000 1,452,000 1,358,058 115,000 . est. None 600-V Control Cable (Includes Liphting and Collaouni ca t ion Cables) {E024B) 6,621 '48 6,409,748 6,678,232 220,339 9/21/84 212,000 9/28/84 12/7/84 300-V Instru- llew ment Cable 10/1/84 {E024P) 1,452,000 1,452,000 1,489,238 4,799 est. None Yhermocouple 12/7/849 Cable {R024R) 371,000 37't,000 385,139 2, 143 'st. None Coaxial Cables {En24a 10/1/84 F0906) 3t5 000 315 000 ~288 4 8 ~i00 . est. None TOMLS )],548 '48 11,336,948 462,684 436,177 212,000 I 1 STATUS OF INSTRUHEMTS SUPPLIES BV CSD, 10/17/84 Total Instruments on Anticipated Quantity c S ecificatioa Ro. S ecification Title Purchase Order to Date Instruments to be Adde C001C Hydrogen Gas Analyzers 30 C002C Thrbine Generator Hydrogen Nonitoring 41 Systole ~ L C002D Devpoint Analyzers 12 C002V Hoisture Transaitters 4 C011N Pipe Insert-Type Venturi Flov Sections 8 COllN Orifice Plates 155 C012D Sight F}ow Glass 8 C012J Rotaaeters 21 C012M Pipe Insert-Type and Pressure 16 Retaining-Type Venturi Flov Sections C012N Orifice Plates 143 C012R Annubar Flov Elements 48 C012S Positive Displaceaent Flmceeters 5 C021L Level Svitches 38 C022F Level Glasses 26 C022L Level Svitches 183 C022R Electronic Level Transmitters 29 (Displacer Type) C022S Pneumatic Level Transmitters 44 C022U Ultrasonic Level Transmitters 23 C032G Kanoeeters 9 C0328 Pressure Indicators 521 C032N Differential Pressure Indicating 70 Svitches and Indicators Category IIB C032R Pressure Svitches - Category IIB 267 C042D Resistance Temperature Detectors 180 and Theraovells C042D Resistance Temperature Detectors 284 1 (10/30 vith Thermovells and Test Valls C3/12177/486/5TH ~ i Total instruments on Anticipated Quantity of S cification No. S ecification Title Purchase Order to Date Iastruacots to be Added C042E Theraocouples and Tbermovells 73 C042X Bimetallic-Type Thermometers vith 305 The rmove 1 I s C042V Temperature Svitches 22 C051A Safety and Relief Valves 130 1 (11/15/84 C051G Rupture Disc hsseablies AStK Code, 2 Section III; Classes 2 and 3 C051H Special Service Control Valves AQK 57 Code, Section III, Classes 2 and 3 C052h Safety and Relief Valves 293 C0528 Control Valves 252 C052N Special Service Control Valves 58 C0616 Control Panels 129 20 (1)/15/84 C061P Local. Instr~at. Racks 53 C062C Control Panels 94 C062P Local instrument Racks 97 C062V Liquid Radvaste Control System 60 C071A Heating, Ventilating, and Air 126 Conditioning Instrumentation C071L Control Room Instrumentation and Racks 810 C0715 Electronic Transmitters 111 3 (10/30/84, C011V Flexible Netal Hose *1577 C071W hcoustic SRV Position Monitoring System 40 C072L Control Rooa Instrumentation and Racks 664 C0725 Electronic Transmitters 189 C072P Instrument Air Dryers ~ 13 C0720 Vibration Nonitoring System 117 C072V Pneuaatic instruments 69 C072M Loose Parts Nonitoring System 26 C012X Electronic Transmitters vith Diaphragm 25 Seals and Accessories C072Y Radvaste Saaple Panels 141 C072Z Heating, Ventilating, and Air 659 Conditioning instruments C073U Fire and Smoke Detection Systems <<+2967 C074K I.evel Differ 2 C151B Instrument Valves 685 12 (10/30/8 C151C Excess Flov Check Valves 252 1 (10/30/8 C3/12171/486/5YH 4 Total Instruments on Anticipated entity of S ecification No. S eciEication Title Purchase Order to Date Instrunent.s to be Added P272V Sajaple Panels and hnalyxing Equipment 1026 P281F Digital Radiation Nonitoring System 547 N070h Material Spec 30 200 (12/30/84 13,957 237 'aOMLY 18 hClllhL EQUIPtQNT ID NOS. ~NLY 75 hCDJAL KglJIBKNT ID NOS. C3/12177/486/5%i LARGE BORE PIPE SPOOL STATUS CURRENT AS OF OCTOBER 1 1984 Total Estimated Scope 11,16Z Spools Delivered through October 1, 1984 11,149 Spools Estimated for Completion 13 Spools Status of Remainin S ools In Fabrication 13 Spools e e ~ ~ Yalves All valves identified as required for NMP2 are ordered. A total of 12,950 valves are currently required. (10,800 small bore and 2.150 large bore). The majority of these valves have been shipped Presently 148 manual small bore valves (2 3n, and smaller) are not delivered. The last valve will be shipped by March 1985. In addition approximately 20 miscellaneous large bore or small bore actuated valves will be shipped by February 1985. AGENDA ITEM N ITEM: Actual and proposed craft work force (by major craft), craft availability, productivity, potential labor negotiations and problems. CURRENT STATUS: See following pages. NINE MILE II CRAFTSMEN OCTOBER 12F 1984 CRAFT 1st 2nd 3rd TOTAL Asbestos Workers Boilermakers 64 10 74 Bricklayers Carpenters 214 29 243 Cement Finishers 30 39 Electricians 760 135 20 915 Zronworkers 123 130 Laborers 332 80 49 461 Millwrights 61 61 Operating Engrs. 83 40 15 Painters 78 13 91 Pipefitters 1598 304 >>0 1902 Roofers 6 6 , Sheetmetal Workers 149 149 Surveyors, 52 30 82 Teamsters 79 15 98 Sprinklerfitters 16 16 Linemen 12 0>> 12 Plasters. 2 2 3665 672 88 4425 JUL HOY DEC JAH FEB HAR APR IIAY JUN JUL AUG SEP OCT NOY DEC JAH FEB HAR APR MAY JUH JUL AUG SEP OCT AUG SEPT OCT CLASSIFICATION PERIOD 6/18 7/16 8/20 9/17 10/15 11/19 IZ/17 I/21 2/18 3/18 4/15 5/20 6/17 7/15 8/'l9 9/'16 ~ 10/14 'll/18 12/16 I/20 2/17 3/'l7 4/16 5/19 6/16 7/Zl 8/18 9/15 7/15 8/'l9 9/ l6 10/ l4 11/18 12/16 I/20 2/17 3/17 4/14 5/19 6/16 7/14 8/18 9/'IS 10/13 11/17 12/15 1/19 2/16 3/16 4/15 5/18 6/15 7/20 8/17 9/14 10/11 HEEKS 4 5 4 4 5 4 5 4 4 4 5 4 4 5 4 4 5 4 5 4 4 4 5 4 5 4 4 1100 750 650 600 500 135 125 100 75 50 25 Pl pe fitters 1900 1900 1500 450 350 300 250 200 175 150 Electrlclans 900 900 900 700 650 600 500 450 400 300 225 200 150 125 100 85 75 60 50 30 15 10 Total Crafts 4500 4500 4000 3000 2500 2000 1750 1450 1150 875 750 675 575 525 425 325 240 185 145 100 60 45 35 25 CASELOAD FORECAST CRAFT EXPIRATION COMMENTS CRAFT AVAILABILITY DATE PROBLEMS Asbestos Workers Poor (At Peak 4/30/85 No Problems Manload) Boilermakers Excellent 9/30/86 No Problems Bricklayers Excellent 5/31/85 No Problems Carpenters/Millwrights Excellent/Good 5/31/85 No Problems Electricians Good 7/31/85 No Problems Ironworkers Excellent 5/31/86 No Problems Laborers Excellent 5/31/85 No Problems Operating Engineers Excellent 5/31/85 No P robl ems Painters Excellent 6/30/85 No Problems Pipefi tters PF - Fair to Good 6/30/85 No Problems Welders - Poor Sheetmetal Workers Good 6/30/85 No Problems Teamsters Excellent 5/31/85 No Problems e PRODUCTIVITY (As of Se t. 1984) ITEM PLAN (UR) ACTUAL (UR) SWEC-Small Bore Pipe 4,95 4.94 SWEC - Small Bore Pipe Supports 40. 41 40.75 LKC - Conduit 1.10 1.08 LKC - Conduit Supports 17.18 17.13 LKC - Cable Terminati on 0.96 1.09 LKC - Cable Pull ing 0.12 0.12 JCI - Seismic Suppor ts 67.78 60.64 JCI - Instrument Tubing 1.73 1.75 ITT - Large Bore Pipe Supports 179.93 197.30 AGENDA ITEM ¹5 ITEN: Detail ed review and current status of all large and small bore pi pe hangers, restraints, snubbers, etc., including desi gn, rework, procurement, fabrication, delivery and installation. CURRENT STATUS: See following page. (We will be prepared to discuss snubbers at the meeting. Information on restraints is in Item ¹7). 1.AR(:1 AND Si1Ai.L BORi. PIPE HA4CER STATUS A. Design Essentially all initiai Large Bore hanger designs are complete. There are 495 Cat I and 405 Cat 11 and Small Bore hanger designs left to be completed. Revisions to both l,arge and Small Bore hangers may result due to final stress verification. B. Hanger - The current status of hanger installation is as follows: L.B. Hangers- Cat I Cat II III QC Accepted 2,838 Completed 10,924 To Go 1,955 To Go 2.514 4,793 13,438 S.B. Hangers Cat 1 Cat II & III QC Accepted 743 Completed 14,990 To Go 6,051 To Go 8.507 6,794 23,497 The manhours to date to complete hangers has been 50 mh/ea for Cat I Large Bore, 25 mh/ea for Cat II III & Large Bore, 0.50 mh/ea for Cat I Small Bore and 2 mh/ea for Cat II III . Small Bore. Using the to date experience results in an estimate of approximately l80,000 of rework will be required to complete hanger installations after initial construction reported completion. Also as stated above, changes due to final stress verifications will be required. Hanger materials are procured and delivered directly to the site. The hangers are then fabricated to the extent possible and delivered to the field. The procurement status for all remaining hanger material is as follows: Large Bore There are currently a total of 70 shop orders at this time, of which twenty-six (26) are designated as priority to complete the primary containment. Priority orders are projected to be complete by November 15, 1984 and the balance of orders complete by January 31, 1985. Currently there are 259 hangers identified as being short of material. Small Bore A total of 2,200 supports and 250 special pipe clamps remain to be delivered on open purchase orders. Completion of shipments is projected to be December 15, 1984. AGENDA ITEM 86 ITEM: Detailed review of project schedule identifying critical path items, near critical items, amount of floa t for vari ous activities, the current cr itical path to fuel loading, methods of impl ementation of corrective action for any activities with negative float, and provisions for contingenci es. The estimated project percent compl ete as of ~3e tether 30, 1984. CURRENT STATUS: See data for Item 81. AGENDA ITEM k'7 ITEM: Detailed review and current status of bulk quantities, including current estimated quantities, quantities installed to date, quantities scheduled to date, current percent compl ete for each, actual versus forecast installation rates, in cubic yards/mo., linear feet/mo., or number/mo., and basi s . for fi gures. Al so indicate what percentage has been gA inspected and accepted.

a. Concrete (CY)
b. Process Pipe (LF)

-Lar ge Bore Pipe (2 1/2" and larger ) -Small Bore Pipe (2" and smaller)

c. Yard Pipe (LF)
d. Large Bore Pipe Hangers, Restraints, Snubbers (ea)
e. Small Bor e Pipe Hangers, Restraints (ea)
f. Cable Tray (LF)
g. Total Conduit (LF)
h. Total Exposed Metal Conduit (LF)
i. Cable (LF)

-Power -Control -Security -I ns trumen ta ti on -Plant Lighting

j. Terminations (ea)

-Power -Control -Security -Ins trumen tati on -Plant Lighting

k. Electrical C ircui ts (ea )

-Power -Control -Security

1. Instrumentation (ea)

CURRENT STATUS: See following pages. Item 7 The following curves and the Production Report are based upon the Engineers Construction Management System (CMS) which is the system used to collect and tabulate installed quantities. Since NMP3J/2 is a sub-contracted project not all project commodities are shown. Also, curves are provided to show complete visability as to the plan, however, the to go planned rate per month shown on the production is the average rate of planned installation from now until the commodity reaches 90% complete. PLAN VS ACT L B WELDS 24 -R PLAN ACT-22 21 ~n 20 19 18 17 16 18-Dec 18-Mar 17-Jun 16-Sep 16-Dec 17-Mar 1984 1985 Quantities are reported as installed to CMS upon completion of the weld. Quantities are verified by comparing actual quantities reported vs. iso-metric drawing takeoffs. The L.B. Welds made by the NSSS erector, Turbine Generator erector and Fire Protection erector are not included. The estimated percent complete is 95%. PLAN VS ACT L B.PIPE SPTS(POS) 19 18 -R PLAN 17 -ACT 16 gC Oo $5 sI- 15 13 12 18-Dec 18-Mar 17-Jun 16-Sep 16-Dec 17-Mar 1984, 1985 Quantities are reported as installed upon completion of construction installation. Final QC inspection and signoff is considered 100% complete and is also tracked. Quantities are verified by comparing actual reported quantities vs. iso-metric drawing takeoffs. L.B. Pipe Supports installed by the VASSS erector, Turbine erector, Fire Protection erector and Mechanical erector are not included. The estimated percent complete is 90%. PLAN VS ACT S B PIPE 200 190 180 170 160 ~c 150 gO w I6 oo 140 130 120 110 100 90 18-Dec 18-Mar 17-Jun 16-Sep 16-Dec 17-Mar 1984 1985 Quantities are reported installed to CMS when satisfactorily supported in place. Quantities are verified against iso-metric drawing takeoffs and physical field audits. The S.B. Pipe installed by the NSSS erector, Turbine Generator erector and Fire Protection erector are not included. The estimated percent complete is 84%. PLAN VS ACT S 9 PIPE SPTS(POS) 30 28 26 24 R PLAN-22 -ACT 20 18 ~c <~w 18 I-12 10 0 18-Dec 18-Mar 17-Jun 16-Sep 16-Dec 17-Mar '1984 1985 Quantities are reported as installed upon completion of construction installation. Final QC inspection and signoff is considered 100% complete and is also tracked. Quantities are verified by comparing actual reported ouantities vs. iso-metric drawing takeoffs. S.B. Pipe Supports installed by the NSSS erector, Turbine erector, Fire Protection erector and Mechanical erector are not included. The estimated percent complete is 69%. PLAN VS ACT KEY INDICATOR CONDUIT 850 R PLAN-800 750 ~> 700 Uc <o I-s Ov OO h.~ 650 600 550 500 18-Dec 18-Mar 17-Jun 16-Sep 16-Dec 17-Mar 16-Jun 15-Sep 1984 1985 The conduit included on this graph are segregated from total conduit in that it represents more than 90% of the total project conduit estimated manhours. Types of conduit included are power, control, instrument, lighting, security and some communications (RSC). Quantities are reported as installed to CHS when securely in place and verified through physical audits and through the engineers conduit identification system. The estimated percent complete is 89%. PLAN VS ACT SCHEDULED CABLE PULLlNG -R PLAN SCH CABLE 18-Dec 18-Mar 17-Jun 16-Sep 16-Dec 17-Mar 16-Jun 15-Sep 1985 Included on this graph are power, control, instrument and signal cables which are specifically identified in the engineers cable track-ing system. Quantities are reported as installed to CMS when initial installation is comnlete. Quantities are verified through the use of cable reel cards. Final verification is performed through the use of the engineers cable tracking system. The estimated percent complete is 72 %. PLAN VS ACT UNSCHEDULED CABLE PULLING 2.5 2.4 2.3 2.2 2'.1 1.9 1.8 O~ 0= 17 1.6 -R PLAN 1.5 1.4 UNSCH CABLE 1.2 -ACT 0.9 18- Dec 18-Mar 17-Jun 16-Sep 16-Dec 17-Mar 16-Jun 15-Sep 1984 . 1985 Lighting wire, communications, security and misc. power cables are reported into CMS when installation from point of origin to its final destination has been completed. Quantities are verified through audits of the cable reel cards which indicate the quantity and use of each cable pulled from the reel. The estim 'ted .percent complete.'s 46%. PLAN VS ACT CABLE TERM 300 280 260 240 220 200 180 z~ Oa 160 n 5; t4O -ACT 120 100 80 60 40 20 0 18- Dec 18-Mar 17-Jun 16-Sep 16-Dec 17-Mar 16-Jun 15-Sep 1984 1985 Power, Control, Instrument, Communications and Security Termina-tions are reported as complete after initial landing of the terminal lugs and the proper paperwork has been completed and turned over to project quality control. Quantities are collected in'he construction management system (CMS) and verified through the Engineers Termination Program. The estimated percent complete is 48%. 0 PLAN VS ACT INST. TUBING 240 230 220 210 200 190 180 170 I-n Ogo Oo 150 -ACT 140 130 120 110 100 90 80 .70 18- Dec 18-Mor 17-Jun 16-Sep 16-Dec 17-Mor 16-Jun 1984 1985 Copper and Stainless Steel Tubing is reported installed to CMS when satisfactorily supported in place. Quantities are verified by physical walkdown audits. The estimated percent complete is 63%. NMP82 Period Ending 10/07/84 MONTHLY PRODUCTION REPORT INSTALLED SCH PHYSICAL TO GO 1984 TO DATE FINAL gA TO TO PLA%1En RATE ACTUAL CAT 1 COMMODITY U/M ESTIMATE DATE DATE COMPLETE (TO 90 % COM) RATE ACCEPTED X

1. Concrete CY 270,258 268,258 N/A 99.26% N/A N/A 100X
2. Large Bore Pipe LF 228,260 225,510 225,275 99.80% N/A 2500/MO N/A
3. S.B. Pipe LF 198,331 166,126 166,633 83 76/ 6 600/MO 7100/MO N/A
4. Pipe Whip Restraint UN 17,333 12,513 N/A 72. 19% N/A N/A N/A
5. Large Bore Valves EA 2,200 2,011 N/A 91.78% N/A N/A N/A
  • 6. L.B. Hangers EA 18,231 16,398 16,992 89.94% 400/MO 375/MO 59.90X
  • 7. S.B. Hangers 30,291 20,798 21,259 68.66X 1,440/MO 1090/MO 8.02X
8. Cable Tray LF 119,286 116,444 N/A 97.62X N/A .N/A 88.20%
9. Key Indicator LF 842,716 751,369 739,783 89-16X 26 000/MO 25i600/MO 44.26X Conduit
10. Total Conduit LF 990,676 871,423 N/A, 87.96X N/A N/A N/A
11. Scheduled Cable LF 7,065,660 5,118,243 5,342,187 72.44% 240,000/MO 266,300/MO 29.78X
12. Unscheduled Cable LF 2,473,198 1,130,958 1,170,467 45.73X 166,000/MO 18,100/MO N/A
13. Cable Terminations EA 276,663 132,862 149,808 48.02X 23,200/MO 10,600/MO 27.79X
14. Instrument Tubing LF 231,854 144,984 150,897 62.53% 11,400/MO 6,900/MO 0.57%
  • Includes final gA by Contractor only.
1. Concrete Placing of structural concrete is essentially complete.

The remaining placements are for equipment pads, blockouts etc. Quantities are reported when placements are made and verified through daily concrete pour tickets as submitted to FQC. The cooling tower, stack and intake & discharge tunnel concrete quantities are not included.

2. ~L.B. Pi e Included is all large bore pipe 2Q" or greater except for cast iron pipe and large bore pipe erected by the NSSS in-staller.and the Turbine Generator installer. Quantities are reported on a pipe spool percent complete basis as each activity during installation is completed. Quantities are verified by comparing actual reported vs. iso-metric drawing takeoffs.
4. ~PL e Whi Restraints The pipe whip restraints support structure is completely installed. The second phase of installation, the crushable sections etc. is ongoing. This activity is reported on a percent complete basis as each restraint is completed and accepted by FQC.
5. Lar e Bore Valves Quantities are reported on a percent complete basis per valve. Quantities are verified by comparing actual reported vs. iso-metric drawing takeoffs.

Cable Tray is essentially complete with work remaining being cleaning, marking and covering. These activities are ongoing to support cable pulling. Quantities are reported when the tray is satisfactorily supported awaiting final QC acceptance. Quantities reported are verified through red lining of drawings and through use of the engineers cable tray tracking system.

10. Total Conduit Includes all key indicator conduit plus all PVC conduit and all other communication conduit (EHT). Quantities are reported the same way as the key indicator conduit.

AGENDA ITEM g8 ITEN: Detailed review and current status of preparation of preop and acceptance test procedures, integration of preop and acceptance test, activities with construction schedule, system turnover schedule identifying each system and status, preop and acceptance tests schedule identifying each test and status, current and proposed preop and acceptance tests program manpower.

a. Total number of procedures required f'r fuel load.
b. Number of dtaft procedures not started.
c. Number of draft procedures being written.
d. Number of procedures approved.
e. Number of- procedures in review.
f. Total number of preop and acceptance tests required for fuel load identifying each.
g. Number of preop and acceptance tests completed identifying each.
h. Number of preop . and acceptance tests currently in progress identifying each and status.
i. Number of systems and/or subsystems turned over to start-up identifying each.
j. Number of systems turned over to operations group identifying each and outstanding open items for each system.
k. Number of retests expected, if any, identifying each and cause for retest.

CURRENT STATUS: See following pages. Answer to Question f/ 8 Detailed Review Process for Pre aration of Prep & Acce tance Procedures. See Attachment 8 l Current Status of Pre aration of Prep & Acce tance Procedures. See Attachment ~J 2 for overview See Attachment f/ 3 for individual detailed Inte ration of Prep & Acce tance Test Activities with the Construction Schedule. See Attachment fJ 4 The Construction Schedule is integrated to the Startup 6 Test Operations Network Schedule by tying a construction completion activity 'A'elease (Attachment ft 4) on the Construction Schedule to the start of Preliminary testing on the Startup 6 Test Operations Network Schedule. S stem Turnover Schedule See Attachment 8 5 Preop & Acce tance Test Schedule See Attachment /I 6 Current and Pro osed Prep & Acce tance Test Pro ram Man ower See Attachment ff 7 &+~ its~ Ig) 0 Total Number of Procedures Re uired for Fuel Load Attachment ¹ 3 qumber of Draft Procedures Not Started Attachment ¹3 Number of Draft Proceudres Being Written Attachment ¹3 T Number of Procedures A roved Attachment ¹3 Number of Proceudres in Review Attachment ¹3 Total Number of Prep and Acce tance Tests R uired for Fuel Load Attachment ¹6 Number of Prep Acce tance Tests Co leted Zero Number of Prep and Acce tance Tests Currentl in Pro ress Zero Number of S stems Turned Over to Start-U (AOD) See Attachment /l5 Zero 0 Number of S stems Turned Over to O erations Grou Zero Number of Retests Ex ected Zero ,'! <<e 0 e ! QN", ~err e e ~ ee P,' ~ . . ~ tI I ee i *f~ppr,~. v ~tg~gIe s~ vr ~er, @PPr

g. er,

'. r IP !! t e "4 e e Vr r "~w* 4 K;re<<, ~ P I mr",r-* P P ~ "P. ~ ve ~ r PREOPERAT I ONAL/ACCEP TANCE PROCEDURE DEVELOPNENT IO/I7/84 REVIEW CYCLE PREOP TEST SCHEDULED START DATE INCORP INCORP JTC COMMENTS COMMENTS MTG RETYPE AND REV PROC TECHNICAL REV I EW RETYPE AND PROCESS PROC APPV 1SSUE NRC REV 1 EM 20 DEVELOP PROCEDURES. OOOQCOQO 4IW 'I A>IJ ICb I IIIMVVVV400 0 PREOP AHO .PTANCE PROCEDURES 0 000000 SThl'US sS OF 15 OCt S4 00000 00000004000400004000000 0000 ~ 0400 OOOO 000 0000 040 OOO 40 000 00 000 00 OO 0 DRAFt NOT STARtD 00 ~ ~ 00 ~ 0 0 4 00 0 00 0 0 30 0 0 21 ~ 74X OP 00 0 0 0 0 00 0 ORAF't StARTEO 0 00 0 69 0 0 $ 000OX 0 0 0 0 0 0 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 0 0 0 0 0 ~~00~ 0 0 ~~ ~ ~ 10 0 0 ~0 ~ ~ ~ 'Fo 25 X OO OO ~ ~ ~ ~ 0 0 READY FOR JTG 0 ~ ~ ~ 0 0 0 OO ~ ~~ 4 ~ ~ 0 0 0 ~2~ QOX ~ 0 00 0 ~ 4 0 ~ 0~ 0 00 ~~ 2090X 0~ 0 00 0 0 ~~ ~ ~ 0 PROC UNDER RE V HD tAL NQ. PRXE.QBD l35 0 00 00 21 ' 0 00 DM'F't NOl 5MGED DMT MARIE.D '9 00 000 000 000 0 1S 022X ~0 00 00 04 0 JTG APPROVEO IN TECH REVIEW 2l 0000 ~0 OI0 0 0040 000 PIIKDURE READY FOR QTG IQ OOOO 0 ~ 0400 + 00000000000 00000000000 DTt APPRDVEQ . lR TECH REVUE'V PRlXEDURE UNXR fKV I ' OOOOOOOO Sf AR 1 4P ANO fFSf 000000000 0 PAEDP AND ACCEPTANCE PROCEDURES 0 IOI0000000 SORTED BY STATUS 000000000 000000 StATUS AS OF 15 OCT 84 00000 PRocFDURE PROCE DURC I I IL t. STATUS TEST DA CE ACCEPt NUHUF. A PRE OP 7~ FEEDVA'CER CONT HO). qYS c H f DRAF t NOT Sfhktfo ISJUL198>> P I 7o4) POS'T ACCI)>t Nl SAHPLING SYSfEN DRAF t Not STARtFD 12AUG19$ b P 30o CONTROL )40u OR IVE 4)Yu>4AUL ICS URAF f NOT Sf ART FO 22 JUL1985 P 34 ' AUTOHATIC DEPRESSU)4 II A'fit)N SYSCEH DRAFT NOT STARTCO I 3 J UO. I 9 S5 P

4) o>) khorASTf Pkt)CE SS COW>uf k f DRAF T Nof 'STARf FD 0 I JUNI 9$ 5 P 4 lo SOLID RADVASTE SYS >4 If DRAFT Nof SthktED 210C f 1955 P 46 ~ FIRE PROTFC114)N )ihLON DRAFT NOT S'fhklfD I 5OCf 1985 P 5 3oC CONTROL ROUN Pkf SSURE I Ebf uRAF t Not STA)41ED ISNOV194)b P HAOVASTE BUILDING VfkfLLAfION DRAF f NO I'StAR CEO I 60C 1 I <>55 P 54> ~ A 56%4) 61 ~ C RADVASTE HLOt Pkf SSU)41 SECONDARY CANT ~ Lt AK ILS f l F).OV ICSC DRAFT DRAFT NOT STAAIED*

Nof STARIED 16uci I 985 15SE P1955 P P 620 04)A ~ )YDkuGc'N )4LC))H>>I ))fR DRAF 1 NOT START 0 f 05NOVL955 P 7bo SCAf ION At>O EHEAGENCY LIGNCIMG DRAFT NOT SfARtEO I SOCf 1985 P 75 REHOTC Si)UCDDVH DRAF f NOT STAR tf0 04UCT1955 P 79o ARE A RADIAC IUN NONI TURING DRAFT NOT STARTED 27HAY 1955 P 80>> Pkl)CESS AHO AIRBORNE RADIAC ION NONIT0RS DRAFI'OT STAklED 15JUL1985 P SJ ~ Pk I NARY CONC A INHCNT I SOLAT I ON Nol SlAkfEO 'RAFT 27NAY 1985 P 9lo PROCESS Co)4PUlER DRAFC Nof STARTED 040CTL985 P 92 ' SOURCE RAHGE NON I BRINGf \ DRAFT Nol StARfEO 12AUG1985 P 92>>O INffAHcDIAffRANGE HuklfORlNG DAAFf Hof SfhATEO I 2AUGL 985 P 92 ~ C AVERAGE V))ef R RANGE HDNI TOR INC DAAFf NOT STARTED 12AUG1985 P 94 TRANSVERSfNG INCURE PROBE DRAFT NOT STARTED 12AUG1985 P 'bo)) koo sF44UCNcf cuklkut. DRAFT Not S'CAkfFO 24JUNL955 P 96o Rf ACTOk NANUAL CDNIRUL 5 ROO POSI fit)N INDICATION OAAFT STAR SIAkfED NOf 24JUNL95b P 97o ABACTOR PAOTLCf IUN DRAFT NOT SfARfEO 2 7HAY198b P' 95o lukBINE GENEHACOk Pk>)TECfluN DRAFT Nof STARTED L SOC C L 9 85 101 ~ A TURBINE BLDG CRANE OAAFt HOT STARtED 0 IDEC1985 A I Ol ~ 0 RADVAStf ULDG CkhNE OAAFf NOT Sfhkffo LSOCI'195b A I 05 ~ Gf f ARS OHAFf Nof STARffo 040CTI985 P 112 ~ Sf RUCf U)4AL I tsl 8 Gk I TY L ILA f DRAFT NOT STARTFD 05NOVI9S5 P 39o FUCL HANDLING 6 kt AClok SERVICE EILUIPNt'.N T DRAFT Sf ARCED 29APRI>)85 P 40 ~ A f L14ulu RAD'VASf SYb1c)4 OAAF f Sf AR'ffo I I Sf P 1985 P 42 ~ OFF GAS SYbTL.H DAAF f StAR TED 15DCT 19S5 P 47o SHOKE FLAN)=. C IF)4Pt RA1UAE Of 'f ECTION ORAF T 'CF 0 26 JUL1955 P 52 ~ RE AC1014 4)I.DGo 4)VAC DRAFT Sf ARCED 0 3JULL 98b P 53 ~ A CuklkOL UUIL >ING )IVAC OAAF f 5'f AR f EO I 2HAY195b I> 5Jot) CONTHUI BLDG Ct)ILLt0 vACcH DRAFI STARTED 25APR19$ 5 P 69o ")45KV fRANSF4)RNFR ORAF T STARff0 17JUNI985 a 7ao PLANT CDHHUNICATIDNS DRAFt STARTEu 12JUN4955 4'> 9J ~ Ruu 4)LUCK HONICDALNG DRAF T Sf AR CED 24JUN194)5 n 100 ~ A DIVISION I Dlt 54'L Gfkt >4ATDk OkAFT SI'A)4TEO 0 7ht>>kl 955 P 104 ~ SICE SFCU)ITY URAF C STARTED 5 1 APk I >)5>> A 3o CONDENSAlE SYS tFH f LST ORAF FINISHED 09HAR19$ 5 P 5~ CONDENSATE OFNINS I ALS IN REGENo f 1ST DRAF FINISHED 23FI 0195'>> P 20 ~ BREAlNLNG Alk LST OAAF'1 FINIS)4CO LbUCTL95b A 24 ~ GFNEAATOR 154)LATED Pt)ASE BUS OUCf COOL ING t I Sf DRAF F INL5)46 0 I 2 JUL 1955 A 27 ~ Gf NFHAI uk 442 C CU2 SYS'f EH 1ST ORAF 1 FINIS)lf0 1 LSC P19>)5 A 29 ~ A REACtOR RCCIHC ~ SYSTEH IsT DRAFT F INIs)4f 0 I 4 JUN195>> 29 ~ >3 kf AClok RECIRC ~ I LOV CONTROL SYSTEH I f Sf ORAF F INI5)46 0 I 4 JUN19>)b P 4J ~ F I RE Pftotf CT I ON vA Ckf I Sf ORAt: T FIHISt)FD 5 7 JUN 1 94)5 P 64 o>) fURUL Nc BU ILUING FLI)OA ORAt NS f 151 ORAF FINISHI.D 29HAR I 94)'i 4~ 4> 6 ~ >) HAIN CHANSFORHI.)4 hl>f h ullhlNS 15f OkAF f FINIS)tt'0 045f P)95>>> A OOOOOOOO TAMTUP AND TESf OOOOOOOOO 0 PAEOP Atfo ACCEPTANCE PROCEDURES 0 OOOOOOOO SORTED BY STATUS 000000000 004400 STATUS AS OF 15 OCT 54 00000 PROCEDURE PAUCEOUME TI TLL STATUS TEST DATE ACCEPf NUMBER PRE OP 640C DIESEL CENERATIIM IILDCI FLUOk DkAINS 1st DRAFT FIHI SHED 06SEIIl 945 d6 ~ E SERVICE BUILDING OMAINb 1 I ST DRAF T F IN SHED 06SEP194$ 660 J HAIH STACK PRALNS 1st ORAF T F IHISHED OdSEP194$ 660K ~ MFACtOA BUILDING kht OftA INS ISI'MAFC F INISHED 065tPI985 A bio OR YVELL EOJ I Pkt NI AND FLOOR OR A INS 1ST DRAFT FINISHED 24JUL1945 P $1 ~ CONTAINHEHC LEAKAGE MANI fAMINC IST ORAFf FINISHED 04ACTL94$ P 82 ~ CONT A IHHENI'TNOSPIIEMt NONI CUA INC SYSTEN f LST ORAF F INI SHED LSOCtl945 P 900 St I SHIC HOHI tOR INC 1ST DRAFT FINISHED 06SEPI945 P 1 00 off DIVISIOH 2 OIFSEL Cot NFMAfAR I St ORAF f F IN! SHED 31HARI945 P 1020 DCCONTANINAtlON SYSfFH LST DRAFT FINISHED LSHARL94$ A I 100 LOSS OF OFF Sl ff'DVER CtSC/ECCS FUNCTIONAL TES f LS'C DRAF f F INIStIFD 15SEP19$ $ P 5408 LI fHIUH BROMIDE CHLLLEO VACEM 1ST OMAFC F INISHEO 6 IN t YP ING 01AUGL 9$ 5 A bioh TUMIIltIE. BLOC FQUIP f)MAINS TEAN REVLEV 29HAkl9$5 950A ROD VORtH HINIWLCEM CEAH REVIEV 24 JUN 1 955 I~ HA IN C AUX0 STEAN 2IKI DRAFT STARCEO I 3HAY1985 P 100A CIRCULAT INC VATEM SYSTFN 2NO AR*F C STARTFO LOHAY19$5 P l1 0 SEMVICE VAtER t 2NO DRAF STARTED I THAR I 955 Lt h CURBINE PLANT SAHPLINC 2ND ORAFf STARTED 09AUC1955 P I toC RADVASTE PLANT SAHPL ING 2ND DRAFT StAftfFO 09AUC19SS P 22 ' TURBINE GENERA T AR LUOE OIL 2NO ORAF f STARTED 20FE519$ 6 A 23 t TUkBINE 0H0C0 2ND ORAFI'TARTED 01APR1955 P '80 NJCLEAR IIAILtR INSfkUIIENTATION 2ND DRAFT STARIEO 15HAY19$ 5 P 31 ~ RESIDUAL IIEAC REMOVAL SYbtEN 2NO DRAFT STARTFO 2ILJUN19$ b P 32 ~ LAW PRtSSUIIE COME SPRAY 2ND DRAFT STARTED 01APM1955 P 33 ~ HIGtt PRESSURE COME SPRAY 2ND LIMAFT SfARTEO 25NAYI9$5 P 3b0 MFAC CAR Cokt I SOLAC IUN COOL INC SYSTEM 2NO DRAFf START'EO 28JUNI9$ 5 P 36 ~ STANDSY L IIIUID CONIAOL 2ND DRAFT Sf*RfEO 29NAYL955 P 3to kE ACTOR VAfEM CLt'AIIUP SYSTt.k 2NO ARAF T STARTFO 09AUG1955 P 3S0 FUEL POOL COOL INI0 AHD CLEANUP 2ND DRAF f STAR fEO 0 SHAY I 9$ b P 450 F tHE PROtECC ION CD/ 2NO DRAFT 5'fARfF.D L2JULL955 P dl ~ A PRINAkY COIIIALNHtNC PURCt 2ND ORAF f STAR fED 25AUG19$ b P dl 08 SfANOAY CAS TREACHI!NC 2ND ORAF T STAR CEO 14AUCI985 ft Si ~ REACTOR UUILllINC POLAR CIIANII 2NO DRAFT STARfEO ITNAYL9$5 P S50 kEACfok COOLANT ANO ECCS LSAK DETFCf ION 2NO DRAF f STAR TEO 04OCC19$ 5 P SS ~ CONTAINMENT INERT INC SYSTEM 2HO DRAFT STARIEO 15ACT19$ 5 P 106 ~ M6DUNOANT MEACTI VI TY CUIIIMDL 2HO DRAFT STARTED 15JUL19SS S~ FEtorAftk HEATEkS C IIXCMACTIUN STCAM 2 ND DRAFT 'F I HI SHF D I dSEP I 9S5 P 90 CONDENSER AIR REMOVAL 2NO OAAI T FINISHED 23AUG19Sb P 490C MADVASTE BLDG HOC VATEII C GLYCOL 2NO ORAF C F INISHED 02JUL19SS A 100 AC DIVISION 3 DIESEL GtNEMAfOR 2HO DRAFT FINISHED 24HAM1955 P I 7 ~ If MEAC f OM fILANI'AHPLI NG 2NO ORAFf FINISHED C IN fYP INC 30AUC19$ 5 P

e. FEtDVhttR SYSftk TEST ENGINEER CHECK LTHAYIQSb P 1905 LOSS OF PLANT AIR/N2 TEST EHCINEER CHECK 15JULI955 P 260 TURBINE GENE MAtAR Sf AIUR COOLING VATER TESt ENGINEER CHECK 1dAUCL 9$ b A 450 AUXILIARY tIQ ILCR TEST ENGINCER CHECK 26FEtSL 'f55 h 490tf tukA INE BLOC Hut VATFR 6 GLYCOL TEST ENGINEER CHECK 05JUN1955 A 490n REACTOR BLOC HDT VATI!A 6 GLYCOL Qk Jig~ENGINEER CHECK 10JUN1055 A lbo NAKEUP VAft'R tfIEATING +to FOR lECH RtVIEV OLIIOV1984 h 19 ~ A INSTRUMENT C SFRVICE AIM SYSTFH DMT FOR TECH REV IEv LSJULL955 P 2bo CLEAN STEAN AEBOLLEM 6 AUXILIAILY CONDEN SATE OLP FOR 'f ECH REV IEV I IAPM1955 A 49 ~ A HOT VATFM HEAT INCI SYS'ftIH FOA CECII AEV IEV O'I JUN I 'ISb A

.IIIQH AUX0 SI.MV LCE BLOC 0 11 I;C f UHHLLS Vt Nt IL. ATION OUT FDM TECH RLIVIEV I II JUL I It55 f' 00000000 SfAATUP AND TEST 000000000 O PRFI)P AND ACCCPTANCE PAQCEDURFS 0 00000000 SORTED t)Y STATUS 000000000 OO0OO0 STAfU5 As OF 15 OCT 84 00000 PL)OCE DUkf PROCE DVAC 1 I CL 8 SI'ATUS ftSf DAft ACCFPT NVHBE R PRE OP 60 ORYVELL COOLING OUf FOR I'ECH REVIE v 0 1 Nnv I o 85 P '6 CONTROL BUILDING DRAINS OUT FO(4 f ECH IlEVIEV 06SFP I 90$ A 20 )IOCSTURE StPAHAIORS/HFHt:ACEHS VENTS C D(IAINS INC(Ã)PORAT IN(i COHHENTS 26JAN198$ A 13 ~ REACfOR BUILDING CI.I)SFU LO()P COOLING 'VATER I NC ORPUAA f I NG COHHt N TS 14JUN198$ P L4 ~ 1 UABLHE BUILDING CLOS('0 LOUP COOL ING VA TEA INCORPOAAC LNG COHHE NTS I lDEC I 984

  • 22mB CUkt)IHE LUBE DIL COND I I II)NCR 6 VASTE Oll INCORPURAf ING COHW:NfS 01 JANI 985 A 22+ C GFNEAATOA SEAL I)IL SYSTE)4 I NCORPOAAC ING CC)HHE NTS 20FEBL985 A iio FIRE PAOTECICON FOAH INCORPORAf IHG COHNCHTS 28JUN1985 P 54 ~A NOAHAL SVITCHGEAA BULL()ING VEttf ILATION I NCORPORAT IN(i COHHCNf S 0 I AUGL 98$ P 55 ~ TV(4OCNE t)LOGE VftiflLAfION I NCOHPORAT LNG COHHI:NTS otncft985 P 58oh SCIIEENVCLL C I Dlt Stt F lkL I IN(PI I; H ISC VENT I NCORPORAf ING CDHH(.Nf5 LSFC.81985 P 58 AC AVX~ tk)lt F(4 6 CHILLEH HLUG Vft4C ILAfIUN I NCORPORA TINS COH)4t;4415 I 8 JUL I 985 P 63 ' f ACAC COH 84(ILDI NG IIULPRE Nf DAALMS INCOAPQAAC ING CONN(:NT5 2 4 JUL I 985 P 63 ' kFACCUH 4)ULLOING FL(tu(t D(4AINS INCORPORATING COHHENCS 2 4 JUL I 985 P 7 I ~ E-2 VPS 2VBi)-UPS 2A JU INCOAPOR*ftNG COHHCNfS OLDEC1981 P lt of 3 UPS 2VBA-UPS 3A 38 CNCORPORAT I NG COHHE N fS 24DECL984 P 65 ~ HADVASTF. BUILDING BRAINS AEAOY FDA JTG APPROVAL 6 tN TYPING 01SEPL985 P 66oH CONOENSAI f STORAGt TANK IIUILDtNG DRAINS READ'Y FOH Jfii APPROVAL C IN f YPING 0 6SE P I 985 P 4~ CONDCNSATE SfORAGt I XFtk HEADY FOR JTG APPROVAL 3 00f C I 984 P Io.n ACID THEATHENT SYSCI Ii READY FOA JTG APPROVAL 25DEC1984 A LOoC IIYPUCHLDAI CF SY5 N lf kf ADY FOR J TG APPRUVAL I 2 3 JAN 985 A 16 ~ HAKEUP VAfEA 5CAAA(if C TIIAN Ffk RFADY FOR JTIL APPROVAL I 5NOV I 985 P 50 ~ DDHE5 1 I C Vhfck READY FOA JfG APPROVAL 01 JANL')86 A Sr. DIESEL GLNL'HAI'I)k BUILULN( Vt 441 ILATION HEADY FOA JTG APPROVAL I lHA(t1 985 P 66+A RESE RVL TRANSFI)kkc(4 Akt A DRAINS READY fOR JfG APPROVAL 06SI;P I 985 A 66+0 SCHEENVFLL BUILDING I)(tA I)4 READY FOA JTG )LPPROVAL OSOC f I 985
  • 12 ~ TRAVELING VAlfk SCuECNS C VASH DISPOSAL JTG APPADVtD 26I)EC I 984 A 71 ~ F-I UPS 2VHI)-VPS IA IB LG IC t() JTG APPROVED 06JULL98S P 73 ' 125V NUkHAL UC DIS'Ck l(IUCLON JTG APPROVED 01JULL985 P 73oo 24/44) VI)Lf DC Ol Sfstl ((Uf IUN J'TG APPRDVtD LSJUNIVI(5 P 66 ' AUXILIARY I(OILCA t(UILI)ING I)RAINS PROCEDURE UNDfR AEVI SION 06SE P I ')I(5 P lioA 125V EH( HGLNCY DC t)l Sftt I UUC tUN DIV I PROCEDURE UNDER REVISION I THAR I 985 P 74mB l25V EHEHGCNCY ()C Dl Sfklt(UC ION OIV 2 PROCEDURE UNDER AEV IS ION I 7 HAH I 985 P ri.C 125V ENfkGC'NCY DC DISC ILUUCION DIV PROCEOVE(4 UNDER REV IS II)N LOHAHL')85 P

Sa)HT CCODES t: START DATA DATE l0/03/84PACF 3 4 RODE 0/I' 0 E 5 C R I P I I 0 N DUH 5 I A H T F I N I 5 H ACf I VI TY SCII ~ O IIEP <0 SCII ~ 0 RLato A RFLEASE 021 000 EVFHI 6/02/85 I34444230 881 A Rt:LEASE 02ct ~ 000 0 EVSNI 3/lu/55 I 34444 I 95 800 A Ht. LEASE 02V ~ 000 LVI.N'f 1/I 4/d5 I 31 444 19u 535

  • Hf LFARI. 030 000 i.VI Nf 2/ I 0/55 I34441I91 112 A HFLEASE 03l ~ 000 EVI.N f 4/28/55 I 31444 I 99 819 A HILEASI.'32F 000 EVa.NT 2/Id/55 I34444209 180 A RELEASE 033+000 0 EVFNT 4/I 4/55 I 3441420 I 835 A HFLf ASL 034 ~ 000 EVENT 3/24/85 I 3144423 l tt I 4 A HFLEASE 03bou00 0 EVI Nf 4/28/55 I34411202 549 A HFLEASL 0360000 0 EVFNI 4/2 5/55 l.)4414203 819 A Rt'L EASE 031 ~ 000 EVFNI 6/09/dh I 34441204 S9 I A HFLFASt 035~000 EVEN f 3/0 I/55 I 31444205 193 C A HELEASI: 039 ~ 000 EVENT I2/I6/54 l34444232 ll6 A HFLEASL 040 F 000 EVENf 3/ I 0/55 l34444233 800 A HFLEASE 04l a000 EVENT 6/30/85 l$ 4444234 9I2 A RFLEASE 042 ~ 000 0 EVENf I/? 1/85 l34444235 158

SOHI ECPPtS t START PATA PATE LO/03/ts4PAGt 4 o e 4 e HOOEc-I)/FE 0 E 5 C H I P T I I) N nuH S T A H T F I N I S ci ACTIVITV SCNcP HEMI) SCcc ~ 0 HOP ~ 0 I C A HFLFASE 043 F 000, EVENT 4/0 J/85 134444236 825 A RFLE ASL. 044 e 000 EVENT I 0/24$ /54 I 34444231 C6r A HELF ASt 045 ~ 500 EVtNT II/04/84 I 314 44 2 3cs 6 F4 A HELFASL 04bo000 LVtNT 8/ I I/55 )34444239 954 A HELF ASE 042o000 EVENI 5/L9/85 134444240 8TO

  • HELEASt 04ue000 EVENT 9/09/54 134444241 bl cl A RFLEASE 049o000 EVENT 12/2 3/I$ 4 I 34114242 72 3.

A RELEASE 050ec)00 EVENT 9/ 30/55 134444213 \004 A HFLEASE 051 F 000 5/31/55 134444320 EVENI'VC:N 552

  • RELEASF. 042o 000 I 3/31 /85 134444245 821 A RELEASE 053e000 tVF NT L/2V/85 134444246 158 A.RFLEASt 0540000 EVI.N T 5/31/85 I'14414247 852 A HELEASE OSSo000 EVENT 12/09/51

)34444245 T09 A RELEASE 05bo000 EVEN T 4/ I 4/85 134144249 835 A HCLEASE 05le000 EVENT 10/14/84 134444250 65$ A HFLFASE 05de000 EVg NT I I /2b/84 134414251 695 SURI ECDDhS F. START DATA I)ATE 10/O.S/4$ 4ltACrh 5 t HDDf 0/Ff 0 E S C H I P I I CS N DUH 5 I

  • H T F I N I S H ACTIVITY SCNtn ScEP ~ IS SCII ill REPI D A HE LEASE 059r AOO fVt'.NT 12/$ 0/84 l30 I '11411 318 A HFLEASh 05'Sru00 F.VI-NI /

I I 3/85 134444 Ill l44 A HELEASh 059+I:Ou EVENT 12/I 6/81 134444316 lib A H&LFAsh uoo ~ uou hvc Nt 4/2IS/tc5 I 31441261 ts4 s A itfLEASt; OOlruoo 0 EVLN I 3/10/ts5 134444255 800 A Hf.LEASE 062 ~ 000 EVI'.NT 3/10/85 13141425O 800 A HFLCASh 063r000 EVENT 11/18/81 13111425 l 48 cl A HEI EASE 0640000 FVLNT I /2 l/8. ~ I 31 4 I 1 25 CS l58 A HELfASh Oabiu00 EVI.Nt 11/ I tl/84 I )114 1259 688 r A RFLEASh unnr000 EVLN I l/0 l/85 131444260 9) 'I A RELEASE Obl ~ 000 F VENT I t /18/cS1 131111261 688 ~ A Ht'LEASE DOCS ~ 000 hVENT 3/ I l/ISS I 34444314 jul A KELFASL 069r000 0 EVENT 5/12/85 134444312 ISO 3 A Itt LF.ASE Ulue 000 fvftct S/2o/81 404 I 34444261 Hf'LEASL'lI ~ AOO I I/18/84 r'/0 A FvhNT I S4444310 68S A Ht LI-ASh 134444266 OllruOU 0 f VESS f, irc ~ 9/84 bl tl STAR'I SI)Rl I CODES E DAlA QA lf- 10/03/84PAGE 6 t t )IDOE= U/F E Dt: 5 CA I PI I UN I)L)R S I A H F I)LISH ACY IVI TY SCtt AD HFPLU SCIL ~ U HL P ~ 0 t t A kf:LEASC 072 ~ Oou 134444 319 EVENI'/I b26 1/84 A Hf LEASE 013 Oou 0 t;VI Nl 5/04/84 13444426t) 4>>) 0 A HELEASI' 14 ~ 000 E VI. Nl 6/25/84 L34444269 54? A HI Lf:.ASF. ulb>>uoo LVI.Nl 3/24/85 I 34444270 ~ )14 A ACLI-ARSE ulb.ooo 0 FVFNI 4/0?/>>)5 I 34444271 t)2 3 A RFLFASF 017>>000 BVI Hl 4/2d/dS 134444306 t)4') A Rl:LEASE 078 ~ uoo EVCNI 6/09/85 134444273 t)VI A Hf:LFASC: 079 ~ Oou L. VI.NI 3/)7/85 I 34444214 t)0 1 A HELFASE 080 ~ uoa) 0 EVCNl 3/ I 1/t)5 134444275 801 A HFLEASC udge>>uoo 081 ~ uoo EVI: Nl ')/? 6/tt 5 134444216 dlb A AELLASE Od?>>000 .EVCHl 3/ I I /85 I 34444271 do I A HCLEASI-I 34444218 EVI'NI'/21/d5 dlr C A RFLEASC 084>>000 EVL'Nl 3/I 7/85 13444427') t)0 1 A kt'LFASt. Od'>> F 000 1344442tlo F VCN1 I I/II/84 ba) A ttl LF ASf udCa ~ oou 0 EVENf 6/05/85 134444281 ddl A HFLEASE utt 7 ~ oou FVENC I /2 3/c)5 134444 304$ 154 SABIR T ECIIDCS L SIAR I DA'IA OA IE I 0/0 IIN4PAGE 7 e NODE=0/FC 0 E S C R I P f I 0 N OuR S I A R I F I H I 5 It ACTIVIIY SCIIID IIEP ~ 0 5 CI I ~ 0 RLV~D A HFLFASE 088 F 000 EVI NI 3/17/d5 I;$ 14442d I I$ 0 7

  • HF LEASE 090~000 evt NI 7/0 7/NS 134444285 919 A RELI'ASt 09 I ~ 000 E VI'lI 1/10/84 I 314442$ $ 6 466 A Ht-l.fASI- 092 OOO 0 f.VI NI 5/76/N5 I $ 4444?NI dtl A RFLEASt; 093 F 000 EVI Nf 4/24/NS I 314412Nd d45 A Hf'LEASI 094 ~ 000 0 I.VI'NI 6/ I I /NS 134444289 89 I A HELEASt. 09be000 EVI NI 1/24/HS 134444290 t$ 4 I A RELEASE 094 F 000 LVENI 4/14/NS

$ 3444429$ H35 A HELF ASE 097 ~ 000 FVI.'HI  ?/I I/d5 I 341 14292 779 A Ht.LF ASE 09N ~ 000 0 dVI:Nf 8/15/NS 134444293 95d A RELEASE 100 ~ AOO 01 V I 0 EVFHI 8/22/84 131414211 600 A RELFASI: 100aAOO DIV  ? EVENT er2?.rd4 1.$ 1441212 600 A Hf LfASE 100 ~ IIOO tlPCS 0 F VENf 10/ I 3/d1 134144210 652 A Ht'.LEASE 101 ~ 000 CVEHC 8/ I d/d5 I 34144294 961 A Ht LfASL'02 ~ 000 LVLN'I 12/ I 6/ I$ 4 134444295 lI 6 A Hl LfAS@ 10 I ~ 000 EVE IIf $ 0/ I 6/d 3 131414 $ 2/ 28'I SORf 8 COOFS E 5'fARf OAfA OAfE 10/03/84PAGE 8 4 4 MOO ET 0/F E 0 E 5 C R I P f I 0 N OUR 5 I A R I F I N I 5 H RC'I <0 ACJ IVI IY SCN ~ 0 REPRO SCN~O .4 A RELEASE 1040000 EVENI I /2 7/85 !34444296 f58 C A RELEASE .105+000 EVI.Nf 7/Of/85 13444429f BIO A RFLEASE IOda000 EVe Nf 5/0 5/HS 1344442Ve 856 C A Rl LFASI'0 I ~ 000 EVLNI 2/Of/06 I 34444 321 II 34 RUN GATE f 15OC S4 L000IUIS II u H K I N G '5 C N Il U U L e PROJCC t Sf ART I/01/53 PHOJECt BIGPUSN CONStRUC TION HtLEASE FUR tCST IHG ORIGINAL COHPL ~ 3/07/56 SURf I:Cl)OES I. START DATA OA TC 10/03/54PAGF I e 4 llOOEaO/FE OE SCRIPT I 4)N OUR 5 T A H T F I N I 5 H ACTI VI I 7 SCIL ~ 0 RFP ~ I) SCNIO REPIO 4 A HE LEASE 00 I e 000 EVeNT 3/ I 7/85 1)4444L80 507 A RELEASE 002 ~ 000 EVENT I I/18/84 I 34144214 688 A RELFASE 003 F 000 Eve Nf LL/LO/84 134444 151 680 A HFLEASE 001 ~ 000 E VFNT I I/18/84 134444 IS 3 685 -. A RELEASE 005e000 FveNT / I I 3/55 I 34444 I 54 744 A HFLFASE 006~000 EVENT 3/17/85 131444155 507 A RELEASE 007 F 000 EVLNT 10/2 I /84 131414215 660 A HELEASC 00css000 EVI:N t 6/30/85 I 314442 16 912 A HELEASE 009+000 EvENt 6/2 3/85 I 3144421 7 905 A HFLFASE 010 '00 E.VI.NT 3/10/55 L34444190 800 A RELEASE 010~000 EVENT 7/0 I /54 134444155 548

  • HFLEASE 010eC00 EVENT I I/23/84 I 34114 189 693 A RELEASE Olla 000 EVENT I/20/55 I 34141182 751 A H>> LEASL 012 ~ 000 0 11/25/81 L34444L91 695

SDRI'CUOES E START DAT A DATE I 0/0 3/c)4PAGE 2 HOOF z 0/FE s ACTIVITY D E S s C R I P c I I 0 N DVH s 5 SCIC ~ D T c A k HFP ~ I) F 5CII ~ 0 IN l S ICI.P)D s c A RFLEAbt 01 3 ~ 000 EVENT 4/ I 1/IS5 134144192 835 A HFLFAsE 014auoo 0 tVEN I 8/2')/84 I 34444 193 60 1 A HELF ASF UI So UOU 0 EVENT 3/18/84 134444218 443 A HFLFASt Olney unu CVI. III I I/I I/IS4 134444198 681 A RELEASE Olr ~ UOU LVLNT 6/0')/85 134444219 891 A HFLFASH Olc) ~ c)00 I:VENT / I I I' /81 13444429') hnl A HELFASL OIVe000 EVONT 2/ I l/cs5 I 34444 194 ll9 A RELFASE 02ui000 EVI NT 5/ I 2/85 1344442?l 865 A RELI ASL 021 ~ UOO 0 EVI NT 5/ I 9/ C15 134444300 8l I) A RFLFASI! 022 ~ AOU 0 F.VL N T 10/14/84 134444223 h53 A RELE*St 022 ~ IIOI) EVFNT 8/30/c14 ~ 34444224 608 A RFLFASF 022 ~ COO CVLNT 6/29/84 1344442?5 546 A kf I I ASF. 0? 3~ c)00 LV<NT 12/2 3/84 13444422h l23 A HELF ASE 0+4 ~ UOO 0 EVCNT 5/12/85 I 3444422 r 863 A RFLFASE 026 F 000 0 I VENT I /0 6/85 1344142?d l3l

  • kfI f*SI: 026 ~ 000 EVENT n/ I 6/cS5 1.141 11 2? 9 cs9 cs

fcuN DA'fF. 15OC T84 1549tlkS PHOJECt 4)IGPUStc SYSTLI)c AVAILAULE I-Ulc I uf / A.f tFStlNE'HE)JECT I) k K I N 8 5 C n F t) cl L E Sf Akf OklGINAL CDHPL ~ I/OI/elk 3/07/86 SL)lcf I:CODES L START UACA OA'CE 10/0 )/84PAGE I t 4 HOOE t)/FE OFSCR I PT I E)N 5 T A k F I N I 5 n ACT IVI CY CD 0E SCncO HFP AD SCtl 40 HEP4 O C SYSftk fukwuvt 8 t.UH PDt/A ~ f~ 11?~ I:Vt Nf I I /0 7/85 )34444044) I) I 042 'SYSTFH fukNOVLk Fclcc PDT/Ae Te 001 ~ EVI Nf 5/12/85 I )4444041 10000L)0 863 SYSCI k f Uk'IDVELE lIUlt tct)I/A o f ~ ~ nc)Z ~ 0 t. Vt N I' /?5/t)5 134444012 ?000000 756 SY 5 CI')4 T UHNDVE44 I.Ilk PD 1/A ~ C ~ 00 3 ~ t:VENT 3/04llc)5 134444013 Jooonno 19 tl sYSft:H TUHNoaek Fc)k PUC/Aditi ooi. 0 CVr 44 f 12/15/84 I 31141011 4000000 71S SY5 TCH TUHNDVER Fok PDT/A ~ T a 005 m EVEN f  ?/22/4)5 134144045 5000000 184 "YSTEN TURNOVER I'Ilk tct)t/A I 006 ~ 0 EVI'H T 5/ I 44/8'5 I 34444046 Gnooooo 861 SYStFII f UkNOVER FOH POC/Aa T ~ 007 ~ EVENT 1/ I 4/8S 134444041 rooooon 926 SYSTI.N TURNDVFk @OH POC/Aef ~ 004) ~ EVI.I4T 9/15/85 I 3444 1 04 ct t)00004)0 989 SYSTt'H 'fURNUVEH I'l)k POC/Ao To 04)')o F VENT tl/22/85 I 31414019 4000000 965 SYSCLH TukNOVFH Fntc POC/A ~ I ~ 014) ~ A EVL:Nt 5/09/85 I )4414050 totooono 860 SYSTEN TURNOVER FOR PDC/A.f. Oio.tl EVENT I 2/21/Si I ')1114051 10200000 724 SYSTCH TUIINDVEH I UE4 PDT/A I ~ 010 C 0 EVCHl I/22/85 I 31441052 10.)00000 153 SYStt H f UHNOVEE4 FU)4 PDC/A ~ T ~ 011 EVEHt 3/ I 6/85 1314410'53 I 1000000 806 SYSTI k TUHNUVFH FOI4 POf/A ~ T ~ 01 J ~ F VENT 12/25/84 I )44440'544 12000000 72S 54$ Rl CCODES C STAkt DATA DATE 10/03/84PAGE 2 f NODE<0/PE. 0 E S C ft I P t I 4$ N OUA 5 T A R 't F I N I 5 H ACTIVITY C4$ DE SCH40 REPS 0 SCHMO REP4D 4 SYSlFN TURHOVEk Fftk POT/A t 01 I ~ EVF.NT 6/I 3/85 I34444055 13000000 895 SYSTCN fUAHDVEk FOk POT/AoTe 0 11 f VC'N f I? / I 6/4$ 1 L1000000 '3444405o 216 SY5TCN f UAHOVCA FUA POT/A of e 0 Isa EVEN l LO/3 I/Si 134444051 15000000 610 SYSTt:N TURNOVER Fflft POT/A ti OIC. ~ CVI;Nf / I I I 4/85 134114058 16000000 1040 SYSTt.N TU44HOVFk F044 POf/A ~ t ~ 0 I toA C.vt:Nf S/08/85 131111060 L 1000000 '>51 SYS'TEN 'TUAHOVFA FOA POT/A~ T ~ 01 7 ~ S EVE.N f S/29/4$ 5 I 3144105V I t000000 972 SYSTCN TURHOVEk FOk POT/A~f~ OIS~ EVcNt I /10/85 134444328 18000000 f41 SYSTt:N TUAHOVE44 FOA 'POT/Aire 019+A EVENT 7/14/85 ~ 134444062 I4$ 000000 4$ 26 SYSTEN TURHOVER FOH $ 40t/Aors 020 EVENt 10/I 4/4$ 5 134444063 '0000000 1018 SYSTCN fURHOVE41 I Ilk POT/A~ f 021 e 000 EVf NT S/II/85 I '$4444 301 2 1000000 954 SYSTCN TURHOVEH FDA PIIT/A~ T ~ 82? A EVFNT 2/19/85 134444065 22100000 TSL SYSTEN TUAHOVEA FOR Pfll/A f 022 fl EVFNf 12/31/Si 134114066 22200000 TLI SYSTCN 'TURNOVER Ftlk POt/A ~ f e 022oC FVF.Nl  ?/19/85 I 34114064 22300000 ts I SYSTCN TUAHQVE41 FOR POT/A 'f 023 ~ EV4;N t 3/31/85 I 3441406T 23000000 4121 SYSTI N fURNOVEII O'Ok POl/A ~ l~ 024 ~ EVCNT 7/ I I /85 I 31441064$ 24000000 923 '5000000 SYsrtft TUAHovck I:ok 134444060 Pflt/A.r. 025. EVEN f 4/ I /S5 S31 4$ S(IR'f ECODUS F Sf A>t f I>A CA DA f t I 0/0 3/H4PA(it. 3 I(DOE D/FF. 0 E S C k I P f I >I N Ouk 5 I A k F I N I S H ACTIVE TY CODE SCtt)O kFP>O SCII >0 REPIO J 4 J SvSCI w fukt OVEk Fok I OfrA.C. oar . tVI.NI 8/ I 5/85 )34414010 2(>uonouu 958 SYSTtk TURNOVtk Fnk Pnf/A ~ C ~ 02( ~ EVI ttl 9/s z/85 I 34444 U f I 2?uoooo>J 9dt> SY'Sf l.k f URNOVI'k Fnk PDT/A ~ C ~ 02tt ~ EVI Hf 5/I I>/85 134444072 28000000 de) SVSCI N fukNOVI k F(lit I>(If/A~ f e 02<) ~ A IIVI ttf I>/I I/d5 $ 344440)4 29>)nooun <I<)5 SY'5 fl:k CURNOVtk F<sk PDC/A o I ~ 0 )no EVI Hf tlat?I /HS 7/? l34414UTS 3nuooouu 'I 3 I SYSTI>N CURNOVtk FO'I I>OT/Aa l ~ 03! ~ I.'Vt. N I er?rrHS I 344440 1(> 3(uounoo Vn J SV5(t.t( rukt>OYEN FDw u(tr/A.f 032. PI> I.V( Hr 4/? I/db I344440ff 32uuuouo CYST>.'JI TURNOVEII I Ilk I>ttf/A~ f ~ 0 3)e tvt Nr 5/24/d5 I $ 444401u $ )onunnu I)IS SYST( N fuktlOVCII I'Ok PDI/A ~ Ce 034 e tvt.tt C rrszrde I 311440 1 NOVEk II)k PtlfrA.C. 0>,. UV>.N'C 6/2 J/'$5 I $ 1444080 $ 5oououu <J 0') SY 5 ft JI I Ukt>OVt>t FO>I (/A r ~ 0 3>. ~ LVI HC 5/2d/85 $ $ 4444U8$ Jeaoouun dl.l 'bbfI>N 'I>INN(JVFtt I-Ok Pttf/A ~ (o 0 lie LVI:NI 8/od/d5 IJ4444082 Ifnnuuon 95 I SVSTEII I URNDVEtt FQk I>O'(/A ~ f ~ 0 $ >I EVENT sro2/ds I'$444408.l 3doououu t>5 3 (: SY'if k CUIINOV('.k >- FOR P(tf/A ~ I 0 I'J ~ EVF Nf 4/2 d/>$ 5 l34444084 3900unun 848 'pvSII H CUkNOVEN Ft)k PUC/A+I ~ 040 ~ II EVcN f 5/31/<Ib l344440(IS 40ouuooo UH2 >YSC Lk TukNOVF>I I Ot> P(lf/A C ~ 040 ~ A tVtNT Ur I u/<$ 5 l$ 4444udt> 40uounno 984 Sukt c.Cuf>US t: GTAHT DATA DATI: 10/oy/UIPAGF t NDDE=U/FE D E 5 C f4 I P I I II N DUR S I A >4 t F I NI SN ACTI VI TY CODE SC))au HEP au SCN'D HLP>D I t 4 SYSTE>t TURNDVE>4 Fuk POT/A ~ T ~ 041 ~ EVI.NT 10/20/t)5 I 34444 0HT I I OOOO UA 1024 SYSft >4 TUH>>OVER Fu>4 PDT/A ~ f ~ 04? ~ Evt Nr 10/I 4/H5 I 344440UU 424)00000 IOI 0 c svstrN TUHNOVFH I:ult pot/A I n4). 0 Kvt NT 6/ot IHS 13444405') 4 3000000 4)SH SYStt'N fuk>>OVI St > 4) ~ I POT/A ~ To 044 ~ I. V>'N I 6/2 I/445 I )4444090 44000000 ')09 5'Vof4,N IUIINUVF>t I-ult P(lt/A ~ f o 04'Se Evl:Nt  ?/I I/HS I 344440') I 45000000 923 SYSTE>t IUHNOVFH Ft)lt PDTIA ~ Ta 046 o C.VLN T 10/ I Tl t)5 134444092. 46000000 10? I 'SYSfl.N TUI4NUVEII I uk Pf)f/A ~ T ~ Ah le Evt Nt  ? I? "/HS 134444093 47000000 931 SYSfLN TURNOVC>4 I t)R Put/A ~ T ~ 04H ~ E,VENT  ?/? S/tlS 134444U94 441900000 141 I SYSTLN TURNOVE>4 FOll POT/A+ tv 04 ~ )~A FVENT 6/0 4/U5 134444096 4>>000000 at)6 SVSfCH tuHNOVFH Fnk PAI/A t. 04).D 0 FVL NT I>/0 I/HS I 34 444>) 94) 4900000>) ~ UH6 SY'LH fukNOVEH Fuk f Ol/A 1 049 ~ u EVI. Nt 6/09/85 13444409I 49OOOuoo H91 UVSf t:H TUHNDVElt I'ul4 Puf/A ~ I ~ 049 ~ C E VI. N t 7/0 I /t)5 134444096 I')4) 00000 SYSTC N IURNOVE>t FOlt I Of IA ~ I ~ OSA EVI.'N T 12/'3 I /85 13444409') 60000000 1096 SYS'll H IUHNOVFH FOH l>l>t/A~ t ~ OSI ~ OUA rvt NI 5/31/HS I 3 IIII )? 3 5 1000000 UH2 SYSTCH TultNOVFlt FOil POT/A ~ I ~ OS?~ Evl:Nt  ?/02/05 I 14441100 S?000000 914 SYSTI V TURNOVER I u>4 4>uf/* ~ f ~ 053 ~ II EVENT I/2 Tl>>S I )4444101 53000000 UIU suR f t CODES t: START UAfA DATE 10/03/84PAGE 5 0 HOOE-0/F E DESCA I P f I ON OUR 5 T A H F I N I S N ACT IV I f Y cnoE SCN40 HEP44) SC1440 REPin SYSTEl4 TURNOVER I OH POT/Aif ~ 05 I A 0 LVt: Nl' 5/I I /85 134444L02 53000000 4)62 SYSTE)4 fUHNQVFH FOH Pnf/A ~ f ~ OS I ~ C YEN I I I/14/85 I34444103 5300@009 1049 SVSTL H TURNOVER Fuk Pof/A ~ 7 ~ nS4 ~ A LV( 14T 7/31/85 I 34444 101 54000000 943 SVSfEH IukNQVI;K F~)k Pnf/A I 051 ~ u (. VI NI 7/ 11/I$ 5 I 34414105 S4000000 94 3 'sf134411 EH TUHNAVEH LOO I'ilk I'nf/A~ I ~ S5000000 Ob' ~ I. VLNI 9/50/tj5 1004 SYsfrH TUHNOYEH I'olt. POT/A ~ f ~ 056 ~ A f. VElt f I 0/15/85 L 34144L07 56000000 1019 SYSTEH fukknvEk I.uk por/A.r. Osc .u t:Vt'Nf 10/15/8'5 I 314441 72 S6000000 1019 SYSTLll TURNOVEH I'Qk I AT/Aef~ 057 Evt Nf 3/ I 6/c$ 5 I ) 1444 I 04) sfununuu t)06 SVSf4 l4 I UHllnVEH Fl)H PU I/A~ f ~ nuke EVt Nf 12/20/84 I 11414 12') 58000000 720 svsffll TUANOvEH Fnl Pnr/A.f. nu ).A ~ EVL Nf 3/?8/85 I 14414111 5'l $ 00000 4) I 44 SYSTI'H fUHNnvtk I 4)k I'uf/* ~T ~ alu9 ~ H LVLNf 4/ub/us I 34444 104 S9200000 827 SVSfLH TUANOVEH I nk Pu'f/A ~ Te n>vsC I VLNT 7/ I 7/85 I $ 1444 110 59sounnu 929 C SVSffk TUANUVEA Fnlt Pof/A ~ f ~ Onus E.VL'Nr 10/31/85 134411112 4 00000un 10 15 SYSTI H TUANOVEk Fnk Pnf/A ~ 'f a Out ~ I) EVr Nf 8/ I 3/4)5 1.1441411 I a lnnuunu 956 SYSTEH TUHNOVEH I'nk PDI/A ~ f ~ Odl eA EVEN f 8/2 7/t)5 1.34144 I 11 61000000 970 'SYSTI-H Tukt<OVEH I')lit Pnf/A ~ 'f a Onl oC Eve Nr 9/I 7/85 I 11444030 ~ 4 1000000 9'1 I Si)Rf Auk ECOOES f 5 C A H Sf Akl'ACA F I N I 5 II AACE 4 lo/0.$ /t)1PAUL ~ HOOE=O/FE 0 F S C H I V C I 0 N ACf IVI fr CI)ut SCII>A HFP)O SCHWA HEPTA SYSTI!H TURNOVFH O'Ak PO'f/A ~ T ~ 06? ~ Evt.Nt I I /01>CC$ 5 1.$ 4444 I 15 62000000 1042 SYSTEH TUHNAVEH FC)k POT/A T ~ 06 I A Evt NT 7/23/d5 1344441 1) 63000000 9$ 5 SYSTCH tc)RNOVE>4 I l)k Pnf/A ~ f ~ da I ~ II I vtNC 7/2 3/ t)5 I 3444>4 I I a 4300000>I 93'5 SY ift.k TU>C)>AVI:IC I CI>4 Puf/As to 061 occ LV>;N f 3/? II/d5 1.$ 44441 ld C>4000000 t)l 0 SY itt.k TUICCCOVEIC FCIH Vt)t/Ail'U1.A FVI NC 3/2 II/05 I 3 I 4 1 4 I I ') c>4000000 I) I >I SYS'fLH TURNAVEI4 FUIC Pnf/A ~ t~ 065 ~ Evc,NT tl/31/d5 I $ 4444120 c>5000000 ~ ))4 SYSTEH TURNOVEH Fntt POC/Ao T~ oan>C EVENT 9/05/85 I 34414 I 22 acoooooo 9r9 SYStt:H TuttNOVEH FAH Vnt/A t ~ obc N F V(. N C 9/05/85 I 34444 121 an000000 )r) Jr 5'f CH CUICNOVEH I')tt POT/A ~ I ~ 0 an > II EVI.NC 9/0 5/c)5 131441121 c 4OOOOOA c)l ) SYSfEH TUHNOVEI4 FOH Puf/Ao T ~ ohn+K EVF.N'C 9/05/d5 131141130 ac>0000 oui >) )') SYSTLH TURtIOVLH I'u>C I AC/A ~ t ~ 064> ~ t F VCNC c) /0 5/ d5 I .'$1444 I 2b C aOOOOOO 9)') SY5Tt.k TURNOVFH I'OH t>t)C/A ~ t ~ OC>n A 0 Evc:Nt 9/0 >/d5 134444 123 c c uooooo 919 SYSf EH TUHNOVEH FAI4 Vt)f/Ae f o oha ~G EVEN f 9/0 5/05 134444L24> 44000000 979 SYSf t>C TUHNAVFk Fc)H PAC/A f ~ 046 3 Evc:44t 9/05/05 434414124 aaooooon 97 i) SYSTI.H TUHNOVEH Fuk I 34144 I 24$ '6000000 Vut/Ae T ~ 046oL 0 Evt:N T 9/0 5/05 979 SYStt-:H TUIINOVEH Fnk I OT/A.f. 044.n EVENT 10/04/4$ 5 L 34441 129 66000000 I ooct SI)Rt t couis I sfAHT OAIA OATE Lo/0 I/81PAGE HQDE> O/I' 0 C R I P I I I) OUR 5 T A N T F I N I S H Acf IVI IV conf SCII ~ I) f H P ~ I) scn)n RL.I )n 4 svstt H TUHNUVLH Fod pot/A f ~ oui. tViNT 7/2 3/dS I 34411 I.) I 6 700(000 93S SY ST).N TUBNOVf k POT/A ~ T 068 ~ 000 FVI.NI 9/I 2/ds I 34111)IS lo80000uu 'J du SVSftN fuHN()VI k PI)t/Ao t ouueood 0 LVI.Nf 7/ll/ds I 341443) 3 69000000 923 C 'SY)lftH IUHNOVI It t'I)et Put/A e t ~ 0 lo ~ Lvt HT 3/01/d6 I.')4114 I )2 10000000 I I62 Svsft H f UkNOVI'll PI) f/A~ I 0 ll ~ Aou L'VI II f I/I 1/ )5 I 34444 Ll I 1LL00000 lid SYsfhN I URNOVLH FOH POT/* ~ T ~ 0 1l ~ II I VI.HT I/L 3/85 I 31111327 1 I douooo 744 SYSfLN TURHOVEk I Ok PI)f/A~ f ~ 012 ~ I.VI.IIf I I/)6/d4 I34444326 12000000 b86 svsrtk ru)tkovt)t Fnk pot/A.r. oil.n EVENr h/)4/ds I 34114 I 3u 13000000 I)9u I Sv S t. H TUHNOVtH I'nk I'0 t/A ~ T ~ 0 1 3 A t vuHr 6/ lu/d5 I 31114 I 13 1 loouooo 4)2 svsrt:.H rukt ovfk Fn)>> por/A.r. oil.c tvtNT 3/Oc)/85 I )4444I 31 14uooouo 79') SYSTL.H luHNI)VEH Fuk VOI/A~ I ~ nil.A LVLNI 3/ I 6/85 I 34141 I 3') 14000000 806 SYSTEN tUHNOVFH I'Ilk POT/A et ~ 011 ~ II 3/l6/85 I )4144) 38 lloouuoo EVLHI'VFNT 808 C SYSTC H 'fUHNOVtk FOll I ~ I)f/Ae T ~ 01'se IO/Ll/ds I 34441llo 15000unu I 02 I SVSTFH TURNOVER Fnlt Puf/A ~ fi dla~ EvaHr 5/II/ds I 31141I4 I 76000000 89 3 SY Sf) N TUHI<OVLtt Pl)f/Ao t 011 ~ 000 Fvt NT 6/27/db I 31414301 11000000 909 svsrt'.H ruHNovfk Fuk Por/*.r. nfl. E%>T I 0/0 I/ds I l4444)42 1duooooo )00 7 Sc)AT I:CADAS I: STAAf OAf* OAT C 10/03/cciVA46 8 J s s NOAE=A/FF 0 6 5 C R I li t I A Ic OUA 5 T A k F I N I 5 N ACTI Vl fY CIAJF. SCII ~ U AEP ~ IJ SCCA ul.PE I) s s s SYSfl'k TUICNOVEN Fc)N POT/A ~ f o 019 ~ tvf Nf 5/26/85 134444143 79000000 SYSTCSC TUANC)VFIC FC)u 'I Ot/* t ~ nc)Q. 0 hvf Nt 7/ I 4/85 I 34444141 cl 0 0 0 cl c) 0 0 97cc C SYSTIN TUICNOVEIC Fku POT/A ~ I ~ onl ~ 4 VI Nf 10/0 I/nb I 31444 115 8 1000000 ton 1 C SYSTI.N 'IUfcNAVLII I l)u Pc)T/A t 082 FV..NT I 0/I 1/IS5 I 34444 I 4 cc 8/onoooo I 0/ I SYSTLN TUIINovl:cl I l)lc Pllt/A~ T ~ 08 I ~ CVFN I 5/2 Cc/ c)5 1,34444039 83000000 811 C 'SY.'iTLV fURNOVFiC FO,C PO'f/A f ~ 084 ~ I VI Nf 5/ I 6/85 134414 147 84000000 861 C SYST Jell TURNOVER Ff)k I Of/A ~ t ~ Onb ~ FVCNT I 0/0 3/c)5 I 31414 I 4 cl 85000000 lon7 SYStf:N TURNOVER FI)k I'Af/A~ T ~ 086 ~ QVI Nf 9/0 5/c)5 1311 ~ 1119 cl4000000 SYSTI:N TURNOVf lc PU I/A~ T 081 ~ 000 CJVI Nt 3/'P 4/c)5 13444430c) cl7000000 III 1 CYST LSC f UANAVFi) 1 Uk PAf/A ~ f ~ On)i ~ FVL Nr IQ/14/85 I 34444 150 niloocJooo 101 cs SY'Sf 1.k TURNOVFA Fc)lc likf/A f ~ ~ oils) ~ LANt 9/05/85 I 31414151 'JQQQQQQQ 979 C SYSTI:sc tUANAVFN Ff Ice PAT/A I ~ 0 JI.A CcVI N f 10/0 3/cl5 I 34444)b I J 100 norm 1001 SYSTUJC TUAICIJVFJC Ff)k PI) TI Ae I ~ 092+C C.VLHT 8/I I/85 I 34144154 J2ooooon 954 'iYS ILll f UANOVI N FOA POT/A ~ 1 ~ O'Jt ell CVI.NT 8/11/c)5 134444155 'J7000000 954 SYSTLN I UANOVEA FO'I Pkf/Ae I ~ O'J2 ~A Cva Nt Jl/11/85 I 34414156 I'/P 9RQOQQQO 954 SYSIC N TUANOVEIC FAN Iskt/A~ I e 0 J I~ "Vf'-M"')of I/c)5 I )4111151 ~ I soooono 9O'.i sukr aconrs = srAkr OAT A OATS'0/0 I/SIPAO>F- ~ ~ t t HOOF=0/FL' e s c u I p r I OIJk 5 r A R r F I N I S N Ac JIVI TY CIIOt SCN>O RLP>u SCNin At.l'Io t ~ t SYSTLH TURNOVI:k Fuk Pof/A ~ To U')4 ~ 0 avcNr N/ I I /ds I 3444115d 940000IJO 954 SYSTCH tuktn)VI k t nW Pot/A ~ f 0 I >.A ~ I: VI!Nl I /2 5/NS I )1141 160 95000000 ~ >Jon svstt.tt tukt Uvek Ft)k Por/A.r. n'J'> ll t.VI Hf 6/? 3/ )5 134144159 9500000u 905 SYSTI'.H TUANOVf:>I Fl)k Pof/Aol o O'Jh ~ I:V>.H f 4/? I/d5 131441 161 9hnouooU Ou'> "SYSTt'H TUANOvtk I'I)lt Pnf/Aoto 09? ~ I't:Hr 5/26/d5 1.5441 1 I 62 9 foquooo dl I SYSTC)t fukNOVI;k Fnk PI)f/A~ t 09d ~ Evt Hr 10/14/15 1344441hJ 'J >)0000 >)0 I 0 I c) SYSTLlH TUkt>OVI!k Fnk I'I) f/Ao f ~ I 00 ~ A OSL 3 C VI.H f 3/)ul>)5 L 34144164 100100000 N7.0 'SYSTI H f URNOVFk t O>t Pnf /Ao f o I unoA l)SL I CVI Nr 1/06/t)5 134414 166 I onl oonuu SYSTEH TURNOVER Fok I>of/A~ f I un U OSL 2 UVLHf 3/2 3/ds I 51411L6t> 100 >ouoUU I) I 3 SYSTt.k tURNOVFII t Ok POT/Aolo lul ~ IS FVI Nt Io/I I/d5 I 344 41 I hd I o lonuoun 1071 SYSTI H tUANI)VFk I-OII I>lll/A~ to lul oi LVI,Nf I I/ Sulds I 31141 14 I Iulonouun 106 > SY'll:It TUANOVI.k t'l)k POT/A ~ r I ). ~ iV.".Itt 3/ I T/>SS I 3141416'J I u?uuuuou I)0 7 SY5TEH TURNS)VFk I t)k POT/Ao To Iu 1 ~ uun I:Vt:Hf 0/I I/ds I )4144 52'.> 103000000 954 SYS'll H lUANOVCk )=Ok POT/A ~ T IU1 o E VI'.tl I 3/11/db. I )44411 ?U I $ 4444142 I 01000000 SYSft'H TUIINOVER Fok POT/Aol ~ Iu'> 105000000 F.VI:H I'o/0 U21 Inn r 5/dh SY'stt H TUIIHOVC>I Fnk POT/A T 106' )4444 I JI luhuuuoUO Ft Irh N f. '/14/ds 926 4 SOI) 1 E.CUOI'5 F. 5 SAII T DAtA DAYQ l0/Oi/84PAGF. l0 )IOOF.= I I/F C D L' C H l P i I I) N DU)I 5 l A II ) F I N I 5 11 ACT!VI)Y C:) Ol. SCNI0 IIFPIO SCII ~O IIrV<O C SYSCt'H CUIINOVEII FUk POT/Aaf ~ l 01 ~ 000 L'VF NT 2/0 r/I)6 l)4444424 LO'F000000 l 134 RUN DATE ISDCts4 0740HRs vuuK LNG SC Htou) 6 RRI) JEC 1 Sf ARf I/Ol/53 PAOJECf QIGPUSH PRCOP ANO ACCEVTANCt lESt ING SCHCDa)LE ORIGINAL COHPL ~ 3/07/86 SURt ECDOCS E STARl DATA DAfE 10/0 3/54VAGE I 4 NODE= 0/FE DESCR I tat I ON DUR 5 f A R 'f F I N I 5 H ACTIVITY SCH)D REPRO SCH)D REPRO 4 a a I C COLO FUNCf )ANAL tSf OPS )IASILR laUNI.H LI 5'1 63 I2/06/5S 2/Od/86 129977001 1071 1133 C I Dt VRIHAHY. CDNTAINHENT LEAK RAll; Tf Sf C Sl 7 112 25 I I/Od/55. 12/05/55 99974001 1043 1070 PAFDV HAIN L AUX SftAH 001 000 21 5/ I J/55 6/07/I) a 95725001 864 554 A<< t<<HOISf UAE. SEPERATDR REHEAT VCNt 5 DAAIN 002 ~ 25 I/26/55 2/22/55 75748001 757 784 Vkt-I)P CONT)i NSA f C SYS 00 I ~ 000 21 3/09/85 3/29/85 98651001 799 819 POf COND STURAGF. 4 XFt'R 004 000 2L 1,2/16/I)4 I /05/85 286260OL 716 736 VO'f CDNI)FNSAf8 DCHIN'5 C ACSIN HEIsf N 005<<000 14 2/2 3/55 3/0 as/d5 97090001 785 r98 PACDP FEEDVATEH SYS 006<<000 21 5/I r/ISS -4/06/85 9865$ 001 868 585 PHCDV Ftl'0 VATCH CI)NtHUL 001 ~ Oa)0 14 r/15/ds 7/25/55 9al849001 927 940 Put FFI DrATfH l)EATEAS G CXTRACI LDN 005.0))0 21 9/16/55 10/06/55 ra)790001 990 LOLO VOf CONI)a":NSCH AIR HE)LOVAI 009 ~ 000 14 8/2 J/d5 9/05/d5 139090001 966 979 VAT CIRCULATING vAftk 010<<AOO 21 5/ I 0/55 5/30/55 I 35714001 861 dd1 A<< t <<ACID THCAfHEAT 10<<O 14 12/25/54 I /0 7/85 25594001 72$ 738 ACCF PT TESf HYI DCHLuk1 tt SYS 0 I 0 COO 14 I /23/85 2/05/85 I Il)716001 754 r4 7 PD I sflavlCI. vATEH 01 I <<000 -S/Ir/85 5/I I /a)5 '%IIIII 7 00 I 507 862 Sa)RT I:LUOFS E START OAfh OA TE I 0/03/84PAGE 2 ~ LOOF =0/FE 0 E S C R I P f I 0 N OUR 5 T A H T F I N I 5 ll ACT/VI I Y SCH$ n HEPJO SCH ~ 0 HE$ ~$ n $ 1 PUT fHAV H20 5CREL'NS ANJ) 'WASH l)l Sl~ 0 I 2 ~ 000 I2/26/84 I /n I /85 3877000I 126 132 POT Hl)CLCle 0 I 3 ~ 000 l4 6/$ 4/85 6/2 1/85 6826800l 896 . 909 POI f8 f I UHlllNG COHPONL T COOl. I NG WAT l'4 0 l4 ~ 000 I?/I 7/cS4 I/)0/c$ 5 1'$42400 I 7I1 76$ ACCfl I 'fl.SI HAACUP WA'IER tRFATING 'SYS 0) ze000 2I L I /0 I /84 I I/2$ /4$ 4 I 3861600 I 61$ 69l POT NAKEUP WtH SfOHAliF C TRANSFER 0 lh ~ OT)0 28 LI/IS/4$5 I 2/ I 2/ )$ 5 ?895800$ f050 L017 POt PR)JCESS SAHPLING I faA 28 8/09/85 9/0 5/SS 68)0800l 9>2 979 POT PO'it ACC I OEN t SAHPL INC I 1~ I) L4 8/30/85 9/ I 2/85 I .1998400 I '73 986 PeIEAP LNSTHUHENT C SERVICI'. A IH l9 ~ A 2l 1/LS/85 8/04/85 9899800 I 9? 1 91 1 POf LOSS OF PLANI AIH l9 ~ l) 28 7/ I 5/85 8/I I/85 l34414002 921 954 ACCEf~fANCF. LS f I'$QEA tillNG At4 020 ~ 000 I4 I 0/I 5/85 lor28/85 9NL 1l 00l L0 I'I l 032 Ao T ~ GFNf.HATUR SEAL UIL 22eC 2/20/85 3/05/85 I 34444 IJO I 182 195 fuR GCNf lAf))H I.u)R n)L $ 2 .8 l4 2/20/$ 'i $ 3/05/85 1'J I I 100 I 7$ $ 2 1)5 4% I~ TURL)INC LUOE UIL CONDL I Ll)NLH I, WAS IL (JIL 02 I/Ol/85 I/l4/85 79$ 2600) 732 745 PRJ:l)P NC 5 YST I H 0)13 ~ 000 56 4/0 I /a$ 5 5/26/85 793 l 000 I 822 811 A~ f~ Gc N I SO PHASE HUS OUCf CU$ )L ING 021 +000 7rl2/Ss 7/I 8/85 l29I7000I 924 930 A~ f~ CLEAN 5 TF AH HEJ)l) ILERS 25 l4 4/I I/85 1/24/l)5 ) 'l'J Lanaa I $$ $2 S1.'i SllRT ECUOES L Sf ART OAfA OATE 10/03/84PAGE HUOE>0/FE OESCR I Pf I UN OUR f A R T F I N I S H ACT SVI TY SCHI 0 REP $ 0 SCHMO RE.P$ 0 Ae fo tdsf tURB GENER SfAfOR COUL IN4WT$$ 026 ~ 000 8/1 drl$ 5 8/29/Bs 79076001 959 972 A T~ CENERATOR H2 C C02 SYS 027 ~ 000 21 9/ I 3/85 10/03/85 7906800$ 981 100 7 aaEnr NUCLEAH ilntLER INSt 028.000 sr17rSs 5/2 3/ 85 98848001 868 874 POl kX RTCIRC SYS 89~A 6/14/85 dr27/us 6 819$ $ 001 896 909 POT RX kEC IRC FLUX C'fRL 29 ~ 8 21 6/14/85 7/01/85 13'4444016 896 91 6 PRFOP CRO HYl$RAULICS 030 ~ 000 7/22/85 8/25/85 98372012 934 968 Pof RES IOUAL IIFAf kEHOVAL 031 DDO 35 6/2 ll/s5 8/0 1/l$ 5 68302001 910 914 POT LPCS 032e000 4/22/85 4/28/85 6856000 I $$ 13 849 POT HPCS 033a000 14 5/26/$ 5 6/0 7/l$ 5 68528001 876 889 POT AUTOHATIC OEPRESSUR ICATION 031 000 7/13/85 8/09/85 1387d6001 925 952 POT RCIC 036+000 21 6/28/85 7/ I 8/85 68104001 910 930 Vnf Stllltt LIOlltO CTRL 036*000 14 5/29r Bs 6/I I/85 68432001 880 893 POt RX VATLR CLEANUP 037~000 8/09/85 8/22/85 68463001 952 96S PO t FULL POOL COOL I N4 38 5/0 I/85 5/2 3/85 1187.'$100t 851 S74 C l nf RX HLOO SRV f. FUEL HANOLING EOUIP 039 000 21 4/29/85 5/19/l$ 5 11$ $ 22 1001 850 870 POt RAUOAStt COHPUTER 40 ~ $ $ 14 6/01/85 6/ I 4/85 1 $ 144401 I 883 896 Si)R I Lcnots E STAAf t)AT A IJA Tt 10/03/84PAGE 4 NOOEAO/Ft ~ OFSCII I P f I ON OUR 5 f A R I F I N I 5 H ACTIVITY SCH)n HEP)l) SCHMO HFP)n 4 POf 4 ti)UID HAOIIASTE SYS 40+A 'I/II /Ss I 0/ I 5/85 '/I I 08084001 985 1019 PAtOP SOL I 0 HAOS*S IF, 041 ~ 000 42 Io/21/85 I 2/0 I /ss Indi sano I I 025 loca pt)f oFF 13'Jod?001 GAs oizaoon li 10/ Is/ss IOLIJ 10/28/ db 1032 C PAT I'IHE'PHI)tECt II)N whtt'R 04) 000 21 6/0 1/85 6/2 1/85 129015001 889 909 Pof FOAN F lkt Pusttct LON 044 ~ 000 14 6/28/ss I/85 19046001 91 923 pnt cn2 FIRE puatcctloN ois.ooo 14 1/12/85 1/25rss 8955200 I 924 'J I1 POT I IAF PRI)TECf ION HALI)N 046 000 28 I 0/1 8/85 /I I I 4/85 89051001 1022 104'9 Pnf FIHE Ot ftCT IUN C CONPUTE H 41 ~ 0 1/2erds I 0/ I 1/85 I 2')02 I 00 I 93d 1021 A T AU)I HULL.FR 4S.O 2/26/Ss 3/I I/85 8852000 I 1Sd 801 Ao f~ TUR')INE BLOG Hof VATFH 4 GLYCOL 4 I ~ II 14 6/nb/ds 6/ I 8/sS 13444402b 88l 900 A~ '1 ~ HI) 1 IIATtA HEA f ING O')eh a/Ob/db errb/8'b ddlbooo I sar 901 A f R )I ULUG II>) I Vh t EA C GLYCOL 49 ~ I) 14 6/lnrd5 4/23/ds I 34444 07 1 d92 900 h 1~ HAI)llhst t UL OG H() t VA TFR G 4LY CIJL 4 9. C 14 rro2rss 1/15/ds I 34444026 914 921 ACCL Vt OOHESflC whfEA 050~000 I /01 /de I/I4/de 13Ndrroo) 1091 LLLO PI) I At ACf OII SLOG VI.Nf 052 ~ 000 14 1/os> 85 1/I 6/85 )lb 8916200 I 928 V<)t Ctkt IILU4 CHILI.ED SAfER 53 ~ II 14 4/28/Ss 5/I I/8'5 I.)4444029 S49 862 suR t Lcoot."5 SfART DATA SATE Io/03/84PAGE 5 a a a ~ a HOSE> 0/I'.I: OF.5CH I P I' UN OUH S T A R F I N I S H ACT!VIf Y SC<<at) REPRO SCHao REP)0 a a a T Por CraaL )SLOG <<VAC S3 ~ A 21 5/12/AS 6/01/55 13444402ts 56.$ dd3 Pnf CTkL Rk PRF.SSU<at: TSt 51 C 14 Il/15/55 I I/?as/85 8 ts 8 5 2 0 5 I 1050 IO63 A~ f~ t<U)t<aL SVC OLDG HVAC 54 ~ A 14 5/0 I/55 ta/14/5<3 89307001 944 951 A f ~ LI lta)uk illtnkluf 54 5 21 S/0 I/55 8/? I /85 I 34444 Q.sa) 944 964 Pn T I Ukls OLO4 VI. N T 055 ~ 000 25 10/0 I/t)5 lo/2d/d5 $ 8522001 I 005 1032 pnt HA))dAstE a'la.oG pRcSSU)IF, tFsT 5n H 14 Lo/L 6/55 10/? <)/55 I~i4444031 I 02<) 10$ ) Pnf HAUVASff HVAC nb+A 14 10/16/a)5 LO/29/85 55115001 I 02l) 1033 pnt usL GENERATOR tavAc 051 ooo 21 3/I 7/55 4/06/55 t) 91 2000 I 501 527 POI'UX SSHVICt. OLOGCELCC TUNNa.L )IVAC 55 ~ t) 28 1/I tl/55 8/14/55 SA900001 930 957 HIPS 059+AS I 2 ~ S9e a)0 I 2 POT PR))cf AURf; 05douoo 4 ~ To Sckka)LLCDSL l LRL PHPCHI SC Vl Ni'ta<S ~ A 2I 2/0 7/55 2/2 1/55 sasdn2001 169 789 Pl)f PR))cFoukt 05)s ~ Aoolsd 001-3 ~ 59 co2 ~ c04-con) Ae T ~ AUX f)UILEH C C)tLLLEH UL OG <<VAC ndec 7 1/15/85 7/? 4/85 AHSV000 I 930 93h ruf PRtlccnuki o55.cool59.col,5).codl C Pnt Ol<Y))ELL COOL LNG (<0~0 14 11/nl /55 /I I I 4/t)5 daaonl 00 I 1036 1049 ra)t Pk)HAHY CONTALNHLNT PUH45 61.st 14 ls/14/s5 8/2 1/85 SSOit uOI 95 )a 970 pof sT*kl)BY GAs T<ILAfHENT nl A 5/2ti/55 9/I 7/55 5<s02n003 971 9<) I l<a) I " t Ca)<)OAR Y cnklAINHLNt LC'AK TC 5 I n) C 14 ')/ I 5/55 10/0 I/db I .) ~ a 0<< 700 I 992 100 < 5:)Hl FCDDES C STARt o At A DA r E 10/Q.S/e1PAGE c 1 NODE=A/Ff 0 f: 5 C R 'I P I I II N OUR 5 T A H F I N I 5 H ACTINI TY ~ D IIEP ~ IS I'Ctt SCIS tA HE P t 0 1 POf UAA <12 Ht.'CDHUINER 062 000 11 I I/0<t/tt5 I I/2 I/85 Sttl 58001 101 3 10'id POf IIX <SLAG FLtIAH DRAINS 63 ~ tt 21 7/< >I/O'i tt/I I/db <tttu1 200.$ V lb VSd PAT HX ILDt> t tt'J IP ttR*IHS 63 ~ A 12 7/71/tt'> 0 /Q,S/ tt5 Vd012001 9 Jo V77 PAl fURISINt 'SLUG F<lttlt DRAINS n1 ~ A ~ 21 I /29/tt 5 1/15/85 7 tt01600 I 51 0 810 PAT TUNIS INE; ttLDG FLOOR IIHAINS 61 5 21 3/29/85 1/I tl/85 I '11111 0 32 519 53V PRIS)P HV ULDG DRAINS 065 ~ 000 21 9/01/85. 9/21/85 1093I76001 V7> 095 A~ l HE SERVE t>IANSFARttt'H AHFA DRAINS 6b A 9/Qd/85 9/ I V/d5 Itl017001 980 993 PAl CANDENSA ff SlARAGE ALDG DRAINS 6b tt 9/al /tlat 9/I V/85 2 tt 3v 7 Q 0 I Vdtt 9<1 3 Ao f ~ ASIX 5OILER UIIAINS 6heG 9/0 6/db 9/ I 9/ISS 85007001 950 993 PAT ISSL GtHFltATAtt FLOOR DRAINS 6n.C 0/06/85 '9/I 9/tt5 1001 7001 v tt 0 VQS Ae 7 e HX <SAT IIRA IN'i 66+K 9/Qa/85 0/10/ SS V+360001 9tt tt 903 Ao I' C<INf RDL ISLDG> f UNHI,L ISRA INS dn I 11 0/06/85 9/I 9/db tt>t01 7001 Vtt0 903 A~ f e ttAIH THAN'iFSSRHEII AHCA tt>IA IHS t>n<tt 0/06/85 9/19/d5 12<SO IVQQ I 950 993 A~ l ~ S>EII VICI'. BLDG UHAINS 6haL 9/0 6/ ts5 9/IV/85 d<S307001 9ttu 903 PDf HAIN 5'TACK DRAINS 66 ~ J 0/06/d5 9/IV/85 58717001 980 90 I Ae 'f ~ SCMFENI>ELL tSLDG DRAINS 66 eD 10/QS/85 I 0/ I IS/05 lttdh7001 1000 1022 SORT FCOOES E SfARf OAfA OATC Io/03/54PAGE 7 ~ st t t HaoF=O/FF OFSCN I P f I QN OUR S I A k T F I N I 5 H ACTI'gITY SCHJO REMI> SCHtn RFPJO PREOP ORYVEJ I FL f, E4J DRAINS 061 000 14 1/?4/85 $ /ocr as 97056OOI 936 949 C PJJT LOP/CCCS FUNCT LONAI 070 000 21 10/18/$ 5 L I/01/85 I? 9975001 1522 1042 POT UPS 2A,tl 71E-2 14 12/OI/4$ 4 12/ I 4/4$ 4 129560001 701 714 Pnf UPS 3A ~ t$ 7I ~5- I I4 L 2/24/4$ 4 I /06/85 129 ih0003 124 737 POT 4JPS IA~ tltC4040 'I LE I 14 7roerds 7/19/ds 12956ooas 9 t 4$ 931 Por'4 48 v oc OAfrEHY 73 ~ 4$ 21 4/I srds 7/05/ss 1.19252oa I 597 917 Pnf 125 V JJATTCRY 73+A 28 frolrds 7/2tt/d5 I'Jlsoool 4JI 3 940 Pttr OIV 3 JJATTEHY 14 ~ C 3/IO/85 3/2 3/4$ 5 134444004 4400 813 POT OIV I u*frERY 14.A 14 I/I 1/85 3/30/85 19040001 501 82a POT OIV 2 IJAf TERY 14 ~ tl 14 3/I 1/85 3/30/85 134444003 tl 0 1 tt2 0 C Pnf TAf tON ANO ENt ttCit.NCY L Iattf IN4'15 000 21 LO/18/55 II/07/ds L29LS200L 1022 1042 POT J4LNT COJ444UNICAT ION 016 ~ 000 21 6/ I 2/415 7/02/415 l?d? 12001 594 914 c po'I kcttor F. 5HU faovN pANt t. old 000 14 10/04/55 I 0/I 1/85 1288.$ 0003 load 1021 Pnf AREA NADIAfION HONI f 4JRIN< 7'I 0 21 5/21/ds 6/I erds I L 93 70001 57d $ 9d pnr pRtlcEss RAO xoNlroktNO odo.ooo 42 7/ I 5/55 8/25/55 I 15061001 927 965 C PttEOP CJINf LEAK NONI IORINO 081 ~ 000 35 10/04/88% I I rn fr ds Vd7d?001 1005 1042 SORT CCOOCS 5'I ART I)A'fA DATE I 0/03/54PAG'E 8 NOOEiO/FE OESCR I Pt I O)t DUH Sett)O 5 f A It'T F I N I S tt ACT I VI TY HEP ~ O SC)ttO REP)D 4 C PRLOP COttf ATNOSP)ILRC NONI TORLNG SYS Oc)2~000 35 IO/15/55 I I/21/55 99405001 1022 1056 anf PRINARY CONTAINNC)tt ISOLAt ION NSSSS 03 5/27/85 6/I I /85 c)8 62 d 0 0 5 87H 59 t) C PHEOP POLAk Ct)ANC 081+000 14 5/17/85 5/3u/55 59017001 ttt)5 551 C PIIFOP LEAK OtcTt.'C f ION Uc)S ~ 000 35 IU/04/Hb I I mr/85 9 70C)400 I 1008 1042 POT VIU NONI TURING HPV 056m 14 9/06/85 9/19/c)5 699cc501 1 950 993 PHI OP CONTAIN)tCNT 6 INE)t I ING SYS Ot)8 ~ 008 14 10/IS/55 10/28/85 99297001 1019 1032 POT SEISNIC NONI TOHING SYS 090m 000 7 9/06/t)5 9/12/85 13900HOOI 980 986 C POf PRI)CCSS COHPUtCR 91 ~ A 81 10/01/55 12/26/c)5 95994001 LUOH 1091 POT APttttS ')2 eC 14 5/12/ci5 8/25/55 13950400L 955 968 P!) T SRNS 92 ~ A 14 8/L2/85 8/2 5/ 55 134414c)10 956 9h5 POf IHNS 92e5 14 c) / I 2/ 85 8/25/85 131444011 9%5 968 anr Rno RLUCK NONI fOHING 093 ~ 000 14 6/21/85 7/0 7/85 L 3937400 I 906 919 PI) t f I P SY5 091 ~ 000 c) / I 2/5c> 9/Oe/t)5 L 3869000 I 955 982 POT ttOU WORT ti NLNINICI.R c)6e A 21 6/24/55 7/14/85 llc)469001 906 926 POT HOI) SEc)UENCE CTIIL 95+5 21 6/21/55 7/14/85 I 34441U33 906 92 tc anf tcnu Inslflt)N INDICATION 6 H)t NNL CTRL 0')6 00 28 b/24/55 7/at/55 I 384 19001 906 933 NODE> SORt ECUOS S E STARt DATA DATE 10/03/84PAGE 9 0 o 4 0/F E ~ D E S C R I P f I n DUR 5 I A R F I N I S H ACT IVI TY sckin kFpi 0 SCOLD m.P ~ 0 4 Pnf RX PROTECTION 097+000 2L 5/2 7/85 8/ I 0/85 I2890400I 8re 898 A~ f ~ f URUINF GI.NI.HATOH PROTECT ION 98 0 I4 . 10/15/d5 I 0/28/85 7933000 I 10 IV 1032 POT STOOY I)SL GFNFRATOH DIV 2 100eA 30 3/31/85 4/29/05 49147001 821 850 Pnf STORY DSL CI'NFRTATOH DIV I 100 ~ A JO 4/07/85 5/0 6/85 49147003 8/d 857 Pnf NPCS OSl DIV 3 100eN 28 I/2 4/85 4/?0/85 4'J304001 814 841 Ae to RAOVAS tF. BI.OG CRANE 101 oB 14 10/Ld/05 IQ/31/85 134444035 1022 1035 4~ f~ TUROLNE OI.OG CkANE. 101 ~ A 14 12/01/85 I?/ I 4/85 I 34444034 I 008 1079 Ao'to ACCFPT OECONTANINATION 102e000 3/I d/85 3/ 11/85 I 18922014 808 821 Ae fa Sl TE SECURL TY SYS 104a0 4/01/85 4/28/85 L3827600L 822 849 C Pnt GFTARS 105. 2L LO/04/85 10/24/85 134444015 1008 1028 PREOP HFOUNDANf HFACf IVI tY CNTL SYS 106 000 28 7/15/85 8/I L/85 99484001 927 954 ra (IHIP STARTUP AND TEST ORGANIZATION 10/04/84 NHP2 SIA REPORtS tO HANACER SUPt ~ SHOUN ON ORCANI(Af(ON attotl CHARf FOR OAILT O(RECIION 5flttvt M CC'I DATE I S AR ~ HANACER tt((vfaoe ~8 ~ ws sratlcv svtftl ~ tcvccvl /.k!TZ oaff NHP2 OPERAIICNS SR ~ ADHIN CE ORCANI 2(I ICN OPS HCR tot(f5 AlOE (SEE OPS ORC CHAR(I ere .l./<r IvtlC Svfc ta(acct aDIlsott ceslvc(R Diff NHPC TCH PAE fCH TCH I/O ELEC( HECH IKC tlANACER CARI(t RASS let II 5 tvtl5 (SUPT SLACvsvae IESIINC), 0 ILLavcf Vial (4 LEAD IKC IRMER LEAD ELECT <<CISVC Rlea(ITAUCN NASI CR INT (EST COORO SRASSMD LEAD SECH R(5TICA ASSt PAE 1 AOCL ICS Aes I et TE Uoe(5 14 ICS CCORCC CRVI at.sl ICS RUILCOCC IE LCfle TS.T4 ICS L MCIVOC fuv(t fE (CS tCltleC vatcv<<<<elf e fE afef Sl 0PLANT HAINt (KC CATO( HLf SUPT v(ella(IN O PLANI ELECT (CS OIVALD TE Clat(Sf 5 TCS CNM tat (E CLM(coot 11 ICS 5 I OCMAN TE IPNILIIA TAIL ICS Lfef1 (CS 4l I NISO IE SURI 11 CONSt SUPT ELECI Lave(TCC O PLAN( HA(N t HECH Cttst tCS fE Covlt taft NIORO ICS tE ROLOO $ 1 a ICS to<<CO fE Lfvls 10 = IRvle fCS ICCVICI<<foe tE 15 '4 tCS <<SAI($ IE Tvav<lsf CR $5 CONS SUPT I ttlMtttf PLANN('IC ULOIAC IIIERS SRDCR OIL MCf A eleC tRA1ICR Iott1 I f CMO ~ Ct IAIRNOYER NALC tce ae AOII IN SvttOR I 5(ott NOVES N(11Aftst DsttEVSV I SOTKC CLITCAI ROICVINAL TULLCR CLERICAL fACC('IC CNILI Oe <<CCM K SIC(ACR CHOC ACO v($ IOe CNOC ICII Ceclvcas Clf ICLAAC ICVRAIMlNAV It SC've(IDEA $ 4 <<Ctatfe<<$ 1 SCNVARII'TC Cvteff SICCAKR II 11114(SILO . I AvVf4 RVRtf( ~A INC LOVCSC ICCVLLOVCN CNEVNAI 44 toltOtlL 4 ~ 5AID I~ <<14 NIDRO INAC<<<<LO NCLLCR LCCC ALVMDI $ $ ~ ~ 5$ . << ~ SUA v I v a CL R(lo 4$ ~ 4$ SMCCTlL SVITA ~ I 105 Joeesoe ~ 5 tat(L ts.tt OAT IS vcfes lt 101 TI I ICLS(e OONCR I0 I Slf TRICD $ 0 et coot ao lol ~ Ctvlt 1$ tlALUS'C $ $ RAttC e NILLCR (001 CR 5 ~ . $ 1. ~ 1 tUce 10.4 ~ AC ~ SC ~ It. 40 Lfalefes 1 CRATCALL vt5 CNIICCRS ala(A 1 TO 1.1 I ICO NIORD NIORD TaLAES $ 4 C eaafl ~ I ~ VILLIS $ 4 I CDER efhtstOV tates v(N I N SNDCNMCR DCICRI 5 ~ ~ LCS ~ 5.44 Maof lle ~ ICTA'Ce 15. ttILL <<IIDRO 11 II I

55. . ~

VALfoe CNIDIU RlL51 tt OCTAN I'I Doves st( ~ CCA 1~ e(CCN 11$ NatC I~ t(000 1$ 40 tl(RL INC Sl tvCLCNM $ 1 5 I TERS SINK 5 5ICDCL 10 V I liC Lfoovs 11 a CILLIS VLVSN ~ M(R la<<flLf 4'le Dale<<ave ~ I Nalvcvos 15 Ul I ~ OL II SIICLL $ $ NI CVSTI. 44 SIASIAT Il MMI ~ 5~ ~ aatSCN I ~ . '50 51tav't(tE 'Iae(C<<CTO ACOSI A IAIC<<<<($ 4$ ~ I1 11 0(t ISOVALf 5(NI A I Dv( NCAS ~ Sevtt(RS 5 MOCT ION 104 Calet(LL 5<<ALITAV 10 ~ OLD(e 5 I(TER coal I EST tCOOID I el(soe 10.11 ~ ILOV TO(I I VILLMil 100 MlCTICLLO I 0l OILS(at Rof 10$ .01C C I(I<<OCAI 41 IMflRD ~ 1 ~ 4 ta'I C ffsl 5IVRIK tC CR'Ctf I Eta 5 4$ fit (I a V VOOCtvtt Toe f a I ~ I@ jgg@0106-0 ~ XvaBe618 Oa Aperhee gaza ~ ~ ty (~ (l, f al AGENDA ITEM 89 ITEM: Detail ed discussion of potential schedul ar in fl uence due to changes attributed to NUREG-0737 and other recent licensing requirements. CURRENT STATUS: NUREG 0737, ATWS and Appendix R requirements have been incorporated in the project schedule. The resolution of some licensing open items may result in additional design or construction work.'pen items that could have an impact are:

a. Diesel Generator Air Driers
b. Break-exclusion zone for Reactor Mater Clean-up System piping.

(See Item 813 a 5 b for more detail) AGENDA ITEM 5 10 ITEN: Discussion of schedular impact, if any, regarding potential deficiencies pepopted in accordance with 10 CFR ~O ~~'te j. CURRENT STATUS: See following pages. orted

10. 'o The50.55(e) Havin NRC; Teems, Re Potential For Schedular I act.
1. Main Steam Isolation Valve - PWHT Qualification
2. Hydrogen Recombiners Qualification
3. Impact Testing of Check Valves Supplied by Anchor Darling Company
4. PGCC Electrical Separation
5. Feedvater Block Valves Supplied by Velan Valve Corporation.

ITEM M S t e ~ Isolation inn Steam s Valve (MSZV) - PWHT gualification (55.55(e) No. T8.3.2.115) PROBLEM Materiai test specimen for the body of one MSIV, mark No. 2MSS NYVIA oas not subjected to simulated postweld heat treatment (PWHT) prior to testing as re-quired by the applicable ASME Code. This problem was reported to the NRC under 10CFR50.55(e) on June 15, 1984. E UIPMENT SUPPLIER Gulf & Western/Fluid Systems Division PROPOSED SOLUTION Engineering evaluation, justifying the use of MSIV as is, has been developed. NMPC is informally discussing it with the NRC. NRC's informal decision is expected by October 15, 1984. However, contingency plan has been developed in case the NRC does not concur with our justification. This plan would cause hardship but the existing valve can be replaced without affecting the fuel load. RESPONSIBLE ENGINEER J. T. Sullivan/T. B. Madden 0 ITEN Hydrogen Recombiners gua1.ification PROBLEM jn fr jsj jy various cosponsors or hydrogen recomb jners fa jjed co Pass qualification tests. Subsequently, vendor indicated that he does not have adequate documentation for all the components of the equipment The problem was reported to the NRC under 10CFR50.55(e) by NMPC on August 9, 1983. The vendor also reported problems with the components to the NRC under 10CFR21. 'E UIPMEHT SUPPLIER Rockwell International PROPOSED SOLUTION The vendor has indicated that the equipment will be qualified to IEEE 323-1974 by mid - 1985. ITEM t Testing of Check Valves Supplied by Anchor Darling Valve Company. pROBLEM Mater ial test es sp'ecimens for various components of the subject valves were not impact tested as required by the applicable ASME Code. This problem was reported by NMPC to the NRC under 10CFR50.55(e) on September 7, 1984. PROPOSED SOLUTION The matter is still being investigated. At this point it is not known if the vendor has material specimens or the number of valves, if anyB that would have to be cut out/replaced. RESPONSIBLE ENGINEER J. McDonough/T. B. Madden ITEMS PGCC Electrical Separation PROBLEM p>>d si ins did not condone to the divisional and snbdivisi'onal sepatation criteria of Reg Guide 1'5 A 50 55(e) final report was submitted by ~C to the NRC on August 9, 1984. PROPOSED SOLUTION The corrective action are scheduled for completion by December 31, 1984. RESPONSIBLE ENGINEER KeVaradara)an ITEN Feedwater Block Valves Supplied by Velan Valve Corporation. PROBLEM Material test specimens for the valve were not sub]ected to simulated post-weld heat treatment (PWHT) prior to testing as required by the applicable ASME Code. An interim report was submitted by NMPC to the NRC under 10CFR50.55{e) on July 6, 1984. PROPOSED SOLUTION

1. A contract is being negotiated with Power Cutting Corporation to remove material from the, bottom of the valves for testing. Cameron Iron works, forging supplier to velan will perform testing. Testing is expected to be completed by December 1984.
2. If the test results from (1) above are found to be unsatisfactory, the va 1 ve will have to be replaced. Replacement of the valve with a new valve may be completed by December 85. However, an attemptt wtl1 bee made to locate an acceptable valve already fabricated, in which cas e the replacement could be accomplished by February 1985.

RESPONSIBLE ENGINEER J. Ventre/T. B. Madden AGENDA ITEM Ill ITEN: A detailed discussion of the recent management organization changes and impact on construction, pre-op testing and startup. Include discussion of how the management organization will be changed for the operational period and effect on startup. Discuss interfaces between MAC, NMPC and SMEC. f CURRENT STATUS: The project reorganization was basically compl eted during the first quarter of this year. The current project organization chart is attached. The goal of the reorganization was to improve the management of construction and startup activities. There has been no significant change to our operating organization, other than the assignment of Mr. Hooten and Mr. Perry. Niagara Mohawk believes that these management organization changes have had a positive impact on the construction and startup schedules. These management changes have resul ted in Niagara Mohawk exercising more direct control of project activities, although Stone Mebster is still the architect/engineer and construction manager and is responsible for day-to-day direction of the project. The MAC individuals assigned to the project act as Niagara Mohawk personnel and fill positions in the Niagara Mohawk organization. Except for Mr. Hooten and Mr. Perry, there are no MAC personnel filling positions in the operating organization. Additional information on the operating organization can be found in FSAR Chapter 13, and additi onal in formation on the startup program can be found in FSAR Chapter 14. W.J. DONLON OIECUTIVE ERECTOR HVCLEAR QKRATK2IS ILG. HOOTEN VICE VICE PRESeEHT PRf SIDEHT PROJECT ERECTOR OREC TOR HVCLEAR ORfC TOR HVCLEAR RAT)OH ~2 EHCIHffRIHC LICEHQHC 4 DUALITY ASSURAHCE CORPORATE Sf CVRITY T.E. LEMPCES D.L. OUAMME C.V. IlANCAN J. PERRY J.J. SIPISER )SHEET 3) ASSIS TAHT CDCBAL SfCRf TlRY TO PROJECT 6LfKRHTEMXHT ONECTOR S4PKHWTOOPIT IIAXEAR IOCLEAR E. OAVES M.J. Rh'I INYSEG) SECIJIIT Y Q3CRATKW T.J. PERKINS R.F. ORR NAHACER NAHACER NAHACfR NAHACER STATION SOU)HTEMXHT ~2 LICE HSHC CONPLMHCE

  • OA OA IOCLEAR TAHT SQKBtPEMX)IT VERONICA TIOH HV CLEAR MP2 OPfRA TIOHS HVCLEAR A.F. ZAI.LNICK J.J. BEBKO C. BECKHAM D.R. PALMER SECLRITY R. ABBOTT ISHEET )3,14) )QUET IS) J.P. BERATTA SfCtl)ITT HVES TICATOR NAHAGER MANACER NAHAGER NAHACER VAICACfR COHTRAC Tz SfHIOR NAHACfR PROST MLO ILG. CHRISTIANSEN STARTVP 4 TEST f HCIHEERIHG fHCRIEERIHC NATfRIALS NAHAGER CONS TRUCTIOH PROJECT COHTROL SfRWCfS/ I&%ET 12)

NAHAGENEHT ADQH5 TRA TIOH G. AFFLERBACK W. TAEGER J. THOMAS J. NIEZABTTOWSKI J.P. PTAK R. GIBSON A.P. BALENO IS%ET 2) )SHEET S) )SHEET 4) I%%ET 7) ISHEET 5) ISHEET lll ISHEET B,Q.IO) IOE LLE PONT H)CLEAR STATK)N IPKT-2 NIACARA LIOHAWK POWER CORPORATION NINE LIILE POINT UNIT t2 PROJECT PROJECT DIRECTION ORGANIZAT ION CHART FUNCTIONAL DRECTION OHLT LOCATK)N KEY MANAGELKNT LESS OTHERWISE NOTED NMP2 QTE CHOC CHERR+~~ IN.J.) OPERATIONS CENTER DATE 10/1/84 SP I OF 15 APPROV DA'IE C Ci MI)A.~Q7CHI AGENDA ITEM 0'12 ITEM: Overview of current construction and startup management organization showing interfaces between the two. CURRENT STATUS: See following page. CONSTRUCTION AND STARTUP NANAGEMENT ORGANIZATION IO/17/84 INTERFACE PROJECT OIRECTOR NMPC STARTUP HG 1 HEERlHG CONST NAHAGER MANAGER SrNANAGER MANAGER MANAGER CONST TEST TEST TEST COMPLET GROUP PROJECT GROUP GROUP I MANAGER MANAGER AOVISORV I MANAGER H ICC ELECT ENGlNEER I I I I I I I I I I I I I I I I I I I I I I I I SWEC CONST CONST NMPC CONST SUPV SUPV TURNOVER MECH ELECT MANAGER T/0 SUPV AGENDA ITEM 813 ITEN: entailed revise and current status of design, engineering and construction effect including quantities, work-off rates, current status and schedule for completion for:

a. ATWS-3A Design Changes
b. Appendix R Design Implementation
c. NSSS Loads Adequacy Evaluation
d. High, Energy Line Break (HELB)
e. Moderate Energy Line Breaks (MELB)
f. Control Rod Drive System
g. Primally and Secondary Containment
h. Control Room Panel Modifications (PGCC)
i. Pipe Stress (as-build)
j. N-Stamp Certification Progr am
k. Updating Drawings and Specifications to as-Build Condition
l. Environmental gualification of Safety-Related Equipment
m. Seismic guali fication of Safety-Related Equipment
n. Hanger Reconcil iati on Progr am CURRENT STATUS:

See following pages. 13a. ATMS-3A entation The NMP2 imp 1 emen of the ASS-3A upgrade consists of nine sp system modifications as follows: 'tandby Liquid Control System 86GPM capacity upgrade

b. Redundant Reactivity Control System addition
c. Alternate Rod Injection
d. Recirculation Pump Trip
e. Feedwater Runback
f. Automatic Standby Liquid Control Injection
g. Average Power Range Monitor Downscale Trip
h. Reactor Mater Clean-up Isolation
i. 'Nuclear Boiler Instrumentation Transmitter Replacement Engineering and Construction requirements have been incorporated into the SWEC and GE documents needed to support construction.

All major equipment is delivered and in place. Installation of the required design changes is continuing in accordance with the applicable system completion schedule. 13b. A endix R The status of the Nine Mile Point Nuclear Station - Unit 2 Appendix R implementation is as follows: All changes resulting from the Appendix R evaluation have been agreed to by Niagara Mohawk Power Corporation. The most significant changes which have to be made involve the control room fire. The description and schedule for accomplishing these changes are listed below.

1. Modifications to the control design of the remote shutdown panel 2CES*PNL405 are in process and scheduled to be completed by October 26, 1984 for input to Electrical.
2. Markups of SWEC elementary diagrams are in process and scheduled to be completed by October 19, 1984. Drafting of the completed SWEC elementary markups are in process and scheduled to be completed by October 26, 1984. All SWEC elementaries are scheduled to be issued by November 2, 1984.

Design of the two disconnect panels 2CES*PNL415 and 2CES*PNL416 is in process and scheduled to be completed by November 2 1984. 4, The GE elementaries which require changes have not been marked .up. However, these elementaries are scheduled to be completed by October 26, 1984, for transmittal to GE.

5. ECNs implementing all changes resulting from Appendix R are in process and scheduled for completion by October 19, 1984.

Appendix R ECNs are scheduled to be signed out by October 26, 1984.

6. Engineering design for the emergency lighting is:in process and scheduled to be completed by February 28, 1985.
7. The safe shutdown problem cables have been rerouted and are in the process of being installed.
8. Cable changes resulting from the Appendix R Control Room Fire Study will be routed as soon as the ESKs are reissued.

i1 13 c. NSSS NEV LOADS ADE UACY EVALUATION The NSSS New Loads Adequacy Evaluation provides an evaluation of NSSS safety zelated equipment sub]ected to hydrodynamic loads as requized by NUREG 0808. Two phases of this evaluation have been defined. Dynamic Analysis - Development of loadings on RPV and equipment due to hydrodynamic loads. C

2. Equipment Adequacy Evaluation - Assessment of each piece of safety related equipments adequacy when sub-

)ected to the loads developed in the first phase. STATUS

1. Dynamic Ana1ysis - Complete
2. Equipment Adequacy Evaluation A. Reactor Pressure Vessel Evaluation complete. No hardware modifications re-quired. Adequacy has been assured, however, use of new ozificed fuel support testing results is re-quired.

B. Other Equipment Thirty items required evaluation. Final adequacy evaluation foz equipment is complete except for: Item Com letion Scheduled ECCS Pumps 10/26/84 SLC Tank 10/26/84 HCU 11/30/84 RCIC Turbine 11/30/84 Fuel Prep Machine* 10/17/84 Recirculation"Piping Analysis 12/31/84 Report 3/1/85 Minor physical changes to the fuel prep machine will be required. ~ HIGH ENERGY LINE BREAKS Systems, s zu ctures and components related to safety have been protected from the unrestrained motion of pipe, ]et impingement and temperature/ pressure effects of high energy line breaks (HELB). STATUS

1. Engineer ing A. Identification o f systems, s truc tures and components affected by HELBs - Complete B. Design for pressure/temperature effects - Complete C. Pipe Rupture Restraint Design - Complete Verification - 12/85 D. Jet Impingement Evaluation
1. Structures Complete
2. Piping - 10/85 507 Complete
3. Equipment - 6/85 60X Complete
2. Const zuc t ion Pi,pe Rupture Restraints and Jet Shield Installation Restzaint Supports - Complete Restraints - 6/85 100X Fabricated 20X Installed Jet Shields - 6/85 100X Fabricated OX Installed

High Energy Line Break All high energy breaks have been postulated at fittings and high stress points. 190 pipe whip restraints have been designed and most have been installed. Structures have been designed to withstand sprays. Equipment targets have been identified and 2 shields have been designed. We are currently identifying other type targets; tubing, small bore pipe, and conduit. This will be complete by February, 1985. Analysis will then proceed to evaluate whether any of the targets must be protected. We expect no more than 8 additional shields. If they are required they will be designed and installed by September, 1985. 13e. MODERATE ENERGY LINE BREAKS MELB ine study was completed of the effects of in Ju J 1y 1984 resu lting Moderate Energy Piping Break ing in the preparation of FSAR (<< sections ) 3C.4 and 3C.5-The baseline 1 t s u dy y resulted in ~7 Cat. I zones being identified as requiring flood detection capability, ' spray shields ' and/or ' othe r chan g es to assure sa fe s h u tdown capability is maintained coincident with a moderate energy line crack. FSAR sections 3C.4 an resolution of these deficiencies. Oue to licensing schedule constrain s, the baseline study used conservative and simplifying assumptions. The extent of identified design changes needs to be reviewed accounting for realistic conditions and minimizing impact, on the existing completion schedule. The 47 Cat. I zones requiring further evaluation are contained in seven areas (Control Bldg., Reactor Bldg., North Aux. Bay, South Aux. Bay, Screenwell Bldg., Diesel Generator Bldg. and tunnels). Mor ksheets have been developed to assure documentation of and consistency in the evaluation process. The speci ic zone eva ua 'f'luations are scheduled to commence in late October 1984 with an average of 15 zones to be addressed each month therea ter, the f r review of zones will require about two months to complete. Identification of required fixes for the first group of zones (Control Bldg.) is scheduled . for mid-December i 1984 and all fixes by mid-February 1985. 13f. En ineerin And Construction Status For Control Rod Drive H draulic S stem. A su@nary of the Engineering and Construction status through August 1984, for the control rod drive hydraulic system (CROHS) is shown below: DESCRIPTION 'NG'RG X COMP X COMP CONSTR X COMP AS-BUILT Inside Containment Enterprise 90o 100 95 270o 100 95 Piping Under Vessel 100 100 SP5 to Contain. 100 95 Supports Sliding Conn. 100 100 Supports SP3 5 SP4 100 100 Outside Containment Multi-function 90'70o 95 95 95 95 Intermediate Supports 100 90 I II M Piping 90o 100 95 0 270'ump 100 95 0 to Contr. Sta. 100 85 0 Control Sta. 100 85 0 Supply Lines 100 70 0 Vent Lines 100 0 0 Drain Lines 95 0 0 Scram Hdrs. 100 60 0 Scram Drops 10 0 '00 Scram Tank 95 70 0 The scheduled completion dates for Engineering, Construction and As-Bui1t Verification are as follows: COMP COMP COMP ENG'RG CONSTR AS-BUILT Inside Containment 11/84 5/85 Outside Containment 11/84 3/84 9/85 0 13g, PRIMARY AND SECONDARY CONTAINMENT Design engineering and construction activities for primary containment and condary containment are complete. Engineering for these structures is now ongoing to verify design adequacy vith actual system loads STATUS ORIGINAL DESIGN CONSTRUCTION LOAD VERIFICATION STATUS OF STRUCTURE COMPLETE COMPLETE COMPLETE VERIFICATION Primary Containment Wall 10/79 10/81 5/84 100X Containment Wall 'econdary 1/80 12/82 2/85 40X Pedestal 6 Dryvell Floor 12/79 9/80 4/84 100X Biological Shield Wall 9/79 7/80 6/85 OX Primary Containment Liner 11/76 10/81 11/84 10X Equipment Hatch 9/77 12/84 OX Reactor Mat 12/73 6/77 2/84 100X l Pool Area 6/82 2/83 7/85 Primary Containment Steel 6/81 2/82 4/85 33X Secondary Containment Steel 9/81 6/83 6/85 5X Design and construction of the above structures, is 100Z complete. 13h. Control Room Panel Modifications PGCC The Power Generation Control Complex (PGCC) is a series of General Electric finished control panels that when assembled provide all the control room functions. PHASE I Start of PGCC Mid 1973 to A ril 1979 This was considered the base PGCC. This phase incorporated fire protection and separation requirements for all panels except P606, P608 and P633 for the Reactor Protection and Neutron Monitoring Systems. SWEC issed the "G" series drawings for fabrication of the baseline PGCC design freeze. PHASE II A ril 1979 to A ril 1982 GE reconstructed and completed the Phase I work. Four design packages were issued in December 1981 to modify the PGCC; specific design changes were issued from December 1981 to April 1982 to incorporate additional PGCC features. This phase incorporated most TMI items on a best effort basis and represents what was delivered in January 1983. SWEC issued Design Change Notices to the base PGCC design. PHASE III A ril 1982 to Present This represents the work performed in the field from Design Change Notices. (Phase IIIA 4/82 - 12/6/83) Continued implementing SWEC design changes to the base PGCC design. (Phase III8 12/7/83 - 3/1/84) Incorporated specific SWEC design changes into the base PGCC design. (ECN-CCP-008, 016 ECN-EGS-002) (ECN-HVP-014 ECN-CCL-OO9) (Phase I I IC 3/I/84 - 6/I/84) Merged the base PGCC fabrication ("G" series) drawings and SWEC design changes into one set of SWEC Project drawings. SWEC issued 6000 and 7000 series Design Change Notices for additional design changes. (Phase I I IO 6/I/84 - 9/I/84) Reviewed SWEC and GE drawings for design consistency (8oundary Identification Package) and issued resulting design changes. (Phase IIIE 6/1/84 - Present, 80P only) Issued past Phase IIIC changes to the balance of plant panels. (Phase IIIF 9/I/84 - Present, NSSS only) No changes implemented. All design changes are minimal and will be implemented by Phase IIIE or I I IF. I ~ I I9 S4 JLIH QUI AUb MP ~T NOV ' ' '~ ', ', FEIST MAR IWQ 6 PAL MA/ JUt4 &PAQATION ALA~ Z TILE P5LAM 1Q. 8 IO-I9 ~ cLO0IFICATLCIN5 ~ 10-3L Q,. OlHCR PANEL i4) CeFLCATLON5 (m-.SPA mTICN) A.6F I AMELIA;P 2,5,BA, LO.e %-BOI $ NSS LO-L9 C. 66 PI5NW5 L2-2Q g 50-NG~S p 4.-1 0 WRM<HATIO54 12 15 CA&lruCT5 p Z-L5 12-LQ p +-I Zr. LNIPE I LST 'l-rO; (imp p 31 3g It4&ALI.ATION( NIL K-PAPAW <IIL> (ORNA);. I 11.15 (IAAF) ~O 3.IS 4.1 l55CAae ~ Q-I FIRE. PANEtTIOH-LIALGe4 S/STEM Q Et4uIN6EAHA ~Y- . PGCC STATUS ~ CICI~ CL ICCVC CCPSMLCTioN 'uKCIC W CI ICCCC ~ CCC ~ I ~ CI ~ a caca caaa ceca CHIC CC STONE G WEBSTER ENGINEERING CORP. aP OWG. NO. naswse aY 05GIC CIIXO IY 13 i8n Pi e Stress As-Built and Han er Reconciliation Pro ram An as-built reconciliation program and engineering work plan has been developed to perform the final stress and support reconciliation, based on field verification of the as-built configuration of the Category I piping installations. The large bo're portion of this effort involves 330 Ax stress analysis for the 20 piping systems to be qualified. Field submittal of as-built data commenced in July 1984, and engineering completion of the reconciliation effort is scheduled for the end of August )985. The status and schedule for completion of this effort is indicated on the attachment. As of September 28, )984; twenty percent of the reconciliation effort has been initiated with 3 percent being completed. ~ ~ I, 'I ~ ~ r r r r I I * ~ I I r ,;SCH EDULE::::::::::::::'::..'::::.::::.:: h .. I I I I I r r 4 ~ I I 350 I I (I 20 ~ h fIII 300 Cg',. .::: I

r

~r~r r ",,', ' I I eI I 250 0 l~ I~ ,,':.--;:.SCHEOUiE I~ ll X 200 I IIUl I I ~ IU 0 ' I 10. ~ II ~ 1 O <50 I G R ENGlNEERfNQ:- .'.' I I 100

-: COMPLEnON -'.:;-:, .;;. I I

I I I 'I r I I 50 r ~ I 4 ~ I I ~ p I ACTUAL 1 I I I JUL AUG SEP r OCT.- NOV: OEC JAN FEB MAR APR MAY - JUN . JUL - AUG SEP OCT NOV 't984"."::- ".1985 ~ ~ h f ~ g-Stam Certification Pro ram The SWEC guali ty Assurance and Control Manual - ASME Section III establishes the project requirements for the ASME III N-Stamp Certification Prog'ram. Currently there are 31 ASME III systems requiring N-Stamp certification, as indicated on Attachment 1. The schedule for completion of the N-5 data reports associated with the 20 major systems's indicated on 'Attachment 2. The additional 11 ASME systems, not shown, require a less extensive effort (i.e., contractor-designed systems, penetrations, small bore only). The first N-5 data report is scheduled to be signed out in February 1985. 20 MAJOR SYSTEMS:,- SMALL BORE ONLY CONTRACTOR DESIGNED P ENETRATIONS TOTAL FOR N-5 1 I' ~ ~ .:.: SCHED ULE: ' j ~ 1 I I I ','r:. ~ l l \ ~ ~ 7 < ~ ~ ' I ~ ~ ~ ~ ~ ~ ~ I. 350 I ~ I I )t 20 ~ I I'- gt t 300

  • 00 t t

~ ~ l~ ~ 250 . ... ....,.'.. -..N-5:-','. /r r ~ - ~

-. SCHEDULE l~

t ~+ 2OO r ~ ~ I~ l~ Q r l~ l~ 150 tl ~o o II' I 0 r .r .,'* ~ ~ ENGlNEERlNG I I Z .: '" ".,COMPLETlON.'-.:.'+-.,":;,,-,, I ~ I I, I 100 ~ I I t I t ~ (' I l l ~ ~ 'l ~ '.1 ' .' t I ' ~ - ~,' ~ I' l I ACTUAL ~V I t JUL AUG SEP ~ OCT NOV. DEC JAN FEB,. MAR APR . MAY JUN . JUL AUG SEP OCT NOV 't 984 - ':.:-"19&5 As-Built Orawin s Comnitment to as-built drawings and documents is addressed in Project Guideline 22 (SMEC Drawings/Documents) and project Guideline 46 (GE-NSSS Drawings/Documents). These documents are currently in the review and signout.cycle. In summary,,the as-built drawing policy is as follows. Update documents in three phases: at start of preoperational testing {system turnover update - STU); prior to fuel load (fuel load update - FL); and after plant turnover (plant turnover update - PT). The as-built updates consist of incorporation of issued change documents (E&OCR, N80, ACNs, etc) into the base document. For STU the scope of document update applies essentially to key engineering diagrams. The FL update scope applies to all gA Category I and Category II Seismic Design drawings (except BZs). The PT update addresses the balance of drawings/documents at the discretion of NNPC. Scheduling of the STU update has been completed and is in the 1985 workplan. The balance of the as-built drawing effort is in the process of being scheduled.

13. 1 8 m Environmental 5 Seismic gualification Environmental 4 Sei smi c equal i fi ca ti on continues to proceed in accordance wi th the requirements of the major E9 mil es tone schedule (Attachment A).

Progress is monitored on an individual specification basis and, more meaningfully, by total component count of components actually qualified versus components required to be qualified; Attachment B shows that status as of August 1, 1984. Attachment C shows the SWEC target plan versus NRC component quantity requirements. Supportive of the NRC audit of El}, it is necessary to demonstrate capability to be 85 percent complete with installation of components requiring Eg. Engineering is currently interfacing with Construction to assess an acceptable method of statusing completion of equipment installation from an Eg standpoint. The potential exists that several components may not have their qualification programs completed by fuel load, and it is expected that these items will be addressed by use of justification for Interim Operation process. ~

  • s Sb7t ~ h h ~

I EQUIPMENT;:.QUALIFICATION"SUMIN'ARY;.',-;.:::' ':.-',"',",:.":,ll: -"::.':,." '.::::-",",".; <@".I" IJ't<f;:@I";:.""!'!Vj':.',"-.'i',-',"::::;:" SCHEDULE r.r"~  :".r.'! '; ., .:..'. 6"", ~, ~ '>>lt I(,:.' ".:j'SEISMIC REPORT ',->>Fr<<h'-us~@,...thg,".Ip sb. ~ .I 1>>. ihh. '>>ck5 r. j.. '. SEISMIC PROGRAM,, AND~, I .',l;; 1!,:, r.br l .. >>'." l .,11.:.,., br'." -.1,",:.h ....)-';>>!gW r..;:-,:.- -;4:..l;;Pq>>t >>S I)>>>> srr.,r rrb i . bsr. 70 SPECSI3000 ITEMS "MASTER UST ~ MEk "..'. ! . 1<<ssV>>< M84 REPORT PROGRAM ",r. t I AND su << 40 SPECSI3200 ITEMS 'MASTER UST +1'-."- -" EOUlp.dUAt'< -'i':".1-i'I'"1--:'.hob;,.,t>>., REMAINING 10% .. pfll<<lt'>>stb~">> 11 ~ 0,',>> 1 '-"1 '<<<'i~t~>><<>><<I~IHlIIS-  ! I .. '-'a<<'V.;rl. II 1IPj'-:<< 1 "4 "s'slI" -"~ <<I'1.<<1 fg@45$ )I 4 1 SUSMIT FSAR AMEND. I>>;~j',.'. ~ "..:.'.": . <~ .". I g:j, ' l,",ag "."', S.',~tI~Q;.;j t FP~g  : S.>> .I ~ - ~ NRC OVERVIEW AND MASTERLIST:.', >>1. .".;.",>>.'.,s>>l..s .I'.!'...'5r .=.. zI,, '<<h,. S>> I<<,'r>'>>,'.>>, t, s, S>>w>>'s +Pe t. ~.l MEETINO Wt!2tI!i t 1srrsrss;" \ btrt't ""':j""h'"ss"")+f4'""/~)'r". I >>l.. I. >>..I s ~,1 . ':13 7">>I:,gr vgrlg.. sill>>1 J",sr>>Is>>; It>le )lh:bsjljsslr/'srgrss", FIRST REFUEUNO )." !:.-.'... OUTAGE Ed 100%".<<".- g t:,.:. b<<<<':Ilrll'sf>>Is>>,,iL~~p COMPLETE, . ')Qfgh'UBMITFSAII AND ~'"i 'I(;gt ' qrj.. "gfCOMPLETE <<<s, E406% NRC AUDIT<< ~ JID 'Q tt;COMPLETE'. 95 r'p>)f'., $>>)5t. '<j t,e)I,~ MASTER LIST UPDA (jib>>~ EOUlp, 0616 I~ BIO-6S ',g.,'.,"')," PLUsscEwsHEETs ) I.: .. ~trt '<<KC)INsTALLED s,sh' ' 1 Pl .s>>>) j REvIEw FsAR s>>$ fg ~ .4I'ppp:ts,.'j'.".~'1 ' v~ >sHEETss EOD; ~ .~5 + fogy ++ rgb);>>1, OE PREP E4D AM N ', S,:jy> . f~g$jig,'<<jan"gpj"S".," )',I It't)1>>)h;.'2>>uMASTERUST i(gga . "g I) LDCN 4 MASTER L)ST ~ ~ "..":..". -..". '1 .". "'t~ltS/0$ ""..".:;;>> 'O'I15) JS: ~ "'.':I '-'&agP.'.I ISSUE TO NRC'"-~sI.'." "'yI ~ f ~ et NRC SELECT:'..: -';>> SWECIOE PREPARE~>>,;II .y0tr~t<. j'4'.-~ gIq,'~'1;..". t~.,<'-.",:.,;. cf' ,... EOUIP. FOR AUDIT: ',.: ' I'.",. ~ DOCUMENTATION ',.:I '."".'-.'".. - .:, ': ", '". - ~ S 1 ~ ~ ~ ~ hc/48& r t I'""t:"' ') WMa/JCPPQA/7 AHAB/krC ~ ri~.V AgquufZ~ ),,;.'. t',:.i<.-.", ~.'.-..'~~~Ffdw' w' aMww7iuiVgl:3>jP~,I'",4 r.":g Vpt'll rrv Jvo ~ rrwooorraoro t vAA~~r ~gAA I ';) ',7g! hlr)IC).o,() J 1 I ~ " ~ .~ ~ ~" ~ r Co, 4 fry ~ . ethel ~'ut 'C':.:: ~ E ~ ~g.t tl)l:, 1 EL, ~ ~ I ~ ~ ~ '1 a. I ~ 'Ig)'-)t' I p ~ r ~ ' C Ap )~ Ilia ~ .1 t ~ ,I ~ ~ I II il ~ ~ ~ t)t Cjaf l I'rt '-.)II I ~ 1 ~ ~ +It ~ C ) Cj t t"Sta))" I. ~ vv

I ~

o E I i:)tt" k,f(; o .!PILI:.. ptttll I S~o ru6'.:.. I',1 D>&PIE( ~ I.i  ! Illa c-!:'.ti ,- l/~ASS. .I, ~ I ov E4 l I '\ I'I'v ,i( ~ ~ .' .Iottt ~ lo ~ ~ ~ J I ' to ~ ~ ( 27da ~ ~ wt 1 . a Co'ot ~ <<o ~ oo) ~a liooa ~I ~ vt ~ ~ ota .'j!4',5o I~

,r~"C,ll'4J f l
r.

I' ~ P;;1 )1. ~ oalr) f1 l) o)opo'gto'N ~ A'~'jl t VI ..il ~I -/dn A ' ~ I .C

j. -iz I' ~ ~

Z5na '-' ~ t.' '!ola a'l I WAw t.,". '.. A!o. I . .Cfl. paog. P, ',a', WI I IE', ~ ~ ol1 ~ ), 'woof1$ <A. I:.) .1 gyle f,la'J~ p I) ~ ,.',y,'Igrr" )'C':l:: ~ ~ .<I,) I) I /do lt '.'DO'~ ) jC) JI I .1,). ao'P >>M '1P ' "IE'z-'))SIP% 'I P)o V o ~ )o)'(I aa' I. I I ~ ~ kfafaf)f) <;i C,P'r'I" I' Ann:) ). oo ~ ,'I)PP )ol'I.I, +gt)8C. tP~'ff ~ 2/on 4"II:tr)I Jrr)L)' ' i l ri"P,,'. la)atto J, ZM9 ~1 J. ~ Coral t -'4'oo".$ ,

a. ~

'll 'I l. I I CI'.f'r, ,' pP,j f,.i,".i,'- tl."'; L. I '3 oo ttP o)~* ~ Ir)v I I J.

If't o o, ~

CI oo ~ r o'I'Plgli! .~p))'t)"j I f'- t'kg> )I ll t, Vlt~ P~ o @gal;~: ~ . I) o'I j;Jgt y'];qII fh)fl $ og I ~ ( 7~a) ~ ~ Vrt 1th I~o 11 II";)[!,:I)t 4.'tot ))lr '.Cg EE oo I/~Q~ f Ct"~.;,j>y, q)QC E ~ .El'."I I'". I .I.U) I,';:, 1 ><)t)C);!r I', ~ ~ I )Q ~ lq' Ct <<'y%g I !,'l!+'a~a)o ": g:.: '.1 I)Ifll'j ~4l .. '

>:-".i'-<<

".X,. .. s ~ x+ ~ B CD ~ ~ ~ II ~ AGENDA ITEM 814 ITEN: Detailed review of room/area turnover schedule and status. CURRENT STATUS: See data for Item tl. AGENDA ITEM 815 ITEM: Projected reques ts for rel i ef of incompl ete i tems, systems, or test completions at the time of Unit 2 licensing, identifying each. CURRENT STATUS: At this time, there is no projection for requests for relief of systems or test completions at the time of Unit t2 licensing. In regards to incomplete items, at the completion of the test program prior to licensing there will be a list of incomplete and deficient conditions with 'the plants systems/equipment. These items will be maintained and statused on the Master Work List with their required completion date/milestone. These items will be negotiated with NRC Region I and Resident Inspectors and will become an attachment to the license. AGENDA ITEM 816 ITEM: Review of open punch listrateitems by category rate. (h ar dware/paperwork ) identifying each and work-off vs add on CURRENT STATUS: See following pages. APROVED EXCEPTIONS as of 10/15 81 Hips OV(NED BY AOD 69 O I-Q rw (0 ~ ~. C U ~ Q(0 4 Oo 0 I Gl X 0 9f'10 9i17 9r 24 10/'1 10' 10i15 TOTAL QQ SOFTWARE ONLY g7g NEED SIGN OFF NEW KQ NEED DISPOSITION ggg COMPLETE .:A.PP:IiOVEI) EXCEPTIONS a.'.! of. 10/I') PC CC (BIP 103.001} ~ .6 0.8 0.6 0.4 0.2 0 Fl "7 9/10 9r'"4 1 0/8 1 0/ 2 t7 r'] TOT [~ CLEZ DSP ~i,~j NEW COlvl P 1 PL'OT DATE 9/10 9/17 9/24 10/1 10/8 10/15 TOTAL 6050 '21 6381 6288 6144 6347 NEW NEED DISPOSITION 201 71 6 297 184 103 2~4 ill 230 127 393 264 NEED SIGN OFF 1182 1310 1~05 1218 1186 1167 CONPLETED 115 75 ~ 184 267 . ~42 266 TOTAL B I PS OWNED 75 76 78 79 81 81 SOFTWARE ONLY 1736 1977 2022 19~1 1892 1914 AGENDA ITEM 817 ITEM: Status and schedule for Seismic II/I review. CURRENT STATUS:. See following pages.

17. CATEGORY II OVER CATEGORY I rh N M le point 2 ProJect established a pol 1cy of seismlcal]y analyzing and su porting non-safety related components 1n nuclear safety-re 1 ated areas back in May (975. A decision was made in June 1977 that all large bore piping >n th e Primary and Secondary Containment would be designed seismica y Additionally, components in other safety-related areaas would be evaluated to determine if they could present a hazard to safet- y-related items. This policy was formally documented via the issuance of Project Procedure 84 in March 1983 and subsequently revised in June 1984.

The procedure; Defines the boundaries of the safety-related areas n

2. Lists the various types of components whose failure must be considered
3. Describes failure methods and assumptions
4. Establishes a method of documenting evaluations resulting in non-seismic design
5. Establishes a check-list of components versus buildings and the corresponding determination '
6. Provides for a method of final verification of as-built designs against seismic/non-seismic designs Not all types of components in each area are seismically pre-designed.

In certain cases, for example, sprinkler piping, sanitary and plumbing systems, etc., a decision is made to perform a walk through of the building to determine if seismic supports and/or restraints should be added. These systems cannot be economically initially designed seismically because the contractors are generally responsible for the final routing in the field and changes generally occur during construction, testing and Inspection Agencies'eviews. The final .walk throughs have been initiated; they will be completed prior to building turn'overs in the last quarter of 1985. This late finalization is necessary to ensure no non-seismic design components are introduced into safety-related areas without an evaluation being made. PP gh Revision l Page 6 of l5 Attachnent ATTACllHEHT I CKHERAL SEISNIC DESICN APPROACH fOR CATECORIES II AND III COHPOHENTS IN SAFETY-RELATED AREAS Screen- Elect Tun-Cadeau' - Sefsnlc Design Reactor 'uell Sulldlng (See Service 'tandby nels and Auslllary Service Ca ~ Treatnent Turb Bldg Portion of el (2)7'-6") or Evaluated Building Control Diesel Attach- Mater Naln- Bui)ding Bul idio g Slab E - Evaluate later Prinary and Roon Generator nents Tunnels Stean Belou (httach- Hain (see Attach-HA Not A licablc Cuntajnnent Aus Ba s B Ildl g Buildln 5 and 6 ALL I Tunnels 26l nent S Stack uent 2) Large Bore Plplng S Fire Protectlon- S HA Hains and Nose Stations Fire Protection- s KA Sprinkler Piping Fire ProtecLlon- HA COt or ltalon Piping Donestle Mater and Hh HA HA Sanitary Piping Floor and Equlpnent S Drainage Roof Drainage Piping HA Hh NA PP B4 Revision 1 Page l of 15 Attac11%cnt Screen- Klcct'Tun-vell nels and Turb b)dg Codes: Bulldlnb Auxiliary Gas Portion uf S - Selsalc Design or Evaluated Reactor Control Diesel (See Attach-Service Mater ln-261'tandby Service Bui 1 ding Trcstnent Bulldint el (2ll'-6") Slab Building Ma K - Evaluate Later Prlaary ~ ad Rooa Generator sents Tunnels Stcaa Be lou (Attacb- Hain (see Attach-X~BX t 6 ll Bl Contsinncnt Aux bays B~ttdtn B lldl 6 5 nd 6 Att l Tunnels sent b) Stad:k e nt~2 Snail bore Plplngd S 5 S S S Tublngd and Conduit Sanpllab Systea NA P-Aur bays NA Nh Tubing K balance Ductvork aSIK S Hanging Kquipaent, S NA NA c j uni't heaters ~ lighted coolers ~ Cable Trays NA Tnstrunent Panels and S Racks I Stuctursl Cosdponcnts, partitioned'alls, S S 'I S c.g.d platforusd ceilinged ladders Floor-Nounted Kquip- S NA ~ Cnt ~ e.b.d Pudsta ~ t a 0 ks ~ 1 ITKX C IIRS ~ 11CC s ~ SMGR eS - Ksst of lrnpingeoent Mall C3/12)77/84A/SYPP AGENDA ITEM 818 ITEN: Detailed review and current status of power accession testing procedures and operational procedures. A. Power ascension test procedures including safety-related and nonsafety-related.

1. Number required
2. Number not started
3. Number in preparation and approval process
4. Number approved.

B. Operating procedures required for fuel loading: including station administrative, station operational, surveillance (e.g., maintenance and emergency procedures. technical'pecification),

l. Nuaber required
2. Number not started
3. Number in preparation and approval process 4 Nuoher approved CURRENT STATUS:

See following pages. QUESTION 18A POWER ASCENSION TEST PROCEDURES - STATUS Procedure No. No. Not No, In No. T e Re uired Started Pre /A rov. A roved NSSS-Startup Test Proc.. 126 116 10 BOP-Startup Test 20 20 0 Proc'iping Vib/Therm Expansion Proc. QUESTION 18B OPERATIONAL PROCEDURES STATUS Procedure T e No. Re uired No. Not Started 're No. In /A rov. No. A roved Chem Analysis Procedure 34 29 Ins trument Procedure 20 Counting Rm. Procedure Computer Oper. Procedure Electrical Maint. Procedure 40 40 Electrical P/M Procedure 55 Electrical Surv. Procedure 10 10 Fuel Handling Procedure 15 15 Rx Analysis Procedure 22 22 I g C Surv. Procedure 780 780 Oper Surv. Procedure 225 225 In Service Insp. Procedure 150 150 Administrative Procedure 33 31 Tech. Dept. Procedure ISI 30 28 Startup Admin. Procedure 29 24 QUESTION 18B OPERATIONAL PROCEDURES - cont. Procedure No. No..Not No. In No. T e Re uired Started Pre /A rov. A roved Office Instructions 30 Document Cntrl. Instructions 18 18 Document Cntrl. Computer Proc. Training APNs 17 16 Operating Procedures 100 13 87 Emerg. Oper. Procedures 23 22 Op's Fire Prot. Procedures Emerg. Plan Proc. 14 14 0 Rad. Protection Procedures Rad. Tech. Procedures 55 Equip Oper 5 Calibration Proc. Envir. Proc. 16 Fire Prot. Detection Proc. 58 54 Inst. Maint. Procedure 25 19 Proc. Surv. Procedure QUESTION 18B OPERATIONAL PROCDURES - cont. Procedure No. No ~ Not No. In No. T)' Re uired Started Pre /A rov. A roved Sampling Procedure . 11 Maint. Proc. 135 35 100 Prev. Maint. Procedure 60 55 0'aint. Surv. Procedure 15 13 AGENDA ITEM fig ITEM: Detail ed review and current status of permanent stati on and suppor t staffing, training and licensing.

a. Staffing for Unit 2 operation, including presently employed, projected and authorized for each group reporting to the Vice President Nuclear.
b. Staffing of Nine Mile Point (Unit 2) station organization including presently employed or contracted, projected, and authorized for each organizational subgroup.

C. Training progr'am: outstanding training courses required prior to fuel load; identifying job titles, numbers of personnel, and projected compl eti on.

d. Operator and senior operator licenses presently onsite, contracted, projected, and required for fuel loading.

CURRENT STATUS: See following pages. Nuclear Engineering and Licensinq - Staffing for Unit 2 operation, including presently aaployed, projected and authorized. Presently there are approximately ninety (90) full-tine engineers employed by Niagara mohawk that are assigned to the design, licensing construction and start up of Nine Mile Point Unit 2. As the need for this support tapers off, nest of these engineers will be transferred to the Engineering Departnant or Operations Department for permanent responsibilities in support of Unit 2 operation. A comprehensive 10 year plan has also been developed for expanding the Nuclear Engineering and Licensing Department staff for Unit 2 operation support. The plan is to build up our in-house engineering staff to support 30 percent of the Unit 2 project m>rkload by 1988 and 50 percent by 1993. This plan is approved by Niagara Mohawk top manage nt. The capability of the Engineerinq staff for Unit 2 operation will mver the full spectrum of disciplines including licensing, fuels, operations assessment, scheduling, cost control, project manage>rent, health physics and senior engineering specialists of various disciplines. A substantial design group is also planned and will include multi&isciplined groups of engineers, designers and drafting technicians. As in the past, Niagara Mohawk will continue the use of outside consultants and architect/engineering firms to supplement the in-house staff as r~ed to support Unit 2 operations. NULLIAk t.L'IIAIIOH ~IATIOH'- SIAIUS As of VClvltk I954 ~AU. SVIAIStcktfakf XI DCDEÃI tktcLEAR ACttINISTMIIVEASSISIANI AtttlNISTMTIVEASSISTANT VXII ll St, fkos, Ottll I SiiliCN Utilltti~1 i(Q~ICAL SV t(AIXIIttDINI 5utik IXTDODtf( I ) ( 5) Dti$111/IADIAIION ICI 5 I1C V Nil DtANCE flkIXIDODtf(5) ( I ) ~ Suffk I (5) SutIRIXIDIDII NANACEXDtf(I) IN INC ICC(l) (5) VtlRIXIDtDDtf ll Otlf Sfillok I SV tlR INlfXDISI Sift SutlRTISCR Suttk CNOtlsfkl UNIT SUTV kaXRD CNNICAL sires(l)($ aivtINIsfsafivt save())s MDIATION lkOI(l) I INXACEXIXT(2)~ e ~ I 2 SutlkVISCR surllvilok(l) I Lissf survk sutt Iksfk. Si'IE ELECIklcaL CLIRIS (24) sf surf (S) SUTIRVISOR tLNATI~ etc(I) i I AXD NaIIOL(s SRVCI(2)(5) cvtfcaf O)(5) iNI surf(I)(s) I 24 TRAINIIC tate(Ih rlkaf toks(I) I ~lf 0 Sltrt CXOI(2)eee Sot t ELECl NAINI(2)eee I SurIR VISOR TMikitC NVC(f)4 ~ ' ASSI 10 svrva orck(l)i il SVW IIC (2) TECH StEC CNIX (l) 0 A5$1 TO ~ e~ assf UNII 2 (1k 1 1 SUIT ELECT ttAIÃf DCINta(2) ~ -I asst sUwk IRAINuC NUC(24)l) QUWR kAD Nasl~ Orfk(I) I tttVR Otlkl(l) I sufr/t ill(l)"e RAD(lieee 2 4551 survR fMINIIC a A551 SUITE 1 I tlECT NAINI(2)eee 2 5ttCIALIST(5)($) MD Uisft Ot(l) I sures RAIAASIL IXSI 4 Ctsti(I)i CI2XXS(4S) (5) TECH StEC RAD (l)eo 5 tlkailcas(l) I ) 'xNplkalck($ 41 tLECI11C IAXI(54)(5) SVWRVISIR SI sutVR ECtotICIAtts (44) 12 5 DktLASR(l)e ortRATIONS(2)2 44 I assi sutvk kalatasf IAC ILCR(t4)($) IatotltC COOkDINAIIR(I)~ Surf RADIOIOCICAL 511E NECNAN ICAL ~ATION SHIIT olilaiioNS(i) 0 45 I surPT (1)(s)I INT Sufi(5) I Urtknsca(T) T tottk ASCIR5 AS51 satlk I SltfkV LctstiCAL ASSI tIAIOIIC I DtIRCDtcf ~ SVIV HECH HA(HI(2)~ ee 1551 ~INEERS (1) ~ ASS I START OIIMIICNS(2) 2 urtokf (i)(s) COOkDINATCR(2)e LAXNIIC COOk(l)(5) I I (cs co.) Ia sN SUTT(O) I SIAIIOt Skill assf suw. (s) Eknct IXsrtcnkk ASST Dtlk XECH NAIXI IRATORS(kt) utlRvisok\o)1 '1ECN '5'UIICkl(l) ulIRINIDIDDtf (I)ei tiiÃkllC COCO ( I ) (5) 0 DCINEI(I)($) I 1t I I 4551 $ 141 ION SLNIOI ILCN UNIT SUtu Dttit(SUNXTAL 51 SutVR sutIRVISCR Skill SUTVR(10) 5 A$5 I ST attf (4) (5) I l lsl (1)e 0 OfttlION COI(l)(5)I NECN NLIHI(4)lee 5 liNC(l) I CRS(54) g LcttklCAL llkVICE islf ~ Dtro~ f501 ttaINT tttck(t T)(s) I 1151 10 ASSIS'IAXI())(5) iÃSt. Sttoe()NS) (1)(S) 0 1't COORDINAICI(I) I I TEST JVNiok 1ICX SUWR IIRE IXEIRT COUR Of($ ) JAN IIORS 01) (5) io I INECRS(li) ASSISTAXI(4)aelee mtcTIDN())(s) 22 4 I surtRVISOR tLQWIM I DC Itttik (5) $1 SVTVR ST DOS CoekD(i)(S) IDOL SCNEINLIIC(I ) I COOt SfutD'l(2) 2 litt tkof(2)ee 1 CUSTODIAN(l)(5) asst surv ltaxaitc I I SCNEtktLIIC( I) Sutta ttk 4 CtkttSTIR NAIA(INS)I lilt 2 le lCNftRS (54) ~tikaftaf tkmtnitkt coca(i)(s) UIILllT I AND Ttcktt ICAL $2 ICS(4)(5) I Elec 4 A55T TESTIIC(1)1 ASSI Sutta kiDloiOC ICAL AISICXED 10 CIAkfur okcANBlfiok CCNtt 0 4 N(I)(5) INCIREIR(1)(S) I 0 SN ILOt CXRD(I)(5) ASSI (1)(5) 5 I I LAN ASSI TECN STEC A!AM/)($) cvttt oriao)(s) (4) Xeaaev Ia teceatkeei ~ aeaeeee I Cecveec Aecllocleea teelcleea 'ILOI ASSI ~ N~F aaC Ia feteaAeefa aeaetee Luttt Halll($)($ ) Cecveat Stall 5 ICXtti c(4 ) (5 ) 4 su I)N v Isok AXALV$ 1(i) 1 UNll SVW Itacfok AXALTST (I) e'e I I~ICIASS($)($ ) ~ o CDt. Dsk ( ) (5 ) f 5 Slee I ~ a ktu Call I ~e Ct Tall 1 ~ ee e I aerate I fetran 2 I I. SUPIXIHTENDIHT - NUCLEAR PROJECIGI hs QF'12/ SKCRKIAMT ADHIHISIRAT1VKASSISIAMT ADHINISIRAIIVEASSISTANT UNIT II St tROS IIK HAINIENANCE SUPBLIMTBeBLT (5) SUPIXINIBeBIT UNIT 11 sTATloN UNIT I SIAIICH TEQDLICAL SUPERINTENDENI(1)(5) QLBLISIRT/RADIATIOMHCI 5 utxall TEMDBLI(s)(I) RECND HANACBLBLT(1) IMINC HUC(1)(5) SUtlRINIIMDBIT Su FIXIMILMDINI SUtlRINIINDBLI ASSOC CINo SUPIXINTENDEMI SITE SUFKRVISN SUPVR CNBLISIRY UNIT SUPT RECORD HISIRATIVE SRVC(1)5 6 RADIAIION PROT(l) BLBLT(2)aaa IJLCIMIAR(I) ICAL SRVCS(1) (5 I IHSIR SITE ELECIR ICAL CLIRS(44) A551 SUPt (5) 5UFIRVISO k SUtlXV1SCR sutlkvlsoa(l) ASST SutVR SUPV PIRAIIORS NC(l) IILSI AND CONTROL($ AIMLIN SRVCS(2) (5) suttoaT (1)(s) IMI SUPI(1)(5) IRAINIMC NUC(1) fBLAT I DMS(1) TECH SPEC IHSIX SUIV. ELECT SUPIXVISOR ASSI TO sup poaI (I ) Hhl NI(2)a a a IRAIMINC Huc(I) sutva OPER(I) -UNIT SUPT QIBL(2)aaa EUCT NAINI ASST SUPVR SUPVl RAD BIG IHEIR(2) a a a IRAININC NUC(19) HASTE OPIX(1) NIT SUPV IIC (2) TECH )PEC CHBL (2)a a~a ASST SUPVR 12AINIHC ASST SUPVR KLICT HAINT(2)aaa PKCIPJIST(7)(s). khD MASTF Ot(1) ASSI IO ASST UM11 UNIT SUPV sutVR OPIXS(I) uPVa ICC(3)aaa RAD(2)a'a - EUXIRICIAMS(lb)(5) SQPIXVISN ST SUPVR SBLUIAIN(l)a OPIXATI DMS (2 ) SQPVR RAIALASIE INST 6 COMI(1) CLBLRS (39) (5) TECH SPEC RAD (1)a luis SITE HECHANICAL QTILln MECHANICS STATION SHIFT PIRAIIOMS(1) IMAIN(5) I UPIRVISN(9) TECHNlchLMS (63) HAINI SUPI(S) (3) SUPV RADIOLOCI CA L SUI'V ILECH HAI'LI(2)aaa ASSISTANT Assi SUPVR RADMASI AC TECH(54)(5) IAMM]HC COORDINATOR(1) ~ suppoaI (l)(s) 5TA 5H supv(9) OPIXAIINS(1) AsSI Supva Otlkhl (2) SUPRV TEQLMICAL UPPORI(1)(s) I ASSI I COORD PIAMH INC HAIOR (2) a IAMNINC COOR(l ) (5) MECH HAINI BLCINElk(1)(SL OPERATORS(bl) ASST DIER ASSI SUPVR SQPBLVISOk Slhllua SMIF1 ASSI SUPV (5) IMSBLVICK 1HSFKCIIOR ISIIMC(1) I UFIXVISN(b) TECH SUPFCRT(2) SUPERINTENDENT(I)a PIAHN INC COOl(1) (5) HELM HAINI(6)3a3aa I Hh:JIT HKQL(106) (5) TEST ASSI SIAI loh SKNIN IML UMII SUPV BLVIROMNENTAL IMATN(l) SNIFT sutta(10) AS S 151ANI (6) (5) lsl (2)aa OIECIIOH Cool(1)(5) I T OPIRAINS(56) IKCILMICAL 1NSERVICE ASST. INV PROT -JANIIORS(11) (S) ISCIMF ERS(33) A55151AMI(3)(5) IHst. stlc.(3)(s) COORD (1)(5) I SUPBLVISOR 'PIAMNIHC JUNIOR IML Sutvk FIRE SINEIRT COOK (1)(S) TOOL ASSISIAHI(6)ha2aa OIECTION(1) (5) CUSIODIAH(1)(5) 5CPFDULIM (I) I ASST DOS COND(1)(5) ILxn I ASSI SUPV PIAHMINC ENGINEER (5) ASSI SUPVR AHD 5CHEDULINC(1) I COOP - SIUDBLI(3) PIRE PROT(2)aaa HBTIANlcsOI)(s) I TECIQIICAL l SUPVR COLLPUIIX FIREF ICUT BLS RESPIRAIORV I ST TESTING(3) OPBL 6 HAIHI(1)(S) 21>> 2)aa PROTECTION CON(1)($ ) L ASST SUPL2 RADIOIOCICAL ASSICHKD TO STARIUt ORGAN IIATION COMP 0 4 IL(1)(5) Jr Can Enbr BLCIMKIX(1)(5) 1 Sa TECH COUR D(1) (5 ) hssI (3)(s) TECH ASST SPEC Alhlh(2)(S) COMP OPIX(I)($) TLCN ASSI COMP HAIMI(i)(5) IKCHMIC IALLS(10)(5 ) SUPERVISOR ax AMALISI(I) UMll SUPV llhCIOl 5 Sita AMALVSI (2) a ~ ~ ~ kW L'nlL I ~ WnLL TKQLNIChLLLS(IO) (5 ) ~ aa n I nL L'nlL I 2 ~L L'nil 2 Jk CBL. MXo (2)(S) 0 NUCLIAK I.L (TALION ~LILT(ON STALUS AS Or VCIOILR Ills ~mu. svrnlvloeaa - WCLIAR SICRKTAAY AIYILNLSLRATLYKlSSISTNa NIILNLSTRATLYCASSISTNa UNIT ll St, rsos. VNII I SlllLIW I(Q~LCAL sutnuaBeDa(L)(s) 511K Nil nANCK SutIRI (5) SutnLNIDOOa VNLT 11 5fifION VtLRLNltnIAL SY ILRLNLBlDLLa OIL$11T/RADIATION NCT utl1 LNT BIDDa($ ) ( I ) ~ NANACSIDa (I) LNLNc wc(l)(s) UrnuaDeDa A5$OC CIR. SUtLRLNLBOLIL 5IIK SUtERYISCR SutYR CNLNLSLIT UNIT sutv EWART LNCLMLR(L)I QNILCAL strcs(L)($ ALSILNISTRATLYC SRYCtf)$ RADIATION IQa(l) I INMCtNnf (I)sos I SutLRVLQR surclflsol(l) I LASST svrrs surf INSLR. SITC ELECTRICAL CLncs(25) ST sutT (5) Surnfl501 ~ IAAIL~ Wc(l) I I AIO (OSIIOL($ SRTCS(2) (5) suttORT 0)(5) LNI Sufi(l)($ ) I TRAINLDC WC(l)L tlRATLONS(l) I 0 ~LT Sutr QIDI(2)sss Sutr. KLKCI SUtLRTISOI os ~ ASSI 10 I HllNT(2)sss I TRALNLNC Wc(f)S svrrl orn(I)L IT Surf LLC (I) TMI StCC CNLN (l)so 2 ELECT NAINT ASST SUTYR QurrR RAD BCLNtn(2)sss I TRAINLNC WC(ll)IL 1[ Ott1(1) I NA$ A5$1 10 Asst Dull UNIT 5utT vtVA OYICS(I) I SVtrl Ill(1)sss ~ AD(2Isss 2 l5$ f SutYR TRAINLNC Asst SVTYR 5VtVR RALSASLL tLRAILSOS(L) l LNSI l I CNI(1)l pOOkPLMLIR($) 'LLRIS(49)(S) ~ )rtc ~ (l)so ELECT Nllvf (I) ~ ss ELECTRICIANS(IA)(5) I StCCIALLST(5) (5) SvtnYLSIR 5 RAD VASIC Ot(1) SI Sutrl I (AS) sLNULATIN(1)~ OtnATLONS(2)2 t KCNNLCIANS 11 sl I ~ 5'Sl 5VIYA RAS4$ 1 LLC ltcv(LI)($) LAIOILNC CXNDLMTIRtl)s I sutf RADLOIOCLCAL SLTK NKQIANICAL ~ATION SNLIT otnAILONS(L) o SY surpf (l)ts)L LNT SUtl($ ) I Vtnftea(f ) 5 tovn AscINsl S1 $ 5tls SUINV TIQNLCAL= $1 tLANNLNC BIERCINCY .Qltf NtCN Nllla(2)sss 15$ 1 SWLNCCRS (5) ~ ASS LsfiNI otLAAILCNS(2) I uttcaf(l)($ ) COCRDLNAT(R(2) ~ 2 LANNLNC COOR(l)($ ) I I (cs co.) TA SN Surf(0)0 I STALLON SNLLI ASSI SVI Y. (5) 11TLCE LNstCCTLn ASST Oln HEQI NANt IRATORS(52) UIIRYLSOIt 0) A551 SIAIION I 1CQI SUIICRL(l) SLNLOI ILCR I rnlNTTXDDa(L)sl VNLT Surf tlANNLIC COOI(l) (5) 0 nctvtn(L)(s) I ST sutYR r- SV tLR TLSCR 15 I SRLII SurYR(to) 0 ASS I5IANL(l)($ ) Isl (l)s 0 IROTKCTICN CXR(L)(S) I NCCN villa(4)1 5 5 I TLNC(l) I 2 (54) )LCIOILCAL  ! LxsnrlcE ASST le tKOT NAINT NCCN(ft)(5) I TtsI 50 A$51$ 1ANL())(5) LNlt. STEC. ())(5) (LNS) 0 lt I CXRDLMTCR(l) I I TCST JIDILOR ILLN SUIIR tLRR ~ LNCLRY CXR O~($ ) JANITORS(tl) (5) I I LNCCRS(13) ASSLSTANL($)4<<ls ~ OTKCTLON($) (5) 10 11 I sutEIVIIOR ttANNLW SQICWLLW(I) I KWINLLA (5) $ 1 SUTYR Sf DOS CXRD(()(5) TOOL I Coot KIND;L(s) I IIRK TROT(2)sso I Cvsfoollv(1)($ ) Assf surV tLANILNC l I I AND SCNKVULINC(L) cclrsfts L$EIICNTns I rn i NALLY(L)(s)I su tvR (SL) RsstLAATINT UILLLTT 2I 52 tROTCCILON COOK(l ) (5) lcs(l) (5) I TCCNNICAL Ilss ASSI Sutrs L ASST 1CSILIC(3)1 l CNIt 0 IXL)($) LOLOCLClL KNCLRKLR(l)($) I AsslcvcD To sfiRIUr oscNIl&flov 0 SR ILCN CXRD(1) (5) Assi (1)(l) 5 I I LAN ASS'I TCCN SICC ALARAg)($) CVNt Ottl(L)($) (I) Noossr lo rsrsorosolo Asoorss I corrsor Aervor Loci tools loss ILQI ASSL Nm4r oot lo Dsroothoots Aosorss I.VNt NALSI(g)(5) Cerrooc 5soll TICÃILCIS S(4)($ ) sutlxflsoa ANALYS I(l) I VNII Qlfr IIACIOR ANlLTST (I) srs I TLCWLCIASSI))($ ) CLN. BVR. (f)($ ) 5 <<siss I ~ <<DV folr I ~s <<gvtolr I soo <<) or I'slr I 2 sr r<<II I 4). SUPHtINTBefsf - NUCLEAR IRQJECIED AS Qf 32/ SECREIARZ ADMINISTRATIVEASSISTANT ADttINISIRAIIVEASSISTANT UNIT 11 $ P PROS UNIT I SIAIICN TECHNICAL SUPBtIHIKNDEHIO)(S) SITE MAINTENANCE OPER II'TENDENI($) (I ) SUPIRINTBeBtT (s) SUPIRINIBeB{T UH 11 ll STATION Su PKRBtl IHDIÃl SUNR IIIIEHDBII CHEM{STET/RADIATIONMCI RECORD MANACBtB{I(I) IHIHc Nuc(I)(s) s UPBt INIENDBII ASSOC CENo SUPIRIHTBeENI SITE SUPERVIStlt SUPVR CHEMISTRT UNIT SUPT kECQRD ~BtLIRO) ICAL SRVCSO) (5 NISIkhTIVE SRVCO)$ 6 RADIAIION PROTO) BIBIT(1)aaa I SUtARVISCR SUPER VISOR O) ASST SUPVR SUPV INSTR SIIE ELECIRICAL C{JRKS(44) hssT supr (s) SUPIRVISO k PIHAIIQRS WC(1) LN51 AND CNQROL(5 ADMIN saves(2) (s) SUPPORT (1)(s) INI SUPI(1)(5) TRAININC NUCO) fIRAII OSS (I) TKCJ SPEC INSIR SU{ V. ELECT supEkv1$ 0R ASSI To suttoaI O) MA HEIR(2 INI(2) aaa IRAININC HUC(I) sutva QPIR(I) UNIT SUPV CHEM(2)a<< ELfCT MAINT AssT sutvk SUPVR kAD BIGI )a a a IRAIHIHC Nuc(19) HASTE Otsk(1) HIT SUPT 14C (1 TECll JPEC CHIN (1)a ASST SUPVR TRAIN INC ASST SUPVR ELPCT MAINT(2)aaa PKCIIJJST(f)($ ) RAD Nhsff Ot(1) ASSI 10 supYR oplas(1) ASST UNIT upva Itc(3)'<< RAD(2) a" UNIT SUPT ELIXIRI CIANS (48) (S) SUPERVIQR ST SUPVR SmUUI{a{I)a OP{RATIONS(2) SUPVk RAIAthslk INST 6 CONIO) ($ 9)(5) TECH SPEC RAD (I)' tlahl IONS O ) IHAIOI($) SIIE NECHANICAL QTILITT INCHLNICS STATION SHIIT TECHNICIANS (6$ ) MAIHI sutI(s) (3) UPIRVISOR(9) ASSI SUPVR RADHASI 6C TECH($ 4)(S) UNNINC COORDINAI{N{I)a . SUPV RADIOIDCIchl. SUPV HECH MAI'tT(2)aaa ASSISTANT OPIRAIIOHS(1) suppORT (l)(s) SIA SH SUPV(9) ASST SUPVR SUPRV TECHNICAL ASSI PUNNING Bt INC ENCT ltECH MAINI DPI%hicks {02) OPIRAIIONS(2) UtPORI(l ) (5) COORDINATOR(2) a UNHINC COOK(l)($) KNC I NEER(1) (5 > Slhl ltta Sltlfl ASSI SUPV. (5) IHSERVICE INSPECTION ASST BIER PSST SUPVR SUPERVISok l UPIRVLSOR(a) TECH SUPP{HI(2) SUPERINTENDENT(I)a PUNNING CO(R{I){5) ME{M MAINT(6)3 3aa IINC(') ASSI Slhl iota SENIOR ILCN UNIT SUPV BtVIRONMENIAL Mh:JIT MECH(106) (5) IEST SNIPT SUPVR(10) ASSISTANT(4) (S) ISI (1)aa OIECTION COOK{1){S) IMARI(i) -0 PIRAItIS (34) TKCHNlCAL INSBtVICE ASST BIV. PROT -JANITORS(II)(5) T ASSISTANT {3)(5) INSPo SPEC {3)(S) COCRD {1)($) ENCI NEER 5(33 ) JUNIOR TEOt SUPVR fIRE SIHEIRT Cook O)($ ) TOOL SUPERVISOR tlhNNINC ASSISTANT(6)4alaa OIECTION(1)(S) CUSTODIAN(1) (5) SCHIDULIN",(I) I EHC INK{a (5) hssI supvR hssT Dos cooaD(1)(s) ILITT I lssT supv plhlotINO coot SIUDBa(3) AIRE PROT(2)aaa NEtlllNICS(11)(5) AND SCHKDULINC(1 ) I I supva CQMpuIIR PIREfICHTERS RES PIRAIORT I TEOQII CAL OPBt 6 MAIHIO)(s) 27a 1laa PROIKCTION COORO){$ ) L ST TKSTINC(3) AssT sutta khDIOLOCICAL ASSIGNED TO SIARIUt QkCANIZATION COMP 0 4 ltO)($ ) -Jr Can anal BICINEIR(I)(5) 1 , Sa TEOl cocao(1) (s) Assi (3)(s) TLCN ASSI IECN StEC AURA(1){s) CQMP QPIAO)(s) TLCM ASSI CNtP MAINIO)($) 'IKCMNICIAXSOO)(S ) SUPBtVISOR RR ANALTSI{I ) UNIT SUPV RIACIOR ANALVSI O) aaa 5 5lta I ~ S.tt t'nit TKCNNICIANSOO)($ ) ~a ~ kit t'ntt 5 aa ~ ~ I it t'nit I JR CEN. IWR {2)(S) 2 it I'ntt 2 i QUESTION 19C TRAINING PROGRAMS RE UIRED FOR FUEL LOAD

1. Reactor Operator/Senior Reactor Operator Licensing Program See Question 19d.

2, General Employee Training General Employee Training (GET) will be conducted for all site personnel when the Site Security Plan (extension of 9MPN1) is implemented. The date of implementation is not yet determined. GET will be conducted for those personnel with access to nuclear fuel when it is delivered to the Site (mid 1985) .

3. Fuel Handling Training
a. Training in fuel receipt, inspection and storage will be conducted for Maintenance mechanics (approximately 20) and Radiation Protection technicians (approximately 10) prior to receipt of nuclear fuel.
b. Training in in-core detector installation and maintenance will be conducted for Instrument and Control technicians (approximately 35) . The schedule for this training is not yet determined.

C. Training in fuel handling and loading will be conducted for Operations personnel as part of the licensed operator training program.

4. Fire Protection Training The Fire Protection training program commenced in August 1984 and will continue to April 1985. This program is being conducted for 27 nuclear fire-fighters, and includes all aspects of 9MP2 commitments to Appendix R training requirements.

QUESTION 19 ~ 0 CURRENTLY SCHEOUL[-0 COLO LI~E:l~E CLAS4ES CLASS I J A>4UAR Y 1 985 REACTOR OPERATOR Sl= 4 [OR OPERAl 3R AA 1 ~ [3 R I CHAR 08 CS:3 I~ A A40ER iEN SSS 2 ~ l4 GAkPuS C S'3 2~ COLO&',.3 SSS h >' 3 ~ J BURR CS'3 3~ JONES OS 4 ~ k GR++ CSJ 4~ J HELKFR ASSS J ST R ~VRRAY C S.3 5~ J KIBBE SSS 'h h 6 ~ 0 ~ K [nlNc'Y C,SU 6~ DEGRAC I 4 SSS > X AN AL AJ 7 ~ F CONA>>AY CSQ 7 ~ J CON@/AY 8 ~ 4 W I TH R='LL CS!3 H BARRET TECSER h AJ 9 ~ J h<CANQ+EW AQ4 9~ W 03+>>S TECSER 10 M CHV[e [LLA AOE 10 G WE[MFR T.RA [ 4 I1 R BERGE>4S TOCK AOE 11 J KALINSK I TRAIN 12 R BI GELQ>> AOE 12 0 W I LSON ASSS CLASS 2 JU'lE 1995 REAC TOR OPERATOR SEN I OR OPERA l OR 1 ~ R SPOO4ER AOE 1 ~ F TOWNSEND SSS 2 ~ 0 NF W<A4 AOE 2 ~ G FOYER SSS 3 ~ c DAY I 3 AOU 3 ~ R GA YNE AOS 4 ~ R iSVLLQCK AOF 4 ~ 0 T )PLEY SSS 5 ~ 0 LO'4[3 E R AQE 5 ~ 8 9QUCIER 'SSS 6~ HOLT AQE J3 ~ A QENNY ASSS 7 ~ B TE SOR I ERQ A Oi=. 7 ~ G SANFORD ASSS 9~ CA:e SON QOc ~ ~ G CQRBIV TRAIN 9~ CONW 4 Y A Oi= 9 ~ 0 FITCH TRA IN 10 J GP AFr AQE 1 0 < >3QQLE Y TRAIN 11 J LA +E~f NC.= AOB 11 H COLL[>4S TRA IN 12 'JOVTFLL AOE 12 R SMITH RXAN A CLASS 3 - NQV'. v REie 1 9[35 REACT-R '~F:WATOW SE NI QR '3PE kA TOR 1 ~ G Pl TT3 AC[3 1 ~ W OAVEY SSS h h 2 ~ 0 RA TH'RUN AOE 2 ~ J MA NCUSi3 ATOS J ~ S DAVIS AOE .3 ~ J PQI NQF XTER SSS AQS AJ 4 ~ W WAMOSG AN 'h ~ 0 CAR ON ASSS 6~ G RANALLI ASSS 7~ E GE i40V A ASSS de K EQLLI TSCH TRAI 4 9~ W PI CC IRILLI ASSS CURR=NT RO L ICENSt-NMP UNI T 1 CURRENT SRO LICENSE'-N4P Ut'll T 4'RO I CERT IF CATI ON GE 3WR < IN I <U'V. > -QV I REO L ICENSES FQR FUEL LOAO 5 SH IFT RQTAT I ON RO 10 SRO 1 1 AGENDA ITEM 820 ITEM: Detailed review and current status of work to be performed in response to the CAT audit concerns (include actions in response to ORDER). CURRENT STATUS: See following pages. NRC Caseload Forecast A enda Item 820 - CAT Audit I. Action Plans - Licensee 7 A. All Action Plans (i.e. Corrective/Preventive Action) completed including:

1. Specific Action Plans (NRC Identified Items)
2. Generic Action Plans (NMPC/SWEC Management)
3. Response Commitments
4. Verifications
a. NM QA
b. NM NCV B. Closure
1. Preparation of Documentation Packages to support NRC CAT Report Item breakdown.

a., 120 issues being tracked by NRC

b. 97 packages in preliminary form
c. Work remaining
1. Review/complete packages
2. Evaluation and verification as required.
2. Submitted to NRC Resident Inspector for review and closure.

II. Actions in Response to Order A. (MAC) Independent Assessment

1. Three interim phase reports issued.
a. Phase I - CAT audit findings
b. Phase II - SALP Report findings
c. Phase III - NMPC findings
2. Final report due on or before 12/18/84.
a. Complete assessment of each phase including Phase IV-Contractor findings
b. Sumary and Conclusions to tie the four phases together.
3. Assessment Ratings/Status
a. Satisfactory - item complete, no further activity required.
b. Satisfactory with Recommendations - item complete with recommendations for more effective courses of action.

c.. Unsatisfactory - item incomplete or corrective action ineffective, and a deficiency document issued.

d. Status Total
  • Reviewed to date Sat Sat w Rec. Unset Phase I 66/59 38 17 15 6 Phase II Viol. 28 25 19 CDR 61 13 12 0 Phase III 216/200 169 125 40 4

<<Actual total/number to be reviewed - Certain items in the "actual total" may be non-safety related, duplicated by or combined with another item and will not be reviewed.

4. NMPC activity required.
a. Respond to recommendations made
b. Track resolution of deficiency documents (issued based on Unsatisfactory ratings) c.'ncorporate results of a) and b) in Documentation packages as appropriate for presentation to NRC Resident Inspector (Phase I and II only)
5. Follow up on areas where sampling failed,;

X B. gual ity Construction Performance Monitoring

1. PG 91 drafted "guality Performance Management Program Implementation"
2. Program implemented
3. Process ongoing C. Independent Third Party Appraisal - Future

'