ML18149A148: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261
{{#Wiki_filter:.e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWABT.
* W. L. STEWABT.
VxcB PRESIDENT                      May 2, 1986 NucLEAR  OPERATIONS Dr. J. Nelson Grace                                  Serial No. 86-246 Regional Administrator                              NO/WDC Region II                                            Docket Nos. 50-280 U.S. Nuclear Regulatory Commission                                50-281 Suite 2900                                          License Nos. DPR-32 101 Marietta St., N.W.                                            DPR-37 Atlanta, Georgia 30323
VxcB PRESIDENT                      May 2, 1986 NucLEAR  OPERATIONS Dr. J. Nelson Grace                                  Serial No. 86-246 Regional Administrator                              NO/WDC Region II                                            Docket Nos. 50-280 U.S. Nuclear Regulatory Commission                                50-281 Suite 2900                                          License Nos. DPR-32 101 Marietta St., N.W.                                            DPR-37 Atlanta, Georgia 30323


==Dear Dr. Grace:==
==Dear Dr. Grace:==
* VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 REVISIONS TO EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), revisions to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures are submitted.
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 REVISIONS TO EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), revisions to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures are submitted.
These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).
These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).
Enclosures cc:    Document Control Desk (2)
Enclosures cc:    Document Control Desk (2)

Latest revision as of 00:17, 3 February 2020

Forwards Revised App 3 to Emergency Plan & Revs to Emergency Plan Implementing Procedures,Including Rev 16 to EPIP-3.01 Re Callout of Emergency Response Personnel & Rev 3 to EPIP-3.03 Re Activation of Operational Support Ctr
ML18149A148
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/02/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18130A419 List:
References
86-246, NUDOCS 8605080145
Download: ML18149A148 (1)


Text

.e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWABT.

VxcB PRESIDENT May 2, 1986 NucLEAR OPERATIONS Dr. J. Nelson Grace Serial No.86-246 Regional Administrator NO/WDC Region II Docket Nos. 50-280 U.S. Nuclear Regulatory Commission 50-281 Suite 2900 License Nos. DPR-32 101 Marietta St., N.W. DPR-37 Atlanta, Georgia 30323

Dear Dr. Grace:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 REVISIONS TO EMERGENCY PLAN AND EMERGENCY PLAN IMPLEMENTING PROCEDURES Pursuant to 10 CFR 50.54(q), revisions to the Surry Power Station Emergency Plan and Emergency Plan Implementing Procedures are submitted.

These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).

Enclosures cc: Document Control Desk (2)

Mr. Lester S. Rubenstein, Director - w/o enclosures PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Chandu P. Patel - w/o enclosures NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A NRC Senior Resident Inspector - w/o enclosures Surry Power Station r aoosoeo145

~DR ADOCK gt8&8~ao PDR

\

. I I

i