ML19318A132: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:- _ _ . _ _    __  _ _ _                                                              _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:- _ _ . _ _    __  _ _ _                                                              _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
Georgia Power Compt.ny Post Office Box 442 Baxley. Georgia 31513 Telephone 912367 7781 912 537-9444 Edwin 1. Hatch Nucteer Plant                                                                              Georgia Power the southem electnc system June 10, 1980 PM-80-592 PLANT E. I. HATCH NRC Monthly Operating Report-Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.            20555
            --
* Georgia Power Compt.ny Post Office Box 442 Baxley. Georgia 31513 Telephone 912367 7781 912 537-9444
                                                      -
Edwin 1. Hatch Nucteer Plant                                                                              Georgia Power the southem electnc system June 10, 1980 PM-80-592 PLANT E. I. HATCH NRC Monthly Operating Report-Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.            20555


==Dear Sir:==
==Dear Sir:==


Per Tech Specs section            6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit          2,  Docket #50-366.
Per Tech Specs section            6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit          2,  Docket #50-366.
                                                                            ,
                                                                                  , - --
[MMi.' //90 Manry : ?d                                y ,)'
[MMi.' //90 Manry : ?d                                y ,)'
Plant Manager CLC/pebe
Plant Manager CLC/pebe

Latest revision as of 06:34, 1 February 2020

Forwards Monthly Operating Rept for May 1980
ML19318A132
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 06/10/1980
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19318A133 List:
References
PM-80-592, NUDOCS 8006180494
Download: ML19318A132 (1)


Text

- _ _ . _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Georgia Power Compt.ny Post Office Box 442 Baxley. Georgia 31513 Telephone 912367 7781 912 537-9444 Edwin 1. Hatch Nucteer Plant Georgia Power the southem electnc system June 10, 1980 PM-80-592 PLANT E. I. HATCH NRC Monthly Operating Report-Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.

[MMi.' //90 Manry : ?d y ,)'

Plant Manager CLC/pebe

[k%

\

8-e1.o y,