{{#Wiki_filter:y                  _
{{#Wiki_filter:y                  _
                                                                    '
:
                                                         -e C      Duke 1%uer Cornpany                                                    II<t B Tbs ~
                                                         -e C      Duke 1%uer Cornpany                                                    II<t B Tbs ~
              * *
           .- e        PO tht.Ul98 '                                          ,              ilce hcsident Charlotte, N C 28242                                                  hutlear1% duction (704)373 4531 DUKEPOWER g                  November 15, 1989 l
        *
           .- e        PO tht.Ul98 '                                          ,              ilce hcsident Charlotte, N C 28242                                                  hutlear1% duction (704)373 4531
                                                                                                                  '
DUKEPOWER g                  November 15, 1989 l
                        ,
     ~'
     ~'
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk F                  Washington, D.C. 20555                                                                        .
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk F                  Washington, D.C. 20555                                                                        .
                                                                                                                 'l
                                                                                                                 'l
                  -


==Subject:==
==Subject:==
Line 36: Line 28:
In accordance with Section 6.9.1.') of the Catawba Nuclear Station Technical                  ;
In accordance with Section 6.9.1.') of the Catawba Nuclear Station Technical                  ;
Specifications, please find attached the twelfth qur.rterly update to the                    ,
Specifications, please find attached the twelfth qur.rterly update to the                    ,
                                                                                                                  '
  '
Unit 2 Startup Report. As indicated in my August 15, 1989 letter to NRC, one test is not complete. Additional quarterly updates to the Startup                        i Report will be submitted as required by Technical Specifications.
Unit 2 Startup Report. As indicated in my August 15, 1989 letter to NRC, one test is not complete. Additional quarterly updates to the Startup                        i Report will be submitted as required by Technical Specifications.
Very truly yours,                                                                            :
Very truly yours,                                                                            :
Line 44: Line 34:
                                                                                                                 .[
                                                                                                                 .[
o                    Hal B. Tucker                                                                                !
o                    Hal B. Tucker                                                                                !
.
hHH-6/lcs                                                                                    <
hHH-6/lcs                                                                                    <
p                                                                                                                ,
p                                                                                                                ,
                                                                                                                  ,
!-                  Attachment xc:      Mr. S. D. Ebneter Regional Administrator, RII U. S. Nuclear Regulatory Commission c-                            101 Marietta Street, NW, Suite 2900                                                >
!-                  Attachment xc:      Mr. S. D. Ebneter Regional Administrator, RII U. S. Nuclear Regulatory Commission c-                            101 Marietta Street, NW, Suite 2900                                                >
Atlanta, Georgia 30301 3
Atlanta, Georgia 30301 3
Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station s
Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station s
                                                                                                                  ,
x 8911220033 691115            4                                                      [(1 DR        ADOCK 0500                                                            /
x 8911220033 691115            4                                                      [(1 DR        ADOCK 0500                                                            /
w    u
w    u


1
1 I
              '
i
I
,  <
* i
  ,, , . ' -            '
                                                                                                                                         .]
                                                                                                                                         .]
i STARTUP REPORT QUARTERLY UPDATE                                                                              )
i STARTUP REPORT QUARTERLY UPDATE                                                                              )
Line 66: Line 49:
TESTING COMPLETED DURING OUARTER d
TESTING COMPLETED DURING OUARTER d
None.                                                                                                                      ;
None.                                                                                                                      ;
i
i STATUS OF TESTING'NOT COMPLETE STEADY STATE PIPING SYSTEMS OPERATIONAL VIBRATION                                                                          ;
                                                                                                                                          '
STATUS OF TESTING'NOT COMPLETE
.
STEADY STATE PIPING SYSTEMS OPERATIONAL VIBRATION                                                                          ;
MEASUREMENT - TP/2/A/1200/21                                                                                                !
MEASUREMENT - TP/2/A/1200/21                                                                                                !
l This test was described !.n Sections-10.5 and 11.5 in the                                                                  I Startup Report.- It is complete except for retesting of                                                                      I piping associated with the Diesel Generator Fuel Oil and                                                                    1 Lube Oil systems. Additional restraints were installed
l This test was described !.n Sections-10.5 and 11.5 in the                                                                  I Startup Report.- It is complete except for retesting of                                                                      I piping associated with the Diesel Generator Fuel Oil and                                                                    1 Lube Oil systems. Additional restraints were installed during the EOC-1 refueling outage. However, further modifi-                                                                '
                                                                                                                                          '
during the EOC-1 refueling outage. However, further modifi-                                                                '
cations have been found to be necessary. These modifications involve the replacemant of rigid piping with                                                                  ;
cations have been found to be necessary. These modifications involve the replacemant of rigid piping with                                                                  ;
flexible piping. It has been determined by Desigh                                                                            '
flexible piping. It has been determined by Desigh                                                                            '
Engineering that a Nuclear Station Modification will be necessary to perform this piping replacement. Design work                                                                  i is nearing completion.                                                                                                  '
Engineering that a Nuclear Station Modification will be necessary to perform this piping replacement. Design work                                                                  i is nearing completion.                                                                                                  '
A qualified parts vendor has been determined. Completion of.the test is dependent on these                                                                    i modifications. It is expected that this modification will
A qualified parts vendor has been determined. Completion of.the test is dependent on these                                                                    i modifications. It is expected that this modification will be completed in mid 1990.
* be completed in mid 1990.
i 1
                                                                                                                                          '
                                                                                                                                         .l rgb docl start. doc
                                                                                                                                          ,
:
i
:
                                                                                                                                        .,
                                                                                                                                          !
1
                                                                                                                                         .l
:
:
:
rgb docl start. doc
            ,
                                       --        - . , , - - - - - . - - - - - - - - _ - - - - _ _ - - - _ - - _ _ - - - - - . - - -}}
                                       --        - . , , - - - - - . - - - - - - - - _ - - - - _ _ - - - _ - - _ _ - - - - - . - - -}}

Latest revision as of 15:26, 31 January 2020

Forwards 12th Quarterly Update to Unit Startup Rept for Cycle 1,per Tech Spec 6.9.1.3.Addl Quarterly Updates to Startup Rept Will Be Submitted
ML19332B924
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 11/15/1989
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8911220033
Download: ML19332B924 (2)


Text

y _

-e C Duke 1%uer Cornpany II<t B Tbs ~

.- e PO tht.Ul98 ' , ilce hcsident Charlotte, N C 28242 hutlear1% duction (704)373 4531 DUKEPOWER g November 15, 1989 l

~'

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk F Washington, D.C. 20555 .

'l

Subject:

Catawba Nuclear Station, Unit 2 Docket No. 50-414 Twelfth Quarterly Update to Startup Report ,

Gentlemen:

In accordance with Section 6.9.1.') of the Catawba Nuclear Station Technical  ;

Specifications, please find attached the twelfth qur.rterly update to the ,

Unit 2 Startup Report. As indicated in my August 15, 1989 letter to NRC, one test is not complete. Additional quarterly updates to the Startup i Report will be submitted as required by Technical Specifications.

Very truly yours,  :

t

& /f. r - - - l i

.[

o Hal B. Tucker  !

hHH-6/lcs <

p ,

!- Attachment xc: Mr. S. D. Ebneter Regional Administrator, RII U. S. Nuclear Regulatory Commission c- 101 Marietta Street, NW, Suite 2900 >

Atlanta, Georgia 30301 3

Mr. W. T. Orders NRC Resident Inspector Catawba Nuclear Station s

x 8911220033 691115 4 [(1 DR ADOCK 0500 /

w u

1 I

i

.]

i STARTUP REPORT QUARTERLY UPDATE )

CATAWBA UNIT 2 CYCLE 1 J November 8, 1989  !

TESTING COMPLETED DURING OUARTER d

None.  ;

i STATUS OF TESTING'NOT COMPLETE STEADY STATE PIPING SYSTEMS OPERATIONAL VIBRATION  ;

MEASUREMENT - TP/2/A/1200/21  !

l This test was described !.n Sections-10.5 and 11.5 in the I Startup Report.- It is complete except for retesting of I piping associated with the Diesel Generator Fuel Oil and 1 Lube Oil systems. Additional restraints were installed during the EOC-1 refueling outage. However, further modifi- '

cations have been found to be necessary. These modifications involve the replacemant of rigid piping with  ;

flexible piping. It has been determined by Desigh '

Engineering that a Nuclear Station Modification will be necessary to perform this piping replacement. Design work i is nearing completion. '

A qualified parts vendor has been determined. Completion of.the test is dependent on these i modifications. It is expected that this modification will be completed in mid 1990.

i 1